Beruflich Dokumente
Kultur Dokumente
I PD C
22 COMBINED CYCLE POWER PLANTS
YAZD COMBINED CYCLE POWER PLANT
PROJECT :
System Description
For HRSG LP Section
FOR APPROVAL
04.08.13
D.S KIM
04.08.13
04.08.13
04.07.07
D.S KIM
04.07.07
04.07.07
04.03.10
D.S KIM
04.03.10
FIRST ISSUE
03.12.02
D.S KIM
03.12.02
B.J PARK
03.12.02
DATE
DESIGN
DATE
CHKD
REV
DESIGNATION
MAPNA C o .
( PRIVATE JOINT STOCK )
IRAN POWER PLANT PROJECTS MANAGEMENT Co.
APPROVED
REV.
CONTRACT NO. :
PAGE 1 OF 13
22-0701/BA/TL
ORIGINATOR
DATE
A4
SEQ.
N.
SH.
N.
REV.
MINISTRY O F E N E R G Y
IRAN POWER DEVELOPMENT CO.
I PD C
22 COMBINED CYCLE POWER PLANTS
YAZD COMBINED CYCLE POWER PLANT
PROJECT :
PAGE
REVISION
51
52
53
54
55
56
57
58
10
11
X
X
13
PAGE
12
REMARKS
REVISION
0
REMARKS
59
60
61
62
63
14
64
15
65
16
66
17
67
18
68
19
69
20
70
21
71
22
72
23
73
24
74
25
75
26
76
27
77
28
78
29
79
30
80
31
81
32
82
33
83
34
84
35
85
36
86
37
87
38
88
39
89
40
90
41
91
42
92
43
93
44
94
45
95
46
96
47
97
48
98
49
99
50
100
MAPNA C o .
( PRIVATE JOINT STOCK )
IRAN POWER PLANT PROJECTS MANAGEMENT Co.
REV.
22-0701/BA/TL
PAGE 2 OF 13
ORIGINATOR
A4
SEQ.
N.
SH.
N.
REV.
22 Units
Combined Cycle
Contract No. :
22-0701/BA/TL
SYSTEM DESCRIPTION
FOR HRSG LP SECTION
Originator No. : YZC-A-SP-201-SDE-002-3
Appendix :
Revision :
C
Date : Aug 13.04
DOOSAN
Changwon, KOREA
Page: 3 of 13
CONTENTS
CLAUSE NO.
DESCRIPTION
PAGE NO.
1.0
2.0
OPERATING CONCEPT
2.1
Preparations
2.2
2.3
2.4
3.0
10
4.0
11
5.0
REFERENCE FILE
13
SYSTEM DESCRIPTION
FOR HRSG LP SECTION
22 Units
Combined Cycle
Contract No. :
22-0701/BA/TL
1.0
Revision :
C
Date : Aug 13.04
DOOSAN
Changwon, KOREA
Page: 4 of 13
The low pressure steam system products LP steam of specific quality, which means of
correct pressure and temperature, from the thermal energy contained in the GT
exhaust gas including supplementary firing at duct firing case.. The steam is produced
in the heat recovery steam generator (HRSG) with connections between the feedwater
system and main steam system.
Besides it fulfils the following objective;
l
Delivers feedwater to the low pressure drum during start-up, shutdown and
power operation of the combined-cycle unit
The low pressure system is located downstream of the exhaust gas inlet of the heat
recovery steam generator behind the HP part. The heating surfaces are fabricated from
mainly finned tubes. The low pressure system is subdivided into the following sections,
listed in the order in which exhaust gas flows through them:
l
l
LP superheater
LP evaporator
The LP evaporator generates steam through a natural circulation loop from LP boiler
drum and to LP boiler drum. The LP superheater heats the saturated steam from drum
temperature up to the required conditions.
The LP superheater is cross counter flow heat exchangers and the LP evaporator flow
is cross to the exhaust gas flow. The HRSG is of horizontal design.
The feedwater is fed by LP feedwater pumps from F.W. storage tank(HAD80BB001) to
the LP drum(HAD50BB001).
Water is fed from the LP drum(HAD50BB001) through downcomers to the inlet header
of the LP evaporator.
Water partly evaporates in the LP evaporator and the water/steam mixture is fed via
natural convection in tube risers from the outlet header back to the LP
drum(HAD50BB001). The connecting piping between the outlet header and drum are
distributed uniformly over the length of the drum.
22 Units
Combined Cycle
Contract No. :
22-0701/BA/TL
SYSTEM DESCRIPTION
FOR HRSG LP SECTION
Originator No. : YZC-A-SP-201-SDE-002-3
Appendix :
Revision :
C
Date : Aug 13.04
DOOSAN
Changwon, KOREA
Page: 5 of 13
SYSTEM DESCRIPTION
FOR HRSG LP SECTION
22 Units
Combined Cycle
Contract No. :
22-0701/BA/TL
Revision :
C
Date : Aug 13.04
DOOSAN
Changwon, KOREA
Page: 6 of 13
US STANDARDS
AISI, ANSI, API, ASME, ASNT, ASTM, AWS, EIA, HEI, HIS, IES, IEEE, ISA,
MSS, NEMA, NFPA, OSHA, PFI, SAMA, SSPC, TEMA
1.1.2
SYSTEM DESCRIPTION
FOR HRSG LP SECTION
22 Units
Combined Cycle
Contract No. :
22-0701/BA/TL
2.0
OPERATION CONCEPT
2.1
Preparations
Revision :
C
Date : Aug 13.04
DOOSAN
Changwon, KOREA
Page: 7 of 13
The filling of the system coincides with the start-up procedures described below.
2.2
22 Units
Combined Cycle
Contract No. :
22-0701/BA/TL
SYSTEM DESCRIPTION
FOR HRSG LP SECTION
Originator No. : YZC-A-SP-201-SDE-002-3
Appendix :
Revision :
C
Date : Aug 13.04
DOOSAN
Changwon, KOREA
Page: 8 of 13
Warm start
The same logical sequences as for the cold start apply for preparation for a warm start.
As a matter of principle, however, motorized venting valves(LBB20AA052) remain
closed if a pressure 3 barg prevails in the system. The drain
valves(LBB20AA051,LBB20AA053) may be opened only after it has been assured that
the HRSG is heated and a positive pressure rise has been detected. The motorized
drains(LBB20AA051,LBB20AA053) are closed according the same criteria as with cold
start.
The gas turbine is then run up corresponding to the steam conditions required by the
steam turbine in accordance with the allowable gradients for the heat recovery steam
generator and the steam turbine.
Shutdown and Part-Load Behavior
The main steam temperature starts to rise slightly in the first phase of the GT load
reduction. The main steam temperature drops proportionally to the GT exhaust gas
temperature only when the GT power is reduced further.
The LP system is shut down simultaneously to the GT run down or the closing of the
diverter damper.
For the shutdown of the steam turbine, the turbine inlet valves are closed.
22 Units
Combined Cycle
Contract No. :
22-0701/BA/TL
2.3
SYSTEM DESCRIPTION
FOR HRSG LP SECTION
Originator No. : YZC-A-SP-201-SDE-002-3
Appendix :
Revision :
C
Date : Aug 13.04
DOOSAN
Changwon, KOREA
Page: 9 of 13
The HRSG will be subject to the prevailing gas turbine exhaust gas conditions.
The HRSG will be on-load generating steam in accordance with the heat available in
the gas turbine exhaust gas.
The quantity of feedwater to low pressure system will be controlled by the feed water
control system utilizing the three element control loop.
22 Units
Combined Cycle
Contract No. :
22-0701/BA/TL
2.4
SYSTEM DESCRIPTION
FOR HRSG LP SECTION
Originator No. : YZC-A-SP-201-SDE-002-3
Appendix :
Revision :
C
Date : Aug 13.04
DOOSAN
Changwon, KOREA
Page: 10 of 13
The LP system is protected against exceeding design pressure by spring loaded safety
valves(HAD50AA191,192) positioned on the drum and spring loaded(LBB20AA191) &
power actuated (LBB20AA192) safety valve positioned on Superheater outlet pipe, in
accordance with the code requirements.
The low pressure circulating system is protected against loss of water by monitoring
the drum water level. If the drum water level rises to High-High level, the HRSG and
feedwater pump will be tripped.
The design of the system is based on the applicable codes and standards.
The design pressure is based on the thermodynamic condition of the steam turbine the
safety valve has a fixed setpoint. Design temperature of the system is based on the
maximum possible heat transfer in the LP superheater of the HRSG.
22 Units
Combined Cycle
Contract No. :
22-0701/BA/TL
3.0
SYSTEM DESCRIPTION
FOR HRSG LP SECTION
Originator No. : YZC-A-SP-201-SDE-002-3
Appendix :
Revision :
C
Date : Aug 13.04
DOOSAN
Changwon, KOREA
Page: 11 of 13
To coordinate the automatic switch-over between level control (during start-up) and
3-element control (during normal operation)
To maintain the required start level (slightly higher then setpoint) during start-up in
cooperation with the feedwater level control valves (slightly lower then setpoint)
To avoid water carry-over into the LP superheater by draining water from the LP
drum(HAD50BB001) to the blow down tank, in case the LP drum(HAD50BB001)
level would rise above overflow level.
22 Units
Combined Cycle
Contract No. :
22-0701/BA/TL
4.0
SYSTEM DESCRIPTION
FOR HRSG LP SECTION
Originator No. : YZC-A-SP-201-SDE-002-3
Appendix :
Revision :
C
Date : Aug 13.04
DOOSAN
Changwon, KOREA
Page: 12 of 13
SYSTEM DESCRIPTION
FOR HRSG LP SECTION
22 Units
Combined Cycle
Contract No. :
22-0701/BA/TL
5.0
Revision :
C
Date : Aug 13.04
DOOSAN
Changwon, KOREA
Page: 13 of 13
Reference File
1. MP-YZC-GA-02-HL0-002 : P&ID DIAGRAM FOR LOW PRESSURE SECTION.
2. MP-YZC-GA-04-HN0-001:SYSTEM DESCRIPTION for HP/LP SYSTEM
3. MP-YZC-IM-04-IG0-001 : PROTECTION, LOOP AND LOGIC DESCRIPTION
4. MP-YZC-MA-04-PE0-001 : DESIGN BASIS REPORT
5. MP-YZC-IM-04-IGO-002 : START-UP/SHUT DOWN DESCRIPTION
6. MP-YZC-GA-04-SA0-001 : SYSTEM DESCRIPTION FOR AUXILIARY STEAM
SYSTEM
7. MP-YZC-I1-05-IG0-004 : ALARM / TRIP LIST
8. MP-YZC-MA-08-HA0-001 : SPECIFICATION AND DRAWING FOR DUCT
BURNER
9. MP-YZC-MA-08-HP0002 : SPECIFICATION AND DRAWING FOR DIVERT
DAMPER
10. MP-YZC-BA-09-PGD-001 : O/M MANUAL