Beruflich Dokumente
Kultur Dokumente
2010-13143
THU/MXYZ
A.
Grade Calculation
Drillhole
DRH-1
DRH-1
DRH-1
DRH-2
DRH-2
DRH-2
DRH-2
DRH-3
DRH-3
DRH-3
DRH-4
DRH-4
DRH-4
DRH-4
DRH-4
DRH-5
DRH-5
DRH-5
DRH-6
Latitude (N)
Longitude
(E)
12.2188398
2
12.2188398
2
12.2188398
2
12.2186577
0
12.2186577
0
12.2186577
0
12.2186577
0
12.2190915
8
12.2190915
8
12.2190915
8
12.2185247
7
12.2185247
7
12.2185247
7
12.2185247
7
12.2185247
7
12.2177740
3
12.2177740
3
12.2177740
3
12.2178000
1
123.367618
4
123.367618
4
123.367618
4
123.368976
1
123.368976
1
123.368976
1
123.368976
1
123.370661
8
123.370661
8
123.370661
8
123.372335
7
123.372335
7
123.372335
7
123.372335
7
123.372335
7
123.368166
3
123.368166
3
123.368166
3
123.369713
4
Azimut
h ()
Dip
()
From
(m)
To
(m)
Thickness
(m)
-90
85
90
-90
90
95
-90
95
105
10
-90
70
73
-90
73
74
-90
74
80
-90
80
90
10
-90
40
50
10
-90
50
55
-90
55
60
-90
85
87
-90
87
95
-90
95
98
-90
98
102
-90
102
105
-90
77.5
80
2.5
-90
80
85
-90
85
-90
90
97.
5
95
12.5
5
Densit
y
(g/cm3)
3
3.5
4
3
3.9
3
4
2.8
3.4
2.6
4.1
3.4
2.9
3.3
3.1
3
2.3
3.2
3
Grade
(%)
1
1.5
2.3
2
3
1.36
2.2
0.7
3.2
2.5
3
1.5
2.1
3
0.5
3
1.5
2.5
2
T*D
15
17.5
40
9
3.9
18
40
28
17
13
8.2
27.2
8.7
13.2
9.3
7.5
11.5
40
15
Tonnage
Average Grade
without Density
Factor (%)
5
7.5
1.775
1.958
8.16
11.7
2.00536
24.48
22
88
19.6
1.775
12.5
54.4
1.836207
32.5
24.6
12
40.8
1.89
12
18.27
1.920721
39.6
1.5
4.65
7.5
22.5
2.3125
31.25
10
1.837931
18
7.5
26.25
92
6.3
15
23
16
D*T*G
2.425
17.25
100
30
2.368644
2.427242
DRH-6
DRH-6
DRH-7
DRH-7
DRH-7
DRH-7
DRH-8
DRH-8
DRH-8
DRH-9
DRH-9
DRH-9
DRH-10
DRH-10
DRH-10
DRH-10
DRH-11
DRH-11
DRH-11
DRH-11
DRH-11
DRH-12
DRH-12
DRH-12
DRH-12
DRH-12
12.2178000
1
12.2178000
1
12.2176335
1
12.2176335
1
12.2176335
1
12.2176335
1
12.2175187
7
12.2175187
7
12.2175187
7
12.2164304
3
12.2164304
3
12.2164304
3
12.2160175
1
12.2160175
1
12.2160175
1
12.2160175
1
12.2163306
8
12.2163306
8
12.2163306
8
12.2163306
8
12.2163306
8
12.2161300
7
12.2161300
7
12.2161300
7
12.2161300
7
12.2161300
7
123.369713
4
123.369713
4
123.370906
4
123.370906
4
123.370906
4
123.370906
4
123.372630
9
123.372630
9
123.372630
9
123.367732
2
123.367732
2
123.367732
2
123.369631
7
123.369631
7
123.369631
7
123.369631
7
123.371318
8
123.371318
8
123.371318
8
123.371318
8
123.371318
8
123.372924
4
123.372924
4
123.372924
4
123.372924
4
123.372924
4
-90
95
108
13
-90
108
110
-90
72.5
75
2.5
-90
75
79
-90
79
84
-90
84
92.
5
8.5
-90
95
100
-90
100
114
14
-90
114
115
-90
35
50
15
-90
50
51
-90
51
55
-90
52.5
55
2.5
-90
55
60
-90
60
70
10
2.5
-90
70
72.
5
-90
40
45
-90
45
50
-90
50
51
-90
51
54
-90
54
60
-90
60
65
-90
65
70
-90
70
73
-90
73
75
-90
75
80
2.9
3.2
2
3
3.2
2.5
3
3.5
3.7
2
3
3.5
3.2
3
2.1
3
3
3.2
3.3
1.9
2
2.2
2
2.1
2.4
2.7
2.5
3
0.1
0.8
2
1.5
2
2.5
2.4
2.5
1
3
2
2
3
1.5
2
1.2
2.1
2.3
2.5
2.9
1.9
1.8
2.3
2.2
37.7
6.4
5
12
16
21.2
5
15
49
3.7
30
3
14
8
15
21
7.5
15
16
3.3
5.7
12
11
10
6.3
4.8
13.5
32.5
94.25
19.2
0.25
0.5
3.2
1.31
10
31.875
10
30
2.37
2.4
2.525
2.4375
30
30
2.334951
63
3.75
11.25
10
30
19.2
2
6.9
6.93
1.908462
13.11
15
30
14.5
31.9
9.5
11
2.553191
16
10
4.6
3
42
5.4
2.383752
75
12
2.1
122.5
8.88
37.5
1
1.363594
32
12.75
35
9.6
19
2.25
11.34
2.258333
11.04
29.7
NOTE: T Thickness (m)
D Density (g/cm3)
G Grade (%)
SAMPLE CALCULATION:
To solve for the grade with density factor per drillhole, the thickness, density and grade of the component of the drillhole must be factored in. The thickness of
each component is obtained from the difference of the values in columns To (m) and From (m). For the first component of DRH-1, the thickness is solved from:
Thickness = To From
Thickness = 90m 85m = 5m
The values for density, thickness and grade are shown in the table above. The equation for the average grade with density factor is shown below:
DTG
DT
where D is the density, T is the thickness and G is the grade.
For DRH-1, the average grade with density factor is solved (values of DTG and DT from table above):
15+ 26.25+92
=1.837931
15+17.5+ 40
Triangle Method
Triangle
4
5
A (m)
B (m)
C (m)
S (m)
Area (m2)
264.615
4
129.230
8
153.8462
273.8462
6623.235
243.076
9
193.846
2
249.230
8
169.230
8
132.307
7
132.307
7
132.307
7
123.076
9
153.8462
249.2308
323.0769
306.1538
17972.21
16370.32
150.7692
132.3077
8196.664
169.2308
123.0769
8079.928
Average
Weighted Density
Tonnage
2.975
394082.5
DRH
Density (Drillhole)
3.625
2.95
2.35
2.553191489
2.95
2.368644068
1.837931034
2.35
2.575
2.334951456
2.95
2.368644068
2.955
10
2.575
2.334951456
3.625
1.837931034
3.545
2.95
3.545
2.95
2.625
2.826666667
943541.2
2.368644068
10
925468.7
3.373333333
553001.6
3.15
509035.5
2.553191489
2.427241963
2.005359661
2.253255531
2.418929004
2.376945829
2.070644921
2.368644068
2.005359661
2.368644068
2.267081897
10
11
12
13
14
15
147.692
3
236.923
1
163.076
9
193.846
2
227.692
3
187.692
3
187.692
3
123.076
9
132.307
7
187.692
3
187.692
3
178.461
5
150.769
2
187.692
3
184.615
4
360
156.923
1
190.769
2
116.9231
193.846
2
332.3077
163.0769
132.3077
227.6923
150.7692
178.4615
190.7692
187.6923
184.6154
163.0769
187.6923
187.6923
123.0769
132.3077
187.6923
360
156.9231
190.7692
116.9231
193.8462
2.955
2.427241963
3.625
1.837931034
3.545
2.9
1.836206897
2.9
1.836206897
3.545
3.545
1.36359447
3.545
2.005359661
2.955
3.545
2.955
3.545
10
2.575
2.334951456
10
2.575
2.334951456
3738.158
15237.89
7999.86
12798.1
14066.26
3.33
3.348333333
1014843
535724
2.005359661
2.005359661
2.427241963
2.906666667
774284.8
2.6
1.908461538
10
2.575
2.334951456
11
2.6
2.485
817718.4
1.36359447
3.545
298912.3
1.36359447
1.908461538
12
2.28
2.258333333
3.385
2.383751846
11
2.6
12
2.28
13081.54
10328.66
2.755
720240.9
1.908461538
2.6
3.545
3.385
2.383751846
3.33
1.920720721
3.545
3.385
2.383751846
2.9
1.836206897
3.33
3.545
1.932065365
2.041929296
1.869002488
2.167248776
2.183515573
2.258333333
11
1.735053676
2.427241963
3.025
13071.52
1.893165864
1.36359447
1.908461538
3.176666667
3.42
3.258333333
SAMPLE CALCULATION:
250955
11
6014.331
13901.37
3.356666667
831114.1
706480.5
905906.1
1.36359447
1.36359447
1.920720721
1.36359447
1.885269285
1.889355679
1.706840696
Area= S ( S A )( SB )( SC )
S=
A+ B+C
2
where A, B and C are the lengths of the sides of the triangle and S is the semiperimeter.
For Triangle 1:
S=
The tonnage of a triangle is solved by calculating first the weighted density of each drillhole, then by calculating the weighted density of the triangle of its three
drillholes/vertices.
DT
T
where D is the density of the component and T is the thickness of the component.
For Triangle 1:
3+3.5+4
=3.62 5
20
3+2.3+3.2
=2.95
20
2+3+3.5
=3.3483333333
20
(3.625+2.95+3.3483333333)
=2.975
3
The tonnage is the product of the weighted density of the triangle, the area of the triangle and the average thickness. For Triangle 1:
1.837931034+2.368644068+2.553191489
=2.25325531
3
POLYGON METHOD
Triangle
Area (m )
Grade with
Density
Factor (%)
18000
1.83793103
2
3
4
5
6
7
8
9
10
11
12
18640
27100
18270
21300
24270
24330
19320
28970
33600
27470
23160
2.00535966
1.8362069
1.92072072
2.36864407
2.42724196
1.36359447
2.38375185
2.55319149
2.33495146
1.90846154
2.25833333
Thickness
(m)
20
20
20
20
20
20
20
20
20
20
20
20
SAMPLE CALCULATION:
Weighted
Density of
Drillhole
Tonnage
(t)
3.625
1305000
3.545
1321576
2.9
1571800
3.33
1216782
2.95
1256700
2.955
1434357
2.7125
1319903
3.385
1307964
2.35
1361590
2.575
1730400
2.6
1428440
2.28
1056096
To calculate for the tonnage, we must get the product of the area, weighted density and thickness of a drillhole. For DRH-1: