RED PILING
METHOD
WORK
PROCEDURE
DATE
FOUNDATIONS
SUBJECT:
Dec 2012
BY:
OF
ISSUE
QA/QC ENGINEER
APPROVED
BY:
BORED PILING
QEHS MANAGER
ACTION
1.
SCOPE
Project
VERIFY
Method
.1
Project
Construction
Programme
Manager
Approval
PROCEDURE
Method
Statement:
i)
Construction
ii)
Pile
iii)
Testing
design
FCC
procedure. Surveyor
with
calculations.
procedure.
iv) Documentation
to
be
maintained during the execution of
Field Book
work.
v)
Mix
design
for
concrete.
vii)
the
.2
Construction
Programme:
.3
Piling
Sequence:
.4
Setting-Out:
Consultants Representative.
WORK
PROJECT:
PROCEDURE
SECTION:
DATE OF ISSUE
FOUNDATIONS
Dec 2012
BY:
SUBJECT:
QA/QC ENGINEER
APPROVED
BY:
BORED PILING
QHSE MANAGER
ACTION
.5
Source
Certificates: Project
Engineer
Concrete
Cube
VERIFY
Source
certificate
Test result,
FOUN/04/A
Pile testing
record
Testing:
Subcon.
Checksheet
.7
Testing
of
Piles:
Non-
Conformity
Report
load test
specified
and
in
integrity test as
the
Contract.
.8 Inspection
Work/Checksheet:
of
.9
Non-Conformity:
PROJECT:
SITE NO.:
SUBCONTRACTOR:
Sheet No.
FATAYERJI
Checke
d
STAGE
ITEM
by
PREPARATION
1. Subcontractors
method statement
PE
approved.
2. Materials approved by
PE
the consultant.
3. Cross-check location
SU
of Pile.
APPROVAL TO
PROCEED
4. Check borehole to be
filled with Bentonite
INSTALLATION
QA/QC
GF
slurry at all times.
5. Check cleaning of
bottom of borehole.
6. Check reinforcement
cage.
7. Check minimum cover
while lowering cage into
the borehole.
8. Check slump of
concrete.
9. Check cut-off level +
location.
APPROVAL TO
PROCEED WITH PILE
CAP.
GF
SE
GF
Lab
SU
CM
DATE