Dual Link
RSTP
PRP
HSR
Agenda
Summary
Page 2
August 2012
Energy Automation
Substation Controller
Station bus
2
3rd
party
device
Process bus
Parallel wiring
1
Control / Inforeport
(ca. 500 ms delay time)
Sampled Values
(ca 2 ms delay time)
Page 3
August 2012
Merging
Unit
Digital Instrument
Transformer
Data via IEC61850-9-2
Energy Automation
Circuit
Breaker
Controller
CT
VT
Agenda
Summary
Page 4
August 2012
Energy Automation
Page 5
August 2012
Energy Automation
Substation Controller
dual link
Page 6
August 2012
Energy Automation
Easy to handle
No settings
CONS
Page 7
August 2012
Energy Automation
Principle of RSTP-Configuration
IEEE 802.1D-2004
2 external RSTP-Switches
SIPROTEC devices with
integrated RSTP switch
Rings with up to 30 devices
Several rings can be
connected to external
switches
Setting of RSTP parameters
necessary
Well established technology
( > 250.000 devices)
Field proven interoperability
Substation Controller
dual link
RSTP
Up to 30
SIPROTEC
devices per ring
.
RSTP Switch
RSTP over
Fast fibre optic Ethernet
Page 8
August 2012
Energy Automation
Features of RSTP
PRO
CONS
Page 9
August 2012
Energy Automation
PRP-B
PRP-A
RB
PRP-B network
Non PRP
devices
RB
Field level
Page 10
August 2012
Energy Automation
PRP-RedBox
CONS
Page 11
August 2012
Energy Automation
Benefits
Siemens
solution
Customer
requirement
Seamless
Setting free
High availability
Retrofitting on existing module
Secure and safe operation
Safes investment
August 2012
Energy Automation
Principle of HSR-Configuration
IEC 62439-3.5
2 Redboxes
SIPROTEC devices with
integrated HSR switch
Rings with up to 50 devices
Redboxes distributed in the
ring
Seamless
Interoperability tests done
Substation Controller
PRP-A
PRP-B
RB
Up to 50
SIPROTEC
devices
per ring
.
PRP-Switch
HSR Ring
HSR
RB
RB
HSR RedBox
PRP-A connection
PRP-B connection
Page 13
August 2012
Energy Automation
Features of HSR
High Available Seamless Redundancy
PRO
CONS
Page 14
August 2012
Energy Automation
Benefits
Siemens
solution
Customer
requirement
Seamless
Setting free
High availability
Retrofitting on existing module
Secure and safe operation
Cost effective
Safes investment
August 2012
Energy Automation
Agenda
Summary
Page 16
August 2012
Energy Automation
RSTP
PRP
HSR
>250.000 devices
>2.000
>100
ring
parallel
ring
Unlimited
(max. 30 / ring)
512
512
(max. 50 / ring)
Parameter free
Budget-saving
network
Siemens
field experience
Network
configuration
Max. devices per
layer 2 network
Seamless
(no recovery time)
Page 17
August 2012
Energy Automation
Agenda
Summary
Page 18
August 2012
Energy Automation
PRP-A
SIPROTEC 4
Communication
Module EN100 optical
(PRP and HSR)
PRP-B
B
SIEMENS Redbox
SCALANCE X204RNA EEC
- Coupler for PRP to HSR
- Connects non-PRP/HSR to
PRP or HSR
HSR
HSR
HSR
Non HSR
device
Page 19
August 2012
Non HSR
device
Energy Automation
Summary
Siemens offers redundancy solutions
Dual link redundancy
RSTP
PRP (seamless)
HSR (seamless)
SIPROTEC with integrated RSTP/PRP/HSR switches
Dual link and RSTP: Field proven established technology
PRP: High level redundancy through double network solution
HSR: High level redundancy through cost effective ring network
structure. Combinable with PRP network.
Successful participation at UCA Interoperability test CIGRE 2010
and 2012
Siemens solutions offer a wide variety in long year field proven
as well as state of the art redundancy
protocols