Sie sind auf Seite 1von 7

Reference Control Document transmitter later List Electrical.I&C (by contractors).

COAL FIRE POWER PLANT INSPECTION AND TEST PLAN ( ITP )

No.

Description

BALANCE OF PLANT & ACCESSORIES


1 Fire Fighting System
Visual Inspection
Motors and Pumps Test
I & C Functional Test
Protection & Interlock Test
Fire Water System Commissioning Test
CO2 System Commissioning Test
Foam System Commissioning Test
Heat, Smoke and Fire Detection System Test
Hydrant, Sprayer and Deluge System Test
Portable Fire Fighting Equipments
Operation and Functional Test (All Area)
2 Emergency Power System
Visual Inspection
Diesel Generator Set Test
Uninteruptible Power Supply Test
Operation Function Test
Protection & Interlock Test
3 DC Supply Power System
Visual Inspection
Battery Test
Battery Charger Test
Protection & Interlock Test
Operation Function Test
4 AC Supply Power System (MV & LV)
Visual Inspection
MV/LV Transformers Test
Station MV Switchgear Function Test
Station MV Switchgear Protection & Interlock Test
Station LV Switchgear Function Test
Station LV Switchgear Protection & Interlock Test
5 Water Treatment System
Visual Inspection
E&C&I Function Test
Protection & Interlock Test
Sea Water Pre Treatment System
Desalination Plant Test
Demineralize Water System Test
Make Up water Treatment Plant Test
Industrial Water System Test
Capacity and Quality Test
6 Waste Water Treatment System
Visual Inspection
E&C&I Function Test
Equipments Running Test
Protection & Interlock Test
System Operation Test
Capacity and Quality Test
7 Fuel Oil System

Remarks

Reference Control Document transmitter later List Electrical.I&C (by contractors).

COAL FIRE POWER PLANT INSPECTION AND TEST PLAN ( ITP )

No.

Description

Visual Inspection
E&C&I Function Test
Motors and Pumps Test
Protection & Interlock Test
Fuel Oil Receiving System Test
Fuel Oil Forwarding System Test
Fuel Oil Unloading System Test
Fuel Oil Circulating Test
8 Air Compressor System
Visual Inspection
E&C&I Function Test
Motors and Compressor Test
Protection & Interlock Test
9 Coal Handling System
Visual Inspection
E&C&I Function Test
Protection & Interlock Test
Coal Transfers and Conveyors System Test
Bridge Grab Ship Unloader System Test
Bucket Wheel Stacker Reclaimer System Test
Capacity Test
10 Fly Ash and Bottom Ash Handling System
Visual Inspection
E&C&I Function Test
Fly Ash Handling System Operation Test
Bottom Ash Handling System Operation Test
Capacity Test
11 Hydrogen Plant System
Visual Inspection
E&C&I Function Test
Hydrogen Plant System Test
Capacity and Quality Test
12 Sodium Hypochlorite Plant System
Visual Inspection
E&C&I Function Test
Sodium Hypochlorite Plant System Test
Capacity and Quality Test
13 Ventilation and Air Conditioning System
Visual Inspection
E&C&I Function Test
Ventilation and Air System Test
Capacity and Quality Test
DISTRIBUTION CONTROL SYSTEM & INSTRUMENTATION
14 Visual Inspection
15 Instrumentation Calibration
16 Power Receiving of DCS and Redundancy Power Test
17 I/O and Control Loops System and Redundancy Test
18 Turbine Supervisory and Emergency Trip System (TSI & ETS)
19 Furnace Safety Supervisory System (FSSS)
20 Data Aquisition System (DAS)
21 Sequence Of Events System (SOE)
22 Turbine Interlock and Protection System (ETS)
23 Boiler Interlock and Protection System (FSSS, MFT & OFT)

Remarks

Reference Control Document transmitter later List Electrical.I&C (by contractors).

COAL FIRE POWER PLANT INSPECTION AND TEST PLAN ( ITP )

No.

Description

24 Modulating Control System (MCS)


25 Sequence Control System (SCS)
26 Digital Electro-Hydraulic Control System for Turbine (DEHC)
27 Digital Electro-Hydraulic Control System for BFP-T (MEH)
28 BFP- Turbine Driven Supervisory & Protection (MTSI & METS)
29 Boiler Furnace Management System (BMS)
30 Bypass Control System (BPS)
31 Coordinate Control System (CCS)
32 Governor Free and Automatic Governor Control System (AGS)
33 Contineous Emission Flue Gas Monitoring System (CEMS)
BOILER, TURBINE, GENERATOR & AUXILIARIES
34 Make Up Water System
Visual Inspection
E&C&I Function Test
Make Up Water Pump H/R Test
35 Closed Cooling Water System
Visual Inspection
E&C&I Function Test
CCCW Make Up Water Pump H/R Test
CCCW Pump H/R Test
36 Circulating Water System
Visual Inspection
E&C&I Function Test
Rotary Screen System Operation Test
Circulating Water Pump H/R Test
Sea Water Booster Pump H/R Test
Condenser Tube Cleaning System Operation Test
37 Condensate Water System
Visual Inspection
E&C&I Function Test
Interlock Test
Condensate Pump H/R Test
Condensate Polishing System Test
Deaerator System Test
38 Feed Water System
Visual Inspection
E&C&I Function Test
Interlock Test
BFP Aux Oil Pump H/R Test
BFP H/R Test
BFP-T H/R Test
39 Condenser Air Evacuation System
Visual Inspection
E&C&I Function Test
Interlock Test
Vacuum Pump H/R Test
Vacuum System Operation Test
40 Turbine Gland Steam Seal System
Visual Inspection
E&C&I Function Test
Interlock Test
Gland Steam Exhauster H/R Test
41 Turbine Extraction and Drain System

Remarks

Reference Control Document transmitter later List Electrical.I&C (by contractors).

COAL FIRE POWER PLANT INSPECTION AND TEST PLAN ( ITP )

No.

42

43

44

45

25

26

27

28

Description
Visual Inspection
I & C Loop Test
Valve Operation Test
Heater Functional Test
Drain Functional Test
Turbine Control/Lubricating Oil System
Visual Inspection
E&C&I Function Test
Interlock Test
Equipment Running Test
Emergency Oil Pump Running Test
EHC Oil Pump H/R Test
Turbine Barring and Turning Gear Test
Turbine Jacking System Test
Main Turbine
Visual Inspection
Turbine Protection Devices Test
Turbine Interlock
Turbine Valves Test
Turbine Vacuum Up Test
Turbine No Load Test
Turbine Load Test
Turbine EHC Control System
Visual Inspection
I & C Loop Test
Interlock Test
Valve Combination Test
Turbine Supervision Instrument System
Visual Inspection
I & C Loop Test
Interlock Test
Vibration Monitoring System
Visual Inspection
Operation Function Test
Generator Seal Oil System
Visual Inspection
E&C&I Function Test
Interlock Test
Emergency Seal oil Pump H/R Test
Generator Leak Test
H2 Gas Charging to Generator
Generator Stator Cooling System
Visual Inspection
E&C&I Function Test
Interlock Test
Stator Cooling water Pump H/R Test
Generator& Main Circuit System
Visual Inspection
Generator Transformer Function Test
Unit Transformer Function Test
Generator Circuit Breaker Test
IPB Cooling System Function Test
Generator Protection Circuit Test

Remarks

Reference Control Document transmitter later List Electrical.I&C (by contractors).

COAL FIRE POWER PLANT INSPECTION AND TEST PLAN ( ITP )

No.

29

30

31

32

30

31

32

33

34

35

36

37

Description
Generator Interlock Test
Generator & Main Circuit HV Test
Generator Excitation System
Visual Inspection
Excitation Function Test
Static Characteristic Test
Interlock Test
Excitation Generator No Load Test
Excitation Generator Load Test
Chemical Dosing System Commissioning
Visual Inspection
Function Test
Operation Test
Chemical Feeding System Commissioning
Visual Inspection
Function Test
Operation Test
Sampling & Analysis System Commissioning
Visual Inspection
Function Test
Operation Test
Burner Front Oil System Operation Test
Visual Inspection
Function Test
Operation Test
Oil Lighter System Commissioning
Visual Inspection
Function Test
Operation Test
Burner Control System Commissioning
Visual Inspection
Function Test
Operation Test
Atomizing Steam System Commissioning
Visual Inspection
Function Test
Operation Test
Flame Scanner Air System Commissioning
Visual Inspection
Function Test
Operation Test
Boiler Vents & Drain System Commissioning
Visual Inspection
Function Test
Operation Test
Boiler Seal Air System Commissioning
Visual Inspection
Function Test
Operation Test
Soot Blowing System Commissioning
Visual Inspection
Function Test
Operation Test

Remarks

Reference Control Document transmitter later List Electrical.I&C (by contractors).

COAL FIRE POWER PLANT INSPECTION AND TEST PLAN ( ITP )

No.

Description

38 Auxiliary Steam System Commissioning


Visual Inspection
Function Test
Operation Test
39 Air Heater System Commissioning
Visual Inspection
Function Test
Operation Test
40 Air-Flue Gas System
Visual Inspection
I & C Function Test
Interlock & Protection Test
Forced Draft Fan Test
Induce Draft Fan Test
Primary Air Fan Test
Seal Air Fan Test
Continous Emission Monitoring System Test
41 Electrosatic Precipitator Commissioning
Visual Inspection
I & C Function Test
Interlock & Protection Test
Operation Function Test
Efficiency Test
42 Coal Feeder & Pulverizer System
Visual Inspection
I & C Function Test
Interlock & Protection Test
Pulverizer / Mills System Test
Coal Feeder System Test
Pyrites Removal System Test
Operation Function Test
43 FGD Sea Water System Commissioning
Visual Inspection
I & C Function Test
Interlock & Protection Test
Operation Function Test
SYSTEM AND PLANTS TEST
44 Boiler Hydrostatic Test
45 Pre-Boiler Chemical Cleaning System
46 Boiler Chemical Cleaning System
47 Boiler Safety Devices & Interlock Test
48 Turbine Safety Devices & Interlock Test
49 Generator Safety Devices & Interlock Test
50 Boiler Initial Firing
51 Boiler Steam Blows
52 Boiler Safety Valve Test
53 BTG Interlock Test
54 Initial Steam Admission to Turbine
56 Turbine Over Speed Test
55 Full Speed No Load Test (Governor/AVR Dynamic Test, etc)
56 Generator Open Circuit Test
57 Generator Short Circuit Test
58 Synchronization System Test

Remarks

Reference Control Document transmitter later List Electrical.I&C (by contractors).

COAL FIRE POWER PLANT INSPECTION AND TEST PLAN ( ITP )

No.
59
60
62
63
64
65
66
67
68
69

Description

First Synchronization & Initial Load Test


Cold, Warm & Hot Start Up Test
Vacuum Tightness Test
Variation Load Test & Tunning
Load Ramp, Load Swing & Run Back Test, etc
Half Condenser and One CWP Operation Test
HP Heater Cut Operation Test
Load rejection Test and House Load Test
Reliability Run Test (720 hours)
Plant Performance Test
- Boiler Efficiency Test
- Generator Net Power Output
- Net Plant Heat Rate
- Auxiliary Power Consumption
- ESP Efficiency Test
- Maximum Load (Valve Wide Open) Test
- Minimum Load (Without Fuel Oil Support) Test
- Net Depandeble Capacity Test (NDC)
70 Environmental Measurement
- Flue Gas Emission Measurement
- Water Disposal Measurement
- Noise Level Measurement
71 Commercial Operation Date (COD)
Remark :
R = Reviev ; W = Witness