Sie sind auf Seite 1von 46

All rights reserved.

Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

Site
SH
Originators
LIU Zehong, ZHOU Xia,
SHEN Wei,Zhang KE,
Zhao hui,jia jun
System
Sub-system
Document Category

ALCATEL-LUCENT
RRH60_21ASB Test Strategy

:
:
:

WCDMA NodeB
RRH
System Test

ABSTRACT
The present document describes the test strategy of China WRRH system.

Name
App.

ZHANG Jianlin
TPM

Approvals
LI Chunting
TPM

HUANG Jincao
TPL

REVIEW

Ed. 01 Proposal 01

2009-07-27

Common platform internal review

Ed. 01 Proposal 01
Ed. 01 Proposal 02
Ed. 01 Proposal 03

2009-07-27
2009-08-10
2009-08-24

Ed. 01 Proposal 04

2009-09-14

Ed. 01 Proposal 05

2009-09-24

Ed. 01 Proposal 06

2009-11-11

Initialize the contents.


Modification according to the design optimization
Include the thermal test and modification according to the
architecture
Updating according to the modification of the power supply test
and reliability test
Updating according to the modification of the SIT3 environment
test
Updating according to the modification of the SIT1/SIT2/SIT3 test
plan modification

HISTORY

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

1/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

TABLE OF CONTENTS
TABLE OF CONTENTS .....................................................................................................................................2
LIST OF FIGURES .............................................................................................................................................4
LIST OF TABLE .................................................................................................................................................5
REFERENCED DOCUMENTS...........................................................................................................................5
PREFACE ...........................................................................................................................................................6
1 SCOPE ..........................................................................................................................................................7
2 GENERAL .....................................................................................................................................................8
2.1 RRH Architecture and Requirements.................................................................................................8
2.2 Test Definition ......................................................................................................................................9
2.3 Test Work Flow ..................................................................................................................................10
3 SIT1 .............................................................................................................................................................12
3.1 TRX Board Test ..................................................................................................................................12
3.1.1 Test Configuration .....................................................................................................................12
3.1.2 Test Equipment and Tool ..........................................................................................................14
3.1.3 Test Domain ..............................................................................................................................14
3.1.4 SIT1 TRX board PQ SW Test ...................................................................................................17
3.2 Power Amplifier Test .........................................................................................................................19
3.2.1 Test Configuration .....................................................................................................................19
3.2.2 Test Equipment and Tool ..........................................................................................................20
3.2.3 Test Domain ..............................................................................................................................21
3.3 FEU board Test ..................................................................................................................................22
3.3.1 Test Configuration .....................................................................................................................22
3.3.2 Test Equipment and Tool ..........................................................................................................23
3.3.3 Test Domain ..............................................................................................................................24
3.4 Mainframe/TRX/PA/FEU Reliability Test .........................................................................................25
3.4.1 EMC Test(Zhang ke) .................................................................................................................25
3.4.2 Safety Test(Zhang ke) ...............................................................................................................26
3.4.3 Lightning Protection Test(Zhang ke) .........................................................................................26
3.4.4 Thermal Test(JIA JUN)..............................................................................................................26
3.4.5 Environment test(Zhao hui) .......................................................................................................26
4 SIT2 .............................................................................................................................................................29
4.1 DL Pre-integration Test .....................................................................................................................29
4.1.1 Test Equipment and Tool ..........................................................................................................29
4.1.2 Test Equipment and Tool ..........................................................................................................30
4.1.3 Test Domain ..............................................................................................................................31
4.2 UL Pre-integration Test .....................................................................................................................32
4.2.1 Test Configuration .....................................................................................................................33
4.2.2 Test Equipment and Tool ..........................................................................................................34
4.2.3 Test Domain ..............................................................................................................................34
4.3 SW Pre-integration Test ....................................................................................................................34
4.3.1 Test Configuration .....................................................................................................................34
4.3.2 Test Equipment and Tool ..........................................................................................................34
4.3.3 Test Domain ..............................................................................................................................34
5 SIT3 .............................................................................................................................................................34
5.1 RRH Standalone Initial Test ..............................................................................................................34
5.1.1 Test Configuration .....................................................................................................................34
5.1.2 Test Equipment and Tool ..........................................................................................................34
5.1.3 Test Domain ..............................................................................................................................34
5.2 RRH Functional Test..........................................................................................................................34
ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

2/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

5.2.1 Test Configuration .....................................................................................................................34


5.2.2 Test Equipment and Tool ..........................................................................................................34
5.2.3 Test Domain ..............................................................................................................................34
5.3 RRH Reliability Test...........................................................................................................................34
5.3.1 EMC Test...................................................................................................................................34
5.3.2 Safety Test.................................................................................................................................34
5.3.3 Lightning Protection Test ...........................................................................................................34
5.3.4 Thermal Test .............................................................................................................................34
5.3.5 Environment test........................................................................................................................34
6 REFERENCE: .............................................................................................................................................34
7 GLOSSARY AND ABBREVIATIONS .........................................................................................................34

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

3/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

LIST OF FIGURES
FIGURE 2-1 RRH ARCHITECTURE ........................................................................................................................................ 8
FIGURE 2-2 TEST WORK FLOW .......................................................................................................................................... 11
FIGURE 3-1 CPRI L1/L2 INTEGRATION.............................................................................................................................. 12
FIGURE 3-2 TRX SIT1 TEST CONFIGURATION ................................................................................................................... 13
FIGURE 3-3 TRX SIT1 CPRI INTERFACE TEST CONFIGURATION....................................................................................... 14
FIGURE 3-4 PQ SW TEST ENV ........................................................................................................................................... 17
FIGURE 3-5 PA TEST BENCH 1 .......................................................................................................................................... 19
FIGURE 3-6 PA TEST BENCH 2 .......................................................................................................................................... 20
FIGURE 3-7 FEU TEST BENCH 1 ........................................................................................................................................ 23
FIGURE 3-8 FEU TEST BENCH 2 ........................................................................................................................................ 23
FIGURE 3-9 RRH ENVIRONMENT AND TEMPERATURE TEST ......................................................................................... 26
FIGURE 4-1 DL PRE-INTEGRATION TEST CONFIGURATION................................................................................................. 30
FIGURE 4-2 UL PRE-INTEGRATION TEST CONFIGURATION................................................................................................. 33
FIGURE 4-3 SW PRE-INTEGRATION TEST CONFIGURATION ................................................................................................ 34
FIGURE 5-1 RRH STANDALONE TEST CONFIGURATION ..................................................................................................... 34
FIGURE 5-2 RRH ENVIRONMENT TEST CONFIGURATION ................................................................................................... 34

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

4/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

LIST OF TABLE
TABLE 2-1 RRH FEATURE LIST ........................................................................................................................................... 9
TABLE 2-2 UNIT TEST DEFINITION....................................................................................................................................... 9
TABLE 2-3 SIT1 DEFINITION ............................................................................................................................................. 10
TABLE 2-4 SIT2 DEFINITION ............................................................................................................................................. 10
TABLE 2-5 SIT3 DEFINITION ............................................................................................................................................. 10
TABLE 3-1 SIT1 TRX BOARD TEST TOOL LIST ................................................................................................................. 14
TABLE 3-2 SIT1 TRX BOARD TEST DOMAIN LIST ............................................................................................................ 17
TABLE 3-3 SIT1 TRX BOARD PQ SW TEST TOOL LIST..................................................................................................... 17
TABLE 3-4 SIT1 TRX BOARD PQ SW TEST DOMAIN LIST ................................................................................................ 18
TABLE 3-5 SIT1 PA TEST TOOL LIST ................................................................................................................................ 20
TABLE 3-6 SIT1 PA TEST DOMAIN LIST............................................................................................................................ 22
TABLE 3-7 SIT1 FEU TEST TOOL LIST .............................................................................................................................. 24
TABLE 3-8 SIT1 FEU TEST DOMAIN LIST ......................................................................................................................... 25
TABLE 3-9 SIT1 ENVIRONMENT TEST TOOL LIST.............................................................................................................. 27
TABLE 3-10 SIT 1 ENVIRONMENT TEST DOMAIN LIST ...................................................................................................... 28
TABLE 4-1 SIT2 DL TEST TOOL LIST ................................................................................................................................ 31
TABLE 4-2 SIT2 DL TEST DOMAIN LIST ........................................................................................................................... 32
TABLE 4-3 SIT2 UL TEST TOOL LIST ................................................................................................................................ 34
TABLE 4-4 SIT2 UL TEST DOMAIN LIST ........................................................................................................................... 34
TABLE 4-5 SIT2 CM TEST TOOL LIST ........................................................................................................................... 34
TABLE 4-6 SIT2 CM TEST DOMAIN LIST....................................................................................................................... 34
TABLE 5-1 SIT3 STANDALONE TEST TOOL LIST ................................................................................................................ 34
TABLE 5-2 SIT3 STANDALONE TEST DOMAIN LIST ........................................................................................................... 34
TABLE 5-3 SIT3 FUNCTIONAL TEST TOOL LIST ............................................................................................................... 34
TABLE 5-4 SIT3 FUNCTIONAL TEST DOMAIN 1............................................................................................................... 34
TABLE 5-5 SIT3 FUNCTIONAL TEST DOMAIN 2............................................................................................................... 34
TABLE 5-6 SIT3 ENVIRONMENT TEST TOOL LIST ............................................................................................................ 34
TABLE 5-7 SIT3 ENVIRONMENT TEST DOMAIN LIST ....................................................................................................... 34

REFERENCED DOCUMENTS
[ 1 ] 3BK 10239 0041 DCZZA

RRH60_21ASB documentation plan

[ 2 ] 3BK 10239 0044 QMZZA

RRH60_21ASB quality plan

[ 3 ] 3BK 11251 0385 DRZZA

RRH60_21ASB technical feature list

[ 4 ] 3BK 11251 0386 DTZZA

RRH60_21ASB technical feature description

[ 5 ] 3BK 11251 0387 EBZZA

RRH60_21ASB architecture specification

RELATED DOCUMENTS
[ 1 ] 3BK 11251 0401 BEZZA

RRH60_21ASB E2E test strategy

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

5/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

PREFACE
The present document describes the test strategy of ASB 60W RRH system. The information contained in
this document should allow the test engineer to develop test plan and related test tools.
This document should be used:
-

As an input to create the test cases and test plan

As an input to build the test configurations and test environments

As an input to estimate the test tools and test instruments.

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

6/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

SCOPE

The present document describes the test strategy of ASB self-developed 60W WCDMA RRH. All the
necessary tests during RRH development will be described in this document, which including:
-

The unitary chip level functional test (Called Unit Test), which focus on unitary analog, digital
components or software functional test on host. The Unit Test carry out in the design teams in the
design evaluation phase and the detail is not include in this document.

Chip group level functional test (Called SIT1), which focus on one functional module constructed by
group of chips and circuit. Reliability test of some critical RRH asset is also included in this phase.

Board level functional test (Called SIT2), which focus on RRH internal DL/UL/C&M functional module
integration test.

RRH subsystem integration test (Called SIT3), which focus on RRH standalone initial test, RRH
downlink/uplink function, and pre-qualification test of whole RRH subsystem.

For Unit Test, as it has tight relationship with design, the test itself is a part of development activity. So the
test strategy of this test will be defined in related design documents and it is out of the present document
scope. For each of the other up-mentioned tests, the test domain/requirements, test environment and related
test tools should be included. The integration test with NodeB (d2U V2) is also out of this document scope, it
will be included in RRH60_21ASB E2E test strategy [ 1 ].

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

7/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

GENERAL

2.1

RRH Architecture and Requirements

The following are RRH schematic, mainly including


-

PA board: power amplifier

FEU board: front end unit

TRX board: transmit/receive board

TX

TXRF
DPDfeedback

PA

DC28v
DC12V

FEU

TX
RX1&RX2

Power
Supply

TRX

DC48V
SFP1&SFP2
OAM

Figure 2-1 RRH Architecture


A list of RRHs main feature is given below. It is about RRH general requirements and RRH interface. This is
thought helpful to understand the test.
Feature

Requirements

Frequency Range

band I : 2110 2170 MHz (DL), 1920-1980 MHz (UL)

RF Power Output at EAC

60W/47.8dBm

RRH capability

UMTS 5MHz,10MHz,15MHz,20MHz
R99
HSDPA
HSUPA
HSPA+

Dimension

less than 47/48cm (h) x 26/27 cm (w) x 20/16cm (d),


( volume < 25l, target is <20 liters)

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

8/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

(mounting kit excluded, solar shield included)


CPRI interface

Main CPRI Interface: SFP


Daisy-chained CPRI Interface: SFP

Power interface

2 DC
Grounding terminal / 2 hole lug

RF interface

2 external antenna connectors : 7/16 female


Allow AISG signal and power transmitted through the Tx antenna feeder :
Internal Bias-T
2 auxiliary antenna connectors : SMA female, (for antenna sharing,
optional )

AISG interface/User Alarm


interface

Compliant to AISG v2.0.


4 user alarm
DB15 in service door

Maintenance/Configuration/Test
interfaces

External_reference (15MHz)
External_triger
RJ45 for OCI / Debug

Table 2-1 RRH Feature List


2.2

Test Definition

The general test scope and input/ending criteria of each test phase are described below:
Unit Test:
Objective

Test Domain
Responsible
Input Criteria
Ending Criteria

Unit Test
The purpose of this test is to verify unitary analog, digital components and software
function.
The sample chip of following components should be tested (e.g. AMP, SAW, Switch,
Mixer, BPF, DSA, Filter, VGA, PLL, Sensor, MPU, DDR2, Flash, EEPROM, CPLD,
ADC, DAC, 88E1111, etc). The software running on MPU should also be tested on host
PC environment or emulator board.
HW/SW development team
Basically after HW/SW design finish, but for some critical components, the evaluation
test should be taken in parallel with design
The perform and reliability meets the requirements of RRH MTBF, and pass rate of test
case reach 100%

Table 2-2 Unit Test Definition


SIT1:
Objective

Test Domain

SIT1
The purpose of this test is to verify a functional module constructed by group of chips
and circuit. The input/output and reliability of this function module will be checked.
The performance and function of following module/board will be tested:
- TRX (include the power supply)
- PA
- FEU
- Mechanical shell
For de-risk the reliability requirements of RRH system, the EMC test of the upmentioned modules should be taken.

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

9/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

Responsible
Input Criteria

HW/SW development team, Mechanical shell/EMC/Safety team, RRH system test team
After PEM1 and Unit test finished

Ending Criteria

SIT1 cases pass and the critical modules meet the requirements of EMC/Safety test.

Table 2-3 SIT1 Definition


SIT2:
Objective
Test Domain
Responsible
Input Criteria
Ending Criteria

SIT2
The purpose of this test is to verify the DL/UL data path and the MPU software
integration(including CPRI L1/L2 & CM, OAM)
TX pre-integration
RX pre-integration
SW pre-integration
RRH system test team
SIT1 basic function test is finished exclude the Mechanical shell/EMC/Safety test and
90% test case is pass
All the test case in the SIT2 is pass

Table 2-4 SIT2 Definition


SIT3:

Responsible
Input Criteria

SIT3
The purpose of this test is to verify whole RRH function and performance, which
including
- RRH standalone initial test
- RRH functional test
- RRH pre-qualification test
RRH system test team
SIT1 TX test and SW test is finished

Ending Criteria

All the test case in the SIT3 is pass

Objective
Test Domain

Table 2-5 SIT3 Definition


2.3

Test Work Flow

The sequence of test phases and the relationship between them are listed in Figure 2-2. Although each
test is an input criterion of its following test, SIT1/SIT2 and SIT2/SIT3 will overlap due to the tight schedule.
The subsequence of detail test cases will be defined in test plan, and the related test will also be arranged
cannily to make the test to be carried in parallel as possible.

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

10/49

Figure 2-2 Test Work Flow

ED01P04

RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

RRH60_21ASB Test Strategy

3BK 11251 0398 BEZZA

11/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

SIT1

3.1

TRX Board Test

TRX board is the main asset of RRH system, which terminating CPRI interface at NodeB side, providing
one TX channel to PA and two RX channels to LNA at the other side. The general architecture of TRX is
illustrated in [ 5 ]. In this test, the outside interfaces will be simulated and the internal behaviour of TRX will be
checked.

3.1.1

Test Configuration

For TRX SIT1, we can set up the test bench as Figure 3-2. The test bench will be tailored to adapt different
tests.

RS232

For CPRI L1/L2 integration, pre-saved data will be fetched from RAM and sent as CPRI payload. The data
can be decoded by TRX or loopback to xCCM and displayed on BCI command window. The software tools,
BCI command menu and xCCM host tool (including ping, telnet, tcpdump) should be used depending on
tests.

Ethernet2

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

Figure 3-1 CPRI L1/L2 Integration


Ethernet port is for sending image files, RS232 is for board control and message report, One RS485 is for
PA control, another is for AISG.JTAG is for FPGA and DSP debug. xCCM is used to test CPRI interface. PC1
is mainly as a BB board send control signals and all messages for CPRI test and system test.PC2 is used to
send control signal, image download(test vectors) and data collect, for board test.
For TRX outside alarm and AISG interface test, NI PXI card will be used to simulate these signals. AISG
and PA alarm can share one PXI485 card if the two tests do not be carried simultaneously. TRX board can be
tailored as a test card, with CPRI interface and MPU remained but IF/RF part cut-off. Depends on the stability
of HW and develop progress, the TRX adapted card will replace PXI as low cost solution in the later test.

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

12/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

For TRX internal chipsets/module and TX/RX verification, pre-saved the I/Q test vector will be used as DL
test signal, and the performance is analysed by VSA. In uplink, VSG is used to generate the wanted test
signal. The test vector we need to two kinds, for ADC,DAC, FPGA test good or not test, we need only CW
test vector, 1ms, period sent. For other performance test, standard WCDMA modulated signal will be
generate, 1ms, period send.

ATT

PA alarms
Frame trigger
15MHz Ref

RS485
TX (QMA)

Loopback
VSG
NI PXI

Ethernet
AISG
Debug port

TRX
(DUT)

RJ45
RS485

RX (SMB)

JTAG

RS232
DC power
Power alarms
Logic Analyzer
Or
USB download cable

PC1
Power
Supply -48V

Multimeter(A)

PC2

Figure 3-2 TRX SIT1 Test Configuration

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

13/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

Figure 3-3 TRX SIT1 CPRI Interface Test Configuration


For CPRI interface, we can use TAC card to simulate the BBU. And check the CPRI interface is compliant
with design requirement.

3.1.2

Test Equipment and Tool

The test equipment which is used within the TRX board test environment is listed in the following table:
Equipment
Designation
Purpose
Power Meter

NRP-Z11

Tx Set point Power Calibration

Power Supply

Agilent N6700

Supply for Test Setup & UUT

VSG

SMU/E4438C

Generate the wanted signal

VSA

FSQ/E4445

Analysis the transmit signal

Logical Analyzer

Agilent 16901A

TRX internal process debug

RS485 interface card

NI PXI485

Terminate AISG interface or PA alarm

Digital interface card

PXI DIO

Power supply alarm interface test

Table 3-1 SIT1 TRX board Test Tool List


3.1.3

Test Domain

Index

Test Domain

Description

TRX Board function Level Test


SIT1-TRX-01

Output power and


power rate Test

Tx performance test

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

14/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

SIT1-TRX-02

EVM

Tx performance test

SIT1-TRX-03

Power step accuracy

Tx performance test

SIT1-TRX-04

TX Spurious Test

Tx performance test

SIT1-TRX-05

ACLR

Tx performance test

SIT1-TRX-06

PAPR

Tx performance test

SIT1-TRX-07

Tx Frequency
configure

Tx performance test

Dynamic range and


SNR

Rx performance test

Rx Frequency
configure

Rx performance test

DFR dynamic range


and SNR

Rx performance test

DFR Frequency
configure

Rx performance test

SIT1-TRX-08
SIT1-TRX-09
SIT1-TRX-10
SIT1-TRX-11
SIT1-TRX-12

-40C to +65C

Environment test

TRX Board digital part test


SIT1-TRX-13

RS232 interface test

check whether the TRX boards rs232 interface is ok or not

SIT1-TRX-14

Ethernet interface test

check whether the TRX boards rs232 Ethernet is ok or not

SIT1-TRX-15

PA interface test

check whether the TRX boards PA interface is ok or not

SIT1-TRX-16

FEU interface test

check whether the TRX boards FEU interface is ok or not

SIT1-TRX-17

AISG&ALM interface
test

check whether the TRX boards AISG&ALM interface is ok or


not

SIT1-TRX-18

ALDI interface test

check whether the TRX boards ALDI interface is ok or not

SIT1-TRX-19

Front LED interface test

check whether the front led is ok or not

SIT1-TRX-20

Board self test

check whether the TRX boards main component is ok or not

Board temperature test

check whether the TRX boards temperature sensor value is ok


or not

Remote 48V power off


test

check whether the remote power off circuit is ok or not

SIT1-TRX-23

-48V Current test

check that the current consumption is within expected limits

SIT1-TRX-24

JTAG Chain Test

verify the function block of JTAG chain

Reset test

check whether the TRX boards function is ok or not after many


times reset

SIT1-TRX-21
SIT1-TRX-22

SIT1-TRX-25
TRX Board CPRI inteface Test

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

15/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

SIT1-TRX-26

remote loop back

CPRI interface Test

SIT1-TRX-27

receive clock test

CPRI interface Test

SIT1-TRX-28

DDR test

CPRI interface Test

SIT1-TRX-29

whole IQ loop test

CPRI interface Test

SIT1-TRX-30

whole ETH loop test

CPRI interface Test

SIT1-TRX-31

L1 inband and vendor


specific test

CPRI interface Test

CPRI L1/L2 Integration


SIT1-TRX-32

CPRI link status check


#2

SIT1-TRX-33

CPRI link status check


#2

SIT1-TRX-34

RRH IP configuration

To check RRH IP configuration using DHCP

RRH FTP test

Test the file transfer on C&M link, catch Ethernet packets and
analyze C&M link quality

Line speed negotiation

To check CPRI rate2/3 negotiation is possible between xCCM


and RRH

SIT1-TRX-35
SIT1-TRX-36
SIT1-TRX-37

C&M Ethernet Speed


Negotiation

SIT1-TRX-38

Reset RRH from xCCM

To check if xCCM is able to Reset RRH

SIT1-TRX-39

Ping test

Ping the RRH from xCCM side

SIT1-TRX-40

Telnet test

Telnet to the RRH on the xCCM side.

OS startup
SW

SIT1-TRX-41

RAM

SIT1-TRX-42

Serial Port

SIT1-TRX-43

Ethernet Port

SIT1-TRX-44

Device Chip test

IQ integration
SW

SIT1-TRX-45

IQ data loopback

SIT1-TRX-46

9E2 decoding data

SIT1-TRX-47

BER test

Init sequence with 2uv2


SW

SIT1-TRX-48

Nominal iBTS Static


start-up without DLU

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

16/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

Cell setup with 2uv2


SW

SIT1-TRX-49

Cell normally setup and


delete

Table 3-2 SIT1 TRX Board Test Domain List


3.1.4

SIT1 TRX board PQ SW Test

PQ SW is software running on RRH PQ2 CPU. During PQ SW test, the object under test is whole PQ SW
only with the cooperation with TRX board hardware (i.e. FPGA, ADC, DAC, etc).
3.1.4.1

Test Configuration

In real condition, RRH is connected to BBU via fiber line based on CPRI. The control between RRH and
BBU is all triggered by ARD546 message based on CPRI L1/L2.
But during PQ SW test, FPGA CPRI function will not be involved. We use Ethernet instead to transport
ARD546 message.
Test configuration is as below, The PC with linux OS is connected to RRH via Ethernet line. Test software
NodeB simulator runs on the PC and trigger the test with RRH

PC

RRH
Eth

Figure 3-4 PQ SW Test Env

3.1.4.2 Test Equipment and Tool


The test equipment used for the FEU board test is listed in the following table:
Equipment
Designation
Purpose
PC with linux OS

Normal PC

NodeB simulator residence

NodeB Simulator

Software running
on linux PC

simulating BBU behaviour to trigger ARD546


message

Table 3-3 SIT1 TRX board PQ SW Test Tool List


3.1.4.3 Test Domain
During PQ SW SIT1, only normal cases will be applied, no abnormal cases will be considered.
Index

Test Domain

Description

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

17/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

PQ SW Test
SIT1-TRX-50

startup

Startup sequence

SIT1-TRX-51

cell setup

Cell mapping and cell config message to setup 3 cell(STSR3)

SIT1-TRX-52

cell delete

delete 3 cells (STSR3)

SIT1-TRX-53

Indication enable/disable

Enable/disable indication request

SIT1-TRX-54

measurement report

get periodic measurement reports from the RE

SIT1-TRX-55

SIT1-TRX-56

Message exchange with dummy values


Delay report

retrieve CPRI delay information from the RE

counter report

get performance counters from the RE

Alarm report

get a snapshot of all (internal and external) alarms managed by


the RE with their associated status, severity and description

SIT1-TRX-57
SIT1-TRX-58

only message exchange, no hardware action


Tx enable/disable

disable radio transmission onto the antenna,

SIT1-TRX-59

selftest report

get detailed information concerning self test results

SIT1-TRX-60

Flr enable

Enabling a Flr (tracing mechanism provided by RE)

SIT1-TRX-61

only message exchange, no hardware action


Txlaser switch

request to switch on or off the laser towards next RE in the daisy


chain

Set new time stamp

The Timestamp attribute provides the remote unit with the


current time of day in the form of a 32 bit UMTS time value in
units of seconds. Upon receipt the remote unit aligns its internal
clock with this timestamp and uses this timing for writing
timestamps to any internal log

SIT1-TRX-62

SIT1-TRX-63

Loopback and stop


loopback

SIT1-TRX-64

only message exchange, no hardware action


IQ data loopback,

Save recsnapshot

save in persistent location (flash, eeprom) the information


relative to the REC

SIT1-TRX-65

Led status

ask for led information

SIT1-TRX-66

TmaAccess

SIT1-TRX-67

setvswrthreshold

SIT1-TRX-68

RRH load download

RRH load download via ethernet

Table 3-4 SIT1 TRX board PQ SW Test Domain List

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

18/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

3.2

Power Amplifier Test

Power amplifier is another critical asset of RRH system, a Doherty PA with three stages amplifier, digital
part, forward/backward power detect and DPD channel will be used in this RRH system. The general
architecture of PA is illustrated in [ 5 ]. In PA SIT1 test, the components inside PA as well as PA outside
interface should also be verified.

3.2.1

Test Configuration

Figure 3-5 shows the test configuration for most PA function and outside interface test. A RS485 interface
is used for PA alarm, which can be controlled by PC with RS485 to RS232 converter.

Figure 3-5 PA Test Bench 1


For some test cases, such as PA gain, VSWR, vector network analyzer will be used. The test configuration
is illustrated in Figure 3-6. Before test setup, the test link should be calibrated and compensated.

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

19/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

Figure 3-6 PA Test Bench 2


3.2.2

Test Equipment and Tool

The test equipment which is used for the PA board test environment is listed in the following table:
Equipment
Designation
Purpose
Power Meter

N1912A

Test output power

Peak and Average Power


Sensor

N1912A

Test output power

Power Supply

62012P-10050(Chroma)/
N6700
Series(Aglient)

Supply for Test Setup & UUT

VSG

SMU/E4438C

Generate the wanted signal

VSA

FSQ/E4445

Analysis the transmit signal

Network Analyzer

E5071C

For gain and line offset

Attenuator

30Db/40Db

To protect the device

Coupler

30Db/40Db

couple the power

RS485 to RS232 converter


card

Control signal, debug signal, alarm signal and


state report

Table 3-5 SIT1 PA Test Tool List


ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

20/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

3.2.3

Test Domain

Index

Test Domain

Description

PA Components Test
SIT1-PA-001

Gain/Gain Flatness

PA Lineup Performance

SIT1-PA-002

Delay

PA Lineup Performance

SIT1-PA-003

CCDF vs. Pout under

SIT1-PA-004
SIT1-PA-005

26V 28V 32V Vdd

PA Lineup Performance

ACPR vs. Pout under 26V


28V 32V Vdd

PA Lineup Performance

Spectrum
Emission Mask

PA Lineup Performance

SIT1-PA-006

Spurious Emission

PA Lineup Performance

SIT1-PA-007

Efficiency vs. Pout uner


26V, 28V, 32V Vdd

SIT1-PA-008

PA Lineup Performance

Return Loss at
Input,Output and FB/Rev
Port

PA Lineup Performance

SIT1-PA-009

Dynamic Range

PA Lineup Performance

SIT1-PA-010

Tx Intermodulation

PA Lineup Performance

SIT1-PA-011

Check In-rush

SIT1-PA-012
SIT1-PA-013

SIT1-PA-014
SIT1-PA-015
SIT1-PA-016

Capability/Trip Point

PA Lineup Performance

CheckThreashold
adjustability

PA Lineup Performance

ON/Off
Timing Measurement

PA Lineup Performance

DPD Feedback Path


Gain/Gain Flatness

PA Lineup Performance

DPD Feedback Path


Delay

PA Lineup Performance

Reverse Power Coupling


Path Gain/Gain Flatness

PA Lineup Performance

SIT1-PA-017

Dynamic range

DPD Close-loop Test

SIT1-PA-018

SNR

DPD Close-loop Test

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

21/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

SIT1-PA-019

gain step accuracy

SIT1-PA-020

isolation between

DPD Close-loop Test

RX/TX

DPD Close-loop Test

SIT1-PA-021

IP3

DPD Close-loop Test

SIT1-PA-022

NF

DPD Close-loop Test

SIT1-PA-023

ber

DPD Close-loop Test

SIT1-PA-024

VSWRAD temp and


failure temp point

SIT1-PA-025

-40C to +85C

DPD Close-loop Test


Environment test

Table 3-6 SIT1 PA Test Domain List


3.3

FEU board Test

As a RF asset near to antenna port, FEU has two cavity filters and two LNAs. The general architecture of
FEU is illustrated in [ 5 ]. The FEU is assumed a third party asset which will be brought in pre-tested. The
FEU inside components verification is not necessary, but FEU board level performance and outside interface
should be tested.

3.3.1

Test Configuration

For FEU TX performance test, a PA board is necessary to send the high power signal. The control signal
can be delivered by RS485, illustrated in Figure 3-7. VNA is used to test gain, IL, VSWR, isolation and so on.
And NFA is used to test the noise figure. The test bench is illustrated in Figure 3-8.

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

22/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

Figure 3-7 FEU Test Bench 1

Figure 3-8 FEU Test Bench 2


3.3.2

Test Equipment and Tool

The test equipment used for the FEU board test is listed in the following table:
Equipment
Designation
Purpose

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

23/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

Power Meter

N1912A

Test output power

Peak and Average Power


Sensor

N1912A

Test output power

Power Supply

62012P-10050(Chroma)/
N6700
Series(Aglient)

Supply for Test Setup & UUT

SG

SMU/E4438C

Generate the wanted signal

VSA

FSQ/E4445

Analysis the transmit signal

Network Analyzer

E5071C

For gain and line offset

Attenuator

30Db/40Db

To protect the device

Coupler

30Db/40Db

couple the power

NF analysis

N8973A

To test NF

RS485 to RS232 converter


card

Control signal, debug signal, alarm and state


report

Table 3-7 SIT1 FEU Test Tool List


3.3.3

Test Domain

Index

Test Domain

Description

FEU Board
Level Test
SIT1-FEU-001

Tx Insertion Loss &


VSWR Tests

performance test

SIT1-FEU-002

Tx In-band Ripple &


Group Delay Tests

performance test

SIT1-FEU-003

Tx Rejection Tests

performance test

SIT1-FEU-004

Average Input Power


Test

performance test

SIT1-FEU-005

Peak Envelope Power


( PEP )Test

performance test

SIT1-FEU-006

Inter-modulation
Distortion ( IMD )Test

performance test

SIT1-FEU-007

ALDI Port Test

performance test

SIT1-FEU-008

Rx Gain and Adjustment


Gain Range

performance test

SIT1-FEU-009

Rx Rejection Tests

performance test

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

24/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

SIT1-FEU-010

Rx VSWR and Group


Delay Test

performance test

SIT1-FEU-011

NF test

performance test

SIT1-FEU-012

Input IP3 Test

performance test

SIT1-FEU-013

Maximum RF Input Test

performance test

SIT1-FEU-014

LNA Alarm Test

performance test

SIT1-FEU-015

Receiver Spurious
Emission Tests

performance test

SIT1-FEU-016

Isolation between TX
port input to RX output
port

performance test

SIT1-FEU-017

Isolation between RX1


and RX2 output ports

performance test

SIT1-FEU-018

performance test
Isolation between
EAC1 and EAC2 ports

SIT1-FEU-019

I2C Verification Tests

performance test

Table 3-8 SIT1 FEU Test Domain List


3.4

Mainframe/TRX/PA/FEU Reliability Test

The system reliability is much depends on the performance of its individual asset. After the TRX/PA/FEU
Module SIT1 function test, it should be validated to verify the reliability of the RRH mainframe and
modules(TRX/PA/FEU) inner the RRH ; the SIT1 reliability test is important and the purpose of the SIT1
reliability test is to validate 90% reliability issue for the RRH product, in SIT3 RRH reliability test only cover the
rest 10% validation on the reliability issue because it very hard to do the big inner modification at that time.
Because the RRH integration function test has not performed when the SIT1 reliability test begin, it will use
the simulation load mode to fit the SIT1 reliability test requirement on the EMC/Heat . The SIT1 reliability
test will be classified as:
-

EMC Test(TRX/PA)

Safety Test(Mainframe/TRX/PA/FEU)

Lightning Protection Test(TRX/PA)

Heat Test(Mainframe/TRX/PA/FEU)

Environment test(Mainframe/TRX/PA/FEU)

The reliability tests can be executed in 3 team of the ASB CCC lab in different test branch.

3.4.1

EMC Test(Zhang ke)

Abou the detail in the test configuration/test equipment/test domain, please find it in
reference_EMC_SATETY_LIGHTNING chapter 2 EMC test , only the SIT1 test will perform in this phase

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

25/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

3.4.2

Safety Test(Zhang ke)

Abou the detail in the test configuration/test equipment/test domain, please find it in
reference_EMC_SATETY_LIGHTNING chapter 3 safety test, only the SIT1 test will perform in this phase

3.4.3 Lightning Protection Test(Zhang ke)


Abou the detail in the test configuration/test equipment/test domain, please find it in
reference_EMC_SATETY_LIGHTNING chapter 4 lightning protection test , only the SIT1 test will perform in
this phase

3.4.4

Thermal Test(JIA JUN)

In SIT1, it only perform the thermal simulation test in the system thermal design , and no thermal test in the
real environment in the SIT1 phase.

3.4.5

Environment test(Zhao hui)

3.4.5.1 Test Configuration


In this section, Mainframe/TRX/PA/FEU reliability test include environment temperature testTRX/PA,
mechanical characteristic test(Mainframe) and Ingress protection test(Mainframe/TRX/PA/FEU). Expect
mechanical characteristic test and IP(ingress Protection ) test, all the test is in the power on condition and the
test bench is the same as Figure 5-13.

Figure 3-9 RRH environment and temperature test


3.4.5.2 Test Equipment and Tool
Equipment

Designation

Purpose

Temperature Chamber

ESPEC

Low / high storage and operation test

Temperature and Humidity Cabinet

ESPEC LHU-213

Damp heat test

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

26/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

Thermal Cycle Temp Chamber

ESPEC SET-Z-080U

Thermal cycle and temp fast change test

Vibration Machine

WXASPR RT-50A

Vibration test

Mechanical Shock Machine

EPCU SD-24

Mechanical shock test

Drop Machine

WXASPR PK-318

Free fall test

Transport Simulation Machine

WXASPR PK-1000

Transport simulation test

Salt Frog Corrosion Chamber

WXASPR AHL-60-SS

Salt mist cycle test

Mildew Cultivation Chamber

WXASPR MC-225

Mildew test

Rain Simulation Chamber

WXASPR RI-1000

Rain simulation test

Sand Dust Chamber

WXASPR SD-1500

Sand dust test

Table 3-9 SIT1 Environment Test Tool List


3.4.5.3 Test Domain
Index

Test Domain

Description

Temperature Test
SIT1-ENV-001

Low temperature start-up

-40 storage for 8 hours and then power up, base function
must be executed after cold start;

SIT1-ENV-002

Working test at low


temperature

-40 / RH not defined /16 hours;


base function test shall be executed during the test;

SIT1-ENV-003

Working at dry heat test

SIT1-ENV-004

Working at damp heat test

SIT1-ENV-005

Damp heat start-up test

50 / 10 % RH /16 hours, Base function test shall be


executed during the test;
45/ 85 % RH/ 96 (16) hours;
Base Function test shall be executed during the test;
45/ 85 % RH storage for 8 hours and then power up, base
function must be executed during damp heat start;

SIT1-ENV-006

Temperature cycle test

-40,3hours,50,3hours,temperature change 1/min,3


times cycle;
Base Function test shall be executed during the test;

Mechanical Characteristic Test


SIT1-ENV-007

Vibration test

SIT1-ENV-008

Shock test

SIT1-ENV-009

Free Fall test

Vibration frequency range: 5 to 200 Hz, axes of vibration: 3


axes, duration: 3 x 30 minutes; test condition: 562 Hz:
velocity 5 mm/s.; 62200 Hz: max. peak acceleration of 2
m/s2.
Base function, visual and mechanical inspection check after
vibration test;
direction of bumps: 3 directions, duration: 6 ms, acceleration:
180 m / s2 ;
Base function and visual inspection check after shock test;
Free fall from 1m high, 2 falls in the normal attitude faces;
Base function and visual and mechanical inspection check
after free fall test;

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

27/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

Ingress Protection Test


SIT1-ENV-010

Salt mist test

At the temp of 35, 5% Nacl liquor for 48hour.


Base function , visual and mechanical inspection check after
salt mist test;

SIT1-ENV-011

Mildew test

29, 90%~98%RH for 24hours;


Base function and visual and mechanical inspection check
after mildew test;

SIT1-ENV-012

Rain simulation test

Raindrop diameter 2~4.5mm,nozzle water pressure 375


kPa for 40min;
Base function and visual and mechanical inspection check
after rain simulation test;

SIT1-ENV-013

Sand dust test

15~35, 45%~75%RH,50um metal square hole very dry


French chalk with 2Kg/m3 at air flow speed 2m/s take out for 2
hours;
Base function and visual and mechanical inspection check
after sand dust test;

Table 3-10 SIT 1 Environment Test Domain List

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

28/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

SIT2

After SIT1, each asset of RRH is verified individually. And in this test phase, all the assets are put together
for first pre-integration. The RRH inner interface between two assets will be checked to verify the middle
results satisfy the designed performance.
SIT2 focus on these aspects about the RRH inner integration and validation:
-

RRH inner module and connection integration

RRH DL function process validation except the SFP module connection on the CPRI interface

RRH UL function process validation except the SFP module connection on the CPRI interface

RRH OAM function process validation except the SFP module connection on the CPRI interface

SFP module connection loop test and FPGA L1/L2 process validation of the CPRI interface

4.1

DL Pre-integration Test

After the SIT1 validation, the TRX board and PA module and FEU module and Power module pass the
module individual test. All of these modules will assemble in the RRH rack and connect together with the
RF/Power/Control cable. About the RRH DL function, the following tests will be performed in the SIT2:
-

Modules Power On and initialization after the assembly and connection

Power supply module validation when all the module is power-on

Module temperature validation when all the module is power-on and load current warm up

Module input/output signal and impedance matching validation

PA and DPD algorithm in the TRX integration and validation

DL IQ SFP module connection loop test and FPGA L1/L2 process validation of the CPRI interface

4.1.1

Test Equipment and Tool

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

29/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

Figure 4-1 DL Pre-integration Test Configuration


In the SIT2 DL pre-integration test environment, the RRH Test SW work on the test mode and do the
module &DL configuration and debug function in the test, it also monitor the module status and internal
process. The DL test vector is generated in the FPGA with the RRH Test SW operation. The RRH test SW
also perform the SFP module connection test and FPGA L1/L2 process validation of the CPRI interface .It
run in the PC and connect with TRX with 100M Ethernet RJ45 cable and RS232 debug cable.
After the module power-on, if the power supply module status and module initialization is abnormal, the
test power supply will replace the power supply module and verify the character of the power supply module
and TRX/PA/FEU internal disturbance.
In order to validate the DL signal input/output character in the module process, the vector signal analyzer is
used in the RF signal test and connects the TRX module DL RF output port and PA module DL RF input port
and output port and DPD feedback output port. It also connects the FEU DL input/output RF port to validate
the FEU process. A high power attenuator is added in the high power output port test to protect the vector
signal analyzer. The vector signal analysis SW is used when it need to analysis the RF signal Vector
modulation character. This SW either is a Vector Signal Analyzer option or a individual SW running in a PC
and connect with Vector Signal Analyzer with LAN cable.
The Network Analyzer is used to test the module impedance matching and module network character when
it has the abnormal in the DL signal input/output test.
It has the digital signal process and analog signal process in the TRX board, when the Vector Signal
Analyzer cant verify the abnormal status in the DL signal process on the module input/output port, it need to
connect ADC/DAC input/output bus with the probe of the Logical Analyzer and capture the internal Digital
signal into the Vector Signal Analysis SW to do the detail analysis job.
About the synchronization and trigger connection between the test module and test tools, it not give the
description for the figure drawing limit.

4.1.2

Test Equipment and Tool

Below is the detail requirement about the test tools in the environment
Equipment
Designation
Purpose
Multimeter
Agilent 34401A
Power supply voltage/current/ground test
ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

30/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

Power meter
Signal generator
Spectrum analyzer
Network analyzer
Oscilloscope
Logical analyzer
Attenuator

TBD
Agilent E4438C
Agilent 4445A
TBD
Agilent DSA90604A
Agilent 17901A
10dB/40dB

Notch Filter

JRF-01-60/2140

High pass filter

JRF-01-3/13

Duplexer

WCDMA Duplexer

circulator

TBD

Test board

TAC board

PC1
PC2
Temperature chamber

TAC OM PC
OM PC
TBD

Test the RF signal power


Generate the interference signal
Spectrum analysis and vector signal analysis
Test the VSWR and S11/S12/S22
Test the power supply ripple and DL time delay
Capture the Digital IQ signal and control signal
protect the instrument and absorb the reflect
power
absorb the DL transmit signal in the spurious
test
in 9K~3GHz
Filter the DL transmit signal in the spurious test
in 3~12.75GHz
absorb the DL transmit signal in the spurious
test
in 1920~1980MHz
Protect the instrument from the high reflect
power
Generate the test vector in the CPRI optic
interface
Config TAC and monitor TAC status
Config RRH and monitor RRH status
Provide the temperature test environment

Table 4-1 SIT2 DL Test Tool List


4.1.3

Test Domain

These sub functions will perform in the DL pre-integration environment


Index
Test Domain
Description
RRH DL basic integration Test
SIT2_DL_001
RRH power-on HW/SW
initialization

Integration of the TRX/PA/FEU module and validation of the


TRX/PA/FEU power-on HW/SW initialization procedure

SIT2_DL_002

RRH internal Power


supply test

Integration of the TRX/PA/FEU moduleand validation of the


TRX/PA/FEU power supply in the RF-off mode on the
voltage/current/ripple

SIT2_DL_003

DL Frequency /Carrier
/Power/Gain/control
configuration test

config frequency/carrier/channel power and monitor the output


signal character

RRH DL function Test


DL IQ signal
gain/outputpower
SIT2_DL_004
integration test with
RRH frequency
calibration
SIT2_DL_005
DL signal occupied
bandwidth
SIT2_DL_006

DL IQ signal
gain/outputpower

Integration of the TRX/PA/FEU module and validation of the


low/middle/high frequency 1/2/3/4 carrier DL gain/output power

validation of the DL occupied bandwidth


Integration of the TRX/PA/FEU module and validation of the
low/middle/high frequency 1/2/3/4 carrier un-balance power config

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

31/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

unbalance power config


integration test with
RRH frequency
calibration

DL gain/output power

SIT2_DL_007

DL IQ signal
intermodulation test

validation of the low/middle/high frequency 1 carrier DL gain/output


power

SIT2_DL_008

DL IQ signal
ACLR/Emission Mask

validation of the low/middle/high frequency 1/4 carrier


ACLR/Emission Mask in normal temperature

SIT2_DL_009

DL VSWR and VSWR


alarm test

SIT2_DL_010

DL spurious test

validation of the low/middle/high frequency 1/4 carrier VSWR and


VSWR in normal temperature
validation of the low/middle/high frequency 1/4 carrier VSWR and
VSWR in normal temperature

SIT2_DL_011

RRH high output power


power supply test

SIT2_DL_012

SIT2_DL_013

SIT2_DL_014
SIT2_DL_015
SIT2_DL_016

DL IQ signal gain
integration test with
RRH temperature
calibration
DL IQ signal
ACLR/Emission Mask
in high output power
DL IQ signal
CCDF/EVM in high
output power
Overdrive alarm
protection test
DL forward and DPD
channel isolation test

validation of the TRX/PA/FEU power supply in the 1 hour high


output power on the voltage/current/ripple
validation of the low/middle/high frequency 1/2/3/4 carrier DL
gain/output power with temperature change in Temperature
Chamber
validation of the low/middle/high frequency 1/2/3/4 carrier DL
gain/output power with temperature change inTemperature
Chamber
validation of the low/middle/high frequency 1/2/3/4 carrier DL
EVM/CCDF with temperature change in Temperature Chamber
validation of the low/middle/high frequency overdrive alarm
protection with the FPGA ALC ON/OFF
validation of the low/middle/high frequency 1 carrier DL forward
channel DPD channel isolation with temperature change in
Temperature Chamber

RRH DL delay and interface Test


SIT2_DL_017

DL chain delay test

SIT2_DL_018

AISG port test

SIT2_DL_019

Over-temperature test

SIT2_DL_020

DL to UL RX1 antenna
port isolation test

validation of the low/middle/high frequency 1 carrier DL chain


delay
validation of the AISG port function and performance
validation of the RRH temperature report and over-temperature
alarm report and disable control in Temperature Chamber
validation of the isolation of the DL to the UL RX1 antenna port

Table 4-2 SIT2 DL Test Domain List


4.2

UL Pre-integration Test

After the SIT1 validation, the TRX board and LNA module and FEU module and Power module pass the
module individual test. All of these modules will assemble in the RRH rack and connect together with the
RF/Power/Control cable. About the RRH UL function, The following tests will be performed in the SIT2:
-

Module input/output signal and impedance matching validation

UL gain and delay/noise validation

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

32/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

2 UL channel balance validation

UL IQ SFP module connection loop test and FPGA L1/L2 process validation of the CPRI interface

4.2.1

Test Configuration

Figure 4-2 UL Pre-integration Test Configuration


In the SIT2 UL pre-integration test environment, the RRH Test SW work on the test mode and do the
module &UL configuration and debug function in the test, it also monitor the module status and internal
process. With the internal proceeding on the test mode the UL TRX FPGA output the UL IQ data/UL test
result to the RRH Test SW PC with the RRH Test SW operation. The RRH test SW also perform the SFP
module connection loop test and FPGA L1/L2 process validation of the CPRI interface .It run in the PC and
connect with TRX with 100M Ethernet RJ45 cable and RS232 debug cable.
In order to validate the UL signal input/output character in the module process , the vector signal generator
is used in the UL RF signal test and connect the FEU module UL RF input port and LNA module RF input port
and TRX UL input port . it also need a additional AWGN noise generator in the UL noise character test. the
vector signal analyzer is used in the UL RF signal test and noise figure test and connect the FEU module DL
RF output port and LNA module RF output port . The vector signal analysis SW is used when it need to
analysis the UL RF signal Vector modulation character. This SW either is a Vector Signal Analyzer option or
a individual SW running in a PC and connect with Vector Signal Analyzer with LAN cable.
The Network Analyzer is used to test the module impedance matching and module network character when
it has the abnormal in the UL signal input/output test.
It has the digital signal process and analog signal process in the TRX board, when the UL Signal analysis
SW cant verify the abnormal status in the DL signal process on the module input/output port, it need to

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

33/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

connect ADC output bus with the probe of the Logical Analyzer and capture the internal Digital signal into the
Vector Signal Analysis SW to do the detail analysis job.
About the synchronization and trigger connection between the test module and test tools, it not give the
description for the figure drawing limit.

4.2.2

Test Equipment and Tool

Below are the detail requirements about the test tools in the environment

Tool

RRH Test Tool SW

Designation
Config/Debug/Monitor
Tool SW on the RRH
test, it is a internal
development
LMT
SW tool

Purpose
Do the configuration of the RRH modules
Debug the RRH modules and do the the
analysis/decode the UL signal
and CPRI
interface loop
Monitor the RRH module process and status

Vector Signal Generator

Instrument
to
generate the UL RF
test vector signal

Generate the UL RF Vector signal and AWGN


noise signal and feed into the UL module input
test point

Vector Signal Analyzer

Instrument on the RF
signal measurement
and capture . it has
the noise figure test
option

Vector Signal Analysis SW

SW to analysis the
UL
vector
signal
modulation character

analysis the vector signal modulation character

Network Analyzer

Instrument on the
module
and
connector character
measurement

Measure the module and connector impedance


matching

Power Meter

Instrument
to
calibrate the test
system cable loss

Calibrate the test system cable loss

Logical Analyzer

Instrument to capture
the digital signal in
the TRX board

Capture the UL digital signal into the Vector


Signal Analysis SW to verify the UL signal
process

Measure the UL RF signal character


Capture the signal to the Vector Signal Analyzer
SW

Table 4-3 SIT2 UL Test Tool List


4.2.3

Test Domain

These sub functions will perform in the UL pre-integration environment.


Index
Test Domain
Description
SIT2_UL_001

Rx Internal Alarm Test


ALDI interface test

Check the Rx chain internal alarm report and disable control


Check the ALD interface function and performance

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

34/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

SIT2_UL_002
SIT2_UL_003
SIT2_UL_004
SIT2_UL_005
SIT2_UL_006
SIT2_UL_007
SIT2_UL_008
SIT2_UL_009
SIT2_UL_010
SIT2_UL_011
SIT2_UL_012

Rx maximum gain test


Rx gain test with the TMA
Rx gain test under extreme
condition
Rx AGC dynamic range test
Rx RSSI test
Rx Noise floor test and
calculated NF test
Rx EVM test
Rx path delay test
Rx VSWR test
Isolation between EAC1
and EAC2 ports
Dual RRH (x+y) test

Check the receive path gain with minimum RF attenuation.


Check the gain settling of FEU with the TMA optional
Validate the Rx gain under high and low temperature
condition
Validate the Rx AGC dynamic range
To measure the RSSI accuracy of the complete RRH over
frequency,
Check the receiver sensitivity by determining the noise figure
of the receiver paths
To check if the EVM budget of 10% for the analogue part of
the receiver is met
To check the Rx path group delay
To test the Rx VSWR in EAC1 and EAC2 input port
To verify that the Isolation between EAC1 and EAC2 output
ports
validate the combined cabinet control function in the Rx gain
function test

Table 4-4 SIT2 UL Test Domain List


4.3

SW Pre-integration Test

After the SIT1 validation, the TRX board and LNA module and FEU module and Power module pass the
module individual test. All of these module will assemble in the RRH rack and connect together with the
RF/Power/Control cable. About the RRH C&M function, the SIT2 only do the RRH inner integration and
validation, the C&M validation only cover the CPRI entity except the CPRI layer1/layer2 and do a individual
loop test on the CPRI layer1/layer2 process
The following tests will be performed in the SIT2:
-

C&M simulation Ethernet connection integration and validation

RRH C&M attribute validation

RRH status indication validation

C&M SFP module connection loop test and FPGA L1/L2 process validation of the CPRI interface

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

35/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

4.3.1

Test Configuration

Figure 4-3 SW Pre-integration Test Configuration


In the SIT2 C&M pre-integration test environment, the RRH Test SW work on the test mode and do the
module &RRH configuration and debug function in the test, it also monitor the module status and internal
process. It run in the PC and connects with TRX with 100M Ethernet RJ45 cable and RS232 debug cable. In
the C&M test ,the RRH Test SW control the FPGA bypass the CPRI lay1/lay2 process entity and direct
connect the CPRI Ethernet driver entity with MCU and the Ethernet port which connect with the MCU.
The NodeB C&M simulator is a self development SW which run in the PC, it do the NodeB side C&M
message simulation and send out the message to RRH and receive the RRH C&M message and display in
the GUI. it connect with TRX with 100M Ethernet RJ45 cable
It also needs to do manual trigger on the C&M message/action in the test.
In order to validate the RRH C&M character in the module process, it needs to simulate the UL input signal
and monitor the DL signal to trigger and verify the C&M action. The vector signal generator is used to connect
the FEU module RF input port to simulate the UL input signal. The vector signal analyzer is used in the FEU
DL RF output port to monitor the DL RF signal. The vector signal analysis SW is used when it need to
analysis the UL RF signal Vector modulation character. This SW either is a Vector Signal Analyzer option or a
individual SW running in a PC and connect with Vector Signal Analyzer with LAN cable.
About the synchronization and trigger connection between the test module and test tools, it not give the
description for the figure drawing limit.

4.3.2

Test Equipment and Tool

Below are the detail requirements about the test tools in the environment
Equipment
Designation
Purpose
NodeB Simulator
PC with Linux OS
Run the NodeB simulator on the C&M message
and entity
Signal generator
Agilent E4438C
Generate the interference signal
Spectrum analyzer
Agilent 4445A
Spectrum analysis and vector signal analysis

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

36/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

Oscilloscope
Attenuator

Agilent DSA90604A
10dB/40dB

Test board

TAC board

PC1
PC2

TAC OM PC
OM PC

Test the time delay


protect the instrument and absorb the reflect
power
Generate the test vector in the CPRI optic
interface
Config TAC and monitor TAC status
Config RRH and monitor RRH status

Table 4-5 SIT2 C


M Test Tool List
4.3.3

Test Domain

These sub functions will perform in the C&M pre-integration environment


Index
Test Domain

Description

RRH C&M basic integration Test


SIT2_C&M_001

C&M Ethernet connection test


HW/SW initialization

validation the connection and config


of the NodeB simulator SW and RRH
in the Ethernet and protocol

RRH C&M message Test


SIT2_C&M_002

General attribute C&M test

SIT2_C&M_003
SIT2_C&M_004
SIT2_C&M_005
SIT2_C&M_006
SIT2_C&M_007
SIT2_C&M_008
SIT2_C&M_009
SIT2_C&M_010
SIT2_C&M_011

delay attribute C&M test


Non-Volatile Memory attribute C&M test
RF attribute C&M test
Carrier attribute C&M test
Antenna line device attribute C&M test
General Action Request attribute C&M test
Antenna line device request attribute C&M test
Event Reporting attribute C&M test
RRH scenario test

validation the C&M General attribute


messages and RRH status

Table 4-6 SIT2 C


M Test Domain List

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

37/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

SIT3

After SIT2 test, the basic DL/UL function and SW can work properly. In SIT3, an assembly RRH will be
treated as a black box, the RF performance and pre-qualification for whole RRH system will be checked.
About the CPRI C&M test, SIT3 does not perform it because it is verified in the SIT1 and SIT2 and the C&M
only focus in the SW/Protocol aspect,

5.1

RRH Standalone Initial Test

This is an initial test after full RRH system assembly, and the tests listed here should be taken prior to full
system function test.

5.1.1

Test Configuration

In this test phase, we suppose TRX adaptive card and related test tools are full ready, otherwise NI PAX
plus d2U solution will be used. The test configuration is illustrated in Figure 5-1. For some standalone initial
test, such as grounding, this test bench is not necessary, a multimeter and a RRH without power on are
enough.

Figure 5-1 RRH Standalone Test Configuration

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

38/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

5.1.2

Test Equipment and Tool


Equipment

Designation

Purpose

Multimeter

Agilent 34401A

Grounding test/Power supply test

VSG

SMU/E4438C

Generate the wanted signal

VSA

FSQ/E4445

Analysis the transmit signal

Attenuator

30dB/40dB

To protect the device

Coupler

30dB/40dB

couple the power

Table 5-1 SIT3 Standalone Test Tool List

5.1.3

Test Domain

Index

Test Domain

Description

Ground and Frame Isolation Test


SIT3-INI-001

Isolation Test

Check the power connection of the RRH is not shorted to ground,


The resistance value should be greater than 1M between:
- DC supply input terminal and chassis ground
- DC supply return and chassis ground

SIT3-INI-002

Grounding Continuity
Test

Check for continuity between the designated grounding point and


any dead metal part equipped. The resistance value should be
lower than 1 between chassis ground and:
- PA module
- FEU module
- TRX module

System Initialisation Test


SIT3-INI-003

Current Consumption

To measure the total current draw of the RRH at start-up.

SIT3-INI-004

PA Voltage Set

To determine VGA offset values for the PA operating voltages for


each supported carrier configuration.(31V and 28V)

Peripheral Interface Check


SIT3-INI-005

LED Check

Check the status of LED

SIT3-INI-006

Parallel Cabinet port


connectivity test

Test the connectivity of parallel cabinet port

Table 5-2 SIT3 Standalone Test Domain List

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

39/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

5.2

RRH Functional Test

After initial test, PA and whole RRH is bring up into operating state, then RRH functional test can be carried
out. In this test, RF TX and RX performance according to TS25.141 will be tested.

5.2.1

Test Configuration

The test bench is same as Figure 5-1. For RF TX test, test vectors according to different TM will be sent
out from TRX adaptive card, and TX performance measured by VSA. For RX test, I/Q data captured by TRX
adaptive board will be sent to PC, ADS/Matlab will be used for uplink performance analysis, such as EVM,
BLER, etc.

5.2.2

Test Equipment and Tool

Equipment and tool

quantity

Designation

Purpose
Do the configuration of the RRH
modules

RRH Test Tool SW

1 pcs

Config/Debug/Monitor
Tool
SW on the RRH test, it is a
internal development LMT
SW tool

Debug the RRH modules and do the


CPRI interface lay1/lay2 bypass and
debug the MPU do the RRH C&M
Ethernet entity connection with the
NodeB simulator
Monitor the RRH module process and
status

A self development SW to do
the
NodeB
side
C&M
simulator

Simulate
the
message/action

1 pcs

Instrument to generate the RF


test vector signal

Generate the UL RF Vector signal and


trigger the C&M message

1 pcs

Instrument on the RF signal


measurement and capture.

Vector Signal Analysis


SW
(Agilent
89600
option)

1 pcs

SW to analysis the UL vector


signal modulation character

analysis the vector signal modulation


character

Power Meter

1 pcs

Instrument to calibrate the


test system cable loss

Calibrate the test system cable loss

50dB Attenuator

2 pcs

100W fixed attenuator

Attenuate the Tx signal

40dB Attenuator

2 pcs

100W fixed attenuator

Attenuate the Tx signal

20dB Attenuator

2 pcs

100W fixed attenuator

Attenuate the Tx signal

8dB Attenuator

2 pcs

100W fixed attenuator

Improve the VSWR of equipment

Duplexer

1 pcs

2110-2170MHz and
1980MHz duplexer

Band Pass Filter

1 pcs

1920-1980MHz
filter

Notch Filter

1 pcs

2110-2170MHz band notch


filter

To notch the in-band useful signal

High Pass Filter

1 pcs

3 -12.75GHz high pass filter

To test the Tx spurious for the

NodeB simulator
Vector Signal Generator
(with WCDMA option)
Vector Signal Analyzer
(with WCDMA option)

1 pcs

band

ED01P04

1920pass

NodeB

Display the RRH C&M message/action

Measure the DL RF signal character


Monitor the C&M action result on the
RF signal

Separate the Tx and Rx signal


To pass the in-band useful signal

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

C&M

3BK 11251 0398 BEZZA

40/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

frequency more than 3GHz.


Power Divider

2 pcs

1000 2500 MHz power


divider

LNA

1 pcs

600 3000MHz Low noise


amplifier

To amplify the small signal.

Coupler

1 pcs

1000 2500 MHz Coupler

To coupling the signal

Circular

1 pcs

1000 2500 MHz Circular

Isolator

1 pcs

1000 -2500 MHz Isolator

Terminator

1 pcs

50 ohm big power terminator

RF Cable

20 pcs

Different length RF Cable

RF Connector

20 pcs

Different type RF connector

Table 5-3 SIT3 Functional Test Tool List


5.2.3

Test Domain

Test Number

Title

Description

Tx

Normal conditions

SIT3-FUN-001

6.2.1
Base
station
Maximum Output Power
(TM1)

The test purpose is to verify the accuracy of the maximum


output power across the frequency range and under normal
conditions for all transmitters in the BS

SIT3-FUN-002

6.2.2 CPICH
accuracy (TM2)

Power

The purpose of the test is to verify, that the RH under test


delivers Primary CPICH code domain power within margins,
thereby allowing reliable cell planning and operation

SIT3-FUN-003

6.3
Frequency error
(TM4)

To verify that the Frequency Error is within the limit of the


minimum requirement

SIT3-FUN-004

6.4.2 Power control


steps (TM2) (Optional)

To verify those requirements for the power control step size and
response are met as specified by the minimum requirement

SIT3-FUN-005

6.4.3 Power control


dynamic range (TM2)

To verify that the minimum power control dynamic range is met


as specified by the minimum requirement

SIT3-FUN-006

6.4.4
Total
power
dynamic range (TM1,
TM4)

To verify that the total power dynamic range is met as specified


by the minimum requirement. The test is to ensure that the total
output power can be reduced while still transmitting a single
code. This is to ensure that the interference to neighbouring
cells is reduced

SIT3-FUN-007

6.5.1
Bandwidth

Occupied

The test purpose is to verify that the emission of the BS does not
occupy an excessive bandwidth for the service to be provided
and is, therefore, not likely to create interference to other users
of the spectrum beyond undue limits

6.5.2.1
Spectrum
emission mask

This test measures the emissions of the BS, close to the


assigned channel bandwidth of the wanted signal, while the
transmitter is in operation

(TM1)
SIT3-FUN-008

(TM1)
SIT3-FUN-009

6.5.2.2 ACLR (TM1)

To verify that the adjacent channel leakage power ratio


requirement shall be met as specified by the minimum
requirement

SIT3-FUN-010

6.5.3

This test measures conducted spurious emission from the BS


transmitter antenna connector, while the transmitter is in

Spurious

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

41/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

emissions (TM1)

operation

SIT3-FUN-011

6.6
Transmit
intermodulation (TM1)

The test purpose is to verify the ability of the BS transmitter to


restrict the generation of intermodulation products in its non
linear elements caused by presence of the wanted signal and an
interfering signal reaching the transmitter via the antenna to
below specified levels

SIT3-FUN-012

6.7.1 EVM (TM4, TM5))

To verify that the Error Vector Magnitude is within the limit


specified by the minimum requirement

SIT3-FUN-013

6.7.2 Peak code Domain


error (TM3)

It is the purpose of this test to discover and limit inter-code


cross-talk

Rx

Normal conditions

SIT3-FUN-014

7.2 Reference sensitivity


level (TM1 + BER)

To verify that at the RH Reference sensitivity level the BER shall


not exceed the specified limit

SIT3-FUN-015

7.3
Dynamic
(BER)

range

The test purpose is to verify the ability of the RH to receive a


single-code test signal of maximum with a BER not exceeding a
specified limit

SIT3-FUN-016

7.4 Adjacent channel


selectivity (BER)

The test purpose is to verify the ability of the RH receiver filter to


suppress interfering signals in the channels adjacent to the
wanted channel

SIT3-FUN-017

7.5
Blocking
characteristics (BER)

The test stresses the ability of the RH receiver to withstand highlevel interference from unwanted signals at frequency offsets of
10 MHz or more, without undue degradation of its sensitivity

SIT3-FUN-018

7.6
Intermodulation
Characteristics (BER)

The test purpose is to verify the ability of the RH receiver to


inhibit the generation of intermodulation products in its non-linear
elements caused by the presence of two high-level interfering
signals at frequencies with a specific relationship to the
frequency of the wanted signal

SIT3-FUN-019

7.7 Spurious Emissions


(Optional)

The test purpose is to verify the ability of the RH to limit the


interference caused by receiver spurious emissions to other
systems

Table 5-4 SIT3 Functional Test Domain

Environment
Test

Tx +Rx

Extreme conditions

6.2.1
Base
station
Maximum Output Power
(TM1)

The test purpose is to verify the accuracy of the maximum


output power across the frequency range for all transmitters
in the BS under extreme condition

6.3
Frequency error
(TM1, TM4-18dB, TM5)

To verify that the Frequency Error is within the limit of the


minimum requirement under extreme condition

6.5.2.2
ACLR
(Optional)

To verify that the adjacent channel leakage power ratio


requirement shall be met as specified by the minimum
requirement under extreme condition

(TM1)

6.7.1 EVM (TM1, TM4-18,


TM5) (Optional)

To verify that the Error Vector Magnitude is within the limit


specified by the minimum requirement under extreme
condition

7.2 Reference sensitivity


level (TM1 + BER)

To verify that at the RH Reference sensitivity level the BER


shall not exceed the specified limit under extreme condition

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

42/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

Table 5-5 SIT3 Functional Test Domain

5.3

RRH Reliability Test

In order to identify the system design bugs as early as possible and repair these bugs in PEM2, the RRH
Reliability will be carried in this test phase based on PEM1. Basically the test cases listed below do not
depend on d2U environments. The complete qualification test will be defined in IT1 and tested with d2U
connected. Though SIT reliability test have validate the module level reliability, the RRH black box level test is
needed to validate the RRH general reliability in the real load environment. The RRH reliability test will be
classified as:
-

EMC Test(RRH)

Safety Test(RRH)

Lightning Protection Test(RRH)

Thermal Test(RRH)

Environment test(RRH)

The reliability tests can be executed in 3 team of the ASB CCC lab in different test branch.

5.3.1

EMC Test

About the detail in the test configuration/test equipment/test domain, please find it in
reference_EMC_SATETY_LIGHTNING chapter 2 EMC test , only the SIT3 test case will perform in this
phase

5.3.2

Safety Test

About the detail in the test configuration/test equipment/test domain, please find it in
reference_EMC_SATETY_LIGHTNING chapter 3 safety test, only the SIT3 test case will perform in this
phase
5.3.3 Lightning Protection Test
About the detail in the test configuration/test equipment/test domain, please find it in
reference_EMC_SATETY_LIGHTNING chapter 4 lightning protection test , only the SIT3 test case will
perform in this phase

5.3.4

Thermal Test

About the detail in the test configuration/test equipment/test domain, please find it in reference_Thermal

5.3.5

Environment test

5.3.5.1 Test Configuration


In this section, RRH reliability test include environment temperature test, mechanical characteristic test and
Ingress protection test. Expect mechanical characteristic test and IP(ingress Protection ) test, all the test is in
the power on condition and the test bench is the same as Figure 5-12.

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

43/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

Figure 5-2 RRH Environment Test Configuration


5.3.5.2 Test Equipment and Tool
Equipment

Designation

Purpose

Temperature Chamber

ESPEC

Low / high storage and operation test

Temperature and Humidity Cabinet

ESPEC LHU-213

Damp heat test

Thermal Cycle Temp Chamber

ESPEC SET-Z-080U

Thermal cycle and temp fast change test

Vibration Machine

WXASPR RT-50A

Vibration test

Mechanical Shock Machine

EPCU SD-24

Mechanical shock test

Drop Machine

WXASPR PK-318

Free fall test

Transport Simulation Machine

WXASPR PK-1000

Transport simulation test

Salt Frog Corrosion Chamber

WXASPR AHL-60-SS

Salt mist cycle test

Mildew Cultivation Chamber

WXASPR MC-225

Mildew test

Rain Simulation Chamber

WXASPR RI-1000

Rain simulation test

Sand Dust Chamber

WXASPR SD-1500

Sand dust test

Solar Radiation Machine

Midwest M304541

Solar radiation test

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

44/49

All rights reserved. Passing on and copying of this


document, use and communication of its contents
not permitted without written authorization from ALU

Table 5-6 SIT3 Environment Test Tool List


5.3.5.3 Test Domain
Index

Test Domain

Test Standard

SIT3_ENV_001

High Temperature
Operating
condition

SIT3_ENV_002

Low temperature
ETS 300 019-1-4

Cold start

-40
within 1 hour

Damp heat
Operating
condition

SIT3_ENV_005

-40,16 hours

Operating
condition
SIT3_ENV_004

55 16 hours

IEC 721-3-4

Operating
condition
SIT3_ENV_003

ETS 300 019-1-4

Description

ETS 300 019-1-4

28,100%RH,96 h

IEC 68-2-56 Test Cb

45,95%RH,96 h

Damp heat cycle


40at 90%RH to 100%RH,2 cycles

Operation
condition
SIT3_ENV_006

Change
temperature

in

ETS 300 019-1-4


IEC 721-3-4

-40~ 55,1/min.

Operating
condition
SIT3_ENV_007

Vibration
Operating
condition

SIT3_ENV_008

Shock

ETS 300 019-1-4


Class 4M5
IEC 60721-3-4
ETS 300 019-1-4
Class 4M5

Operating
condition

IEC 60721-3-4

SIT3_ENV_009

Earthquake

GR63 CORE

Zone 3

SIT3_ENV_010

Salt Fog

IEC 68-2-52 Test Kb

Salt Mist Cycling

SIT3_ENV_011

Rain simulation

IEC 60529

IP65

SIT3_ENV_012

Sand dust test

IEC 60529

IP65

ED01P04

RRH60_21ASB Test Strategy


RRH60_21ASB Test
Strategy_ED01P06.DOC
22/07/2010

3BK 11251 0398 BEZZA

45/49

ERROR: typecheck
OFFENDING COMMAND: setcolor
STACK:
[/DeviceRGB ]
/DeviceGray
/DeviceGray