DESCRIPTION OF ENHANCEMENT
23. Various MIS reports are provided under Reports Profile of all
DSC Holders of the Units. However,
i) Works awarded to MSME alongwith SC-ST categorisation shall
be available on portal.
ii) A field may be created for award of work where MSME or
other feature can be selected to reflect in the report.
In progress. Date to be
intimated.
In progress. Date to be
intimated.
pg. 1
As on 10.10.2014
SN
DESCRIPTION OF ENHANCEMENT
In progress. Date to be
intimated.
In progress. Date to be
intimated.
ITI to coordinate with all Nodal Officers of Units to get the Unit
specific prefix for unique auto tender number.
78. Providing prefix to a unique tender numbering (Department
& Unit wise).
8
10
11
13
104. Many times, the System prompt to change file name of BOQ while
uploading. Further, while renaming file, it is not getting renamed showing
the message "File is open in java platform". While uploading after
delinking file and on renaming, it is getting protected.
File should not be get protected till it is finally uploaded.
117. For all type of tenders, Optional fields for i) Date of Pre-bid
meeting to be introduced in Tender Notification page including
ii) Time & iii) Venue.
"Pre-bid Meeting" to be
replaced by "Pre-bid
Clarification".
Report to have only 4
columns as indicated.
For queries by agencies for online upload, there should not be fixed
period of 48 hours and period left to TIO to decide. System to compile
and generate report of all queries received for further action by TIO.
Implemented.
pg. 2
As on 10.10.2014
SN
DESCRIPTION OF ENHANCEMENT
14
Respective template to be
sent.
16
17
127. Strengthening of DAE Help Desk is very much needed. Many ITI to do the needful.
a time Helpdesk response is very poor and many important
issues are even ignored without response.
18
19
20
21
22
23
145. One senior Engineer from ITI should be deputed for DAE to
co-ordinate implementation of enhancements and for taking
Inputs / providing Outputs / Co-ordination among various Units
/ Sites / Department / ITI Helpdesk / Mr. Prabhudev / Mr.
Rajesh Kumar etc. visiting various sites as required for promptly
attending the bottlenecks faced in the Department.
24
25
26
27
pg. 3
As on 10.10.2014
SN
DESCRIPTION OF ENHANCEMENT
28
29
30
31
33
34
35
36
37
38
39
40
41
42
It is assured by DAE
Helpdesk that the request
will be complied with by
November.
pg. 4
As on 10.10.2014
SN
1
DESCRIPTION OF ENHANCEMENT
Status is Paid and money credited back to NPCIL account:ICICI is currently providing the status as paid to tender wizard
once it is sent to RBI for Payment, if the IFSC code entered by
bidder is wrong; ICICI will reject the transaction And provide
status as cancelled to tenderwizard portal. There are some cases
due to wrong account number, Beneficiary details destination
bank may reject the transcatios.In this cases Money will be
credited back to NPCIL account, for these transaction again file
will be posted Back by ICICI through H2H with in 7 banking days
to tenderwizard portal, that this transaction has been cancelled.
And tenderwizard shall provide the mechanism to refund these
transactions to NPCIL officials, ICICI will make ready 19-06-2014,
ITI will come back with the timeline.
Response of ITI
awaited
Response of ITI
awaited
ICICI not received file for refund request file posted from
Tenderwizard.
ICICI has confirmed that there were some technical issue for four
entries and it has been resolved, ICICI confirmed that system
does not require any change.
ITI RESPONSE
Response of ITI
awaited
Response of ITI
awaited
Done
Done
Done
Done
Done
***
pg. 5
As on 10.10.2014
DESCRIPTION OF ENHANCEMENT
RESPONSE
agencies Implemented
10. Agency to get only one consolidated mail per day with Implemented
NITs of all Units for new tenders only in place of many mails
for all NITs published on DAE Portal of TW.
13. Deputing of Help Desk Executives for BARC and at every Complied with.
Unit of the Department (DCSEM, BARC, Heavy Water Plants,
NPCIL, DPS, IGCAR, NFC, AMD, TMC, HRI etc.).
14. Following Class of Trades need to be further added as Implemented
required by various Sections/Units of the Department (& also
as per CVC Circular No.15/07/2012).
a) Turnkey works contracts; b) Stores and Purchase;
c) Supply of Medicines;
d) Medical Equipment
e) Sales of Goods/Scrap/Land; f) Consultancy Contracts;
g) Public Private Partnership;
h) Service Contracts including Electronics i) Instrumentation;
j) Telecommunication;
k) Manpower Supply
15. Charging Tender Processing Fee while Inviting Tenders as Implemented
Prequalification cum Limited tenders :
Dropped by DAE
10
11
12
13
29. As per the recent rules, the limited tender has to be visible Implemented.
to all but rights to quote shall be limited.
14
Implemented
pg. 6
As on 10.10.2014
SN
DESCRIPTION OF ENHANCEMENT
15
33. EMD in NPCIL GCC is called bid security. Hence on web Implemented
site the icon shall be EMD / BID SECURITY to avoid any
confusion.
16
17
37. The information of tender shall be sent to all the tenderers Implemented
who are registered for DAE rather than limiting to unit wise.
18
38. The programme shall have facility wherein GCC once Implemented
uploaded in the portal need not be loaded with each tender.
19
Dropped.
20
Implemented
21
42. The portal shall have facility to export bill of quantity and Already available. Format of billing
CST in excel file to another software for billing.
software to be used for BOQ used in
e- Tendering.
22
23
24
25
26
48. In the portal while filling data one item reads cost. This is Implemented..
not clear. Please make it as date and time of technical bid
opening. Cost to be renamed as Financial.
27
28
57. The EMD shall be refunded manually in two stages : a) Implemented. For Whole DAE. For
Technically disqualified bidder, b) Others except L-1
NPCIL Refund by return path of
EPG.
29
30
Implemented.
31
68. In NIT Creation page, "Announce Date" should be replaced Creation date is for creating NIT.
by "Creation Date".
Announcement Date is Authorisation
date. Hence no change required.
32
69. List of work awarded in the month should be freely Award status of each tender is
available in the website.
available in the free view.
33
34
35
36
76. Standard documents to be provided to official as a link Std Docs may be uploaded on home
which may be attached from document library of Unit.
page, hence not to be attached with
each and every tender. However the
same can be stored in Library also
through Helpdesk.
37
RESPONSE
pg. 7
Implemented
As on 10.10.2014
SN
DESCRIPTION OF ENHANCEMENT
RESPONSE
38
Implemented
39
85. In EMD / bid security refund: show 1.Qualification Implemented. For NPCIL only for
status of bidders; 2. Refund will be initiated by engineer EPG.
and concurred by Accounts.
40
89. Create column for ESIC number in drop down. (For whole Implemented
DAE. However, it should not be mandatory.)
41
42
91. Negotiation date and Financial opening date shall be made Implemented
01.01.9999 by default.
43
enter e mail
send link
verify link
Implemented
44
45
46
125. In view of Problems being faced by DPS Units, Director Complied by ITI. Mr. Nikhil joined
DPS specifically requested to depute two senior support ITI on 12.11.13 & Mr. Dhanraj on
Executives specifically for DPS at VS Bhavan.
14.11.13.
47
48
Implemented
REVISED VERSION:
With a particular PAN Card The agency should be able to
purchase a particular tender only once and should not be
allowed to purchase the same tender with the same PAN Card,
who has registered with the same company in different location
/ address.
49
31. For NPCIL Tender Processing Fee shall be on-line only. Implemented
No DD can be submitted.
50
51
43. While registering the bidder has to fill the following Implemented.
information
- ESIC, Service tax, EPF registration nos. These field shall be
non mandatory. These information and others viz., name of
company, email, fax etc., shall be asked only during registration
and not subsequently to avoid mismatch and for simplification
of operation.
52
24. Providing an icon for list of black listed agencies- on DAE Implemented.
Portal Home page.
(Agencies are registered for DAE Portal and are allowed to
tender for all Units of DAE. Hence blacklisting of any agency,
if required, shall be done through Nodal agency (DCSEM).
Proposal to be submitted to DCSEM to instruct ITI to include
any agency under blacklisting).
65. Black listing, user id not to be shown. Name and number of
work order, Details of debarring, name of site for which black
listing done shall be shown in summary page.
pg. 8
As on 10.10.2014
SN
DESCRIPTION OF ENHANCEMENT
53
36. The Tender Fee and EMD / Bid Security is required to be Implemented.
forwarded to the F&A group. A report of TPF and bid security each
tender wise may be generated mentioning i) Tender no., ii) Name of
contractor, iii) Address, iv) Contact no. and v) Details of the instrument
viz . Amount, bank, no., date etc. This report will make it easy for the
Engineer to forward instruments to F&A group expeditiously.
54
55
139. Tender wise EMD report is being generated. Site wise Implemented. Features available
consolidated EMD report also to be generated, which can be on under MIS Reports.
weekly basis.
56
75. Importing of rates of vendor to display in one place with Implemented. DAE Helpdesk to send
negotiated rates.
new template for necessary circulation
among all Nodal Officers of DAE Units.
ts.
57
58
99. Provision for display of Scheduled and Actual date & time Implemented. DAE Helpdesk to send
of opening of Technical Bid to be made.
new template for necessary circulation
among all Nodal Officers of DAE Units.
59
100. Documents submitted by bidders when downloaded in zip Facility available in respective
form doesnt depict total file size in KB/MB/GB of documents browsers.
to be downloaded. Same to be displayed only what
what amount is
being currently downloading is displayed.
60
61
105. The Bid clarification icon should be available till the date Implemented. Bid clarification From
as filled by TIO, which is presently available by default upto & To Dates are available while
two days before submission date. This facility to be enhanced creating the tenders.
for all type of tenders.
62
109. Tender Type: In Free View Tender Type drop down list Done.
NOMINATION type should appear. Open & Limited Options
available in dropdown. Pl. Also add Nomination
63
64
126. Slow performance of Site, Login problem, Session expiry Problem is resolved. Now no
problem Delay in uploading
uploading documents, some time in hours, complaints on these issues are raised.
Stuck-up
up due to JAVA update etc. to be looked into seriously.
Portal to be maintained USER Friendly.
65
66
Done.
67
68
69
Received.
70
EMD Exemption
71
72
Implemented.
To be stopped for NPCIL.
RESPONSE
pg. 9
DONE:While
While creating tender, under
Class of Trade, facility of uploading
details of Manual Tender is available
(DAE Manual Tender).
As on 10.10.20
10.2014
DESCRIPTION OF ENHANCEMENT
RESPONSE
89
90
11.
Tender
Notification
and DPS to communicate
Templates for Procurement are required
Notification
different from works. To be modified Templates.
as required by DPS Units.
91
92
93
94
To be included in proposed
presentation. Sample letter
generated to be sent by DAE
to Helpdesk.
1) Bid Security
2) Registration of company defining
constitution, legal status, place of
registration.
3) PAN card
96
97
98
120. Mandatory documents list to be Mr. Rudresh to confirm Done. Same as Point No.94
confirmed in the Library of the User. through DAE Helpdesk.
99
136. Auto upload of documents To be looked into by ITI. As (Only for DPS). TIO to select
based on slab of estimated cost for per feedback from DPS.
documents from Library as per
DPS procurements. DPS to provide
Estimate cost slab.
documents with slab level.
100
141. All terminology of wordings to DCSEM Helpdesk to list out While creating tender PQ
be checked and customized.
and inform DAE Helpdesk for Tender template to be added in
NA.
dropdown menu.
Implemented.
pg. 10
As on 10.10.2014