Data Drive Test Report

A General
A.1 Name of the Operator
A.2 Name of LSA
Name of City/Town where Data Drive Test conducted (Network Plot

A.3 with routes/areas covered to be submitted)


A.4 Date on which Data Drive Test conducted
A.5 TCBH in Day time

B Test File
Theoritically maximum data transmission rate in Kbit/Second (The test

B.1 file should have at least twice the size (in Kbit) of the theoretically
maximum data transmission rate per second (in Kbit/s))

B.2 Test file size


B.3 Test file format

C Test Device & Test Server


C.1 Test Toolkit used with make and version of H/W and S/W
C.2 Test Server location
C.3 TCP stack of Test Server
C.3.1 Maximum Segment Size (Benchmark between 1380 to 1460 Bytes)
C.3.2 TCP Rx Windows size (Benchmark 4096 Bytes)
C.3.3 SACK Selective Acknowledgs segemnt (Benchmark : Enabled)
C.3.4 TCP fast retransmit (Benchmark : Enabled)
C.3.5 TCP fast recovery (Benchmark : Enabled)
C.3.6 Delayed ACK (Benchmark : Enabled 200ms)

st Report

CHTD
CHENNAI
24-Sep-14
19:00

Throughput
(2G/3G):

(UL/DL)

Offered

by

Operator

20000/72000
RAR
NemoOutdoor ver.7.0.0.9
GGSN-10.42.175.66- Anna Road Exchange chennai
FTP / SFTP/FTPS
1460 Bytes
4096 (default)
enabled
enabled
enabled
enabled

2000/3600

.0.9

xchange chennai

D : Data Download Percentage


Total download attempts

FTP
a
2

HTTP
b
0

Total
c= a+ b
2

CHENNAI CENTRAL RLY STN

CHENNAI EGMORE RLY STN

SKYWALK,AMINJIKARAI
CHENNAI MOFUSSIL BUS
TERMINUS
Total

Route /Area

CITYCENTER

Total Successful download


attempts (<60 Sec)

Percentage of
Successful
download

FTP
d
2

HTTP
e
0

Total
f =d+ e
2

100

100

100

100

10

10

10

10

100

E : Data Upload Percentage


Total Upload attempts

Total Successful Upload


attempts (<60 Sec)

g = f *100/c
100

Percentage of
Successful
Upload

FTP
a
2

HTTP
b
0

Total
c= a+ b
2

FTP
d
2

HTTP
e
0

Total
f =d+ e
2

CHENNAI CENTRAL RLY STN

100

CHENNAI EGMORE RLY STN

100

SKYWALK,AMINJIKARAI
CHENNAI MOFUSSIL BUS
TERMINUS
Total

100

100

12

12

12

12

100

Route /Area

CITYCENTER

g = f *100/c
100

F : Minimum Download Speed ( Average of lower 10% of all


Area 1
Particulars

Name of the Plan

Plan 1

Plan2

Plan 3

Plan 4

Plan 5

Plan2

Plan 3

Plan 4

Plan 5

3600

Minimum download Speed in Kbit/S)

1000.29

Area 2
Particulars

Plan 1

Name of the Plan

3600

Minimum download Speed in Kbit/S)

1447.64

Area 3
Particulars

Plan 1

Name of the Plan

Plan2

Plan 3

Plan 4

Plan 5

Plan2

Plan 3

Plan 4

Plan 5

Plan2

Plan 3

Plan 4

Plan 5

Plan2

Plan 3

Plan 4

Plan 5

3600

Minimum download Speed in Kbit/S)

2983.23

Area 4
Particulars

Plan 1

Name of the Plan

3600

Minimum download Speed in Kbit/S)

919.82

Area 5
Particulars

Plan 1

Name of the Plan

3600

Minimum download Speed in Kbit/S)

492.97

All Areas
Particulars

Plan 1

Name of the Plan


Minimum download Speed in Kbit/S)

3600
1368.79

G : Average throughput for Packet Data


Area 1

Plans

Plan1
Plan2
Plan3

Throughp
ut offered
Total
to the number of Total time taken
customers download
for downloads
/subscribe Attempts
d speed

3600

98

Average download
time per download

Average
throughput for
packet data in
Kbit/Sec.)

49

1396.007

Plan4
Plan5

Area 2

Plans

Plan1
Plan2
Plan3
Plan4
Plan5

Throughp
ut offered
Total
to the number of Total time taken
customers download
for downloads
/subscribe Attempts
d speed

3600

63

Average download
time per download

Average
throughput for
packet data in
Kbit/Sec.)

31.5

2294.2

Average download
time per download

Average
throughput for
packet data in
Kbit/Sec.)

21

2983.23

Average download
time per download

Average
throughput for
packet data in
Kbit/Sec.)

68

919.92

Area 3

Plans

Plan1
Plan2
Plan3
Plan4
Plan5

Throughp
ut offered
Total
to the number of Total time taken
customers download
for downloads
/subscribe Attempts
d speed

3600

42

Area 4

Plans

Plan1
Plan2
Plan3

Throughp
ut offered
Total
to the number of Total time taken
customers download
for downloads
/subscribe Attempts
d speed

3600

136

Plan4
Plan5

Area 5

Plans

Plan1
Plan2
Plan3
Plan4
Plan5

Throughp
ut offered
Total
to the number of Total time taken
customers download
for downloads
/subscribe Attempts
d speed

3600

Average download
time per download

Average
throughput for
packet data in
Kbit/Sec.)

128

492.97

Average download
time per download

Average
throughput for
packet data in
Kbit/Sec.)

49.5833333333

1617.2654

256

For all Areas

Plans

Plan1
Plan2
Plan3
Plan4
Plan5

Throughp
ut offered
Total
to the number of Total time taken
customers download
for downloads
/subscribe Attempts
d speed

3600

12

595

H : Latency (Benchmark : Data < 250 ms)


IP address of Test
Server pinged

Total number of
ping sent to the
Test Server

Total number of successful


ping

CITYCENTER

74.125.236.178/31.
13.79.65/206.190.1
36.45

12

12

CHENNAI CENTRAL RLY STN

74.125.236.48/31.1
3.79.96/206.190.36
.45

12

CHENNAI EGMORE RLY STN


SKYWALK,AMINJIKARAI
CHENNAI MOFUSSIL BUS
TERMINUS
Total

74.125.236.179/31.
13.79.33/206.190.3
6.105
74.125.236.211/31.
13.79.96/206.190.3
6.105
74.125.236.179/31.
13.79.128/206.190.
36.105

12

11

12

11

12

11

60

52

Das könnte Ihnen auch gefallen