AF/QLY/FR/29

Issue no - 1.0

Vendor: SYNCHRON SYSTEMS


Drawing no: J 060.200

Slno

Parameters

Cabinet Quality/Finishing

2
3
4
5

Cabinet Paint
All Door Operation
Gasket On All doors
Door Lock Operation

Door Handles

Base Frame(Antivibration pads)

Componenets/Channels

Cable Turfs / Finshing

10
11
12

Lugging / Ferruling
Wiring Quality
Door Wiring Finishing

13

Proper & Complete Labels

14
15
16
17

Terminal Drawings
Earthing Strip/Terminal
Mimic Quality/Pasting
Bus Bar Mounting

18

Proper PB/SS

19

Proper indication lamps operation

20

Proper gauges, Hour meter

21
22

Components mounting positions


inside the panel
Electrical material Varified

Comments : 1. Door cabels rubbing with channels , to be protected with PVC sleeve, 2. Key holder
closed with rubbe

FABRICATED BY

: N/A

Name& Signature:
Date:

N/A

INSPECTION REPORT
Description : CONTROL PANEL JSP 40

Specification

Check for proper fabrication finishing

Instrume
nts used
&
calibrate
d on
Visual

Paint Quality & Coating, should't have any scratch/rust


Proper operation/alignment of all doors/hinges
Proper mounting/pasting of gasket
Door lock-quality, fittment and operation

Visual
Visual
Visual
Visual

Door handles-quality, fittment and operation

Visual

Base frame fittment and moutning holes as per drg.

Visual

Proper fittment of components/channels

Visual

Cable turf/channels mounting and finishing with labels

Visual

All cable ends should have proper ferrules/lugging


Good finishing, lugging and tightening
Door wiring finshing, binding and clamping

Visual
Visual
Visual

Labels on - Components, Turfs, Terminals. Doors etc.

Visual

Correct & Proper pasting of terminal drawings


Check for proper earthing strip/Terminal for each motor
Corectness, quality, cleanliness and proper pasting
Proper insulation, fittment, finishing

Visual
Visual
Visual
Visual

fittment, operational

Visual

fittment, operation

Visual

fittment, operation range

Quality, fittment, finishing

Visual

All component makes, models & rating

Visual

with channels , to be protected with PVC sleeve, 2. Key holder chain to be fitted, 3. Door not opening compl
closed with rubber gromites

PORT
Rev: 0

Observations

Judgment

Finishing found ok

Accepted

Powder coating done


Found ok
Found ok
Used darshan make lock

Accepted

Not provided

Rework

Poor quality pads used/


height is more compare
to sampel

Rework

Found ok

Accepted

Terminal nos to be
inserted &
Remote/engine
connector/working lamp
stickers to be provided

Rework

Found ok
Found ok
Found ok

Accepted
Accepted
Accepted

Accepted
Accepted

Pads not as per our sample

Rework
Accepted
Accepted
Accepted

NA
Rubber boot not
provided for toggle
switch
Found ok

Pumping & engine


hour meter fitted in
opposite direction

Remarks

Accepted

Terminal labeling not done on panel


Found ok
Found ok
Found ok

Sep-14
Date:8/11/2014
SL No:

Rework
Accepted

Rework

Found ok

Ref BOM

Accepted
Accepted

o be fitted, 3. Door not opening completely to be rectified , 4. unwanted holes to be


tes

FOR Ajax QUALITY

Inspector By

Name& Signature: Ashok kumar.K/Tappan


Date: 08/11/2014

Action taken by Synchron systems


Date. 16.01.2014

Correction details
(Kindly doubble
click on Icons)

Concrete door
chain handle.jpg

Concrete anti
vibration pad.jpg

Connector
marking.jpg

Concrete toggle
switch cover.jpg

Concrete harness
protection.jpg

Concreate cable
entry closing.jpg