01.2015 | NEWS

WASSER BERLIN INTERNATIONAL

WHERE THE INFORMATION


IS IN FULL FLOW
WASSER BERLIN INTERNATIONAL
24 March 27 March 2015
Hall 1.2. Stand 117
We look forward to welcoming you!
From 24 to 27 March, Berlin is this year again the meeting point
for everyone who wants to catch up on the latest trends and development in the field of water and wastewater management.
Some 700 renowned exhibitors will be attending. Look forward to
getting together with experts from all over the globe to exchange
opinions and ideas in an exciting and informative setting!
We look forward to welcoming you to our exhibition stand in Hall
1.2, Stand 117, where you can expect the following highlights:

..KeraPort manhole programme (DN 600 DN 1000)


..KeraMat stainless steel coupling N/H
..KeraMat ceramic coupling DN 200
..KeraBase carbon-neutral pipe DN 200

An informative presentation of our range of manhole


products will be given at 2:30pm on every day of the
exhibition. Individual appointments can also be arranged
on request.

Are you already familiar with our Cradle to Cradle-certified pipes


and fittings? If not, just ask us well be delighted to present our
sustainable design concept to you in all the details.

This year too, interested visitors to the exhibition have the


opportunity to experience our operations live on site. Schaus-

We look forward to welcoming you!

telle Wasser the new name of the former Baustellentag


provides insights into the Berlin underworld, in a tour given by
technically competent guides.
Register now for a place on the tour at: www.wasser-berlin.de/
KongressUndEvents/SchaustelleWasserBerlinInternational/

Our pipe-jacking construction sites:

..Berlin Augsburger Strasse, DN 300, DN 400, and DN 600


(microtunnel pipe jacking)

..Berlin, Veithstrasse, DN 300 (pilot pipe jacking)

01.2015 | NEWS

STAINLESS STEEL COUPLING

SPECIAL SLEEVE COUPLINGS

ONE 4 ALL

KERAMAT
KeraMat sleeve couplings type 2B with non-standard
dimensions
To complement our programme of original accessories, we take
pleasure in announcing the introduction of type 2B KeraMat sleeve
couplings in non-standard dimensions, which can be used for
coupling two spigots e.g. when retroactively installing junctions or
exchanging pipe sections. These sleeve couplings are made of a
special rubber-elastomer jointing ring (EPDM) fitted in a stainless steel jacket equipped with turnbuckles. Pipes with the same
internal diameter but different external diameters are fitted with
Keramat compensation elements at the factory. The lower side of
these elements is specially profiled to enhance the efficiency of the
joint.
KeraMat sleeve couplings with non-standard dimensions for pipes
with external diameters in the range of 190 mm to 1999 mm with a
width of 185 mm.

Now you can cover four specific areas of application at once with
just one intelligently constructed component. Until now, four different coupling designs have had to be kept in stock for connecting
normal-strength pipes with extra-strength ones.
Type 2A 200 N
Type 2B 200 N
Type 2A 200 H

Stainless steel coupling N/H

Type 2B 200 H

Thats a thing of the past now: our new stainless steel


coupling

..is particularly robust and safe thanks to the use of more material
..offers the highest possible quality wherever sleeve couplings are
The complete range of KeraMat products can

used

..reduces the volume of items kept in stock at suppliers and on

be found in our KeraMat Original Accessories


brochure, which can be ordered or download-

the construction site

..excludes the likelihood of confusing different components


..includes the RE system

ed at www.steinzeug-keramo.de.
OGRAMM.

KERAMAT ORIGINAL-ZUBEHRPR
QUALITT BIS INS DETAIL.

RELIABLE THROUGH AND THROUGH.


THE COMPLETE SYSTEM SOLUTION.
Our range of manholes completes the high-quality
system solutions made by Steinzeug-Keramo. Expressed
visually: In the vertical dimension, the manholes are the
perfect complement of the comprehensive advantages that the vitrified clay pipes and fittings offer in the
horizontal dimension.

Manhole DN 1000

01.2015 | NEWS

KERAPORT

MANHOLE PROGRAMME
Construction features

..KeraPort manholes are monolithic up to the water-transport


level

..Top sections are delivered with integrated joints


..Cover slabs complete the manholes; a tapered slab is

The standard manholes are fitted with a one-piece PU channel


element with integrated manhole connections from DN 150 to DN
500 in the smooth cylindrical section of the pipe and also feature an
internally integrated anti-buoyancy ballast.

alternatively available for DN 1000

..The channel element, cover slab, and taper slab have a


corrosion-resistant coat of polyurethane (PU)
The frame structural analysis specifies potential installation depths
of more than 8 meters, as proven by loads with heavy-duty traffic.
In addition, the manholes are also approved for installation in
areas subject to the loads imposed by rail traffic.
Thanks to the rigid, non-deformable material, the manholes are
absolutely safe from buckling.
The spectrum of diameters available in the standard range with

KERAPORT SCHACHTPRO
GRAMM
KORROSIONSSICHER UND
DICHT

PU channel elements DN 600, DN 800, and DN 1000. DN 1200


and DN 1400 manholes are supplied with vitrified clay channel
elements.

For more detailed information please see our Manholes

The scope of delivery includes the lower section of the manhole,


the top sections, and the cover slab/tapered slab.

PU channel element
DN 600
DN 800
DN 1000
Vitrified clay channel element
DN 1200
DN 1400

brochure, which can be ordered or downloaded at


www.steinzeug-keramo.de

We can also provide solutions


according to the customers
specifications: complete flexibility for installations within the
manholes.

MANHOLE
CALCULATOR

01.2015 | PROJECT REPORT EUROPE

WROCAW BUILDS A NEW SYSTEM, REGENERATES AN OLD ONE

CONTINUATION OF THE EU PROJECT

01.2015 | PROJECT REPORT EUROPE

Piotr Kosz, Steinzeug-Keramo Sp. z o.o.

MPWik Sp. Z o.o. is the name of the municipal water-supply and

Wrocaw is receiving 24 million euros of the total investment amount

sewage-disposal company of the city of Wrocaw (Breslau) with a

of 53 million euros from EU regional development funds, leaving a

population of 630,000 inhabitants, also serving some of the sur-

tab of 29 million euros for MPWik and its customers. Money well

rounding towns and villages. The company manages and operates

invested for many generations to come.

a water-supply network about 2,000 km in length and a sewage


system of around 1,420 km for the disposal of wastewater. Obsolete pipelines the oldest ones date back to the year 1850 and
the development of housing areas around the edges of the city
have made it necessary to replace and expand many sections of
the sewage network in recent years.

Open-trench construction
Dimension

Installed

DN

150 N

20.435

Open and trenchless

200 N

50.001

Between 2009 and 2014, three engineering offices contracted by

250 N

7.407

MPWik Wrocaw devoted their efforts to planning the new con-

300 N

4.223

struction of a sewage network with a total length of 93 km and to

300 H

662
82.728

the regeneration of a further 6.6 km of sewage pipes. The subsoil


conditions alternating strata of sand, clayey sand, gravel, and
clay, in some cases below the groundwater table posed no major
problems for the installation of the pipes in the open-trench method or using trenchless construction when it came to overcoming
obstacles. The depth of the installation operations varied between

Trenchless construction
Dimension

Installed

1.00 and 6.20 meters. The vitrified clay pipes installed in the open-

DN

trench method were of the DN 150 to DN 300 dimensions, while

150

1.546

vitrified clay jacking pipes of the dimensions DN 150 to DN 400

200

6.942

were used for the trenchless method (see table).

250

2.490

300

831

Experienced and cost-efficient


Based on experience and taking cost-efficiency aspects into con-

400

48
11.857

sideration, the responsible engineers didnt need long to opt for


pipe systems made of vitrified clay: for them the decisive criteria
were the long service life, the high resistance to abrasion, and the
pipes resistance to chemical impact, and last but not least the
targeted depreciation period of 80 to 100 years.

Client: MPWik Sp. Z o.o., Wrocaw | Planning: P.P.U. Domed Sp. z o.o., Wrocaw; Biprowod Sp. z o.o., Wrocaw; Besko Elbieta Staworko Bogdan
Staworko S.C., Wrocaw | Construction: SKANSKA S.A., Warszawa; AG System Sp. z o.o., Krakw; BUSKOPOL S.A., Busko-Zdrj; COMPLEX-BUD
Przedsibiorstwo Budowlane, Jelcz-Laskowice; ELBAN P.P.H.U. Sp. z o.o., erniki Wrocawskie | Construction-materials supplier: HTI BP Spka z
ograniczon odpowiedzialnoci lsk Spka Komandytowa, Stanowice; KANWA Sp.z o.o. Sp.k., Krakw

01.2015 | PROJECT REPORT EUROPE

VITRIFIED CLAY FOR FLEMISH ARTISTS COLONY

NOT JUST PIPES 29 MANHOLES, TOO

01.2015 | PROJECT REPORT EUROPE

Joeri Hamal, Steinzeug-Keramo N.V.

Sint-Martens-Latem - Deurle is a double township in the Belgian

Switch to the separate system

province of East Flanders, a mere 15-minute drive from Ghent. This

When planning this new construction project, the decision was also

small town proudly boasts the byname of Artists Colony, since

made to switch from the combined wastewater system to the sep-

this is the birthplace of Flemish expressionism. Along the idyllic

arate system as a measure to ease the load on the wastewater

banks of the Leie river, numerous painters, sculptors, writers, and

treatment plant. This also means, however, that the wastewater will

poets once drew their artistic inspiration from Mother Nature.

dwell in the pipe system for a longer time, that the system will be
flushed by smaller volumes of water, and hence that the potential

Expansion of the sewage network

for corrosion will be greater. No problem in the eyes of the special-

But even colonies of artists need a properly regulated and safe

ists responsible for the project, however: they came down in favour

infrastructure, and this naturally extends to the matter of sewage

of a system using parts made of vitrified clay both for the pipes

disposal. Last year, when new buildings were being constructed

and fittings, and also for the manholes, since vitrified clay is a guar-

on the eastern edge of the town in a council housing project, the

antee of the highest degree of corrosion resistance and tightness

Vlaamse maatschappij voor sociaal wonen (a public, autonomous

throughout the entire pipeline system.

agency for selling and leasing residential property) and the private
Matexi N.V. company expanded the sewage network accordingly:
1,000 meters of vitrified clay pipes of the DN 250 diameter and
690 meters of house connections in the DN 150 dimension were
installed in the open-trench construction method, and the entire
system was rounded off by the installation of 29 manholes at a
depth of about 4.00 meters. The operator of this new system will

The Flemish artists


village decides in
favour of system solutions made of vitrified
clay.

be the Farys Water Board in close cooperation with the municipal


authorities, the body already responsible for the existing network.

Client: Matexi N.V. Waregem | Operator: Farys, Ghent and Sint-Martens-Latem Communal Water Board| Planning: Studiebureel Lesaffre N.V., Ghent |
Construction: Tavernier N.V.

10

01.2015 | PROJECT REPORT EUROPE

DEVELOPMENT OF THE SEEWINKEL


HOUSING ESTATE IN POING

SWIFT INSTALLATION OF 4,760


METERS OF VITRIFIED CLAY PIPES
Diana Klose, Steinzeug-Keramo GmbH

The Upper Bavarian municipality of Poing, around 23 km east of Mu-

Dimension

nich, is an aspiring growth community in the administative district

DN

Installed
m

of Ebersberg: once a small village, Poing has meanwhile emerged

150

1.260

to become an attractive residential community with a population of

200

3.000

almost 14,500 inhabitants, a figure that is set to grow to between

250

17,000 and 20,000 by the year 2020. After the construction of the

500
9.260

Zauberwinkel residential estate and with the completion of the


new W6 living quarter, the Seewinkel estate, which together will
house 1,400 people, the township is making a large step forward

The sewage-system construction operations were finished in mid-

towards reaching this target.

2014, and on 30 October 2014 the ARGE Poing Am Bergfeld


consortium handed over the utility roads and the sewage systems

13 hectares developed in no time

in the Poing Seewinkel residential construction zone to the town-

The Munich-based GFM engineering consultancy company set out

ship.

the development of the site starting with the layout of the sewage
system in the W6 Seewinkel
project back in 2011, and the client, gKu VE | Mnchen-Ost, put
out its invitation for public bids
in 2012. At the end of 2013, the
Richard Sem Bau GmbH construction company excavated the
first trenches for the installation of
the sewage pipes over a total surface area of 130,000 m2. All main
pipes and house connections in
the new residential estate were
made using vitrified clay products,
including 1,260 meters in the DN
150 dimension, 3,000 m in the DN
200 dimension, and 500 m in the
DN 250 dimension. They are all
laid above the groundwater table
in the gravelly subsoil that is typical of this region.

Client: gKu VE | Mnchen-Ost Ver- und Entsorgung, Poing | Planning: GFM Beratende Ingenieure GmbH, Munich | Construction: Richard Sem Bau GmbH,
Zimmern | Construction-materials supplier: Richter + Frenzel, Landshut

11

01.2015 | PROJECT REPORT EUROPE

DEVELOPMENT OF THE PARSDORF INDUSTRIAL ESTATE

BLANKET COVERAGE
2,000 METERS OF VITRIFIED CLAY PIPES
Diana Klose, Steinzeug-Keramo GmbH

of by the GFM Beratende Ingenieure GmbH consultancy company,


Munich, and in September 2013 the SWIETELSKY Baugesellschaft
mbH company, Ebersberg, broke the ground for the installations.

Secure basis in the entire industrial estate


Since there was more than enough space available on the greenfield site, the decision for the construction of the sewage system by
the open trench method was an easy one to take. Over the entire
industrial estate, all main pipe systems and all property drainage
pipes up to the manhole have been constructed using vitrified clay
In May last year the deal was sealed: the last plot of land in the new

pipes: about 2,000 meters of vitrified clay pipes of different diameters

industrial estate in Parsdorf, a part of the township of Vaterstetten,

(see table) and the corresponding number of fittings were laid in the

just five minutes by car east of the Neue Messe Mnchen (New Mu-

gravelly subsoil above the groundwater level, involving the excavation

nich Trade Fair Centre) and with direct access to the A 94 autobahn.

of about 7,000 m of soil.

The Parsdorf industrial estate had officially taken off just one month
earlier with the ground-breaking ceremony for a DIY superstore. By

Despite project-related interruptions, the construction activities

the end of the year, the once green meadows had been turned into a

were completed in March 2014.

busy construction site. In facilities with a total floor space of 210,000


m, enterprises, retailers, specialist stores, gastronomy, traders, and
service providers one by one moved in to take up business; the development zones and green spaces extend over a further 90,000 m.
More than 250 million euros were invested in buildings and infrastructure, and about 1,000 jobs have been created.

Dimension

Installed

DN

150

310

200 H

527

250 H

387

300 H

743

First underground, then on top


The phase between the first cut of the greenfield location and the
start of overground construction activities, however, was taken up
with the measures necessary to develop the site, for example the
installation of the supply and disposal infrastructure. These measures naturally also include a safe and reliably functioning wastewater
drainage system; in Parsdorf, these activities are the responsibility of
the gKu VE | Mnchen-Ost Ver- und Entsorgung company, based
in the nearby town of Poing. This company put out the sewage system project for public tender in 2013; the planning was taken care

Client: gKu VE | Mnchen-Ost Ver- und Entsorgung, Poing | Planning: GFM Beratende Ingenieure GmbH, Munich | Construction: SWIETELSKY Baugesellschaft mbH, Ebersberg | Construction-materials supplier: BayWa AG, Munich

12

01.2015 | PROJECT REPORT EUROPE

MICROTUNNELLING IN PEAT

LBECK USES AN ASSESSMENT MATRIX

13

01.2015 | PROJECT REPORT EUROPE

Jrgen Schneider, Steinzeug-Keramo GmbH

Entsorgungsbetriebe Lbeck, the waste-management company

A clean installation

publicly owned by the Hanseatic city of Lbeck, operates a waste-

After being awarded the contract for the project, in November 2013

water network with a total length of about 1,000 km, mainly as a

the ARGE Geniner Ufer consortium, comprising the construction

separate system comprising 391 km of pipes for foul wastewater

companies Bergemann-Grper mbH & Co. KG in Lbeck, Ech-

and 382 km of pipes for rain and surface water. The wastewater is

terhoff GmbH & Co KG in Hamburg, and interra Microtunnelbau

led via a combined wastewater system over a distance of 135 km,

GmbH in Crimmitschau started the preliminary excavation work.

and by a pressurized system for a further 78 km. A 630-meter-long


section of damaged wastewater pipes beneath the Geniner Ufer,

A starting shaft 3,200 mm in diameter was excavated to a depth

a stretch of the bank of the Trave Canal, has now recently been

of approximately 6.50 m i.e. bang in the centre of the peat layer.

regenerated using the microtunnelling method.

From the bottom of this shaft, DN 400 vitrified clay jacking pipes
were then jacked through the subsoil using an AVM 400 jacking

A challenging combination

device made by Herrenknecht AG. Before this work could be start-

The geological constraints and the subsoil conditions in the Lbeck

ed, first a deep well had to be dug directly next to the starting shaft

region pose a number of problems: man-made banks of soil, dense

to relieve the pressure of the second aquifer, the Artesian water

inhomogenous layers of peat, fine sand, silt, and clay piled on top

directly beneath the peat stratum.

of each other, meaning that the groundwater horizons can shift


repeatedly. The choice of the appropriate construction method thus

The pipeline distances that were achieved in this way were between

depends on an exact knowledge of the subsoil on the site together

50 m and 85 m in length. Both the DN 3,200 starting shaft and the

with an accurate assessment of the various methods available and

DN 2,600 target shaft were converted into inspection manholes

of the prevailing traffic conditions.

after the jacking operations had been completed.

Careful review

A normal way of financing

Drillings made along the Geniner Ufer yielded the following picture:

Even if theyre embedded in a highly aggressive peat milieu, the

Beneath a three-meter-thick layer of man-made river bank bearing

vitrified clay pipes will do their job: reliably, safely, sustainably. Ent-

one aquifer, a seven-meter-thick inhomogenous stratum of peat

sorgungsbetriebe Lbeck have set a depreciation period of 70

(slightly too strongly decomposed forest-swamp peat) with depos-

years and can comfortably finance the costs for the regeneration

its of fine sand. Under this layer, sands containing a second dynam-

of the sewage system from their completely normal wastewater

ic aquifer, so-called Artesian water.

levies.

After thorough and highly specific planning, careful appraisal of the


geological constraints, and assessing the various construction and
jacking techniques available, Entsorgungsbetriebe Lbeck decided
to construct the 630-meter-long wastewater pipeline with vitrified
clay pipes by the microtunnelling method.

Client and planning: Entsorgungsbetriebe Lbeck, Lbeck | Construction: ARGE Geniner Ufer: Baugesellschaft Bergemann-Grper mbH & Co. KG,
Lbeck; Bauunternehmen Echterhoff GmbH & Co KG, Hamburg; interra Microtunnelbau GmbH, Crimmitschau

14

01.2015 | PROJECT REPORT EUROPE

REHABILITATION BY REGENERATION

WRMTAL TOWNSHIPS
MAKE A WISE DECISION

Planegg

Planegg

Grfelfing

Grfelfing

15

01.2015 | PROJECT REPORT EUROPE

Diana Klose, Steinzeug-Keramo GmbH

Ever since 1960, the townships of Gauting, Krailling, Planegg, and

Grfelfing follows Planeggs lead

Grfelfing that make up the Wrmtal community, located just south-

The situation in the neighbouring township of Grfelfing with its

west of the Munich city limits, have had a central wastewater drain-

13,000 inhabitants is similar to the one in Planegg: Grfelfing is also

age system. Originally constructed by the Wrmtal Water Board, it

part of the Wrmtal community whose sewage disposal is taken care

has made a major contribution to stopping the ever deteriorating

of by the Wrmtal Water Board; here too, the wastewater system

quality of the waters of the Wrm river. Today the water board feeds

was in need of renewal, and in three streets all at once. Rehabili-

off the separated wastewater via a sewage system with a total length

tation by regeneration was the call of the day here, too, also taking

of about 200 km, with a spread of around 10,000 house connec-

advantage of the new construction approach to improve the hydrau-

tions with an average connection length of approx. 5 m; almost 185

lic efficiency by enlarging the cross-section of the pipe system. Al-

km of the sewage system is accounted for by vitrified clay pipes.

though the project was planned in 2011/2012, due to overlaps with


other construction measures and the re-routing of the road traffic

Planegg renews 370 m of sewage pipes and 28 connections

that these measures involved, the start had to be delayed until 2014.

In the Planegg township with its some 11,000 inhabitants, the next

Over a period of 3 months, the Richard Schulz Tiefbau GmbH

stage of the project was to regenerate the wastewater pipes and

& Co. KG company installed about 370 m of vitrified clay pipes

the house connections in the Bahnhofstrasse. Rehabilitation by

in diameters of DN 200 to DN 400 in the Pasinger Strasse, the

regeneration was the approach chosen by the Wrmtal Water

Immelmannstrasse, and the Drosselgasse. Here, too, the work

Board as the client and operator, not least for reasons of econo-

was carried out without interfering with the road traffic a specially

my: regeneration guarantees a substantially longer service life than

challenging situation, since as a feeder road for the highway and a

simply rehabilitation, and the excavation of the pipeline system also

designated diversion route for highway traffic the Pasinger Strasse

enabled other technical installations to be done at the same time.

has a very high traffic volume. The passage of the pipeline beneath

The planning took four years, and the final planning of the installa-

the nearby Wrm river made it necessary to install the pipes at a

tions started in the autumn of 2013.

depth of as much as 5 meters.

Over a period of 5 months, the Wadle Bauunternehmung GmbH

Conserving the value for both townships

company installed about 370 m of vitrified clay pipes in the DN

The rehabilitation by regeneration approach is a wise decision in

250 and DN 300 diameters in the Bahnhofstrasse construction site.

both cases: on the one hand it is a farsighted option with a long-

To keep the construction time as short as possible, at the same

term impact, and on the other hand, it goes a long way to pre-

time the house connections were renewed, in most cases using the

serving the assets of the water board: unlike a typical rehabilitation

bursting method. The construction activities were designed not to

project, regeneration is not just for an indefinite period of time, but

interfere with the local traffic, since the Bahnhofstrasse is the main

instead an approach that benefits this and many other generations

shopping street in Planegg.

to come after all, everything is new!

Planegg Client and planning: Wrmtal-Zweckverband, Planegg | Construction: Wadle Bauunternehmung GmbH, Altheim/Landshut |
Construction-materials supplier: BayWa AG, Straubing
Grfelfing Client and planning: Wrmtal-Zweckverband, Planegg | Construction: Richard Schulz Tiefbau GmbH & Co. KG, Neuburg a.d.

Donau | Construction-materials supplier: BayWa AG, Augsburg

16

01.2015 | INFOPOOL

STEINZEUG-KERAMO INFOPOOL

VERSION 4.0
An update of our online service for professionals. Thank you all for your constructive feedback on our Infopool. Were
delighted that weve been able to help you complete your projects more easily, more swiftly, and more professionally with
this service. Our updated Version 4.0 has been optimized and now includes many of your wishes and suggestions. Even
more user-friendliness, enhanced system performance, additional processing functions, and an expanded database
these are just some of the many improvements that have been made. We look forward to seeing you again soon on your
next online visit.
The Infopool features eight calculation modules, about 800 CAD
drawings of items in our product range, and also many documents
on our pipes, manholes, and accessories; in addition, it contains
plenty of useful information all around the topic of the proper installation of wastewater systems using vitrified clay pipes and fittings.

INFOPOOL
ONLINE CALCULATOR
OPEN TRENCH METHOD

HYDRAULICS

You can use this tool to calculate the neces-

This programme offers a simple method to

sary bedding and thus generate the Struc-

calculate the run-off in circular profiles, thus

tural Strength Certificate for socket pipes.

enabling the flow rate, the gradient, and

The result: a verifiable structural calculation


STRUCTURAL CALCULATION
OPEN TRENCH METHOD

for pipes of the sizes DN 150 to DN 1400.

HYDRAULICS
COMPLETE FILLING /
PARTIAL FILLING

the current velocity to be calculated for the


products in the Steinzeug Keramo range
under full and partial filling conditions.

TRENCHLESS METHOD
This tool can be used to calculate the

MANHOLE

maximum permissible forces and thus

Vitrified clay manholes of the sizes DN

generate the Structural Strength Certifi-

800 to DN 1200 can be designed and


calculated.

cate for jacking pipes. The result: a verifiSTRUCTURAL CALCULATION


TRENCHLESS METHOD

able structural calculation for pipes of the


sizes DN 150 to DN 1400.

MANHOLE
DN 800 TO DN 1200

17

01.2015 | INFOPOOL

INFOPOOL
CAD DRAWINGS

SAVE / PRINT

CAD drawings of our products can be downloaded in the DWG,

printed, and sent directly from the application

DXF, and WMF formats. CAD software is required to use the draw-

programme using the Acrobat Reader functionalities. Exception:

ings!

Graphics and Word documents, which after downloading can also

After downloading, documents can be saved,

be printed directly from the self-starting programmes or taken for

INFOPOOL
SEARCH

further processing in these programmes.

Search routines in the Infopool are run using keywords and full text.

LOG OUT

The search term must be contained in the keyword list for the search

Click the Log out button to close the Infopool tool and

routine to be successful. In the full-text search routine, matching

to return to the Steinzeug-Kramo homepage. Please

character strings in the document title and text are sought out.

use this button every time you leave the Infopool, since this is the
only way of ensuring that no-one else can access your data by

DISPLAY

unauthorized use of your user name and password.

Documents can be opened directly from the displayed


document lists by double-clicking the symbol. With the
exception of tendering texts and images, Infopool documents are
saved in the PDF format. A PDF reader (e.g. Adobe Acrobat Read-

Our tip: Register as a user right away at


www.steinzeug-keramo.com

er) is required to be able to read these documents.

BUOYANCY

CONNECTING SOCKET

This can be used to document the exclu-

This calculator can be used to calculate

sion of upwelling (buoyancy) of installa-

the type of connecting socket for sub-

tions, and can be applied to both vitrified

sequent connections with vitrified clay


pipes and pipes made of other materials

clay manholes and pipe systems.


BUOYANCY
MANHOLE/PIPE

CONNECTING SOCKET
DN 125/150/200

SLEEVE COUPLING

ECONOMY

This calculates the type of sleeve cou-

This programme, designed to demonstrate

pling and, where applicable, also the

the economic efficiency of vitrified clay pipe

number and type of the bush rings nec-

systems compared with wastewater pipe


systems made of other materials, is current-

essary to make an effective spigot joint.


SLEEVE COUPLING
SPIGOT JOINT

(concrete).

ECONOMY
COST COMPARISON

ly still under development. Programming will


be completed in the second half of 2015.

26 Frechen

o.com
mo.com

18

01.2015 | NEWS

THE DIVERSITY OF OUR RANGE OF PRODUCTS AND SERVICES

IN WORDS AND PICTURES

Hchster Standard fr koeffektivitt. Weltweit einzigartig: Cradle-to-Cradle -Druckprodukte innovated by gugler.at. Papier und Druckfarben sind fr den biologischen Kreislauf optimiert.

2014

Steinzeug-Keramo N.V.
Paalsteenstraat 36 | B-3500 Hasselt
Telefon
Telefax

+32 11 21 02 32
+32 11 21 09 44

E-Mail
Internet

info@steinzeug-keramo.com
www.steinzeug-keramo.com

KERAPORT SCHACHTPROGRAMM
KORROSIONSSICHER UND DICHT

100 PROZENT NATUR. NULL MLL.


CRADLE TO CRADLE PRODUKTKREISLAUF MIT ZUKUNFT.

MANUAL

CARBON-NEUTRAL VITRIFIED CLAY PIPES


TECHNOLOGY FOR FUTURE GENERATIONS

VITRIFIED CLAY PIPE SYSTEMS


OF COURSE, WHAT ELSE?

GUIDELINES FOR BUILDING WASTEWATER PIPE SYSTEMS

VITRIFIED CLAY PIPE SYSTEMS


FOR OPEN TRENCH INSTALLATION
POWERFUL. SUSTAINABLE. FUTURE-ORIENTED.

KERAMAT ORIGINAL ACCESSORIES.


QUALITY DOWN TO THE LAST DETAIL.

SYSTEMS
CLAY PIPE
CTION.
VITRIFIED
SS CONSTRU
TRENCHLE
DLY. SAFE.
. ECO-FRIEN
BLE
INA
SUSTA

NEW: The new and updated version of our brochure


for trenchless construction an indispensable tool for
planners!

All brochures are available for downloading in the PDF format at


www.steinzeug-keramo.com

LIKE!

STEINZEUG KERAMO ON FACEBOOK


Come and browse around with no obligation:
www.facebook.com/Steinzeug.Keramo
We look forward to communicating with you on Facebook!

Edition notice: Editors: Steinzeug-Keramo GmbH


Alfred-Nobel-Strae 17 | D-50226 Frechen | Phone +49 2234 507-0 | Fax +49 2234 507-207

19

01.2015 | EVENT CALENDAR

All current events, trade fairs,


training events etc. can also be
found as always on our website at
www.steinzeug-keramo.com

EVENT CALENDAR

2015

Antwerp (B)

24.03.2015
27.03.2015

15.04.2015
17.04.2015

15.04.2015
18.04.2015

23.04.2015
25.04.2015

Vlariodag

Berlin (DE)

Aachen (DE)

Markt Schwaben (DE)

Bremen/Stuhr-Se-

Wasser Berlin

48. Essener Tagung

Neuheitenschau

ckenhausen (DE)

Gienger 2015

HTI aktuell 2015

24.03.2015

06.05.2015
07.05.2015

06.05.2015
08.05.2015

26.05.2015
28.05.2015

03.06.2015
04.06.2015

05.06.2015
06.06.2015

Chemnitz (DE)

Kassel (DE)

Bydgoszcz (PL)

Sopron (HUN)

Berlin (DE)

DWA Landes-

RO-KA-TECH

WOD-KAN

Hungarian Water

HTI Br & Ollenroth

verbandstagung

Utility Association

15.06.2015
17.06.2015

15.10.2015
16.10.2015

21.10.2015
22.10.2015

21.10.2015

Bucharest (RO)

Pforzheim (DE)

Straubing (DE)

Tiefbau Forum 2015

Expo Apa

DWA Landes-

DWA Landesver-

verbandstagung

bandstagung

Ulm (DE)

SAVE THE DATE VOB TRAINING COURSES 2015


Provisional event dates
1 Oct 2015

Feuchtwangen

Dates

14 Oct 2015

Hausen ob Verena

programme descriptions will be posted

Organizer:

13 Oct 2015

Herrsching

on the Steinzeug-Keramo Infopool at the

Fachverband Steinzeugindustrie e.V.

beginning of June online at

www.fachverband-steinzeug.com

19 Nov 2015 Braunschweig (scheduled)


Spring 2016 Cologne (scheduled)

of

other

events

and

www.steinzeug-keramo.com.

detailed

03.2015

Steinzeug-Keramo GmbH
Alfred-Nobel-Strae 17 | D-50226 Frechen
Phone
Fax

+49 2234 507-0


+49 2234 507-207

E-mail info@steinzeug-keramo.com
Internet www.steinzeug-keramo.com

Steinzeug-Keramo N.V.
Paalsteenstraat 36 | B-3500 Hasselt
Phone
Fax

+32 11 21 02 32
+32 11 21 09 44

E-mail info@steinzeug-keramo.com
Internet www.steinzeug-keramo.com

Das könnte Ihnen auch gefallen