Beruflich Dokumente
Kultur Dokumente
I.
II.
ENERGY POLICY
3
5
V.
POLICY OF SOLAR PV
10
14
15
NRE
5,03%
Natural
Gas
24,29%
Coal
23,91%
1.
2.
3.
4.
5.
Crude
Oil
46,77%
b.
6.
Aceh
89,75%
Category :
Sumut
88,71%
Kaltim
74,40%
Kepri
83,56%
Riau
85,45%
Kalteng
63,51%
Kalbar
75,62%
Sulut
80,24%
Gorontalo
65,37%
Sumsel
77,55%
Sumbar
78,84%
> 60 %
Sulbar
70,13%
41 - 60 %
Malut
76,75%
20 - 40 %
Papua Barat
62,97%
Sulteng
69,97%
Babel
97,96%
Jambi
72,39%
Jakarta
100%
Bengkulu
85,13%
Lampung
74,70%
Kalsel
79,96%
Bali
77,31%
Banten
87,04%
Jabar Jateng
79,05% 83,95%
DIY
79,59%
Sultra
61,99%
Sulsel
80,47%
Maluku
72,85%
Papua
35,17%
NTT
57,58%
Jatim
NTB
77,91% 62,04%
REALISASI
2006
2007
2008
2009
RENCANA
2010
2011
2012
67.15%
72.95%
76.56%
Target RPJM
67.20%
70.40%
73.60%
Energy
andKesejahteraan
Mineral Resources
ESDM
untuk
Rakyat for Peoples Welfare
Sep-13 Des-2013
80.16%
2014
79.30%
81.40%
76.80%
80.00%
RENEWABLE ENERGY
a.
b.
c.
d.
e.
f.
Geothermal,
Hydro,
Bio energy,
Solar,
Wind,
Ocean wave and current.
CURRENT CONDITION
2012
Oil
46.77%
2025 TARGET
PRESIDENTIAL REGULATION NO. 5/2006
Coal
33%
Coal
23.91%
Natural Gas
24.29%
Oil
20%
NRE; 17%
NRE
5.03%
Biofuel
5%
Nuclear,
Hydro,
Solar,
Wind,
and Other NRE 5%
Geothermal
5%
Liquified
Coal 2%
1.
2.
3.
4.
5.
6.
7.
3)
4)
5)
6)
1. CURRENT CONDITION
Solar PV PP installed capacity: 42.77 MW
By Government Funding, in year 2012 : 123 units Solar PV
PP (4.8 MWp), in year 2013 : 121 units Solar PV PP (5.27
MWp)
2. DEVELOPMENT PROGRAM
By Government Funding, in year 2014 : 154 units Solar PV
PP
For Independent Power Producer (IPP) : The GoI have
already released the ministerial regulation on solar PV PP
Tariff (MEMR Regulation No 17 Year 2013)
1)
2)
3)
4)
5)
6)
7)
NATIONAL
ENERGY MIX
MEMR
REGULATION NR
17/2013
(PRICE, QUOTA,
BIDDING)
DECREE OF DG
NRE&EC (QUOTA,
TENDER, AUCTION
WINNER)
PT. PLN
(ELECTRICITY
PURCHASING)
BIDDING
PROCESS
OF QUOTA
CONSTRUCTION
OF SOLAR PV PP
APPOINTMENT
OF IPP
PPA
1.
2.
3.
4.
5.
2.
3.
4.
5.
6.
7.