PROJECT SCHEDULE
ID
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
Task Name
Duration
PRE DEVELOPMENT
PHE Approval Works for Project Capacity Enhancement up to SPPA
Project Land Purchases
Surveys (Engineering and Land) throughout the project period
Soil Investigations
Detailed Designs
Conduct Detailed Civil Designs & approval by the client
Conduct Detailed Mechanical Designs and approval by the client
Condcut Detailed Electrical Designs & approval by the client
CIVIL ENGINEERING WORKS
PRELIMINARIES
Construction of Access gravel roads in the project area
Culvert preparation near Old Dambulu Oya
Maintenance of all Access roads related to the project
Obtain Insurance of CAR, Workman's compensation - Civil
Obtain Insurance of Pipe transport and erection incl of material
Obtain Insurance of E&M Equipment for transport and erection
Mobilization of contractor and Engineers facilities
Cutting, felling and removing trees (girth more than 500mm)
Site Clearing and grubbing
DEALING WITH WATER DURING CONSTRUCTION.
Setting out coffer dam in the intake area
Construction,maintenance of flood protection works - Intake (50m)
Construction, maintenance of flood protection works - confluence (50m)
Dewatering of surface construction areas PH-1 & shoring if required
Dewatering of surface construction areas PH-2 shoring if required
INTAKE & TRASHRACK BLOCK
Setting out works
Soil and Soft rock excavation
Rock excavation (Presplitting, mucking in foundation)
Grade 15/38 Concrete in screed
Straight form work smooth finish
Furnishing and placing 225mm pvc water stop
Furnishing and fixing High yield steel reinforcement
Grade 25/19 Concrete in foundations and walls
Boulder packing in erosive areas
Rubble masonary works in retaining walls, rainwater channels etc
Turfing and landscaping
HOBAS Engineering GmbH Austria
Finalise the pipe BOQ, engineering drawings and part list
Establishment of LC
Despatch shipment & Sea freight up to Colomobo port
Clearing & terminal handling etc
HOBAS Pipe Transport, Unloading, Transport to path and pipe fixing
Transport shipment Colombo Port to Dambulla Yard
Machine Mobilization and demobilization for Unloading pipes
De - nesting pipes at Dambulla Yard
Fixing coupling at yard
Transport pipe to Dambulla Yard to site
Laying pipe and fixing
HOBAS PIPE PATH CIVIL WORKS (300m)
Setting out works
Temporary Access Roads
Soil/existing structures and Soft rock excavation
Rock excavation (Presplitting/Chemical blasting/mucking)
Cutting, felling and disposal of trees
180 days
60 days
90 days
180 days
60 days
60 days
60 days
60 days
60 days
494 days
400 days
180 days
15 days
400 days
5 days
90 days
90 days
90 days
90 days
90 days
303 days
5 days
250 days
200 days
90 days
90 days
224 days
5 days
30 days
30 days
5 days
60 days
30 days
60 days
60 days
15 days
30 days
60 days
59 days
1 day
14 days
20 days
7 days
220 days
35 days
35 days
60 days
30 days
180 days
180 days
213 days
5 days
20 days
180 days
180 days
5 days
Start
Sun 01-02-15
Sun 01-02-15
Sun 01-02-15
Sun 01-02-15
Sun 01-02-15
Sun 01-02-15
Sun 01-02-15
Sun 01-02-15
Sun 01-02-15
Sun 01-02-15
Sun 01-02-15
Sun 01-02-15
Mon 01-06-15
Sun 01-02-15
Sun 01-02-15
Sun 01-02-15
Sun 01-02-15
Sun 01-02-15
Sun 01-02-15
Sun 01-02-15
Wed 18-02-15
Wed 18-02-15
Fri 13-03-15
Mon 01-06-15
Fri 01-05-15
Mon 01-06-15
Mon 20-04-15
Mon 20-04-15
Sat 25-04-15
Sat 25-04-15
Mon 25-05-15
Mon 01-06-15
Sat 01-08-15
Mon 01-06-15
Mon 15-06-15
Tue 01-09-15
Tue 01-09-15
Thu 01-10-15
Sun 01-02-15
Sun 01-02-15
Sun 01-02-15
Wed 25-02-15
Wed 25-03-15
Sun 05-04-15
Sun 05-04-15
Sun 05-04-15
Sun 05-04-15
Mon 20-04-15
Fri 15-05-15
Fri 15-05-15
Wed 01-04-15
Wed 01-04-15
Sun 05-04-15
Mon 20-04-15
Mon 20-04-15
Sun 05-04-15
Finish
2015
1st Quarter
Jan
Feb
Mar
2nd Quarter
Apr
May
Jun
3rd Quarter
Jul
Aug
Sep
4th Quarter
Oct
Nov
Fri 31-07-15
Thu 02-04-15
Sat 02-05-15
Fri 31-07-15
Thu 02-04-15
Thu 02-04-15
Thu 02-04-15
Thu 02-04-15
Thu 02-04-15
Thu 09-06-16
Mon 07-03-16
Fri 31-07-15
Tue 16-06-15
Mon 07-03-16
Fri 06-02-15
Sat 02-05-15
Sat 02-05-15
Sat 02-05-15
Sat 02-05-15
Sat 02-05-15
Fri 18-12-15
Mon 23-02-15
Wed 18-11-15
Fri 18-12-15
Thu 30-07-15
Sun 30-08-15
Mon 30-11-15
Sat 25-04-15
Mon 25-05-15
Mon 25-05-15
Sat 30-05-15
Fri 31-07-15
Mon 31-08-15
Fri 31-07-15
Fri 14-08-15
Wed 16-09-15
Thu 01-10-15
Mon 30-11-15
Wed 01-04-15
Mon 02-02-15
Sun 15-02-15
Tue 17-03-15
Wed 01-04-15
Wed 11-11-15
Sun 10-05-15
Sun 10-05-15
Thu 04-06-15
Wed 20-05-15
Wed 11-11-15
Wed 11-11-15
Sat 31-10-15
Mon 06-04-15
Sat 25-04-15
Sat 17-10-15
Sat 17-10-15
Fri 10-04-15
Task
Progress
Summary
External Tasks
Split
Milestone
Project Summary
External Milestone
Page 1
Deadline
Dec
2016
1st Quarter
Jan
Feb
Mar
2nd Quarter
Apr
May
Jun
3rd Quarter
Jul
Aug
Task Name
Duration
150 days
120 days
120 days
120 days
30 days
30 days
180 days
268 days
5 days
30 days
5 days
30 days
30 days
60 days
20 days
21 days
30 days
30 days
20 days
30 days
30 days
15 days
10 days
14 days
30 days
15 days
30 days
15 days
15 days
20 days
20 days
20 days
20 days
20 days
20 days
90 days
51 days
2 days
10 days
10 days
10 days
10 days
14 days
10 days
20 days
5 days
133 days
5 days
30 days
30 days
15 days
30 days
30 days
30 days
30 days
60 days
20 days
Start
Fri 15-05-15
Mon 01-06-15
Mon 01-06-15
Fri 05-06-15
Thu 01-10-15
Thu 01-10-15
Fri 01-05-15
Mon 20-04-15
Mon 20-04-15
Sat 25-04-15
Mon 25-05-15
Mon 01-06-15
Wed 10-06-15
Sun 10-05-15
Sat 20-06-15
Wed 01-07-15
Fri 10-07-15
Fri 10-07-15
Sat 25-07-15
Mon 10-08-15
Tue 01-09-15
Tue 15-09-15
Sun 20-09-15
Sun 01-11-15
Mon 10-08-15
Thu 10-09-15
Thu 01-10-15
Tue 15-09-15
Tue 15-09-15
Mon 21-09-15
Sun 01-11-15
Sun 01-11-15
Sun 01-11-15
Thu 01-10-15
Thu 01-10-15
Thu 15-10-15
Sun 15-11-15
Sun 15-11-15
Tue 17-11-15
Fri 20-11-15
Fri 20-11-15
Wed 25-11-15
Sat 05-12-15
Tue 15-12-15
Tue 15-12-15
Thu 31-12-15
Mon 20-04-15
Mon 20-04-15
Sat 25-04-15
Sat 25-04-15
Thu 30-04-15
Tue 05-05-15
Tue 05-05-15
Sun 10-05-15
Wed 10-06-15
Wed 10-06-15
Mon 01-06-15
Finish
2015
1st Quarter
Jan
Feb
Mar
2nd Quarter
Apr
May
Jun
3rd Quarter
Jul
Aug
Sep
4th Quarter
Oct
Nov
Mon 12-10-15
Tue 29-09-15
Tue 29-09-15
Sat 03-10-15
Sat 31-10-15
Sat 31-10-15
Wed 28-10-15
Wed 13-01-16
Sat 25-04-15
Mon 25-05-15
Sat 30-05-15
Wed 01-07-15
Fri 10-07-15
Thu 09-07-15
Fri 10-07-15
Wed 22-07-15
Sun 09-08-15
Sun 09-08-15
Fri 14-08-15
Wed 09-09-15
Thu 01-10-15
Wed 30-09-15
Wed 30-09-15
Sun 15-11-15
Wed 09-09-15
Fri 25-09-15
Sat 31-10-15
Wed 30-09-15
Wed 30-09-15
Sun 11-10-15
Sat 21-11-15
Sat 21-11-15
Sat 21-11-15
Wed 21-10-15
Wed 21-10-15
Wed 13-01-16
Tue 05-01-16
Tue 17-11-15
Fri 27-11-15
Mon 30-11-15
Mon 30-11-15
Sat 05-12-15
Sat 19-12-15
Fri 25-12-15
Mon 04-01-16
Tue 05-01-16
Mon 31-08-15
Sat 25-04-15
Mon 25-05-15
Mon 25-05-15
Fri 15-05-15
Thu 04-06-15
Thu 04-06-15
Tue 09-06-15
Fri 10-07-15
Sun 09-08-15
Sun 21-06-15
Task
Progress
Summary
External Tasks
Split
Milestone
Project Summary
External Milestone
Page 2
Deadline
Dec
2016
1st Quarter
Jan
Feb
Mar
2nd Quarter
Apr
May
Jun
3rd Quarter
Jul
Aug
Task Name
Duration
30 days
20 days
30 days
211 days
5 days
60 days
60 days
45 days
90 days
30 days
30 days
30 days
30 days
60 days
20 days
30 days
20 days
30 days
273 days
10 days
60 days
90 days
30 days
30 days
30 days
15 days
5 days
20 days
20 days
20 days
30 days
30 days
45 days
197 days
5 days
30 days
5 days
20 days
20 days
20 days
60 days
10 days
10 days
15 days
20 days
10 days
15 days
30 days
30 days
20 days
10 days
20 days
30 days
30 days
30 days
10 days
10 days
Start
Mon 15-06-15
Wed 15-07-15
Sat 01-08-15
Sun 01-02-15
Sun 01-02-15
Sun 01-02-15
Sun 01-02-15
Sun 15-02-15
Fri 15-05-15
Mon 20-04-15
Tue 05-05-15
Sun 10-05-15
Wed 10-06-15
Wed 10-06-15
Mon 01-06-15
Mon 15-06-15
Wed 15-07-15
Sat 01-08-15
Mon 01-06-15
Mon 01-06-15
Wed 10-06-15
Wed 01-07-15
Tue 15-09-15
Thu 01-10-15
Thu 01-10-15
Tue 01-12-15
Sun 01-11-15
Tue 10-11-15
Sun 15-11-15
Fri 20-11-15
Tue 15-12-15
Tue 05-01-16
Fri 15-01-16
Thu 01-10-15
Thu 01-10-15
Mon 05-10-15
Thu 05-11-15
Tue 10-11-15
Fri 20-11-15
Wed 25-11-15
Thu 01-10-15
Tue 01-12-15
Tue 15-12-15
Fri 25-12-15
Tue 05-01-16
Fri 15-01-16
Wed 20-01-16
Mon 25-01-16
Mon 25-01-16
Thu 25-02-16
Thu 25-02-16
Tue 01-03-16
Fri 05-02-16
Fri 05-02-16
Sun 10-01-16
Wed 20-01-16
Wed 20-01-16
Finish
2015
1st Quarter
Jan
Feb
Mar
2nd Quarter
Apr
May
Jun
3rd Quarter
Jul
Aug
Sep
4th Quarter
Oct
Nov
Wed 15-07-15
Tue 04-08-15
Mon 31-08-15
Mon 31-08-15
Fri 06-02-15
Thu 02-04-15
Thu 02-04-15
Wed 01-04-15
Thu 13-08-15
Wed 20-05-15
Thu 04-06-15
Tue 09-06-15
Fri 10-07-15
Sun 09-08-15
Sun 21-06-15
Wed 15-07-15
Tue 04-08-15
Mon 31-08-15
Mon 29-02-16
Thu 11-06-15
Sun 09-08-15
Tue 29-09-15
Thu 15-10-15
Sat 31-10-15
Sat 31-10-15
Wed 16-12-15
Fri 06-11-15
Mon 30-11-15
Sat 05-12-15
Thu 10-12-15
Thu 14-01-16
Thu 04-02-16
Mon 29-02-16
Fri 15-04-16
Tue 06-10-15
Wed 04-11-15
Tue 10-11-15
Mon 30-11-15
Thu 10-12-15
Tue 15-12-15
Mon 30-11-15
Fri 11-12-15
Fri 25-12-15
Sat 09-01-16
Mon 25-01-16
Mon 25-01-16
Thu 04-02-16
Wed 24-02-16
Wed 24-02-16
Wed 16-03-16
Sun 06-03-16
Mon 21-03-16
Sun 06-03-16
Sun 06-03-16
Tue 09-02-16
Sat 30-01-16
Sat 30-01-16
Task
Progress
Summary
External Tasks
Split
Milestone
Project Summary
External Milestone
Page 3
Deadline
Dec
2016
1st Quarter
Jan
Feb
Mar
2nd Quarter
Apr
May
Jun
3rd Quarter
Jul
Aug
Task Name
Duration
10 days
20 days
20 days
20 days
30 days
20 days
60 days
172 days
5 days
30 days
5 days
45 days
45 days
45 days
30 days
30 days
30 days
45 days
45 days
152 days
10 days
120 days
120 days
30 days
60 days
30 days
30 days
30 days
30 days
20 days
25 days
20 days
30 days
447 days
5 days
30 days
30 days
50 days
20 days
35 days
30 days
30 days
30 days
20 days
435 days
60 days
15 days
10 days
60 days
91 days
30 days
30 days
30 days
30 days
30 days
45 days
91 days
Start
Mon 01-02-16
Tue 01-03-16
Tue 01-03-16
Tue 01-03-16
Fri 05-02-16
Mon 15-02-16
Mon 15-02-16
Thu 01-10-15
Thu 01-10-15
Mon 05-10-15
Thu 05-11-15
Sun 15-11-15
Fri 20-11-15
Mon 30-11-15
Tue 15-12-15
Tue 05-01-16
Fri 15-01-16
Mon 01-02-16
Fri 05-02-16
Sun 20-12-15
Sun 20-12-15
Fri 01-01-16
Fri 01-01-16
Sat 20-02-16
Thu 25-02-16
Tue 01-03-16
Tue 15-03-16
Sun 20-03-16
Fri 25-03-16
Fri 01-04-16
Sun 10-04-16
Sun 10-04-16
Wed 20-04-16
Fri 20-03-15
Mon 01-02-16
Wed 10-02-16
Thu 10-03-16
Wed 20-04-16
Fri 20-03-15
Sat 20-02-16
Thu 25-02-16
Tue 01-03-16
Thu 10-03-16
Sun 20-03-16
Sun 01-02-15
Sun 01-02-15
Sun 01-02-15
Tue 10-02-15
Sun 01-02-15
Thu 01-10-15
Thu 01-10-15
Sun 01-11-15
Tue 01-12-15
Thu 01-10-15
Tue 01-12-15
Sun 01-11-15
Thu 01-10-15
Finish
2015
1st Quarter
Jan
Feb
Mar
2nd Quarter
Apr
May
Jun
3rd Quarter
Jul
Aug
Sep
4th Quarter
Oct
Nov
Thu 11-02-16
Mon 21-03-16
Mon 21-03-16
Mon 21-03-16
Sun 06-03-16
Sun 06-03-16
Fri 15-04-16
Mon 21-03-16
Tue 06-10-15
Wed 04-11-15
Tue 10-11-15
Wed 30-12-15
Mon 04-01-16
Thu 14-01-16
Thu 14-01-16
Thu 04-02-16
Sun 14-02-16
Thu 17-03-16
Mon 21-03-16
Fri 20-05-16
Wed 30-12-15
Sat 30-04-16
Sat 30-04-16
Mon 21-03-16
Mon 25-04-16
Thu 31-03-16
Thu 14-04-16
Tue 19-04-16
Sun 24-04-16
Thu 21-04-16
Thu 05-05-16
Sat 30-04-16
Fri 20-05-16
Thu 09-06-16
Sat 06-02-16
Fri 11-03-16
Sat 09-04-16
Thu 09-06-16
Thu 09-04-15
Sat 26-03-16
Sat 26-03-16
Thu 31-03-16
Sat 09-04-16
Sat 09-04-16
Mon 11-04-16
Thu 02-04-15
Mon 16-02-15
Fri 20-02-15
Thu 02-04-15
Thu 31-12-15
Sat 31-10-15
Tue 01-12-15
Thu 31-12-15
Sat 31-10-15
Thu 31-12-15
Wed 16-12-15
Thu 31-12-15
Task
Progress
Summary
External Tasks
Split
Milestone
Project Summary
External Milestone
Page 4
Deadline
Dec
2016
1st Quarter
Jan
Feb
Mar
2nd Quarter
Apr
May
Jun
3rd Quarter
Jul
Aug
Task Name
Duration
30 days
30 days
30 days
30 days
30 days
45 days
102 days
2 days
60 days
7 days
15 days
10 days
10 days
10 days
15 days
10 days
162 days
2 days
60 days
7 days
14 days
10 days
10 days
10 days
15 days
10 days
432 days
271 days
30 days
120 days
60 days
35 days
3 days
371 days
30 days
120 days
60 days
30 days
15 days
371 days
30 days
160 days
160 days
90 days
90 days
30 days
20 days
30 days
30 days
30 days
30 days
15 days
371 days
30 days
120 days
60 days
30 days
Start
Thu 01-10-15
Sun 01-11-15
Tue 01-12-15
Thu 01-10-15
Tue 01-12-15
Sun 01-11-15
Sun 01-11-15
Sun 01-11-15
Thu 05-11-15
Thu 05-11-15
Sun 15-11-15
Tue 01-12-15
Thu 10-12-15
Tue 05-01-16
Fri 15-01-16
Mon 01-02-16
Sun 01-11-15
Sun 01-11-15
Thu 05-11-15
Tue 05-01-16
Fri 15-01-16
Mon 01-02-16
Mon 15-02-16
Tue 01-03-16
Tue 15-03-16
Fri 01-04-16
Wed 01-04-15
Wed 01-04-15
Wed 01-04-15
Fri 01-05-15
Tue 01-09-15
Sun 15-11-15
Fri 25-12-15
Fri 15-05-15
Sat 01-08-15
Tue 01-09-15
Mon 01-02-16
Wed 20-04-16
Fri 15-05-15
Fri 15-05-15
Sat 01-08-15
Tue 01-09-15
Tue 01-09-15
Tue 01-09-15
Tue 01-09-15
Mon 15-02-16
Mon 15-02-16
Tue 15-09-15
Wed 10-02-16
Sun 01-11-15
Wed 20-04-16
Fri 15-05-15
Fri 15-05-15
Sat 01-08-15
Tue 01-09-15
Mon 01-02-16
Wed 20-04-16
Finish
2015
1st Quarter
Jan
Feb
Mar
2nd Quarter
Apr
May
Jun
3rd Quarter
Jul
Aug
Sep
4th Quarter
Oct
Nov
Sat 31-10-15
Tue 01-12-15
Thu 31-12-15
Sat 31-10-15
Thu 31-12-15
Wed 16-12-15
Thu 11-02-16
Tue 03-11-15
Mon 04-01-16
Thu 12-11-15
Mon 30-11-15
Fri 11-12-15
Sun 20-12-15
Fri 15-01-16
Sat 30-01-16
Thu 11-02-16
Mon 11-04-16
Tue 03-11-15
Mon 04-01-16
Tue 12-01-16
Fri 29-01-16
Thu 11-02-16
Thu 25-02-16
Fri 11-03-16
Wed 30-03-16
Mon 11-04-16
Mon 06-06-16
Mon 28-12-15
Fri 01-05-15
Sat 29-08-15
Sat 31-10-15
Sun 20-12-15
Mon 28-12-15
Fri 20-05-16
Mon 31-08-15
Wed 30-12-15
Fri 01-04-16
Fri 20-05-16
Sat 30-05-15
Fri 20-05-16
Mon 31-08-15
Mon 08-02-16
Mon 08-02-16
Mon 30-11-15
Mon 30-11-15
Wed 16-03-16
Sun 06-03-16
Thu 15-10-15
Fri 11-03-16
Tue 01-12-15
Fri 20-05-16
Sat 30-05-15
Fri 20-05-16
Mon 31-08-15
Wed 30-12-15
Fri 01-04-16
Fri 20-05-16
Task
Progress
Summary
External Tasks
Split
Milestone
Project Summary
External Milestone
Page 5
Deadline
Dec
2016
1st Quarter
Jan
Feb
Mar
2nd Quarter
Apr
May
Jun
3rd Quarter
Jul
Aug
Task Name
Duration
Dry Testing
Power & Control Cables
Finalise specificaitons and prepare Documents for tender
690V, 400mm power cables & Accessories - Order & trans up to site
All Control Cables - LC opening and transport up to site
Cable Trays Max of 20m length inside PH supply and install
Power and Control Cable laying
Dry Testing
Energising
Transformers
Finalise specificaitons and prepare Documents for tender
Auxiliary Transformer - LC opening and transport up to site
Power Transformer - LC opening and transport up to site
Installation and oil filling
Control and power cable intergration
Dry Testing
Energising
CEB Transmission Line
Cordinate with CEB and finalise the line path, site visits and prepare estim
Obtain CEB Estimate for LINX Line Construction With Double Cct & Com
Payment for material to CEB
Prepare Techincal spec for line construction, finalise the contractor
Construciton of line, erection of poles incl of civil cost
Fixing of cross arms and other accessroies and stringing, installation of L
CEB checking of line and handing over procedures
Energising the line by CEB up to LBS
Connection of the line to the plant
Arial Bundle Conductor Line from Turbine House to Power House
Finalise specificaitons and prepare Documents for tender
Importation of arial bundle conductor from opening of LC up to transport t
Prepare Techincal spec for line construction, finalise the contractor
Mobilisation of the line contractor, erection of poles incl of civil cost
Fixing of clamps arms and other accessroies and stringing
Intergration of line to 33kV switchyard and CE line
Energising the line
CEB metering Equipment incl of CT & PT Units
Cordinate with CEB, finalise estimate, site visits, prepare estimate
Estimate from CEB for metering Equipment incl of CT & PT Units
Supply and installation of CEB metering Equipment
Commissioning of the meter by CEB
MECHANICAL WORKS
Powerhouse 1 & 2 Overhead cranes
Finalise specificaitons and prepare Documents for tender
20 ton overhead crane - opening LC up to transport to site
Clearing and Internal Transport (2 Nos of 40' containers)
Erection of overhead crane
Testing and commissioning of crane
Fine Trash Rack at Intake & Before PH2
Finalise the design and prepare BOQ, finalise the fabricators
Purchase of steel inclusive of nuts and bolts
Galvanizing cost inclusive of transport
Fabrication of local steel parts including transport and all OH
Erection
Installation and commissioning & testing
Main Gates at Intake before pipe entrance & Main Gate beofore PH2
Finalise the design and prepare BOQ, finalise the fabricators
Import process for all import material
15 days
371 days
30 days
120 days
120 days
60 days
30 days
15 days
5 days
371 days
30 days
120 days
180 days
30 days
30 days
15 days
5 days
402 days
120 days
1 day
10 days
30 days
60 days
30 days
15 days
5 days
5 days
341 days
30 days
90 days
30 days
45 days
30 days
5 days
5 days
238 days
120 days
20 days
5 days
5 days
442 days
212 days
30 days
120 days
15 days
45 days
10 days
432 days
60 days
30 days
30 days
30 days
30 days
5 days
442 days
60 days
150 days
Start
Fri 15-05-15
Fri 15-05-15
Sat 01-08-15
Tue 01-09-15
Tue 01-09-15
Mon 01-02-16
Wed 20-04-16
Fri 15-05-15
Mon 01-06-15
Fri 15-05-15
Wed 01-07-15
Sat 01-08-15
Sat 01-08-15
Tue 01-03-16
Wed 20-04-16
Fri 15-05-15
Mon 01-06-15
Fri 01-05-15
Fri 01-05-15
Tue 01-09-15
Thu 10-09-15
Sat 15-08-15
Tue 15-09-15
Sun 15-11-15
Tue 15-12-15
Tue 05-01-16
Wed 01-06-16
Wed 01-07-15
Wed 01-07-15
Sat 01-08-15
Wed 15-07-15
Thu 15-10-15
Sun 15-11-15
Wed 25-05-16
Wed 01-06-16
Fri 01-05-15
Fri 01-05-15
Tue 01-09-15
Tue 15-12-15
Sun 20-12-15
Wed 01-04-15
Fri 01-05-15
Fri 01-05-15
Mon 01-06-15
Thu 01-10-15
Thu 15-10-15
Sun 15-11-15
Wed 01-04-15
Wed 01-04-15
Fri 15-05-15
Thu 01-10-15
Sun 01-11-15
Tue 01-12-15
Wed 01-06-16
Wed 01-04-15
Wed 01-04-15
Fri 15-05-15
Finish
2015
1st Quarter
Jan
Feb
Mar
2nd Quarter
Apr
May
Jun
3rd Quarter
Jul
Aug
Sep
4th Quarter
Oct
Nov
Sat 30-05-15
Fri 20-05-16
Mon 31-08-15
Wed 30-12-15
Wed 30-12-15
Fri 01-04-16
Fri 20-05-16
Sat 30-05-15
Sat 06-06-15
Fri 20-05-16
Fri 31-07-15
Sun 29-11-15
Thu 28-01-16
Thu 31-03-16
Fri 20-05-16
Sat 30-05-15
Sat 06-06-15
Mon 06-06-16
Sat 29-08-15
Wed 02-09-15
Sun 20-09-15
Mon 14-09-15
Sat 14-11-15
Tue 15-12-15
Wed 30-12-15
Sun 10-01-16
Mon 06-06-16
Mon 06-06-16
Fri 31-07-15
Fri 30-10-15
Fri 14-08-15
Sun 29-11-15
Tue 15-12-15
Mon 30-05-16
Mon 06-06-16
Fri 25-12-15
Sat 29-08-15
Mon 21-09-15
Sun 20-12-15
Fri 25-12-15
Thu 16-06-16
Sun 29-11-15
Sun 31-05-15
Tue 29-09-15
Fri 16-10-15
Sun 29-11-15
Wed 25-11-15
Mon 06-06-16
Sun 31-05-15
Sun 14-06-15
Sat 31-10-15
Tue 01-12-15
Thu 31-12-15
Mon 06-06-16
Thu 16-06-16
Sun 31-05-15
Mon 12-10-15
Task
Progress
Summary
External Tasks
Split
Milestone
Project Summary
External Milestone
Page 6
Deadline
Dec
2016
1st Quarter
Jan
Feb
Mar
2nd Quarter
Apr
May
Jun
3rd Quarter
Jul
Aug
Task Name
Duration
60 days
60 days
30 days
60 days
60 days
15 days
111 days
20 days
5 days
5 days
5 days
5 days
5 days
5 days
5 days
5 days
10 days
5 days
5 days
5 days
5 days
5 days
Start
Mon 01-06-15
Mon 15-06-15
Sat 15-08-15
Thu 01-10-15
Tue 01-03-16
Wed 01-06-16
Sun 01-05-16
Sun 01-05-16
Sun 15-05-16
Tue 10-05-16
Wed 15-06-16
Mon 20-06-16
Sat 25-06-16
Thu 30-06-16
Tue 05-07-16
Sun 10-07-16
Fri 15-07-16
Mon 25-07-16
Sat 30-07-16
Fri 05-08-16
Wed 10-08-16
Mon 15-08-16
Finish
2015
1st Quarter
Jan
Feb
Mar
2nd Quarter
Apr
May
Jun
3rd Quarter
Jul
Aug
Sep
4th Quarter
Oct
Nov
Fri 31-07-15
Fri 14-08-15
Mon 14-09-15
Mon 30-11-15
Sat 30-04-16
Thu 16-06-16
Sat 20-08-16
Sat 21-05-16
Fri 20-05-16
Sun 15-05-16
Mon 20-06-16
Sat 25-06-16
Thu 30-06-16
Tue 05-07-16
Sun 10-07-16
Fri 15-07-16
Mon 25-07-16
Sat 30-07-16
Thu 04-08-16
Wed 10-08-16
Mon 15-08-16
Sat 20-08-16
Dec
2016
1st Quarter
Jan
Feb
Mar
2nd Quarter
Apr
May
Jun
3rd Quarter
Jul
Aug
Task
Progress
Summary
External Tasks
Split
Milestone
Project Summary
External Milestone
Page 7
Deadline