Present/
Deadline
Procurement
Approval Authority
Responsibility
Purchase order
issue
As Per Schedule /
Deadline
If Change /
Deadline
Responsibility
Sub-station
Done
AGM,EME
M.D Sir /
Design Comitte
18.11.14
E.D (P)
SDB (Apartment)
Done
AGM,EME
M.D Sir /
Design Comitte
done
E.D (P)
Cable Puling
Not Done
AGM,EME
M.D Sir /
Design Comitte
Lift
Done
AGM,EME
M.D Sir /
Design Comitte
Generator
Not Done
AGM,EME
M.D Sir /
Design Comitte
E.D (P)
Not Done
AGM,EME
M.D Sir /
Design Comitte
E.D (P)
Not Done
AGM,EME
M.D Sir /
Design Comitte
E.D (P)
Done
AGM,EME
M.D Sir /
Design Comitte
Not Done
AGM,EME
M.D Sir /
Design Comitte
E.D (P)
Very urgent
Very urgent
E.D (P)
E.D (P)
E.D (P)
M.D Sir /
Design Comitte
10
Not Done
AGM,EME
11
PA System
Not Done
AGM,EME
12
CCTV System
Not Done
AGM,EME
13
Ventilation System
Not Done
AGM,EME
M.D Sir /
Design Comitte
E.D (P)
14
Not Done
AGM,EME
M.D Sir /
Design Comitte
E.D (P)
15
AGM,EME
M.D Sir /
Design Comitte
E.D (P)
16
Not Done
AGM,EME
M.D Sir /
Design Comitte
E.D (P)
17
Not Done
AGM,EME
M.D Sir /
Design Comitte
E.D (P)
18
Not Done
M.D Sir /
Design Comitte
E.D (P)
19
Mock up Status
M.D Sir /
Design Comitte
E.D (P)
20
M.D Sir /
Design Comitte
E.D (P)
21
M.D Sir /
Design Comitte
E.D (P)
Not Done
M.D Sir /
Design Comitte
M.D Sir /
Design Comitte
Very urgent
E.D (P)
E.D (P)
E.D (P)
ING
nmondi, DHAKA
Date :
Installation &
commissioning / Construction
status
Present/
Responsibility
Deadline
02.11.14
Comments
Bottleneck of progress
30.05.15
PM
31.12.14
PM
Requsition raised on
17.08.14.SDB size will be
required as approved
15.04.15
PM
Yet to finalize
Requsition raised on
24.03.14.Sample is being
collected by PD as per approved
code for final approval.
Decision is required for either
uPVC or cPVC for cold and hot
water.
Wiring is on going
Design is on process.
Need to be discussed if it is as
per consultant design or not
Need to be discussed if it is as
per consultant design or not
need to be finalized
Yet to decide
Yet to place requisition for
purchase
SHANTA ALISHAN
PLOT # , ROAD # 10A, DHANMONDI, DHAKA
Electrical Materials
AC Points
done
Substation
Present/
Deadline
Procurement
Approval Authority
Responsibility
On going
AGM
AGM
Done
AGM
Lift
Done
AGM
Generator
Not Done
AGM
Purchase order
issue
L / C Opening
As Per Schedule /
Deadline
If Change /
Deadline
Basement Ventilation
Not Done
AGM
Not Done
AGM
AN
MONDI, DHAKA
Date :
Installation & commissioning /
Construction status
Procurement
Responsibility
E.D (P)
Present/ Deadline
02.11.14
Comments
Bottleneck of
progress
Collumn Casting is
on going.
Shuttering is on
going .Roof casting
tentative date:
(15.11.14)
Responsibility
requistion was
placed.
E.D (P)
E.D (P)
DP Switch will be
given or not.In B type
Apt.Bed 2. AC
DP Switch will be
shown on the CAT given on SB position.
door position. Out
(Finalized)
door Position need to
be checked.
E.D (P)
Quotation
invited:14.09.2014
E.D (P)
E.D (P)
Calculation is being
done.
E.D (P)
Conceptual design
received from
consultant.
E.D (P)
Conceptual design
received from
consultant.
Present/
Deadline
Procurement
Approval Authority
Responsibility
Purchase order
issue
As Per Schedule /
Deadline
Sub-station
Done
30.09.14
AGM,EME
30.09.14
SDB
Not Done
30.09.14
AGM,EME
30.11.14
Cable Puling
Not Done
15.01.15
AGM,EME
30.12.14
Lift
Done
30.09.14
AGM,EME
15.11.14
Generator
Not Done
30.09.14
AGM,EME
15.11.14
Not Done
30.11.14
AGM,EME
30.12.14
Not Done
30.11.14
AGM,EME
30.12.14
Not Done
30.11.14
AGM,EME
Not Done
30.11.14
AGM,EME
10
Not Done
30.11.14
AGM,EME
11
PA System
Not Done
30.11.14
AGM,EME
30.12.14
15.01.15
01.01.15
30.12.14
If Change /
Deadline
12
CCTV System
Not Done
30.11.14
AGM,EME
13
Ventilation System
Not Done
20.12.14
AGM,EME
14
Not Done
30.11.14
AGM,EME
15
Done
30.11.14
AGM,EME
16
Not Done
15.03.15
AGM,EME
15.04.15
17
Not Done
20.01.15
AGM,EME
20.02.15
30.12.14
15.03.15
30.12.14
30.12.14
dho
ndi, DHAKA
Date :
Installation & commissioning /
Construction status
Procurement
20.11.14
Remarks
Bottleneck of progress
PM
17.03.15
PM
Requsition raised on
17.08.14.SDB size will be
required as approved
E.D (P)
15.04.15
PM
E.D (P)
15.05.15
PM
E.D (P)
30.04.15
PM
E.D (P)
15.04.15
PM
Yet to finalized
E.D (P)
15.04.15
PM
E.D (P)
15.04.15
PM
E.D (P)
15.04.15
PM
E.D (P)
30.03.15
PM
E.D (P)
15.04.15
PM
Responsibility
Present/ Deadline
Responsibility
E.D (P)
30.05.15
E.D (P)
Yet to finalized
E.D (P)
15.04.15
PM
Yet to finalized
E.D (P)
15.05.15
PM
E.D (P)
15.04.15
PM
Yet to finalized
E.D (P)
15.04.15
PM
E.D (P)
15.05.15
PM
E.D (P)
10.05.15
PM
Design on process
Design on process
yet to decision
Yet to Brand Selection
CWCH
Ashulia
Electrical Conduiting
Works
Need to
discuss
AC Points
Done
Substation
Present/
Deadline
Procurement
Approval Authority
Responsibility
Sr.DGM
AGM
Done
AGM
Lift
Done
AGM
Generator
Not Done
AGM
Basement Ventilation
Not Done
AGM
Need to
discuss
Sr.DGM
Hot Water
Need to
discuss
Sr.DGM
Oxigen/Nitrogen supply
system
Need to
discuss
Sr.DGM
Purchase order
issue
As Per Schedule /
Deadline
If Change /
Deadline
Date :
Installation & commissioning /
Construction status
Responsibility
Present/ Deadline
Responsibility
02.11.14
Bottleneck of
progress
E.D (P)
Ongoing
E.D (P)
Yet to be finalized
E.D (P)
Quotation
invited:01.10.2014
and waiting for
quotation.
E.D (P)
E.D (P)
Not decided
E.D (P)
Yet to be finalized
E.D (P)
Yet to be finalized
E.D (P)
Yet to be finalized
E.D (P)
Yet to be finalized
Items
Status
Procurement
LC
Deadline
Opening
Installation/Constru
ction
Rspnsblty Deadline Rspnsblty
Rspnsblty
Approval
Authority
Sr. DGM,
EME
MD Sir/Design
Committee
Not done
Not done
15/01/201
5
HSCM&
ED(P&C)
19/05/201
5
PM
Sr. DGM,
EME
MD Sir/Design
Committee
Not done
Not done
1/1/2015
HSCM &
ED(P&C)
4/4/2015
PM
Sr. DGM,
EME
MD Sir/Design
Committee
Not done
14/09/201
4
ED(P)
15/12/201
4
PM
20/9/2014
Sr. DGM,
EME
MD Sir/Design
Committee
Not done
14/01/201
5
ED(P)
15/3/2015
PM
15/9/2014
Sr. DGM,
EME
MD Sir/Design
Committee
MD Sir/Design
Committee
Deadline
Passenger
Lift
Done
Generator
***
Not done
Substation
Done
Distribution
Board ***
Cable
SwitchSocket *
Not done
10/1/2015
P & C Dept.
Air
Conditionin
g System
Not done
1/10/2014
P & C Dept.
Fire
Protection
System ***
Not done
15/10/2014 Consultant
25/9/2014
PO Issue
13/10/201
4
15/02/201
5
ED(P)
14/11/201
4
16/05/201
5
Not done
Not done
Not done
Not done
MD Sir/Design
Committee
Not done
Not done
4/2/2015
ED(P)
5/6/2015
PM
MD Sir/Design
Committee
Not done
Not done
17/01/201
5
ED(P)
19/4/2015
PM
ED(P)
PM
PM
Fire
Detection
Not done
System(Con
ventional)
15/10/2015
Sr. DGM,
EME
MD Sir/Design
Committee
Not done
Not done
17/01/201
5
ED(P)
26/4/2015
PM
10
Sanitary
Pumps
Not done
10/10/2014
Sr. DGM,
EME
MD Sir/Design
Committee
Not done
Not done
17/12/201
4
ED(P)
17/4/2015
PM
11
Gym
Equipment
***
Not done
7/1/2015
Sr. DGM,
EME
MD Sir/Design
Committee
Not done
Not done
19/3/2015
ED(P)
20/6/2015
PM
12
CCTV *
Not done
9/9/2014
P & C Dept.
MD Sir/Design
Committee
Not done
Not done
14/12/201
4
ED(P)
19/4/2015
PM
13
9/9/2014
Sr. DGM,
EME
MD Sir/Design
Committee
Not done
Not done
14/12/201
5
ED(P)
19/4/2016
PM
14
PABX &
Telephone *
10/9/2014
Sr. DGM,
EME
MD Sir/Design
Committee
Not done
Not done
8/3/2015
ED(P)
9/6/2015
PM
15
Internet
Connection/ Not done
Networking
30/10/2014
Sr. DGM,
EME
MD Sir/Design
Committee
Not done
Not done
5/4/2015
ED(P)
10/6/2015
PM
16
Gas Line
Design &
Installtion *
Not done
30/11/2014
Sr. DGM,
EME
MD Sir/Design
Committee
Not done
15/3/2015
ED(P)
17/6/2015
PM
17
Water Line
Connection
*
Not done
20/10/2014
Sr. DGM,
EME
MD Sir/Design
Committee
Not done
15/3/2014
ED(P)
5/6/2014
PM
18
Central
Geyser
System *
Not done
10/12/2014
Sr. DGM,
EME
MD Sir/Design
Committee
Not done
Not done
7/3/2015
ED(P)
10/6/2015
PM
19
Swimming
Pool
Done
Sr. DGM,
EME
MD Sir/Design
Committee
Not done
Not done
12/1/2015
ED(P)
14/5/2015
PM
20
Building
Ventilation
System *
Not done
Sr. DGM,
EME
MD Sir/Design
Committee
Not done
10/1/2015
ED(P)
15/4/2015
PM
Not done
10/11/2014
NB: **** Need urgent attention, *** Alarming item for completion, *
Item to pay special attention
Testing,
Commissioning
/Checking
Deadline Rspnsblty
Date: 25/8/2014
Bottleneck of
Progress
Remarks
20/6/2015
Work has
not been yet
started.
5/5/2015
Approx. time
from design
state
to
commissioni
ng is
08month
Material will
be arrived at
site on
08.05.15
22/5/2015
MPR has
been
submitted
20/6/2015
20/5/2015
Workdone
already
given to the
suppliers.
25/5/2015
Workdone
already
given to the
suppliers.
18/5/2015
MPR has
been
submitted
21/7/2015
MPR has
been
submitted
20/5/2015
20/5/2015
10/7/2015
8/7/2015
16/6/2015
18/7/2015
15/6/2015
Quotation
alrady
approved
20/6/2015
Items
Passenger
Lift
Generator
***
Status
Deadline
Done
Rspnsblty
Approval
Authority
Procurement
PO Issue
LC Opening
Sr. DGM,
EME
MD
Sir/Design
Committee
Done
Done
Sr. DGM,
EME
Land Owner
Not under
process
Not under
process
Deadline
Rspnsblty
HSCM&
ED(P&C)
15/07/2014
HSCM &
ED(P&C)
Substation
Distribution
Board ***
Cable
SwitchSocket *
Done
Sr. DGM,
EME
MD
Sir/Design
Committee
Done
15/4/2014
ED(P)
Sr. DGM,
EME
MD
Sir/Design
Committee
Not done
15/7/2014
ED(P)
Consultant
P & C Dept.
Air
Conditionin
g System
Done
Not done
15/06/2014
ED(P)
MD
Sir/Design
Committee
Not done
Not done
25/06/2014
ED(P)
P & C Dept.
MD
Sir/Design
Committee
Not done
Not done
15/07/2014
ED(P)
Consultant
MD
Sir/Design
Committee
done
Not done
6/9/2014
ED(P)
Fire
Detection
System(Con
ventional)
Sr. DGM,
EME
MD
Sir/Design
Committee
Not done
Not done
6/9/2014
ED(P)
Sr. DGM,
EME
MD
Sir/Design
Committee
Not done
Not done
15/10/2014
ED(P)
Done
Sr. DGM,
EME
MD
Sir/Design
Committee
Done
Done
P & C Dept.
MD
Sir/Design
Committee
Not done
Not done
1/7/2014
ED(P)
Not done
15/8/2014
10
Sanitary
Pumps
11
Gym
Equipment
***
12
CCTV *
13
PA System *
Not done
15/6/2014
Sr. DGM,
EME
MD
Sir/Design
Committee
Not done
Not done
30/8/2014
ED(P)
14
PABX &
Telephone *
30/7/2014
Sr. DGM,
EME
MD
Sir/Design
Committee
Not done
Not done
20/9/2014
ED(P)
15
Internet
Connection/
Networking
30/07/2014
Sr. DGM,
EME
MD
Sir/Design
Committee
Not done
16
Sr. DGM,
EME
MD
Sir/Design
Committee
17
Water Line
Connection
*
18
Central
Geyser
System *
19
Building
Ventilation
System *
Not done
10/9/2014
ED(P)
Not done
20/9/2014
ED(P)
20/09/2014
ED(P)
25/9/2014
ED(P)
Not done
10/9/2014
Sr. DGM,
EME
MD
Sir/Design
Committee
Not done
20/09/2014
Sr. DGM,
EME
MD
Sir/Design
Committee
Not done
Not done
Sr. DGM,
EME
MD
Sir/Design
Committee
Not done
Not done
NB: **** Need urgent attention, *** Alarming item for completion, * Item to pay
special attention
ED(P)
Installation/Constructi
on
Deadline
Rspnsblty
Ongoing
1/5/2015
PM
PM
Date: 03/6/2014
Testing,
Commissioning
Bottleneck Remarks
/Checking
of
Deadline
Rspnsblty
Progress
Installation
has alredy
completed
but
commission
ing is
delayed due
to power
line that will
come
substation
DB.
Installation
Done
10/12/2014
Decision
regarding
Genset
capacity is
not yet
finalised
(Documents
for L/O
approval
has been
sent to CS
dept.)
Approx.
time from
design state
to
commission
ing is
08month
9/1/2015
PM
15/9/2014
PM
Internal
wiring
Subject to
between ht
getting
switch Gear
power from
to LT and LT
utility
to PFI
authority
already
completed.
27/10/2014
PM
Cable is
being
delivered as
per
requirement
s
PM
25/01/2015
PM
PM
5/5/2015
15/04/2015
PM
Depending
on Genset
Capacity
22/12/2014
Quotation
collection &
CS done
PM
25/12/2014
2/12/2014
PM
1/5/2015
PM
15/12/2014
PM
20/11/2014
PM
15/12/2014
PM
Not in our
scope i.e in
agreement
PM
Quotation
has been
offered from
Vendor
15/04/2015
PM
22/12/2014
20/10/2014
5/5/2015
PM
5/12/2014
PM
PM
30/11/2014
PM
PM
PM
PM
5/12/2014
PM
PM
10/11/2014
PM
Heat souce
by electric
type burner
New design
required for
cost
minimizatio
n
Items
Status
Deadline
Rspnsblty
Approval
Authority
Procurement
Installation
/Construction
Deadline
PO Issue
LC Opening
Deadline
Rspnsblty
Done
14/05/2014
HSCM&
ED(P&C)
Done
Not under
30/04/2014
process
HSCM&
ED(P&C)
30/07/2014
Sr. DGM,
EME
MD
Sir/Design
Committee
Done
MD
Sir/Design
Committee
Not under
process
Sr. DGM,
EME
MD
Sir/Design
Committee
Done
15/07/2014
ED(P)
15/09/2014
Distribution
Sr. DGM,
Depends on genset sizeEME
Board ***
MD
Sir/Design
Committee
Not done
15/07/2014
ED(P)
15/08/2014
Cable
Sr. DGM,
EME
MD
Sir/Design
Committee
ED(P)
1/8/2015
Switch &
Socket *
Not done
MD
Sir/Design
Committee
Not done
30/06/2014
ED(P)
30/08/2014
Air
Conditionin
g System
Not done
MD
Sir/Design
Committee
Not done
30/07/2014
ED(P)
30/10/2014
Fire
Protection
***
Not done
25/08/2014
MD
Sir/Design
Committee
Not done
10/9/2014
ED(P)
25/11/2014
Passenger
Lift
Generator
***
Substation
Done
Done
Done
15/06/2014
Sr. DGM,
EME
Fire
Detection
Not done
25/08/2014
Sr. DGM,
EME
MD
Sir/Design
Committee
Not done
15/09/2014
ED(P)
25/11/2014
10
Sanitary
Pumps
Not done
25/08/2014
Sr. DGM,
EME
MD
Sir/Design
Committee
Not done
21/09/2014
ED(P)
25/11/2014
11
Gym
Equipment
****
Done
Sr. DGM,
EME
MD
Sir/Design
Committee
Done
12
CCTV *
Done
P &C Dept.
MD
Sir/Design
Committee
Not done
30/07/2014
ED(P)
30/09/2014
13
PA System *
Not done
15/07/2014
Sr. DGM,
EME
MD
Sir/Design
Committee
Not done
30/07/2014
ED(P)
30/10/2014
14
PABX &
Telephone
System *
Not done
15/08/2014
Sr. DGM,
EME
MD
Sir/Design
Committee
Not done
15/10/2014
ED(P)
15/11/2014
15
Internet
Connection/
Networking
Not done
30/07/2014
Sr. DGM,
EME
MD
Sir/Design
Committee
Not done
30/08/2014
ED(P)
30/10/2014
16
Gas Line
Design &
Installtion *
Done
Sr. DGM,
EME
MD
Sir/Design
Committee
Done
ED(P)
27/10/2014
17
Water Line
Connection
*
Not done
30/8/2014
Sr. DGM,
EME
MD
Sir/Design
Committee
Not done
25/09/2014
ED(P)
10/10/2014
18
Central
Geyser
System *
Not done
10/9/2014
Sr. DGM,
EME
MD
Sir/Design
Committee
Not done
30/10/2014
ED(P)
Done
20/11/2014
19
Building
Ventilation
System *
Not done
Sr. DGM,
EME
MD
Sir/Design
Committee
NB: **** Need urgent attention, *** Alarming item for completion, *
Item to pay special attention
Not done
ED(P)
rks
Installation
/Construction
Rspnsblty
PM
Testing,
Commissioning
/Checking
Deadline
Rspnsblty
Subject to
getting AVS
& AC of M/C
room
PM
Date: 19/05/2014
Bottleneck of
Progress
Remarks
Deceision pending
regarding Genset
capacity
PM
30/08/2014
PM
PM
30/09/2014
PM
PM
30/08/2014
PM
PM
15/08/2014
PM
PM
30/10/2014
PM
PM
30/11/2014
PM
PM
1/12/2014
PM
Material at site.
Subject to getting
Installation depending power supply from
on new HT pole set up. utility authority
Depends on genset
capacity
Depends on genset
size
PM
1/12/2014
PM
PM
2/12/2014
PM
Need to procure
PM
30/10/2014
PM
PM
30/11/2014
PM
PM
15/12/2014
PM
PM
30/11/2014
PM
Provision of Wi-Fi is
being kept
PM
30/11/2014
PM
PM
15/10/2014
PM
PM
30/11/2014
PM
Application, material
transfer order, demand
note done
PM
PM
Procurement
LC Opening
Passenger
Lift
Done
Sr. DGM,
EME
MD
Sir/Design
Committee
Done
Done
Generator
***
Done
EME
Consultant
MD
Sir/Design
Committee
Not done
Not done
Substation
Done
Sr. DGM,
EME
MD
Sir/Design
Committee
Done
Distribution
Board ***
Done
Sr. DGM,
EME
Design
Committee
Not done
Cable
Done
Sr. DGM,
EME
SwitchSocket *
Not done
Air
Conditionin
g System
Not done
Partially on going
Deadline
Installation/Constru
ction
Rspnsblty Deadline Rspnsblty
Testing,
Commission
/Checkin
Deadline
HSCM&
ED(P&C)
30/09/2014
PM
30/10/2014
15/07/2014
HSCM&
ED(P&C)
30/11/2014
PM
10/12/2014
25/9/2014
ED(P)
10/10/2014
PM
15/07/2014
ED(P)
15/09/2014
PM
15/06/2014
ED(P)
20/08/2014
PM
P &C Dept.
MD
Sir/Design
Committee
Not done
Not done
20/05/2014
ED(P)
25/08/2014
PM
Not done
P &C Dept.
MD
Sir/Design
Committee
Not done
Not done
15/07/2014
ED(P)
30/10/2014
PM
10/11/2014
Fire
Protection
System *
Done
Consultant
MD
Sir/Design
Committee
Not done
Not done
10/9/2014
ED(P)
15/12/2014
PM
22/12/2014
Fire
Detection
System
Done
Consultant
MD
Sir/Design
Committee
Not done
Not done
23/09/2014
ED(P)
15/12/2014
PM
25/12/2014
30/3/2014
MD
Sir/Design
Committee
Not done
Not done
MD
Sir/Design
Committee
Done
Done
P & C Dept.
MD
Sir/Design
Committee
Not done
Not done
1/7/2014
ED(P)
10/11/2014
15/6/2014
Sr. DGM,
EME
MD
Sir/Design
Committee
Not done
Not done
30/8/2014
ED(P)
20/11/2014
Not done
30/7/2014
Sr. DGM,
EME
MD
Sir/Design
Committee
Not done
Not done
20/9/2014
ED(P)
15/12/2014
PM
22/12/2014
Internet
Connection/
Networking
Not done
30/07/2014
Sr. DGM,
EME
MD
Sir/Design
Committee
Not done
Not done
10/9/2014
ED(P)
10/11/2014
PM
5/12/2014
16
Gas Line
Design &
Installtion *
Done
Sr. DGM,
EME
MD
Sir/Design
Committee
Done
7/10/2014
ED(P)
25/10/2014
PM
30/11/2014
17
Water Line
Connection
*
Not done
10/9/2014
Sr. DGM,
EME
MD
Sir/Design
Committee
Not done
30/09/2014
ED(P)
10/10/2014
PM
18
Central
Geyser
System *
Not done
20/9/2014
Sr. DGM,
EME
MD
Sir/Design
Committee
Not done
Not done
15/10/2014
ED(P)
10/11/2014
PM
5/12/2014
19
Building
Ventilation
System *
Not done
Sr. DGM,
EME
MD
Sir/Design
Committee
Not done
Not done
24/10/2014
ED(P)
15/12/2014
PM
15/1/2015
10
Sanitary
Pumps
11
Gym
Equipment
****
Done
12
CCTV *
Done
13
PA System *
Not done
14
PABX &
Telephone *
15
Not done
25/8/2014
Sr. DGM,
EME
20/9/2014
ED(P)
25/11/2014
ED(P)
PM
2/12/2014
PM
PM
15/12/2014
15/12/2014
NB: **** Need urgent attention, *** Alarming item for completion, * Item to pay
special attention
e Landing 104
Plan for EME Works
Testing,
Commissioning
/Checking
Rspnsblty
Bottleneck of
Progress
PM
PM
Approval required
regarding genset capacity
PM
PM
Date: 03/6/2014
Remarks
PM
PM
PM
PM
PM
PM
Need to procure
PM
PM
PM
PM
PM
PM
PM
Commissioning depends
on gas supply
PM