STRENGTHENING AND REPAIR OF LANHESES BRIDGE

IC

Joo Pinho,Jos D avid, M anuelLorena,Alexandre Portugal

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

BRIDGE DESCRIPTION

Lanheses bridge is a 1218 m long structure.

It is a beam slab continuous deck, supported by pendulum piers.

9 piers are located in the main river channel of Lima River.

The bridge was designed by the renowned Portuguese engineer Prof.


Edgar Cardoso.

It was built between 1977 and 1981.

LNE
C

ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES

BRIDGE DESCRIPTION - DECK

12

LNEC Lisbon 31 May - 1June 2012

The bridge has a total of 41 spans, with typical spans of 30 m and lateral spans of 24 m.

The deck is 11.50 m wide and is a post-tensioned concrete structure (with post-tension in
both directions).

DS

It has 4 longitudinal beams with variable heights.

IC

The deck is fixed to South abutment by hinges, and dilates freely in the longitudinal
direction at piers and at North abutment.

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

LNE
C

BRIDGE DESCRIPTION - PIERS

Piers are reinforced concrete blades.

They have a pendulum functioning hinged in both ends.

The hinges are materialized by lead plates and mechanical studs.

Foundations: Each pier has a single alignment of 4 piles 0.8 m.

ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES
BRIDGE DESCRIPTION - ABUTMENTS

12

LNEC Lisbon 31 May - 1June 2012

It is a wall abutments, with approximately 7 m of height and 10.3 m of extension.

The cill beam is supported by counterforts and wing walls.

The foundations are composed of 18 piles 0.8 m.

Concrete dead ground blocks located on the back of abutments, under the the road embankment, are
anchored by tendons to the abutments, to withstand the horizontal loads.
In the South abutment: the deck is laid on lead plates, fixed by mechanical studs.

In the North abutment: the deck is laid on steel rollers.

IC

DS

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

REHABILITATION DESIGN - OVERVIEW

LNE
C

1st Phase: Inspection and characterisation

Data collection.

Detailed visual inspection.

Underwater inspection.

Topographic and bathymetric survey.

River bed material characterisation tests.

Concrete characterization tests.

Geotechnical investigation.

Sonic tests on piles.

2nd Phase: Design of bridge strenghtening and repair

Evaluation of structural safety.

Hydraulic and river morphology studies.

Geotechnical studies.

Preliminary design.

Detailed design.

ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES

12

LNEC Lisbon 31 May - 1June 2012

INSPECTION AND CHARACTERISATION MAJOR PROBLEMS FOUND

DS

A strong riverbed widespread scouring


occurs, with movements of the
protection of the riprap embankments,
with exposed piles.

The river flow was concentrated between


protections.

A large scour hole was identified, downstream of the


bridge section.

IC

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

INSPECTION AND CHARACTERISATION MAJOR PROBLEMS FOUND

LNE
C

Defective structural functioning of hinges, between deck and piers:


Crushing of the lead plates, with direct contact between concrete surfaces.
Crushing and delamination of concrete.
Exposure and corrosion of rebars.

Deterioration of concrete occurs at several


members.

ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES

12

LNEC Lisbon 31 May - 1June 2012

INSPECTION AND CHARACTERISATION MAJOR PROBLEMS FOUND


Major cracks at supports of deck s
cross beams.

A general degradation of the


construction joints.

Degradation of the connection


between deck and the fixed
abutment.

IC

DS

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

LNE
C

EVALUATION OF STRUCTURAL SAFETY - APPROACH

1. Following the standards applicable at the time of the original design.


2. Following the current applicable standards in Portugal.

ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES

12

LNEC Lisbon 31 May - 1June 2012

EVALUATION OF GLOBAL STRUCTURAL SAFETY FINAL CONCLUSIONS

The deck does not comply with the limit state


of decompression, required for posttensioned concrete members.

Unstable equilibrium of the piers extreme


sensitivity to horizontal loads.

Reduction of piles capacity in the piers


located in the main riverbed, due to loss of
confinement.

Insufficient penetration of the piles in


substratum.

Insufficient strength for seismic loads of


abutment piles, counterforts and connections
with the deck.

Insufficient global strength for seismic loads.

IC

DS

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

LNE
C

A MODIFICATION OF THE STRUCTURAL SYSTEM WAS DECIDED

Eliminate the Problems of former structural system, that consisted:

The existing extreme sensitivity of the structure to horizontal loads.

An eventual collapse of one pier, or breaking of deck-abutment connection, could


cause a chain reaction and collapse of the whole bridge.

The Adopted Solution consisted: modifying the structural system, with

minimum intervention on the bridge:

The deck remained fixed to South abutment.

The piers were fixed to the foundations.

The hinges were replaced by sliding bearings at piers.

ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES

STRENGTHENING AND REPAIR WORKS

12

LNEC Lisbon 31 May - 1June 2012

Modification of structural system: by eliminating of the pendulum functioning of the


piers.
Strengthening of piers foundations.

DS

Strengthening of cross beams at piers.


Replacement of bearings.

Strengthening of the fixed abutment and of the connection between the fixed
abutment and the deck.

Strengthening of deck with external post-tension.

Protection of piers against scour and protection of entire riverbed with riprap.

Treatment of scour holes.

Concrete repair and treatment.

IC

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

STRENGTHENING OF FOUNDATIONS OF PIERS

LNE
C

Micro-piles: high-strength steel tubes 127 mm


x 9 mm have been installed.
The micro-piles were connected to a new pile
cap extension, embedding the existing one.

ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES

FIXATION OF PIERS TO FOUNDATION

12

LNEC Lisbon 31 May - 1June 2012

IC

DS

The connection of piers to the foundation was made integral.


A reinforced concrete casing above the pile cap was executed.

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

STRENGTHENING OF CROSS BEAMS AT PIERS

LNE
C

The cross beams were widened to take into account:


The deviation of vertical alignment of piers.
The need to accommodate the top plates of the new bearings.

ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES

REPLACEMENT OF BEARINGS AT PIERS


A temporary support of the deck
was required.

IC

Installation of elastomeric
bearings: sliding in the
longitudinal direction and
blocked in the transverse
direction.

DS

The auxiliary system allow


restoring the pier verticality.

12

LNEC Lisbon 31 May - 1June 2012

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

STRENGTHENING OF THE FIXED ABUTMENT

LNE
C

The strengthening of the fixed


abutment was executed to withstand
the seismic loads.
High-strength steel bars, were
installed, to connect the deck to the
abutment.

ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES

12

LNEC Lisbon 31 May - 1June 2012

DECK STRENGTHENING WITH EXTERNAL POST-TENSION

IC

DS

The deck was strengthened by external post-tensioning to ensure the compliance


to serviceability limit state.
Four cables at each span were installed.

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

SCOUR TREATMENT AND PROTECTION OF RIVER BED WAS IMPLEMENTED


Demolition and removal of
riprap embankments and
of the sheet pile walls
around piers.

BEFO RE

LNE
C

Installation of a general
riprap protection on the
regularized riverbed.

AFTER

ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES

12

LNEC Lisbon 31 May - 1June 2012

CONCLUSIONS

DS

THE STRUCTURAL VULNERABILITY OF THE EXISTING PENDULUM-PIER


SYSTEM OF THE BRIDGE WAS ELIMINATED.
THE IMPROVEMENT OF SEISMIC CAPABILITY OF BRIDGE WAS
ACHIEVED.
THE DRAMATIC

PROCESS OF SCOURING AND EROSION THAT


ENDANGERED THE GLOBAL STABILITY OF THE BRIDGE WAS
ELIMINATED.

IC

THE PROCESS OF RIVERBED STABILIZATION HAS STARTED.

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

LNE
C