Beruflich Dokumente
Kultur Dokumente
June 00 Feb 01
I-21 - Area Supervisor ( Germany ).
To oversee the day to day construction
Activities. Interface and coordinate with prime contractor country
supervisors. Resolve minor Conflicts locally according to overall project
approach. Report in real time, Enforce installation specifications, ISO
9001-9002.
Execute acceptance testing. Forecast any critical path issues and other possible
delays. This position also included installation of cables & commissioning at
various POP, ILA locations this included rigging activitirs.
June 99 - Jan 00
Colt FOC Network Testing - Inner
London .
July 1998 June 99
ITEA, Saudi Arabia
OSP/MW Links Engineer my duties included
The day-to-day construction of a new
Telecom infrastructure within Saudi
Arabia .
June 1997 July 98
Lucent Technologies, Saudi Arabia Senior OSP/MW Supervisor for Lucent
Technologies on the Saudi Arabian TEP 6 project. Assigned to Lucent
Technologies formally known as (AT&T) as a technician on the TEP 6/ GSM
Project. The TEP 6 project was to install Fibre Rings around the Kingdom of
Saudi Arabia also to install GSM & MW Links and upgrade the telephone infrastructure
within Saudi Arabia .
May 1996 - June 1997
GSM/MW Inspector with Vodafone Site Inspection Dept
Responsibilities were mainly within the UK and duties included - Verify new GSM
installations were correctly installed with proper materials and within the
correct construction parameters. The buffer between Vodafone and sub-contractors
and ensuring a general standard is achieved throughout all installations and any
faults are recorded and rectified. Speaking to departments within Vodafone to
ensure no problems found are detrimental to all installation and new methods
I.e. Testing, aligning etc are disclosed with relevant department and getting
new procedures working in practice.