Sie sind auf Seite 1von 2

No bargain in this basement | Magazine Comment | Building

Page 1 of 2

No bargain in this basement


11 June 2015 | By Sarah Strange
Basement developments can often be a delicate and troublesome procedure. But whos at fault if things start to go
wrong?
It is fair to say that basement conversions are controversial. On the one hand, they can
cause mayhem and stress for neighbours but on the other, they provide an excellent
solution to alleviating cramped living once completed.
Basements also raise particular design challenges which can lead to numerous
problems if things go wrong, including if the insurers refuse to pay and the question
arises: who is at fault? The recent case of Goldswain vs Beltec Ltd (t/a BCS
Consulting) [2015] (TCC) provided welcome insight into these knotty issues where the
remit of an engineers duty to warn, and extent of responsibility for design, were
considered.
The facts of the case were as follows: Mr Goldswain and his partner Ms Hale (the
claimants) owned a ground floor flat in a semi-detached house. The flat had a cellar and the plan was to convert
the cellar into living accommodation by underpinning the outer walls and lowering the floor to create more height.
The claimants appointed engineer Beltec Ltd to design the essential structural works and AIMS Plumbing and
Building Services Limited to carry out the work.
AIMS started the work and installed the underpinning but apparently not anything else of importance. AIMS
retained Beltec to visit the site to inspect the construction of the initial pin and Beltec duly visited the site and
advised AIMS that the pin had not been constructed in accordance with the design.
Engineers should expect that builders would understand and act upon the construction method
indicated
The underpinning was completed but shortly afterwards, following increasing amounts of cracking in the
superstructure, the house collapsed. The claimants insurer refused to cover the claim on the grounds of
inadequate construction.
The claimants then issued proceedings against Beltec and AIMS claiming that Beltec had failed to exercise the
appropriate level of skill and care when designing the basement and failed to warn the claimants about the
contractors progress following the
initial site visit. Unfortunately, according to the judgment, AIMS was, at that time, believed to be insolvent and so
did not take part in the proceedings.
The court ruled that Beltec was not liable and that there was an overwhelming probability that AIMS had failed to
carry out its work with reasonable skill and care or complied with the drawings with which it had been
This site uses cookies
provided. Therefore, AIMS breaches of contract had caused the collapse.
The key points to note are as follows:

By continuing to browse the site you are


agreeing to our use of cookies. Read our Cookie
The court had close regard to the scope of Beltecs retainer andPolicy
held that
Beltec had no ongoing obligation
to find out more.

to supervise the works. Beltecs obligation was limited to providing the claimants with the structural designs
with reasonable care and skill.
I AGREE
Competent engineers should be entitled to expect that builders would understand
and act upon the
construction method indicated in the drawings.
The court explained that when and to what extent the duty will apply will depend on all the circumstances,
but it will often arise when there is an obvious and significant danger either to life and limb or to property.

In addition, the obligation can arise when a careful professional ought to have known of such danger, having regard
to all the facts and circumstances.

http://www.building.co.uk/professional/legal/no-bargain-in-this-basement/5075747.ar... 16/06/2015

No bargain in this basement | Magazine Comment | Building

Page 2 of 2

The court will be unlikely to conclude that a duty to warn arises in situations where, at the time that the professional
inspects the work, there is a possibility that the contractor in question may in future not do the works properly. Here,
Beltec did not owe the claimant a duty to warn. It was AIMS, and not the claimants, who had retained Beltec to visit
the site to see what AIMS had done in relation to the initial pin. Beltec advised that the pin should be redone and
resent AIMS the drawings; however, there was no danger at this stage.
The court held that, while generally it is the responsibility of the engineer or architect to design the permanent
works and the contractors responsibility to construct the temporary works required to build the permanent works, it
will always be necessary to consider what services the professional is engaged to provide.
Here, it was noted that Beltecs design provided a precise sequence of work which, if followed, would have resulted
in the basement being created without any significant damage to the structure above. The conclusion was that
nothing in Beltecs design should have prevented AIMS from working in a reasonably safe way.
Sarah Strange is a senior associate in the construction and engineering team at international law firm
Taylor Wessing

Marketplace Recommendations

Glazing Vision
Rooflight
Manufacture: Quality
and Conformance
With BS5750.

Quality and
Conformance

Ads Powered with

Like

2
Follow @buildingnews

60.1K followers

This site uses cookies


By continuing to browse the site you are
agreeing to our use of cookies. Read our Cookie
Policy to find out more.

I AGREE

http://www.building.co.uk/professional/legal/no-bargain-in-this-basement/5075747.ar... 16/06/2015

Das könnte Ihnen auch gefallen