EFFECTIVE 05 AUGUST 2014
10%
05%
15%
05%
15%
2.1 Increase
by 10% in the rate sanctioned in this schedule shall be considered for works
in hilly areas declared under GR ] x xVx M xh E.bE1089/|.66/
agencies are to justify the inclusion of this 10% addition in the rates. While framing
estimate for non plan work this provision is not to be used. Inclusion is to be made
only for those works which are distant, inaccessible and this be decided by Executive
Engineer as per site conditions
3. The increase in rates as above should be applicable only one at a time e.g. if jail
premises is situated in corporation areas an increase of 15% for the Jail Premises is to
be considered and not 20%(5%+ 15%)
4. The above percentage shall be applied on the cost of items after deducting the cost of
specified materials as stated below
Basic Rates of Material are as follows :
1
2
3
3a
4
5
6
7
Cement
Mild Steel
T.M.T. Bars FE 500(CRS FE 500 D Tata Tiscon,
HCRM From SAIL)
T.M.T.Bars FE 500 (Other than Tata Tiscon)
Structural Steel
Bitumen in bulk 30/40
Bitumen in bulk 60/70
Bitumen in bulk 80/100
Rs
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
8
9
10
11
Rs.
Rs.
Rs.
Rs.
61758/-per M.T.
58026/- per M.T.
56996/- per M.T.
41707/- per M.T.
Note :
The rates of Bulk, Pack Bitumen, Emulsion, adopted for the item of bituminous work are
based on the rates prevailing on 1/7/2014 at ex-refinery Mumbai. The rates are inclusive of
excise duty 14% additional educational cess 3% on excise duty and VAT 12.50%. Subsequent
increase/decrease if any in these rates shall be accounted in the analysis of the item while
framing estimates.
5. Since the basic rates of materials adopted while preparing the Rate Abstract of items
are as per market rates, which include VAT and all other taxes, no separate provision is
required to be made in the Estimate i.e. rates considered in the DSR are inclusive of VAT
and all other taxes
(As per Govt. in P.W. Departments G.R. No.BDG-2005/324/Bldg-2 dt.3.3.2006)
6. For cost towards procurement and temporary storage of water for construction purpose
provision of 1% in rate analysis is made. In difficult situations where water is not
available in reasonable lead or where water charges are essentially required to be paid to
local authorities etc. assessment of cost of procurement of water for construction may
be made on factual data. If this cost of procurement of water required for construction
is more than 1%, for additional cost (i.e. more than 1%) separate lump sum item may be
added in the estimate and tender papers. For the purpose of estimate for requirement
of water reference may be made to standard text book.
7. As per Govt. Circular No.DSR 1090/CR-6453/ Pln.3 dated 14/07/1993, 1% for labour
amenity is considered while arriving at the rates.
i) As per Govt. in Industries & Power G.R. No.BCA-2009/CR-108/Labour 7-A dated 17-062010, 1% cess on labour welfare is not considered in the DSR while arriving the rate. The
same should be added in the rate analysis while framing the estimates and the amount shall
be deducted from contractors bills as prescribed in the said G.R..
ii) As per revised circular issued by Dy. Directorate of Insurance Maharashtra State vide
letter No.|x-2310/../ /+-3 dated 08/09/2010 below mentioned
percentage for insurance of contract work shall be added in the recapitulation sheet
while framing the estimate as it is not considered in the D.S.R. while arriving at rates
and the amount incurred by Contractors for insurance of work shall be reimbursed on
production of documentary evidence and after checking certification from Divisional
Accountant Officer,
difference in the cost of cement be adjusted according to mix design. (This para shall
be incorporated in tender conditions at appropriate place)
17. The rates for labour and materials are included in the D.S.R. for the purpose of
preparing rate analysis. The labour rates shown against the completed items are
based on minimum labour wages. Whenever the rates for labour, material and
transport are operated separately it should be ensured that the rate so derived, does
not exceed the concerned item rate sanctioned in DSR.
18. For splitting of items while calculating part rate etc. necessary overhead charges,
sundries etc. should be proportionately considered as per rate abstract.
19. References of P.W.D. standard specification M.O.R.T. & H. specification Edition 2012
are mentioned below the description of the items to be treated for guideline purpose
only.
20. Notes about "Approval / Permission" given in the bracket below the wording of item
is only for the guidelines for preparation of estimate / approval / execution purpose.
These wording shall not reflect in estimate as well as in tender document. The
wording of "approval of sample" shall be included in the wording of schedule 'C'.
21. This schedule of rates is applicable for all Building works, Road works, Bridges,
Culverts, Sakav in areas of Ratnagiri / Sindhudurg District only.
22. The head lead is to be considered while preparing detailed rate analysis for
inaccessible areas where shifting of materials by head lead is necessary.
23. The excavation items for building & C.D. works are inclusive of normal dewatering
like manual. If pumping is required another item for dewatering is to be included
while framing the estimate, on BHP basis.
24. BUILDING WORKS :a.
b.
The floor is designated by the space contained between the virgin slabs of floors.
c. The D.S.R. rates of items are applicable for ground floor and first floor works. For
every additional floor, percentage increase in rates shall be considered for the
items as given in the table below without deducting the cost of cement and steel.
Sr. No
I
II
III
IV
V
VI
Floor
Ground Floor
First Floor
Second Floor
Third Floor
Fourth Floor
Further Additional Floor
Percentage Increase
Nil
Nil
1%
2%
3%
1%
The above increase is applicable for items and specifications shown below, wherever
applicable.
Item
Sr. No Specification
1
BD-C
Structural Steel work, Tubular Trusses.
2
BD-F-G-H
R.C.C. Mold Steel, Tor Steel Reinforcement, Brick
Masonry, Stone Masonry, Hume Pipe Tanks.
3
BD-L
External Plastering and Pointing.
4
BD-M
Flooring, Dado, Skirting, Treads (except white glazed,
ceramic and marble tiles)
5
BD-O
External Painting
6
BD-R
Manglore Tiles roof, ridge, ceilings
7
BD-T
Weather sheds, Replacing external window shutters
using scaffolding
8
BD-U
Iron Work
9
BD-V
Soil,waste, Vent and Rain water pipes and mild steel
tanks.
10
BD-W
External Guniting.
d. For the items required to be carried out in the respective floors other than those
specified above, following rates of percentage increase shall be adopted.
Sr No
Floor
Average percentage by which rate is to be increased.
I
II
Second Floor
0.35%
III
Third Floor
0.75%
IV
Fourth Floor
1.20%
Nil
e. The percentage increase to be applied for items like water proofing treatment, storage
f.
g.
h.
[
25 .
tank, parapet wall with coping, stair case, Lift room with slab and plastering, painting
to be carried out in the terrace shall be at the same rates of the floor next below.
R.C.C. Design shall be modified accordingly where, AAC (Autoclaved Aerated Block )
Block masonry is considered for superstructure, as these block are light in weight,
dead load of Masonry shall be considered according to light weight of AAC blocks so
that overall saving may be Achieved in RCC Structure.
The Anti Corrosive Treatment shall not be considered additionally if HCRM (High
Corrosion Resistance Marine) TMT FE 500 from SAIL or FE 500D CRS (Corrosion
Resistance Steel) TMT steel from TATA TISCON is considered while framing the
estimate.
CPVC items shall only be considered in Estimates of Health Department works.
ROAD WORKS, BRIDGES C.D. & SAKAV WORKS
The various rates in the D.S.R. are inclusive of following initial leads (unless
otherwise specifically mentioned in the items)
a)
50
b)
50
c)
For Bituminous construction works no lead for asphalt and 5.00 km. initial
lead for metal/aggregates is considered.
d)
For all items of cement concrete, plain or reinforced cement concrete, stone
masonry the initial lead for metal, sand, stone, cement & steel is considered
as 5.00 km.
e)
For working out items of additional leads more than 5.00 km., the estimate
should be prepared for actual leads by deducting initial lead charges of 5.00
km. for all completed items.
Initial
lead
meters.
26. E.G.S. works like earthwork in embankment, Items following the specifications
mentioned in Rd-13 Page No.194 shall invariably be used while framing the
estimate.
27. The D.S.R. rates for bridge items are for works in normal conditions of site.
Wherever bridges are to be constructed in special site conditions, such as bridge
on creek having tidal effect / in standing water of perennial river, the detailed
rate analysis shall be prepared and the same shall be got approved from the
concerned Superintending Engineer.
28. The rates of R.C.C. pipes shall be adopted as per prevalent MSSIDC rate contract,
for preparation of estimates. (Rate Contract No. NO. MSSIDC/ MRK/ RCT/201314/ DT.4/3/2014)
29. The Anti Corrosive Treatment shall not be considered additionally if HCRM
(High Corrosion Resistance Marine) TMT FE 500 from SAIL or FE 500D CRS
(Corrosion Resistance Steel) TMT steel from TATA TISCON is considered while
framing the estimate.
30. CONCRETE ITEMS.
The rates of Cement concrete items are based on Standard Consumption . For
structural concrete works, minimum grade for plain cement concrete & reinforced
cement concrete shall be adopted as per IS 456-2000. For R.C.C. works Mix design
shall be done as per requirement of IS 456-2000 and IS 10620
31. TRANSPORTATION CHARGES :
Lead charges for various material are given in statement C 1 and these
charges are including loading and unloading charges, hence loading and
unloading charges should not be separately added.
b. Lead charges are given in the statement C-1 for major items such as lime,
murum, earth, building rubble, sand, stone aggregate, soling stone, concrete
blocks, timber, cement, steel, bulk asphalt, bricks, Roofing tiles,all types of
flooring, RCC pipes etc.
c. Statement C-2 is for loading, unloading and stacking charges.
d. Transportation charges of initial lead upto 50 metre is Rs. 31.35/cum.
e. For transportation of bulk/packed bitumen, transportation charges including
heating if required, loading & unloading etc. shall be taken as Rs.8.75 per
M.T./ 1 Km. beyond 200 kms.
f. For H.T.S. Strands transportation charges including loading unloading shall
be taken as Rs.1.50/MT/Km beyond 200 Km.
32. For concrete, masonary & plastering items if Artificial sand, (Crushed sand
approved from laboratory) is considered while framing the estimate, rates
shall be worked out accordingly.
DSR
APPROVED
VIDE
S.E.R.C.
LETTER
NO
RTN/PWC/DB/017/DSR/2014
-2015/ C-156/4851, DT.5th Aug 2014 AND VALID UPTO 4th Aug 2015.
a.
Sd/(A.V.Kamble)
Executive Engineer
Chiplun P.W.Division, Chiplun
Sd/( P.B.Shinde)
Executive Engineer
Sawantwadi P.W.Division,Sawantwadi
( P.V.Valvi)
Executive Engineer
Road Project Division, Ratnagiri
Sd/(Raosaheb S. Bobade)
Superintending Engineer,
Ratnagiri P.W.Circle, Ratnagiri
Item
No.&
Item
code
Description Of Items
Unit
BUILDING WORKS
Bd - A : Excavation
1
Cu.M.
200.00
170.00
Cu.M.
219.00
164.00
Cu.M.
219.00
164.00
Cu.M.
219.00
164.00
Cu.M.
238.00
185.00
Cu.M.
248.00
185.00
Cu.M.
257.00
184.00
Cu.M.
295.00
223.00
Cu.M.
305.00
223.00
B) Hard Murum
Item
No.&
Item
code
2
Description Of Items
Unit
A) Soft Rock
Cu.M.
475.00
425.00
Cu.M.
580.00
542.00
Cu.M.
785.00
545.00
Cu.M.
785.00
575.00
Cu.M.
715.00
582.00
Cu.M.
768.00
690.00
Cu.M.
680.00
225.00
Cu.M.
745.00
235.00
Item
No.&
Item
code
Description Of Items
Unit
Bd. A-10
Bd. A-11
Bd. A-12
92.00
564.00
80.00
978.00
240.00
Item
No.&
Item
code
Description Of Items
Unit
Bd - B : Pile foundation
1
325 mm diameter
R. M.
1505.00
435.00
ii)
350 mm diameter
R. M.
1520.00
450.00
iii)
400 mm diameter
R. M.
1655.00
478.00
iv)
450 mm diameter
R. M.
1875.00
515.00
v)
475 mm diameter
R. M.
1995.00
533.00
vi)
500 mm diameter
R. M.
2125.00
554.00
vii)
525 mm diameter
R. M.
2345.00
575.00
viii)
550 mm diameter
R. M.
2475.00
595.00
ix)
600 mm diameter
R. M.
2780.00
645.00
x)
625 mm diameter
R. M.
3055.00
610.00
xi)
650 mm diameter
R. M.
3215.00
695.00
xii)
750 mm diameter
R. M.
3925.00
810.00
xiii)
800 mm diameter
R. M.
4395.00
875.00
xiv)
825 mm diameter
R. M.
4605.00
905.00
xv)
900 mm diameter
R. M.
5262.00
1015.00
xvi)
975 mm diameter
R. M.
6080.00
1130.00
xvii)
1000 mm diameter
R. M.
6325.00
1170.00
xviii)
1050 mm diameter
R. M.
6840.00
1255.00
Item
No.&
Item
code
Description Of Items
Unit
xix)
1100 mm diameter
R. M.
7420.00
1255.00
Bd. B- 2
xx)
1200 mm diameter
R. M.
8500.00
1255.00
325 mm diameter
R. M.
1535.00
435.00
ii)
350 mm diameter
R. M.
1608.00
450.00
iii)
400 mm diameter
R. M.
1833.00
475.00
iv)
450 mm diameter
R. M.
1910.00
515.00
v)
475 mm diameter
R. M.
2160.00
530.00
vi)
500 mm diameter
R. M.
2185.00
555.00
vii)
525 mm diameter
R. M.
2390.00
575.00
viii)
550 mm diameter
R. M.
2568.00
595.00
ix)
600 mm diameter
R. M.
2845.00
645.00
x)
625 mm diameter
R. M.
3120.00
670.00
xi)
650 mm diameter
R. M.
3290.00
695.00
xii)
750 mm diameter
R. M.
4025.00
810.00
xiii)
800 mm diameter
R. M.
4508.00
875.00
xiv)
825 mm diameter
R. M.
4730.00
910.00
xv)
900 mm diameter
R. M.
5405.00
1015.00
xvi)
975 mm diameter
R. M.
6245.00
1130.00
Item
No.&
Item
code
Description Of Items
Unit
xvii)
1000 mm diameter
R. M.
6500.00
1170.00
xviii)
1050 mm diameter
R. M.
7030.00
1255.00
xix)
1100 mm diameter
R. M.
7632.00
1255.00
Bd. B- 2
xx)
1200 mm diameter
R. M.
8753.00
1255.00
452.00
400.00
Spec.
4
As directed by Engineer-In-Charge.
As directed by Engineer-In-Charge.
a)
R. M.
85.00
9.00
b)
R. M.
97.00
9.00
As directed by Engineer-In-Charge.
a)
Rig
Hour
333.00
333.00
b)
Rig
Hour
444.00
444.00
Carrying out load test for 1.5 times the proposed safe
working load on the pile in driven position upto
______________including construction of test cap, use of
accessories and instruments including providing graphs as
per I.S. code or Std. Specifications and dismantling the cap
etc. and cleaning the site complete.
i)
No.
34452.00
0.00
ii)
No
44828.00
0.00
Item
No.&
Item
code
Description Of Items
Unit
iii)
No
65759.00
0.00
iv)
No
83404.00
0.00
v)
No
105208.00
0.00
vi)
No
124346.00
0.00
vii)
No
158131.00
0.00
297.00
0.00
338.00
0.00
350.00
0.00
388.00
0.00
446.00
0.00
Bd.B-4
Empty boring for 325 to 400 mm dia bored R.C.C. cast in situ Rmt
piles including withdrawal of sheel, removal of earth to a
distance of 50 metres etc. complete.
Spec.
8
As directed by Engineer-In-Charge.
Empty boring for 625 to 700 mm dia bored R.C.C. cast in situ Rmt
piles including withdrawal of sheel, removal of earth to a
distance of 50 metres etc. complete.
Spec.
11
As directed by Engineer-In-Charge.
Empty boring for 525 to 600 mm dia bored R.C.C. cast in situ Rmt
piles including withdrawal of sheel, removal of earth to a
distance of 50 metres etc. complete.
Spec.
10
As directed by Engineer-In-Charge.
Empty boring for 425 to 500 mm dia bored R.C.C. cast in situ Rmt
piles including withdrawal of sheel, removal of earth to a
distance of 50 metres etc. complete.
Spec.
As directed by Engineer-In-Charge.
Empty boring for 725 t0 1050 mm dia bored R.C.C. cast in Rmt
situ piles including withdrawal of sheel, removal of earth to a
distance of 50 metres etc. complete.
Spec.
As directed by Engineer-In-Charge.
Item
No.&
Item
code
Description Of Items
Unit
Bd. C- 1
Bd. C-2
Bd. C-5
70750.00
7998.00
69900.00
7633.00
69500.00
7165.00
Item
No.&
Item
code
Description Of Items
Unit
Bd. C-7
19139.0
0
4.00
1.00
85750.00
8000.00
93000.00
8000.00
As directed by Engineer-In-Charge.
Spec.
80850.00
As directed by Engineer-In-Charge.
Spec.
As directed by Engineer-In-Charge.
Item
No.&
Item
code
Description Of Items
Unit
Bd. E -1
a)
1:5:10
Cu. M.
3677.00
584.00
b)
1:4:8
Cu. M.
4010.00
584.00
c)
1:3:6
Cu. M.
4479.00
584.00
d)
M-15
Cu. M.
5311.00
584.00
e)
M-20
Cu. M.
5605.00
584.00
1:5:10
Cu. M.
3502.00
587.00
b)
1:4:8
Cu. M.
3838.00
587.00
c)
1:3:6
Cu. M.
4274.00
587.00
d)
M-15
Cu. M.
5104.00
587.00
Bd. E -1
e)
M-20
Cu. M.
5399.00
587.00
M-15
Cu. M.
5609.00
587.00
Bd. E -2
b)
M-20
Cu. M.
5897.00
587.00
Item
No.&
Item
code
Description Of Items
Unit
M-15
Cu. M.
5906.00
682.00
Bd. E -3
b)
M-20
Cu. M.
6271.00
682.00
M-15
Cu. M.
5573.00
587.00
Bd. E -4
b)
M-20
Cu. M.
5874.00
587.00
Bd. E -5
a)
M-15
Cu. M.
5780.00
587.00
b)
M-20
Cu. M.
6078.00
587.00
Item
No.&
Item
code
Description Of Items
Unit
M-20
Cu. M.
6034.00
825.00
b)
M-25
Cu. M.
6238.00
821.00
Bd. F -1
C)
M-30
Cu. M.
6443.00
812.00
Bd. F -3
a)
M-20
Cu. M.
6034.00
825.00
b)
M-25
Cu. M.
6238.00
821.00
C)
M-30
Cu. M.
6443.00
822.00
Item
No.&
Item
code
3
Description Of Items
Unit
Bd. F -5
a)
M-20
Cu. M.
7454.00
1052.00
b)
M-25
Cu. M.
7658.00
1052.00
C)
M-30
Cu. M.
7862.00
1052.00
M-20
Cu. M.
8712.00
1421.00
b)
M-25
Cu. M.
8917.00
1421.00
Bd. F -5
C)
M-30
Cu. M.
9120.00
1421.00
Item
No.&
Item
code
Description Of Items
Unit
Bd. F -6
a)
M-20
Cu. M.
7467.00
1359.00
b)
M-25
Cu. M.
7671.00
1359.00
C)
M-30
Cu. M.
7876.00
1359.00
M-20
Cu. M.
8606.00
1802.00
b)
M-25
Cu. M.
8613.00
1802.00
Bd. F -6
C)
M-30
Cu. M.
9016.00
1802.00
M-20
Cu. M.
7893.00
1484.00
b)
M-25
Cu. M.
8107.00
1484.00
Bd. F -8
C)
M-30
Cu. M.
8305.00
1484.00
Bd. F -8
M-20
Cu. M.
9229.00
1914.00
b)
M-25
Cu. M.
9492.00
1914.00
C)
M-30
Cu. M.
9697.00
1914.00
Item
No.&
Item
code
6
Description Of Items
Unit
M-20
Cu. M.
7597.00
1383.00
b)
M-25
Cu. M.
7801.00
1383.00
Bd. F -9
C)
M-30
Cu. M.
8000.00
1383.00
Bd. F -10
M-20
Cu. M.
8026.00
1410.00
b)
M-25
Cu. M.
8230.00
1410.00
C)
M-30
Cu. M.
8435.00
1410.00
Item
No.&
Item
code
Description Of Items
Bd. F -13
Unit
a)
M-20
Cu. M.
7613.00
1484.00
b)
M-25
Cu. M.
8044.00
1484.00
C)
M-30
Cu. M.
8248.00
1484.00
Bd. F -11
M-20
Cu. M.
9272.00
1753.00
b)
M-25
Cu. M.
9469.00
1753.00
C)
M-30
Cu. M.
9609.00
1753.00
Item
No.&
Item
code
Description Of Items
10
Bd. F -16
Unit
a)
M-20
Cu. M.
9615.00
1753.00
b)
M-25
Cu. M.
9754.00
1753.00
C)
M-30
Cu. M.
9827.00
1753.00
11
Bd. F -17
M.S.BAR
M.T.
62250.00
8000.00
b)
M.T.
62975.00
8000.00
c)
TMT Bar FE 500 HCRM from SAIL CRS FE 500 D from M.T.
TATA Tiscon
69265.00
8000.00
Item
No.&
Item
code
Description Of Items
Unit
12
Bd. F -20
13
60.00
BDF-15
M - 20
Cum
8780.00
1230.00
M - 25
Cum
8925.00
1230.00
Item
No.&
Item
code
14
Description Of Items
Unit
Cu.M
9144.00
1750.00
b) M - 25
Cu.M
9349.00
1750.00
Item
No.&
Item
code
15
Description Of Items
Unit
Cu.M
7868.00
1325.00
BdF 14
b) M - 25
Cu.M
8085.00
1325.00
16
Providing and fixing in position in R.C.C. slab during laying Number 61.00
rectangular 2 mm thick M.S. Sheet iron box 180 mm x 100
mm and of required depth with holes or notches as required,
bottom and top lids of 1.6 mm thick M.S. sheet fixed with
3.5 mm dia round head Screwed together with Fan dia.M.S.
bar bent to shape with hooked ends (for fan hooks) as per
standard design including painting to exposed portion
complete.
10.00
17
185.00
69.00
Item
No.&
Item
code
Description Of Items
Unit
Item
No.&
Item
code
Description Of Items
Unit
Bd - G : Brick work
1
Bd. G -1
1a
Providing Fly Ash Brick masonry with conventional / I.S. type Cu. M.
bricks with all surfaces form finished in cement mortar 1:6
in foundations and plinth of inner walls & external walls,
including bailing out water manually, striking joints on
unexposed faces, racking out joints on exposed faces and
watering complete. (Including all leads and lifts. (No extra
lead shall be added.)
Bd. G -1
Bd. G -5
2a
Bd. G -5
4567.00
686.00
7412.00
690.00
5229.00
833.00
7747.00
835.00
Item
No.&
Item
code
Description Of Items
Unit
Bd. G -7
3a
105.00
Sq. M.
1443.00
105.00
Sq. M.
1645.00
105.00
Bd. G -7
5703.00
866.00
Bd. G -10
4a
8050.00
866.00
Item
No.&
Item
code
Description Of Items
Unit
Bd. G -10
Bd. G -10
5a
Bd. G -10
5730.00
866.00
8095.00
866.00
5362.00
839.00
7540.00
839.00
Bd-G-13
Spec.No.: Bd.G.13/Page No.272
6a
Bd-G-13
Item
No.&
Item
code
Description Of Items
Unit
Bd - H : Stone masonry
1
Bd.H. -1
Bd.H. -4
Providing coursed rubble 2nd sort masonry using all stones Cu. M.
of full height in each course of trap stones in cement mortar
1:6 in external walls of plinth, including striking joints,
raking out joints, watering.
Bd.H.-11
Providing coursed rubble 2nd sort masonry using all stones Cu. M.
of full height in each course of trap stones in cement mortar
1:6 in superstructure, including racking out joints when
plastering is to be done / striking out joints, watering and
scaffolding.
2874.00
380.00
3026.00
419.00
4893.00
605.00
5277.00
605.00
4789.00
636.00
Bd. H.-14
Item
No.&
Item
code
Description Of Items
Unit
Providing coursed rubble masonry 1st sort for piller of trap Cu. M.
stones in cement mortar 1:6 including pointing with cement
mortar 1:3 scaffolding and watering etc. complete.
Bd. H.-30
Bd. H. -7
Bd.H-18
Bd-H-19
10
3232.00
773.00
3031.00
422.00
4103.00
1250.00
4542.00
1623.00
1045.00
105.00
Item
No.&
Item
code
Description Of Items
Unit
Bd - I : Block masonry
1
Bd. I. -1
Bd. I. -1
Spec.
480.00
145.00
798.00
255.00
5858.00
562.00
As directed by Engineer-In-Charge.
UNITS
SIZES
Size
mm
Thickness
mm
Compressive Strength
N/mm2
Item
No.&
Item
code
Description Of Items
Unit
Kg/m3
550 - 650
Sound Absorption
Db
upto 42
Fire Resistance
Hrs
4*
w/m2k
0.16
Thermal Resistance
K-m2/W
0.46
w/m2k
2.13
Drying shrinkage
0.04%
(Of the length of
block)
Volume of block
75 x 240 x 625
0.0113
88.49
0.015
66.66
0.0188
53.19
0.0225
44.44
0.03
33.33
0.034
29.41
Item
No.&
Item
code
Description Of Items
Unit
Bd - J : WATER PROOFING
1
Bd. J. -2
Bd. J. -2
Bd. J. -3
As directed by Engineer-In-Charge.
282.00
29.00
445.00
28.00
110.00
11.00
125.00
39.00
Item
No.&
Item
code
5
Description Of Items
Spec.
6
280.00
285.00
33.00
61.00
53.00
280.00
99.00
As directed by Engineer-In-Charge.
880.00
As directed by Engineer-In-Charge.
Spec.
As directed by Engineer-In-Charge.
Spec.
7
Unit
As directed by Engineer-In-Charge.
Item
No.&
Item
code
Description Of Items
10
3390.00
2095.00
170.00
90.00
357.00
35.00
385.00
0.00
As directed by Engineer-In-Charge.
As directed by Engineer-In-Charge.
11
Unit
As directed by Engineer-In-Charge.
12
Item
No.&
Item
code
Description Of Items
Unit
309.00
0.00
710.00
0.00
795.00
200.00
Spec.
13
As directed by Engineer-In-Charge.
Item
No.&
Item
code
Description Of Items
Unit
484.00
95.00
612.00
137.00
Item
No.&
Item
code
Description Of Items
Unit
223.00
88.00
980.00
170.00
Item
No.&
Item
code
Description Of Items
Unit
1050.00
200.00
Item
No.&
Item
code
Description Of Items
Unit
or as per site condition & filling the joints with polt sulphide
ealant(0.08 kg per sq.mt.) after curing, including providing
holler with drip moulds at the junction and finishing
theconcrete surface with neat cement slurry including curing
as directed and ponding the surface as directed etc.
complete; covering 10 years guarantee against
leakproofness on Court Fee Stamp Paper of Rs. 100/(Note
:
for
slanting
length
upto
5.0
m)
(Excluding grouting and Removing existing treatment
to
be
paid
separately
as
required)
Spec. No. As directed by Engineer-incharge and as per
manufacturers specifications.
895.00
145.00
Item
No.&
Item
code
Description Of Items
Unit
933.00
176.00
Item
No.&
Item
code
Description Of Items
Unit
1050.00
269.00
Item
No.&
Item
code
Description Of Items
Unit
600.00
110.00
10
270.00
65.00
Item
No.&
Item
code
11
Description Of Items
Unit
80.00
Item
No.&
Item
code
Description Of Items
Unit
Bd - K : Expansion Joints
1
Bd.K-1A
Bd.K.-1B
Bd.K.-1A
Bd.K -1A
As directed by Engineer-In-Charge.
1822.00
163.00
2475.00
215.00
2818.00
248.00
4650.00
429.00
138.00
50.00
Item
No.&
Item
code
Description Of Items
Unit
Bd.L.-1
Sq.M
113.00
58.00
b)
Sq.M
117.00
58.00
Bd.L.-2
Sq. M.
167.00
80.00
b)
Sq.M
155.00
80.00
c)
Sq.M
147.00
80.00
238.00
113.00
247.00
164.00
Bd.L.-3
Bd.L.-4
Sq. M.
Item
No.&
Item
code
Description Of Items
b)
Unit
Sq. M.
233.00
164.00
309.00
173.00
Bd.L.-5
407.00
192.00
Bd. L. -7
335.00
167.00
Bd.L.-8
Item
No.&
Item
code
Description Of Items
Unit
Bd.L.-9
Bd.L.-10
10
Bd.L.-10
11
Bd.L.-11
12
Bd.L.-19
200.00
21.00
8.00
35.00
14.00
369.00
190.00
106.00
81.00
Item
No.&
Item
code
Description Of Items
Unit
13
Bd.L -19
14
Bd.L.-16
15
Bd.L.-17
16
Bd.L-18
17
72.00
162.00
129.00
125.00
101.00
99.00
65.00
662.00
190.00
103.00
47.00
As directed by Engineer-In-Charge.
18
Bd L 1
Item
No.&
Item
code
19
Description Of Items
Unit
5.00
20
21
Rmt
9.00
4.00
b)100 mm Wide.
Rmt
13.00
5.00
c)150 mm Wide.
Rmt
20.00
8.00
84.00
27.00
56.00
30.00
22
Item
No.&
Item
code
Description Of Items
Unit
Providing and laying rough Shahabad Stone Flooring --------------------- and 30cm wide in plain/diamond pattern on a bed
of cement mortar 1:6 including cement float, pointing in
cement mortar 1:3, curing and cleaning etc. complete.
Bd.M.-1
Sq. M.
446.00
102.00
418.00
78.00
Bd.M.-1
Bd.M.-3
502.00
92.00
40 cm. x 55 cm.
Bd.M.-3
18 to 25 mm
Sq. M.
990.00
169.00
b)
25 to 30 mm
Sq. M.
1210.00
169.00
Item
No.&
Item
code
Description Of Items
Unit
Bd.M.-5
Bd.M.-5
591.00
115.00
a) 18 mm to 20mm
Sq. M.
1045.00
176.00
b) 25 mm to 30mm
Sq. M.
1320.00
187.00
Bd M.-6
a)
40mm
Sq. M.
349.00
107.00
b)
50mm
Sq. M.
364.00
110.00
Item
No.&
Item
code
Bd.M.-6
Description Of Items
Unit
40mm
Sq. M.
353.00
110.00
b)
50mm
Sq. M.
390.00
110.00
Providing and laying white glazed tiles of --------------------------in size and 5 to 6 mm thick for flooring in required
positions and laid on a bed of cement mortar 1:4 including
neat cement float, filling joints with white cement slurry,
curing and cleaning complete. (Including all specials required
like round edge titles, corner cups ,etc.) (with white cement)
Bd.M-12
148.5x148.5mm
Sq. M.
690.00
210.00
b)
200x100mm
Sq. M.
705.00
210.00
10
Providing and laying coloured glazed tiles of --------------------in size and 5 to 6 mm thick for flooring in required positions
and laid on a bed of cement mortar 1:4 including neat
cement float, filling joints with white cement slurry, curing
and cleaning complete. (Including all specials required like
round edge titles, corner cups, etc)
Bd.M.-12
148.5x148.5mm
Sq. M.
750.00
199.00
b)
200x100mm
Sq. M.
750.00
199.00
Sq. M.
750.00
230.00
11
Bd.M-13
148.5x148.5mm
Item
No.&
Item
code
Description Of Items
b)
200x100mm
12
Providing and fixing coloured glazed tiles of ----------------------- in size and 5 to 6 mm thick for dado and skirting in
required positions on plaster of cement mortar 1:4 including
neat cement float, including filling joints with white cement
slurry, curing and cleaning complete. (Including all specials
required like round edge titles, corner cups, etc)
Bd.M-13
Unit
Sq. M.
750.00
230.00
a)
148.5x148.5mm
Sq. M.
807.00
248.00
b)
200x100mm
Sq. M.
785.00
248.00
13
Bd.M.-12
30x30cm.
Sq. M.
790.00
210.00
b)
20x20cm.
Sq. M.
740.00
210.00
14
Bd.M-13
30x30cm.
Sq. M.
810.00
230.00
b)
20x20cm.
Sq. M.
760.00
230.00
Item
No.&
Item
code
Description Of Items
15
Bd.M.-14
Unit
a)
Sq. M.
407.00
114.00
b)
Sq. M.
496.00
113.00
16
Bd.M.-15
Sq. M.
417.00
143.00
b)
Sq. M.
520.00
150.00
17
Bd.M.-16
Sq. M.
2490.00
452.00
b)
Sq. M.
2241.00
452.00
Item
No.&
Item
code
Description Of Items
18
Bd.M-17
Unit
a)
Sq. M.
2470.00
482.00
b)
Sq. M.
2222.00
482.00
501.00
132.00
463.00
233.00
370.00
183.00
19
Bd.M-18
20
Providing and laying in situ marble mosaic tiles for dado Sq. M.
and skirting 6 mm thick with white and coloured marble
chips of size upto with suitable panels on cement plaster
1:3, 20 mm thick including aluminium strips for forming
panels,rounding of corners and junctions with flooring and
walls, curing, polishing and cleaning complete.
Bd.M-19
21
Bd.M-20
Item
No.&
Item
code
Description Of Items
22
Bd.M.-22
23
Unit
Kota
i) 25 mm to 30mm
Sq. M.
1437.00
297.00
ii) 18 mm to 25mm
Sq. M.
1124.00
297.00
b)
Sq. M.
946.00
205.00
Black Kadappa
24
a)
Sq. M.
590.00
150.00
b)
Sq. M.
620.00
150.00
i) 25 mm to 30mm
Sq. M.
1318.00
244.00
ii) 18 mm to 20mm
Sq. M.
1029.00
244.00
Kota
Item
No.&
Item
code
Description Of Items
b)
25
Black Kadappa
Unit
Sq. M.
826.00
193.00
i) 20 mm
Sq. M.
2614.00
252.00
ii) 18 mm to 20mm
Sq. M.
2286.00
252.00
i) 20 mm
Sq. M.
1983.00
252.00
ii) 15 mm to 20mm
Sq. M.
1735.00
252.00
869.00
230.00
930.00
234.00
A) Perfect white
26
Bd.M.-35
27
As directed by Engineer-In-Charge.
Item
No.&
Item
code
28
Description Of Items
29
31
49.00
50.00
36.00
703.00
266.00
730.00
266.00
As directed by Engineer-In-Charge.
Spec.
95.00
As directed by Engineer-In-Charge.
Spec.
As directed by Engineer-In-Charge.
Spec.
30
Unit
As directed by Engineer-In-Charge.
Item
No.&
Item
code
32
Description Of Items
Spec.
33
Unit
814.00
277.00
850.00
277.00
As directed by Engineer-In-Charge.
Spec.
As directed by Engineer-In-Charge.
Item
No.&
Item
code
34
Description Of Items
859.00
277.00
983.00
277.00
215.00
65.00
446.00
111.00
468.00
111.00
As directed by Engineer-In-Charge.
Spec.
37
As directed by Engineer-In-Charge.
36
Spec.
35
Unit
As directed by Engineer-In-Charge.
Item
No.&
Item
code
Description Of Items
Spec.
Unit
As directed by Engineer-In-Charge.
38
Bd M 4
39
Bd M 8
40
Bd M 9
41
Bd M 10
557.00
111.00
396.00
99.00
495.00
154.00
429.00
99.00
Item
No.&
Item
code
Description Of Items
Unit
42
Bd M 11
43
154.00
Sq. M.
2946.00
277.00
Bd M 16
2282.00
277.00
44
Sq. M.
3015.00
298.00
2337.00
298.00
Item
No.&
Item
code
45
Description Of Items
Unit
Sq. M.
3239.00
454.00
Bd M 31
Sq. M.
3239.00
475.00
46
2245.00
144.00
2874.00
194.00
503.00
99.00
396.00
154.00
49
Providing and laying plain cement tiles for treads and risers Sq.M.
of steps and staircases with nosing of treads moulded as per
drawings or as directed on a bed of C.M. 1:4 including
cement float filling joints with neat cement slurry, curing,
Item
No.&
Item
code
Description Of Items
Unit
50
Bd M 24
51
Bd M 25
52
Bd M 25
440.00
165.00
476.00
193.00
460.00
140.00
Item
No.&
Item
code
53
Description Of Items
Unit
Sq.M.
2349.00
269.00
Bd M 26
1828.00
274.00
54
937.00
269.00
Bd M 40
55
Providing and fixing 20 mm to 25 mm thick polished -----stone on parapet wall of terrace, staircase, etc. on plane,
leveled, top surface, including cleaning top surface, fixing
with ready made adhesive, screws for fixing stones, rounding
corners, finishing etc. complete.
141.00
9.00
206.00
9.00
303.00
9.00
77.00
9.00
107.00
9.00
164.00
9.00
305.00
9.00
483.00
9.00
734.00
9.00
218.00
8.00
Sq.M.
Item
No.&
Item
code
56
Description Of Items
Unit
348.00
8.00
523.00
8.00
Sq.M.
800.00
95.00
b) Skirting
Sq.M.
951.00
150.00
a) Flooring
Sq.M.
1046.00
95.00
b) Skirting
Sq.M.
1199.00
150.00
a) Flooring
Sq.M.
1323.00
95.00
b) Skirting
Sq.M.
1460.00
150.00
a) Flooring
Sq.M.
1654.00
95.00
b) Skirting
Sq.M.
1785.00
150.00
B) Matt/finish
57
600.00
66.00
58
790.00
390.00
Item
No.&
Item
code
Description Of Items
Unit
A) M-20 Concrete
Cum
6526.00
1715.00
B) M-25 Concrete
Cum
6665.00
1715.00
Item
No.&
Item
code
Description Of Items
Unit
Bd - N : WOOD FINISHES
1
One coat
Sq. M.
13.00
6.00
Bd.N.-1.1
b)
Two coat
Sq. M.
17.00
7.00
29.00
19.00
Bd.N-1.2
Providing and applying Wax polishing to the old wood work, Sq. M.
including knotting, preparing the surface, scaffolding etc.
complete as directed.
20.00
12.00
Bd.N-1.2
43.00
19.00
Bd.N-1.3
88.00
39.00
Bd.N-1.3
17.00
9.00
Bd.N-1.4
Item
No.&
Item
code
Bd.N-1.6
Description Of Items
Unit
One coat
Sq. M.
9.00
4.00
b)
Two coat
Sq. M.
20.00
6.00
677.00
319.00
42.00
21.00
As directed by Engineer-In-Charge.
Bd.N-1.4
11
Bd.N.-1.3
No.
128.00
32.00
No.
102.00
25.00
No.
128.00
32.00
No.
64.00
15.00
No.
81.00
20.00
No.
51.00
13.00
No.
140.00
35.00
No.
51.00
13.00
Table (Big)
No.
165.00
42.00
10
Table (Small)
No.
153.00
39.00
11
Tray Wooden
No.
26.00
7.00
12
Writing Desk
No.
151.00
37.00
13
No.
128.00
32.00
Item
No.&
Item
code
Description Of Items
Unit
14
Dinning Table
No.
140.00
35.00
15
No.
51.00
13.00
16
No.
345.00
87.00
17
No.
153.00
39.00
18
No.
110.00
28.00
19
Side Board
No.
39.00
10.00
20
Ward Rope
No.
191.00
47.00
21
Sofa Set
No.
128.00
32.00
22
No.
191.00
48.00
23
No.
140.00
35.00
24
No.
102.00
25.00
25
Central Table
No.
102.00
25.00
26
Easy Chair
No.
102.00
25.00
27
No.
179.00
45.00
28
No.
268.00
67.00
29
Dressing Table
No.
140.00
35.00
30
No.
102.00
25.00
31
Towel Horse
No.
46.00
11.00
32
No.
51.00
13.00
33
Takht Wooden
No.
140.00
35.00
34
No.
128.00
32.00
35
Chest of Drawers
No.
140.00
35.00
36
Letter Box
No.
36.00
9.00
37
No.
102.00
25.00
38
Comode
No.
56.00
14.00
39
Shoe Rack
No.
51.00
13.00
40
No.
102.00
25.00
41
No.
179.00
45.00
42
No.
128.00
32.00
Item
No.&
Item
code
Description Of Items
Unit
43
Pelmet
No.
36.00
9.00
44
Peg Rail
No.
15.00
3.00
45
No.
102.00
25.00
46
No.
64.00
17.00
47
Name Board
No.
13.00
3.00
48
Photo Frame
No.
15.00
4.00
49
No.
46.00
11.00
50
Pot
No.
26.00
7.00
51
No.
178.00
44.00
52
No.
46.00
11.00
53
No.
95.00
23.00
Item
No.&
Item
code
Description Of Items
Unit
Bd - O : OIL PAINTING
1
Bd.O.-1.
Two coat
Bd.O.-3.
Two coat
Bd.O.-4.
One coat
Bd.O-6.
Two coat
Sq. M.
59.00
18.00
Sq. M.
61.00
16.00
Sq. M.
54.00
12.00
Sq. M.
50.00
16.00
Item
No.&
Item
code
Bd.O-7.
Description Of Items
Bd.O.-8.
65.00
18.00
Two coat
Sq. M.
41.00
19.00
b)
Three
coat
Sq. M.
47.00
24.00
14.00
12.00
23.00
10.00
19.00
8.00
As directed by Engineer-In-Charge.
Sq. M.
a)
Spec.
8
Unit
As directed by Engineer-In-Charge.
As directed by Engineer-In-Charge.
Item
No.&
Item
code
10
Description Of Items
Unit
10.00
84.00
25.00
31.00
12.00
48.00
16.00
As directed by Engineer-In-Charge.
11
Bd O 1
12
Providing and applying one coat of lead/zinc base oil paint Sq.M.
of approved colour and shade to old wood work previously
painted and fibre boards including preparing the surface, if
necessary scaffolding, including primer coat complete.
(Sample and brand is to be got approved from Ex. Engineer
before use)
Bd O 2
13
Providing and applying two coats of lead/zinc base oil paint Sq.M.
of approved colour and shade to old wood work and fibre
boards previously painted including preparing the surface, if
necessary scaffolding, including primer coat complete.
(Sample and brand is to be got approved from Ex.Engineer
before use)
Bd O 2
Item
No.&
Item
code
Description Of Items
Unit
14
Providing and applying three coats of lead / zinc base of oil Sq.M.
paint of approved colour and shade on old wood work
previously painted and fibre boards, including preparing the
surface, if necessary scaffolding including primer coat etc.
complete.(Sample and brand is to be got approved from Ex.
Engineer before use)
Bd O 2
15
Bd O 3
16
Bd O 4
17
Bd O 4
24.00
84.00
25.00
79.00
16.00
97.00
20.00
Item
No.&
Item
code
Description Of Items
Unit
18
Bd O 5
19
20.00
53.00
20.00
84.00
24.00
35.00
11.00
Bd O 5
21
Providing and applying one coat of flat oil paint of approved Sq.M.
colour to the old structural steel work and iron work
previously painted in building including scaffolding, if
necessary, cleaning and preparing surface including primer
coat complete. (Sample and brand is to be got approved
from Ex. Engineer before use)
Bd O 6
Item
No.&
Item
code
Description Of Items
Unit
22
Bd O 6
23
Providing and applying one coat of flat oil paint of approved Sq.M.
colour and shade to internal/External plastered surfaces
including scaffolding if necessary, cleaning and preparing the
surface including primer coat complete. (Sample and brand
is to be got approved from Ex. Engineer before use)
Bd O 7
24
Bd O 8
25
24.00
34.00
11.00
40.00
17.00
59.00
26.00
Item
No.&
Item
code
Description Of Items
Unit
Bd. P. -1.
Bd. P. -2.
7.00
7.00
a)
Two coat
Sq. M.
10.00
8.00
b)
Three
coat
Sq. M.
12.00
11.00
Bd. P. -3.
Two coat
Sq. M.
8.00
8.00
b)
Three
coat
Sq. M.
14.00
11.00
Bd.P.-6.
Two coat
Sq. M.
76.00
36.00
b)
Three
coat
Sq. M.
86.00
37.00
Item
No.&
Item
code
Description Of Items
Bd P 1
Bd P 2
Bd P 3
Unit
Sq. M.
5.00
4.00
Sq. M.
6.00
4.00
Sq. M.
6.00
4.00
Sq. M.
25.00
8.00
Sq. M.
28.00
10.00
Sq. M.
41.00
24.00
Sq. M.
44.00
24.00
Bd P 5
Item
No.&
Item
code
Description Of Items
Bd P 5
10
Unit
Sq. M.
114.00
48.00
Sq. M.
120.00
54.00
Sq. M.
2.00
2.00
11
Item
No.&
Item
code
Description Of Items
Unit
Bd - Q : WOOD WORK
1
Bd. Q. -4.
Cu. M.
104720.00
13031.0
0
b)
Hard wood
Cu. M.
57053.00
14295.0
0
Bd. Q. -5
Cu. M.
104600.00
5580.00
b)
Hard wood
Cu. M.
57053.00
7234.00
Bd.Q.-19
Rmt
534.00
55.00
b)
Hard wood
Rmt
323.00
61.00
Bd.Q.-21
Rmt
690.00
85.00
b)
Hard wood
Rmt
373.00
91.00
Item
No.&
Item
code
Description Of Items
Unit
Bd. Q. -8
866.00
184.00
325.00
37.00
360.00
39.00
3297.00
838.00
1994.00
916.00
1128.00
112.00
As directed by Engineer-In-Charge.
As directed by Engineer-In-Charge.
Bd.Q.-11
10
Item
No.&
Item
code
Description Of Items
Unit
Bd.Q-18
11
1832.00
559.00
2041.00
652.00
1639.00
348.00
3630.00
793.00
2858.00
539.00
As directed by Engineer-In-Charge.
12
Bd.Q.-11
13
Bd.Q.-13
14
Providing and fixing double leaf steel shutter with frame to Sqm
wall cupboard of 18 gauge M.S.sheet as per standard
drawing including oxidised fixtures and fastenings with
locking arrangment including G.I.Sheet shelves at 40 cm
center to center including primer coat and three coats of
enamel paint of approved colour and pattern finishing fixing
in position complete.
Spec.No.: As directed by Engineer- in-charge.
15
Providing and fixing double leaf steel shutter with frame to Sqm
wall cupboard of 18 gauge M.S.sheet as per standard
drawing including oxidised fixtures and fastenings with
locking arrangement excluding shelves, including primer
coat and three coats of enamel paint of approved colour and
pattern, finishing fixing in position complete.
Item
No.&
Item
code
16
Description Of Items
Unit
934.00
213.00
77.00
18.00
130.00
12.00
Bd Q 22
18
Providing and fixing 100 mm dia. Country teak wood ballies Rmt
for post truss of 6.00 m. span as per drawing or as directed
by Engineer- in-charge including all iron work, scaffolding if
necessary and oiling complete.
Bd Q 23
19
BDQ-24
a) 40mm size
Rmt
141.00
35.00
b) 50mm size
Rmt
158.00
35.00
Item
No.&
Item
code
20
Description Of Items
Unit
275.00
Item
No.&
Item
code
Description Of Items
Unit
Providing and fixing Mangalore tiled roofing with class "AA" Sq.M.
tiles , including fixing 50 x 25 mm horizontal teak wood
battens, all iron work and oiling the battens and securing the
last course of tiles near the eaves with mild steel flats of 40 x
3 mm or 10 mm dia.steel rod and 1.22 mm thick wire
plaining the underside of battens including scaffolding if
necessary etc. complete. (excluding ridge and hip tiles)
Bd R. -1
Providing and fixing Mangalore tiled roofing with class "AA" Sq.M.
tiles , including securing the last course of tiles near the
eaves with steel flats of 40 x 3 mm and fixing by 112 mm
long screw and fixing of 50mm x 25mm country teak wood
sloping battens and fixing 50 x 25 mm country teak wood
horizontal battens over the sloping battens including
painting to all iron work and coal tarring the battens
complete. (excluding ridge and hip tiles)
Bd. R. -2
Providing and fixing new Mangalore tiles with "AA" tiles Sq.M.
including scaffolding to M.T. rooffing excluding wood work.
etc. complete.
Spec.
635.00
55.00
635.00
59.00
279.00
21.00
156.00
60.00
682.00
41.00
As directed by Engineer-In-Charge.
Providing and fixing Mangalore type ridge and hip tiles class R.M.
"AA" tiles, including scaffolding if necessary, pointing with
coloured cement mortar and curing complete.
Bd. R. -3
Bd. R. -5
Item
No.&
Item
code
Description Of Items
Unit
Bd. R. -5
Bd. R. -6
Bd. R. -7
Bd. R. -7
10
Bd. R. -9
11
44.00
612.00
70.00
446.00
68.00
432.00
41.00
306.00
86.00
Item
No.&
Item
code
Description Of Items
Unit
12
a)
120cm.
R.M.
2750.00
196.00
b)
90cm.
R.M.
2087.00
144.00
205.00
68.00
67.00
47.00
87.00
36.00
397.00
35.00
152.00
47.00
98.00
22.00
13
Providing and fixing 12 mm dia. mild steel bar upto 0.5 No.
metre length for anchor rods with necessary threading nuts
and bolts etc. complete.
Spec.
14
As directed by Engineer-In-Charge.
15
As directed by Engineer-In-Charge.
As directed by Engineer-In-Charge.
16
Bd.R.-14
17
Bd.R.-13
Item
No.&
Item
code
18
19
Description Of Items
Unit
As directed by Engineer-In-Charge.
a)
50x25mm.
Rmt
91.00
8.00
b)
25x12mm.
Rmt
51.00
5.00
1396.00
63.00
1190.00
105.00
1320.00
159.00
744.00
70.00
As directed by Engineer-In-Charge.
20
Bd.R.-16
21
Bd.R.-17
22
Bd.R.-18
Item
No.&
Item
code
23
Description Of Items
Unit
174.00
1405.00
153.00
54.00
21.00
24.00
15.00
789.00
146.00
Bd.R.-19
25
26
27
As directed by Engineer-In-Charge.
As directed by Engineer-In-Charge.
As directed by Engineer-In-Charge.
Item
No.&
Item
code
28
Description Of Items
Unit
752.00
1511.00
138.00
30
Sq.M.
641.00
77.00
Sq.M.
689.00
77.00
1778.00
215.00
31
Item
No.&
Item
code
Description Of Items
Unit
Providing & Fixing Manglore tiled roofing with Class AA tiles Sq.M.
including fixing (25 x 25 x 5mm) horizontal M.S. Angle
battens, all iron work and oil painiting to angle battens &
securing the last course of tiles near the eaves with M.S.flat
of 40mm x 3mm or 10mm dia steel rods and 1.22mm wire
including scafolding if necessary etc complete.
794.00
77.00
9108.00
115.00
34
769.00
41.00
734.00
31.00
543.00
55.00
35
36
Item
No.&
Item
code
37
Description Of Items
Unit
2846.00
504.00
3099.00
504.00
3656.00
504.00
Item
No.&
Item
code
Description Of Items
Unit
38
39
49.00
Item
No.&
Item
code
Description Of Items
Unit
a)
Sq. M.
968.00
49.00
b)
Sq.M.
1032.00
49.00
1668.00
334.00
0.00
Item
No.&
Item
code
Description Of Items
Unit
Bd. T. -2
a)
Cu.M.
131249.00
13856.0
0
b)
Cu.M.
63628.00
13856.0
0
376.00
89.00
373.00
85.00
Providing and fixing in position precast R.C.C. (as per IS 456- Rmt
2000) M-40 frames for doors / windows / louver windows
of section 125 x 50 mm with two tor steel bars of 8 mm / 10
mm diameter for compressed stength of 300 kg/squere
centimetre with wood like finish having 3 numbers of 12
guage M.S. galvanised plates on verical members for fixing
hinges with 4 numbers of threaded holes in each plate, 2
numbers of 12 mm dia holes on horizontal top members for
tower bolts, 2 numbers of 16 mm dia holes on vertical
members for fixing Aldrop or Tadi, 3 numbers of M.S.
galvanised heavy duty hings with 12 numbers G.I. machine
secrews of 3/16" x 3/8", 6 numbers of M.S. galvanised
specially designed hold fast anchored with tor steel bars of
vertical members etc. complete (with all lead) Excluding
painting to the frame.
Spec.
3
As directed by Engineer-In-Charge.
As directed by Engineer-In-Charge.
Item
No.&
Item
code
4
Description Of Items
3524.00
605.00
3345.00
97.00
2627.00
376.00
As directed by Engineer-In-Charge.
Solid Panel PVC Door providing 30mm thick factory made Sq.M.
from rigid foam panelled door shutter and approved
manufacturer made from M.S. Tube of 19 guage thickness
size 19mm x 19mm fro styles and 15 x 15 mm for the top
and bottom rails, M.S. frame shall be covered with heat
moulded PVC 'C" channel of 5mm thick sheet and 30 x
50mm wide to form styles and 5mm thick and 75 mm wide
PVC sheet for the top rail, lock rail and bottom rail on either
side and 5mm thick 20mm wide cross PVC sheet as gap
insert for the top rail and bottom rail. Panelling of 5mm thick
PVC sheet fitted in the M.S. Frame welded/Sealed to the
styles and rails with 5 x 30mm PVC sheet beading on either
side and joined together with solvent cement adhesive etc.
complete as per direction of Engineer-in-Charge, fixed to
frames with 4 Nos. M.S. Powder coated bull hinges (for W.C.
and bathroom shutters)
Spec.
As directed by Engineer-In-Charge.
Spec.
5a
Unit
As directed by Engineer-In-Charge.
Item
No.&
Item
code
5b
Description Of Items
Providing and fixing 30mm thick FACTORY MADE BOTH SIDE Sq.M.
PRELAM SOLID PANEL PVC DOOR SHUTTER consisting of
frame made out M.S. Tubes of 19 gauge thickness and size of
19mm x 19mm for stiles, top and bottom rails. M.S. frame
shall have a cost of steel primers of approved make and
manufacture M.S. frame covered with 5mm thick heat
moulded Prelam PVC 'C' channel of size 30mm thickness,
70mm width out of which 50mm shall be flat and 20mm
shall be tapered in 45 degree angle on either side forming
stiles; and 5mm thick, 95mm wide Prelam PVC sheet out of
which 75 mm shall be flat and 20mm shall be tapered in 45
degree on the inner side to form top and bottom rail and
115mm wide Prelam PVC sheet out of which 75 mm shall be
flat and 20mm shall be tapered on both sides to form lock
rail. Top, bottom and lock rail shall be provided either side of
the panel, 10mm (5mm x 2) thick, 20mm wide cross PVC
shall be provided as gap insert for top rail and bottom rail.
Panelling of 5mm thick both side Prelam PVC sheet to be
fitted in the M.S. Frame welded/sealed to the stiles and rails
with 7mm (5mm +2mm) thick x 15mm wide PVC sheet
beading on inner side, and joined together with solvent
cement adhesive etc. An additional 5mm thick PVC strip of
20mm width is to be stuck on the interior side of the 'C'
Channel using PVC solvent cement adhesive etc. complete as
per direction of Engineer-in-Charge, manufacturer's
specification & drawing .
Spec.
Unit
376.00
2290.00
546.00
2663.00
196.00
As directed by Engineer-In-Charge.
Providing and fixing 18 guage M.S. sheet door with frame Sqm
work 40 x 40 x 6 mm M.S. Angle including locking
arrangements, hold fast including applying anticorrossive
primer coat of red lead paint and 2 coats of oil paint
complete.
Spec.No.: As directed by Engineer- in-charge.
Item
No.&
Item
code
Description Of Items
Unit
3593.00
196.00
Bd. T. -7
a)
Sq.M.
7791.00
1109.00
b)
Sq.M.
6809.00
1109.00
c)
Sq.M.
6605.00
1109.00
Item
No.&
Item
code
10
Description Of Items
a)
Sq.M.
7802.00
1061.00
b)
Sq.M.
6364.00
1061.00
c)
Sq.M.
5905.00
1061.00
Bd. T. -8
11
Bd. T. -11
Unit
a)
Sq.M.
7107.00
994.00
b)
Sq.M.
5442.00
994.00
c)
Sq.M.
4922.00
994.00
Item
No.&
Item
code
12
Description Of Items
a)
Sq.M.
5741.00
849.00
b)
Sq.M.
4305.00
849.00
c)
Sq.M.
3845.00
849.00
Bd. T. -12
13
Bd.T.-21
Unit
a)
Sq.M.
6362.00
918.00
b)
Sq.M.
5221.00
918.00
c)
Sq.M.
4732.00
918.00
Item
No.&
Item
code
Description Of Items
Unit
14
Bd. T. -22
a)
Sq.M.
6454.00
851.00
b)
Sq.M.
5175.00
851.00
c)
Sq.M.
4683.00
851.00
Bd.T.-23
a)
6740.00
918.00
b)
5273.00
918.00
c)
4760.00
918.00
Item
No.&
Item
code
16
Description Of Items
Unit
a)
Sq.M.
6553.00
851.00
b)
Sq.M.
5255.00
851.00
c)
Sq.M.
4755.00
851.00
Bd.T-24
17
Providing and fixing teak wood single swing shutter part size
panelled as per detailed drawings, including double acting ---- spring hinges and finishing with french polishing
complete. (Without frame) (2 No.s Hinges 100mm, 1 no
Black hinge, 2 handles of 150mm)
a)
Sq.M.
6630.00
907.00
b)
Sq.M.
5934.00
907.00
c)
Sq.M.
5310.00
907.00
Bd.T.-27
18
a)
Sq.M.
4928.00
656.00
b)
Sq.M.
4232.00
656.00
Item
No.&
Item
code
Description Of Items
c)
Bd.T.-28
19
Unit
Sq.M.
3608.00
656.00
Bd T 30
a)
Sq.M.
7080.00
667.00
b)
Sq.M.
5266.00
667.00
c)
Sq.M.
4589.00
667.00
6806.00
668.00
b)
5572.00
667.00
c)
4886.00
667.00
Item
No.&
Item
code
20
Description Of Items
Unit
Sq.M.
5544.00
719.00
b)
Sq.M.
4278.00
719.00
c)
3720.00
719.00
Bd T 31
a)
Sq.M.
5831.00
719.00
b)
Sq.M.
4563.00
719.00
c)
Sq.M.
4006.00
719.00
Item
No.&
Item
code
21
Description Of Items
Unit
Sqm
4324.00
788.00
b)
Sqm
3574.00
788.00
c)
Sqm
3242.00
788.00
3410.00
639.00
4061.00
213.00
22
23
Providing and fixing UPVC Twin paneled single leaf door Sq.M.
shutter of approved colour / lamination made out of
extruded rigid uPVC hollow section PW2459 shutter frame of
size 24 x 59 mm having double wall construction as vertical
styles, top & bottom rails and middle lock rails of PW24100H
of size 24 x 100 mm and the panel in PW20610
multichamber hollow plastic section of size 20 x 610 mm
duty inserted in shutter frames, lock rails, styles reinforced
by polymer inserted inside for fixing of hinges, aldrops,
tower bolts and baby latch etc. All corners should be mitre
cut joined each other by metal screw after inserting rigid L
bracket PVC reinforced of size 100 x 200 mm including
synthetic metal fixtures and fastenings remarking , damage
surface etc. complete. 4 No.s hinges of 100mm length, 2
No.s handles 150mm length, 2 No.s of tower bolt of 200mm
length, 1 No. of Tadi patti, 1 aldrop of 300mm length &
diametrer 20mm.
Item
No.&
Item
code
Description Of Items
Spec.
24
Unit
As directed by Engineer-In-Charge.
Sq.M.
3465.00
210.00
b)
Sq.M.
2835.00
210.00
Sq.M.
3990.00
210.00
b)
Sq.M.
3360.00
210.00
Sq.M.
3990.00
210.00
b)
Sq.M.
3360.00
210.00
Sq.M.
4515.00
210.00
b)
Sq.M.
3885.00
210.00
Item
No.&
Item
code
25
Description Of Items
Providing and fixing UPVC Twin paneled single leaf door Sq.M.
shutter of approved colour / lamination made out of
extruded rigid uPVC hollow section PW2459 shutter frame of
size 24 x 59 mm having double wall construction as vertical
styles, top & bottom rails and middle lock rails of size 29 x
100 mm and the panel in PW20710 multichamber hollow
plastic section of size 25 x 710 mm duty inserted in shutter
frames, lock rails, styles reinforced by polymer inserted
inside for fixing of hinges, aldrops, tower bolts and baby
latch etc. All corners should be mitre cut joined each other
by metal screw after inserting rigid L bracket PVC reinforced
of size 100 x 200 mm including synthetic metal fixtures and
fastenings remarking , damage surface etc. complete. (4 No.s
hinges of 100mm length, 2 No.s handles 150mm length, 2
No.s of tower bolt of 200mm length, 1 No. of Tadi patti, 1
aldrop of 300mm length & diametrer 20mm.)
Spec.
25a
Unit
216.00
4744.00
557.00
As directed by Engineer-In-Charge.
Item
No.&
Item
code
Description Of Items
26
Bd.T.-34
Unit
(A)
a)
Sq.M.
7713.00
454.00
b)
Sq.M.
6321.00
454.00
c)
Sq.M.
5855.00
454.00
(B)
a)
Sq.M.
4951.00
454.00
b)
Sq.M.
3541.00
454.00
c)
Sq.M.
2938.00
454.00
27
Bd.T-34
Item
No.&
Item
code
28
Description Of Items
a)
Sq.M.
4974.00
454.00
b)
Sq.M.
3642.00
454.00
c)
Sq.M.
3183.00
454.00
(B)
a)
Sq.M.
5010.00
454.00
b)
Sq.M.
3327.00
454.00
c)
Sq.M.
2711.00
454.00
676.00
189.00
3927.00
583.00
29
Unit
As directed by Engineer-In-Charge.
Spec.
As directed by Engineer-In-Charge.
(A)
a)
Sq.M.
Item
No.&
Item
code
Description Of Items
Unit
b)
Sq.M.
3182.00
583.00
c)
Sq.M.
2562.00
583.00
(B)
a)
Sq.M.
4211.00
583.00
b)
Sq.M.
3465.00
583.00
c)
Sq.M.
2846.00
583.00
30
2364.00
197.00
Bd.T.-55
31
2679.00
328.00
Bd.T.-56
32
2555.00
328.00
Bd.T.-56
33
Providing and fixing collapsible steel gate in two leaves with Sq.M.
channel pickets, pivoted flat bars, including top and bottom
guide rollers, stoppers, handles, all fittings and
accessories,locking arrangement and applying one coat of
red lead primer etc. complete.
3045.00
773.00
Item
No.&
Item
code
Description Of Items
Bd.T.-57
34
Unit
a)
Sq.M.
5217.00
583.00
b)
Sq.M.
3803.00
583.00
c)
Sq.M.
3163.00
583.00
b) For 32 mm thick
Bd T 35
a)
Sq.M.
4916.00
583.00
b)
Sq.M.
3502.00
583.00
c)
Sq.M.
2861.00
583.00
VENTILATORS
35
Item
No.&
Item
code
Description Of Items
Unit
36
a)
Ventilator
a)
Sq.M.
3045.00
347.00
b)
Sq.M.
2352.00
347.00
c)
Sq.M.
1995.00
347.00
b)
Fanlight
a)
Sq.M.
3045.00
347.00
b)
2352.00
347.00
c)
1995.00
347.00
2074.00
315.00
2472.00
154.00
Spec.
37
As directed by Engineer-In-Charge.
Spec.
As directed by Engineer-In-Charge.
Item
No.&
Item
code
Description Of Items
Unit
38
Bd T 97
39
Providing and fixing steel ventilator fully glazed partly top Sq.M.
hung and partly fixed as per detailed drawing without hot
dip zinc coating including fabricating glazing with plain
obscured glass panes of approved type and quality and
fastening without teak wood boxing and architecture and oil
painting two coats etc. complete. (Sample to be got
approved from Ex.Engineer before use)
Bd T 123
368.00
2252.00
302.00
WINDOWS
40
Bd.T.-42
25mm thick
a)
Sq.M.
5941.00
910.00
b)
Sq.M.
4507.00
910.00
Item
No.&
Item
code
Description Of Items
(B)
30mm thick
a)
Sq.M.
3635.00
910.00
Sq.M.
6253.00
910.00
b)
Sq.M.
4820.00
910.00
c)
Sq.M.
3947.00
910.00
41
4410.00
420.00
Bd.T.-52
42
Bd.T.-45
c)
Unit
a)
Sq.M.
6972.00
1109.00
b)
Sq.M.
6158.00
1109.00
c)
Sq.M.
5811.00
1109.00
Item
No.&
Item
code
Description Of Items
Unit
43
Bd.T.-53
44
Bd.T.-53
45
Spec.
46
2134.00
224.00
2885.00
458.00
4223.00
992.00
1218.00
158.00
As directed by Engineer-In-Charge.
As directed by Engineer-In-Charge.
Item
No.&
Item
code
47
Description Of Items
Spec.
48
50
Bd T 53A
1089.00
158.00
1035.00
138.00
708.00
238.00
2273.00
251.00
As directed by Engineer-In-Charge.
As directed by Engineer-In-Charge.
Spec.
49
Unit
As directed by Engineer-In-Charge.
Item
No.&
Item
code
51
Bd T-53B
Description Of Items
Unit
434.00
4100.00
945.00
Sq.M.
4077.00
945.00
3493.00
840.00
3442.00
735.00
52
Bd T 98A
Sq.M.
Item
No.&
Item
code
Description Of Items
Unit
54
Sq.M.
3243.00
769.00
Sq.M.
2586.00
769.00
Sq.M.
3514.00
769.00
Sq.M.
2790.00
769.00
Item
No.&
Item
code
55
Description Of Items
Unit
Sq.M.
3481.00
1038.00
Sq.M.
2804.00
1038.00
Sq.M.
3784.00
1038.00
Sq.M.
3036.00
1038.00
55a
4589.00
540.00
Item
No.&
Item
code
Description Of Items
Unit
55b
With 5.00 mm selected quality plain sheet glass and netlon Sq.M.
equivalent type extruded mosquito proof netting
4494.00
540.00
56
1218.00
168.00
1575.00
158.00
3315.00
646.00
Sq.M.
3270.00
646.00
3465.00
314.00
58
Spec.
As directed by Engineer-In-Charge.
Item
No.&
Item
code
60
Description Of Items
Spec.
61
Unit
2835.00
318.00
2625.00
233.00
1365.00
271.00
1575.00
315.00
As directed by Engineer-In-Charge.
Spec.
As directed by Engineer-In-Charge.
62
Bd.T.-63
63
Bd.T.-63
Item
No.&
Item
code
Description Of Items
Unit
64
Bd.T.-68
65
Spec.
66
1680.00
315.00
2167.00
478.00
2126.00
359.00
As directed by Engineer-In-Charge.
Spec.
As directed by Engineer-In-Charge.
Item
No.&
Item
code
67
Description Of Items
Spec.
68
404.00
1945.00
394.00
1594.00
266.00
As directed by Engineer-In-Charge.
Spec.
69
Unit
As directed by Engineer-In-Charge.
Providing and fixing partitions using 2.1 metre height and Sq.M.
12 mm thick three layered flat pressed veneered teak wood
particle board, exterior grade, bonded with BWP type
phenol formaldehyde synthetic resin conforming to
I.S.12893-1990 with commercial veneers on both side
including Aluminium frame and verticals of size of 65 mm x
40 mm in a pannels of 1.20 m etc. complete. (As per detailed
drawing) (Sample to be got approved from Ex. Engineer
before use)
Item
No.&
Item
code
70
Description Of Items
Unit
461.00
2552.00
455.00
1383.00
379.00
Providing and fixing GYP board material stud single layer Sq.M.
partition 97.00 mm thick using single board of 12.5 mm
thick on each side of 34/76/36 mm studs fixed to floor and
ceiling channel 70/32 mm at every 610 mm regular interval
horizontally including finishing the joints with jointing
compounds, paper tape and two coats of primer paint etc.
Item
No.&
Item
code
73
Description Of Items
74
76
77
78
81.00
1503.00
81.00
224.00
75.00
433.00
64.00
420.00
64.00
As directed by Engineer-In-Charge.
Spec.
544.00
As directed by Engineer-In-Charge.
7453.00
As directed by Engineer-In-Charge.
Providing and fixing 4 mm thick plain A.C. sheets (of IS std.) Sq.M.
on top of the weather shed including scaffolding, fixing by
means of nuts and bolts or as directed etc. complete as per
detailed drawing (Brackets of 70 x 45 mm to be paid
separately).
Spec.
66827.00
As directed by Engineer-In-Charge.
As directed by Engineer-In-Charge.
Spec.
75
Unit
As directed by Engineer-In-Charge.
Item
No.&
Item
code
79
Description Of Items
Providing and fixing clear/frosted glass panels 3mm thick for Sq.M.
all size including putty, C.T.W. beading etc. complete.
Spec.
80
82
83
84
540.00
62.00
579.00
53.00
728.00
43.00
84.00
25.00
As directed by Engineer-In-Charge.
57.00
As directed by Engineer-In-Charge.
Providing and fixing country teak wood runner size 150 x 75 Rmt
mm over partition, including rounding, fixing in the masonry
where necessary beading on sides etc. complete.
Spec.
394.00
As directed by Engineer-In-Charge.
Spec.
As directed by Engineer-In-Charge.
Spec.
81
Unit
As directed by Engineer-In-Charge.
Bd.T.-38
a)
75x25mm
Sq.M.
205.00
20.00
b)
50x25mm
Sq.M.
223.00
24.00
Item
No.&
Item
code
85
Description Of Items
Unit
c)
25x25mm
Sq.M.
289.00
24.00
d)
50x50mm
Sq.M.
273.00
24.00
3494.00
270.00
Item
No.&
Item
code
Description Of Items
Unit
Bd - U : IRON WORK
1
Providing and fixing mild steel grill work for windows, Sq.M.
ventilators weighing
15 kg per sq.m as per drawing,
including necessary fixtures, welding and painting with one
coat of anti-corrosive paint etc. complete.
Bd.U. -1
Add for extra weight or deduct for less weight for Kg.
fabricating such as cutting, shaping, riveting etc. mild steel
for grill works including welding.
Bd. U. -1
Bd.U.-3
1114.00
175.00
62.00
3.00
a)
15 kg.
Sq.M.
1559.00
171.00
b)
20 kg.
Sq.M.
1833.00
171.00
c)
25 kg.
Sq.M.
2014.00
171.00
d)
30 kg.
Sq.M.
2366.00
171.00
e)
35 kg.
Sq.M.
2606.00
171.00
Item
No.&
Item
code
Description Of Items
Unit
Bd. V. -5
A)
Medium type.
B)
Rmt
200.00
74.00
Rmt
257.00
74.00
Rmt
299.00
74.00
Rmt
326.00
74.00
Rmt
373.00
76.00
Rmt
202.00
49.00
Rmt
236.00
66.00
Rmt
310.00
66.00
Rmt
394.00
67.00
Rmt
441.00
69.00
Rmt
557.00
76.00
Rmt
814.00
77.00
Rmt
1076.00
84.00
Heavy type.
Item
No.&
Item
code
Description Of Items
Bd. V. -5
A)
Medium type.
B)
Unit
Rmt
202.00
39.00
Rmt
225.00
39.00
Rmt
267.00
39.00
Rmt
319.00
39.00
Rmt
352.00
39.00
Rmt
449.00
40.00
Rmt
771.00
40.00
Rmt
252.00
39.00
Rmt
267.00
42.00
Rmt
313.00
42.00
Rmt
352.00
42.00
Rmt
410.00
53.00
Rmt
457.00
53.00
Rmt
900.00
53.00
Heavy type.
Item
No.&
Item
code
3
Description Of Items
Bd.
V.6-7
A)
B)
Spec.
Unit
As directed by Engineer-In-Charge.
a)15mm. Diameter
Rmt
41.00
12.00
b)20mm. Diameter
Rmt
49.00
12.00
c)25mm. Diameter
Rmt
66.00
12.00
d)32mm. Diameter
Rmt
80.00
12.00
e)40mm. Diameter
Rmt
93.00
12.00
f)50mm. Diameter
Rmt
107.00
12.00
h)63mm. Diameter
Rmt
131.00
12.00
No.
4591.00
363.00
No.
5236.00
363.00
No.
5727.00
363.00
No.
1943.00
290.00
No.
2588.00
290.00
Item
No.&
Item
code
Description Of Items
Unit
No.
3079.00
290.00
a)15mm. Diameter
No.
291.00
42.00
b)20mm. Diameter
No.
401.00
40.00
c)25mm. Diameter
No.
478.00
39.00
a)15mm. Diameter
No.
192.00
35.00
b)20mm. Diameter
No.
257.00
35.00
c)25mm. Diameter
No.
341.00
38.00
d)32mm. Diameter
No.
378.00
38.00
e)40mm. Diameter
No.
491.00
47.00
f)50mm. Diameter
No.
545.00
47.00
g)65mm. Diameter
No.
587.00
51.00
h)80mm. Diameter
No.
621.00
51.00
a)15mm. Diameter
No.
1373.00
37.00
b)20mm. Diameter
No.
1470.00
37.00
Providing and fixing screw down ___ dia wheeled stop tap of
steel or chromium plating of approved quality and make
bearing I.S.I. mark, including sockets, union nut complete.
Bd.
V. -9
Bd.
V.-10
Item
No.&
Item
code
Description Of Items
c)25mm. Diameter
Unit
No.
1608.00
37.00
a)15mm. Diameter
No.
975.00
37.00
b)20mm. Diameter
No.
1013.00
37.00
c)25mm. Diameter
No.
1069.00
37.00
242.00
51.00
473.00
66.00
1570.00
440.00
706.00
186.00
8Bd.V.-11 Providing and fixing brass stop tap of approved quality and
make with crutch/ wheel including sockets/ union nut and
brick masonry chamber with cast iron-frame and mild steel
hinged cover with locking arrangement and lock etc.
complete.
Spec. No.:BDV.-11 Page No.603
Bd.
V.-14
10
Bd.V.-15
Page No.606
11
Providing and fixing fittings and accessories such as ball cock, No.
overflow pipe with mosquito proof coupling, scour, pipe
with plug, manhole with cover and locking arrangement,
connecting pipes and embedding intake and outflow pipes
into the R.C.C water reservior.
Bd.V.-18
12
Bd.V.-19
Item
No.&
Item
code
Description Of Items
Unit
13
Bd.V.-20
14
15
A)
As directed by Engineer-In-Charge.
As directed by Engineer-In-Charge.
1012.00
1153.00
300.00
Item
No.&
Item
code
B)
16
Description Of Items
No.
5666.00
849.00
No.
4427.00
777.00
No.
4437.00
849.00
No.
3042.00
607.00
Providing and fixing European type white glazed (of IS Std.) No.
earthenware W.C.PAN with Bekelite seat and lid with
chromium plated brass hinges and rubber buffers including
UPVC and soil/vent pipe upto the outside face of wall, 10
litre enamelled low level flushing cistern with fittings, pipe
and stop tap brackets for fixing cistern 32 mm dia. UPVC
flush pipe with fittings and clamps, 20 mm dia. UPVC
overflow pipe, mosquito proof couplings, G.I. chain and
pulley, cutting and making good to the walls and floors,
testing etc. complete. (Prior approval of sample and brand
by Ex.Engineer is necessary before use.) (HINDWARE/
JOHNSON/ PERRYWARE)
4085.00
994.00
4343.00
994.00
Spec.
17
Unit
As directed by Engineer-In-Charge.
Providing and fixing European type white glazed (as per IS No.
Std.) earthenware water closet pan with Bekelite seat and lid
with chromium plated brass hinges and rubber buffers
including UPVC, soil/vent pipes upto outside face of-the
walls, 10 litre fibre low level tank flushing cistern with
fittings, pipes and stop tap, brackets for fixing the cistern 32
mm dia. UPVC flush pipe with fittings and clamps, 20 mm
dia. UPVC overflow pipe with mosquito proof coupling
galvanised iron chain and pulley painting of the cistern and
exposed pipes and cutting and making good to the wall and
floor, testing etc. complete. (Prior approval of sample and
brand by Ex.Engineer is necessary be fore use.) (HINDWARE/
JOHNSON/ PERRYWARE/ VIENA)
Spec.
As directed by Engineer-In-Charge.
Item
No.&
Item
code
18
Description Of Items
Providing and fixing European type coloured glazed (as per No.
IS Std.) earthenware W.C PAN with Bekelite seat and lid with
chromium plated brass hinges and rubber buffers including
UPVC soil and vent pipe upto the outside face of wall, 10
litre UPVC low level TANK flushing cistern, 32 mm. dia. UPVC
flush pipe with fittings, and clamps 20 mm dia. UPVC over
flow pipe with mosquito proof couplings, pointing to
exposed pipe and cutting and making good to the wall and
floor testing etc. complete. (Prior approval of sample and
brand by Ex. Engineer is necessary before use.) (HINDWARE/
JOHNSON/ PERRYWARE/ VIENA)
Spec.
19
4560.00
994.00
9030.00
840.00
4035.00
994.00
As directed by Engineer-In-Charge.
Providing and fixing "Anglo Indian type" white glazed (as per No.
IS Std.) earthenware W.C.Pan with bekelite seat and lead
with chromium plated brass hinges including UPVC soil and
vent pipe upto the outside face of the wall and 100 mm dia.
UPVC plug bend, 10 litre UPVC low level flushing cistern, 32
mm dia. PVC flush pipe with fittings and clamps,20 mm dia.
PVC over flow pipe with mosquito proof coupling, G.I.chain
and pulley painting of cistern and exposed pipe and cutting
and making good to the walls and floor, testing etc.
complete. (Prior approval of sample and brand, by Ex.
Engineer is necessary before use.)
Spec.
As directed by Engineer-In-Charge.
Providing and fixing European type white glazed (as per IS No.
Std.) earthernware coupled closet with syphonic trap with
syphonic low level 10 litres White Glazed cistern with black
bakelite seat and lid with chromium plated brass hinges
including UPVC soil and white glazed vent pipe upto the
outside face of the wall including 100 mm- dia. UPVC plug
bend, inlet pipe, stop tap etc. all fittings, cutting and making
good to the walls and floor, testing etc. complete. (Prior
approval of sample and brand by Ex.Engineer is necessary
before use.) (HINDWARE/ JOHNSON/ PARRYWARE/ VIENA)
Spec.
20
Unit
As directed by Engineer-In-Charge.
Item
No.&
Item
code
21
Description Of Items
Unit
Providing and fixing "Anglo Indian type" (IS Std.) Orissa No.
Pattern white glazed W.C.Pan with backelite seat and lid
with chromium plated brass hinges including UPVC soil and
vent pipe upto the outside face of the wall and 100 mm dia.
UPVC plug bend, 10 litre UPVC low level flushing cistern, 32
mm dia. PVC flush pipe with fittings and clamps,20 mm dia.
PVC over flow pipe with mosquito proof coupling, G.I.chain
and pulley painting of cistern and exposed pipe and cutting
and making good to the walls and floor, testing etc.
complete.
(Prior approval of sample and brand, by Ex. Engineer is
necessary before use.)
Spec.
994.00
As directed by Engineer-In-Charge.
22
Bd.V.-23
No.
6657.00
1004.00
b) White glazed
No.
4260.00
335.00
23
Bd.V.-23
Item
No.&
Item
code
24
Description Of Items
Bd.
V. -26
a) Coloured glazed
No.
9277.00
1151.00
b) White glazed
No.
6726.00
1024.00
a) Coloured glazed
No.
3264.00
605.00
b) White glazed
No.
2810.00
605.00
2232.00
674.00
2539.00
774.00
Spec.
25
Unit
As directed by Engineer-In-Charge.
Bd.V.-27
27
Item
No.&
Item
code
Description Of Items
Bd.V.-30
A)
B)
28
Unit
a)45x30 cm.
No.
2209.00
588.00
b)55x40 cm.
No.
2510.00
588.00
c)63x45 cm.
No.
2746.00
588.00
a)45x30 cm.
No.
2447.00
588.00
b)55x40 cm.
No.
2739.00
588.00
c)63x45 cm.
No.
3261.00
588.00
a) White glazed
No.
849.00
41.00
a) Coloured glazed
No.
1129.00
41.00
a) 600x450x200 mm.
No.
2126.00
352.00
b) 450x300x200 mm.
No.
1918.00
331.00
As directed by Engineer-In-Charge.
29
Bd.V.-31
Item
No.&
Item
code
Description Of Items
30
Bd.V.-31
Unit
a) 60x45x25 cm.
No.
8295.00
1006.00
b) 40x30x25 cm.
No.
4107.00
582.00
555.00
105.00
447.00
177.00
236.00
76.00
191.00
60.00
31
Bd.V.-32
32
Providing and fixing 10 cm dia. P.V.C. Nahani Trap fixed with No.
P.V.C. grating, P.V.C. plug bend and piece of P.V.C. pipe upto
plug bend, scaffolding etc. complete.
Bd.V.-32
33
Providing and laying 100 mm dia. half round white glazed R.M.
earthenware pipes in cement concrete 1:5:10 bedding
including bends, giving necessary slope, pointing, making
good the damaged surface testing etc. complete.
Bd.V.-29
34
Bd.V.-39
Rmt
Item
No.&
Item
code
35
Description Of Items
Rmt
261.00
45.00
c)225 mm.
Rmt
455.00
65.00
a) 110 mm.diameter
Rmt
347.00
56.00
b) 75 mm. diameter
Rmt
210.00
44.00
Rmt
263.00
56.00
Rmt
410.00
80.00
a) 75 mm.diameter
No.
46.00
19.00
b) 90 mm. Diameter
No.
62.00
19.00
As directed by Engineer-In-Charge.
Spec.
37
b) 150 mm.
Spec.
36
Unit
As directed by Engineer-In-Charge.
As directed by Engineer-In-Charge.
Item
No.&
Item
code
Description Of Items
67.00
19.00
a) 150 mm.diameter
Rmt
476.00
63.00
Rmt
528.00
64.00
Rmt
765.00
101.00
a) 60x45 cm.
No.
4181.00
946.00
b) 90x45 cm.
No.
5279.00
1140.00
5985.00
1181.00
755.00
47.00
Bd.V.-41
39
Bd.V -43
Bd.
V -44
No.
38
40
Unit
41
Item
No.&
Item
code
Description Of Items
Unit
Bd.V.-38
42
Bd.V.-46
43
Bd. V. -12
44
45
46
47
525.00
294.00
76.00
130.00
11.00
110.00
7.00
58.00
5.00
580.00
63.00
As directed by Engineer-In-Charge.
Providing and fixing chromium plated Peg Rack fixed on 3" x No.
3/8" varnished teak wood plate 3'-0" long including fixing
teak wood blocks in masonry etc. complete.
Spec.
1575.00
As directed by Engineer-In-Charge.
As directed by Engineer-In-Charge.
Item
No.&
Item
code
Description Of Items
Spec.
48
917.00
53.00
242.00
42.00
No.
827.00
83.00
No.
555.00
109.00
No.
823.00
109.00
7.00
0.00
As directed by Engineer-In-Charge.
50
As directed by Engineer-In-Charge.
As directed by Engineer-In-Charge.
a) Fibre / JPVC
51
52
As directed by Engineer-In-Charge.
49
Unit
As directed by Engineer-In-Charge.
Item
No.&
Item
code
Description Of Items
Spec.
53
As directed by Engineer-In-Charge.
As directed by Engineer-In-Charge.
Litre
1.00
0.00
Litre
2.00
0.00
No
968.00
843.00
Add for extra one cubical capacity of Septic tank above 1.50 No
Cubic Meter Capacity.
578.00
0.00
Spec.
55
54
Unit
As directed by Engineer-In-Charge.
As directed by Engineer-In-Charge.
Per
Tank
256.00
0.00
Per
Tank
347.00
0.00
Per
Tank
373.00
0.00
Per
Tank
487.00
0.00
Per
Tank
569.00
0.00
Per
Tank
861.00
0.00
Item
No.&
Item
code
Description Of Items
Unit
Per
Tank
1324.00
0.00
Per
Tank
1437.00
0.00
Per
Tank
1930.00
0.00
1000
litre
30.00
0.00
1000
litre
14.00
0.00
1000
litre
12.00
0.00
1000
litre
11.00
0.00
a) 900 mm.diameter
No.
9806.00
559.00
No.
14591.00
918.00
801.00
85.00
1048.00
85.00
As directed by Engineer-In-Charge.
56
BdV-45
57
Providing and fixing C.P. Angular Stop Cock with wall fiange No.
Jaquar make continental (CAT.No.CON-059) or equivalent
including necessary sockets /union nut etc.complete
Spec.
58
Providing and fixing C.P. Teo way BIB Cock Jaquar make No.
continental (CAT.No.CON-041) or equivalent including
necessary sockets /union nut etc.complete
Spec.
Item
No.&
Item
code
59
Description Of Items
60
62
63
990.00
85.00
815.00
85.00
1399.00
85.00
341.00
79.00
Spec.
170.00
Spec.
3293.00
Providing and fixing C.P. BIB Cock with wall flange Jaquar No
make continental (CAT.No.CON-047) or equivalent including
necessary sockets /union nut etc.complete
Spec.
Providing and fixing C.P. Pillar cock long neck with aerator No
Jaquar make continental (CAT.No.CON-021) or equivalent
including necessary sockets /union nut etc.complete
Spec.
61
Unit
NEW ITEMS
Item
No.&
Item
code
Description Of Items
Unit
158.00
75.00
183.00
78.00
216.00
78.00
265.00
78.00
334.00
78.00
501.00
78.00
Item
No.&
Item
code
Description Of Items
Unit
180.00
99.00
200.00
99.00
232.00
99.00
10
302.00
99.00
11
355.00
99.00
12
524.00
99.00
Item
No.&
Item
code
Description Of Items
Unit
Bd - W : Miscellaneous
1
Providing and fixing mild steel grill gate with angle iron Sq.M.
frame 65 x 65 x 10 mm with iron bars at 150 mm etc. centre
to centre and diagonal flats as per the detailed drawing,
including hinges, pivot blocks, locking arrangement, welding,
reveting with oil painting in three coats of approved colour
shade. (Weight of gate 35 kg /sq.m.)
Bd.W. -6
74.00
2384.00
32.00
32.00
21.00
26.00
12.00
As directed by Engineer-In-Charge.
Spec.
74.00
As directed by Engineer-In-Charge.
Item
No.&
Item
code
Description Of Items
Spec.
5
9.00
5.00
24.00
5.00
14.00
5.00
As directed by Engineer-In-Charge.
5.00
As directed by Engineer-In-Charge.
Spec.
17.00
As directed by Engineer-In-Charge.
As directed by Engineer-In-Charge.
Unit
As directed by Engineer-In-Charge.
Item
No.&
Item
code
9
Description Of Items
Unit
No.
140.00
11.00
No.
68.00
37.00
34.00
21.00
21.00
16.00
21.00
21.00
26.00
26.00
16.00
14.00
426.00
254.00
Spec.
As directed by Engineer-In-Charge.
10
Dismantling manglore tiled roof and ridge tiles with battens, Sq.M.
ridge and barge boards, eaves boards etc. and stacking the
materials as directed with all leads and lifts complete
including removing wood work below.
Bd.W-8
11
Bd.W-8
12
Dismantling G.I. and A.C. sheet roof covering and stacking Sq.M.
them as and where directed in the compound, including
scaffolding etc. complete.
Bd. W. -8
13
Dismantling G.I. and A.C. sheet roofing including purlins and Sq.M.
rafters etc. including sorting out serviceable and
unserviceable material and stacking the same as and where
directed in the compound, including scaffolding etc.
complete.
Bd.W. -8
14
Bd.W.-8
15
Dismantling queen post truss from roof and stacking the No.
materials as directed with all leads and lifts etc. complete.
Item
No.&
Item
code
Description Of Items
Unit
Bd.W -8
16
Dismantling king post truss from roof and stacking the No.
materials as directed with all leads and lifts etc. complete.
Bd.W. -8
17
Bd.W.-8
18
Bd.W.-8
19
Bd.W.-8
20
Bd.W.-8
21
Bd.W.-8
292.00
242.00
14.00
13.00
29.00
24.00
172.00
140.00
93.00
77.00
65.00
55.00
Item
No.&
Item
code
Description Of Items
Unit
22
Bd.W.-8
23
Bd.W.-8
24
Bd.W. -8
25
Bd.W.-8
26
Bd.W.-8
27
Bd.W.-8
28
Bd.W.-8
33.00
8.00
7.00
18.00
15.00
15.00
14.00
18.00
15.00
20.00
20.00
20.00
20.00
Item
No.&
Item
code
Description Of Items
Unit
29
Bd.W.-8
30
Dismantling old paint from steel and other metal surface Sq.M.
with flame, cleaning and making the surface even and
scaffolding etc. complete.
Bd.W.-8
31
Dismantling old paint from steel and other metal surface Sq.M.
with hand scrapping, cleaning and making the surface even
and scaffolding etc. complete.
Bd.W.-8
32
Bd.W.-8
33
Bd.W.-8
34
Bd.W.-8
35
13.00
14.00
13.00
24.00
20.00
30.00
30.00
7.00
4.00
36.00
36.00
72.00
62.00
Item
No.&
Item
code
Description Of Items
Spec.
36
38
39
40
41
85.00
223.00
189.00
658.00
562.00
3.00
2.00
9.00
7.00
As directed by Engineer-In-Charge.
101.00
As directed by Engineer-In-Charge.
111.00
As directed by Engineer-In-Charge.
130.00
As directed by Engineer-In-Charge.
As directed by Engineer-In-Charge.
37
Unit
As directed by Engineer-In-Charge.
Item
No.&
Item
code
Description Of Items
Unit
Bd.W.-8
42
Removing old paint from steel and other metal surface Sq.M.
preparing the surface by solvent degreasing and derusting by
manual scrapping, flame cleaning and chemical methods,
hand scrapping, scaffolding etc. complete.
Bd.W.-8
43
Bd.W.-8
44
Bd.W.-8
45
Bd.W.-8
46
Bd.W.-8
19.00
16.00
20.00
15.00
27.00
23.00
366.00
310.00
150.00
138.00
Item
No.&
Item
code
47
Description Of Items
Unit
Providing and erecting chain link fencing 1.6 M. height with Rmt
G.L chain link of size 50 x 50 mm 8 guage thick and fixed 75
mm above Ground level vertical M.S. Angle of 40 x 40 x 6
mm size embedded in C.C. block of 1:4:8 mix of size 450 x
450 x 670 mm at 1.75 M. c/c with iron bar 16 mm dia as hold
fast including welding link with angle frame at 30 cm c/c nuts
and bolts and horizontal M.S. angles at top and bottom of 25
x 25x 5 mm size and vertical M.S. flat 35 x 5 mm and 25 x 5
mm horizontal including cross support of 40 x 40 x 6 mm
angles both sides at every corner or bends embedded in
concrete blocks of 1:4:8 of size 450 x 450 x 670 mm including
3 coats of oil painting etc. complete.
Spec.
1762.00
125.00
478.00
40.00
14779.00
1871.00
As directed by Engineer-In-Charge.
48
Bd-W-1
Spec.
49
Spec.
Item
No.&
Item
code
Description Of Items
Unit
50
Providing and erecting 1.5 metre high wire fencing with Rmt
seven rows of barbed wire supported on mild steel angles
(50 x 50 x 6 mm) at 2.5 metres centre to centre including
excavating pits for foundation, fixing posts in cement
concrete blocks of size 45 x 45 x 45 cm., fastening the wire
and painting the mild steel angles with one coat of red lead
primer and two coats of painting etc. complete.
Bd.W.-3
51
Providing and erecting 1.5 metre high wire fencing with Rmt
seven rows of barbed wire supported on hard wood round
bullies of 100 mm at 2.5 metres centre to centre including
excavating pits for foundation, fixing posts in cement
concrete 1:4:8 blocks of size 45 x 45 x 45 cm, fastening the
wire and coal tarring to wooden post in two coats etc.
complete.
Bd-W-4
Spec.
52
Spec.
53
698.00
47.00
295.00
49.00
97.00
29.00
84.00
21.00
Item
No.&
Item
code
54
Description Of Items
Spec.
55
57
618.00
106.00
1063.00
200.00
644.00
126.00
906.00
210.00
Spec.
Spec.
56
Unit
Item
No.&
Item
code
Description Of Items
Spec.
58
60
131.00
814.00
210.00
1064.00
210.00
Spec.
466.00
Spec.
Spec.
59
Unit
Item
No.&
Item
code
61
Description Of Items
62
64
65
236.00
108.00
16.00
127.00
16.00
264.00
42.00
459.00
63.00
Spec.
1214.00
63
Unit
Item
No.&
Item
code
Description Of Items
Spec.
66
68
918.00
95.00
1148.00
158.00
1922.00
389.00
4095.00
903.00
3885.00
903.00
67
Unit
70
Item
No.&
Item
code
Description Of Items
Unit
Providing and fixing 50 dia. galvanised iron heavy type Pipe Sq.M.
Gate as per approved drawing with all fixtures and fittings in
two leaves with strong hold fasts embedded in cement
concrete block at top and bottom with locking arrangements
including providing Wicket Gates as per drawing, cutting,
bending and making holes, thread to pipe and one coat of
primer
etc.
complete.
3780.00
756.00
Item
No.&
Item
code
Description Of Items
Unit
Each
4343.65
Each
6032.25
Each
7331.65
Item
No.&
Item
code
Description Of Items
Unit
Each
9652.50
Each
37125.00
Each
63112.50
Item
No.&
Item
code
Description Of Items
Unit
Each
81675.00
Item
No.&
Item
code
Description Of Items
Unit
BRIDGE WORKS..
1
BR-2
Cu.M.
1069.00
893.00
Cu.M.
586.00
482.00
Cu.M.
254.00
167.00
Cu.M.
164.00
112.00
Cu.M.
216.00
156.00
Cu.M.
305.00
201.00
Cu.M.
70.00
11.00
Cu.M.
83.00
12.00
Cu.M.
112.00
19.00
A) Manual Means
Cu.M.
253.00
167.00
B) Mechanical Means
Cu.M.
105.00
10.00
Cu.M.
613.00
271.00
Cu.M.
856.00
139.00
Cu.M.
762.00
139.00
I. Ordinary Soil
B) Mechanical Means
MORTH
V) Marshy Soil
Item
No.&
Item
code
Description Of Items
Unit
Cu.M.
549.00
282.00
Cu.M.
101.00
57.00
Cu.M.
1210.00
165.00
Cu.M.
3915.00
307.00
b)M-15
Cu.M.
4269.00
307.00
a) M-15
Cu.M.
4466.00
411.00
b)M-20
Cu.M.
5072.00
411.00
c)M-25
Cu.M.
5509.00
411.00
d)M-30
Cu.M.
5545.00
411.00
a)M-20
Cu.M.
5193.00
411.00
b)M-25
Cu.M.
5635.00
411.00
c)M-30
Cu.M.
5649.00
411.00
d)M-35
Cu.M.
5743.00
411.00
B) Mechanical Means
Sp.No. MORTH 301.3/50
3
Spec.
No.
A) (Without formwork)
MORTH
405/121
Item
No.&
Item
code
Description Of Items
Unit
Cu.M.
3014.00
715.00
Cu.M.
3300.00
785.00
a)M-15
Cu.M.
5434.00
550.00
b)M-20
Cu.M.
5720.00
550.00
c) M25
Cu.M.
5940.00
550.00
d)M-30
Cu.M.
6050.00
550.00
a)M-15
Cu.M.
5720.00
1451.00
b)M-20
Cu.M.
6050.00
1425.00
c) M25
Cu.M.
6160.00
1425.00
d)M-30
Cu.M.
6380.00
1425.00
BR-31
BR-38
Item
No.&
Item
code
Description Of Items
Unit
R.M.
178.00
9.00
Cu.m.
1100.00
110.00
i) M-15
Cu.M.
4706.00
413.00
ii) M-20
Cu.M.
5334.00
413.00
iii) M-25
Cu.M.
5818.00
413.00
iv) M-30
Cu.M.
5869.00
413.00
v) M-35
Cu.M.
5992.00
413.00
i) M-25
Cu.M.
6081.00
413.00
ii) M-30
Cu.M.
6135.00
413.00
BR-6
10
Item
No.&
Item
code
Description Of Items
Unit
Cu.M.
6260.00
413.00
i) M-25
Cu.M.
6372.00
413.00
ii) M-30
Cu.M.
6430.00
413.00
iii) M-35
Cu.M.
6560.00
413.00
Cu.M.
4730.00
413.00
ii) M-20
Cu.M.
5500.00
413.00
iii) M-25
Cu.M.
5983.00
413.00
iv) M-30
Cu.M.
6012.00
413.00
v) M-35
Cu.M.
6145.00
413.00
vi) M-40
Cu.M.
6213.00
413.00
i) M-20
Cu.M.
5718.00
413.00
ii) M-25
Cu.M.
6196.00
413.00
iii) M-30
Cu.M.
6196.00
413.00
iv) M-35
Cu.M.
6291.00
413.00
v) M-40
Cu.M.
6361.00
413.00
i) M-20
Cu.M.
5992.00
413.00
ii) M-25
Cu.M.
6486.00
413.00
iii) M-30
Cu.M.
6459.00
413.00
iv) M-35
Cu.M.
6510.00
413.00
v) M-40
Cu.M.
6584.00
413.00
iii) M-35
c) Height above 10 m
11
c) Height above 10 m
Item
No.&
Item
code
Description Of Items
12
BR-27 a
Unit
Cu.M.
7930.00
1760.00
b) M25
Cu.M.
8140.00
1760.00
c)M-30
Cu.M.
8360.00
1760.00
d)M-35
Cu.M.
8469.00
1760.00
e)M-40
Cu.M.
8649.00
1760.00
f)M-45
Cu.M.
8831.00
1760.00
g)M-50
Cu.M.
9099.00
1760.00
Cu.M.
Cu.M.
Cu.M.
Cu.M.
Cu.M.
7095.00
7325.00
7667.00
7783.00
8694.00
413.00
413.00
431.00
431.00
460.00
Cu.M.
Cu.M.
Cu.M.
Cu.M.
Cu.M.
7404.00
7618.00
7960.00
8075.00
8987.00
413.00
413.00
431.00
431.00
460.00
Cu.M.
Cu.M.
Cu.M.
Cu.M.
Cu.M.
7907.00
8895.00
9034.00
9096.00
9446.00
413.00
413.00
431.00
431.00
460.00
13
Spec.
No.
MORTH
405/
Page
121
Note
:
1. Add 50% on basic rate for span 30m to 50m for creek bridge.
2. Add 75% on basic rate for span 50m and above for creek bridge.
Item
No.&
Item
code
14
Description Of Items
2) T-BEAM/ SLAB
a) Height upto 5 M.
i) M-20
ii) M-25
iii) M-30
iv) M-35
v) M-40
b) Height above 5 m & upto 10 m
i) M-20
ii) M-25
iii) M-30
iv) M-35
v) M-40
c) Height above 10 m
i) M-20
ii) M-25
iii) M-30
iv) M-35
v) M-40
Providing and laying in situ
cement concrete of trap
/granite/quartzite/gneiss metal for R.C.C. work
including ramming, vibrating, finishing IN cm 1:3 and
curing complete for main/cross girder diaphragms
arch etc ( including plywood/steel formwork, centering
(Excluding reinforcement)
Unit
Cu.M.
Cu.M.
Cu.M.
Cu.M.
Cu.M.
7732.00
8401.00
8535.00
8588.00
8924.00
408.00
408.00
428.00
428.00
455.00
Cu.M.
Cu.M.
Cu.M.
Cu.M.
Cu.M.
7907.00
8602.00
8743.00
8804.00
408.00
408.00
428.00
428.00
Cu.M.
Cu.M.
Cu.M.
Cu.M.
Cu.M.
8227.00
8950.00
9242.00
9312.00
9528.00
408.00
408.00
428.00
428.00
455.00
i) M-20
Cu.M.
7586.00
413.00
ii) M-25
Cu.M.
7962.00
413.00
iii) M-30
Cu.M.
8243.00
431.00
iv) M-35
Cu.M.
8295.00
431.00
v) M-40
Cu.M.
8344.00
460.00
Cu.M.
7877.00
413.00
Item
No.&
Item
code
Description Of Items
Unit
ii) M-25
Cu.M.
8254.00
413.00
iii) M-30
Cu.M.
8389.00
431.00
iv) M-35
Cu.M.
8588.00
431.00
v) M-40
Cu.M.
8749.00
460.00
i) M-20
Cu.M.
8170.00
413.00
ii) M-25
Cu.M.
8547.00
413.00
iii) M-30
Cu.M.
8974.00
431.00
iv) M-35
Cu.M.
9027.00
431.00
v) M-40
Cu.M.
9241.00
460.00
a)M-35
Cu.M.
8733.00
431.00
b)M-40
Cu.M.
9079.00
460.00
Cu.M.
9269.00
431.00
c) Height above 10 m
15
Item
No.&
Item
code
Description Of Items
Unit
Cu.M.
9634.00
461.00
a)M-35
Cu.M.
9790.00
431.00
b)M-40
Cu.M.
10054.00
460.00
Cu.M.
3748.00
330.00
8m
No.
17967.00
1096.00
b)M-40
c) Height above 10 m
16
17
Island Diameter
1)
4m
2)
6m
12m
No.
40427.00
2462.00
3)
8m
16m
No.
71871.00
4384.00
4)
10m
20m
No.
112297.00
6849.00
8m
No.
48872.00
2974.00
12m
No.
69130.00
4208.00
4m
2)
6m
Island Diameter
Item
No.&
Item
code
Description Of Items
Unit
3)
8m
16m
No.
90559.00
5512.00
4)
10m
20m
No.
119035.00
7245.00
8m
No.
107605.00 10361.00
Island Diameter
1)
4m
2)
6m
12m
No.
242111.00 23310.00
3)
8m
16m
No.
430420.00 41441.00
4)
10m
20m
No.
672531.00 64752.00
18 A
BR-14
4 m dia well
R.M.
43165.00
4664.00
b)
5 m dia well
R.M.
47689.00
5413.00
c)
6 m dia well
R.M.
69091.00
8632.00
d)
7 m dia well
R.M.
92176.00
11477.00
e)
8 m dia well
R.M.
124398.00 14835.00
f)
10 m dia well
R.M.
146322.00 17372.00
Item
No.&
Item
code
Description Of Items
18 B
BR-14
Unit
a)
4 m dia well
R.M.
184863.00 12939.00
b)
5 m dia well
R.M.
190427.00 13330.00
c)
6 m dia well
R.M.
197680.00 13838.00
d)
7 m dia well
R.M.
211145.00 14780.00
e)
8 m dia well
R.M.
236525.00 16557.00
f)
10 m dia well
R.M.
271596.00 19011.00
18 C
Cu.m.
1348.00
95.00
19
R.M.
3711.00
57.00
20
M.T.
86198.00
11270.00
M.T.
98557.00
13200.00
BR-8
21
Item
No.&
Item
code
Description Of Items
22
BR-9
23
Unit
Cu.M.
4917.00
639.00
c)M-20
Cu.M.
5221.00
639.00
d)M-25
Cu.M.
5474.00
639.00
e)M-30
Cu.M.
5678.00
639.00
f)M-35
Cu.M.
5743.00
639.00
24
a)M-20
Cu.M.
6013.00
413.00
b)M-25
Cu.M.
6541.00
413.00
c)M-30
Cu.M.
6573.00
413.00
d)M-35
Cu.M.
6717.00
413.00
e)M-40
Cu.M.
6793.00
413.00
Cu.M.
5500.00
413.00
b)M-25
Cu.M.
5983.00
413.00
c)M-30
Cu.M.
6012.00
413.00
d)M-35
Cu.M.
6145.00
413.00
e)M-40
Cu.M.
6213.00
413.00
Item
No.&
Item
code
Description Of Items
Unit
25
No.
16711.00
1453.00
BR-16
26
R.M.
2145.00
235.00
26B
R.M.
1376.00
165.00
27
R.M.
2627.00
235.00
Rmt.
7909.00
909.00
Cu.M.
5570.00
414.00
BR-16
28
BR-16
29
Item
No.&
Item
code
Description Of Items
Unit
b)M-25
Cu.M.
5811.00
414.00
c)M-30
Cu.M.
5861.00
414.00
d) M-35
Cu.M.
5975.00
414.00
a)M-20
Cu.M.
5323.00
414.00
b)M-25
Cu.M.
5553.00
414.00
c)M-30
Cu.M.
5599.00
414.00
d) M-35
Cu.M.
5709.00
414.00
Cu.M.
952.00
75.00
a)M-15
Cu.M.
4290.00
413.00
b)M-20
Cu.M.
4835.00
413.00
c)M-25
Cu.M.
5304.00
413.00
d)M-30
Cu.M.
5352.00
413.00
B) INTERMEDIATE PLUG
30
32
Item
No.&
Item
code
Description Of Items
Unit
A) Well Cap
a)M-20
Cu.M.
5145.00
413.00
b)M-25
Cu.M.
5635.00
413.00
c)M-30
Cu.M.
5647.00
413.00
d)M-35
Cu.M.
5743.00
413.00
a)M-20
Cu.M.
5168.00
431.00
b)M-25
Cu.M.
5640.00
431.00
c)M-30
Cu.M.
5699.00
431.00
d)M-35
Cu.M.
5823.00
431.00
a)M-20
Cu.M.
6076.00
653.00
b)M-25
Cu.M.
6252.00
653.00
c)M-30
Cu.M.
6472.00
653.00
d)M-35
Cu.M.
6582.00
653.00
e)M-40
Cu.M.
6691.00
653.00
B) Pile Cap
33
BR-29
34
Item
No.&
Item
code
Description Of Items
Unit
i) Foundation
M.T.
64250.00
8000.00
ii) Sub-Structure
M.T.
62250.00
8000.00
M.T.
64250.00
8000.00
i) Foundation
M.T.
64975.00
8000.00
ii) Sub-Structure
M.T.
62975.00
8000.00
M.T.
64975.00
8000.00
i) Foundation
M.T.
71265.00
8000.00
ii) Sub-Structure
M.T.
69265.00
8000.00
M.T.
71265.00
8000.00
a)M-15
Cu.M.
6128.00
1109.00
b)M-20
Cu.M.
6514.00
1109.00
c)M-25
Cu.M.
6664.00
1109.00
d)M-30
Cu.M.
6839.00
1109.00
e)M-35
Cu.M.
6907.00
1109.00
f)M-40
Cu.M.
7026.00
1109.00
35
BR-38
Item
No.&
Item
code
Description Of Items
36
BR-30
37
BR-29
38
Unit
Cu.M.
6031.00
653.00
b)M-25
Cu.M.
6252.00
653.00
c)M-30
Cu.M.
6472.00
653.00
d)M-35
Cu.M.
6582.00
653.00
e)M-40
Cu.M.
6691.00
653.00
f)M-45
Cu.M.
6911.00
653.00
g)M-50
Cu.M.
7131.00
653.00
a) upto 25 mm dia.
No.
340.00
125.00
b) above 25 mm dia.
No.
472.00
125.00
Sq.M.
76.00
14.00
Cu.
Cm.
2.00
0.30
steel
39
Item
No.&
Item
code
Description Of Items
Unit
40
MT
340.00
1.10
MT
325.00
1.10
R.M.
25018.00
1492.00
Sq.M.
1176.00
122.00
a) 18 mm. Thick
Sq.M.
1331.00
229.00
b) 25 mm. Thick
Sq.M.
2217.00
229.00
c) 37 mm. Thick
Sq.M.
2103.00
263.00
Rmt.
42
43
BR-30
44
BR-32
45
Providing & fixing in position expansion joint with ----bituminous pad as per detailed drawing etc. complete
Spec. No. BR-32 Page No.146
103400.00 10340.00
Item
No.&
Item
code
Description Of Items
46
BR-35
47
Unit
Sq.M.
431.00
70.00
b)M-20
Sq.M.
451.00
70.00
c)M-25
Sq.M.
482.00
70.00
d)M-30
Sq.M.
497.00
70.00
e)M-35
Sq.M.
508.00
70.00
f)M-40
Sq.M.
517.00
70.00
Sq.M.
935.00
121.00
a)M-15
Cu.M.
4899.00
680.00
b)M-20
Cu.M.
5327.00
680.00
c)M-25
Cu.M.
5543.00
680.00
d)M-30
Cu.M.
5756.00
680.00
e)M-35
Cu.M.
5842.00
680.00
f)M-40
Cu.M.
6013.00
680.00
BR-35
Item
No.&
Item
code
Description Of Items
Unit
49
Cu.M.
1036.00
275.00
No.
1105.00
70.00
R.M.
162.00
11.00
Cu.M.
3157.00
330.00
a)M-10
Cu.M.
3740.00
330.00
b)M-15
Cu.M.
4070.00
330.00
Cu.M.
1035.00
275.00
51
52
BR-33
53
BR-45
54
BR-34
Item
No.&
Item
code
Description Of Items
Unit
55
M.T.
191070.00
5353.00
a)M-25
R.M.
2248.00
745.00
b)M-30
R.M.
2306.00
745.00
c)M-35
R.M.
2365.00
745.00
d)M-40
R.M.
2424.00
745.00
a)M-25
R.M.
2156.00
207.00
b)M-30
R.M.
2166.00
207.00
c)M-35
R.M.
2179.00
207.00
d)M-40
R.M.
2203.00
207.00
R.M.
1747.00
146.00
57
58
BR-39
Item
No.&
Item
code
Description Of Items
block
R.M.
1741.00
146.00
R.M.
1673.00
141.00
R.M.
2047.00
147.00
Sq.M.
6895.00
1440.00
Cu.M.
704.00
220.00
Unit
with
bed
61
BR-42
62
BR-43
63
Cu.M.
139927.00 10346.00
Item
No.&
Item
code
Description Of Items
Unit
64
Cu.M.
94463.00
10450.00
Sq.M.
688.00
255.00
Kg.
1234.00
87.00
Cu.M.
3135.00
1123.00
66
Item
No.&
Item
code
Description Of Items
68
Unit
69
a) 25mm
Sq.M.
637.00
79.00
b) 40mm
Sq.M.
1019.00
103.00
Sq.M.
260.00
64.00
Sq.M.
505.00
160.00
Item
No.&
Item
code
Description Of Items
Unit
71
Providing
and
applying
Polymer
synthetic
elastomeric coating cum paint, ready to use for
bridge structure in Saline as to avoid salt penitration
from marine environmet & U.V effects of sunrays,
fungus developments and to protect the reinforcement
from marine atmoshpere effects in three coats
including sand blasting, cleaing the surface of
concrete, brushing and steel reinforcement and
applying POLYMER coating with PRIMER, FIRST
COAT and SECOND COAT at an interval of 24
hours in approved shade and colour, but not to applied
on oil, Grease, Tar & Moisture of surface, including
Scaffolding etc (as directed by Engineer in Charge)
Complete.
NOTE :- Thinner only, KEEP AWAY FROM FIRE
AND DIRECT SUNLIGHT.
Sq.M.
528.00
56.00
Cu.M.
180.00
147.00
a) Abutment
Cu.M.
162.00
43.00
b) Returns
Cu.M.
78.00
43.00
c) Piers
Cu.M.
233.00
43.00
Cu.M.
163.00
43.00
Cu.M.
76.00
43.00
73
BR-4
Dewatering
for
---(a/b/c/d/e)--in---(A/B/C)--including diversion of stream providing cofferdam,
bunds etc. as may be necessary for foundation and
other parts of work and bailing out and pumping out
water below the actual initial natural water level for
start of that particular component till completion of
bridge etc. Complete
Spec. No. BR-4 Page No.114-116
(A) other soil
Item
No.&
Item
code
Description Of Items
Unit
Cu.M.
263.00
43.00
b) Returns
Cu.M.
109.00
43.00
c) Piers
Cu.M.
289.00
43.00
Cu.M.
281.00
43.00
Cu.M.
133.00
43.00
a) Abutment
Cu.M.
538.00
43.00
b) Returns
Cu.M.
204.00
43.00
c) Piers
Cu.M.
733.00
43.00
Cu.M.
766.00
43.00
Cu.M.
358.00
43.00
74
MORTH
12.23,
12.24,
12.25/
1100,
1600 &
1700.
Item
No.&
Item
code
75
Description Of Items
Unit
a) 450 mm dia
R.M.
1896.00
19.00
b) 475 mm dia
R.M.
2113.00
21.00
c) 500 mm dia
R.M.
2340.00
23.00
d) 525 mm dia
R.M.
2581.00
26.00
e) 550 mm dia
R.M.
2833.00
29.00
f) 600 mm dia
R.M.
3372.00
34.00
g) 625 mm dia
R.M.
3658.00
36.00
h) 650 mm dia
R.M.
3956.00
40.00
I) 750 mm dia
R.M.
5267.00
53.00
j) 800 mm dia
R.M.
5424.00
57.00
k) 825 mm dia
R.M.
5512.00
62.00
l) 900 mm dia
R.M.
6558.00
73.00
n) 975 mm dia
R.M.
7697.00
86.00
m) 1000 mm dia
R.M.
8097.00
90.00
o) 1050 mm dia
R.M.
8401.00
94.00
p) 1100 mm dia
R.M.
9220.00
96.00
q) 1200 mm dia
R.M.
10969.00
113.00
r) 1500 mm dia
R.M.
17145.00
176.00
R.M.
1912.00
19.00
Item
No.&
Item
code
MORTH
1107
page
344
76
Description Of Items
Unit
b) 475 mm dia
R.M.
2130.00
21.00
c) 500 mm dia
R.M.
2360.00
23.00
d) 525 mm dia
R.M.
2602.00
26.00
e) 550 mm dia
R.M.
2856.00
29.00
f) 600 mm dia
R.M.
3399.00
34.00
g) 625 mm dia
R.M.
3688.00
36.00
h) 650 mm dia
R.M.
3989.00
40.00
I) 750 mm dia
R.M.
5311.00
53.00
j) 800 mm dia
R.M.
5344.00
57.00
k) 825 mm dia
R.M.
5554.00
62.00
l) 900 mm dia
R.M.
6610.00
73.00
n) 975 mm dia
R.M.
7758.00
86.00
m) 1000 mm dia
R.M.
8162.00
90.00
o) 1050 mm dia
R.M.
8485.00
94.00
p) 1100 mm dia
R.M.
9314.00
96.00
q) 1200 mm dia
R.M.
11080.00
113.00
r) 1500 mm dia
R.M.
17318.00
176.00
R.M.
2914.00
0.00
b) 475 mm dia
R.M.
3330.00
0.00
c) 500 mm dia
R.M.
3538.00
0.00
d) 525 mm dia
R.M.
3955.00
0.00
e) 550 mm dia
R.M.
4370.00
0.00
Chiselling in hard
rocks including removing and
stacking the loose material and disposing the
unserviceable materials as directed etc. complete.
Item
No.&
Item
code
77
Description Of Items
Unit
f) 600 mm dia
R.M.
5203.00
0.00
g) 625 mm dia
R.M.
5619.00
0.00
h) 650 mm dia
R.M.
6035.00
0.00
I) 750 mm dia
R.M.
7944.00
0.00
j) 800 mm dia
R.M.
9156.00
0.00
k) 825 mm dia
R.M.
9781.00
0.00
l) 900 mm dia
R.M.
13527.00
0.00
n) 975 mm dia
R.M.
13736.00
0.00
m) 1000 mm dia
R.M.
14359.00
0.00
o) 1050 mm dia
R.M.
15608.00
0.00
p) 1100 mm dia
R.M.
16233.00
0.00
q) 1200 mm dia
R.M.
20811.00
0.00
r) 1500 mm dia
R.M.
29136.00
0.00
M.T.
93117.00
7118.00
R.M.
14467.00
25.00
Item
No.&
Item
code
Description Of Items
79
80
As directed by Engineer-in-charge
Providing fusion bonded epoxy coating
to
reinforcing bars as per IS: 3620-1993 specification for
a thickness of 175+/-50 microns including testing of
coating at plant, extra cost for careful handling using
PVC coating, binding wires instead of G.I.wires,
touching up the material supplied, repair work etc.
complete as per detailed specifications. (Lead 200 km
to and fro from plant) etc. complete.
Unit
M.T.
8963.00
2321.00
M.T.
11798.00
770.00
As directed by Engineer-in-charge
81
Each
198241.00 15941.00
Support
of
staging
322234.00 25873.00
451361.00 36252.00
Item
No.&
Item
code
Description Of Items
Unit
653602.00 52506.00
730404.00 58658.00
852819.00 68462.00
929172.00 74578.00
As directed by Engineer-in-charge
82
Providing
and
applying
Polymer
Synthetic
Elastomeric Coating cum paint, ready to use for
bridge structure in saline as to avoid salt penetration
from marine environment & U.V. effects of sunrays,
fungus developments and to protect the reinforcement
from marine atmosphere effects in three coats
including scaffolding, sand blasting, cleaning the
surface of concrete, brushing steel reinforcement and
applying polymer coating with Primer, 1st coat and 2nd
coat at an interval of 24 hours of approved shade and
colour (But not to applied on Oil, Grease, Tar &
Moisture of surface)
Note : Prior Approval of SE is required
Sq.M.
728.00
75.00
83
Cu.M.
1106.00
440.00
84
Sq.M.
858.00
111.00
85
3300.00
4290.00
880.00
550.00
Item
No.&
Item
code
Description Of Items
Unit
86
Cum
1543.00
95.00
87
Cum
3186.00
330.00
Cu.M.
3690.00
307.00
b)M-15
Cu.M.
3995.00
307.00
Cu.M.
3788.00
411.00
NEW ITEM
Providing & laying plain in situ Plum cement concrete
of trap/granite/quartzite/gneiss/crushed stone
metal
mechanically mixed, placed in foundation and compacted
by vibration including necessary bailing out water, curing
for 14 days (excluding dewatering by pump)(with 15%
plum)
Spec.
No.
A) (Without formwork)
MORTH
405/121
Item
No.&
Item
code
Description Of Items
Unit
Each
33700.00
3370.00
Each
56180.00
5618.00
Each
78650.00
7865.00
Each
95500.00
9550.00
Each
955060.00
95506.00
Load test :
Carrying out load test by collecting all the relevant
data of the bridge from PWD. Design Circle and checking
the design and redesign should be done to calculate safe
working load carrying capacity of bridge if required.
Detailed design and calculation should be done by grid
analysis/courbons method/Little and morice method or by
using AASHTO factors in case of Girder Slab and bon
type superstructure and by dispersion width formula in
Slab type structure should be submitted to PWD for
approval
along
with
method
statement.
The test load shall be applied by appropriate method and
placed longitude initially and transversely for minimum
desired effect with finding of deflection gauges at critical
points with necassary inspection platform and supporting
system including measuring of defection and crack width
if
any.
The adequate safety pracautions shall be taken during
test period including video photography of entire testing
procedure. The soft copy shall be submitted along with
detail design calculations load test result and
recommendations etc complete. approved of SE/CE)
The entire work shall be carried out in presence of
concern Sectional Engineer and Deputy Engineer.
In this column rate for 1st Span had to be quoted after
considering all above said factors.
a) For 1st Span each
Item
No.&
Item
code
Description Of Items
Unit
Each
280900.00
28090.00
Each
10000.00
1000.00
Each
5000.00
500.00
Each
16850.00
1685.00
Item
No.&
Item
code
Description Of Items
Unit
PH,
Chloride
&
Sulphate
Test
Each core should test for pH, Chloride and Sulphate test.
pH test can be done by making concrete power. Test
shall be done either by litmus paper or preferably by
digital pH meter. Chloride and Sulphate test should be
carried out as per IS : 3025 Part - 32 and IS : 3025 part 24
respectively.
Test report should mention pH, Chloride and Sulphate
values for each core.
Each
2800.00
In-situ
Absorption
Test
It shall be done as per IS specifications/ASTM
specification.
Each
2800.00
280.00
In-situ
It shall be
specification.
Permeability
Test
as per IS specifications/ASTM
Each
2800.00
280.00
Carbonation
Test
Carbonation Test shall be done by spraying or by
applying on concrete phenolphthalein or rain bow
indicator
as
approved
by
Engineer-in-charge.
Carbonation depth shall be measured in milimeter (mm)
and should submit along with the report.
Each
670.00
67.00
10
Half
Cell
Potential
Test
Half cell potential test carried out to check the corrosion
attack on reinforcement will in the presense of
D.E./S.O.The calibrated equipement shall be used and
calibration certificate should be available at site during
testing.
Test should be carried out as per ASTM-C876-80. Test
report should mention corrosion readings along with
photographs.
Each
670.00
67.00
11
Each
560.00
56.00
done
Item
No.&
Item
code
Description Of Items
Unit
12
Each
560.00
56.00
13
Cover
measurement
by
cover
meter
:
Each Cover meter test should be carried out with
pachometer digital instrument having data storage
capacity Equipment should properly calibrated and
calibration certificate should be available at site during
testing.
The test must be carried out in the presence of concern
D.E./S.O.
Test report should mention number of bars. minimum and
maximum cover and average depth of cover along with
graphical representation along with photographs.
Each
560.00
56.00
14
Preparing
Estimate
for
repair,
BOQ,
each
specification and methodology, suggesting make and
type
of
material.
Preparation of a execution clear (without ambiguity)
summary report with cerification based on the bridge
inspections done, carrying out measurement of the
defects and estimating the ouantities for the repair items
and preparation of estimate in the P.W.D s formation
specifying the procedures and specifications in
consultaion with competent authority for various
repair/rehabilitation items, suggesting the materials to be
used, their source for doing quantity work. also
suggesting the equipments/machinery to be used. The
payment will be made after sanctioning of the
estimate, procedures and specification by the
competent authority.
Each
3370.00
337.00
Item
No.&
Item
code
Description Of Items
Unit
C. D. WORK
1
825.00
250.00
3677.00
584.00
CD -1 P-317
2
CD -1 P-317
CD-3
P-160
a)
1:5:10
Cu. M.
b)
1:4:8
Cu. M.
4010.00
584.00
c)
1:3:6
Cu. M.
4479.00
584.00
d)
M-15
Cu. M.
5311.00
584.00
1135.00
243.00
2975.00
672.00
CD -2 P-317
4
Item
No.&
Item
code
Description Of Items
Unit
CD -3 P-318
5
2578.00
346.00
CD -4 P-319
6
A)
i)
Diameter 450 mm
Rmt
1245.00
197.00
ii)
Diameter 600 mm
Rmt
1842.00
241.00
iii)
Diameter 800 mm
Rmt
2978.00
344.00
iv)
Diameter 900 mm
Rmt
3474.00
344.00
v)
Diameter 1000 mm
Rmt
3998.00
402.00
vi)
Diameter 1200 mm
Rmt
5527.00
463.00
Diameter 600 mm
Rmt
3027.00
243.00
ii)
Diameter 800 mm
Rmt
4926.00
245.00
iii)
Diameter 900 mm
Rmt
5604.00
352.00
iv)
Diameter 1000 mm
Rmt
6287.00
403.00
v)
Diameter 1200 mm
Rmt
8442.00
461.00
Diameter 600 mm
Rmt
3337.00
243.00
ii)
Diameter 800 mm
Rmt
5664.00
245.00
Item
No.&
Item
code
Description Of Items
Unit
iii)
Diameter 900 mm
Rmt
6639.00
352.00
iv)
Diameter 1000 mm
Rmt
8407.00
403.00
v)
Diameter 1200 mm
Rmt
9845.00
461.00
3900.00
1000.00
3275.00
300.00
626.00
123.00
4498.00
539.00
5048.00
830.00
Providing cast in situ block 1:3:6 cement concrete with circle Cu.M.
or other shaped opening for water way including necessary
form work, compacting, finishing and curing etc. complete.
CD -6 P-320
8
CD -7 P-321
CD -8 P-321
10
As directed by Engineer-In-Charge
11
Item
No.&
Item
code
Description Of Items
Unit
CD -10 P-322
12
400.00
49.00
CD -12 P-322
13
14
a)M-15
Cu.M.
4159.00
387.00
b)M-20
Cu.M.
4632.00
387.00
Providing & fixing precast M-20 RCC Slab over the span of Cu.M.
the C.D.Work as per detailed drawing including Tor Steel
Reinforcement, conveyance, fixing in proper position in CM
1:3
and
curing,
finishing
etc.
complete.
8468.00
810.00
CD -6 P-320
Item
No.&
Item
code
Description Of Items
Unit
SAKAV
80050.00
8085.00
83480.00
11325.00
Providing & fixing 50mm thick RCC Planks for Sakav decking Sq.M
of size 120m x 0.30m in CC M-20 including fixing with
M.S.Flat 40mm x 6 mm with nut and bolt, scaffolding etc.
complete
1290.00
132.00
Providing and fixing chequered plate 5/6mm thick for sakav Sq.M
decking including fixing with nut & bolts or welding as per
requirement, One Coat of Red Oxide paint, scaffolding etc.
complete
3372.00
110.00
Providing and fixing 25mm. "B" Class G.I. Pipe railing in two R.M.
rows with oil painting in two coats including cost of pipe
fixture etc. completed. (Excluding M.S.Angle Post)
708.00
195.00
Item
No.&
Item
code
Description Of Items
Unit
ROAD
1
a)
Cu.M.
125.00
80.00
b)
Hard murum
Cu.M.
146.00
85.00
c)
Cu.M.
163.00
95.00
55.00
5.00
Excavation for roadway in earth soil of all sorts sand, gravel Cu.M.
or soft murum including dressing section to the required
grade, camber and side slopes and conveying the excavated
materials with all lifts upto a lead of 50m and spreading for
embankment or stacking, disposing as directed.
By Mechanical means
Soft rock
Cu.M.
254.00
215.00
b)
Cu.M.
480.00
300.00
c)
Cu.M.
567.00
360.00
Item
No.&
Item
code
Description Of Items
d)
4
Unit
Cu.M.
500.00
170.00
a)
Cu.M.
200.00
95.00
b)
In Hard murum
Cu.M.
234.00
100.00
c)
Cu.M.
262.00
105.00
d)
In Soft rock
Cu.M.
456.00
195.00
e)
Cu.M.
755.00
315.00
a)
Cu.M.
82.00
6.00
b)
In Hard murum
Cu.M.
91.00
12.00
c)
Cu.M.
150.00
20.00
Item
No.&
Item
code
Description Of Items
Unit
a)
lead of 50m
Cu.M.
69.00
30.00
b)
Cu.M.
126.00
40.00
c)
Cu.M.
140.00
35.00
a)
Static roller
Cu.M.
55.00
24.00
b)
Vibratory roller
Cu.M.
70.00
24.00
a)
Static roller
Cu.M.
58.00
6.00
b)
Vibratory roller
Cu.M.
76.00
6.00
52.00
30.00
Item
No.&
Item
code
10
Description Of Items
Unit
11
a)
Cu.M.
132.00
78.00
b)
Cu.M.
138.00
78.00
i)
Cu.M.
132.00
78.00
ii)
Cu.M.
162.00
78.00
119.00
76.00
Cu.M.
216.00
76.00
ii)
Cu.M.
241.00
76.00
i)
Cu.M.
213.00
76.00
ii)
Cu.M.
244.00
76.00
Item
No.&
Item
code
13
Description Of Items
Unit
76.00
Cu.M.
465.00
21.00
a) By blasting/Quarrying
Cu.M.
280.00
105.00
b) By breaking boulders
Cu.M.
240.00
95.00
Cu.M.
685.00
188.00
Cu.M.
750.00
188.00
Cu.M.
344.00
125.00
Cu.M.
394.00
125.00
By blasting
II)
Laterite
15
a)
By Blasting
II)
60mm metal
40mm metal
80mm metal
Rd.19(a).P-373
V)
60mm metal
Item
No.&
Item
code
Description Of Items
VI)
40 mm metal
Unit
Cu.M.
419.00
125.00
Cu.M.
531.00
190.00
Cu.M.
544.00
190.00
Supplying 80 mm. laterite stone metal at the road side for Cu.M.
metal including conveying & stocking etc. complete (50 meter
lead hand broken from boulders (Including Royalty)
312.00
188.00
325.00
200.00
264.00
67.00
139.00
67.00
222.00
122.00
60mm metal
16
Supplying 60 mm. laterite stone metal at the road side for Cu.M.
metal including conveying & stocking etc. complete (50 meter
lead hand broken from boulders) (Including Royalty)
Spec. - As directed by Engineer-In-Charge.
18
19
20
Item
No.&
Item
code
21
Description Of Items
Unit
83.00
17.00
11.00
27.00
22.00
Spreading gravel / hard murum /soft murum & stone dust Cu.M.
over the rubble soling, oversize and size metal layer /
Blandage on W.B.M. surface etc. complete.
Spec. No.:Rd.Rd.28,31,36.P-379,382,388
23
24
25
i)
By Static roller
Sq.M.
15.00
2.00
(II)
By Vibratory Roller.
Sq.M.
20.00
2.00
26
i)
on W.B.M. surface
Sq.M.
4.25
3.00
ii)
Sq.M.
6.00
4.00
iii)
on murum surface
Sq.M.
2.50
1.00
Item
No.&
Item
code
27
Description Of Items
Unit
i)
Static roller
Sq.M.
16.00
2.00
ii)
Vibratory Roller.
Sq.M.
19.00
2.00
static roller
Sq.M.
16.00
2.00
ii)
Vibratory Roller.
Sq.M.
19.00
2.00
28
7.00
1.00
29
5.00
1.00
30
19.00
10.00
32
i)
Static roller
Sq.M.
6.25
1.00
ii)
Vibratory Roller.
Sq.M.
11.25
1.00
Cu.M.
903.00
230.00
Rd.64.
P-420
a)
40 mm
Item
No.&
Item
code
33
Description Of Items
Unit
b)
25 mm
Cu.M.
903.00
230.00
c)
20 mm
Cu.M.
950.00
230.00
d)
12 mm
Cu.M.
950.00
230.00
e)
10 mm
Cu.M.
950.00
230.00
f)
6 mm
Cu.M.
750.00
228.00
12.00
9.00
5.00
2.00
310.00
85.00
1499.00
285.00
Refixing the disturbed guard stone in position and in line with No.
necessary excavation, back filling, ramming etc. Complete.
35
36
37
Item
No.&
Item
code
Description Of Items
Unit
38
i)
Sq.M.
181.00
29.00
ii)
Sq.M.
188.00
29.00
39
i)
Sq.M.
143.00
1.00
ii)
Sq.M.
150.00
1.00
78.80
1.00
77.70
1.00
Providing & laying Single coat surface dressing or first coat of Sq.M.
the two coat surface dressing with 0.15 cum crushed stone
chipping & bitumen 12Kg/10Sqm dressing as wearing course
consisting of a layer of bituminious binder laid on the
prepared surface, followed by a cover of crushed stone
chippings of specified size (may be precoated also) and rolling
with power roller 8-10 tonne.(19mm nominal chipping size)
Using 60/70 Asphalt
Item
No.&
Item
code
41
Description Of Items
Unit
42
a)
Sq.M.
39.00
7.00
b)
Sq.M.
73.00
9.00
43
i)
Power Roller
Sq.M.
304.00
32.00
ii)
Sq.M.
312.00
32.00
Item
No.&
Item
code
Description Of Items
Unit
44
i)
Power Roller
Sq.M.
236.00
23.00
ii)
Sq.M.
242.00
23.00
12.00
4.00
136.00
40.00
263.00
143.00
222.00
134.00
91.00
55.00
44.00
19.00
Providing and painting centre line strip 3.00 x 0.10 metre R.M.
4.50 m interval etc. Complete with superior quality road
marking paint of approved brand In two coats including
traffic control etc complete.
Spec. As directed by Engineer-in Charge
45
46
Painting 5th K.M. stone with approved enamel paint in two No.
coats and lettering including cleaning surface etc. complete.
48
49
Item
No.&
Item
code
Description Of Items
Unit
51
i)
No.
5.00
2.00
ii)
No.
6.00
2.00
iii)
No.
7.00
2.00
iv)
No.
10.00
2.00
35.00
21.00
30.00
10.00
52
53
10.00
5.00
54
33.00
28.00
Item
No.&
Item
code
55
Description Of Items
Unit
690.00
7.50
7.00
2940.00
348.00
2305.00
270.00
1020.00
166.00
685.00
83.00
57
Providing R.C.C 5th kilometre stone standard size (M-15) and No.
shape including painting, numbering as per I.R.C. design for
highway and fixing in standard size of cement concrete 1:4:8
block etc. complete.
Spec. No.:Rd. 57 Page No. 411
58
59
60
Item
No.&
Item
code
61
Description Of Items
Unit
18.00
7006.00
46.00
250.00
100.00
62
63
Item
No.&
Item
code
Description Of Items
Unit
895.00
294.00
567.00
400.00
3720.00
520.00
5640.00
660.00
880.00
115.00
66
67
68
No
Item
No.&
Item
code
Description Of Items
70
Unit
No
770.00
115.00
a) 80 mm laterite metal
Cu.M.
95.00
94.00
b) 60 mm laterite metal
Cu.M.
103.00
102.00
c) 60 mm trap metal
Cu.M.
116.00
123.00
d) 40 mm trap metal
Cu.M.
124.00
130.00
330.00
73.00
Providing & fixing plain cement concrete M-20 guard stones No.
of standard size 75cm x 20cmx20cm including fixing in ground
and white washing etc. complete.
As directed by Engineer in Charge
71
218.00
35.00
72
226.00
35.00
Item
No.&
Item
code
Description Of Items
Unit
73
215.00
30.00
74
223.75
29.00
75
4.00
4.00
74.00
6.00
283.00
29.00
77
Item
No.&
Item
code
78
Description Of Items
Unit
Cum
1111.00
218.00
Cum
1205.00
218.00
Cum
1344.00
218.00
Cum
1051.00
14.00
Cum
1103.00
14.00
Cum
1160.00
14.00
B. By Mechanical Means
79
388.00
29.00
80
29.00
18.00
Item
No.&
Item
code
Description Of Items
Unit
81
8.00
1.10
82
Wet
Mix
Macadam Cum
Providing, laying, spreading and compacting graded stone
aggregates to wet mix macadam specification including
premixing the material with water at OMC in mechanical mix
plant carriage of mixed material by tipper to site, laying in
uniform layers with paver in sub base/ base course on well
prepared surface and compacting with vibratory roller ro
achieve
the
desired
density.
Spec : MORTH 406 Page 123
1229.00
18.00
83
287.00
114.00
84
320.00
77.00
85
Prime
Coat Sqm
Providing and applying primer coat with bitumen emulsion on
prepared surface of granular base including clearing of road
surface and spraying primer at the rate of 0.60 kg/ sqm. Using
mechanical
means.
Spec : MORTH 502 Page 145
31.00
0.00
86
Tack
Coat
Providing and applying tack coat with bitumen emulsion using
emulsion pressure distributor at the rate of ........ kg per sqm.
On the prepared bituminious/ granular surface cleaned with
mechanical
broom.
Spec : MORTH 503 Page 148
a) On B.T. Surface by Emulsion at 5 Kg/10 Sqm
Sqm
25.00
4.00
Sqm
30.00
6.00
Item
No.&
Item
code
Description Of Items
Unit
8.00
88
Sqm
20.00
4.00
Sqm
39.00
7.00
Cum
6410.00
45.00
Sqm
367.00
1.00
Sqm
512.00
1.00
Bituminous
Macadam
Providing and applying bituminous macadam with 40-60 TPH
hot mix plant producing an average output of 37 tonnes per
hour using crushed aggregates of specified grading premixed
with bituminous binder, transported to site, laid over a
previously prepared surface with paver finisher to the
required grade, level and alignment and rolled as per Clause
501.6 and 501.7 to achieve the desired compaction.Bitumen
Content
3.30
%
Spec : MORTH 504 Page 149
Grading I (40 mm Nominal Size)
89
Bituminous
Penetration
Macadam
Construction of penetration macadam over prepared base by
providing a layer of compacted crushed coarse aggregates
using chips spreder with alternate applications of bituminous
binder and key aggregates and rolling with a smooth wheeled
steel roller 8-10 tonnes capacity to achieve the desired
degree
of
compaction.
Spec : MORTH 505 Page 157
Item
No.&
Item
code
90
Description Of Items
Unit
Built-up
Spray
Grout Sqm
Providing laying and rolling of built up spray grout layer over
prepared base consisting of a two layer composite
construction of compacted crushed coarseaggregates using
motor grader for aggregates. Key stone chips spreader may
be used with application of bituminous binder after each
layer, and with key aggregates placed on top of the second
layer to serve as a base conforming to the line,grades and
cross section specified, the compacted layer thickness being
75
mm.Initial
lead
consider
is
0.5
Kms.
Binder Content 15 Kg/10Sqm for each layer i.e. 30 Kg/10 Sqm
for
both
layers
1.00
Cum
7754.00
46.00
Cum
9426.00
46.00
Bituminous
Concrete
Providing and laying bituminous concrete with 40-60 TPH
batch type HMP producing an average output of 75 tonne per
hour using crushed aggregates of specified grading, premixed
with bituminous binder @ 5% of mix and filler, transporting
the hot mix to work site, laying with a hydraulic paver finisher
with sensor control to the required grade, level and
alignment, rolling with smooth wheeled, vibratory and
tandem rollers to achieve the desired compaction as per
MORT&H Specificiations Clause 509 complete in all respects.
Spec : MORTH 512 Page 186
Item
No.&
Item
code
93
94
Description Of Items
Unit
Surface
Dressing
Providing and laying surface dressing as wearing course in
single coat using crushed stone aggregates of specified size on
a layer of bituminous binder laid on prepared surface and
rollingwith 8-10
smooth wheeled steel roller.
Spec : MORTH 508 Page 170
19 mm Nominal Chipping Size.Bitumen 1.20 Kg/Sqm
Sqm
93.00
0.00
Sqm
80.00
0.00
Sqm
159.00
1.00
Sqm
150.00
1.00
Seal
Coat Sqm
A)
Type
AProviding and laying seal coat sealing the voids in a
bituminous surface laid to the specified levels, grade and
cross fall using type 'A'
seal coats.Type A
Binder content 9.80 Kg/10 Sqm.
72.00
0.00
B)Type
B. Sqm
Providing and laying of premix
seal coat with HMP of
appropriate capacity using crushed stone chipping 6.70 mm
size and penetration bitumen of suitable grade.
Binder content 6.80 Kg/10 Sqm.
59.00
0.00
95
Item
No.&
Item
code
Description Of Items
Unit
7155.00
46.00
97
8995.00
49.00
98
10719.00
50.00
Item
No.&
Item
code
Description Of Items
Unit
99
100
11.00
Sq.M.
237.00
36.00
Sq.M.
251.00
36.00
i) Power Roller
Sq.M.
196.00
35.00
Sq.M.
200.00
35.00
i) Power Roller
Sq.M.
253.00
36.00
Sq.M.
275.00
36.00
b) 50mm
Item
No.&
Item
code
Description Of Items
Unit
b) 50mm
101
102
i) Power Roller
Sq.M.
213.00
33.00
Sq.M.
223.00
33.00
a) 12 mm thick
Sq.M.
630.00
40.00
b) 25 mm thick
Sq.M.
1100.00
80.00
c) 40 mm thick
Sq.M.
1300.00
120.00
110798.00 11079.00
5985.00
598.00
Item
No.&
Item
code
Description Of Items
Unit
Providing & fixing HYSD steel for the 25m gantry foundation M.T.
as per drawingfor Gantry Foundation including cutting,
bending, binding alongwith foundation bolts alignment etc.
57353.00
5735.00
21600.00
2160.00
2520.00
252.00
Supply & fixing of removable type clear film for the overhead Sq.M.
gantry signboard of size 3.66m x 2.44m & all around vertical
columns of the gantry around 8m height as per drawing for
Gantry Pictorial Illustration
Spec : As directed by Engineer-In-Charge
107
110798.00 11079.00
Supply of foundation bolts set for the the above said M.T.
cantilever alongwith the connecting hardwares as per
drawing for Cantilever-Structure
Spec : As directed by Engineer-In-Charge
12000.00
1200.00
Item
No.&
Item
code
109
Description Of Items
Unit
598.00
57353.00
5735.00
12000.00
1200.00
70000.00
7000.00
Providing & fixing HYSD steel for the Cantilever foundation as M.T.
per drawing for Cantilever Foundation including cutting,
bending, binding alongwith foundation bolts alignment etc.
Supply of foundation bolts set for the the above said gantry M.T.
alongwith the connecting hardwares as per drawing for
Gantry-Structure
Spec : As directed by Engineer-In-Charge
Item
No.&
Item
code
Description Of Items
Unit
113
11107.00
1110.00
114
6381.00
638.00
Item
No.&
Item
code
Description Of Items
Unit
115
7956.00
795.00
116
14610.00
1461.00
Item
No.&
Item
code
Description Of Items
Unit
117
62671.00
118
11725.00
Item
No.&
Item
code
Description Of Items
Unit
119
54653.00
120
121568.00
Item
No.&
Item
code
Description Of Items
Unit
121
38895.00
122
23.00
17.00
10.00
1.00
Item
No.&
Item
code
124
Description Of Items
Unit
Road
Delimeators Nos
Supplying and installation of delineators ( road way
indicators, hazard markers, object markers) 80-100 cm high
above ground level, painted black and white in 15 cm wide
strips, fitted with 80 x 100 mm rectangular or 75 mm dia
circular reflectorised panels at the top, buried or pressed into
the ground and conforming to IRC:79 and the drawings.
9.00
2997.00
101.00
125
Item
No.&
Item
code
Description Of Items
Unit
126
1 683.00
127
Road
Studs
with
lense
Reflectors: Per 1 No
Providing and fixing of reflective raised pavement marker
(RPM's)/Cat eyes/road studs conforming to ASTMD4280
TypeH having reflective pannels made of presmatic lense of
total internal reflection the prismatic lense should be
electronically fixed (welded)to the body made of poly
carbonate mould with a height of 20mm size of
130mmx105mm and reflecting area of 13 Sq.cm with a slope
of retro reflective surface withen the limit of 35+ degree to
the base on either side.The marker shall disply an initial
minimum luminous intensity of 279mod/lux at an entrance
angle of zero degree an observation angle of 0.2degree. The
corrospponding values for 20 degree entrance and 0.2 Degree
observation angle shall be 112 mod/lux with colour
multiplieng factor on either cases for white yellow and red
markers being 1.0,0.6 and 0.25 respectively.
340.00
217.00
34.00
Item
No.&
Item
code
Description Of Items
Unit
128
3843.00
384.00
Item
No.&
Item
code
Description Of Items
Unit
129
725.00
72.00
130
2050.00
205.00
Item
No.&
Item
code
Description Of Items
Unit
131
2275.00
227.00
132
13375.00
1337.00
Item
No.&
Item
code
Description Of Items
Unit
5020.00
502.00
134
3615.00
361.00
Item
No.&
Item
code
135
Description Of Items
B)
___
do____
shape
of
size
60cm.
Unit
Diameter. No.
315.00
2275.00
227.00
136
Item
No.&
Item
code
Description Of Items
Unit
137
2010.00
201.00
138
10810.00
1081.00
Item
No.&
Item
code
Description Of Items
Unit
139
10730.00
1073.00
140
12625.00
1262.00
141
12217.00
1221.00
Item
No.&
Item
code
Description Of Items
Unit
142
12140.00
1214.00
143
14030.00
1403.00
Item
No.&
Item
code
Description Of Items
Unit
GENERAL NOTES
Rates are inclusive of following charges
A) Over Head Charges
10%
B) Service Tax
C) Vat
5%
E) TDS
10%.
Item
No.&
Item
code
Description Of Items
Unit
Item Description
Unit
Out Turn
(Without chaining )
Day
4 Nos
Day
7 Nos
Levelling
Day
3 Nos
Day
6 Nos
Catchment Area Survey upto 100 Acres with chain and compass Day
(Traverse survey )
6 Nos
-do- village Map upto 100 Acres by visualisation (without chain Day
and Compass )
2 Nos
9 Nos
Day
6 Nos
1) ROAD SURVEY
1
Tin/K.M.
2 Tin/Km
Chunam
K.M.
2 Kg/Km.
Pegs
No/Km.
65 Nos/Km
Kersone oil
Lit/Month
6 Ltr/Month
Cell/Month 3Cell/Month
Item
No.&
Item
code
6
Description Of Items
Flags
Unit
No./K,
2Km/Day
2 Km/Day
1.50Km/Day
Km/Day
1Km./Day
Km/Day
1.50Km/Day
1.50
Km/Day
1.50
Km/Day
Km/Day
1.25Km/Day
Detailed survey for a new hilly road taking C/S at every chain Km/Day
or as desired including chaining levelling and closing survey
0.50Km/Day
10
0.75Km/Day
11
Km/Day
1.50Km/Day
12
Km/Day
0.75
Km/Day
(II) STREAMS
Km/Day
Item
No.&
Item
code
Description Of Items
Unit
1.50Km/Day
Km/Day
5 Km/Day
Finding out catchment area with traverse survey upto 100 No/Day
acres.
3 No/Day
Finding out catchment area with traverse survey above 100 No/Day
acres.(not traceable in topo- sheets and upto 1 Sq.m. site )
2 No/Day
Fixing chain and apex stones alaong the road on and Av.4 to 5 Km.
chain stone and 5 to 6 apex stone in length of 1 Km. for unit
labour
0.75 Km.
Unit
Rate
for
2012-13
(In Rs)
No
30.00
No
35.00
b) - do - 600mm. x 450mm.
No
60.00
c) - do - 900mm x 900mm.
No
90.00
No
30.00
b) - do - 600mm. x 450mm.
No
55.00
c) - do - 900mm x 900mm.
No
80.00
No
30.00
Chunum (lime)
Kg
14.00
Plastic buckets
a) 2 liters. capacity
No
25.00
b) 5 liters. capacity
No
50.00
No
15.00
Item
No.&
Item
code
Description Of Items
Unit
No
15.00
Nylon rope
Kg
200.00
No
180.00
10
No / day
850.00
11
No / day
1100.00
12
No / day
240.00
13
Survey Shoes
Pair
750.00
14
Lettering Brush
No
40.00
Item
No.&
Item
code
Description Of Items
Unit
Description of Item
Completed
Labour
Km.
2480
Km.
1860
c)
Km.
1240
Km.
930
Km.
5253
Km.
3090
c)
Km.
3502
Km.
1751
2065
Hilly Area
a)
Hilly Area
a)
Unit
Item
No.&
Item
code
Description Of Items
Unit
Km.
12388
Km.
7742
c)
Km.
6194
Km.
3100
Km.
14865
Km.
9291
c)
Km.
7433
Km.
3720
2787
3407
Taking trial pit 1.00 x 1.00 x 1.50 mtr.at 200 metre interval and
minimum 3 numbers for small stream in earth soil of all types,
sand, gravel, soft murum etc.complete.
Hilly Area
Hilly Area
Item
No.&
Item
code
Description Of Items
a)
Unit
No
300
No
386
Trap stone - 20 X 20 X 75 Cm
No
117
b) P.C.C.-M -15 - 10 X 10 X 60 Cm
No
104
c)
No
126
No
123
11
754
12
159
13
a)
R.C.C.-M -15 - 10 X 10 X 60 Cm
d) Laterite Stone - 20 x 20 x 60 Cm
a)
Km
413
Km.
275
c)
Km.
310
Km.
248
Km.
12388
b) Hilly Area
Km.
6194
c)
Km.
4129
Hilly Area
a)
Item
No.&
Item
code
15
Description Of Items
Unit
a)
Km.
15485
b) Hilly Area
Km.
10323
c)
Km.
6194
Item
No.&
Item
code
Description Of Items
Unit
SURVEY
( 2 ) SURVEY FOR C.D. WORK
1
1858
a)
Number
5574
Number
11149
Number
6194
Number
11768
Km.
4058
b) Hilly Area
Km.
2478
c)
Km.
1487
a)
a)
Item
No.&
Item
code
Description Of Items
Km.
11515
b) Hilly Area
Km.
7012
c)
Km.
4675
Km.
13064
b) Hilly Area
Km.
8251
c)
Km.
4955
2748
a)
a)
Unit
Plain area
Hector
829
b) Hilly area
Hector
1658
Plain area
Hector
619
b) Hilly area
Hector
1239
Item
No.&
Item
code
Description Of Items
Unit
a)
No.
14654
2790
93672
1116
c)
98356
1172
103274
1230
e)
108438
1292
No.
Taking trial bores 150 mm (6 ") dia in soft strata & in soft Rmt.
rocks including all materials such as casing pipes & accessories
oil grease steel balls & such other material as required (
including conveying the materials and machineries to site of
work) preserving the loose sample serially in glass/ plastic jar
on site of work and conveying the same to the concerned
office as directed including S.P.T. test and supplying results
etc. complete.. .
5310
2232
Taking trial bores in hard strata 76.20mm.(3") dia for 50.80 Rmt.
mm. (2") core by diamond drilling machine with "N.X. Bit"
with double tube core barrel system including preservation of
core in standard core boxes etc. complete with testing &
supplying results etc. complete..
14417
3348
Providing trun tappa core boxes of jungle wood of size 1.25 No.
x 0.55 x 0.15 metres for preserving core sample with all
fixtures and fastening handles locking arrangement etc.
complete
4421
565
Item
No.&
Item
code
Description Of Items
Unit
Km.
24364.00
Km.
Km.
17153.00
14496.00
Km.
68420.00
Km.
52706.00
Km.
36993.00
Item
No.&
Item
code
Description Of Items
Unit
a) Ghat portion
b) Plain and Rolling terrain
Preparing detailed computer plans on the basis of the
approved detailed survey data of road confirming to guide
lines of govt. of Maharashtra and IRC Hill Road Manual
and other relevant IRC codes including necessary
L.S./C.S. in 5 copies in proper file indexing and paging
with all types of compliance if required from department
etc complete. ( Prior approval of S.E. is necessary before
sanctioning of estimate.)
Km.
Km.
6211.00
5130.00
a)
Km.
2979.00
Km.
2422.00
Km.
Km.
Km.
Km.
2923.00
1948.00
2192.00
1754.00
No.
6427.00
No.
31175.00
Ghat portion
Hilly Area
Item
No.&
Item
code
Description Of Items
Unit
No.
31501.00
a)
No.
7471.00
No.
5009.00
No.
5688.00
No.
4240.00
No.
54062.00
No.
58237.00
Hilly Area
a)
Item
No.&
Item
code
Description Of Items
Unit
No.
No.
6924.00
7685.00
a)
No.
5009.00
No.
5497.00
Km
2766.00
15971.00
Item
No.&
Item
code
Description Of Items
Unit
Km.
Km.
13010.00
17510.00
No.
2393.00
No.
9271.00
No.
17881.00
c)
No.
30133.00
No.
54494.00
e)
No.
12244.00
f)
No.
18900.00
No.
32560.00
No.
55980.00
Item
No.&
Item
code
Description Of Items
Unit
14.00
Item
No.&
Item
code
Description Of Items
Unit
VIDEOGRAPHY
1
1694.00
i)
Within 50 Kms
Day
3465.00
ii)
Beyond 50 Kms
Day
4447.00
iii)
Day
1943.00
3 Copies
64.00
I)a
1 each
18.00
3 Copies
87.00
1 each
18.00
3 Copies
145.00
1 each
29.00
ii)
ii)a
iii)
iii)a
4
Item
No.&
Item
code
Description Of Items
Unit
i) AO ( 1165X817mm )
1 each
635.00
ii) A1 ( 817X570mm )
1 each
508.00
iii) A2 ( 570X396mm )
1 each
444.00
iv) A3 ( 396X275mm )
1 each
381.00
v) A4 ( 285X196mm )
1 each
254.00
i) AO ( 1165X817mm )
1 each
2033.00
ii) A1 ( 817X570mm )
1 each
1525.00
iii) A2 ( 570X396mm )
1 each
1271.00
iv) A3 ( 396X275mm )
1 each
1016.00
v) A4 ( 285X196mm )
1 each
635.00
i) AO ( 1165X817mm )
1 each
762.00
ii) A1 ( 817X570mm )
1 each
635.00
iii) A2 ( 570X396mm )
1 each
571.00
iv) A3 ( 396X275mm )
1 each
444.00
v) A4 ( 285X196mm )
1 each
312.00
Statement 'C'.
TRANSPORTATION CHARGES
STATEMENT 'C' CARRIAGE OF MATERIALS OVER DISTANCE EXCEEDING 0.05 KM.INCLUDING LOADING & UNLOADING
Lead in
Kms
Average
Speed
Km/Hour
No. of trips
in 8 hour
kms done
Quantity of
diesel in ltr.
Cost of diesel
at
Rs.65.13/liter
Quantity of
mobile oil
Cost of oil
per liter
Rs.230/ltr
Cost of 6
mazdoor at
Rs.
283.00/day
Hire
charges of
truck Rs.
Total cost
col.6+8+9+10
Add 10%
over head
charges
Total of
11+12
10
11
12
13
14
0.5
15
7.50
13.50
3.38
219.81
0.09
20.70
1590
2400
4230.51
423.05
4653.57
620.48
16
7.11
20.22
5.06
329.27
0.13
31.01
1590
2400
4350.28
435.03
4785.30
672.93
1.5
16.5
6.77
26.31
6.58
428.36
0.18
40.34
1590
2400
4458.69
445.87
4904.56
724.54
17
6.48
31.90
7.98
519.49
0.21
48.92
1590
2400
4558.41
455.84
5014.25
774.26
2.5
17.25
6.20
37.01
9.25
602.64
0.25
56.75
1590
2400
4649.39
464.94
5114.32
824.59
17.5
5.96
41.74
10.44
679.71
0.28
64.01
1590
2400
4733.72
473.37
5207.09
874.05
3.5
17.75
5.74
46.16
11.54
751.63
0.31
70.78
1590
2400
4812.41
481.24
5293.65
922.66
18
5.54
50.31
12.58
819.14
0.34
77.14
1590
2400
4886.27
488.63
5374.90
970.47
4.5
18.25
5.36
54.22
13.56
882.84
0.36
83.14
1590
2400
4955.98
495.60
5451.58
1017.50
18.5
5.19
57.93
14.48
943.24
0.39
88.83
1590
2400
5022.07
502.21
5524.27
1063.80
18.75
4.88
64.54
16.13
1050.82
0.43
98.96
1590
2400
5139.77
513.98
5653.75
1159.02
19
4.61
70.48
17.62
1147.67
0.47
108.08
1590
2400
5245.75
524.57
5770.32
1252.77
19.3
4.37
75.98
19.00
1237.19
0.51
116.51
1590
2400
5343.70
534.37
5878.07
1343.89
19.6
4.17
81.06
20.27
1319.92
0.54
124.30
1590
2400
5434.22
543.42
5977.64
1433.41
10
20
4.00
86.00
21.50
1400.30
0.57
131.87
1590
2400
5522.16
552.22
6074.38
1518.59
15
25
3.64
115.09
28.77
1873.97
0.77
176.47
1590
2400
6040.44
604.04
6644.48
1827.23
20
25
3.08
129.08
32.27
2101.70
0.86
197.92
1590
2400
6289.61
628.96
6918.57
2248.54
25
25
2.67
139.33
34.83
2268.70
0.93
213.64
1590
2400
6472.34
647.23
7119.57
2669.84
30
25
2.35
147.18
36.79
2396.40
0.98
225.67
1590
2400
6612.07
661.21
7273.28
3091.14
35
30
2.40
174.00
43.50
2833.16
1.16
266.80
1590
2400
7089.96
709.00
7798.95
3249.56
40
30
2.18
180.55
45.14
2939.73
1.20
276.84
1590
2400
7206.57
720.66
7927.22
3633.31
Lead in
Kms
Average
Speed
Km/Hour
No. of trips
in 8 hour
kms done
Quantity of
diesel in ltr.
Cost of diesel
at
Rs.65.13/liter
Quantity of
mobile oil
Cost of oil
per liter
Rs.230/ltr
Cost of 6
mazdoor at
Rs.
283.00/day
Hire
charges of
truck Rs.
Total cost
col.6+8+9+10
Add 10%
over head
charges
Total of
11+12
10
11
12
13
14
60
30
1.60
198.00
49.50
3223.94
1.32
303.60
1590
2400
7517.54
751.75
8269.29
5168.31
70
30
1.41
203.65
50.91
3315.88
1.36
312.26
1590
2400
7618.14
761.81
8379.96
5935.80
80
30
1.26
208.11
52.03
3388.47
1.39
319.09
1590
2400
7697.57
769.76
8467.33
6703.30
90
30
1.14
211.71
52.93
3447.24
1.41
324.63
1590
2400
7761.87
776.19
8538.05
7470.80
100
30
1.04
214.70
53.67
3495.78
1.43
329.20
1590
2400
7814.98
781.50
8596.48
8238.29
125
40
1.10
281.86
70.47
4589.42
1.88
432.19
1590
2400
9011.61
901.16
9912.77
8983.45
150
40
0.94
288.35
72.09
4695.11
1.92
442.14
1590
2400
9127.25
912.72
10039.97
10667.47
175
40
0.82
293.18
73.29
4773.70
1.95
449.54
1590
2400
9213.24
921.32
10134.56
12351.50
200
40
0.73
296.91
74.23
4834.42
1.98
455.26
1590
2400
9279.68
927.97
10207.65
14035.52
225
40
0.65
299.88
74.97
4882.76
2.00
459.81
1590
2400
9332.57
933.26
10265.83
15719.55
250
40
0.59
302.30
75.57
4922.14
2.02
463.52
1590
2400
9375.66
937.57
10313.23
17403.57
275
40
0.54
304.31
76.08
4954.85
2.03
466.60
1590
2400
9411.45
941.14
10352.59
19087.59
300
40
0.50
306.00
76.50
4982.45
2.04
469.20
1590
2400
9441.65
944.16
10385.81
20771.62
325
40
0.46
307.45
76.86
5006.04
2.05
471.42
1590
2400
9467.47
946.75
10414.21
22455.64
350
40
0.43
308.70
77.18
5026.45
2.06
473.34
1590
2400
9489.80
948.98
10438.78
24139.67
375
40
0.41
309.80
77.45
5044.28
2.07
475.02
1590
2400
9509.30
950.93
10460.23
25823.69
400
40
0.38
310.76
77.69
5059.98
2.07
476.50
1590
2400
9526.48
952.65
10479.13
27507.72
Statement 'C2'.
Materials
Unit
Cement, Lime
Shahabad Stones
One
Cubic
metre
One
Cubic
metre
One
metric
tonne
One
metric
tonne
1000
Nos.
One
Square
metre
1000
Nos.
Timber
10
Flooring tiles
11
Sr.No.
One
metric
tonne
One
Cubic
metre
1000
Nos.
One
metric
tonne
12.62
7.42
6.91
42.66
36.21
17.73
46.90
39.39
29.85
27.73
22.34
14.42
1.54
1.54
1.40
17.05
12.81
13.32
42.66
42.66
11.12
18.20
18.20
6.61
25.62
21.38
17.73
37.36
37.36
22.13
One
Cubic
metre
One
Cubic
metre
2013-14
31.35
23.54
One
Cubic
metre
One
Cubic
metre
One Bag
37.66
One Bag
12.12
One Bag
15.12
18.23
4.51
Item
Unit
Rubble
in M3
Over Size
metal in M3
Sand in
M3
Quarry in spaul
in M3
Providing
trap
rubble spoiling 15
to 20cm thick
M3
1.00
--
--
0.20
Providing
soiling
using 80mm over
size trap metal
M3
--
1.00
0.15
--
PILE FOUNDATION
Sr.
No.
Item
Cement
Bags
Sand in M3
M3
7.50
0.45
M3
8.00
0.45
Unit
Sr.
No.
Item
Unit
Cement
Bags
Screened
Sand in
M3
Coarse Aggregate
40mm
in M3
20mm
in M3
12/10m
m in M3
Plain cement
concrete 1:5:10
M3
2.60
0.47
0.90
--
--
Plain cement
concrete 1:4:8
M3
3.40
0.47
0.90
00
00
Plain cement
concrete 1:3:6
M3
4.40
0.445
0.56
0.24
0.11
Plain cement
concrete 1:2:4
M3
6.27
0.445
--
0.57
0.28
M3
4.40
0.445
0.56
0.24
0.11
M3
6.27
0.445
0.57
0.28
M3
7.00
0.445
0.57
0.28
M3
6.27
0.425
0.57
0.28
Concrete (RCC)
9
M3
7.00
0.425
0.57
0.28
10
M3
7.50
0.425
0.57
0.28
11
M3
8.00
0.425
0.57
0.28
BRICK MASONARY.
Sr.
No.
Item
Unit
Cement
in Bags
Screened
Sand in M3
Bricks
in Nos
M.S. Bars
in Kg.
M3
1.42
0.32
475
00
M3
1.42
0.32
475
00
M3
0.22
0.034
55
1.76
M3
2.60
0.25
475
--
M3
2.60
0.25
475
--
M3
1.24
0.25
475
--
STONE MASONARY.
Sr.
No.
Item
Unit
Cement
in Bags
Screened
Sand in M3
Trap
Rubble
in Nos
Corner/
Quins in
Nos
M3
1.77
0.35
1.16
M3
2.05
0.35
1.16
M3
2.05
0.35
1.16
Sr.
No.
Item
1.50
0.30
0.35
Khandkis
in Nos
50
M3
1.50
0.30
0.35
50
M3
1.50
0.30
0.35
50
Sr.
No.
Item
Unit
Cement
in Bags
Screened
Sand in M3
Laterite Stone
45x30x20 cm in
nos.
M3
1.20
0.21
45
M3
1.20
0.21
45
Sr.
No.
Item
Unit
Cement
in Bags
Screened
sand in M3
Course Aggtregate
20mm in
M3
12/10mm
in M3
M2
0.32
0.022
0.033
0.011
M2
0.20
0.020
M2
0.71
0.09
Brick Bat
0.10
00
M3
2.20
0.23
M2
0.22
0.03
M2
0.27
0.02
Item
Sr.
No.
1
2
Unit
Cement
in bags
M2
0.054
0.0076
0.07
0.0076
Screened
Fine
sand in aggregate
M3
in M3
0.090
0.015
M2
0.11
0.015
M2
0.14
0.015
M2
0.228
0.024
M2
0.14
0.025
M2
0.17
0.025
M2
0.217
0.031
10
M2
0.25
0.033
11
M2
0.25
0.021
0.012
12
0.25
0.021
0.012
13
M2
0.300
0.015
0.015
14
M2
0.02
0.003
15
M2
0.040
0.003
16
M2
0.040
0.005
17
M2
0.040
0.004
18
M2
0.030
0.003
19
M2
0.025
0.003
Item
Unit
Cement in
Bags
Screened
sand in M3
M2
0.135
0.022
M2
0.135
0.022
M2
0.135
0.022
M2
0.185
0.022
M2
0.135
0.02
M2
0.185
0.02
M2
0.135
0.02
M2
0.185
0.02
M2
0.22
0.02
10
M2
0.21
0.02
11
M2
0.135
0.02
12
M2
0.185
0.02
13
M2
0.135
0.022
14
M2
0.185
0.02
15
M2
0.20
0.02
16
M2
0.30
0.024
17
M2
0.185
0.02
18
M2
0.185
0.02
Sr.
No.
Item
Unit
Cement
in Bags
Screened
sand in M3
19
M2
0.185
0.02
20
M2
0.185
0.02
21
M2
0.185
0.02
22
M2
0.185
0.02
23
M2
0.185
0.02
24
0.16
0.02
25
M2
0.185
0.02
26
M2
0.055
0.005
27
M2
0.21
0.017
28
M2
0.20
0.012
0.21
0.017
0.20
0.012
29
30
Sr.
No.
Unit
Cement
in bags
Screened
sand in M3
Metal
20mm in
M3
12/10m
m in M3
:3
M2
0.310
0.020
0.033
0.017
:3
M2
0.350
0.022
0.044
0.014
M2
0.300
0.020
0.033
0.017
M2
0.314
0.022
0.044
0.014
SR.
No.
1
Item
Unit
Cement
in bags
Screened
sand in M3
Crushed
Sand in M3
M2
0.20
0.0136
0.0272
Item
Unit
Cement
in Bags
Sand in
Cum
Bricks in
Number
Metal in
Cum
No
0.52
0.103
134
0.025
No
0.35
0.024
--
0.048
No
0.20
0.02
--
--
No
0.25
0.018
--
--
No
0.25
0.035
--
--
No
0.25
0.035
--
--
No
0.10
0.01
--
--
No
0.10
0.01
--
--
No
0.15
0.02
--
0.02
10
0.10
0.02
31
--
11
No
0.10
0.01
--
--
12
No
0.10
0.01
--
--
13
No
0.10
0.01
--
--
14
No
0.55
0.01
52
0.05
15
No
2.33
0.35
350
0.194
16
No
3.53
0.054
527
0.3
17
No
3.90
0.57
450
0.45
18
No
6.70
--
--
--
Sr.
No.
Item
19
Unit
Cement in
Bags
0.003
20
0.005
21
0.007
22
0.007
23
0.035
24
0.045
25
0.080
Unit
Item
Asphalt
in Kg
Coarse Aggregate
40mm
cum
25
mm
in
cum
20mm
cum
12mm
cum
10mm
cum
6m
m
cum
Providing 20mm
thick premix carpet
100
Sqm
156
1.83
0.90
0.15
100
Sqm
120
1.50
Bituminous liquid
seal coat
100
Sqm
98
0.90
(6.70
(19 mm
nominal)
mm)
100
Sqm
100
Tack coat on BT
surface
100
Sqm
50
100
Sqm
146
1.80
(13.2
mm)
0.90
20 mm thick open
graded hot mix laid
carpet
75
mm
thick
bituminous bound
macadam surface
50
mm
bituminous
thick
bound
(11.20
mm)
100
Sqm
100
200
175
6.30
Hand
broken +
2.70
crushed
= 9.00
4.20
Hand
broken +
1.80
1.80
1.20
macadam
Providing
50mm
thick semi grout
with seal coat
crushed
= 6.00
Sqm
100
Sqm
Dose
275.00
Seal
coat
125.00
Total
400.00
6.00
--
--
1.50
1.20
--
Sr.
No
Item
Unit
Cement
in bags
Screene
d sand in
Cum
Cum
2.65
Cum
Course Aggregate
40 mm
in Cum
20 mm
in Cum
12/10 mm
in Cum
0.43
0.85
3.40
0.43
0.85
Cum
4.40
0.43
0.85
Cum
6.27
0.43
0.85
Cum
4.40
0.43
0.85
Cum
6.27
0.45
0.67
0.22
Cum
7.10
0.45
0.67
0.22
Cum
7.50
0.45
0.67
0.22
Cum
8.00
0.45
0.67
0.22
10
Cum
8.20
0.45
0.67
0.22
Sr.
No
Item
Unit
Cement
in bag
Screene
d sand
in Cum
Trap
Rubble
in Cum
Corner
Quins
in Nos
Trap
Header
in Nos
Khandki in
Nos
11
UCR masonry in CM
1:6 for head wall
including pointing in
CM 1:3
Cum
1.77
0.35
1.16
12
Cum
1.20
RCC PIPES
SR.
No
Item
Unit
Cement in
Bag
Sand in
Cum
450 mm dia.
0.12
0.009
II
600 mm dia.
0.16
0.011
III
800 mm dia.
0.22
0.015
IV
900 mm dia
0.22
0.0154
1000 mm dia
0.24
0.017
VI
1200 mm dia.
0.26
0.018
1)
6 to 9 kg/10 Sqm
iii)
9 to 12 kg/10 Sqm
12 to 15 kg/10 Sqm
ii)
iii)
iv)
a)
b)
A) Bitumen
B) Coarse aggregate
72.43 Kg / Cum
37.5 mm to 25 mm
0.212 Cum
C) Chipping
25mm to 10 mm
0.637 Cum
D) Fine aggregate
10 mm to 5 mm
0.354 Cum
5 mm & below
0.212 Cum
---------------------1.415 Cum
Compacted
Bitumen
thickness
coarse
Key
Aggregate
Aggregate
50 mm
50 kg/ 10 m2
0.60 m3 /10m2
0.15 m3 / 10m2
75 mm
68 kg/ 10 m2
0.90 m3/ 10 m2
0.18 m3/ 10 m2
5) Built up Spray Grout (Excluding Primer / Tack coat) clause no. 506
A) Bitumen @ 15 kg /10m2 for each layer
B) Coarse aggregate passing 53 mm
C) key aggregate
30 kg / 10m2
0.50 Cum/10m2
1.00cum/ 10m2
Passing 22.4 mm
Retained on 2.80 mm
Total
i)
Bitumen
98.10 kg/cum
ii)
37.5 mm to 25 mm
iii)
Total
25 mm to 10 mm
0.191 Cum / Cum
1.445 Cum/ Cum
iv)
10 mm to 4.75 mm
v)
vi)
Bitumen
Stone chipping
12.00 kg/10m2
0.15 Cum/10m2
10.00 kg/10m2
0.10 m3/10m2
8) Open graded premix carpet 20mm thick (Table 500.23 page 57 clause no.511
i) 13.20 mm stone chipping
0.18 m3/10m2
total chipping
0.27m3/10m2
0.09 m3/10m2
Total Bitumen
14.60 kg /10 Sqm
ii) 10 to 05 mm
Total Aggregate
1.462 Cum/Cum
iii) Filler
@2%
iv) Bitumen at 5%
of weight of aggregate
117.80 kg/m3
Stone chipping
6.70 mm
0.09 m3/10m2
11) Providing and applying premixed seal coat type B Clause no 513
i) Sand or grit passing 2.36 mm and
0.060 m3/10 m2
6.80 kg /10 m2
SR.
NO
ITEM
CEMEN
T IN
MT
COARSE
SAND IN
M3
m3
0.275
m3
COURSE AGGREGATE
40
mm
in M3
20
mm
in m3
10
mm
in m3
0.45
0.54
0.27
0.09
0.34
0.45
0.36
0.36
0.18
m3
0.40
0.45
0.36
0.36
0.18
m3
0.405
0.45
0.36
0.36
0.18
m3
0.35
0.45
0.54
0.36
m3
0.403
0.45
0.54
0.36
m3
0.407
0.45
0.54
0.36
m3
0.422
0.45
0.54
0.36
m3
0.347
0.45
0.54
0.36
m3
0.403
0.45
0.54
0.36
m3
0.407
0.45
0.54
0.36
m3
0.422
0.45
0.54
0.36
m3
0.430
0.45
0.54
0.36
UNIT
a)
b)
c)
d)
PCC m 15
PCC m 20
PCC m 25
PCC m 30
RCC M-20
RCC M-25
RCC M-30
RCC M-35
RCC M20
RCC M25
RCC M30
RCC M35
RCC M40
b) Well Staining
i)
ii)
iii)
iv)
v)
RCC M-20
RCC M-25
RCC M-30
RCC M-35
RCC M-40
m3
0.347
0.45
0.54
0.36
m3
0.403
0.45
0.54
0.36
m3
0.407
0.45
0.54
0.36
m3
0.422
0.45
0.54
0.36
m3
0.430
0.45
0.54
0.36
m3
0.37
0.45
0.36
0.36
0.18
m3
0.40
0.45
0.36
0.36
0.18
m3
0.405
0.45
0.36
0.36
0.18
m3
0.420
0.45
0.36
0.36
0.18
m3
0.344
0.45
0.36
0.36
0.18
m3
0.40
0.45
0.36
0.36
0.18
m3
0.405
0.45
0.36
0.36
0.18
UNIT
CEMEN
T IN
MT
COARSE
SAND IN
M3
C) Bottom Plug
i)
ii)
iii)
iv)
PCC M20
PCC M25
PCC M30
PCC M35
iii)
SR.
NO
PCC M20
PCC M25
PCC M30
ITEM
COURSE AGGREGATE
40
mm
in M3
20
mm
in m3
10
mm
in m3
RCC M20
RCC M25
RCC M30
RCC M35
m3
0.340
0.45
0.54
0.36
m3
0.403
0.45
0.54
0.36
m3
0.407
0.45
0.54
0.36
m3
0.422
0.45
0.54
0.36
m3
0.275
0.45
0.54
0.27
0.09
m3
0.344
0.45
0.36
0.36
0.18
m3
0.400
0.45
0.36
0.36
0.18
m3
0.405
0.45
0.36
0.36
0.18
m3
0.419
0.45
0.36
0.36
0.18
m3
0.275
0.45
0.54
0.27
0.09
m3
0.347
0.45
0.54
0.36
m3
0.403
0.45
0.54
0.36
m3
0.407
0.45
0.54
0.36
m3
0.422
0.45
0.54
0.36
m3
0.430
0.45
0.54
0.36
m3
0.347
0.45
0.54
0.36
m3
0.400
0.45
0.54
0.36
m3
0.407
0.45
0.54
0.36
m3
0.422
0.45
0.54
0.36
m3
0.430
0.45
0.54
0.36
iii)
iv)
v)
PCC M- 15 grade
PCC M- 20 grade
PCC M- 25 grade
PCC M- 30 grade
PCC M- 35 grade
a) RCC Superstructure
a)
b)
c)
d)
e)
RCC M 20
RCC M 25
RCC M30
RCC M35
RCC M40
m3
m3
m3
m3
m3
0.347
0.400
0.407
0.422
0.430
0.45
0.54
0.36
0.45
0.54
0.36
0.45
0.54
0.36
0.45
0.54
0.36
0.45
0.54
0.36
c) Prestressed concrete
a)
b)
SR.
NO
M-35 grade
M-40 grade
ITEM
m3
0.422
0.45
0.54
0.36
m3
0.430
0.45
0.54
0.36
UNIT
CEMEN
T IN
MT
COARSE
SAND IN
M3
m3
0.300
m3
COURSE AGGREGATE
40
mm
in M3
20
mm
in m3
10
mm
in m3
0.45
0.67
0.22
0.350
0.45
0.67
0.22
m3
0.375
0.45
0.67
0.22
m3
0.400
0.45
0.67
0.22
m3
0.413
0.45
0.67
0.22
m3
0.425
0.45
0.67
0.22
BUILDINGS
The rates to be adopted for different buildings work in block plans and
estimates for the year 2014-2015 (with effect from 14/8/2014) are shown
in the statement below for guidance. These rates may be considered for
normal provisions of the items mentioned against each rate. These rates
basically cover work portion only. Other usual lumpsum or on percentage
basis provisions like contingencies, electrification, work charge estt. &
sanitary arrangements, internal furniture, solar power, air conditioning, rain
water harvesting, compound wall, street lights, vehicle sheds etc shall be
made separately.
Sr. No
Type of Building
Unit
Administrative Buildings
22500/-
Residential Buildings
23000/-
Item
Unit
Rates
(Rs.in lakhs)
ROAD WORKS
New Roads
Per Km
40.00
Per Km
48.00
Per Km
60.00
Per Km
50.00
Per Km
42.00
A-2
a
A-3
Improvements of Road
Improvement from Single Lane to 1.50 lane(5.50m) with
formation widening
(WBM + BBM + Carpet + Seal Coat)
Improvement from Single Lane to 1.50 lane(5.50m)
without formation widening
(WBM + BBM + Carpet + Seal Coat)
Strengthening & Black Topping
(WBM + BBM + Carpet + Seal Coat)
3.00 m width
Per Km
24.00
3.75 m width
Per Km
30.00
5.50 m width
Per Km
38.00
Per Km
20.00
A-4
a
3.75 m width
Per Km
25.00
5.50 m width
Per Km
32.00
A-5
3.00 m width
Per Km
11.00
3.75 m width
Per Km
14.00
5.50 m width
Per Km
20.00
A-7
Per Km
38.00
A-8
Per Km
55.00
A-9
Per Km
42.00
A-10
Per Km
30.00
S.H.Standard
Per Km
200.00
ODR/MDR Standard
Per Km
170.00
V.R. Standard
Per Km
150.00
Sr. No.
Item
Unit
Rates
(Rs. in lakhs)
Rmt
11.00
Rmt
8.00
Creek Bridge
C
Rmt
3.00
Rmt
4.30
Rmt
4.00
Rmt
6.50
Rmt
7.50
Rmt
4.50
Rmt
6.00
Rmt
1.50
C.D.Works
a)
each
1.60
b)
each
2.00
R.C.C. Sakav
a)
1.20 m wide
Rmt
0.80
b)
2.00 m wide
Rmt
1.25
c)
2.50 m wide
Rmt
1.75
d)
4.25 m wide
Rmt
2.75
STATEMENT-A- 1
Material Master
Sr.
No.
Perticulars
Unit
Rate 14-15
Cement
MT
7200.00
Mild Steel
MT
50450.00
MT
49040.00
MT
56300.00
Structural Steel
5a
a) MS Angles
MT
49500.00
5b
b) MS Channels
MT
53333.00
5c
c) MS Beams
MT
53333.00
5d
d) MS Flats ( 50 x 6mm to
MT
53333.00
5e
e) MS Plates
MT
56760.00
Bitumin Bulk 30 / 40
MT
57768.00
Bitumin Bulk 60 / 70
MT
54035.00
MT
53005.00
Bitumin Pack 30 / 40
MT
61758.00
10
Bitumin Pack 60 / 70
MT
58026.00
11
MT
56996.00
12
MT
41707.00
13
MT
79500.00
14
No
5.00
15
MT
67000.00
16
Cum
1670.00
150x12mm )
Unit
17
FUSE
NO
18
BLASTING POWDER
KG
19
SOFT MURUM
CUM
20
Hard murum
CUM
Sr.No.
21
22
TR.RUBLE 15-23CM.
Quarry spauls
CUM
CUM
Rate 14-15
45.00
140.00
250.00
250.00
500.00
275.00
Pile foundation
23
Kg.
24
Bentonite
M.T.
115.00
25000.00
No.
26
No.
27
MT
28
No.
29
100 No
15.00
24.00
68500.00
6.00
88.00
Sand ( Screened)
Cum.
31
Cum.
32
Cum.
33
Cum
34
Cum
35
Fine Aggregate
Cum
36
Stone dust
Cum
37
Cum
38
No.
39
No
40
Binding Wire
Kg
41
No
1250.00
650.00
760.00
990.00
990.00
500.00
440.00
55555.00
55.00
40.00
63.00
4.00
42
Sqm
43
Centering Oil
Litre
325.00
50.00
Plastisizer
Liter
45
Super Plastisizer
Liter
65.00
135.00
No
47
No
48
Cum
49
Corner stone
50
TR.Rubble 15-23 cm
51
TR.Header/Through Stone
No
52
khandkies
No
53
No
54
Laterite stone45x22x20cm
No
55
No
56
No
57
No
58
No
59
No
60
No
61
62
63
64
65
66
No
Cum
15.00
7.00
500.00
50.00
500.00
90.00
50.00
30.00
27.00
40.00
25.00
25.00
115.00
120.00
53.00
No
71.00
No
88.00
No
106.00
No
141.00
No
162.00
Bags
750.00
Water proofing..
67
Waterproofing compound
Kg
68
Bitumen (compound)
Kg
69
Kerosine
Litre
85.00
70.00
30.00
70
Kg.
71
Brick -Bats
Cum
72
Litre
73
Sqm
74
Sqm
5.00
883.00
346.00
105.00
280.00
Expansion Joints.
75
Sqm.
76
Cum
77
GI screws 75mm
Doz
78
79
Doz
80
Doz
81
Alluminium Strips
Kg.
82
No.
83
Kg.
84
Kg.
85
sqm
86
sqm
Gross.
900.00
115140.00
40.00
304.00
27.00
11.00
250.00
45.00
35.00
220.00
100.00
150.00
Plastering / Flooring.
87
Kg.
88
Kg.
89
Neeru
Kg.
90
Sqm
91
Kg.
92
Sqm
93
Sqm
94
Sqm
95
Rmt
96
Sqm
97
Sqm
98
Sqm
110.00
110.00
20.00
450.00
30.00
215.00
260.00
260.00
15.00
950.00
950.00
165.00
99
Sqm
100
Doz
101
Doz
102
No
103
No
104
CERAMIC TILES 30 x 30 Cm
Sqm
105
CERAMIC TILES 20 x 20 Cm
Sqm
106
Sqm
107
Sqm
108
Kg.
109
Sqm
110
Sqm
111
Sqm
112
Sqm
113
Sqm
115
116
MARBLE POWDER
Kg.
117
SYNTHETIC TILES
Sqm
118
Bags
119
Sqm
120
Sqm
121
Sqm
122
Sqm
123
Sqm
124
Sqm
125
COW DUNG.
Kg.
126
Araldate ADHESIVE
Kg.
127
READYMADE ADHESIVE
Litre
128
Sqm
129
Sqm
114
185.00
250.00
300.00
25.00
30.00
518.00
518.00
200.00
230.00
15.00
2691.00
1600.00
2600.00
480.00
400.00
Sqm
400.00
Kg.
9.00
12.00
300.00
450.00
660.00
660.00
1200.00
400.00
300.00
200.00
30.00
70.00
200.00
890.00
1240.00
Wood finish
130
Litre
131
Litre
132
Bees Wax
kg
133
Turpentine
Litre
134
Varnish
Litre
135
Spirit
Litre
136
Chandras,Ral,Bansena' Lakh
Litre
137
Coal Tar
138
Kerosine Solvent
Litre
139
Malemine polish
Litre
140
Thinner
Litre
141
French polish
Litre
kg
190.00
70.00
70.00
110.00
236.00
60.00
70.00
22.00
50.00
360.00
150.00
165.00
Oil painting
141
Litre
142
Alluminium Paint
Litre
143
Litre
144
Synthetic Paint
Litre
145
Litre
146
Cement Paint
Kg
147
Kg
148
Litre
149
Litre
150
Kg
151
No
152
No
153
No
154
No
155
Luster Paint
Litre
156
Texture Paint
Litre
268.00
315.00
170.00
250.00
286.00
35.00
60.00
140.00
190.00
10.00
60.00
80.00
140.00
194.00
265.00
700.00
157
Neel
Kg
158
Lime ( Un slacked )
Kg
159
Kg
160
Kg
161
Kg
162
163
Putty
Kg
164
Saras
Kg
165
Dry Distemper
Kg
Litre
140.00
30.00
30.00
125.00
278.00
278.00
70.00
50.00
55.00
Rmt
167
Rmt
168
Sqm
169
Rmt
170
Rmt
171
G. I. Screw ( 25 mm)
Doz
172
GI screws 50mm
Doz
173
GI screws 75mm
Doz
174
GI screws 100mm
Doz
175
GI screws 125mm
Doz
176
Doz
177
Doz
178
Doz
179
Doz
180
Cum
181
Cum
182
Cum
183
Cum
184
Nails
185
Sqm
186
Sqm
187
Sqm
188
Sqm
Kg
7.00
12.00
38.00
72.00
87.00
10.00
18.00
18.00
22.00
44.00
24.00
30.00
30.00
30.00
132000.00
115140.00
55555.00
0.00
70.00
695.00
580.00
580.00
650.00
189
Sqm
190
Sqm
191
Sqm
192
Sqm
193
wooden pegs
194
No
Sqm
345.00
490.00
650.00
280.00
10.00
417.00
Sqm
196
Rmt
197
Rmt
198
Jointing compound
Kg
199
No
200
Rmt
201
Sqm
202
Rmt
203
Rmt
204
Wood Beading
Rmt
205
206
Dungree Cloth
207
MT
208
MT
209
MT
210
Sqm
211
Sqm
212
Sqm
213
Sqm
214
A.C.Sheets Ridge
Pair
215
No
216
Sqm
217
Rmt
362.00
38.00
49.00
Kg
Sqm
136.00
145.00
81.00
270.00
35.00
80.00
24.00
70.00
25.00
72000.00
72000.00
72000.00
638.00
604.00
182.00
220.00
228.00
275.00
130.00
156.00
218
G.I.Washer
No
219
No
220
Bituminous Washer
No
221
Bituminous Washer
Kg
222
Sqm
223
Sqm
224
Sqm
225
Sqm
226
Sqm
227
Sqm
228
Kg
229
No
230
No
231
Sqm
232
Sqm
0.75
11.00
0.60
60.00
308.00
250.00
451.00
560.00
323.00
290.00
156.00
11.00
12.00
369.00
383.00
Rmt
234
Rmt
235
Nylon sleeves
236
56.00
No
35.00
8.00
Rmt
238
Rmt
239
Sqm
240
No
241
No
242
No
243
No
244
No
120.00
65.00
650.00
8.00
15.00
45.00
334.00
66.00
No
246
No
247
No
248
No
249
No
250
No
251
No
252
No
253
No
254
No
255
No
256
No
257
No
258
No
259
No
260
No
261
Sqm
262
Sqm
263
No
264
Black hinge
No
265
No
266
No
267
No
268
No
269
No
270
No
271
No
272
No
273
No
274
No
20.00
25.00
35.00
85.00
75.00
75.00
145.00
100.00
65.00
190.00
80.00
82.00
76.00
185.00
495.00
48.00
1776.00
1500.00
1054.00
20.00
114.00
175.00
180.00
195.00
144.00
288.00
230.00
173.00
127.00
886.00
275
No
276
Sqm
277
Sqm
278
Sqm
279
Sqm
280
Sqm
281
Sqm
282
Sqm
283
Sqm
284
No
285
Set
286
Sqm
287
Sqm
288
Sqm
289
No
290
No
291
No
292
No
293
No
294
No
295
No
296
No
297
Alluminium channel 62 x 34 mm
Kg
298
Kg
299
Sqm
300
Rmt
301
302
303
Rmt
304
No
305
No
225.00
4097.00
4291.00
4997.00
5242.00
5688.00
7313.00
1721.00
1244.00
1978.00
280.00
2152.00
345.00
90.00
36.00
33.00
70.00
17.00
70.00
60.00
40.00
30.00
200.00
225.00
484.00
48.00
14.00
Kg
110.00
600.00
55.00
27.00
306
307
Rmt
308
Rmt
309
Rmt
310
No
311
Rmt
312
Rmt
313
314
No
315
Kg
316
No
317
No
318
No
319
No
320
RUBBER GASKET
Rmt
321
No
322
No
323
No
324
No
325
No
326
No
327
No
328
No
329
No
330
No
331
No
332
No
333
No
334
No
335
No
336
No
337
No
338
No
0.00
171.00
276.00
269.00
37.00
300.00
265.00
Kg
290.00
50.00
50.00
30.00
30.00
45.00
30.00
20.00
35.00
40.00
45.00
22.00
40.00
45.00
60.00
45.00
50.00
22.00
18.00
34.00
25.00
20.00
72.00
65.00
55.00
45.00
339
No
340
No
341
No
342
No
343
Kg
344
Sqm
345
Sqm
346
Sqm
347
Kg
348
Rqm
349
F.R.P.Sheet 22BWG
Sqm
350
Sqm
351
352
Alluminium Grill
Kg
353
No
354
No
355
Sqm
356
Sqm
357
Sqm
358
Sqm
359
Sqm
360
Sqm
361
Sqm
362
Sqm
363
Sqm
364
Sqm
365
Sqm
366
Sqm
367
Sqm
368
Sqm
369
Sqm
Packet
25.00
18.00
105.00
52.00
295.00
300.00
475.00
798.00
220.00
14.00
1050.00
425.00
20.00
275.00
70.00
24.00
198.00
190.00
212.00
200.00
236.00
162.00
188.00
174.00
120.00
189.00
151.00
242.00
236.00
358.00
276.00
Lit
371
Hemp Rope
Kg
372
Rmt
373
Rmt
374
Rmt
375
Rmt
376
Rmt
377
Rmt
378
Rmt
379
Rmt
380
Rmt
381
Rmt
382
Rmt
383
Rmt
384
Rmt
385
Rmt
386
Rmt
387
Rmt
388
Rmt
389
Rmt
390
Rmt
391
Rmt
392
Rmt
393
Rmt
394
Rmt
395
Rmt
396
No
397
No
398
No
399
No
4.30
55.00
108.00
140.00
186.00
246.00
290.00
380.00
590.00
120.00
155.00
210.00
268.00
311.00
418.00
673.00
974.00
37.00
49.00
73.00
98.00
120.00
158.00
251.00
180.00
88.00
104.00
80.00
227.00
270.00
400
No
401
No
402
No
403
No
404
No
405
No
406
No
407
No
408
No
409
No
410
No
411
No
412
No
413
No
414
No
415
No
416
No
417
No
418
No
419
No
420
No
421
Strainer 15mm
No
422
Strainer 20mm
No
423
Strainer 25mm
No
424
No
425
No
426
No
427
GI union 25mm
No
428
No
429
No
430
Sqm
431
No
330.00
324.00
437.00
647.00
995.00
1300.00
1850.00
3380.00
5820.00
149.00
215.00
275.00
16.00
24.00
32.00
49.00
61.00
102.00
168.00
245.00
6.00
113.00
165.00
248.00
132.00
275.00
400.00
97.00
318.00
27.00
49.00
368.00
432
No
433
No
434
No
435
No
436
No
437
No
438
No
439
No
440
No
441
No
442
No
443
No
444
No
445
No
446
No
447
No
448
No
449
No
450
No
451
No
452
C.I. cover 45 x 30 cm
No
453
No
454
No
455
No
456
Bottle trap
No
457
CI brackets
Pair
458
No
459
No
460
Clamps 100mm
No
1246.00
1095.00
1314.00
1320.00
1584.00
9000.00
2375.00
2427.00
600.00
640.00
920.00
1800.00
750.00
1104.00
1675.00
970.00
440.00
66.00
7447.00
50.00
1664.00
250.00
20.00
275.00
864.00
148.00
114.00
75.00
20.00
461
No
462
Clamps 75mm
No
463
No
464
No
465
No
466
No
467
No
468
No
469
No
470
No
471
No
472
No
473
No
474
No
475
No
476
No
477
Rmt
478
Rmt
479
Rmt
46.00
16.00
41.00
36.00
30.00
60.00
70.00
1747.00
1512.00
5900.00
2600.00
165.00
152.00
310.00
108.00
346.00
196.00
250.00
330.00
480
Rmt
46.00
481
Spun yarn
Kg
482
No
483
No
484
No
485
No
486
No
487
No
88.00
1430.00
2300.00
3255.00
1250.00
1300.00
1550.00
488
No
495.00
489
No
490
Belgium Mirror 45 x 55 cm
No
491
No
420.00
360.00
65.00
492
Rmt
45.00
493
No
494
No
495
No
496
No
497
No
498
No
499
No
900.00
1500.00
900.00
1200.00
1250.00
3300.00
4500.00
500
Rmt
260.00
501
Rmt
502
Rmt
503
No
504
No
505
No
506
No
507
No
297.00
470.00
26.00
30.00
47.00
9000.00
11000.00
Miscellenous
508
Barbed Wire
Kg
509
510
Nut Bolts
Kg
511
Kg
512
Kg
513
Kg
Sqm
72.00
164.00
90.00
358.00
348.00
358.00
514
Fedrum
Kg
515
Chloropynfos 20% EC
516
Clorodone
Kg
517
Coir string
Kg
518
Maxphalt
MT
519
520
Nylon Rope
521
Sqm
522
Sqm
523
Sqm
524
Sqm
525
Sqm
Litre
Sqm
Kg
2880.00
220.00
246.00
88.00
10110.00
120.00
186.00
1356.00
1614.00
2002.00
548.00
570.00
Road Work
526
Blasting Material
Kg
527
Noble Dynamite
Kg
528
Detonator
No
529
Geletin
Kg
530
No
531
Rmt
532
TR.RUBLE 15-23CM.
CUM
533
CUM
534
CUM
535
CUM
536
CUM
537
CUM
538
CUM
539
CUM
540
CUM
541
CUM
542
Hard Murum
CUM
543
Soft Murum
CUM
130.00
84.00
12.00
125.00
22.00
10.00
500.00
335.00
500.00
550.00
650.00
800.00
385.00
385.00
106.00
106.00
155.00
150.00
544
Gravel
CUM
545
CUM
546
CUM
547
CUM
548
CUM
549
CUM
550
CUM
551
CUM
552
Stone Dust
CUM
553
CUM
554
CUM
555
No
556
No
557
Qntl
558
Kerosene
Litre
559
Litre
560
Litre
561
Kg
562
Kg
563
Neel
Kg
564
No
565
566
Cost of water
567
568
Joint sealant
Kg
569
Sealent primer
Kg
570
Sqm
571
Curing compound
Litre
572
Sqm
573
Sqm
574
Litre
KL
Sqm
Kg
50.00
40.00
760.00
990.00
990.00
990.00
990.00
990.00
475.00
275.00
250.00
77.00
21.00
500.00
30.00
300.00
200.00
20.00
30.00
180.00
144.00
180.00
66.00
120.00
50.00
25.00
216.00
125.00
920.00
6890.00
276.00
575
CUM
50.00
CUM
577
CUM
546.00
578
612.00
CUM
300.00
CUM
546.00
580
CUM
581
CUM
612.00
360.00
CUM
583
CUM
584
585
No
586
Kg
587
Kg
588
Kg
589
MT
590
Kg
591
592
593
594
No
595
No
596
No
597
Bitumin primer
546.00
510.00
CUM
396.00
819.00
42.00
42.00
42.00
Litre
Kg
CUM
Litre
13200.00
102.00
285.00
625.00
360.00
252.00
220.00
600.00
90.00
Rmt
599
Rmt
600
Rmt
601
Rmt
602
Rmt
603
Rmt
604
Rmt
605
Rmt
606
Rmt
607
Rmt
608
Rmt
609
Rmt
610
Rmt
611
Rmt
612
Rmt
613
Rmt
614
MT
615
Each
616
Each
772.00
1207.00
2042.00
2454.00
2830.00
4092.00
2302.00
3963.00
4417.00
4955.00
6770.00
2573.00
4610.00
5324.00
6812.00
8000.00
8200.00
62500.00
8690.00
Bridge Works.
617
Earth compacted
Cum
618
Sand bags
No
619
No
620
Rmt
621
No
622
No
623
MT
624
Rmt
625
626
83.00
19.00
338.00
14.00
61893.00
59080.00
53290.00
74.00
Rmt
Per set
57.00
4043.00
627
628
Rmt
629
No
630
Kg
631
Alluminium powder
632
No
633
Rmt
634
Rmt
635
636
Sqm
637
Sqm
638
Sqm
639
Sqm
640
Litre
641
Litre
642
Litre
643
644
Bituminous felt
Sqm
645
Roll
646
Tar paper
Per set
Gramms
Kg
Tonne
Sqm
647
CuCm
648
MT
649
No
650
No
651
Cum
652
Cum
653
Rustiside/Rustolin
Kg
654
Polyalk fixo-prime
Kg
655
Polyalk E. P.
Kg
656
Quartz Sand
Kg
657
Cum
3257.00
17968.00
18.00
87.00
165.00
11.00
370.00
6325.00
51.00
652.00
1388.00
1291.00
4000.00
304.00
338.00
143.00
12600.00
42.00
958.00
42.00
0.49
390.00
12.00
12.00
275.00
450.00
87.00
248.00
199.00
3.30
1500.00
658
Epoxy
Kg
659
Sqm
660
Litre
661
Litre
662
Litre
663
Litre
664
Solvent
Litre
665
Sand Blasting
Sqm
666
Litre
667
Litre
668
Litre
669
Litre
670
Polysafe Plastone
Litre
671
Sqm
550.00
2119.00
271.00
591.00
686.00
741.00
159.00
45.00
474.00
526.00
578.00
398.00
380.00
302.00
Additional Material
1
Sqm
Sqm
Sqm
No
No
No
No
Sqm
10
Sqm
11
No.
12
No.
13
Sqm
14
Sqm
15
Sqm
436.00
872.00
1307.00
889.00
1080.00
956.25
466.88
1634.22
Sqm
1719.00
1476.81
956.25
1293.75
944.19
1065.24
1150.00
16
No.
17
No.
18
No.
19
Sqm
20
Sqm
21
Sqm
22
No.
23
No.
24
No.
25
No.
26
No.
27
No.
28
No.
29
No.
30
No.
31
Showers (Kaveri)
No.
31
Showers (Kaveri)
No.
31
Showers (Kaveri)
No.
32
Showers (Neiko)
No.
32
Showers (Neiko)
No.
33
Showers (Speed)
No.
34
Showers (Speed)
No.
35
Showers (Speed)
No.
36
No.
37
No.
38
No.
39
N0.
40
No.
41
No.
42
1 Doz.
43
No
44
No
1856.00
2475.00
3262.00
786.00
1065.00
1174.00
725.00
1000.00
750.00
3400.00
700.00
1100.00
1100.00
4200.00
1000.00
281.25
393.75
489.38
253.13
405.00
506.25
675.00
821.25
915.75
410.63
526.50
443.25
200.25
229.50
51.75
438.75
270.00
45
No
46
No
47
No.
48
No.
49
No.
50
N0.
51
No.
52
No.
53
1 Doz.
54
No
55
No
56
No
57
No
58
No.
59
No.
60
No.
61
N0.
62
No.
63
No.
64
1 Doz.
65
No
66
No
67
No
68
No
146.25
444.35
390.00
75.00
120.00
300.00
60.00
60.00
25.00
100.00
80.00
47.00
260.00
155.00
57.00
100.00
40.00
40.00
40.00
20.00
83.00
67.00
31.00
100.00
STATEMENT-A-2
Labour Master
Sr.No.
Perticulars
Unit
Rate 14-15
Day
286.00
Day
283.00
Bandhani semiskilled
Day
283.00
Barbender skilled
Day
286.00
Beldar skilled
Day
286.00
Below boy
Day
279.00
Day
283.00
Day
286.00
Boreman skilled
Day
286.00
10
Breaker semiskilled
Day
283.00
11
Day
600.00
12
Day
286.00
13
Chiseller semiskilled
Day
283.00
14
Day
286.00
15
Electrician
Day
600.00
16
Day
286.00
17
Day
279.00
18
Day
286.00
19
Day
600.00
20
Day
286.00
21
Foreman skilled
Day
600.00
22
Day
286.00
23
Day
283.00
24
Day
600.00
25
Helper unskiled
Day
283.00
26
Day
283.00
27
Day
283.00
28
Khalashi / Diver
Day
283.00
29
Laboratory assistant
Day
283.00
30
Day
279.00
31
Day
283.00
32
Day
283.00
33
Day
600.00
34
Day
600.00
35
Day
600.00
36
Day
286.00
37
Day
286.00
38
Day
279.00
39
Day
279.00
40
Mechanic
Day
600.00
41
Day
286.00
42
Mukadam semiskilled
Day
283.00
43
Navaghani
Day
279.00
44
Day
286.00
45
Day
600.00
46
Day
286.00
47
Day
600.00
48
Day
286.00
49
Day
283.00
50
Skilled labour
Day
286.00
51
Day
286.00
52
supervisor
Day
286.00
53
Day
283.00
54
Day
286.00
55
Day
286.00
56
Day
283.00
57
Day
286.00
58
Watchman
Day
283.00
59
Day
600.00
STATEMENT-A-3
Machinary Master
Sr.
No.
Perticulars
Unit
Rate 1415
HOUR
723.00
DAY
1105.00
Building Excavation.
1
AIR COMPRESSOR
WAGON DRILL
Pile foundation
3
Rmt
357.00
Rmt
432.00
Rmt
536.00
Rmt
598.00
Rmt
672.00
Rmt
784.00
Rmt
897.00
10
Bentonite pump
Hour.
258.00
Day
205.00
Welding Machine
Day
305.00
Concrete Mixer
Hour
228.00
Vibrator
Hour
132.00
Day
917.00
Day
2140.00
Flooring
PLATE VIBRATOR
Day
800.00
Road Work
18
Hour
1818.00
19
Hour
1818.00
20
Hour
1818.00
21
Hour
2616.00
22
Hour
2536.00
23
Hour
2712.00
24
Hour
2712.00
25
Hour
643.00
26
Hour
625.00
27
Vibratory Roller
Hour
2702.00
28
Hour
1618.00
29
Hydraulic self propelled chip spreader both for aggregates & key
aggregate @ 1500 sqm per hour
Hour
1818.00
30
Hour
1319.00
31
BOILER [ASPHALT]
Hour
128.00
32
ASPHALT MIXER
Hour
328.00
33
BOUSER
Hour
270.00
34
MT
263.00
35
Hour
1900.00
36
Hour
1078.00
37
Hour
614.00
38
Hour
2400.00
39
T.Km
2.90
40
Hour
342.00
41
Hour
342.00
42
T.Km
7.50
43
Hour
360.00
44
Pavement Breaker
Hour
339.00
45
Texturing machine
Hour
163.00
46
Tractor-trolley
Hour
415.00
47
Hour
692.00
48
Hour
692.00
49
Hour
580.00
50
Hour
1759.00
51
Tractor Rotavator
Hour
472.00
52
Hour
1175.00
53
Hour
2409.00
54
Hour
256.00
55
Hour
745.00
56
Hour
1000.00
57
Hour
11500.00
58
HMP 30-40
Hour
8550.00
59
Hour
295.00
60
Hour
157.00
60a
Hour
835.00
Bridge works.
61
Hour
614.00
62
Hour
614.00
63
Hour
4042.00
64
Hour
765.00
65
Bentonite pump
Hour
255.00
66
Hour
145.00
67
Grouting Pump
Hour
445.00
68
Mastic Cooker
Hour
298.00
69
Hour
743.00
70
Tractor
Hour
390.00
71
Hour
165.00
72
Hour
239.00
73
Hour
105.00
74
Hour
1135.00
75
Day
369.00
76
Day
192.00
77
Day
217.00
78
MT
445.00
79
Winch or Hoist
Day
193.00
80
Day
334.00
81
Hour
115.00
82
Hour
2000.00
83
Hour
3836.00
84
Hour
8085.00
85
Hour
1940.00
86
Hour
1759.00
87
Hour
1123.00
88
Hour
2409.00
89
JCB 8 to 10 mt
Day
6565.00
CEMENT (OPC)
1) Initial setting time.
3) Fineness by dry
sieving
4) Specific gravity.
5) Compressive
strength. (in Kg/cm2.)
3.10 to 3.15
33 Grade
a) 160
b) 220
2)
Sr.
No.
3)
SAND
1)Particle size.
Specified Limit.
Frequency.
43
Grade
53 Grade
230
330
270
370
c) 330
430
530
Expansion not more than 10 mm.
2) Silt content.
3) Fineness modulus.
4) Bulkage.
5) Moisture content.
Specified Limit.
Tests
should
be
carried out in the
beginning and if there
is a change in source.
Frequency.
1) Gradation.
Size of metal.
100 % Passing
through sieve size
100 % Retained
on sieve size.
80 mm.
60mm
50mm
100mm
80mm
60mm
50 mm
50mm
40mm
40mm
63mm
40mm 35 to 70 %
63mm (0%)
40mm (30 to
65% )
12.5mm (95 to
100% )
12.5mm 0 to 5%
Sr.
No.
40mm to 50mm.
For Bituminus
Works
40mm Crushed Metal
25mm Crushed Metal
20mm Crushed Metal
12.5mm Crushed
Metal
10mm Crushed Metal
6.3 mm Crushed Metal
63mm
25 mm
50 mm
40 mm
25 mm
20 mm
25 mm
20 mm
12.5 mm
10 mm
12.5 mm
10 mm
For Concrete
6.3 mm
4.75 mm .00 ton
For Road work
(Heavy traffic)
2) Impact Value.
3) Crushing value
4) Los Angles
abrasion value
5) Flakiness Index
6) Water absorption
7) Specific Gravity
Not specified
Tests
Specified Limit.
Not specified
Frequency.
4)
5)
6)
BRICKS
1) Water absorption
shall not exceed
I Class
20%
II Class
22%
2) Compressive
strength (Wet
condition)
32.8
kg/cm2
minimum
29.52 Kg/Cm2
minimum
3) Efflorescence
Sr.
No.
7
Quantity Min. No Of
Concrete of Samples
Cum.
M100
70
100
1-5
M150
105
150
6-15
M200
135
200
16-30
M250
170
250
31-50
M300
200
300
M350
235
350
M400
270
400
1 Sample = 6 Cubes
Specified Limit.
Frequency.
1. Water absorption
2. Transverse strength
SOIL/MURUM
1. Proctor Density
shall not be less than
2. C.B.R. Value
HARD MURUM
1) Gradation
2) Plasticity Index
SOFT MURUM
1) Plasticity Index
Below 4
13
BITUMEN
1) Penetration
14
BITUMINOUS MIX
1) Extraction
2) Marshall Stability
& Flow measurements
11
Sr.
No.
Name of Tests.
COARSE
AGGREGATE
Below 8
Specified Limit.
Frequency.
Soundness
Bulk Density
FINE AGGREGATE
CL2 & Sulphate content
Moisture content
Bulkage of sand
3
4
5
CONCRETE
SOIL MURUM
Sulphate & Chloride
Content
Mechanical analysis
BITUMEN Grade -->
Softening point
Viscosity
Flash & fire point
(Minimum
12
Specific gravity
(Minimum)
Ductility (Minimum)
14
15
WATER
PH Value
Grade
Modules of rupture Of By
beam test min. Concrete
3 days
N/mm2
1.2
1.5
1.7
1.9
2.1
2.3
2.5
Flexural Strength of
beam
9
10
11
13
7 days N/mm2
1.7
2.1
2.4
2.7
3.0
3.2
3.4
2 beams/150 m3 or part
there of (one for 7 days
and other for 28 days) or
minimum 6 beams per
day's work whichever is
more.
30/40
60/70
80/100
50-65
40-55
35-50
min 175
min 175
min 175
min 0.99
min 0.99
min 0.99
min 75
cm.
min. 75 cm.
min 50cm.
60 to 80 at 250 C without coarse aggregate
10 to 20 at 250 c after adding coarse
aggregate
2 sample/lot to be
subjected to all or some
tests as directed by the
Engineers
16
17
18
WOOD
Density
Moisture content
At least 3 samples
from lots containing
upto 200 pieces
Resistance to applied
voltage (1 Hr. test)
20
Resistance to applied
voltage (30 days.test)
21
Thickness of coating
Minimum thickness
CECRI - 200 - 400 Mic.
FBEC - 100 - 300 Mic.
CPCC - 125 Mic. Min.
22
Chemical resistance
Test
23
Hardness of coating
Test
Sr.
No.
Name of Tests.
COARSE
AGGREGATE
Specified Limit.
Coating thickness
shall be tested at a
frequency of not less
than one full length
bar every twenty bars
for each size.
Frequency.
Soundness
Bulk Density
FINE AGGREGATE
CL2 & Sulphate content
Moisture content
Bulkage of sand
3
4
5
CONCRETE
Grade
SOIL MURUM
Sulphate & Chloride
Content
Mechanical analysis
BITUMEN Grade -->
9
10
11
Softening point
Viscosity
Flash & fire point
(Minimum
12
13
Specific gravity
(Minimum)
Ductility (Minimum)
14
WATER
15
PH Value
Modules of rupture Of By
beam test min. Concrete
3 days
N/mm2
1.2
1.5
1.7
1.9
2.1
2.3
2.5
Flexural Strength of
beam
7 days N/mm2
1.7
2.1
2.4
2.7
3.0
3.2
3.4
2 beams/150 m3 or part
there of (one for 7 days
and other for 28 days) or
minimum 6 beams per
day's work whichever is
more.
30/40
60/70
80/100
50-65
40-55
35-50
min 175
min 175
min 175
min 0.99
min 0.99
min 0.99
min 75
cm.
min. 75 cm.
min 50cm.
60 to 80 at 250 C without coarse aggregate
10 to 20 at 250 c after adding
coarse
aggregate
2 sample/lot to be
subjected to all or some
tests as directed by the
Engineers
16
17
WOOD
Density
18
Moisture content
STEEL ANTI
CORROSIVE TEST
19
Resistance to applied
voltage (1 Hr. test)
20
Resistance to applied
voltage (30 days.test)
21
Thickness of coating
Minimum thickness
CECRI - 200 - 400 Mic.
FBEC - 100 - 300 Mic.
CPCC - 125 Mic. Min.
22
Chemical resistance
Test
23
Hardness of coating
Test
Coating thickness
shall be tested at a
frequency of not less
than one full length
bar every twenty bars
for each size.