Sie sind auf Seite 1von 4

Muhammad Naseer Ud Din Ahmad PMP

Cell # +966-599086476 Email: naseer2000@gmail.com D.O.B. 13-Aug-1982 Nationality : Pakistan

CAREER OBJECTIVE:
PMP certified an enthusiastic individual with an interest in moving into a fast
growing environment which will provide challenges and allow further
development of my skills in Project Management, Project Control, Planning and Monitoring.

EDUCATION:

Currently pursuing for CCP (Certified Cost Professional)


2011
Project Management Professional (PMP) from PMI USA
2000 2003 B.Sc. Mechanical Engineering from U.E.T. Lahore 73%
1997 1999
1997
Distinctions

F.Sc Pre-Engineering from B.I.S.E, Faisalabad


Schooling from B.I.S.E, Faisalabad.
Got

79%
88%

1st position in the Division during F.Sc. (Pre Engineering)

CAREER HIGHLITES
Working in the field of EPC Projects in Oil and Gas and Petrochemicals Planning,
Scheduling, Costing, Monitoring & Co-ordination functions. Cross Functional Project
Coordination, Manpower & Equipment Estimation / Mobilization Plan, Project Schedule
Generation, Tracking of the Schedule, Progress Measurement System & Reports
generation, Interface management & Critical Path Analysis. Associated with
multinational EPC consultants and Contractors, Wood Group-CCC, M/s TARGET
Engineering Construction Company UAE, DESCON Engineering Qatar
Responsible for preparation of Multidisciplinary EPC Project Schedules from CSR,
BFD, FEED & DD to Pre-Commissioning stage. Having excellent project planning,
management, reporting, communication and Planning Software Skills

WORK EXPERIENCE:
Sep 2011~ June 2014
a.

WOOD GROUP CCC (EPC) COMPANY Ltd OMAN


EMC (Engineering, Maintenance & Construction) for PDO (Petroleum
Development of Oman) South

As a Project Control & Planning Engineer

Experience encompass all the phases of a project i.e. Feasibility studies,


Conceptual design, BFD, FEED, Detail design, Procurement, Construction,
Inspection & testing, Level II, III & IV Planning and Resource Loading using Primavera
P6 V 8.2 and preparation of planning package having EDDR, Procurement register,
Quantity based construction progress measurement system.
Establish critical path & setting up progress measurement system for FEED, DD and
EPC projects. Perform project schedule analysis & studies of problem area to
determine criticality of schedule activity. Recommends alternatives for schedule
improvement to project team for discussion & decision.
Project Monitoring & cost controlling through EVM. Projects planning & monitoring for
Fabrication & Installation of CS / SS/ GRE piping, Steel structure, Pumps, Vessels
installation.
Effective implementation of six week, four week rolling plans.
Perform risk analysis of project plans to identify Risk issues and recommend
appropriate mitigation actions. Identification and analysis of complications and problems
and recommend suitable remedies.
Page 1 of 4

June 2010~Aug 2011TARGET ENGINEERING CONSTRUCTION (EPIC) COMPANY


(W.L.L) UAE

b.
IGD - GASCO - RUWAIS Fourth NGL Recovery Train
c. EMAL Smelter Complex Power Plant Above Ground Electrical &
Instrumentation Works
d.
Transformer Replacement (TAKREER Refinery)

The main contractor (NGL 4th Train project) is M/s Petrofac / GS JV, the contract value
is US$ 129,500,000.00, Scope of work includes engineering, procurement, construction
and commissioning of pump house structure, sea water intake, cooling water supply,
cooling water return line, water outfall, sealing weir and discharge structure
For E & I above ground works, Emirates Aluminum (EMAL) is the client for complete
power plant electrical & instrumentation work.
As a Planning, Scheduling & Monitoring Engineer

To ensure that aims, goals and objectives were accomplished in accordance with EPC
Project outlined priorities, time limitations, and funding conditions.
Involved in helping to assess risk, project cost control, estimation, forecasting,
reviewing proposed schedules, risk analysis and analyzing variances.
Responsible for processing and monitoring expenditures, project status reporting,
annual capital and expense corridor budget preparation, cost trending analysis and
change order tracking. Prepares monthly and quarterly project cost status reports.
Project progress monitoring, reporting to Project Manager, Liaising with Clients and
advising project team regarding proper execution strategy and identify bottle necks.
Preparation of plans for new jobs, Collecting data from all sites to make the weekly and
monthly reports, invoices. Approve sub-contractor and vendor invoices.
Liaises between Engineering and Procurement department to ensure timely
procurement of project materials/equipment requirements. Advises corrective action for
timely delivery.
Preparation / Implementation of corrective action / acceleration programme to
capture the slippage
Attending meetings with clients / project managers and clarify strategies
Analyze productivity data and report to project manager as necessary
Preparation of Tenders plans, Estimation of Engineering Design man-hours with the
engineering team, made the time extension claim for EMAL project
Prepared the baseline plan for Upgrade of UPS, Battery Charger & Battery Banks at
NFA Qatar Petroleum
Prepared the baseline plan for Transformer replacement project at Takreer Refinery.

Apr 2009~May2010 DESCON ENGINEERING QATAR L.L.C


RAS GIRTAS POWER COMPANY (DESALINATION UNIT)
Descon Scope of Work includes 10 Evaporator Units erection, 3 Limestone Filter
Backwash Recovery Tanks (2900 m3 each Dia 19 m), A/G Piping: 145,000 DI, GRP
Piping: 154,000 LMD, Structural Steel: 3050MT, Mechanical Stationary Equipments: 319
Nos including 10 Steam Transformers (95 Ton Each), Plate Heat Exchangers, CO2
Absorber Towers (30m) with Cooling Fans, Stripper Towers (20m), PPM Vessels,
Package Boiler, Centrifugal Pumps, Thermo-compressors, Upstream & Downstream
Ejectors, Painting & Insulation for the Plant and Complete Electrical & Instrumentation
Work.
As a Construction Lead Planning, Scheduling & Monitoring Engineer
Prepared Base Plan independently & on time using P3
Page 2 of 4

Planning and monitoring all the construction activities for the Desalination Unit being
built by EPC Contractor, HYUNDAI, KOREA & SIDEM, FRANCE

Major responsibilities include


Leading the team of Area Planners for all disciplines to prepare the Work front on
monthly and weekly basis, to calculate the resources, consumable and direct material
for said work fronts and to control their respective discipline efficiency while Monitoring
Daily Progress and Reporting to client.
I prepared Planning Package supported by Project execution plan, phasing of project
budget & resources, milestone dates & procurement strategies.
Updating cash flows based on balance forecast cost to complete for the project.
Making Bill of Materials and total material required. Coordination with Purchase
department for in time material procurement and allocate the same to the Execution in
consultation with store.
Took corrective action as needed during projects and/or consulted with construction
project manager to resolve issues arising during projects.
Reconciled costs/deliveries of project materials and ensured the materials portions of
project budgets were properly maintained and updated. Identified Project surplus
materials and booked for use on another projects.
Feb 2009~ March 2009
DESCON ENGINEERING QATAR L.L.C
DOLPHIN ENERGY QATAR (SHUT DOWN)
As a Shut-Down Planning & Monitoring Engineer
Effective shutdown planning and monitoring at Dolphin Energy Plants static and rotary
equipment: columns, vessels, heat exchangers, cooling towers, fans, compressors,
pumps, different types of valves, piping fabrication/erection and modifications jobs etc.
Major responsibilities include
Preparation of plan during annual shutdown of Train-2, Including piping shop fabrication/
field erection, and internal parts replacement of Re-claimer columns, modification of
Regeneration Gas heater, hot taping with installation of split tee of Steam strainer and
tubes replacement of Stripper re-boiler.
To plan & monitor the progress of repair and maintenance of vessels, columns,
pumps, heat exchangers, compressors and other stationary equipments.
Removal of damaged internals and nozzles with new one for the column (95 m).
Cleaning & repair of demister pads, installation of new demisters against damaged one.
Modification of existing scrub column (65m) in addition to installation of new one.
Modification of piping routing to boiler
Preparation of daily & weekly reports for submission to client
Jan 2008~Jan 2009

DESCON ENGINEERING QATAR L.L.C


RAS LAFFAN OLEFIN PROJECT

As a Construction Planning & Monitoring Engineer


Planning and monitoring all the construction activities for the Cold Section of Ethylene
Cracker Project (3rd Largest Project of its kind in the World) being built by EPC
Contractor, TECHNIP FRANCE.
Major responsibilities include
Planning & monitoring of 613200 fabrication inch dia and 243000 erection inch
(CS & SS), 7000 MT of steel structure fabrication & erection, vessels installation,
Pumps, drums installation, 37Km of cable laying and other E&I activities .
Preparing engineering plans, drawings, specifications and cost estimates. Responsible
for analyzing the original status of the project and to find the CPM (critical path method).
Page 3 of 4

Collecting the practical difficulties of the project from site engineers and submitted to the
Project Manager.

Preparing & Maintaining of ISO Documents & Records. Updating of total documentation
and facing the ISO Internal Audit.
Jan 2004 ~ Dec2007 Shakarganj Mills Limited (Pakistan)
Shakarganj is a leader in Sugar Industry having 1- Sugar plant production more than 800
tons/day, 2- Self power generation of 38 MW, 3- Alcohol plants production more than 2 lack
liters/day,
As a Management Trainee
I worked in various disciplines to understand the process and the company policies.
Operation & Maintenance Planning Engineer
Responsible for the safe and efficient operation of the powerhouse. Duties included the
operation of the four 360 Ton (25 Kg/cm2) boilers to supply steam to drive the Qingdao
turbine generator (38 MW). Performed light, electrical/mechanical maintenance tasks.
I was also responsible for overseeing the boiler hydrostatic testing after any boiler repair
and overseeing the repairs as they took place.
Responsible for operating the control board, maintaining desired load conditions, taking
readings, keeping daily operational logs, and assisting the shift supervisor in the boiler.
Planned annual maintenance activities of Boilers, steam turbines, feed pumps system,
feed water storage vessels and de-aration vessels.
Proposed and installed 1 Heat Exchanger in Boiler Feed Water Circuit to recover
process condensate heat.
Responsible for Start-up and Shut-down and environmental control of Boilers,
Turbine/Generator and auxiliary related equipment.
Regular inspection of assigned equipment, participating in breakdown analysis/trouble
shooting to minimize down time.
Maintenance of Valves, Compressors, Pumps, Boilers, Heat Exchanger.
Motor and gearbox removal and installation.
Achievements:
Successful implementation of HSE Policies at Shakarganj Mills Ltd.
Successful erection & commissioning of 4x6 MW Back Pressure Turbines & 2x6 MW
Condensing Extraction Turbines.
Successful erection & commissioning of Steam Boiler capacity 80Tons/Hr @ 25 Kg/cm2
2002
As an Internee
Done my internship in all the division of Millat Tractor Limited, Lahore

Membership Member of Pakistan Engineering Council (PEC)


Workshops
Participated in workshops on i) Fuel Conservation Techniques
ii) Bearing Maintenance iii) Attitude, Communication and Team Work
Trainings
Conducted Trainings on i) Team Building ii) Project Integration Management iii) P3

SKILL PROFILE:
Computing Skills
Primavera Project Planner (P3), P6, MS Project, well
conversant Auto CAD
Microsoft Word, Power Point, Excel spreadsheets, Outlook, Average
SAP
Interpersonal Skills: Motivated & Professional, with natural drive, together with
sound knowledge and a desire to succeed in developing capability in the field of
Project Management and Control.
Page 4 of 4

Das könnte Ihnen auch gefallen