Beruflich Dokumente
Kultur Dokumente
Medochemie Factory
0712 BOILERS
TABLE OF CONTENTS
1
GENERAL........................................................................................................................... 2
1.1
SUMMARY......................................................................................................................2
1.2
REFERENCES..................................................................................................................2
1.3
SUBMITTALS..................................................................................................................3
1.4
CLOSEOUT SUBMITTALS..................................................................................................3
1.5
QUALITY ASSURANCE......................................................................................................3
1.6
QUALIFICATIONS............................................................................................................3
1.7
PRE-INSTALLATION MEETINGS.........................................................................................3
1.8
1.9
WARRANTY....................................................................................................................4
1.10
MAINTENANCE SERVICE...............................................................................................4
1.11
MAINTENANCE MATERIALS............................................................................................4
1.12
EXTRA MATERIALS.......................................................................................................4
PRODUCTS.........................................................................................................................4
2.1
GENERAL.......................................................................................................................4
2.2
CAST-IRON BOILERS.......................................................................................................4
2.3
2.4
EXECUTION.......................................................................................................................7
3.1
INSTALLATION...............................................................................................................7
3.2
3.3
3.4
CLEANING.....................................................................................................................7
3.5
DEMONSTRATION...........................................................................................................7
SELCTION..........................................................................................................................7
Archetype Vietnam
Medochemie Factory
1 GENERAL
1.1
SUMMARY
a)
b)
Section Includes:
1.
2.
3.
4.
5.
Boiler controls.
6.
7.
Boiler controls.
8.
Boiler trim.
Related Sections:
1.
1.2
REFERENCES
a)
b)
British standards:
1.
BS 779 Specification for cast iron boilers for central heating and
indirect hot water supply (rated output 44 kW and above).
2.
3.
4.
5.
c)
American Society
Engineers:
1.
d)
e)
g)
of
Heating,
Refrigerating
Standard
for
and
Buildings
Air-Conditioning
Except
Low-Rise
2.
ASME Section VIII - Boiler and Pressure Vessel Code - Pressure Vessels.
Hydronics Institute:
1.
f)
ANSI Z21.13 - Gas-fired Low Pressure Steam and Hot Water Boilers.
H.I. Heating Boiler Standard - Testing and Rating Standard for Heating
Boilers.
2.
3.
Archetype Vietnam
1.3
Medochemie Factory
SUBMITTALS
a)
Product Data:
Submit capacities and accessories included with boiler. Include general layout,
dimensions, size and location of water, steam, fuel, electric and vent
connections, electrical characteristics, weight and mounting loads.
b)
Test Reports:
Indicate boilers meet or exceed specified performance and efficiency. Submit
results of combustion test.
c)
d)
e)
1.4
CLOSEOUT SUBMITTALS
a)
1.5
1.6
QUALITY ASSURANCE
a)
b)
c)
d)
e)
f)
g)
QUALIFICATIONS
a)
Manufacturer:
Company specializing in manufacturing products specified in this section with
minimum ten years documented experience and with service facilities.
b)
Installer:
Company specializing in performing Work of this section with minimum five
years.
1.7
PRE-INSTALLATION MEETINGS
a)
1.8
Convene minimum one week prior to commencing work of this section (One
whole day)
Accept boilers and accessories on site in factory shipping packaging. Inspect for
damage.
b)
Archetype Vietnam
1.9
WARRANTY
a)
1.10
1.11
Medochemie Factory
MAINTENANCE SERVICE
a)
Furnish service and maintenance of boilers for two years from Date of
Substantial Completion or in accordance to condition of contract.
b)
Provide emergency call back service during working hours for this maintenance
period.
c)
Maintain locally, near Place of the Work, adequate stock of parts for
replacement or emergency purposes. Have personnel available to ensure
fulfillment of this maintenance service, without unreasonable loss of time.
d)
MAINTENANCE MATERIALS
As mentioned in conditions of contract
1.12
EXTRA MATERIALS
As mentioned in conditions of contract
2 PRODUCTS
2.1
GENERAL
a)
The boiler shall be of the fully packaged, designed and constructed, and
certified in accordance with the latest version of ASME standard.
b)
The boiler shall be equipped with integral forced draft fuel burning equipment
specifically supplied for burning Number 2 light oil, boiler trim and accessories,
operating and safety controls, refractory and insulation all assembled, piped and
wired at the factory and delivered as a packaged unit ready for installation and
operation with simple piping, power and smoke outlet connections. The
complete packaged boiler shall be UL approved and shall bear its label.
c)
The completed unit shall be fire tested at the factory prior to shipment and a
copy of the test report shall be furnished with the boiler.
d)
e)
The boiler shall be insulated with minimum 80 mm thick mineral wool blanket
insulation and covered with heavy gauge galvanized steel removable jacket with
factory applied heat resisting enamel finish.
2.2
CAST-IRON BOILERS
Archetype Vietnam
Medochemie Factory
i.
Product Description: Hot Water boilers with forced draft, insulated jacket,
sectional cast-iron heat exchanger, fuel oil burning system, refractory and,
controls.
ii.
Product Description (for steam): Steam boilers with forced draft, insulated
jacket, sectional cast-iron heat exchanger, fuel oil burning system, refractory
and, controls.
iii.
The boiler shall be provided with hinged access doors and inspection openings
to provide full access to all fire surfaces for inspection, cleaning and
maintenance without disconnecting any fuel oil piping or electrical wiring. The
access doors shall be lined with high quality refractory, fully gasket and bolted
on for complete gas tightness.
iv.
The boiler shall be provided with all necessary threaded and flanged
connections for boiler inlet and outlet, boiler drain, relief valve, controls and
smoke outlet all as required by ASME.
v.
The boiler inlet and outlet pipe connections shall be provided with isolating
valves and thermometers of glass stem type.
vi.
Furnish water wall design consisting of water backed combustion area with
water circulating around firebox. Refractory chamber or separate base not
required.
vii.
viii.
1.
2.
3.
4.
Low water cut-off to prevent burner operation when boiler water drops
below safe level and boiler condensate return pump control to maintain
water level by controlling pump operation.
5.
6.
7.
High limit pressure control with manual reset for burner to prevent
steam pressure from exceeding system pressure.
8.
Archetype Vietnam
2.3
Medochemie Factory
1.
2.
Oil Burner: High pressure forced draft atomizing type for No. 2 fuel oil
with combustion air blower, one stage fuel pump mounted on burner,
hinged flame inspection port, cadmium sulfide electronic flame sensor,
ignition electrodes, ignition transformer, oil atomizing nozzle, oil solenoid
valve, oil control valve, oil supply & return pressure gauges, fuel filter,
low fire start interlock, working temperature controls, totally enclosed
electric control panel mounted on the unit at the factory and all
necessary controls and accessories.
3.
Oil Burner Safety Controls: Energize burner motor and electric ignition,
limit time for establishment of main flame, monitor flame continuously
during burner operation and stop burner on flame failure with manual
reset necessary, solenoid oil delay valve opens after burner motor
energized and closes when de-energized.
4.
5.
ii.
Product Description: Hot water induced draft boiler with horizontal grid, finned
tube heat exchanger, gas burning system, refractory combustion chamber,
controls, and boiler trim.
Boiler Fabrication:
1.
Archetype Vietnam
iii.
2.
3.
Exchanger: Fabricate of finned steel tubing with baffles and welded into
steel headers
4.
iv.
v.
vi.
2.4
Medochemie Factory
1.
ASME rated pressure relief valve set with rating in accordance to the
working pressure.
2.
3.
4.
5.
Pressure gage with scale graduated from 1-1/2 to 3 times safety relief
valve set pressure.
6.
Control transformer.
7.
8.
Alarm bell.
Induced Draft Gas Burner: Stainless steel burners for On-OFF firing and
either natural gas or LPG (according to the drawings) with adjustable
combustion air supply, gas pressure regulator, diaphragm gas valves,
manual shut-off, intermittent spark or glow coil ignition, thermistor
flame sensing device, and automatic 100 percent safety gas shutoff.
2.
3.
Flue Gas Collector and Draft Hood: External draft diverter with automatic
motorized vent damper
Boiler Controls:
1.
2.
3.
High limit temperature controller with manual reset for burner to prevent
boiler water temperature from exceeding safe system temperature.
4.
Pump controller.
5.
6.
b)
Archetype Vietnam
c)
Medochemie Factory
3 EXECUTION
3.1
3.2
3.3
INSTALLATION
a)
Install boilers plumb and level, to plus or minus 2 mm over boiler base.
b)
c)
Install boiler on concrete housekeeping pad, minimum 100 mm high and 150
mm larger than boiler base on each side. Refer to detailed mechanical drawings
for exact base dimension.
d)
e)
f)
Connect fuel oil piping to boiler, full size of boiler gas train inlet. Arrange piping
with clearances for burner removal and service.
g)
Shutoff valve.
3.
Check valve.
a)
Perform combustion test including boiler firing rate, over fire draft, gas flow
rate, heat input, burner manifold gas pressure, percent carbon monoxide,
percent oxygen, percent excess air, flue gas temperature at outlet, ambient
temperature, net stack temperature, percent stack loss, percent combustion
efficiency, and heat output. Perform test at minimum, mid-range, and high fire.
b)
Arrange with local authorities having jurisdiction for inspection of boiler, piping,
and for certificate of operation.
CLEANING
a)
3.5
Strainer.
a)
3.4
1.
DEMONSTRATION
a.
b.
4 SELCTION
END OF SECTION