Julien Vincent
head of very high broadband access
marketing NExT
agenda
1
2
agenda
1
2
download and
upload at 100mbps
download at
8mbps
upload at
1mbps
30 Gb
40min
>8h
>66h
4.8 Gb
6min 30s
1h 20min
>10h
800 Mb
1min
13 min
1h 40min
20 photos with
uncompressed 8M pixels
480 Mb
40s
8 min
> 1h
40Mb
3s
40 sec
5 min
ADSL access
ADSL / ADSL2+
window of
opportunit
y
< 20 Mbps
2005
FTTC
bandwidth
/
reachabilit
y
cost
DSL
VDSL2
< 100 Mbps
2009
FTTB
FTTH
100+ Mbps
2015
FTTH
VDSL speed is 25 to
30 Mbps for a 700 m
distance to the street
cabinet (average in
France)
VDSL speed is 50 to
100 Mbps when fiber
terminates at the
building
100+ Mbps
FTTB saves on
indoor wiring but
requires active
equipment
installation in the
building (with
syndics agreement)
FTTC is less CAPEX intensive than FTTH, but reachability is not sufficient.
As very few of FTTC CAPEX can be re-used for FTTH, FTTC is not a first
6
step to FTTH
point
to
multipoint
1 fiber for
64 customers
64th customer
1 fiber for
1 customer
point
to point
all-included offer
6 districts in Paris
3rd, 4th, 6th, 7th, 13th, 16th
70 / month
14 000 homes passed
900 agreements with managing agents for collective buildings (syndics)
1 000 customers (7% penetration)
less than 5 m CAPEX
technology
roll-out
customers
agenda
1
2
10
190 M
80 M
2007 CAPEX
estimates
2008 CAPEX
estimates
1,000 +
150-200
14
Q2-07
Q3-07
Q4-07
HH connectable
27 000
77 000
146 000
Cust. signed
2 100
3 500
7 300
(in 000s)
2008 target
subscribers
home passed
launch of la fibre
on march 1st, 2007
competitors
triple play
offers with
Internet
speed >
50mbps
44.90/month*
* 12 month subscription
Internet 100Mb
Orange TV
unlimited voice
free access to 45
French and
international channels
to fixed numbers in
mainland France
up to 100mbps download
& up to 10mbps upload
Web 2.0 portal,
TV on PC
options
16
fiber optics
livebox
3/month
services
7/month
5/month
20/month
2006 services
2007-2008
evolutions
6 000
subscribers
3 000
5 000
4 000
2 000
3 000
2 000
1 000
1 000
0
2006
2007
2008
2012
Phase 1
Phase 2
Phase 3
Pilot
Pre-rollout
Mass market-rollout
summary
20
demand for very high speed access is emerging, and will achieve
mass market status in 2009