Beruflich Dokumente
Kultur Dokumente
31/05/2015
Notes for
Honble Chief Ministers
visit
INDEX
Sl.
No.
I
II
III
IV
V
Page
Topic
YSR (KADAPA) DISTRICT - HIGHLIGHTS
YSR (KADAPA) DISTRICT AT A GLANCE
RESOURCES
INFRASTRUCTURE
EXISTING INDUSTRIAL SCENARIO
PRIORITY PROJECTS UNDER
VI
VII
I.
No.
23
34
59
9 13
14
15 17
IMPLEMENTATION
OPPORTUNITIES
18
77 o
Mylavaram,
Jammalamadugu
Mandals,
worlds
single
The old
records of
the
district
reveal
that
Cuddapah
camping
Matham, Ameen Peer Dargah and Gandi Kshetram are some of the most
important tourist places in the district which is noted for religious
harmony.
II.
S.N
o.
I
II
No of Assembly Constituencies
No of Parliamentary Constituencies
POPULATION (As per 2011 Census )
Total Population (2011 Census)
Density of Population
Male
Female
Rural Population
Urban Population
Sex Ratio (Females per 1000 Male
Population)
S.C. Population
S.T. Population
Literates
Unit
Sq.Kms.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Lakh
Nos.
Nos.
Nos.
Lakh
Nos.
Per
Sq.Km.
Lakh
Nos.
Lakh
Nos.
%
%
Nos.
Lakh
Nos.
Lakh
Nos.
Lakh
No
15359
3
51
1
8
965
790
4954
7.06
10
2
28.82
188
14.52
14.30
66.03
33.97
985
4.65
0.75
19.04
III
IV
Literacy Rate
RAINFALL
Normal Rainfall
IMPORTANT RIVERS
Nos.
%
67.30
mm
699.6
Penna,
Chitrava
thi,
Kunderu
,
Papagni,
Sagileru,
Cheyyer
u.
VI
418871
183709
51753
42251
1139
34119
47113
38574
214949
10959
17263
26486
1803
97046
9866
40495
203918
170063
48562
507728
280672
1132452
470423
1632842
III.
RESOURCES
a)
Productio Productivit
n
y
('000 T)
(Kg/ha)
Major Field crops (Crops to be identified based on total
acreage)
1 Rice
209.6
2950
2
Groundnut
55.3
995
Sunflower
45.7
848.5
Bengal gram
54.01
750
Orange &Batavian
90.7
13300
Banana
115.8
30000
Lemon
45.5
14667
Papaya
238.8
78667
Vegetables
1 Chillies
2.8
3264
Onion
44.3
17000
Tomato
49.0
19000
ii)
800
1
2
3
4
5
1
2
3
1
2
3
b)
9.7
Forest Resources:
YSR district has a forest area of 5,050 km, which is 32.87 % of
is
available.
Neem,
Apart
from
Ficus species,
Spathodia, Teak,
Hardwikia,
Red
Sanders,
Kanuga,
Neeruddi,
Raintree,
Dirisinam,
Rela,
Cassia
Holoptilia,
Alstonia are the other major species available in forests of the district.
c) Mineral resources:
Sl.
No
1
2
3
4
5
6
7
8
9
10
Production
in MT (2011)
88,49,650
13,03,136
5,53,453
1,37,614
1,31,883
42,500
12,971
3,521
2,363
1,898
Mineral
Lime Stone
Grey Barytes
Iron Ore
Yellow Ochre
Clay
Dolomite
Quartz
Pyrophillite
White Barytes
Dimensional Stone
Name of
the
mineral
Asbestos
Bramhanapalli, Lingala,
Ramanutapalli,
Lopatnoothala
Gray
Barytes
Limeston
eCement
Grade
Limeston
e - High
Grade
Mangampeta,
Anantarajupeta
Yerraguntla,
Jammalamadugu,
Kamalapuram
Clay
Quartz
Location
Khajipeta, Rajampeta,
B.Kodur, Pulivendula,
Lingala, Vemula &
Kalasapadu
Rajampeta, Nandalur,
Khajipeta
Rayachoty, Badvel &
B.Kodur
Estimation
of ores in
Million
Tonnes
(Approx)
0.25
74.00
1700.00
50.00
0.08
0.07
Applications
Cement Industries
as a Fire Proof and
used as a Fibre in
Heat resistance
Industries.
Oil well drilling in
Gulf Countries.
Manufacturing of
Cement in Cement
Industries.
Manufacturing of
Paper, Fertilizers
and Steel
Industries.
Manufacturing of
Ceramic Tiles and
Paint Industries.
Manufacturing of
Glasses and Silicon
Carbide Industries.
Napaslab
s
Yerraguntla, Nidizuvvi,
Sugamanchipalle &
Jammalamadugu
Rehmatti
B.Kodur, B.Mattam
0.68
0.002
Detergent Soaps
Companies.
0.67
Manufacturing of
Granite Slab
Industries as a
Granite Tiles and
Slabs for
ornamentation
purpose.
Grey
Granite
Matli, Veeraballi,
Galiveedu, Rayachoty,
T.Sundupalli and
Sibyala.
10
Road
Metal &
Building
Stone
Ramapuram,
Gopagudipalli,
Saraswathipalle,
Nandyalampeta,
Mydukur, Muddanur,
Pedda Cheppali,
Kondapuram,
Pulivendula etc.,
0.14
11
Marble
B.Mattam, Kodur,
S.R.Palem, Khajipeta
0.01
12
Sand
Chitravati, Papaghni,
Cheyyeru, Penna Rivers
d)
Construction of
Roads and
Buildings and
Basements.
Manufacturing of
Slab Industries for
flooring purpose.
Construction of
Buildings, brides
and road works.
Human Resources:
Human resources available in the district in the form of Techno-
Managerial
Graduates,
Technicians
coming
out
of
the
Technical
Category
University
Engineering Colleges
3
4
No
1
25
1
9
Stude
nts
(No)
1971
23,49
9
1930
6330
10
5
6
32
2
Degree Colleges
50
IV
INFRASTRUCTURE:
A)
LAND:
910
1057
26,39
7
13
1935.55
979
26
550
26
429
776.07
Name of the
Industrial Park
Gross Area
(Acs)
Total
Plots
Allotted
Plots
Vacant
Plots
IDP, Pulivendula.
841.00
246
239
MIP, Kopparthy.
415.05
185
17
168
10
11
IE, Pulivendula.
20.78
36
27
CP Brown IT Park,
Kadapa.
52.76
IE, Proddatur
Expansion.
27.69
40
36
IDA, Kadapa.
415.51
216
214
Layout :
Ship,
Putlampalli
52.76 Acres
Plot Area
38.92 Acres
Open Space
5.28 Acres
Road Area
8.56 Acres
Total Plots
417.45 Acres
6779.22 acres
out
of
total
land
of
11
12
Plot Area
287.84 Acres
Open Space
42.29 Acres
Road Area
50.17 Acres
CFC Area
34.72 Acres
Total Plots
185
ii)
Sl.
No
.
1
Name of the
site
Lands in
Vemagunta
Palli
Lands in
M.Kambaladin
ne
Lands in
Peddapalli
Remarks
The lands resumed by the Govt., from M/s
Brahmani Industries Ltd., to an extent of
10760.66
Acres
in
Vemaguntapalli,
Kotthaguntapalli, P.Bommepalli Villages of
Jammalamadugu (M), vide G.O.M.s. No. 99,
Industries & Commerce (IP) Dept., , dated
31.05.2012.
An extent of 4553.04 Acres in Sy.No. 402 etc.,
of M.Kambaladinne (V), Mylavaram (M) is
identified by Revenue Authorities and the land
is mostly of Assessed Waste land except for
certain pockets of Patta land.
An extent of 846.60 Acres in Sy. No. 936/B
(Part), 937 (Part) & others, in Peddapalli (V),
Sidhout (M).
12
13
iii) Lands under acquisition for new industrial land bank for APIIC
Land identified in Acs - Cents
Sl.
No
.
Mandal
Village
Assigne
d
Extent
physical
ly
verified
Patt
a
Govt
land
Velpula
0.0
0
100.0
0
23.00
123.00
123.00
PeddaJutur
u
0.0
0
90.65
123.35
214.00
214.00
Total
Vemula
Ramapuram
GopagudiP
alli
0.0
0
128.5
2
0.00
128.52
128.52
Vontimitta
Vontimitta
0.0
0
106.0
0
0.00
106.00
106.00
Ambavara
mBit - I
0.0
0
200.0
0
0.00
200.00
200.00
Sirigepalli
0.0
0
425.4
3
5.03
430.46
430.46
PeddaDand
luru
0.0
0
634.4
9
0.00
634.49
634.49
0.0
0
1685.
09
151.38
1836.
47
1836.4
7
Jammalamadu
gu
Total
B)
POWER:
Power Structure
S. No
Details
No
12
C)
207
CONNECTIVITY:
i) Roads
National Highways
258 Km
80 Km
13
14
State Highways
Rural Roads
Important Roads:
153 Km
25 Km
572 Km
:
1312 Km
:
2685 Km
24
:
195.13 KM
iii)Airports :
Kadapa Airport (Domestic Services to be commissioned shortly)
(8 Km from Kadapa city)
Proximity to metros / International Airports:
Bengaluru
248 Km
Chennai
288 Km
Hyderabad
410 Km
14
15
: 205 KM
: 288 KM
iv)Seaports:
Chennai Seaport
288 Km
Krishnapatnam Seaport
205 Km
Ennore Seaport
275 Km
V.
S.
No.
Sector
No. of
Units
Investment
(Rs. Cr.)
Employment
(Nos)
Cement Industries
3029.95
3867
Textile Industries
489.08
3775
Power Generation
3760.27
4107
Polymer based
57.38
350
Glass Industry
12.40
178
Uranium Processing
1106.29
4000
14
8455.37
16277
Total
Category
Micro
Small
Medium
Total
No. of
Units
646
537
2
1185
Investment
(Rs. in Crores)
93.6337
435.4868
17.9397
547
Employment
(No)
6493
7127
235
13855
Sector
Agro & Food based
Activities
Paddy Milling, Solvent Extraction,
15
16
Chemical based
Engineering Industries
Mineral Based
6
7
Paper Products
Rubber & Plastics
Service Sector
VI.
i.
Sl.
No.
1
2
3
ii.
Sl.
N
o.
1
2.
Engg Works,
ABSTRACT
No of
projects
Sector
Public Sector
Private Sector
Public
Private
Partnership
Total
2
11
Investment
(Rs. In Cr)
23,782
14,516.06
Employment
(no.)
10,684
9,515
136.25
1,325
16
38,434.31
21,524
Public Sector:
Name of the
unit
Integrated Steel
Plant by SAIL,
YSR district.
Rayalaseema
Thermal Power
Project,
(Expansion),
V.V.Reddy Nagar,
Muddanur.
Objectives
Investm
Progress
ent
Employm
Indicators
Activity
(In Rs.
ent (No)
Cr)
Integrate
20000
10000 Pre-feasibility
d Steel
report
prepared
Plant
by SAIL is under
(3 MTPA)
consideration by
Ministry of Steel,
GoI.
Thermal
3782
684 Under
Power
construction.
Plant
Likely to
(1X 600
commence
MW)
operations in
August, 2015.
iii.
Private Sector:
Sl.
Name of the
Objectives
Progress
16
17
No
.
Investm
ent
(In Rs.
Cr)
5400
unit
Activity
Midwest
Granites.,
Pendlimarri (V)
& (M)
MRKR
Construction &
Industries Pvt.
Ltd.,
Machanuru
(V),
Pendlimarri
(M).
M/s
V.P.Cements
Ltd.,
Peddamudiam
(M).
Cement
Teja Cements
Pvt. Ltd.,
Nidizuvvi (V),
Yerraguntla
(M).
Cement
(2.5
MTPA)
1500
Mahathi
Cements Pvt.
Ltd., Malepadu
(V),
Yerraguntla
(M).
Shabro Metals
&
Technologies
Ltd.,
Konidyala,
Machanuru,
Bindurao Palli
Cement
1800
Employm
ent (No)
Indicators
1200
Mining
Licence
to be obtained.
Cement
2400
1000
Mining
Licence
to be obtained.
Cement
1500
500
Mining
Licence
to be obtained.
700 Mining Licence &
Lease
of
Limestone
mines,
Environmental
Clearance
&
Consent
for
Establishment
(CFE)
obtained.Alienati
on
of
Government
land
to
be
obtained.
2900
Mining
Licence
to be obtained.
Cement
1000
2000 Mining
Licence
to be obtained.
17
18
(V),
Pendlimarri
(M).
10
11
Bharathi
Cement
Corporation
Ltd.,
Nallingayapalli
(V),
Kamalapuram
(M).
Pinakini Power
Projects Pvt.
Ltd., Dommara
Nandyala (V),
Mylavaram
(M).
Pashupathinat
h Power
Projects Pvt.
Ltd., Motakatla
(V),
Sambepalli
(M).
Sri
Govindaraja
Textiles Pvt.
Ltd.,
(Expansion),
Pedhurenga
Puram,
Pulivendula.
Narayanadri
Sponge Iron &
Power Projects
(P) Ltd.,
Sy.No.1402 &
632,
Tippayapalli
(V), Pullampet
(M).
Coal
Based
Power
Plant
(1X 30
MW)
Power
Generati
on (1X 6
MW)
Power
Generati
on
(1 X 3
MW)
Cotton
Yarn,
Polyeste
r Yarn
(1,50,00
0
Spindles
)
Sponge
Iron
(100
TPD)
238
41
26.06
600
Erection of
machinery &
Trail run
completed.
60
Likely to go into
production in
April, 2015.
150
Under
construction.
Acquired land of
15 Ac. All
necessary
approvals
obtained. Civil
35
works under
progress; Likely
to go into
operation in
three months.
Estimated time
for
commissioning
720
the project is 36
months.
Environmental
clearance
obtained.
11
250
18
19
iv.
Sl
.
N
o.
1
Objectives
Investm
ent
Activity
(In Rs.
Cr)
Name of the
unit
Andhra Baryte
Corporation Pvt.
Ltd.,
Anantarajupeta
(V), Rly. Koduru
(M).
M/s Gimpex AP
Baryte
Beneficiation
Pvt Ltd.,
Korlakunta (V),
Obulavaripalli (M).
M/s Trimex
Barite Pvt Ltd.
Govindampalli (V),
Obulavaripalli (M).
Beneficiate
d
Barytes
(0.20 MTPA)
Beneficiate
d
Barytes
(0.50 MTPA)
Beneficiate
d
Barytes
(0.10 MTPA)
Emplo
ymen
t (No)
11.25
80
45
Progress
Indicators
Project completed.
Awaiting raw
425 material supply
agreement from
APMDC.
Estimated time for
commissioning the
550 project is 18
months.
Estimated time for
commissioning the
350
project is 18
months.
VII. OPPORTUNITIES:
The following activities in the district are good avenues to establish and
sustain industrial activity in YSR district.
Agro based and Food Paddy, Mango, Papaya,
Banana, Sun Flower,
Processing
Turmeric Processing
Seed processing,
Ice Blocks,
19
20
Mineral based
Chemical based
Barium Chemicals
Polymer Woven Sacks
Ancillary industries
Corrugated Paper
Boards
Readymade Garments
Paper Cones
Cold Storages,
IT & IT enabled
services,
Service Sector
20