Issue no - 1.0
Slno
Parameters
Cabinet Quality/Finishing
2
3
4
5
Cabinet Paint
All Door Operation
Gasket On All doors
Door Lock Operation
Door Handles
Componenets/Channels
10
11
12
Lugging / Ferruling
Wiring Quality
Door Wiring Finishing
13
14
15
16
17
Terminal Drawings
Earthing Strip/Terminal
Mimic Quality/Pasting
Bus Bar Mounting
18
Proper PB/SS
19
20
21
22
Comments : 1. Door cabels rubbing with channels , to be protected with PVC sleeve, 2. Key holder
closed with rubbe
FABRICATED BY
: N/A
Name& Signature:
Date:
N/A
INSPECTION REPORT
Description : CONTROL PANEL JSP 40
Specification
Instrume
nts used
&
calibrate
d on
Visual
Visual
Visual
Visual
Visual
Visual
Visual
Visual
Visual
Visual
Visual
Visual
Visual
Visual
Visual
Visual
Visual
fittment, operational
Visual
fittment, operation
Visual
Visual
Visual
with channels , to be protected with PVC sleeve, 2. Key holder chain to be fitted, 3. Door not opening compl
closed with rubber gromites
PORT
Rev: 0
Observations
Judgment
Finishing found ok
Accepted
Accepted
Not provided
Rework
Rework
Found ok
Accepted
Terminal nos to be
inserted &
Remote/engine
connector/working lamp
stickers to be provided
Rework
Found ok
Found ok
Found ok
Accepted
Accepted
Accepted
Accepted
Accepted
Rework
Accepted
Accepted
Accepted
NA
Rubber boot not
provided for toggle
switch
Found ok
Remarks
Accepted
Sep-14
Date:8/11/2014
SL No:
Rework
Accepted
Rework
Found ok
Ref BOM
Accepted
Accepted
Inspector By
Correction details
(Kindly doubble
click on Icons)
Concrete door
chain handle.jpg
Concrete anti
vibration pad.jpg
Connector
marking.jpg
Concrete toggle
switch cover.jpg
Concrete harness
protection.jpg
Concreate cable
entry closing.jpg