Beruflich Dokumente
Kultur Dokumente
Dusting
g
Porosity
Cracks
Microbial growth
Poor chemical resistance
Poor cleanability
Degradation due to neutralization
Resistance to cracking
g
Impermeable to corrosive attack
Hygienic and clean floors
Thwarts off microbiological growth
Better abrasion resistance
Improved chemical resistance & oil resistance
Easy maintenance and improved service life
Higher
g
compressive
p
strength
g
Physical Properties
Abrasion Resistance :
concrete
t ffailure
il
att 2 N/mm
N/ 2 as per ISO 4624
Chemical properties
SSelect
l the
h fl
d calculate
l l
h area
flooring and
the
The flooring should be a sound concrete or fresh plastered surface
and be free from oil,
oil grease
grease, laitance
laitance, dust
dust, blowholes
blowholes, voids
voids, cracks
cracks,
damaged spots, old loose paint, water, high moisture in concrete and
high rough finishes should be leveled using screed or mortar.
Solvent Cleaning
Acid Etching
Abrasive blasting
Vacuum Blasting
g -concrete
CONCRETE
12
A l
Application
related
l d tools
l
Moisture meter, serrated trowel, spiked roller, wet film thickness guage
M k the
Masking
h edges
d
Maintains and ensures proper edge lines; use 3M masking tapes
U mechanical
Use
h
l stirrer for
f large
l
packs
k
Mixing base separately and then catalyst gets added (pot life is 30 mts)
A l
Application
off self
lf lleveling
l fl
floor coating
Just pour the pre-weighed contents on the floor and get it spread using serrated
h product
d will
ill selflf llevell iitself
lf ffor iits special
i l property
trowel;l the
SSpike
k roller
ll
Spike rolling is done to remove entrapped air bubbles from the floor coating.
It is also referred
f
as degassing ffrom the concrete voids
M
l Th
k
Measurement off W
Wet FFilm
Thickness
on fl
floor
The coating is wet for the first 20-30 minutes and using WFT gage
immediately after
f application did not cause an impression which required for
f
touch up later as for the self leveling property it gets covered on its own
W
l Th
k
Wet FFilm
Thickness
measurement
WFT is equal to DFT in our floor coating as we are working with
100% solids material. In this case the DFT expected is 1mm as shown
in the gage on wet film
O
h d
h wet paint
Over night
drying off the
The painted area should be free from dust and flies till the drying is
completed. Ensure to cover the area with a plastic sheet and cordon off
ff ffrom
movement
T hd
Touch
dry is achieved
h
d in 3 to 4 hours
h
It is always better to ensure that no dust falls on the coated film
EEpilux
l SL Gl
h b
h d )
Glossy Fl
Floor C
Coating (l(light
biscuit shade)
Sample completed and dried overnight for foot traffic. It takes
minimum three days for other heavy work permission and not to forget
epoxies will take one week to cure.
B
Bangalore
l
S
Sanmar
Ch
Chemicals
l
1mm thick Epilux SL Glossy floor coating done over a coat of Epilux Floor Primer;
db
l
IIntermarketing
k i iin M
workk executed
by BBangalore
May 2009
Ph
Pharmaceuticals
l clean
l
room corridor
d
29
S
Service
area- food
f d process plant
l
31
W
Ware
hhouse flooringfl
automobile
b l unit
35
C Park
Car
P k flooring
fl
37
Product
DFT
Epilux Floor
Primer
Mix ratio
Drying time
Volume Solids
30 40 microns 2 : 1
6 hrs
100%
Epilux Floor
Screed
3,4,5 mm
2:1:20
24 hrs
100%
p u SSL
Epilux
Glossy Floor
Coating
0.5 mm to
o5
mm
3:1:0-3.5
3:
:0 3.5
7 days
100%
00%
38