Design data :
A. Given
1 Max. design discharge
2 Max. water level
3 Spillway crest elevation
4 Full tank level
5 Top bund level of earthen dam
6 Length of spillway crest
7 Head over spillway crest
8 No. of spans and clear span width
9 No.of piers and their thickness
10 Bed level of approach channel
11 Height of spillway crest from stream bed
12 Slope of upstream face of spillway
13 Pier contraction coefficient
14 Abutment contraction coefficient
15 Downstream water level for
16 Length of approach channel
B. Cross section of approach channel
Assumed
Value of silt factor
Angle of repose
Unit weight of water
Unit weight of masonry
Unit weight of dry earth
Unit weight of saturated earth
Coefficient of discharge
Bearing capacity of foundation soil / rock
Side slope of approach channel
Rugosity coefficient value for different case :
i)
Design of approach channel ( Unlined )
ii) Water profile over the chute
11 iii) For the stilling basin
iii) Water level for various discharge
1
2
3
4
5
6
7
8
9
10
Design:
Approach Channel and Head Over Crest
Q
=
C.L.H 3/2
Head over crest as per data given
Head over crest as per calculation
Hence upstream water level
River bed level
Water depth
H
H
=
=
=
=
4.50
m
[Q / C.L]2/3
=
346.50
=
346.50
Upstream Water level
River bed level
351.00
346.00
5.00
Velocity of approach
Velocity Head
V=
V2
=
=
=
=
Q/A
/2g
R=A/P
(
567.50
1430.00
0.324
567.50
123.50
4.60
=
=
=
Crest Elevation
346.50
351.297
=
=
0.50
4.80
0.324
Hd
4.80
Coefficient of discharge
Coefficient of discharge ( corrected )
Effective length
0.104
0.067
P
Hd
ha
=
=
=
=
=
=
=
=
1.86
L' 85.00
83.08
83.10
2.( N .K p + K
m
m
C.L.Hd 3/2
1699.13
1700.00
Cumecs
>
1.50
0.336
5.00
2.760
U/S Profile :
S.N.
1
2
3
4
5
6
7
8
9
x / Hd
-0.000
-0.02
-0.060
-0.100
-0.120
-0.140
-0.150
-0.160
-0.175
y / Hd
0.0000
0.0004
0.0035
0.0101
0.0147
0.0203
0.0235
0.0270
0.0328
For
Hd
x (m)
0.0000
-0.0959
-0.2878
-0.4797
-0.5756
-0.6715
-0.7195
-0.7675
-0.8394
0.0000
0.0019
0.0168
0.0484
0.0705
0.0974
0.1127
0.1295
0.1573
10
-0.190
0.0395
-0.9114
0.1895
11
12
-0.195
-0.200
0.0420
1.0000
-0.9354
NA
0.2015
Hd
Hence apron elevation
=
=
=
=
y (m)
NA
hd
hd
113.50
Velocity downstream
=
[
12.599
/
d
+
2. X g
1.00
d3
8.154
d2
By applying goal seek
d
1.069
Adopt
d
=
1.069
m
Design of discharge carrier :
The flow at the toe of spillway should be supercritical.
Cum./sec.m
12.60
]2
d
+
m
q2
g
The depth of flow at the toe is supercritical depth as'd' is less than critcal depth.
Critical Depth
y / Hd
-0.4820
-0.4800
-0.4720
-0.4570
-0.4310
-0.3840
-0.3130
-0.2200
-0.0880
x (m)
-4.80
-3.84
-2.88
-1.92
-0.96
0.00
0.96
1.92
2.88
y (m)
2.31
2.30
2.26
2.19
2.07
1.84
1.50
1.06
0.42
8.0905
10
11
12
13
14
15
0.800
1.000
1.200
1.400
1.600
1.800
0.0750
0.2570
0.4620
0.7050
0.9770
1.2780
3.84
4.80
5.76
6.72
7.67
8.63
The flow at the toe may remain supercritical for certain distance ,
the slope of the discharge carrier should be more than the critical.
q
Critical
Velocity V
=
d
Hydraulic Mean Depth,
Critical
Slope
R=A/P
Sf
Provide a slope of
Curve Radius at toe
T.E.L.
351.30
-0.36
-1.23
-2.22
-3.38
-4.69
-6.13
12.60
2.50
113.50
113.50
N 2 . V2
R 4/3
1/
200.00
=
x
+
2.50
5.00
0.0026
in
2 . Hd
1/ 200.00 slope
=
N
h
S.N.
Length
Depth
Vel. V
Vel. Head
1
1
2
3
4
5
6
7
8
9
10
2
0.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
2.00
2.00
3
1.069
1.030
0.998
0.969
0.944
0.923
0.903
0.886
0.878
0.871
4
11.79
12.23
12.63
13.00
13.34
13.66
13.95
14.22
14.34
14.47
5
7.09
7.62
8.13
8.61
9.07
9.50
9.92
10.30
10.49
10.67
351.20
=
=
Area
Vel. Head
Drop in level
Length of chute channel
20.00
113.50
6
121.28
116.94
113.22
110.01
107.19
104.72
102.52
100.57
99.69
98.85
=
=
5.000
30.00
Junction of
y
tan
Here
=
=
=
=
=
=
k
d
h
x
200.00
This curve will meet the downstream slope where
dy/dx
cos
factor of safety to ensure positive pressure on the floor
1.50
depth of flow at the beginning of transition
velocity head at the beginning of transition.
x2
+
48.92
dy /dx
=
1/ 6.0
1
x
+
=
200.0
76.02
3.95
m
1.00
0.0254
3.00
0.1990
Junction of
1/
x
6.00
This curve will meet the downstream slope where
x
6.00
=
4.00
0.3470
2
=
0.1667
0.16515
x.tan
x.tan
=
x2
53.29
+
=
0.00
0.00
NA
0.00
NA
Junction of
10 .d
9.40
=
=
y1
Design of energy dissipator :
y2
( y1 /
=
2
) x ( 1 + 8 F1 2
If Froude number is a high value than ,the water depth in the stilling basin should
% more than the calculated conjugated depth y2 .
be
5
Required water depth
Required basin level
cos
=
=
=
Stilling basin is designed for N = 0.008 ,therefore stilling basin is checked for
y1
=
0.871
m
V
=
5.68
Downstream water level 338.86
14.47
m/s
y2
y2
( y1 /
=
Required water depth
Required basin level
)x(
m
2
5.68
1 + 8 F1 2
=
=
=
=
5.68
Downstream water level 338.86
338.86
16.00
Height
Width
Fractional space
Height h b
Basin Blocks :
Width
Fractional space
Slope of taper face of basin block is
N.B.U/s face of the basin blocks should be at a distance of
the downstream face of the chute blocks .
Height h s
Dentated End Sill :
Width
Provide slope of taper face of dent and sill block
Free Board :
Free Board for discharge channel where flow is supercritical :
Free board ( in m )
=
v
=
d
=
Free board ( in m )
=
=
Free Board for the side walls of stilling basin:
Free board ( in m )
=
v1
=
d2
=
Free board ( in m )
=
=
=
=
=
=
0.90
0.90
0.40
1.40
1.10
0.53
=
=
1.10
0.90
0.61
+
0.0378
maximum velocity of flow in m/s
depth of flow in meter
0.61
+
0.52
1.13
(v 1
0.10
+
Incoming velocity to the basin in m/s
Conjugate tailwater depth in m
2.01
m
=
=
=
12.60
7.36
9.20
cumec/m
m
m
=
=
351.00
341.80
m
yd/2+0.50
2.50
3.00
343.00
=
=
=
=
9.20
+
m
m
341.70
338.00
=
=
=
12.60
7.36
11.05
cumec/m
m
m
=
=
344.54
333.49
m
yd/2
3.27
3.77
334.23
333.40
332.00
=
=
=
=
=
m
m
11.05
+
+
m
m
m
m
0.50
0.50
The exit gradient should be checked for the condition when there is no water in the stilling basin
when high flood is passing in the river; this provides the worst static condition.
Maximum static head
GE
head =
=
350.50
12.50
338.00
338.00
6.00
332.00
H
= ---d
1
'---
1
GE*d
-----------=
-------------H
0.08
30.65
=
=
184.00
183.88
d
m
=
=
=
=
=
16.00
50.00
5.64
1.23
111.00
m
m
m
m
m
Total
184.00
1.00
Pressure calculations
Let the floor thickness in the u/s be
be 1.50
m.
(i)
=
=
=
d/b
346.00
4.30
184.00
m
m
0.02
341.70
I/
=
86.29
C1
=
90.34
D1
%
%
DC1
0.94
corrected
=
=
87.43
6.00
4.30
m
m
0.19
(+ ve)
4.05
86.29
%
0.94
m
m
332.00
=
=
b =
338.00
6.00
184.00
d/b=
8.00
184.00
0.03
16.17
%
11.37
%
D
1.20
(- ve)
4.80
I/
corrected
=
=
16.17
14.81
6.00
4.30
1.20
m
m
0.16
(iii) The levels of hydraulic gradient lines at key points under different flow conditions are
given in the following table Condition
Head
No flow (max
static head )
high flood
338.00
350.50
12.50
344.54
351.00
6.46
Flow at pond
level
344.54
350.50
5.96
Floor thickness
The maximum static head will occur on the floor when there is nowater in the D/S and FTL
Thus maximum static head
=
350.50
338.00
=
12.50
m
The subsoil hydraulic gradient line shall be drawn for the maximum static head only since the floor
thicknesses are governed by this critical condition.
Downstream floor
(i) Upto
Unbalanced head =
1.90 m
of stilling basin
1.90 /1.24
1.53 m
1.60 m
Unbalanced head =
Floor thickness required
5.00 m
2.05 m
=
2.05 /1.24
1.66 m
1.70 m
Unbalanced head =
8.00 m
2.48 m
2.48 /1.24
(v) At
16.00 m
2.72 m
33.00 m
3.79 m
3.79
---------- =
1.24
3.10 m
Unbalanced head =
2.00 m
3.37 m
3.37
---------- =
1.24
2.80 m
Unbalanced head =
3.06 m
41.00 m
5.11 m
5.11
---------- =
1.24
4.20 m
4.12 m
Scour depth,R
Anticipated scour
Uownstream scour level
=
=
7.36
m
1.25 R =
9.20
=
351.00
=
341.80
=
4.20
m
m
m
Loose apron 1.5 D long consisting of either boulders of not less than 40 kg or wire boulder
crates should be provided so as to ensure a minimum thickness of 1 m in launched position
(refer IS 6531 : 1994).
Thickness of launching apron
1.50
9.20
Length required =
9.46
1.50
2.25 D
9.46
6.31
1.50
cu m/m
m deep in a length of
6.30
R=
1.5R =
=
=
7.36
11.05
344.54
333.49
3.77
m
m
-
11.05
m
m
4.00
2D
=
rows of
cm.gap filled
16.20
D 15 of filter
D 85 of foundation
7.54 m
say
15.00 m thick graded
1.25 m X
1.25
m X
0.90
with ' bajri ' over
0.80
m thick graded
m.
Length required =
8.48
1.70
=
=
=
1.70
2.25 D
8.48
4.99
1.70
m thick
and
m
cu m/m
cu m/m
m
deep in a length of
1.70
say
5.00
5.00
*************
Q
(cumecs)
MWL
(m)
Crest level
(m)
FRL/FRL
(m)
TBL
(m)
L
(m)
Gates
Piers
Av.u/s Bed level
P
=
=
=
=
=
=
1430.00
351.00
346.50
350.50
354.70
=
=
=
=
(m)
(m)
Kp
Ka
TWL
Length of approach channel
4.50
8.50
2.00
346.00
0.50
3
0.01
0.10
344.54
100.00
0.00
11.00 Each
10.00 Each
=
=
1.00
30.00
1000.00
2300.00
1800.00
2000.00
1.78
100.00
0.00
m
m
m
m
:1
0.0180
0.0180
0.0080
0.0180
[KNOWN]
=
346.50
346.50
River bed level
346.00
Q
L
L
C
3.69
+
-
m
4.50
0.50
=
=
=
=
O.K.
1430.00
8.50
113.50
1.78
=
=
Cumecs
*
11.00 +
m,
351.00
346.00
m
m
2.00 *
10.00
113.50
m2
567.50
1430.00
0.324
+
/
0.00
567.50
0.00
2.52
m/s
=
=
113.50
123.50
+
m
5.00
567.50
123.50
4.60
Wetted Perimeter,P
0.00
2.00
m
hf
hf
Sf
=
=
=
Crest Elevation
346.50
351.297
4.50
N2
.V2
.L
4/3
R
0.0269
m
N2
.V2
R4/3
0.000269
1 in
3713
+
Head Over Crest
+
0.32
Say
+
-
1 in 3000.00
Vel.Head
0.027
m
Hd
=
=
=
=
=
2.( N .K p + K a ) Hd
351.297
4.80
346.50
1.946
1.92
1430.00
Cumecs
O.K.
1.50
0.336
5.00
2.760
5.00
=
=
346.50 &
3.403
m
2.00
0.555
6.00
3.797
343.10
2.50
0.821
7.00
4.973
3.00
1.129
7.50
5.611
8.00
6.282
8.50
6.985
5.64
3.407
Head loss
4.80
y (m)
X
0.00
0.50
1.00
1.50
2.00
0.00
-0.04
-0.12
-0.24
-0.40 -0.59
2.50
3.00
3.50
-0.82 -1.07
4.00
4.50
-1.35
-1.66
0.00
-1.00
-2.00
NA
-3.00
d
-4.00
8.15
[ hd
Hd
1.7 x
+
d]
8.20
-5.00
-6.00
Cum./sec.m
/
Q
q
V
=
=
=
V.A
V.d
q/d
V.
b.d
Row 102
8.154
8.0905
2.50
0.00
3.00
2.00
1.00
0.00
-6.00 -4.00 -2.00
0.00
-1.00
-2.00
-3.00
-4.00
-5.00
-6.00
-7.00
2.00
4.00
6.
5.04
m/s
2.50
5.00
2.39
0.0026
1.00
389.30
m
=
distance.
9.59
=
351.20
1 in 389
343.10
0.10
343.00
0.018
8.09
d2
Perimeter
.d
6
121.28
116.94
113.22
110.01
107.19
104.72
102.52
100.57
99.69
98.85
7
115.64
115.56
115.50
115.44
115.39
115.35
115.31
115.27
115.26
115.24
P= 113.50 +2d
Slope
Area
5.000
30.00
Sf
N2 V2
R4/3
L
R4/3
Slope
Sf
8
1.05
1.01
0.98
0.95
0.93
0.91
0.89
0.87
0.86
0.86
9
1.07
1.02
0.97
0.94
0.91
0.88
0.86
0.83
0.82
0.81
10
0.0423
0.0477
0.0531
0.0584
0.0636
0.0687
0.0737
0.0786
0.0809
0.0164
Av. Slope
S fm
11
0.0450
0.0504
0.0557
0.0610
0.0662
0.0712
0.0761
0.0797
0.0451
hf
12
0.18
0.20
0.22
0.24
0.26
0.28
0.30
0.16
0.09
.S 0
Drop in bed
level
13
0.00
0.667
1.333
2.000
2.667
3.333
4.000
4.667
5.000
5.333
1/ 200
slope and
x2
k [4.(d + hv ) cos2 ]
1/ 6
slope
1.00
=
=
dy /dx
1
200.0
1.07
7.09
x
24.46
6.0
1
6
3.95
0.3394
1/ 6
k
cos
slope and
1.50
1/ 6
d
h
0.9864
dy /dx
1
6.0
=
=
dy /dx
0.00
NA
0.00
NA
1/ 6
slope and
9.00
0.871
-1 )
m
eam water level m
slope
1.00
8.13
x2
k [4.(d + hv ) cos2 ]
say
=
=
x
26.64
1/ 6.0
1/ 6
slope
14.47
m/s
5.68
m
m
V
y2
F1
4.95
y2
this condition as well.
F1
4.95
-1 )
m
eam water level m
Say
y2
338.00
m
0.90
0.90
0.40
1.40
1.10
0.53
m
m
m
m
m
m
4.95
y2
5.68
14.47
y1
0.87
Top length
Spacing
between block and wall.
Top length
Spacing
between block and wall.
=
=
0.90
0.90
m
m
=
=
0.03
1.10
m
m
1:1
4.50
1.10
0.90
m
m
Top length
Spacing
=
=
2:1
0.0378
of flow in m/s
v.d1/3
0.52
d2)
=
=
14.34
0.88
m
0.10
0.90
from
m
m
wnstream cutoff
fC1
0.00
0.00
338.00
0.00
344.54
0.00
344.54
m.
m thick graded
m
m thick graded
C.C. blocks
m.
10.00
5.00
Head loss
ON]
X 1.747 = 1.905 (Hd) 0.747 .y
5.00
6.00
7.00
7.50
-1.99
-2.74
-3.59
8.50
8.65
Row 102
0.0000
-0.0500
-0.1000
-0.1500
Column AK
-0.2000
-0.2500
-0.3000
2.00
4.00
6.00
8.00 10.00
-0.3500
0.0000
-0.148
-0.444
-0.74
-0.888
1.0355
1.1094
1.1834
1.2943
1.4053
1.4423
0.0000
-0.0030
-0.0259
-0.0747
-0.1087
-0.1501
-0.1738
-0.1997
-0.2426
-0.2921
-0.3106
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Actual
T.E.L.
Bottom
Elev.
14
343.00
342.33
341.66
341.00
340.33
339.66
339.00
338.33
338.00
337.66
as cal.
at
the end
15
351.151
350.982
350.791
350.578
350.345
350.090
349.815
349.520
349.363
349.201
Actual
T.E.L.
16
351.197
350.971
350.780
350.568
350.334
350.080
349.805
349.511
349.361
349.725
T.E.L
T.E.L.
17
-0.01
-0.01
-0.01
-0.01
-0.01
0.99
-0.01
0.00
0.52
Froude
No. F r
18
3.64
3.85
4.04
4.22
4.38
4.54
4.69
4.82
4.89
4.95
Hd) 0.747 .y
ABILITY RANGE
.y
Column AK
VALUES OF P/ H d
CO
P/ H d
1.700
1.800
1.850
1.900
2.000
2.100
2.150
2.160
2.170
2.174
2.175
0.000
0.050
0.100
0.150
0.250
0.500
1.100
1.500
2.000
2.500
3.000
2.2
VALUESOF Co
2.1
P/ H d
0.104
C O (= Y )
1.86
2
1.9
1.8
1.7
0.000
0.500
1.000
1.500
2.000
VALUES OF P/Hd
2.500
3.000
VALUES OF P/ H d
1.0295
1.0265
1.0225
0.150
0.200
0.300
1.0400
f(x) = 0.0418482987x^6 - 0.2425076311x^5 + 0.5614282844x^4 - 0.6749867556x^3 + 0.48
R = 0.9999302565
1.0300
f(x) = 0.0275746237x^6 - 0.1530150522x^5 + 0.3369474011x^4 - 0.3786125036x^3 + 0.24
R = 0.9997802361
C inclined / C vertical
0.150
0.200
0.300
0.400
0.500
0.600
0.700
0.800
0.900
1.000
1.100
1.200
1.300
1.400
1.500
FOR SLOPES 2(H) : 3(V)
C i / Cv
P / Hd
OF COEFFICIENTS
1.0100
1.0090
1.0070
1.0060
1.0050
1.0042
1.0036
1.0031
1.0027
1.0023
1.0019
1.0016
1.0013
1.0010
1.0008
1.0200
1.0100
f(x) = - 0.0044926163x^5 + 0.0245002492x^4 - 0.0531975977x^3 + 0.0593653203x^2
R = 0.9995379622
1.0000
0.9900
1.0185
1.0160
1.0135
1.0110
1.0090
1.0075
1.0060
1.0050
1.0040
1.0032
1.0026
1.0020
0.400
0.500
0.600
0.700
0.800
0.900
1.000
1.100
1.200
1.300
1.400
1.500
FOR SLOPES 3(H) : 3(V)
C i / Cv
P / Hd
1.0400
0.150
1.0340
0.200
1.0250
1.0180
0.300
0.400
1.0130
1.0085
0.500
0.600
1.0045
1.0020
0.9995
0.9978
0.9964
0.9958
0.9952
0.9948
0.9945
0.700
0.800
0.900
1.000
1.100
1.200
1.300
1.400
1.500
RATIO OF COEFFICIENTS
C inclined / C
R = 0.9997802361
1.0200
1.0100
f(x) = - 0.0044926163x^5 + 0.0245002492x^4 - 0.0531975977x^3 + 0.0593653203x^2
R = 0.9995379622
1.0000
0.9900
0.9800
0.000
0.500
VALUES
OF P / Hd
1.000
P / Hd
C i / C v FOR SLOPE 1(H):3(V)
Ci
C i / C v FOR SLOPE 2(H):3(V)
Ci
C i / C v FOR SLOPE 3(H):3(V)
Ci
C / CO
0.800
0.840
0.900
0.940
0.980
1.000
1.020
1.040
1.050
1.060
1.070
H / Hd
0.050
0.150
0.400
0.600
0.850
1.000
1.150
1.300
1.400
1.500
1.600
RATIO OF COEFFICIENTS C / Co
VALUES OF COEF
1.100
1.050
1.000
0.950
0.900
0.850
0.800
0.000
0.200
0.400
0.600
0.800
1.000
1.
RATIO OF
0.850
0.800
0.000
0.200
0.400
0.600
0.800
1.000
1.
H / Hd
1.300
C / CO
=
=
1.040
1.934
VALUES OF COEF
Cs / C
Y-AXIS
X-AXIS
h d / Hd
Cs / C
Cs
=
=
=
0.000
0.050
0.100
0.150
0.200
0.250
0.300
0.350
0.400
0.450
0.500
0.550
0.600
0.650
0.700
0.750
0.800
1.000
0.600
0.979
1.894
VALUES OF ( h d + 1) / H d
( h d + 1 ) / Hd
X-AXIS
1.000
1.100
1.200
1.300
0.000
0.430
0.650
0.780
0.850
0.900
0.920
0.940
0.950
0.960
0.970
0.980
0.985
0.990
0.996
0.997
1.000
0.400
0.200
0.000
0.000 0.100 0.200 0.300 0.400 0.500 0.600 0.700 0.800 0.900
DEGREE OF SUBMERGENCE
hd / Hd
1.000
f (x) = - 4.739962993x^5 + 32.4580197079x^4 - 87.8268962349x^3 + 116.7962402198x^2 - 75.62362859
R = 0.9999556241
R A T IO O F M O D IF IED C O EF F IC IEN T S T O F R EE
0.964
0.982
0.992
0.996
1.400
1.500
1.600
1.650
1.000
f (x) = - 4.739962993x^5 + 32.4580197079x^4 - 87.8268962349x^3 + 116.7962402198x^2 - 75.62362859
R = 0.9999556241
( h d + 1 ) / Hd
=
=
=
Cs / C
Cs
1.650
1.004
1.902
0.900
0.800
0.700
1.000
1.100
1.200
1.300
1.400
POSITION OF DOWNSTREAM APRON
Kp & Ka
Coefficients :--Kp
1
2
3
Ka
Ogee Profile :
Values of ha / Hd
0.080
0.120
-0.490
-0.480
-0.475
-0.460
-0.425
-0.371
-0.300
-0.200
0.01
0.00
1
0.02
Applicable P / Hd Range
x / Hd
-1.0
-0.8
-0.6
-0.4
-0.2
0.0
0.2
0.4
1.500
1.600
( hd + d)/ Hd
-1.210
-1.185
-1.151
-1.110
-1.060
-1.000
-0.912
-0.821
0.570
0.300
( Upper nappe )
Central Line of Span
P / Hd
0.500
1.000
1.330
x / Hd
y / Hd
-1.0
-0.482
-0.941
-1.230
-0.8
-0.480
-0.932
-1.215
-0.6
-0.472
-0.913
-1.194
-0.4
-0.457
-0.890
-1.165
-0.2
-0.431
-0.855
-1.122
0.0
-0.384
-0.805
-1.071
0.2
-0.313
-0.735
-1.015
0.4
-0.220
-0.647
-0.944
1.700
1.800
0.6
0.8
1.0
1.2
1.4
1.6
1.8
-0.075
0.075
0.258
0.470
0.705
0.973
1.269
-0.465
-0.320
-0.145
-0.055
0.294
0.563
0.857
-0.700
-0.569
-0.411
-0.220
0.002
0.243
0.531
0.6
0.8
1.0
1.2
1.4
1.6
1.8
-0.088
0.075
0.257
0.462
0.705
0.977
1.278
-0.539
-0.389
-0.202
0.015
0.266
0.521
0.860
-0.847
-0.725
-0.564
-0.356
-0.102
0.172
0.465
1.60
2.000
3.000
4.000
4.500
L b / D 2 R ATIO
BASIN I
5.00
4.50
4.00
3.50
Lb
F1
/D2
=
=
4.949
5.16
3.00
2.50
2.00
1.50
1.00
0.50
0.00
1.00
Basin II
4.50
5.00
6.000
7.000
8.000
9.000
10.000
11.000
11.500
Lb
F1
/D2
2.00
2.50
FROUDE
NUMBER
(3.00
F 1)
3.50
4.00
4.50
5.00
Ref: IS:4997-1968,PAGE-17 FIG.9A Hydraulic jump type stilling basin with horizontal apron :
Lb
D2
2.70
2.88
3.200
3.450
3.680
3.800
3.870
3.920
3.950
=
=
=
=
Chart Title
5.00
4.00
L b / D2
F1
1.50
3.00
2.00
1.00
0.00
4.00
4.95
2.863
2.865
2.864
6.00
8.00
FROUDE NUMBE
Column C
Polynomial (Column C)
4.50
4.00
3.50
3.00
2.50
2.00
Column C
Polynomial (Column C)
4.50
4.00
3.50
3.00
2.50
2.00
1.50
1.00
0.50
0.00
4.00
hb
F1
/D1
=
=
BASIN BLOCK
basin block initial curve
12.00
4.00
h b / D1
4.95
1.559
10.00
3.00
1.40
2.050
2.670
3.600
8.00
3.50
4.00
8.000
12.000
18.000
6.00
2.50
2.00
1.50
1.00
0.50
0.00
0.00
FROUFE NO. F1
10.00
20.00
OF DEPTH OF APPROACH
1.500
2.000
UES OF P/Hd
2.500
3.000
0.500
VALUES
OF P / Hd
1.000
0.104
=
=
NA
NA
=
=
NA
NA
=
=
1.046
1.946
1.500
0.200
0.400
0.600
0.800
1.000
1.200
1.400
1.600
1.800
0.200
0.400
0.600
0.800
1.000
1.200
1.400
1.600
UBMERGENCE :
CE
hd / Hd
1.800
1.300
1.400
TREAM APRON
1.500
1.600
( hd + d)/ Hd
1.700
1.800
Ka
0.20
0.10
0.00
Along Piers
P / Hd
0.500
x / Hd
-1.0
-0.8
-0.6
-0.4
-0.2
0.0
0.2
0.4
-0.495
-0.492
-0.490
-0.482
-0.440
-0.383
-0.265
-0.185
1.000
y / Hd
-0.950
-0.940
-0.929
-0.930
-0.925
-0.779
-0.651
-0.545
1.330
-1.235
-1.221
-1.209
-1.218
-1.244
-1.103
-0.950
-0.821
0.6
0.8
1.0
1.2
1.4
1.6
1.8
-0.076
-0.060
-0.240
0.445
0.675
0.925
1.177
-0.425
-0.285
-0.121
0.067
0.286
0.521
0.729
-0.689
-0.549
-0.389
-0.215
-0.011
-0.208
0.438
BASIN I
BASIN I
4.00
4.50
5.00
6.00
8.00
omial (Column C)
6186829054x + 0.4816800527
10.00
12.00
omial (Column C)
6186829054x + 0.4816800527
10.00
12.00
S FOR BASIN II
(BASIN BLOCK)
omial (basin block initial curve)
4299x + 0.783364486
5523
0.9856928314x - 0.7678414097
00
FROUFE NO. F1
20.00
-0.22
-0.21
-0.2
-0.19
-0.18
-0.17
-0.16
-0.15
-0.14
-0.13
-0.12
-0.11
-0.1
-0.09
-0.08
-0.07
-0.06
-0.05
-0.04
-0.03
-0.02
-0.01
0
0.01
0.02
0.03
0.04
0.05
0.06
0.07
0.08
0.09
0.1
0.11
0.12
0.13
0.14
0.15
0.16
0.17
0.18
0.19
0.2
1.06
1.05
1.04
1.03
1.02
1.01
1
0.99
0.98
0.97
-0.22
-0.21
-0.2
-0.19
-0.18
-0.17
-0.16
-0.15
-0.14
-0.13
-0.12
-0.11
-0.1
-0.09
-0.08
-0.07
-0.06
-0.05
-0.04
-0.03
-0.02
-0.01
0
0.01
0.02
0.03
0.04
0.05
0.06
0.07
0.08
0.09
0.1
0.11
0.12
0.13
0.14
0.15
0.16
0.17
1.0484
1.0441
1.04
1.0361
1.0324
1.0289
1.0256
1.0225
1.0196
1.0169
1.0144
1.0121
1.01
1.0081
1.0064
1.0049
1.0036
1.0025
1.0016
1.0009
1.0004
1.0001
1
1.0001
1.0004
1.0009
1.0016
1.0025
1.0036
1.0049
1.0064
1.0081
1.01
1.0121
1.0144
1.0169
1.0196
1.0225
1.0256
1.0289
1.0324
1.0361
1.04
0
0.01
0.02
0.03
0.04
0.05
0.06
0.07
0.08
0.09
0.1
0.11
0.12
0.13
0.14
0.15
0.16
0.17
0.18
0.19
0.2
Column B
d^3-8.154*d^2+8.0905
-10.64
-7.89
-5.38
-3.11
-1.06
0.76
2.36
3.75
4.94
5.93
6.72
7.33
7.76
8.01
8.09
8.01
7.77
7.38
6.85
6.18
5.37
4.44
3.38
2.21
y=
0.94
-0.44
-1.92
-3.49
-5.15
-6.88
-8.69
-10.56
-12.50
-14.49
-16.53
-18.61
-20.73
-22.88
-25.05
-27.25
-29.45
-31.67
-33.88
-1.4
-1.3
-1.2
-1.1
-1
-0.9
-0.8
-0.7
-0.6
-0.5
-0.4
-0.3
-0.2
-0.1
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
-36.10
-38.30
-40.48
-42.64
-44.77
-46.87
-48.92
-50.93
-52.88
-54.78
-56.61
-58.37
-60.06
-61.66
-63.17
-64.59
-65.90
-67.11
-68.21
-69.19
-70.04
-70.76
-71.34
-71.79
-72.08
-72.22
-72.19
-72.00
-71.64
-71.10
-70.37
-69.45
-68.34
-67.02
-65.49
-63.75
-61.79
-59.60
-57.18
-54.52
-51.61
-48.46
-45.04
-41.36
-37.42
-33.20
-28.70
-23.91
-18.83
-13.45
-7.76
2.9
3
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
4
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
5
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8
5.9
6
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
7
7.1
7.2
7.3
7.4
7.5
7.6
7.7
7.8
7.9
50.00
40.00
30.00
20.00
10.00
0.00
-10.00
-20.00
-30.00
-40.00
-50.00
-60.00
-70.00
-80.00
-1.77
4.55
11.18
18.15
25.45
33.09
41.08
8
8.1
8.2
8.3
8.4
8.5
8.6
Column D
8.65
-5.05
-5.21
8.65
6.00
8.50
8.50
8.00
8.00
7.50
7.50
6.50 7.00
7.00
6.00
6.50
5.5
5.50
5.00
5.00
4.50
4.50
4.00
4.00
0.00
-0.50
-1.00
-1.50
-2.00
-2.50
-3.00
-3.50
-4.00
-4.50
-5.00
-5.50
-6.00
-6.50
-7.00
-7.50
-8.00
-8.50
-9.00
-9.50
-10.00
-10.50
-11.00
-11.50
-12.00
3.50
3.50
3.00
3.00
2.50
2.50
2.00
2.00
1.50
0.00
1.00
1.50
0.00 -0.04 -0.12 -0.24 -0.40 -0.59 -0.82 -1.07 -1.35 -1.66 -1.99
1.00
0.00 0.50
0.50
-7.50
-8.00
-8.50
-9.00
-9.50
-10.00
-10.50
-11.00
-11.50
-12.00
30.65 32.65 34.65 36.65 38.65 40.65 42.65 44.65 46.65 48.65 50.65 52.65 54.65 56.65 58.65 60.65 62.65 64.65 66.65 68.65 70.65 72.65
-5.31
-5.56
76.65
74.65
72.65
70.65
68.65
66.65
64.65
62.65
60.65
58.65
56.65
54.65
52.65
50.65
48.65
46.65
-7.81 -8.06 -8.31 -8.56 -8.81 -9.06 -9.31 -9.31 -9.31 -9.31 -9.31 -9.31 -9.31
44.65
42.65
40.65
38.65
36.65
34.65
32.65
30.65
-5.81
28.65
8.65
28.65
Row 5
96.65
94.65
-9.31
92.65
90.65
88.65
86.65
84.65
82.65
80.65
78.65
76.65
74.65
72.65
70.65
68.65
74.65 76.65 78.65 80.65 82.65 84.65 86.65 88.65 90.65 92.65 94.65 96.65