Inspector
Inspector
Aaaa Bbbb
Name:
Maintenance Concept
Subjects:
Exam #1
1
2
3
4
5
6
7
8
Locations/Equipments
Inspections
Job Plan (inspection 1st level - in running)
Job Plan (specific inspection - at stoppage)
Routes
PM
Inspection 1st level
Specific Inspection
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%
100%
50%
50%
0%
0%
Subjects:
MAXIMO
Page 1 of 14
Inspector
Aaaa Bbbb
Name:
Exam #2
1
2
3
4
5
6
7
MAXIMO Test
Inspector
0%
0%
0%
0%
0%
0%
0%
0%
100%
100%
50%
50%
0%
0%
Page 2 of 14
MAXIMO Test
inspector
Aaaa Bbbb
Maintenance Concept
Inspector
AaBb
1 Locations/Equipments
A
2 Inspections
What is a route ?
1 a list of equipments/locations to be inspected
2 is a record in MAXIMO which link equipments/locations sequential
3 is an inspection of equipments/locations with different frecquency
3\14
MAXIMO Test
inspector
6 PM
A
In order to generate WOs , what are cases whenyou will choose <Use Target Start = Y> ?
1 in case of 1st level inspection
2 in case of specific inspection
8 Specific Inspection
4\14
AaBb
Subiecte
Operare MAXIMO
Test MAXIMO
inspectori
Aaaa Bbbb
Inspector
MAXIMO 4.1.1 Global Overview
Work Order
Page 5 of 14
DaAu
Subiecte
Operare MAXIMO
Test MAXIMO
inspectori
PM
Condition Monitoring
Materials Allocation
Page 6 of 14
DaAu
Subiecte
Operare MAXIMO
Test MAXIMO
inspectori
Job Plan
Page 7 of 14
DaAu
Subiecte
Operare MAXIMO
Test MAXIMO
inspectori
Failure Code
Page 8 of 14
DaAu
Subiecte
Operare MAXIMO
Test MAXIMO
inspectori
Page 9 of 14
DaAu
Subiecte
Operare MAXIMO
Test MAXIMO
inspectori
Condition Monitoring
Materials Allocation
Page 10 of 14
DaAu
Subiecte
Operare MAXIMO
Test MAXIMO
inspectori
Page 11 of 14
DaAu
Subiecte
Operare MAXIMO
Test MAXIMO
inspectori
Page 12 of 14
DaAu
MAXIMO Test
foreman
XxYy
Aaaa Bbbb
Inspector
Maintenance Concept
1 Locations/Equipments
0%
0%
T
T
0%
0%
0%
0%
F
F
T
0%
0%
0%
0%
0%
T
T
T
T
F
0%
0%
0%
T
T
T
0%
0%
0%
0%
0%
T
T
T
F
F
2 Inspections
0%
3 Job Plan (inspection 1st level - in running)
A The building steps for Job Plan involves:
0%
T
1 the action descriptions according to the type of equipment
0%
T
2 operations list
0%
F
3 the operations will be defined in asceding sequences with specific numbers 1,2,
0%
F
4 selection regarding necessity of equipment downtime
0%
F
5 selection regarding actions uninterruptings
0%
T
6 resources (materials, labor, tools)
0%
F
7 measurement points
0%
T
8 equipment locations - work asset
0%
T
9 attaching documents (scanned, drawings, flowshhets)
0%
4 Job Plan (specific inspection - at stoppage)
A The building steps for Job Plan involves:
0%
T
1 the action descriptions according to the type of equipment
0%
T
2 operations list
0%
F
3 the operations will be defined in asceding sequences with specific numbers 1,2,
0%
T
4 selection regarding necessity of equipment downtime
0%
F
5 selection regarding actions uninterruptings
0%
T
6 resources (materials, labor, tools)
0%
T
7 measurement points
0%
T
8 equipment locations - work asset
0%
T
9 attaching documents (scanned, drawings, flowshhets)
0%
5 Routes
A What is a route ?
0%
T
1 a list of equipments/locations to be inspected
0%
T
2 is a record in MAXIMO which link equipments/locations sequential
0%
F
3 is an inspection of equipments/locations with different frecquency
B
0%
0%
0%
0%
T
F
T
13\14
MAXIMO Test
foreman
6 PM
0%
0%
0%
T
T
T
0%
0%
0%
F
T
F
0%
0%
0%
F
T
F
0%
0%
0%
F
T
F
In order to generate WOs , what are cases whenyou will choose <Use Target Start = Y> ?
1 in case of 1st level inspection
2 in case of specific inspection
0%
T
0%
F
0%
7 Inspection 1st level
0%
0%
0%
0%
0%
0%
0%
1
2
3
4
5
6
7
0%
8
0%
8 Specific Inspection
0%
0%
0%
0%
0%
0%
0%
0%
1
2
3
4
5
6
7
8
0%
0%
0%
0%
9
10
11
14\14