Beruflich Dokumente
Kultur Dokumente
ORGANISATION
QP
JOB TITLE
DIRECTORATE
DEPARTMENT
LOCATION
JOB TITLE
Planning Engineer (Contracts/Logistics)
SUBORDINATES
2 Technical Assistants (Contracts/Logistics)
1 Senior Clerk
Page 1 of 3
9. Optimises cost / budget Management within the framework of contractual agreements and assists the
Lead Planning Engineer in preparation of Corporation Estimates for tenders under process.
10. Makes recommendations for improving the contractual producer, strategies for price structure,
combining services as integrates services. Request comments from end users of contracts if any
amendment to be considered prior to re-tendering to avoid any short fall that they may have
occurred in previous contract.
11. Participates at the required level, in meetings with Finance/Legal/Materials/ contracts personnel and
auditors.
12. Make presentations and familiarisation to end users to new contracts for the proper administration
of the contracts including pricing structure.
13. Acting for Lead Engineer during his leave.
Principal Accountabilities
1. Directs and supervises the subordinates with regard to the tendering plan for each tender i.e.
advertisement, tender closing, evaluation, awarding and budget related work.
2. Responsible for strict adherence to the established tendering and contracting procedures and
negotiations.
3. Has access to tender and contracts confidential commercial bids and evaluation which he must
maintain strict secrecy and confidentiality.
4. Interpretation of 25-35 active Drilling Department equipment and services contracts and assist in
administrating worth 400 MMQR 800 MMQR.
5. Responsible for the accuracy of corporation estimates, tender evaluation and variations cost and
ensures that the evaluation of bids are comprehensive. A lack of accuracy and thoroughness could
have significant financial and legal implications.
6. Processing of Call Off Orders and Materials reservations depending upon the activities. Constantly
monitoring for over invoice / duplicate invoice, a slip can cause great financial and legal
implications on Q.P and issue monthly reports for status of Contracts and Call off Orders.
Knowledge, Skills & Experience
B. Sc. in Petroleum Engineering or related discipline.
1.
Should have in depth knowledge and experience of drilling, completion, well testing and rigless
operations engineering.
2.
Knowledge of complete tendering procedures from preparing the tender to awarding the contract.
3.
4.
AJT/zakia
Page 2 of 3
5. Should have good knowledge of oil industry pricing structures and standards in order to
incorporate best pricing structure in the contracts to achieve maximum for Q.P./budgeting
exercises.
6.
7.
8.
9.
Providing data for well insurance on yearly basis, actual and forecasts. Data for Corporate
Planning.
Budget Dimensions
1. Drilling annual budget varies from 400 MMQR to + 800 MMQR depending upon the activities.
2. Over 25 35 active drilling services and supply contracts are administered by Drilling, valued
between 500 700 MMQR.
3. Some 70 100 MMQR worth of drilling equipment and materials are ordered and consumed every
year.
Special Features
Prepared by
Reviewed by Job Holder
Reviewed by Supervisor
Approved by
AJT/zakia
Adnan J. Al-Talla
Mohd Y. Al-Sayed
Talib A. Al-Murri
Date
Date
Date
Date
Page 3 of 3