BIDAR CITY CHECK LIST(TECHNICAL REPORT)

Tranch - 4(24x7) WATER SUPPLY SCHEME PROPOSAL

Sl.
No

Description

Year 2013

Year 2026

Remarks

259937

368355

Based
on
NKUSIP
guidelines.
(2041=519332)

Manjra River

Karanja Reservoir

Population

Source

Rate of water
demand

100 lpcd

100 lpcd

Bulk Water
Requirement

29.89 MLD

36.83 MLD

Design Capacity of
scheme

Intake works

Jackwell

Raw water pumps

Raw water rising


main

10

11

WTP

Clear water pumps

Ex WTP 16.14 MLD


T-2 : 27.96 MLD

As
per
guidelines

NKUSIP

15% losses considered

44.10 MLD

Ex : RCC 3m internal dia


and 5.5m depth,
1100mmdiaRCC pipe, 60m
length.
T2(NKUSIP) RCC
Channel, 640m length
Ext: 1 no. 8.0 m dia RCC, 19
m depth with Pump house
13.0m dia. 6.6m depth
T2(NKUSIP) - 1 no. 8.0 m
dia RCC, 16.36 m depth with
Pump house 10.0m dia. 6.0m
depth.

Ex : RCC 3m internal dia


and 5.5m depth,
1100mmdiaRCC pipe, 60m
length.
T2(NKUSIP) RCC
Channel, 640m length
Ext: 1 no. 8.0 m dia RCC,
19 m depth with Pump house
13.0m dia. 6.6m depth
T2(NKUSIP) - 1 no. 8.0 m
dia RCC, 16.36 m depth with
Pump house 10.0m dia. 6.0m
depth.

Ext :2Nos of VT pumps, 600


HP, 110m Head,252LPS
T2 (NKUSIP) - 3 Nos of VT
pumps, 400 HP, 101m
Head,389LPS

Ext :2Nos of VT pumps, 600


HP, 110m Head,252LPS
T2 (NKUSIP) - 3 Nos of VT
pumps, 400 HP, 101m
Head,389LPS

Proposed arrangement
under
TRANCH
2(NKUSIP) can be
utilised

TRANCH - 2(NKUSIP)
implemented
arrangement can be
utilised

Proposed arrangement
under
TRANCH
2(NKUSIP) can be
utilised.

864 mm dia 7.9mmThick.


MS 6.15 km.

TRANCH - 2(NKUSIP)
implemented
arrangement can be
utilised.

27.28MLD
WTPConsistingAerator,raw
water channel circular Flash
mixer, Tube Settler, Rapid
Sand filterwash water tank
chlorinator

28 MLD (2026)
WTPConsisting Aerator,
Flash mixer, Tube Settler,
Rapid Sand filter

WTP is expected to be
fully functional after the
improvements
under
TRANCH - 2(NKUSIP)

2 nosHorz. Split cage Pumps


283 lps, 97 m head and
550HP.

TRANCH - 2(NKUSIP) 2
nosHorz. Split cage Pumps
355lps, 54 m head and
550HP..

Proposed arrangement
under
TRANCH
2(NKUSIP) can be
utilised
as
Life
expectancy of pumps is

600 mm dia.MS -1.09 km.


600mm dia PSC 7.805 km

15 years

BIDAR CITY CHECK LIST(TECHNICAL REPORT)


Tranch - 4(24x7) WATER SUPPLY SCHEME PROPOSAL

Sl.
No

Description

Year 2013

12

Clear water Gravity


mains

600 mm dia PSC, 18Ksc 5.69


km

TRANCH - 2(NKUSIP):
800 mm dia PSC, 12Ksc
12.68 km

Implemented
under
TRANCH - 2(NKUSIP).

13

Service reservoirs

Total Existing SR is 13 and 7


in good condition will be
utilised..

Tranch II -SR(7 No) 8.0 ml


Tranch IV SR 0
KUWS&DB-.SR(5 N0)
6.0ml

Total SRs = 19 with


17.89 ml capacity will be
in use for 24x7

14

Clear water
requirement for
Distribution
(Excluding fire
demand) with 9%
losses

28.33 ML

40.15ML

15

Distribution system
Distribution zones

16

17

Distribution pipe
length

Control valves /
regulators

Total 17 Zone
TRANCH - 2(NKUSIP)
PE-90mm-123.904km
PE-110mm-9.04km
PE-125mm-2.67km
PE-140mm-3.29km
PE-160mm-4.19km
PE-180mm-1.04km
PE-200mm-7.04km
PE-225mm-0.99km
PE-250mm-3.17km
PE-280mm-1.75km
PE-315mm-0.47km
PE-355mm-0.41km
PE-400mm-0.22km
PE-450mm-0.07km
158.26 Km
TRANCH - 4(24x7)
PE-63mm-16.833km
PE-90mm-25.796km
Total-42.629Km.
Grand Total -200.889 Km
TRANCH 2 (NKUSIP) :
SLV- 80mm-61nos
SLV- 100mm-25nos
SLV- 150mm-26nos
SLV- 200mm-21 nos
SLV- 250mm-17nos
SLV- 300mm-2nos
SLV- 350mm-1 nos
SLV- 400mm-2 nos
Total SLV- 155 nos
SCV- 80mm-29nos
SCV- 100mm-1nos
Total SCV- 30 nos
SLV + SCV 185nos
Trench (24x7) :
SLV- 80mm-80nos
SLV- 100mm-70nos

Year 2026

Total 12 Zone

Remarks

Total 12 Zones Covered


under 24 X 7

Total -200.889 Km

TRANCH 2 (NKUSIP) :
SLV-155nos
SCV-30nos
Total 185 nos
Trench (24x7) :
SLV-80nos
SCV-70nos
Total 150nos

New Works

BIDAR CITY CHECK LIST(TECHNICAL REPORT)


Tranch - 4(24x7) WATER SUPPLY SCHEME PROPOSAL

Sl.
No

Description

Year 2013

Year 2026

Remarks

Total 150nos

18

Electromechanical
bulk flow meters

19

House service
connections

20

No. of properties

TRANCH 2 (NKUSIP) :
864mm-1nos
800mm-2 nos
500mm-2 nos
250mm-12nos
200mm-3nos
Total 20nos
Tranch (24x7) :
80mm-27nos

TRANCH 2 (NKUSIP) :
864mm-1 nos
800mm-2 nos
500mm-2 nos
250mm-12 nos
200mm-3 nosTotal 20nos
Tranch (24x7) :
80mm-27nos

T4(24x7) :11969Nos

11969 + As per demand

Domestic Non-Domestic

10587

Sl.
No.
19
20
21
22
23
24

Year / Particular
Projected Population
No. of Houses
O&M Costs excluding
operator fees in Rs.
Lakhs
O&M Costs including
operator fees in Rs.
Lakhs
Technical Auditor fees
in Rs. Lakhs
Expected Revenue in
Rs. Lakhs.
a) HDMC old rates
b) HDMC new rates
c) Government new
rates
d) New rates for Bidar
City

All properties are


required to be connected

Industrial/Commercial

Total

121

11969

1261

2013

2014

2015

2016

2017

2018

2019

259937

267537

275261

283108

291078

299171

307388

19018

21245

22612

24122

25795

27662

29764

927.24

970.35

1018.87

1159.58

1221.79

1311.85

1489.57

981.68

1031.86

1088.37

1238.12

1310.54

1412.14

1602.89

14.45

13.79

15.59

17.61

19.90

Cost of Works proposed under T4(24x7) ( Interventions)


Part - A
Distribution network
Total
Part B
House service connections

New works

Rs. 5.63 Cr.


Rs.5.63Cr.

Rs. 7.29 Cr.


Total
Rs. 7.30 Cr.
Total of A+B Rs. 12.92 Cr. Say Rs. 12.92Cr.

Annual Maintenance Cost (Minimum Operational Cost for the year 2013)
1.
2.
3.
4.

Establishment charges
Power charges
Cost of chemicals/Consumables
Cost of Repairs/Replacements
Total

Rs. 340.763 Lakhs


Rs. 616.770 Lakhs
Rs.
22.678 Lakhs
Rs.
31.558 Lakhs
Rs. 1011.769 Lakhs

(Establishment, Power charges, Cost of chemicals/Consumables, Cost of Repairs/Replacements, Operator Fees , Technical
Auditor Fees & NIC Fee for providing Billing & Collection software For five years -- 7405.00 Lakhs)