Calculation of Area

Population of BKM
Urban population growth rate
Projected population
Waste generation rate
Waste generation per day

Type
Organic
Plastic
Glass
Metal
Paper
Textile
Wood
Bone
Rubber
Fensi
Innert
Other
Special waste

=
=
=
=
=

Density Kg/m3
Range
Typical
70.73 120-480
290
7.02
30-130
65
2.26 160-480
195
0.42
45-160
90
3.5
30-130
85
3.2
30-100
65
0.2 120-320
240
0.19 120-320
240
0.29
90-200
130
0.17
30-100
65
10.73 320-960
480
1.29 320-960
480
120-320
240
Total Load =
Density

83658 (2068 BS)


1.7 %
143476 (2100 BS)
0.3 kg/c/day
43042.67 kg/day
43 Ton/day
To CP
Wt
Volume
17.00
58.62
17.00
58.62
0.29

To LF
Wt
Volume
13.41
46.25
0.12
0.96
0.07
1.12
4.61
9.61
0.55
1.16
5.00
20.83
23.78
79.94
0.30

Area calculation for LF and CP at Taikabu


Assuming 30% residue is produced after recovery then
Total load on LF
=
25.95 ton/day
Density of waste after compaction
=
0.5 ton/m3
Total volume of waste
=
51.89 m3
Site condition allows upto 5 lifts
Assuming plan area of cell= 6*6
=
36 m2
Then Height of cell
=
1.44 m
If daily cover of 15 cm is provided then
Height of cell including daily cover
=
1.59 m
Volume of cell including daily cover
=
60.19 m3
There will be 4 cells in a lift then intermediate cover of 30 cm will be provided
Height of lift including intermediate cover =
6.67 m
Area of land fill
=
20707.82 m2
Area for LF operation and management =
10000 m2
Area for Leachate treatment
500 m2

To MRF
Wt
3.02
0.97
0.18
1.51
1.38
0.09
0.08
7.22
0.08

Area calculation for CP


Total load to CP
=
17 ton/day
If 35% density is increased by shredding
Density of organic
=
0.39 ton/m3
Volume of waste
=
43.42 m3/day
Sectional area of pile
=
3.5 m2
Length of pile/day
=
12.3 m
If clearance is left 3 m between two consecutive pile
Area required
=
73.72 m2/day
Assuming composting completes in 30 days
Required no of cell
=
31
Total area for CP pile
=
2285.218
Additional service area
=
3000
Area for Buffer zone
=
40000
Aprox area to be acquised
=
76493.04 m2
7.65 ha
150.4 ropani
Area calculation for TS at Hanumante
Organic waste received at TS
Volume of waste
If height is limited upto 1.5 m
Area required for receive
Area required for equipment
Area for management office
Direct loading TS for special waste
Additional service area
Total area for TS

=
=

30.41 ton
104.8755 m3

=
=
=
=
=
=

69.91701 m2
500 m2
350 m2
500 m2
2000 m2
3419.917 m2
0.34 ha
6.7 ropani

Area calculation for MRF at Bhelukhel


Waste received at MRF
=
If height of pile is 2 m
Area required
=
Area required for equipment
=
Area for management office
=
Area for recovery storage
=
Area for incinarator
=
Additional service area
=
Total area for MRF
=

105.86 m3
52.92794
1000 m2
150 m2
1100
200 m2
2000 m2
4502.928 m2
0.45 ha
8.9 ropani

3m

Financial proposal
Currently BKM is spending 53.7 M per anum for waste collection and management. The main sources of
income of municipality are household tax and tourist tax.
Activity -A (Awareness and model program)
People Aware programme at Tathali
People Aware programme at BKM for seperation at source
Model progam for SS
Procurement of Containers
Contigency
Total for Activity- A
Activity- B (Civil construction and Land Acquisition)
Acquisition of Land
Civil Construction at TS
Civil Construction at MRF
Civil Construction at LF and CP
Total for Activity- B
Activity-C (Procurement of Equipments)
Equipment
No
Shredder
Sheep foot Roller
Weighing bridge
Submersible pump and chain
Aerator
DG30 KW
Warm air blower
Transformer
Excavator
Conveyor for MRF
Bull Dozer
Total for Activity C
Total of A B and C

120.29 M
15 M
20 M
80 M
235.29 M

Rate
2
1
2
1
1
3
1
3
1
1
2

1M
1M
2M
4.7 M
1.3 M
10.0 M

25
12.5
0.25
0.2
3
15
3
1
10
1
10

Amount
50
12.5
0.5
0.2
3
45
3
3
10
1
20
148.2
393.5

M
M
M
M
M
M
M
M
M
M
M
M
M

To MRF
Remark
Volume
46.44
4.98
2.01
17.71
21.17 Excess will be
0.36 incinarated
0.34
93.00
0.08

1.5 m

main sources of