Beruflich Dokumente
Kultur Dokumente
CAREER OBJECTIVE:
PMP certified an enthusiastic individual with an interest in moving into a fast
growing environment which will provide challenges and allow further
development of my skills in Project Management, Project Control, Planning and Monitoring.
EDUCATION:
79%
88%
CAREER HIGHLITES
Working in the field of EPC Projects in Oil and Gas and Petrochemicals Planning,
Scheduling, Costing, Monitoring & Co-ordination functions. Cross Functional Project
Coordination, Manpower & Equipment Estimation / Mobilization Plan, Project Schedule
Generation, Tracking of the Schedule, Progress Measurement System & Reports
generation, Interface management & Critical Path Analysis. Associated with
multinational EPC consultants and Contractors, Wood Group-CCC, M/s TARGET
Engineering Construction Company UAE, DESCON Engineering Qatar
Responsible for preparation of Multidisciplinary EPC Project Schedules from CSR,
BFD, FEED & DD to Pre-Commissioning stage. Having excellent project planning,
management, reporting, communication and Planning Software Skills
WORK EXPERIENCE:
Sep 2011~ June 2014
a.
b.
IGD - GASCO - RUWAIS Fourth NGL Recovery Train
c. EMAL Smelter Complex Power Plant Above Ground Electrical &
Instrumentation Works
d.
Transformer Replacement (TAKREER Refinery)
The main contractor (NGL 4th Train project) is M/s Petrofac / GS JV, the contract value
is US$ 129,500,000.00, Scope of work includes engineering, procurement, construction
and commissioning of pump house structure, sea water intake, cooling water supply,
cooling water return line, water outfall, sealing weir and discharge structure
For E & I above ground works, Emirates Aluminum (EMAL) is the client for complete
power plant electrical & instrumentation work.
As a Planning, Scheduling & Monitoring Engineer
To ensure that aims, goals and objectives were accomplished in accordance with EPC
Project outlined priorities, time limitations, and funding conditions.
Involved in helping to assess risk, project cost control, estimation, forecasting,
reviewing proposed schedules, risk analysis and analyzing variances.
Responsible for processing and monitoring expenditures, project status reporting,
annual capital and expense corridor budget preparation, cost trending analysis and
change order tracking. Prepares monthly and quarterly project cost status reports.
Project progress monitoring, reporting to Project Manager, Liaising with Clients and
advising project team regarding proper execution strategy and identify bottle necks.
Preparation of plans for new jobs, Collecting data from all sites to make the weekly and
monthly reports, invoices. Approve sub-contractor and vendor invoices.
Liaises between Engineering and Procurement department to ensure timely
procurement of project materials/equipment requirements. Advises corrective action for
timely delivery.
Preparation / Implementation of corrective action / acceleration programme to
capture the slippage
Attending meetings with clients / project managers and clarify strategies
Analyze productivity data and report to project manager as necessary
Preparation of Tenders plans, Estimation of Engineering Design man-hours with the
engineering team, made the time extension claim for EMAL project
Prepared the baseline plan for Upgrade of UPS, Battery Charger & Battery Banks at
NFA Qatar Petroleum
Prepared the baseline plan for Transformer replacement project at Takreer Refinery.
Planning and monitoring all the construction activities for the Desalination Unit being
built by EPC Contractor, HYUNDAI, KOREA & SIDEM, FRANCE
Collecting the practical difficulties of the project from site engineers and submitted to the
Project Manager.
Preparing & Maintaining of ISO Documents & Records. Updating of total documentation
and facing the ISO Internal Audit.
Jan 2004 ~ Dec2007 Shakarganj Mills Limited (Pakistan)
Shakarganj is a leader in Sugar Industry having 1- Sugar plant production more than 800
tons/day, 2- Self power generation of 38 MW, 3- Alcohol plants production more than 2 lack
liters/day,
As a Management Trainee
I worked in various disciplines to understand the process and the company policies.
Operation & Maintenance Planning Engineer
Responsible for the safe and efficient operation of the powerhouse. Duties included the
operation of the four 360 Ton (25 Kg/cm2) boilers to supply steam to drive the Qingdao
turbine generator (38 MW). Performed light, electrical/mechanical maintenance tasks.
I was also responsible for overseeing the boiler hydrostatic testing after any boiler repair
and overseeing the repairs as they took place.
Responsible for operating the control board, maintaining desired load conditions, taking
readings, keeping daily operational logs, and assisting the shift supervisor in the boiler.
Planned annual maintenance activities of Boilers, steam turbines, feed pumps system,
feed water storage vessels and de-aration vessels.
Proposed and installed 1 Heat Exchanger in Boiler Feed Water Circuit to recover
process condensate heat.
Responsible for Start-up and Shut-down and environmental control of Boilers,
Turbine/Generator and auxiliary related equipment.
Regular inspection of assigned equipment, participating in breakdown analysis/trouble
shooting to minimize down time.
Maintenance of Valves, Compressors, Pumps, Boilers, Heat Exchanger.
Motor and gearbox removal and installation.
Achievements:
Successful implementation of HSE Policies at Shakarganj Mills Ltd.
Successful erection & commissioning of 4x6 MW Back Pressure Turbines & 2x6 MW
Condensing Extraction Turbines.
Successful erection & commissioning of Steam Boiler capacity 80Tons/Hr @ 25 Kg/cm2
2002
As an Internee
Done my internship in all the division of Millat Tractor Limited, Lahore
SKILL PROFILE:
Computing Skills
Primavera Project Planner (P3), P6, MS Project, well
conversant Auto CAD
Microsoft Word, Power Point, Excel spreadsheets, Outlook, Average
SAP
Interpersonal Skills: Motivated & Professional, with natural drive, together with
sound knowledge and a desire to succeed in developing capability in the field of
Project Management and Control.
Page 4 of 4