Beruflich Dokumente
Kultur Dokumente
Life Sciences
KTA ready PM Fact Sheet
E
nsures the quality of your results
Extends the life of your KTA ready system
Ensures implementation of the latest factory
developments
Enables traceability via visit records
Preventive Maintenance
For optimal performance
Testing and inspection
During the PM visit, our service engineers perform
an extensive set of functional tests on your equipment.
Testing and inspection typically include:
A
test of the valves, pressure meter, flow meter,
conductivity meter, temperature sensors, pumps,
air sensors, level sensors, pH sensors, and UV meter
A mechanical inspection
Safety tests
A hydrostatic leakage test
PM replacement parts
A typical PM visit includes replacement of the following
parts:
Air filter
Pump rotor
UV LED
UV filter
Documentation
Our trained service engineers ensure that all changes are
carefully evaluated, verified, documented, and reviewed.
PM interval
Our standard recommended PM frequency for normal
usage is one Preventive Maintenance visit once every two
years. For 24/7 system usage we recommend one PM visit
per year. Our service team can advise on the optimal PM
frequency to suit your needs.
2011 General Electric Company All rights reserved. First published August 2011.
All third party trademarks are the property of their respective owners.
All goods and services are sold subject to the terms and conditions of sale of the
company within GE Healthcare which supplies them. A copy of these terms and
conditions is available on request. Contact your local GE Healthcare representative
for the most current information.
www.gelifesciences.com
28-9980-83 AA 08/2011