Sie sind auf Seite 1von 9

Project Information

Project

Job No
Company
Designer
Remarks

MEJORAMIENTO DEL SERVICIO EDUCATIVO EN


LA I.E. N 38131/MX-P DE LA LOCALIDAD DE
POMABAMBA DEL DISTRITO DE MARA PARADO
DE BELLIDO, PROVINCIA DE CANGALLO AYACUCHO
NgEs

Software
File Name

CSICOL (Version: 9.0 (Rev. 0))


E:\01 Consultoria\01 2014\03 IE Pomabamba\04
Ingenieria del Proyecto\01 Aulas\Modulo 04 Aulas \C1

Working Units
Design Code

Metric (m, Ton, Ton-m, kg/cm^2)


ACI-318-02

Column:Column1
Basic Design Parameters
Caption
Default Concrete Strength, Fc
Default Concrete Modulus, Ec
Maximum Concrete Strain

= Column1
= 210
= 210000
= 0.003

Rebar Set
Default Rebar Yeild Strength, Fy
Default Rebar Modulus, Es
Default Cover to Rebars
Maximum Steel Strain

= ASTM
= 4200
= 2000000
= 5.00
= Infinity

Transverse Rebar Type

= Ties

Total Shapes in Section


Consider Slenderness

=1
= No

kg/cm^2
kg/cm^2
in/in
kg/cm^2
kg/cm^2
cm

E:\01 Consultoria\01 2014\03 IE Pomabamba\04 Ingenieria del Proyecto\01 Aulas\Modulo 04 Aulas\C1.CDB Page 1

Section Diagram

Cross-section Shapes
Shape

Width
cm
67.00

T Shape

Height
cm
42.00

Conc Fc
kg/cm^2
210.00

S/S Curve

Rebars

ACI-Whitney Rectangular

Rebar Properties
Sr.No

Designation
d 5/8
d 5/8
d 5/8
d 5/8
d 5/8
d 5/8
d 5/8
d 5/8
d 5/8
d 5/8

Area
cm^2
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0

Cord-X
cm
26.00
26.00
5.00
5.00
62.00
62.00
41.00
41.00
26.00
41.00

1
2
3
4
5
6
7
8
9
10

+
Total Area =
Steel Ratio =

20.0
1.01

cm^2
%

Cord-Y
cm
5.00
25.00
25.00
37.00
37.00
25.00
25.00
5.00
37.00
37.00

Fy
kg/cm^2
4200
4200
4200
4200
4200
4200
4200
4200
4200
4200

S/S Curve
Elasto-Plastic
Elasto-Plastic
Elasto-Plastic
Elasto-Plastic
Elasto-Plastic
Elasto-Plastic
Elasto-Plastic
Elasto-Plastic
Elasto-Plastic
Elasto-Plastic

Basic Section Properties:


Total Width
Total Height
Center, Xo
Center, Yo

= 67.00
= 42.00
= 0.00
= 0.00

cm
cm
cm
cm

X-bar (Right)

= 33.50

cm

E:\01 Consultoria\01 2014\03 IE Pomabamba\04 Ingenieria del Proyecto\01 Aulas\Modulo 04 Aulas\C1.CDB Page 2

X-bar (Left)
Y-bar (Top)
Y-bar (Bot)

= 33.50
= 16.319
= 25.681

cm
cm
cm

Area, A
Inertia, I33
Inertia, I22
Inertia, I32

= fc' = 210
kg/cm^2
= 1,974.0
= 2.41E+05
= 5.77E+05
= 0.00E+00

cm^2
cm^4
cm^4
cm^4

Radius, r3
Radius, r2

= 11.044
= 17.103

cm
cm

Transformed Properties:
Base Material

Additional Section Properties:


Transformed Properties:
Base Material
Modulus, S3(Top)
Modulus, S3(Bot)
Modulus, S2(Left)
Modulus, S2(Right)

= fc' = 210
kg/cm^2
= 1.48E+04
= 9.38E+03
= 1.72E+04
= 1.72E+04

cm^3
cm^3
cm^3
cm^3

Plastic Modulus, Z3
Plastic Modulus, Z2
Torsional, J
Shear Area, A3
Shear Area, A2

= 1.91E+04
= 3.01E+04
= 2.83E+05
= 1,793.0
= 1,497.0

cm^3
cm^3
cm^4
cm^2
cm^2

Principal Angle
Inertia, I33'
Inertia, I22'

= 0.00E+00
= 5.77E+05
= 2.41E+05

Deg
cm^4
cm^4

= 3.500
= 3.000
=4
=0
= 1.00
= 17.54
= 1.00
= 17.54

m
m

= 3.500
= 3.000
=4
=0
= 1.00
= 27.16
= 1.00
= 27.16

m
m

Framing Along-X
Total C/C Length, Lc
Unsupported Length, Lu
Framing Type
Framing Case
K Factor, Braced
Kl/r, Braced
K Factor, Unbraced
Kl/r, Unbraced

Framing Along-Y
Total C/C Length, Lc
Unsupported Length, Lu
Framing Type
Framing Case
K Factor, Braced
Kl/r, Braced
K Factor, Unbraced
Kl/r, Unbraced

Final Design Loads


Sr.No

Combination

1.4D+1.7(L1+L2)

Load Pu
ton
32.88

Mux-Bot
ton-m
1.75

Muy-Bot
ton-m
0.05

Mux-Top
ton-m
1.75

Muy-Top
ton-m
0.05

E:\01 Consultoria\01 2014\03 IE Pomabamba\04 Ingenieria del Proyecto\01 Aulas\Modulo 04 Aulas\C1.CDB Page 3

2
3
4
5

1.25D+1.25(L1+L
2)+1.00SXX
1.25D+1.25(L1+L
2)+1.00SYY
0.9D+1.00SXX
0.9D+1.00SYY

28.85

1.53

12.53

1.53

12.53

30.20

2.83

0.51

2.83

0.51

17.49
18.84

0.66
1.96

12.52
0.51

0.66
1.96

12.52
0.51

Remarks

Result Summary
Sr.No

Combination

Pu (ton)

1
2

1.4D+1.7(L1+L2)
1.25D+1.25(L1+L
2)+1.00SXX
1.25D+1.25(L1+L
2)+1.00SYY
0.9D+1.00SXX
0.9D+1.00SYY

32.88
28.85

Cap. Ratio-Bot Cap. RatioTop


0.155
0.155
0.63
0.63

30.20

0.236

0.236

Capacity OK

17.49
18.84

0.588
0.186

0.588
0.186

Capacity OK
Capacity OK

3
4
5

Capacity OK
Capacity OK

E:\01 Consultoria\01 2014\03 IE Pomabamba\04 Ingenieria del Proyecto\01 Aulas\Modulo 04 Aulas\C1.CDB Page 4

Load-Moment Interaction

E:\01 Consultoria\01 2014\03 IE Pomabamba\04 Ingenieria del Proyecto\01 Aulas\Modulo 04 Aulas\C1.CDB Page 5

Load-Moment Interaction

E:\01 Consultoria\01 2014\03 IE Pomabamba\04 Ingenieria del Proyecto\01 Aulas\Modulo 04 Aulas\C1.CDB Page 6

Load-Moment Interaction

E:\01 Consultoria\01 2014\03 IE Pomabamba\04 Ingenieria del Proyecto\01 Aulas\Modulo 04 Aulas\C1.CDB Page 7

Load-Moment Interaction

E:\01 Consultoria\01 2014\03 IE Pomabamba\04 Ingenieria del Proyecto\01 Aulas\Modulo 04 Aulas\C1.CDB Page 8

Load-Moment Interaction

E:\01 Consultoria\01 2014\03 IE Pomabamba\04 Ingenieria del Proyecto\01 Aulas\Modulo 04 Aulas\C1.CDB Page 9

Das könnte Ihnen auch gefallen