Liabilities
Termination of contract
a. Termination for default, insolvency and convenience
Enclosed form for annual turnover in Technical bid
Enclosed form for similar completed works in Technical bid
Enclosed form for similar works under progress in Technical bid
Enclosed form for organizational structure of the applicant
Work description in Annexure
INFERENCES1. The structure of the RFP was concise and accurate and can be used
2. The selection of quality cum cost basis with a distribution of 80% and
20% for technical bid and financial bid respectively can be used in the
RFP for Janpath metro station as this allows a more flexibility in
determining the appropriate consultant keeping varied qualifications
into consideration
3. The clause of similar works of either 1 work with similar value/ 2 works
of half the value/ 3 works of a determined value can be used in the RFP
to be prepared
4. Three- envelope system can be adopted as this allows step wise
elimination of applicants at fault
5. Scope of work during different project stages has been detailed
appropriately
6. Credentials of team leader and team members of the proposed
engaged team can be incorporated as this allows choice of appropriate
execution team along with a competitive company association
7. 70% of marks has been allotted to the presentation during the
technical bid. This would allow a lot of flexibility to choose and also
allow the applicants to present varied proposals