ItemNo.
a.
b.
i)
ii)
c)
i)
ii)
Description of Item
1 Earthwork in Excavation
For isolated footing
For brickwork
Long walls
Short walls
For boundary tile placement
Long walls
Short walls
2 Flagstone paving
Flagstone brick soling for flagstone paving
Longwall
Shortwall
50mm thick PCC(1:2:4)
Long side
Short side
Providing and laying 50mm thick flagstone in
(1:4) cement mortar
3 150mm stone soling for footing
75 mm PCC(1:3:6) for footing
PCC work(1:3:6) for RCC in footing+Column
4
i)
ii)
5 Steel reinforcements(2.5% of PCC)
No.
Length(ft)
1
3.33
2
2
10.00
8.50
2
2
15.50
10.50
2
2
15.83
10.83
2
2
15.83
10.83
2
1
1
10.83
3.33
3.33
1
1
1
3.33
1.00
1
6 PCC(1:2:4) for staircase
i)
ii)
iii)
7 Marble over staircase
8 Brickwork (1:3 mortar)
9 Brick soling for B/W
10 PCC (1:3:6) for B/W
11 Stone finishing around brick masonry
12 Metal posts
13 Copper railing (3')
14 Wooden frame(1'2"X1')
15 Wooden support for roof(1'X1.5")
16 Clay tile roofing
2
2
2
3
1.00
1.00
1.00
2.00
12.00
1.00
1.00
8.00
4.00
3
3
3
3
37.00
37.00
37.00
40.00
40.00
1.67
of Quantity Calculation
Breadth(ft)
Height(ft)
Quantity
Unit
3.33
3.33
36.93 cu.ft
0.75
0.75
0.50
0.50
7.50 cu.ft
6.38 cu.ft
2.50
2.50
0.38
0.38
3'4"
29.06
19.69
15'6",2'6",4.5"
10'6"
2.50
2.50
39.58 sq.ft
27.08 sq.ft
15'10"
10'10"
2.50
2.50
39.58 sq.ft
27.08 sq.ft
15'10"
10'10"
2.50
3.33
3.33
27.08 sq.ft
11.09 sq.ft
11.09 sq.ft
10'10"
3'4"
3'4"
7.45 cu.ft
10.17 cu.ft
of base(Here 2.24
sq.ft)=Area)
Of column over base
2.24
1.00
10.17
321.37 kg
3
2
1
1
0.75
0.75
0.75
0.17
3.00
1.67
Explanatory Notes
0.5
0.5
0.5
2.00
0.33
9 cu.ft
6 cu.ft
3 cu.ft
9.00 sq.ft
55.50 cu.ft
27.75 sq.ft
9.25 sq.ft
13.33 sq.ft
12.00 Nos.
120.00 sq.ft
1.00 Nos.
80.00 Nos.
6.66 sq.ft
((7.45+10.17)*2.5/100)*729.
55
1st step
2nd step
3rd step
P=(10'-9")*4,B=9",H=2'
4" thickness
On top and bottom
A=(0.5X1'X1'x2)+(1'4"X6")
Description of Item
1 Earthwork in Excavation
For isolated footing
For brickwork
Long walls
Short walls
For boundary tile placement
Long walls
Short walls
2 Flagstone paving
Flagstone brick soling for flagstone paving
Longwall
Shortwall
50mm thick PCC(1:2:4)
Long side
Short side
Providing and laying 50mm thick flagstone in
(1:4) cement mortar
3 150mm stone soling for footing
75 mm PCC(1:3:6) for footing
PCC work(1:3:6) for RCC in footing+Column
4
i)
ii)
5 Steel reinforcements(2.5% of PCC)
6 PCC(1:2:4) for staircase
i)
ii)
iii)
7 Providing and laying Marble over staircase
8 laying Brickwork (1:3 mortar)
9 Laying Brick soling for B/W
10 PCC (1:3:6) for B/W
11 Stone finishing around brick masonry
12 Metal posts
13 Copper railing (3')
14 Wooden frame(1'2"X1')
15 Wooden support for roof(1'X1.5")
16 Clay tile roofing
No.
Quantity
Unit
36.93 cu.ft
2
2
7.50 cu.ft
6.38 cu.ft
2
2
29.06 cu.ft
19.69 cu.ft
2
2
39.58 sq.ft
27.08 sq.ft
2
2
39.58 sq.ft
27.08 sq.ft
2
1
1
27.08 sq.ft
11.09 sq.ft
11.09 sq.ft
1
1
1
7.45 cu.ft
10.17 cu.ft
321.37 kg
2
2
2
3
1.00
1.00
1.00
2.00
12.00
1.00
1.00
8.00
4.00
9 cu.ft
6 cu.ft
3 cu.ft
9.00 sq.ft
55.50 cu.ft
27.75 sq.ft
9.25 sq.ft
13.33 sq.ft
12.00 Nos.
120.00 sq.ft
1.00 Nos.
8.00 Nos.
6.66 sq.ft
Total cost
Reference:
Chichhok Solukhumbu handicraft,Kathmandu,Nepal
DHL office,Kathmandu
Israel Embassy,Kathmandu
Central Bureou of Statistics,Israel
Buddha Arts and Crafts,Kapan,kathmandu
http://theconstructor.org/
t Estimation
Rate(In USD)
Amount(USD)
$0.15
Explanatory Notes
$5.54
$0.15
$0.15
$0.15
$0.15
$4.36
$2.95
$3.00
$3.00
$118.75
$81.25
$6.00
$6.00
$237.50
$162.50
$5.00
$8.00
$135.41
$0.00
$88.71
$8.00
$8.00
$0.80
$59.58
$81.33
$257.09
$7.00
$7.00
$7.00
$8.00
$5.00
$3.00
$7.00
$4.00
$15.00
$83.50
$662.00
$58.75
$37.54
$63.00
$42.00
$21.00
$72.00
$277.50
$83.25
$64.75
$53.33
$180.00
$10,020.00 (L+M)+Shipping=($8400)+$1620
$662.00 (L+M)+Shipping=($300+$332)
$470.00 (L+M)+shipping=($120+$350)
$250.00
$ 13493.81