Final Assembly & System Test

Temporary Manual test procedure for


EDPD Verification on RRH850/RRH2100

1
2
3

Test instruction
Test procedure

4
5

Document Summary
Document Issue Number

1.0.0

Document Status

Release

Document Type

Test Instruction

Document Champion

Musamettin Zurnaci / +49 911 526-1686

Document Author

Petra Mauer

Release Date

19-Oct-2007

Retention Time

This document follows the regular retention rules for Alcatel-Lucent Germany

The printed document is not under document control.


The current version is available in Agile.
6

Document Number:
Issue:

1.0.0

Author:
Petra Mauer

Final Assembly & Systemtest


EDPD Verification on RRH850/RRH2100
Manual test procedure
Lucent Technolgies Proprietary
Use pursuant to Company Instruction

Print Date:

10/19/2007
Page:

1 of 7

CONTENTS

Overview

1.1

List of Changes

10

1.2

Responsibilities

11

Test flow

12
13

Document Number:
Issue:

1.0.0

Author:
Petra Mauer

Final Assembly & Systemtest


EDPD Verification on RRH850/RRH2100
Manual test procedure
Lucent Technolgies Proprietary
Use pursuant to Company Instruction

Print Date:

10/19/2007
Page:

2 of 7

14

Overview

15

1.1

List of Changes

16

17

All changes incorporated compared with previous versions, incl. Reason for change (e.g. CAR).

1.2

Version

Date

Reason for change

Affected chapter

V1.0.0

19-Oct-2007

Initial version

all

Responsibilities

18

Contact details of R&D engineers for final approval:

19

Rich Ellis: rellis@alcatel-lucent.com, Telephone: +44 (0)1793776330

20

Chris Clarke: cclarke3@alcatel-lucent.com, Telephone +44 (0)1793776363

21

Richard Bungay: bungay@alcatel-lucent.com, Telephone +44 (0)1793776301

22

Geoff Patterson: gpatters@alcatel-lucent.com, Telephone +44 (0)1793776355

23

Contact Details for TestEngineering:

24

Burkhard Schermer, bschermer@alcatel-lucent.com, Telephone: +49 911 526 1706

25

Document Number:
Issue:

1.0.0

Author:
Petra Mauer

Final Assembly & Systemtest


EDPD Verification on RRH850/RRH2100
Manual test procedure
Lucent Technolgies Proprietary
Use pursuant to Company Instruction

Print Date:

10/19/2007
Page:

3 of 7

26

Test flow

27
28
29
30
31
32
33
34
35
36

Abstract:
This document covers the basic instructions for carrying out the temporary manual test for verifying
that the EDPD function is operating correctly and setting the output power of the RRH to the right
power. This test is to be carried out after the complete assembly and MTP Test of the RRH850 or
RRH2100 and should be the final procedure before the shipment of the unit. Until a new version of
apps code is available to verify this procedure automatically, this manual operation should be
carried out on every RRH850 and RRH2100 before shipment. In addition, a screenshot from the
Agilent MXA Spectrum Analyser should be captured and attached with the complete test results for
the unit for verification from R&D contact (namely Chris Clarke, Richard Bungay, Rich Ellis and
Geoff Patterson) before shipment can be approved.

37

PROCEDURE:

38
39

Starting point is a fully assembled RRH unit of either frequency, connected up fully to a MTP
platform with the latest release of test code.

40
41

1.

Open NI TestStand and log in as Developer. Without issuing the password for this login in
this document, please refer to Burkhard Schermer (NBG).

42

2.

Once in NI TestStand, load the RRH.seq test sequence.

43
44
45
46
47
48
49

3.

Skip the following test in the main sequence:


y TxSRx RF Tests
y Rx RF Tests
y InTDU RF Tests
y Write EBID Data
y Reboot RRH
y InTDU, LNA, Rx Tests Apps Code.

50

4.

Open the Interface Tests sub-sequence.

51
52
53
54

5.

55

6.

Return to main RRH.seq. Open the TxSRx Tests Apps Code sub-sequence.

56
57
58
59

7.

Skip the following tests:


y Tx Pwr Acc OBGC Tests
y Final Signal Quality Tests
y PA Voltage Cal

60

8.

Open the Spectrum Mask EDPD Tests sub-sequence.

61

9.

Skip all tests EXCEPT the Switch to PSA tests.

62

10.

Insert a breakpoint (STOP) in DIRECTLY AFTER this test.

63

11.

Return to the main RRH.seq top level and run the test code (without saving at prompt).

64
65

12.

Run the test as normal, scanning the barcodes for the serial number and CLEI codes. If you
encounter any errors during testing, please click IGNORE and continue. This is normal.

Skip the following tests:


Alarm, Fan, ALD Interface Tests
PSU Alarm Test
Optical TRx EEPROM Read

y
y
y

Document Number:
Issue:

1.0.0

Author:
Petra Mauer

Final Assembly & Systemtest


EDPD Verification on RRH850/RRH2100
Manual test procedure
Lucent Technolgies Proprietary
Use pursuant to Company Instruction

Print Date:

10/19/2007
Page:

4 of 7

66
67
68
69
70

13.

When the test routine encounters the breakpoint (STOP) perform the following:
y Turn off the master power switch on the RRH.
y Wait 3-4 seconds
y Turn on the master power switch on the RRH
Wait 1 minute.

71
72

14.

While the RRH is rebooting (during the wait 1 minute period above) you may perform the
manual button presses on the Agilent MXA test instrument:

73

Press:

y
y
y
y
y
y

74
75
76
77
78
79

Cancel (Esc) to go into local mode.


Meas Setup > Integ BW. Set this to 5MHz
Span. Set this to 20MHz
Freq. Set to 881.5MHz for RRH850 or 2140MHz for RRH2100.
Amptd > Ref Value. Set to 30dBm
BW > Res BW. Set to 10kHz.

80
81

1.

At this point, continue waiting until the 1 minute period from step 13 has elapsed. If it has
already continue to step 16.

82

2.

Click the Start button on the Windows XP taskbar.

83
84
85

3.

Select Run. Locate the executable file TCI.exe which should be installed under the
C:\Program Files\TCI folder (If not, please speak to Kanin Buapet who has copies of these
files and can provide them).

86
87

4.

With the TCI window open, reduce the lower pane as low as possible to enable full viewing
of the window.

88

5.

Click the Add New tab.

89

6.

Enter IP Address: 192.168.168.2 and Cell Name: rrh. Click Initialise.

90
91

7.

Wait until the TCI interface establishes the connection with the RRH (see lower pane in
window for confirmation).

92

8.

Click the Test Tab on the left hand side and select RRH Config.

93

9.

Click Next. Enter the baseband type as EX-NORTEL and click Next.

94

10.

Wait for the TCI interface to set up the Transmitter and then click Finish.

95

11.

Click the Data tab on the left hand side of the TCI window.

96

12.

Select the blue dot (RRH).

97

13.

Click the EDPD tab (scroll far right) in the newly appeared right hand pane.

98

14.

Select the mode tab.

99

15.

Select NORMAL_OPERATION under EDPD Mode and INFLATION under Test mode.

100

16.

Click WRITE.

Document Number:
Issue:

1.0.0

Author:
Petra Mauer

Final Assembly & Systemtest


EDPD Verification on RRH850/RRH2100
Manual test procedure
Lucent Technolgies Proprietary
Use pursuant to Company Instruction

Print Date:

10/19/2007
Page:

5 of 7

101
102

At this point, you will now observe the Transmit spectrum on the MXA Spectrum Analyser. Allow a
few moments for the signal to stabilise. The spectrum should appear as follows:

103
104

Figure: 1

Figure 1: Good EDPD Spectrum for a RRH850

105
106

A good output spectrum for an RRH2100 should appear identical only at 2140MHz.

107

1.

Capture the output spectrum for inclusion in the test report for the unit.

108

2.

Note the Channel Power (for Figure 1, this is the 18.09dBm/5MHz number).

109
110

3.

Open the RRH Calibration file in Wordpad, located in C:\RRH_TestSetCal_850.txt or


C:\RRH_TestSetCal_2100.txt for RRH850 and RRH2100 respectively.

111
112
113

4.

Locate the line (near the top of the file) which starts EAC1 to PSA and record the value
which is the loss/attenuation calibrated out from the EAC of the RRH to the MXA front panel
input connection.

114
115

5.

Perform the calculation: Total Output Power (dBm) = (EAC1 to PSA) + (RRH Channel
Power)

y
y

116
117
118
119
120

6.

Document Number:
Issue:

1.0.0

Author:
Petra Mauer

Where EAC1 to PSA = the value recorded from step 34


Where RRH Channel Power = the value recorded in step 32.
The Total Output Power (dBm) should be roughly 45.6dBm +/- 0.15dBm. For the above
example, the channel power was 18.09dBm and the loss from EAC1 to PSA was 27.479 =
45.569dBm = OK.

Final Assembly & Systemtest


EDPD Verification on RRH850/RRH2100
Manual test procedure
Lucent Technolgies Proprietary
Use pursuant to Company Instruction

Print Date:

10/19/2007
Page:

6 of 7

121
122
123
124
125
126
127
128

7.
8.
9.

10.

With the output power verified and the MXA Spectrum Analyser screenshot captured, return
to TCI and click Connection on the menu bar. Then slick Shutdown.
Wait a few moments for TCI to terminate the session. Then return to NI TestStand.
Click the Resume button to continue the test code. Once again, Ignore any further error
messages as this is normal. Once TestStand completes and informs you that the sequence
has completed, OK the message then disconnect the UUT.
Email the results of the Total Output Power (dBm) calculation complete with the output
spectrum capture from the MXA to R&D for final approval before shipment.

129
130
131

Please note that this sequence of instructions is purely temporary and is a last check before units
can be shipped. If in any doubt as to whether the unit is passing or failing, DO NOT SHIP and
contact R&D with the following:

132

1.

Details of test setup

133

2.

Total Output power measurement

134

3.

EAC1 to PSA figure

135

4.

Screen capture from MXA.

136

Document Number:
Issue:

1.0.0

Author:
Petra Mauer

Final Assembly & Systemtest


EDPD Verification on RRH850/RRH2100
Manual test procedure
Lucent Technolgies Proprietary
Use pursuant to Company Instruction

Print Date:

10/19/2007
Page:

7 of 7