Sie sind auf Seite 1von 338

[1]

SUMMARY
PUBLIC SECTOR DEVELOPMENT PROGRAMME 2015-16
Including Foreign Project Assistance (FPA)
S.No

Name of Department

( Rs. In Million )
Financial Projection

Throw fwd
as on
01.07.15
3

No.

Capital

Revenue

Total

No.

Capital

Revenue

Total

No.

Capital

Revenue

Total

10

11

12

13

14

15

20541.641

20

224.630

3752.238

3976.868

11

161.812

942.744
9407.396
149.074
3588.117
6454.310

4
6
1
7
2

50.471
54.398
70.000
49.761
0.000

209.760
109.550
10.000
2584.916
838.012

260.231
163.948
80.000
2634.677
838.012

2
5
0
1
3

50.000
55.000
0.000
0.000
56.812

644.488

167.975

40.000

207.975

10017.568
6447.039
3570.529

6
2
4

1210.263
1166.783
43.480

2264.737
0.000
2264.737

3475.000
1166.783
2308.217

523.890

123.890

0.000

46.264

16.000

On-Going

New

TOTAL
FPA

Grand Total
(15+16)

2016-17

2017-18

16

17

18

19

A. PROVINCIAL PROGRAMME

AGRICULTURE, SUPPLY &


PRICES
i) Agriculture Research
ii) Agriculture Extension
iii) Agri. Supply & Prices
iv) Agriculture Mechanization
v) Agri. Water Management

361.320

523.132

31

386.442

4113.558

4500.000

4780.086

9280.086

4988.575

3362.000

35.000
158.000
0.000
65.000
103.320

85.000
213.000
0.000
65.000
160.132

6
11
1
8
5

100.471
109.398
70.000
49.761
56.812

244.760
267.550
10.000
2649.916
941.332

345.231
376.948
80.000
2699.677
998.144

0.000
1597.476
0.000
0.000
3182.610

345.231
1974.424
80.000
2699.677
4180.754

597.513
2463.622
70.000
821.440
1036.000

0.000
2295.000
0.000
67.000
1000.000

52.025

0.000

52.025

12

220.000

40.000

260.000

0.000

260.000

384.488

0.000

1
1
0

25.000
25.000
0.000

0.000
0.000
0.000

25.000
25.000
0.000

7
3
4

1235.263
1191.783
43.480

2264.737
0.000
2264.737

3500.000
1191.783
2308.217

0.000
0.000
0.000

3500.000
1191.783
2308.217

3902.440
2640.128
1262.312

2640.128
2640.128
0.000

123.890

226.110

0.000

226.110

350.000

0.000

350.000

0.000

350.000

86.945

0.000

0.000

16.000

0.000

0.000

0.000

16.000

0.000

16.000

0.000

16.000

30.264

0.000

AUQAF, ZAKAT & RELIG

BOARD OF REVENUE
i) Buildings
ii) I.T. Scheme

CHIEF MINISTER'S
SECRETARIAT

COOPERATIVE

CDP for SDGs

7000.000

0.000

0.000

0.000

7000.000

0.000

7000.000

7000.000

0.000

7000.000

0.000

7000.000

0.000

0.000

CULTURE, TOUR. & ANTIQ:

6632.571

50

963.158

211.842

1175.000

17

258.000

17.000

275.000

67

1221.158

228.842

1450.000

0.000

1450.000

5182.571

0.000

EDUCATION
i) Elementary Education
ii) Teacher Education
iii) Sindh Edu. Foundation
iv) Secondary Education
v) College Education
vi) Miscelleneous

6351.308 1587.942
419.634
181.000
77.000
15.000
0.000
0.000
3546.692
424.046
1895.811
306.766
412.171
661.130

7939.250
600.634
92.000
0.000
3970.738
2202.577
1073.301

71
10
4
3
20
10
24

884.500
37.500
25.000
0.000
423.000
79.000
320.000

1176.250
130.000
35.000
512.500
224.000
95.000
179.750

2060.750 195
167.500 24
60.000 7
512.500 3
647.000 66
174.000 54
499.750 41

7235.808
457.134
102.000
0.000
3969.692
1974.811
732.171

2764.192
311.000
50.000
512.500
648.046
401.766
840.880

10000.000
768.134
152.000
512.500
4617.738
2376.577
1573.051

2616.242 12616.242
502.452
1270.586
0.000
152.000
0.000
512.500
2113.790
6731.528
0.000
2376.577
0.000
1573.051

ENERGY
i. Thar Coal
ii. Energy

0.000 16500.000
0.000
9790.000
0.000
6710.000

10 EXCISE & TAXATION


i) Buildings
ii) E&T (IT Schemes)
11 FINANCE

50511.612 124
2759.743 14
551.342
3
1946.000
0
17709.749 46
19968.492 44
7576.286 17
18761.806
15551.806
3210.000

10
9
1

13277.839
8277.839
5000.000

555.516
555.516
0.000

13833.355
8833.355
5000.000

8
4
4

2656.645
956.645
1700.000

10.000
0.000
10.000

2666.645
956.645
1710.000

18
13
5

15934.484
9234.484
6700.000

565.516
555.516
10.000

16500.000
9790.000
6710.000

331.207
4.660
326.547

2
1
1

4.660
4.660
0.000

115.340
0.000
115.340

120.000
4.660
115.340

1
0
1

0.000
0.000
0.000

30.000
0.000
30.000

30.000
0.000
30.000

3
1
2

4.660
4.660
0.000

145.340
0.000
145.340

150.000
4.660
145.340

0.000
0.000
0.000

97.678

11.000

0.000

11.000

0.000

25.250

25.250

11.000

25.250

36.250

0.000

20255.806 20255.806
995.805
995.805
199.671
199.671
716.750
716.750
6546.006
6546.006
8795.958
8795.958
3001.618
3001.618
7261.806
5761.806
1500.000

0.000
0.000
0.000

150.000
4.660
145.340

181.207
0.000
181.207

0.000
0.000
0.000

36.250

75.750

0.000

[2]

SUMMARY
PUBLIC SECTOR DEVELOPMENT PROGRAMME 2015-16
Including Foreign Project Assistance (FPA)
S.No

Name of Department

Throw fwd
as on
01.07.15
3
807.219

On-Going
No.

Capital

Revenue

New
Total

No.

Capital

( Rs. In Million )
Financial Projection

TOTAL

Revenue

Total

No.

Capital

Revenue

Total

FPA

Grand Total
(15+16)

2016-17

2017-18

4
1

5
207.219

6
0.000

7
207.219

8
1

9
152.781

10
0.000

11
152.781

12
2

13
360.000

14
0.000

15
360.000

16
0.000

17
360.000

18
223.610

19
223.610

3893.322

11

200.000

550.000

750.000

110.000

40.000

150.000

15

310.000

590.000

900.000

0.000

900.000

1584.194

1409.128

3283.256
323.000
287.066

6
3
2

140.000
0.000
60.000

410.000
120.000
20.000

550.000
120.000
80.000

1
1
2

90.000
0.000
20.000

10.000
25.000
5.000

100.000
25.000
25.000

7
4
4

230.000
0.000
80.000

420.000
145.000
25.000

650.000
145.000
105.000

0.000
0.000
0.000

650.000
145.000
105.000

1316.628
123.000
144.566

1316.628
55.000
37.500

710.930

56.086

48.914

105.000

95.000

0.000

95.000

151.086

48.914

200.000

0.000

200.000

510.930

0.000

46995.268
7264.762
25910.655
7464.430
395.667
411.710
5133.282
414.762

86
17
48
8
2
1
8
2

5540.757
1164.196
3416.650
894.739
65.172
0.000
0.000
0.000

4522.243
1213.690
2240.585
299.682
31.543
153.000
501.743
82.000

10063.000
2377.886
5657.235
1194.421
96.715
153.000
501.743
82.000

34
6
23
1
0
0
4
0

1424.510
220.000
1092.010
100.000
0.000
0.000
12.500
0.000

1512.490
90.000
335.000
0.000
0.000
0.000
1087.490
0.000

6965.267
1384.196
4508.660
994.739
65.172
0.000
12.500
0.000

6034.733
1303.690
2575.585
299.682
31.543
153.000
1589.233
82.000

13000.000
2687.886
7084.245
1294.421
96.715
153.000
1601.733
82.000

16 HOME
i) Police
ii) Jail (Building)
iii) Jail (IT scheme)

4856.554
2556.662
2068.189
231.703

35
14
19
2

862.785
341.183
521.602
0.000

52.540
0.000
0.000
52.540

915.325
341.183
521.602
52.540

8
6
2
0

84.675
75.175
9.500
0.000

0.000
0.000
0.000
0.000

84.675
75.175
9.500
0.000

43
20
21
2

947.460
416.358
531.102
0.000

52.540
0.000
0.000
52.540

1000.000
416.358
531.102
52.540

0.000
0.000
0.000
0.000

1000.000
416.358
531.102
52.540

2008.255
1101.532
806.724
100.000

1874.326
1048.773
747.355
78.199

17 INDUSTRIES

5258.478

27.580

0.000

27.580

11

952.420

1520.000

2472.420

14

980.000

1520.000

2500.000

0.000

2500.000

1416.278

1342.200

609.750

0.000

188.500

188.500

52.500

0.000

52.500

13

52.500

188.500

241.000

0.000

241.000

368.750

0.000

1563.611

0.000

400.000

400.000

0.000

100.000

100.000

0.000

500.000

500.000

0.000

500.000

1063.611

0.000

91331.794
1296.569
20349.732
64746.031
4939.462

261
3
71
175
12

8910.169
0.000
2346.458
6176.603
387.108

54.000
42.000
0.000
12.000
0.000

8964.169
42.000
2346.458
6188.603
387.108

63
4
14
43
2

2943.331
200.000
404.617
2239.732
98.982

92.500
92.500
0.000
0.000
0.000

11853.500
200.000
2751.075
8416.335
486.090

146.500
134.500
0.000
12.000
0.000

12000.000
334.500
2751.075
8428.335
486.090

12 FOOD
13 FOREST, ENVIRONMENT &
WILDLIFE
i) Forest
ii) Environment
iii) Wildlife
14 GOVERNOR'S SECTT.
15 HEALTH
i) Teaching Hospitals
ii) Other Hospitals
iii) Medical Education
iv) PHC Admin:/Trng:
v) Nutrition
vi) Preventive Programme
vii) Foreign Aided Projects

18 INFO. & ARCHIVES


19 INFORMATION, SCI. & TECH
20 IRRIGATION
i) Survey and Investigation
ii) Drainage/ Reclam. & T.Wells
iii) Open Canals
iv) Small Dams Projects
21 KATCHI ABADIS
22 LABOUR & HR
23 LAW P.A, PROSECUTION &
HUMAN RIGHTS

2937.000 120
310.000 23
1427.010 71
100.000 9
0.000 2
0.000 1
1099.990 12
0.000 2

3035.831 324
292.500 7
404.617 85
2239.732 218
98.982 14

2385.270 15385.270
0.000
2687.886
0.000
7084.245
0.000
1294.421
0.000
96.715
1385.270
1538.270
0.000
1601.733
1000.000
1082.000

9457.470 21457.470
0.000
334.500
0.000
2751.075
9457.470 17885.805
0.000
486.090

17860.005 16467.474
2360.686
2099.912
9863.229
8963.182
3085.005
3085.005
149.476
149.476
129.355
129.355
2064.478
1915.560
207.777
124.985

27223.810 51871.113
462.069
500.000
5886.218 11474.868
20025.523 36292.873
850.000
3603.372

97.137

57.120

0.000

57.120

29.880

0.000

29.880

87.000

0.000

87.000

0.000

87.000

0.000

0.000

187.906

42.799

47.201

90.000

5.000

5.000

10.000

47.799

52.201

100.000

0.000

100.000

87.906

0.000

2979.856

30

258.613

80.000

338.613

176.387

0.000

176.387

38

435.000

80.000

515.000

0.000

515.000

1315.083

1170.530

[3]

SUMMARY
PUBLIC SECTOR DEVELOPMENT PROGRAMME 2015-16
Including Foreign Project Assistance (FPA)
S.No

Name of Department

2
i) Law
(a) Judicial (Building)
(b) Prosecution
ii) Human Rights

24 LIVESTOCK & FISHERIES


(i) Animal Husbandry
(ii) Fisheries
25 LG, RD, PHE & HTP
i. Local Government
ii. Public Health Engg:
iii.Rural Development

Throw fwd
as on
01.07.15
3
2844.487

On-Going
No.

Capital

Revenue

New
Total

No.

Capital

( Rs. In Million )
Financial Projection

TOTAL

Revenue

Total

No.

Capital

Revenue

Total

FPA

Grand Total
(15+16)

2016-17

2017-18

4
27

5
258.613

6
40.000

7
298.613

8
8

9
176.387

10
0.000

11
176.387

12
35

13
435.000

14
40.000

15
475.000

16
0.000

17
475.000

18
1219.714

19
1170.530

2792.592
51.895
135.369

25
2
3

248.613
10.000
0.000

40.000
0.000
40.000

288.613
10.000
40.000

8
0
0

176.387
0.000
0.000

0.000
0.000
0.000

176.387
0.000
0.000

33
2
3

425.000
10.000
0.000

40.000
0.000
40.000

465.000
10.000
40.000

0.000
0.000
0.000

465.000
10.000
40.000

1198.766
20.948
95.369

1149.582
20.948
0.000

5899.584
3779.823

17
12

405.290
315.567

794.880
431.608

1200.170
747.175

11
8

52.000
12.000

147.830
108.000

199.830
120.000

28
20

457.290
327.567

942.710
539.608

1400.000
867.175

130.000
130.000

1530.000
997.175

4221.789
2753.088

282.796
164.561

2119.761

89.723

363.272

452.995

40.000

39.830

79.830

129.723

403.102

532.825

0.000

532.825

1468.701

118.235

17917.307
14517.307
2900.000
500.000

842.693
342.693
0.000
500.000

18760.000
14860.000
2900.000
1000.000

65516.177
44408.548
17514.635
3592.994

377
221
141
15

13561.407
10865.956
2409.341
286.110

25408.910

4000.000

0.000

4000.000

0.000

0.000

0.000

4000.000

0.000

4000.000

0.000

4000.000

356.454

7.458

112.748

120.206

0.000

29.794

29.794

7.458

142.542

150.000

0.000

150.000

176.805

23.650

28 MINORITIES AFFAIRS

1938.698

12

542.000

0.000

542.000

25.000

0.000

25.000

13

567.000

0.000

567.000

0.000

567.000

1371.698

0.000

29 NEW DEVELOPMENT
INITIATIVES

5000.000

5000.000

0.000

0.000

0.000

5000.000

0.000

5000.000

0.000

5000.000

0.000

0.000

30 PLANNING & DEVELOPMENT

17206.018

13

1173.128

2340.622

3513.750

0.000

216.555

216.555

16

1173.128

2557.177

3730.305

6136.135

9866.440

7892.054

5583.660

(i) Eco. Policy & Research (EPR)


(ii) Coastal Dev. Auth (CDA)
(iv) PP&H

9250.586
616.682
7338.750

10
1
2

4.128
200.000
969.000

2110.317
30.305
200.000

2114.445
230.305
1169.000

3
0
0

0.000
0.000
0.000

216.555
0.000
0.000

216.555
0.000
0.000

13
1
2

4.128
200.000
969.000

2326.872
30.305
200.000

2331.000
230.305
1169.000

9.345
0.000
6126.790

2340.345
230.305
7295.790

4613.990
193.189
3084.875

2305.596
193.189
3084.875

31 POPULATION WELFARE

1079.940

50.500

0.000

50.500

0.000

249.500

249.500

50.500

249.500

300.000

0.000

300.000

405.690

374.250

32 PROV. ASSEMBLY

5593.010

995.000

0.000

995.000

5.000

0.000

5.000

1000.000

0.000

1000.000

0.000

1000.000

510.000

500.000

26 MATCHING ALLOCATION
27 MINES & MINERAL DEV

5000.000

717.943 14279.350 187


217.943 11083.899 117
0.000
2409.341 59
500.000
786.110 11

0.000

4355.900
3651.351
490.659
213.890

124.750 4480.650 564


124.750 3776.101 338
0.000
490.659 200
0.000
213.890 26

0.000 18760.000 30904.709 15499.350


0.000 14860.000 21004.397
8192.032
0.000
2900.000
7307.318
7307.318
0.000
1000.000
2592.994
0.000
11831.705 12077.205

[4]

SUMMARY
PUBLIC SECTOR DEVELOPMENT PROGRAMME 2015-16
Including Foreign Project Assistance (FPA)
S.No

Name of Department

2
33 PROV. OMBUDSMAN

Throw fwd
as on
01.07.15
3
10.681

On-Going
No.

Capital

Revenue

New
Total

No.

Capital

( Rs. In Million )
Financial Projection

TOTAL

Revenue

Total

No.

Capital

Revenue

Total

FPA

Grand Total
(15+16)

2016-17

2017-18

4
1

5
10.681

6
0.000

7
10.681

8
0

9
0.000

10
0.000

11
0.000

12
1

13
10.681

14
0.000

15
10.681

16
0.000

17
10.681

18
0.000

19
0.000

1508.971

151.971

0.000

151.971

368.029

130.000

498.029

520.000

130.000

650.000

0.000

650.000

553.971

305.000

29973.075
24134.011
5819.064
20.000

17
17
0
0

3375.999
3375.999
0.000
0.000

0.000
0.000
0.000
0.000

3375.999
3375.999
0.000
0.000

23
15
7
1

2444.779
269.001
2175.778
0.000

845.986
0.000
840.986
5.000

3290.765
269.001
3016.764
5.000

40
32
7
1

5820.778
3645.000
2175.778
0.000

845.986
0.000
840.986
5.000

6666.764
3645.000
3016.764
5.000

0.000
0.000
0.000
0.000

6666.764
3645.000
3016.764
5.000

1185.587

0.000

260.000

260.000

0.000

0.000

0.000

0.000

260.000

260.000

0.000

260.000

925.587

0.000

37 SOCIAL WELFARE

607.393

37.643

122.357

160.000

32.500

7.500

40.000

70.143

129.857

200.000

0.000

200.000

381.143

26.250

38 SPECIAL EDUCATION

800.000

0.000

0.000

0.000

170.000

30.000

200.000

170.000

30.000

200.000

0.000

200.000

300.000

300.000

39 SPECIAL INITIATIVES

8573.614

3294.669

395.331

3690.000

725.000

125.000

850.000

11

4019.669

520.331

4540.000

0.000

4540.000

2136.561

1252.000

40 SPORTS & Y. AFFAIRS


i) Sports
ii) Youth Affairs

4456.104
3761.534
694.570

38
25
13

720.085
646.654
73.431

79.915
24.363
55.552

800.000
671.017
128.983

16
10
6

155.000
145.000
10.000

45.000
10.000
35.000

200.000
155.000
45.000

54
35
19

875.085
791.654
83.431

124.915
34.363
90.552

1000.000
826.017
173.983

0.000
0.000
0.000

1000.000
826.017
173.983

1728.052
1467.759
260.294

1495.552
1235.259
260.294

41 STEVTA

3499.506

540.945

259.055

800.000

200.000

0.000

200.000

740.945

259.055

1000.000

268.595

1268.595

1249.753

1249.753

42 TRANSPORT

4930.543

2207.808

92.192

2300.000

675.000

25.000

700.000

2882.808

117.192

3000.000

0.000

3000.000

965.272

965.272

43 UNIVERSITIES & BOARDS

13388.980

21

1195.165

404.835

1600.000

400.000

0.000

400.000

22

1595.165

404.835

2000.000

0.000

2000.000

5694.490

5694.490

44 WATER SCHS: FOR THAR


COAL DEVELOPMENT

12775.371

3000.000

0.000

3000.000

0.000

0.000

0.000

3000.000

0.000

3000.000

0.000

3000.000

4000.000

5559.634

45 WOMEN DEVELOPMENT

1128.122

112.661

207.339

320.000

62.500

17.500

80.000

10

175.161

224.839

400.000

0.000

400.000

394.105

320.000

544

6992.994

36.539

7029.533

69

1970.467

0.000

1970.467 613

8963.461

36.539

9000.000

1211.500 10211.500

29845.355 28991.495

65754.499 536
55727.20 514
7854.947 18
2172.353
4
1007.804
7
36.539
1

6613.852
6231.750
151.102
231.000
379.142
0.000

0.000
0.000
0.000
0.000
0.000
36.539

6613.852
6231.750
151.102
231.000
379.142
36.539

66
66
0
0
3
0

1929.467
1929.467
0.000
0.000
41.000
0.000

0.000
0.000
0.000
0.000
0.000
0.000

1929.467 602
1929.467 580
0.000 18
0.000 4
41.000 10
0.000 1

8543.319
8161.217
151.102
231.000
420.142
0.000

0.000
0.000
0.000
0.000
0.000
36.539

8543.319
8161.217
151.102
231.000
420.142
36.539

1211.500
0.000
0.000
1211.500
0.000
0.000

29494.412 28754.776
24082.884 23343.248
3851.922
3851.922
1559.606
1559.606
350.943
236.719
0.000
0.000

34 REHABILITATION (PDMA)
35 SGA&C
i) Buildings
ii) Environment
ii) Others
36 SINDH BOARD OF INVT.

46 WORKS & SERVICES


i. Roads
(a) Normal Roads
(b) Strategic Roads
(c) Foreign Aided Projects
ii. Buildings
ii. I. T. Schemes

66798.842

9754.819
8161.217
151.102
1442.500
420.142
36.539

13054.306 10252.006
10244.506 10244.506
2802.300
0.000
7.500
7.500

TOTAL PROVINCIAL
552036.129 1762 85889.255 20294.769 106184.024 590 28931.751 6884.225 35815.976 2352 114821.006 27178.994 142000.000 26985.298 168985.298 214555.325 191368.675
ALLOCATION OF PROVINCIAL ADP INCLUDES Rs.3513 MILLION FOR 10% ROYALTY SHARE FOR 16 DISTRICTS
B- ALLOCATION FOR DISTRICTS DEVELOPMENT SCHEMES
TOTAL (A+B)

15000.000

5000.000

20000.000

121184.024

40815.976

162000.000

121184.024

40815.976

177000.000

C- DEVELOPMENT FINANCING-THROUGH VGF


GRAND TOTAL (A+B+C)

15000.000

[5]

SUMMARY
AGRICULTURE DEPARTMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
(Rs. In million)
Sr
No.

Sector / Sub-Sector

ThrowNo. of
forward as
Schemes
on 01.07.15
3

On-Going
Capital

Revenue

Total

No. of
Schemes
8

New
Capital Revenue
9

Total

No. of
Schemes

10

11

12

Total
FPA
Capital

Revenue

Total

13

14

15

16

Grand
Total
(15+16)
17

Financial Projection
2015-16

2016-17

18

19

Agriculture Research

942.744

50.471

209.760

260.231

50.000

35.000

85.000

100.471

244.760

345.231

0.000

345.231

597.513

0.000

Agriculture Extension

9407.396

54.398

109.55

163.948

55.000

158.000

213.000

11

109.398

267.550

376.948

1597.476

1974.424

2463.622

2295.000

Agriculture, Supply & Prices

149.074

70.000

10.000

80.000

0.000

0.000

0.000

70.000

10.000

80.000

0.000

80.000

70.000

0.000

Agriculture Mechanization

3588.117

49.761

2584.916 2634.677

0.000

65.000

65.000

49.761

2649.916 2699.677

0.000

2699.677

821.440

67.000

Agriculture Water Management

6454.310

0.000

838.012

56.812

103.320

160.132

56.812

998.144

3182.610

4180.754

1036.000

1000.000

20541.641

20

224.630

3752.238 3976.868

11

161.812

361.320

523.132

31

386.442

4113.558 4500.000

4780.086

9280.086

4988.575

3362.000

TOTAL

838.012

941.332

[6]

PROVINCIAL
AGRICULTURE DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District
3

Actual Revised Allocation Estimated ThrowforStatus


Target
Allocation for 2015-16
Estimated ExpenditExpendit- ward as on
2014-15
Date of
Date for
Cost
ure upto
ure upto 01-07-15
Approval Completion
Capital Revenue
Total
Total
F.P.A. June' 15
June, 14
4
5
6
7
8
9
10
11
12
13
14

FPA
15

Financial
Progress in %age
upto

Financial Projection

Jun'15 Jun'16 2016-17


16
17
18

2017-18
19

AGRICULTURE
Agriculture Research
(On-Going Schemes)
1

Development and Promotion of Quality


Sindh
Seed through Public Private
Partnership in Sindh
(Ghotki, Khairpur, Larkana,
Shahdadkot, Dadu, N.Feroze, Sh.
Benazirabad, Sanghar, Mirpurkhas,
Umerkot, Matiari, T. Allahyar,
Hyderabad. T.M. Khan, Badin,
Shikarpur, Thatta and Jacobabad)
(C. 3.921 + R.455.379)
Reclamation of Saline Soils through
Thatta,
Effective Measures (Total Cost
Badin,
Rs.431.595 M with GOS share
Larkana &
Rs.256.545 M)
Shikarpur
Rehabilitation of Rice and Cotton
Thatta
Research Station Thatta (C.76.475 +
R.33.735)
Establishment of Agricultural Services Hyderabad
Complex & Advisory Centers in Sindh
(C.113.230 + R.10.52)

Approved
07.05.09

June-15

459.300

103.432

49.900

0.000

153.332

305.968

0.000

100.000

100.000

0.000

33

55

205.968

0.000

Approved
23.01.12

June-15

256.545

0.000

0.000

0.000

0.000

256.545

0.000

80.000

80.000

0.000

31

176.545

0.000

Approved
23.01.12

June-15

110.210

5.000

0.000

70.450

39.760

10.000

29.760

39.760

0.000

64

100

0.000

0.000

Approved
23.01.12

June-15

123.750

72.279

11.000

0.000

83.279

40.471

40.471

0.000

40.471

0.000

67

100

0.000

0.000

949.805

241.161

65.900

0.000

307.061

642.744

50.471

209.760

260.231

0.000

382.513

0.000

Sub-Total Agriculture Research (On-Going)

65.450

(New Schemes)
5

Establishment of Cotton & Sugarcane


Research Institute Ghotki,(To be
funded out of 10% share of Royalty)

Ghotki

UnApproved

June-17

200.000

0.000

0.000

0.000

0.000

200.000

50.000

10.000

60.000

0.000

30

140.000

0.000

Development of Technology for


Sindh
Production of Hybrid Seed in Sindh
Sub-Total Agriculture Research (New)
Total Agriculture Research (On-Going & New)

UnApproved

June-17

100.000

0.000

0.000

0.000

0.000

100.000

0.000

25.000

25.000

0.000

25

75.000

0.000

300.000
1249.805

0.000
241.161

0.000
65.900

0.000
0.000

0.000
307.061

300.000 50.000
942.744 100.471

35.000
244.760

85.000
345.231

0.000
0.000

28

215.000
597.513

0.000
0.000

[7]

PROVINCIAL
AGRICULTURE DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Agriculture Extension
(On-Going Schemes)
Up-Gradation of Pesticide and
Fertilizer Quality Control and Testing
Laboratories (Revised)(C:10.075 +
R:42.150)
Horticulture Training Project for
increasing earning capability of
subsistence Farmers (Revised)
Sindh Agricultural Growth Project
(SAGP) World Bank Assisted, (Total
Cost Rs.8867.50 M (IDA Share
Rs.7641.238 M, Farmer's share
Rs.1226.225 M, GOS 0.000)
Agriculture Component (Rs.6236.778
M) Livestock Component (Rs.2630.685
M) (Khairpur, Larkana, Umerkot,
Mirpurkhas, Sanghar, Nausheroferoz,
Shaheed Benazirabad, Sukkur,
Matiari, Hyderabad, Jacobabad,
Shikarpur, Kashmore, Kamber,
Thatta, T. Allahyar and Badin)
(C.451.329 + R.8416.17)

10 Adoption of Farmers Field School


Approach in Agriculture Extension for
Dissemination Agriculture Technology
Among the Farming Communities.

Financial
Progress in %age
upto

Location
of
Scheme/
District
3

Actual Revised Allocation Estimated ThrowforStatus


Target
Allocation for 2015-16
Estimated ExpenditExpendit- ward as on
2014-15
Date of
Date for
Cost
ure upto
ure upto 01-07-15
Approval Completion
Capital Revenue
Total
Total
F.P.A. June' 15
June, 14
4
5
6
7
8
9
10
11
12
13
14

Sukkur,
Larkana,
M'khas

Approved
02.04.14

June-15

52.643

0.400

13.000

0.000

13.400

39.243

10.000

29.243

39.243

0.000

25

100

0.000

0.000

Ghotki,
Sukkur,
Khairpur,
N.Feroze
Sindh

Approved
04.03.14

June-15

75.719

21.372

20.000

0.000

41.372

34.347

0.000

34.347

34.347

0.000

55

100

0.000

0.000

Approved
12.02.14

June-17

8867.500

3.674

10.000 392.000

405.674

8461.826

0.000

0.000

0.000 1597.476

Sindh

Approved
16.07.12

June-15

50.960

0.000

10.000

40.960

0.000

40.960

20

100

9.660

0.000

40.960

FPA
15

0.000

Financial Projection

Jun'15 Jun'16 2016-17


16
17
18

2017-18
19

2088.000 2102.000

0.000

0.000

[8]

PROVINCIAL
AGRICULTURE DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District
3

Actual Revised Allocation Estimated ThrowforStatus


Target
Allocation for 2015-16
Estimated ExpenditExpendit- ward as on
2014-15
Date of
Date for
Cost
ure upto
ure upto 01-07-15
Approval Completion
Capital Revenue
Total
Total
F.P.A. June' 15
June, 14
4
5
6
7
8
9
10
11
12
13
14

11 Establishment of Agro-Export
Processing Zone for Fruits, Vegetables,
Flowers & Allied Processing Products
from Local Farms / Processing Units to
Overseas Markets (U/R). Karachi,
Hyderabad, Badin Mirpurkhas,
Shaheed Benazirabad, Naushero
Feroze, Khairpur and Ghotki.
(C.483.471 + R.7.042)

Sindh

Approved
25.02.10

June-14

490.513

12 Construction of Training Resource


Center and Repair of Existing facilities
at Agriculture Training Institute,
Sakrand (C.75.317 + R.13.683)

S.B.A

Approved
02.03.12

June-15

89.000

Sub-Total Agri: Extension (On-Going)

FPA
15

Financial
Progress in %age
upto

Financial Projection

Jun'15 Jun'16 2016-17


16
17
18

2017-18
19

318.891

0.000

0.000

318.891

171.622

10.000

5.000

15.000

0.000

65

68

156.622

0.000

51.602

3.000

0.000

54.602

34.398

34.398

0.000

34.398

0.000

61

100

0.000

0.000

55.660 392.000

843.939

8782.396

54.398

109.550

9626.335

395.939

163.948 1597.476

2244.622 2102.000

New Schemes
13 Dissemination of Agricultural
Information among the Farming
Community through Electronic &
Print Media Phase-II
14 Provision / Facilities for Grain (Anaj)
Market Near NLC Khairpur
15 Provision of Power Sprayer to Growers
on 50% Subsidy
16 Sustainable Plant Health System
(SPHS) through Network of Crop
Clinics and Capacity Building of
Officers/officials

Sindh

UnApproved

June-18

200.000

0.000

0.000

0.000

0.000

200.000

0.000

65.000

65.000

0.000

33

68.000

67.000

Khairpur

UnApproved
UnApproved
UnApproved

June-18

200.000

0.000

0.000

0.000

0.000

200.000

55.000

10.000

65.000

0.000

33

68.000

67.000

June-18

100.000

0.000

0.000

0.000

0.000

100.000

0.000

33.000

33.000

0.000

33

33.000

34.000

June-17

50.000

0.000

0.000

0.000

0.000

50.000

0.000

25.000

25.000

0.000

50

25.000

0.000

Sindh
Sindh

[9]

PROVINCIAL
AGRICULTURE DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

17 Nutrition Sensitive Agriculutre Project


Phase-I, (Total Cost Rs.575.00 M, GOS
Share Rs.75.00 M and World Bank
anticipated share Rs.500.00 M)
(Larkana, Kamber-Shahdadkot,
Kashmore, Jacobabad, Sanghar, T.M.
Khan, Tharparkar, Umerkot and
Badin)
Sub-Total Agri: Extension (New)
Total Agri: Extension (On-Going & New)

Location
of
Scheme/
District
3
Sindh

Actual Revised Allocation Estimated ThrowforStatus


Target
Allocation for 2015-16
Estimated ExpenditExpendit- ward as on
2014-15
Date of
Date for
Cost
ure upto
ure upto 01-07-15
Approval Completion
Capital Revenue
Total
Total
F.P.A. June' 15
June, 14
4
5
6
7
8
9
10
11
12
13
14
UnApproved

June-18

0.000

0.000

0.000

0.000
0.000
55.660 392.000

0.000
843.939

75.000

0.000

25.000

625.000 55.000
9407.396 109.398

158.000
267.550

25.000

FPA
15
0.000

Financial
Progress in %age
upto

Financial Projection

Jun'15 Jun'16 2016-17


16
17
18

75.000

0.000

625.000
10251.335

0.000
395.939

199.074

0.000

50.000

0.000

50.000

149.074

70.000

10.000

80.000

0.000

199.074

0.000

50.000

0.000

50.000

149.074

70.000

10.000

80.000

0.000

357.000

423.000

0.000

780.000

120.000

0.000

120.000

120.000

0.000

87

1500.000 1000.000

0.000

2500.000

502.150

0.000

502.150

502.150

0.000

0.000 1500.000

1500.000

170.020

33

213.000
0.000
376.948 1597.476

25.000

2017-18
19
25.000

219.000 193.000
2463.622 2295.000

Agriculture Supply & Prices


(On-Going Schemes)
18 Renovation, construction and
Karachi
expansion of office building of Bureau
of Supply & Prices (C:186.737
+R:12.337)
Total Agriculture Supply & Prices (On Going)

Approved
08.11.12

June-15

25

65

70.000

0.000

70.000

0.000

100

0.000

0.000

83

100

0.000

0.000

0.000

75

500.000

0.000

0.000

57

100

0.000

0.000

Agriculture Mechanization
(On-Going Schemes)
19 Replacement of Earth Moving
Machinery (Phase-II)
20 Provision of Assistance to Farmers on
Purchase of 11000 Wheel Type
Tractors, Phase-III.
21 Provision of Assistance to Farmers on
Purchase of Wheel Type Tractors,
Phase-IV.
22 Subsidy Assistance on Agriculture
Implements for Farm Mechanization
(Total Cost Rs.794.42 M, GOS Share
Rs.400.0 M, Farmers share Rs.394.42
M)

Sindh

Approved
17.12.12
Approved
26.04.13

June-15

900.000

June-15

3002.150

Sindh

Approved
14.05.15

June-17

2000.000

0.000

0.000

0.000

0.000

2000.000

Sindh

Approved
15.11.12

June-15

400.000

144.980

85.000

0.000

229.980

170.020

Sindh

0.000

170.020

[ 10 ]

PROVINCIAL
AGRICULTURE DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District
3

23 Provision of Solar Pumps on 50%


Sindh
Subsidy to Farmers (Total Cost
Rs.1000.0 M, GOS share Rs.506.44 M,
Farmers share Rs.493.575 M)
24 Modernization of Training & Research Hyderabad
Facilities in Agriculture Engineering
Workshop, Nareja (Revised)
(C.128.807+R.255.078)
25 Construction of Compound wall of
Kashmore@
Agricultural Engineering Workshop
Kandhkot,
Sanghar and Kandhkot, Renovation of
Sukkur,
Agriculture Workshop, Tandojam and Sanghar &
Residential Accomodation at Sukkur
Hyderabad
(Revised)
Sub Total Agri: Mechanization (On-Going)

Actual Revised Allocation Estimated ThrowforStatus


Target
Allocation for 2015-16
Estimated ExpenditExpendit- ward as on
2014-15
Date of
Date for
Cost
ure upto
ure upto 01-07-15
Approval Completion
Capital Revenue
Total
Total
F.P.A. June' 15
June, 14
4
5
6
7
8
9
10
11
12
13
14

FPA
15

Financial
Progress in %age
upto

Financial Projection

Jun'15 Jun'16 2016-17


16
17
18

2017-18
19

Approved
28.05.14

June-17

506.440

0.000

0.000

0.000

0.000

506.440

0.000

253.000

253.000

0.000

50

253.440

0.000

Approved
19.01.07

June-15

383.885

295.639

7.500

0.000

303.139

80.746

41.000

39.746

80.746

0.000

79

100

0.000

0.000

Approved
05.05.09

June-13

54.681

45.920

0.000

0.000

45.920

8.761

8.761

0.000

8.761

0.000

84

100

0.000

0.000

2343.539 1515.500

0.000

3859.039

3388.117

49.761 2584.916

2634.677

0.000

753.440

0.000

0.000

0.000

0.000

200.000

65.000

65.000

0.000

68.000

67.000

0.000
0.000
2343.539 1515.500

0.000
0.000

0.000
3859.039

200.000
3588.117

0.000
65.000
49.761 2649.916

65.000
2699.677

0.000
0.000

68.000
821.440

67.000
67.000

0.000

142.235

138.012

138.012

0.000

0.000

0.000

7247.156

Agriculture Mechanization
(New Schemes)
26 Installation of Tubewells on 50%
Sindh
Subsidy in Sindh Phase-II
Sub Total Agri: Mechanization (New)
Total Agri: Mechanization (Ongoing + New)

UnApproved

June-18

200.000
200.000
7447.156

0.000

0.000

33

Agriculture Water Management


(On-Going Schemes)
27 Pilot Project for Sustainable
Agriculture through Storage Tanks in
Thatta (Revised)

Sujawal

Approved
22.03.12

June-15

280.247

142.235

0.000

0.000

138.012

51

100

[ 11 ]

PROVINCIAL
AGRICULTURE DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

28 Sindh Irrigated Agriculture


Productivity Enhancement Program
Phase-I Project (World Bank Assisted)
(Total Cost Rs.30139.75 M, IDA Share
Rs.18686.64 M, GOS: Rs.6120.0 M and
Farmer share Rs.5333.11 M)
(C.11651.08 + R.18488.669)

Location
of
Scheme/
District
3
Sindh

Actual Revised Allocation Estimated ThrowforStatus


Target
Allocation for 2015-16
Estimated ExpenditExpendit- ward as on
2014-15
Date of
Date for
Cost
ure upto
ure upto 01-07-15
Approval Completion
Capital Revenue
Total
Total
F.P.A. June' 15
June, 14
4
5
6
7
8
9
10
11
12
13
14
Approved
02.03.15

June-20

Sub-Total Agri: Water Management (On-Going)

FPA
15

6120.000

0.000

0.000

0.000

0.000

6120.000

0.000

700.000

700.000 3182.610

6400.247

142.235

0.000

0.000

142.235

6258.012

0.000

838.012

838.012 3182.610

Financial
Progress in %age
upto

Financial Projection

Jun'15 Jun'16 2016-17


16
17
18
0

11

2017-18
19

1000.000 1000.000

1000.000 1000.000

(New Schemes)
29 Construction of Office Buildings for
OFWM Staff
(Badin, Mirpurkhas,
Sanghar, Shaheed Benazirabad,
Sukkur, Khairpur, Shikarpur, Dadu,
Ghotki, Kashmore @ Kandhkot,
Jamshoro)

Sindh

UnApproved

June-17

92.978

0.000

0.000

0.000

0.000

92.978

56.812

0.000

56.812

0.000

61

36.000

0.000

30 Sustainable Agriculture System Along


with Allied Components

Jamshoro

UnApproved

June-16

53.020

0.000

0.000

0.000

0.000

53.020

0.000

53.020

53.020

0.000

100

0.000

0.000

31 Additional lining of watercourses NoKhairpur


27-BR Baharwah,87-L Mirwah and 56L, Pandhirowah District Khairpur
Sub-Total Agri: Water Management (New)
Total Agri: Water Management (Ongoing & New)
Total Agriculture (On-Going)
Total Agriculture (New)
Total Agriculture Department

UnApproved

June-16

50.300

0.000

0.000

0.000

0.000

50.300

0.000

50.300

50.300

0.000

100

0.000

0.000

196.298
6596.545
24422.617
1321.298
25743.915

0.000
0.000
0.000
142.235
0.000
0.000
3122.874 1687.060 392.000
0.000
0.000
0.000
3122.874 1687.060 392.000

0.000
196.298 56.812 103.320
142.235 6454.310 56.812 941.332
5202.274 19220.343 224.630 3752.238
0.000 1321.298 161.812 361.320
5202.274 20541.641 386.442 4113.558

160.132
0.000
998.144 3182.610
3976.868 4780.086
523.132
0.000
4500.000 4780.086

36.000
0.000
1036.000 1000.000
4450.575 3102.000
538.000 260.000
4988.575 3362.000

[ 12 ]

SUMMARY
AUQAF, ZAKAT, USHR & RELIGIOUS AFFAIRS DEPARTMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
(Rs. In million)
Sr
No.

Sub-Sector

ThrowNo. of
forward as
Schemes
on 01.07.15

On-Going
Capital

Revenue

Total

No. of
Schemes

New
Capital Revenue

Total

No. of
Schemes

Total
FPA
Capital

Revenue

Total

Grand
Total
(15+16)

Financial Projection
2016-17

2017-18

10

11

12

13

14

15

16

17

18

19

Auqaf, Zakat, Ushr

576.133

167.975

20.000

187.975

52.025

0.000

52.025

11

220.000

20.000

240.000

0.000

240.000

336.133

0.000

Religious Affairs

68.355

0.000

20.000

20.000

0.000

0.000

0.000

0.000

20.000

20.000

0.000

20.000

48.355

0.000

Total Auqaf, Zakat, Ushr &


Religious Affairs

644.488

167.975

40.000

207.975

52.025

0.000

52.025

12

220.000

40.000

260.000

0.000

260.000

384.488

0.000

[ 13 ]

PROVINCIAL
AUQAF, ZAKAT, USHR & RELIGIOUS AFFAIRS DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District

Actual
Estimated ThrowRevised Allocation
Status
Target
Estimated ExpenditExpendit- forward
2014-15
Date of
Date for
Cost
ure upto
ure upto
as on
Approval Completion
June, 14
Total
F.P.A. June' 15 01-07-15
4
5
6
7
8
9
10
11

Allocation for 2015-16


Capital Revenue
12
13

Total
14

FPA

15

Financial Progress
in %age upto

Financial
Projection

Jun'15 Jun'16 2016-17 2017-18


16
17
18
19

Auqaf, Zakat & Ushr


(On-Going Schemes)
32

33

34

35

36

37

38

Development, Repairs & Renovation of


Dargah Sakhi Abdul Wahab Shah
Jeelani Hyderabad (Re-Revised)
(C:137.905)
Reconstruction of Mosque Abul Fazal
and its Units at Mola Ali Qadam Gah
Hyderabad (C:185.000)
Strengthening of Engineering Wing of
Auqaf & Construction / Rehabilitation
of Office at Dargah Makki Shah
Hyderabad (C:5.505)
Construction of Roza Mubarak Ahmed
Shah Lakyari village Mehar Shah
Taluka Saeedabad District Matiari.
(C:38.151)
Construction / Reconstruction /
Rehabilitation & allied facilities of
Dargahs in Sindh (6 Nos)
T.M Khan(01), Thatta (02), Khairpur
(01) and Hyderabad (01), Larkana (01)
(C:150.599)
Construction of Dargah Sadruddin
Badshah (Rizvi) situated at Deh
Bakhar Taluka Rohri District Sukkur
Ph-I (C:42.304)
Installation of close circuit CCTV/
security gate surveillance Cameras on
various Dargah / Mazar in Sindh
(R:20.000)

Hyderabad Approved
04.03.14

June-16

137.905

73.190

19.858

0.000

93.048

44.857

30.000

0.000

30.000

0.000

67

89

14.857

0.000

Hyderabad Approved
22.09.14

June-17

185.000

0.000

5.000

0.000

5.000

180.000

54.166

0.000

54.166

0.000

32

125.834

0.000

Hyderabad Approved
14.04.15

June-17

5.505

0.000

0.000

0.000

0.000

5.505

5.505

0.000

5.505

0.000

100

0.000

0.000

Approved
16.08.12
(U/R)

June-16

38.151

30.113

8.308

0.000

38.421

-0.270

5.600

0.000

5.600

0.000

101

115

-5.870

0.000

T.M. Khan, Approved


Thatta,
03.12.13
Khairpur,
Hyderabad,
Larkana

June-16

150.599

0.000

38.962

0.000

38.962

111.637

50.400

0.000

50.400

0.000

26

59

61.237

0.000

Matiari

Sukkur

Approved
23.12.13

June-16

42.304

0.000

20.000

0.000

20.000

22.304

22.304

0.000

22.304

0.000

47

100

0.000

0.000

Sindh

Approved
14.01.12

June-17

20.000

0.000

0.000

0.000

0.000

20.000

0.000

20.000

20.000

0.000

100

0.000

0.000

579.464

103.303

92.128

0.000

195.431

384.033

167.975

20.000

187.975

0.000

196.058

0.000

Total Auqaf, Zakat & Ushr (On-Going Schemes)

[ 14 ]

PROVINCIAL
AUQAF, ZAKAT, USHR & RELIGIOUS AFFAIRS DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District

Actual
Estimated ThrowRevised Allocation
Status
Target
Estimated ExpenditExpendit- forward
2014-15
Date of
Date for
Cost
ure upto
ure upto
as on
Approval Completion
June, 14
Total
F.P.A. June' 15 01-07-15
4
5
6
7
8
9
10
11

Allocation for 2015-16


Capital Revenue
12
13

Total
14

FPA

15

Financial Progress
in %age upto

Financial
Projection

Jun'15 Jun'16 2016-17 2017-18


16
17
18
19

Auqaf, Zakat & Ushr


(New Schemes)
39
40

41

42

Extension / Rehabilitation of Dargah


Sachal Sarmast Khairpur.
Construction of boundary wall for
security purpose of Auqaf Dargahs /
Mosque in various District of Sindh
Construction of Mosque & allied
facilities at Dargah Miskeen Shah at
District Kamber Shahdadkot.
Construction of Compound Wall &
Wash room for Dargah Shaheed
Muhammad Ali Taluka Bathoro
District Sajawal

Khairpur

UnApproved
UnApproved

June-18

90.100

0.000

0.000

0.000

0.000

90.100

22.525

0.000

22.525

0.000

25

67.575

0.000

June-17

75.000

0.000

0.000

0.000

0.000

75.000

19.000

0.000

19.000

0.000

25

56.000

0.000

Kamber @
UnShahdadkot Approved

June-17

22.000

0.000

0.000

0.000

0.000

22.000

5.500

0.000

5.500

0.000

25

16.500

0.000

June-16

5.000

0.000

0.000

0.000

0.000

5.000

5.000

0.000

5.000

0.000

100

0.000

0.000

192.100
771.564

0.000
103.303

0.000
92.128

0.000
0.000

0.000
195.431

192.100
576.133

52.025
220.000

0.000
20.000

52.025
240.000

0.000
0.000

140.075
336.133

0.000
0.000

48.355

0.000

48.355
384.488

0.000
0.000

Sindh

Sujawal

UnApproved

Total Auqaf, Zakat & Ushr (New Schemes)


Total Auqaf, Zakat & Ushr
Religious Affairs
(On-going scheme)
43

Establishment of Islamic Research


Centre (R:90.000)
Total Religious Affairs
Total Auqaf, Zakat, Ushr & RA Deptt:

Karachi

Approved
29.11.12

June-15

90.000

90.000
861.564

14.045

14.045
117.348

7.600

7.600
99.728

0.000

0.000
0.000

21.645

21.645
217.076

68.355

68.355
644.488

0.000

0.000
220.000

20.000

20.000
40.000

20.000

20.000
260.000

0.000

0.000
0.000

24

46

[ 15 ]

SUMMARY
BOARD OF REVENUE DEPARTMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
(Rs. In million)
Sr
No.

Sub-Sector

ThrowNo. of
forward as
Schemes
on 01.07.15

On-Going

No. of
Schemes

New

Financial Projection

Capital

Revenue

Total

Capital

Revenue

Total

10

11

12

13

14

15

16

17

0.000

1166.783

25.000

0.000

25.000

1191.783

0.000

1191.783

0.000

1191.783

2640.128 2640.128

2264.737 2308.217

0.000

0.000

0.000

43.480

2264.737

2308.217

0.000

2308.217

1262.312

1210.263 2264.737 3475.000

25.000

0.000

25.000

1235.263

2264.737

3500.000

0.000

3500.000

3902.440 2640.128

Buildings

6447.039

1166.783

I. T. Schemes

3570.529

43.480

Total Board of Revenue

10017.568

Total

FPA

Total

Capital Revenue

No. of
Schemes

Grand
Total
(15+16)

2016-17

2017-18

18

19

0.000

[ 16 ]

PROVINCIAL
BOARD OF REVENUE DEPARTMENT

( Rs. in million )
Revised
Actual
Target
Estimated Expendit- Allocation 2014Date for
15
Cost
ure upto
Completion
June, 14
Total F.P.A

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District

Sindh

Approved
13.01.15

June-16

9420.880

2534.903

464.051 0.000

2998.954

Sindh

Approved
26.03.08

June-15

160.200

135.087

0.000 0.000

135.087

9581.080

2669.990

464.051 0.000

3134.041

100.000

0.000

0.000 0.000

0.000

100.000
9681.080

0.000
2669.990

0.000 0.000
464.051 0.000

0.000
3134.041

100.000
25.000
6547.039 1191.783

Status
Date of
Approval

Estimated
ThrowforAllocation for 2015-16
Expenditward as on
ure upto
01-07-15
June' 15
Capital Revenue
Total
10

11

12

13

14

FPA

Financial Progress
in %age upto

Financial Projection

Jun'15 Jun'16 2016-17


15

16

17

0.000 1141.670 0.000

32

44

0.000

84

100

18

2017-18
19

BUILDINGS (On-going Schemes)


44

45

Development of townships in major


urban centers (50,000 Nos 120 square
yard plots with all civic services)
(Revised)
Construction of Office of District
Registrar , at Karachi and SubRegistrar Offices (22 Nos) at Head
Quarters all Districts in Sindh
Total Buildings (Ongoing):-

6421.926 1141.670

25.113

25.113

6447.039 1166.783

25.113 0.000

0.000 1166.783 0.000

2640.128 2640.128

0.000

0.000

2640.128 2640.128

Buildings (New Scheme)


46

Renovation / Rehabilitation of
Revenue Colony at Sukkur
Total Buildings (New):Total Buildings :-

Sukkur

UnApproved

June-17

100.000

25.000

0.000

25.000 0.000

25

0.000
25.000 0.000
0.000 1191.783 0.000

75.000

0.000

75.000
0.000
2715.128 2640.128

I.T. Schemes
(On-Going Schemes)
47

48

49

Computerization and Establishment


of Land Administration and Revenue
Management Information System
(LARMIS) (Re-revised)(C:639.792+
R:4357.661)
Preservation of Land Revenue Record
& Revamping of Survey Settlement
Department Board of Revenue, Sindh
(Preservation) (C:50.684
+R:313.025)(Revised)
Creation of GIS for Land
Administration and Revenue
Management Information System (Rerevised)

Sindh

Approved
16.04.14

June-15

4997.453

2803.370

871.301 0.000

3674.671

1322.782

23.480 1299.302 1322.782 0.000

74

100

0.000

0.000

Sindh

Approved
20.08.09

June-15

363.709

141.197

10.000 0.000

151.197

212.512

20.000

50.000

70.000 0.000

42

61

142.512

0.000

Sindh

Approved
24.10.14

June-15

648.864

337.816

58.417 0.000

396.233

252.631

0.000

110.548

110.548 0.000

61

78

142.083

0.000

[ 17 ]

PROVINCIAL
BOARD OF REVENUE DEPARTMENT

( Rs. in million )
Revised
Actual
Target
Estimated Expendit- Allocation 2014Date for
15
Cost
ure upto
Completion
June, 14
Total F.P.A

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District

50

Automation of Stamp & Registration,


21 districs (Except Karachi &
Hyderabad) (Revised)

Sindh

Approved
26.12.14

June-16

Total I.T. Schemes


Total Board of Revenue:-

Status
Date of
Approval

6
1946.624

7956.650
17637.730

7
44.020

120.000 0.000

3326.403 1059.718 0.000


5996.393 1523.769 0.000

Estimated
ThrowforAllocation for 2015-16
Expenditward as on
ure upto
01-07-15
June' 15
Capital Revenue
Total
10
164.020

11
1782.604

12
0.000

13
804.887

14

FPA

Financial Progress
in %age upto

Financial Projection

Jun'15 Jun'16 2016-17


15

804.887 0.000

4386.121 3570.529
43.480 2264.737 2308.217 0.000
7520.162 10117.568 1235.263 2264.737 3500.000 0.000

16

17

50

18
977.717

2017-18
19
0.000

1262.312
0.000
3977.440 2640.128

[ 18 ]

SUMMARY
CHIEF MINISTER's SECRETARIAT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
(Rs. In million)
Sr
No.

Sector / Sub-Sector

ThrowNo. of
forward as
Schemes
on 01.07.15
3

On-Going
Capital

Revenue

Total

No. of
Schemes
8

New
Capital Revenue
9

10

Total
11

No. of
Schemes
12

Total
FPA
Capital

Revenue

Total

13

14

15

Grand
Total
(15+16)

Financial Projection
2016-17

2017-18
19

16

17

18

Buildings

323.890

123.890

0.000

123.890

176.110

0.000

176.110

300.000

0.000

300.000

0.000

300.000

11.945

0.000

BBSHRR&DB

200.000

0.000

0.000

0.000

50.000

0.000

50.000

50.000

0.000

50.000

0.000

50.000

75.000

0.000

523.890

123.890

0.000

123.890

226.110

0.000

226.110

350.000

0.000

350.000

0.000

350.000

86.945

0.000

TOTAL

[ 19 ]

PROVINCIAL
CHIEF MINISTER's SECRETARIAT

( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District
3

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4
5
6
7

Karachi

Approved
08.04.15

Revised
Estimated
ThrowforAllocation for 2015-16
Allocation
Expenditward as on
2014-15
ure upto
01-07-15
Capital Revenue Total
Total F.P.A. June' 15
8
9
10
11
12
13
14

FPA
15

Financial Progress
in %age upto

Financial
Projection

Jun'15 Jun'16 2016-17 2017-18


16
17
18
19

Buildings
(On-going Scheme)
51

Renovation & Rehabilitation of


Chief Minister House, Karachi

June-16

123.890

0.000

0.000

0.000

0.000

123.890

123.890

0.000

123.890

0.000

123.890

0.000

0.000

0.000

0.000

123.890

123.890

0.000

123.890

0.000

200.000

0.000

0.000

0.000

0.000

200.000

176.110

0.000

176.110

0.000

200.000

0.000

0.000

0.000

0.000

200.000

176.110

0.000

176.110

323.890

0.000

0.000

0.000

0.000

323.890

300.000

0.000

300.000

200.000

0.000

0.000

0.000

0.000

200.000

50.000

0.000

50.000

0.000

200.000
123.890

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

200.000
123.890

50.000
123.890

0.000
0.000

50.000
123.890

TOTAL CM SECTT (NEW)

400.000

0.000

0.000

0.000

0.000

400.000

226.110

0.000

TOTAL C.M's SECTT:-

523.890

0.000

0.000

0.000

0.000

523.890

350.000

0.000

Total Buildings (On-going Scheme)

100

0.000

0.000

0.000

0.000

11.945

0.000

0.000

11.945

0.000

0.000

11.945

0.000

75.000

0.000

0.000
0.000

75.000
0.000

0.000
0.000

226.110

0.000

86.945

0.000

350.000

0.000

86.945

0.000

Buildings
(New Scheme)
52

Construction of New Chief Minister


Secretariat, Karachi
Total Buildings (New Scheme)

Karachi

UnApproved

June-16

Total Buildings :-

88

BBSHRR&DB
(New Scheme)
53

Establishment of Head Office for


BBSHRR&DB and Center of
excellence for Soft Skills Training
and Curriculum Development
Total BBSHRR&DB :TOTAL CM SECTT (ONGOING)

Karachi

UnApproved

June-17

25

[ 20 ]

SUMMARY
COOPERATIVE DEPARTMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
(Rs. In million)
Sr
No.

Sub-Sector

ThrowNo. of
forward as
Schemes
on 01.07.15

On-Going

No. of
Schemes

New

Capital
5

Revenue
6

Total
7

Cooperative Department

46.264

16.000

0.000

16.000

0.000

0.000

Total Cooperative Deptt:

46.264

16.000

0.000

16.000

0.000

0.000

Capital Revenue
9
10

Total
11

No. of
Schemes

Total

FPA

Grand
Total
(15+16)

Financial Projection

12

Capital
13

Revenue
14

Total
15

16

17

2016-17
18

2017-18
19

0.000

16.000

0.000

16.000

0.000

16.000

30.264

0.000

0.000

16.000

0.000

16.000

0.000

16.000

30.264

0.000

[ 21 ]

PROVINCIAL
COOPERATIVE DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District
3

Actual
Estimated ThrowforRevised Allocation
Status
Target
Allocation for 2015-16
Estimated ExpenditExpendit- ward as
2014-15
Date of
Date for
Cost
ure upto
ure upto
on
Approval Completion
Total
F.P.A. June' 15 01-07-15 Capital Revenue Total
June, 14
4
5
6
7
8
9
10
11
12
13
14

FPA
15

Financial Progress
in %age upto

Financial
Projection

Jun'15 Jun'16 2016-17 2017-18


16
17
18
19

Cooperative
(On-Going Scheme)
54

Construction of Sindh Government Hyderabad Approved


Cooperative College Hyderabad
23.01.12
(C:107.693+R:10.728)

Total Cooperative Deptt:

June-15

118.421

61.210

10.947

0.000

72.157

46.264

16.000

0.000

16.000

0.000

118.421

61.210

10.947

0.000

72.157

46.264

16.000

0.000

16.000

0.000

61

74

30.264

0.000

30.264

0.000

[ 22 ]

SUMMARY
COMMUNITY DEVELOPMENT PROGRAM (CDP) FOR
SUSTAINABLE DEVELOPMENT GOALS (SDGs)
ANNUAL DEVELOPMENT PROGRAMME 2015-16

(Rs. In million)
Throwforward as No. of
on 01.07.15 Schemes

On-Going

New

Sr
No.

Sub-Sector

CDP FOR SDGs.

7000.000

0.000

0.000

0.000

7000.000

0.000

Total CDP FOR SDGs :-

7000.000

0.000

0.000

0.000

7000.000

0.000

No. of
Schemes

Capital Revenue Total


5
6
7

Capital
9

Revenue
10

Total

No. of
Schemes
Total
11

Revenue
14

Total
15

FPA

Grand
Total
(15+16)

16

17

12

Capital
13

7000.000

7000.000

0.000

7000.000 0.000

7000.000

7000.000

0.000

7000.000 0.000

Financial
Projection
2016-17
18

2017-18
19

7000.000

0.000

0.000

7000.000

0.000

0.000

[ 23 ]

PROVINCIAL
COMMUNITY DEVELOPMENT PROGRAM (CDP) FOR SUSTAINABLE DEVELOPMENT GOALS (SDGs)
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Revised
Location of
Status Target Date
Actual Exp.
Est. Exp. ThrowforEstimated
Allocation
2014-15
Scheme/
Date of
for
upto Jun,
upto ward as on
Cost
District
Approval Completion
14
June' 15 01-07-15
Total
F.P.A.
3

Approved

June, 15

10

11

Allocation for
2015-16
Capital Revenue
12

13

FPA
Total
14

Financial
Progress in
%age upto

Financial
Projection

Jun'15 Jun'16 2016-17 2017-18


15

16

17

18

19

100

0.000

0.000

0.000

0.000

ALLOCATION OF CDP FOR SDGs


(New Schemes)
55

Allocation of Community
Sindh
Development Program (CDP) for
Sustainable Development Goals
(SDGs)
TOTAL ALLOCATION OF CDP FOR SDGs :-

7000.000

0.000

0.000 0.000

0.000

7,000.000

7000.000

0.000

7000.000

0.000

7000.000

0.000

0.000 0.000

0.000

7000.000

7000.000

0.000

7000.000

0.000

[ 24 ]

SUMMARY
CULTURE TOURISM & ANTIQUITIES DEPARTMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
Sr.
No.

Sub Sector

Throwforward
as on
01.07.15
3

On-Going
No. of
Scheme

Capital

Revenue

New
Total

No. of
Schemes

Capital

Revenue

Total
Total

No. of
Scheme

Capital

Revenue

Total

10

11

12

13

14

15

FPA

Grand
Total
(15+16)

16

(Rs. In million)
Financial Projection
2016-17

2017-18

17

18

19

Culture, Tourism &


Antiquities

6632.571

50

963.158

211.842 1175.000

17

258.000

17.000

275.000

67

1221.158

228.842 1450.000

0.000

1450.000

5182.571

0.000

Total Culture, Tourism &


Antiquites Department

6632.571

50

963.158

211.842 1175.000

17

258.000

17.000

275.000

67

1221.158

228.842 1450.000

0.000

1450.000

5182.571

0.000

[ 25 ]

PROVINCIAL
CULTURE, TOURISM & ANTIQUITIES DEPARTMENT
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

Actual
Location of
Status
Target
Estimated ExpenditScheme/
Date of
Date for
Cost
ure upto
District
Approval Completion
June, 14
3
4
5
6
7

Revised
Estimated ThrowAllocation
Expendit- forward
2014-15
ure upto
as on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

( Rs. in million )
Financial
Progress in Financial Projection
FPA
%age upto
Jun'15 Jun'16 2016-17 2017-18
15
16
17
18
19

Culture, Tourism & Antiquities


(On-going Schemes)
56

Establishment of Cultural Complex at


Rani Kot (C:32.100+R:6.841)

Jamshoro

Approved
03.10.03

June-15

38.941

6.500

1.000

0.000

7.500

31.441

24.600

6.841

31.441 0.000

19

100

0.000

0.000

57

Establishment of Museum at Kot Diji

Khairpur

June-15

38.827

5.473

1.000

0.000

6.473

32.354

25.513

6.841

32.354 0.000

17

100

0.000

0.000

58

Approved
11.01.03
Approved
06.09.07

Construction of Auditorium &


Karachi
Conference Hall at Liaquat Memorial
library Karachi (Revised)
(C:102.221+R:40.685)
Establishment of Sindh Kashi Institute
Thatta
Approved
at Bhitshah and Conservation and
31.12.08
Restoration of Dabgeer Mosque
(U/R)
Thatta (C:59.011+R:61.014)
Establishment of Public Libraries in
Khairpur, Approved
Sindh including Pir-jo-Goth Khairpur, Karachi,
22.09.07
Sachal Goth Karachi and Cultural
T.A.Yar,
(U/R)
Complexes(C:295.955+R:96.309)
Sukkur

June-16

142.906

64.749

22.511

0.000

87.260

55.646

27.823

27.823

55.646 0.000

61

100

0.000

0.000

June-15

120.025

3.498

3.500

0.000

6.998

113.027

10.000

0.000

10.000 0.000

14

103.027

0.000

June-15

362.264

143.222

0.000

0.000

143.222

219.042

47.500

0.000

47.500 0.000

40

53

171.542

0.000

Establishment of Cultural Complexes


in Sindh (Phase-II)
(C:334.217+R:36.214)
Construction of Larkana Art Complex
at Larkana (C:53.327+R:23.784)
Establishment of Doolah Darya Khan
Amusement Park in Thatta (C:59.843)
Establishment of Sindh Cultural
Heritage Institute at Karachi and
Up-gradation of National Museum of
Pakistan at Karachi
(C:242.274+R:98.689)
Establishment of Cultural Complex
and Model Library at New Karachi
(C:145.573+R:14.895)

Umerkot,
Thatta,
S.B.A,
Sanghar
Larkana

Approved
30.09.08
(U/R)
Approved
23.12.05
Approved
30.04.10
Approved
24.02.12

June-15

370.431

244.824

20.000

0.000

264.824

105.607

10.000

0.000

10.000 0.000

71

74

95.607

0.000

June-15

77.111

24.000

7.500

0.000

31.500

45.611

22.000

0.000

22.000 0.000

41

69

23.611

0.000

June-15

59.843

51.305

4.269

0.000

55.574

4.269

4.269

0.000

4.269 0.000

93

100

0.000

0.000

June-15

340.963

37.607

18.250

0.000

55.857

285.106

150.855

0.000

150.855 0.000

16

61

134.251

0.000

Karachi

Approved
02.11.11
(U/R)

June-15

160.468

155.949

0.000

0.000

155.949

4.519

0.430

4.089

4.519 0.000

97

100

0.000

0.000

Establishment of Public Libraries in


Sindh (T.M Khan, Thatta, S.B.A,
Dadu, N'Feroze, Karachi, Kashmore,
Sukkur, Jamshoro)
(C:346.510+R:101.830)

Sindh

Approved
24.02.12

June-15

448.340

39.495

15.806

0.000

55.301

393.039

15.000

0.000

15.000 0.000

12

16

378.039

0.000

59

60

61

62
63
64

65

66

Thatta
Karachi

[ 26 ]

PROVINCIAL
CULTURE, TOURISM & ANTIQUITIES DEPARTMENT
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

Actual
Location of
Status
Target
Estimated ExpenditScheme/
Date of
Date for
Cost
ure upto
District
Approval Completion
June, 14
3
4
5
6
7
Sindh
Approved
June-15
245.247
39.983
24.02.12

Revised
Allocation
2014-15
Total
F.P.A.
8
9
19.000
0.000

Estimated ThrowExpendit- forward


ure upto
as on
June' 15 01-07-15
10
11
58.983 186.264

( Rs. in million )
Financial
Allocation for 2015-16
Progress in Financial Projection
FPA
%age upto
Capital Revenue Total
Jun'15 Jun'16 2016-17 2017-18
12
13
14
15
16
17
18
19
25.681
0.000
25.681 0.000 24
35
160.583
0.000

1
67

2
Establishment of Cultural Centers at
Various Places in Sindh (Jamshoro,
Tharparkar, Thatta, S.B.A, Badin,
Shikarpur, Jacobabad)
(C:195.227+R:50.020)

68

Improvement / Extension of Public


Libraries in Sindh (Karachi,
Hyderabad, Jamshoro, Khairpur Mirs,
Dadu, Larkana & Shikarpur)
(C:143.434+R:78.564)

Sindh

Approved
24.02.12

June-15

221.998

70.978

18.134

0.000

89.112

132.886

20.000

0.000

20.000 0.000

40

49

112.886

0.000

69

Sindh Indigenious Traditional Crafts


Company (SITCO) (Capacity Building
& Assistance to Producer / Civil
Society Organization)(R:800.000)

Karachi

Approved
30.07.09

June-15

800.000

241.000

12.000

0.000

253.000

547.000

0.000

12.000

12.000 0.000

32

33

535.000

0.000

70

Establishment of Abdul Aziz Public


Library at Pano Akil
(C:25.955+R:7.514)
Promotion of Cultural Heritage of
Sindh through Telecasts,
Documentaries, Dramas, Music school
and Natioanl & International
Exchange Programmes(R:59.320)

Sukkur

Approved
07.09.11

June-15

33.469

0.000

0.000

0.000

0.000

33.469

11.469

0.000

11.469 0.000

34

22.000

0.000

Sindh

Approved
07.09.11

June-15

59.320

1.796

5.000

0.000

6.796

52.524

0.000

5.000

5.000 0.000

11

20

47.524

0.000

Khairpur

Approved
01.10.12

June-15

20.849

0.000

5.000

0.000

5.000

15.849

15.849

0.000

15.849 0.000

24

100

0.000

0.000

Sindh

Approved
19.10.12

June-15

333.860

11.352

18.970

0.000

30.322

303.538

15.620

19.380

35.000 0.000

20

268.538

0.000

71

72

Construction of Compound Wall


around Faiz Mehal (C:20.849)

73

Protection, Preservation and


Promotion of Protected Archaeological
Sites and Monuments in Sindh

74

Protection, Preservation, Promotion


and Development of World Heritage
Site of Mohen jo Daro
(C:197.706+R:87.723)

Larkana

Approved
19.10.12

June-15

285.429

3.732

12.500

0.000

16.232

269.197

50.000

0.000

50.000 0.000

23

219.197

0.000

75

Protection, Preservation, Promotion


and Development of World Heritage
Site of Makli Hill Manuments, Thatta
(C:360.184+R:111.698)

Thatta

Approved
19.10.12

June-15

471.882

8.117

18.369

0.000

26.486

445.396

30.000

5.000

35.000 0.000

13

410.396

0.000

[ 27 ]

PROVINCIAL
CULTURE, TOURISM & ANTIQUITIES DEPARTMENT
Actual
Location of
Status
Target
Gen.
Sector / Sub-sector /
Estimated ExpenditScheme/
Date of
Date for
Sr. No.
Name of Scheme
Cost
ure upto
District
Approval Completion
June, 14
1
2
3
4
5
6
7
76 Protection, Preservation, Promotion
Thatta
Approved
June-15
255.306
6.250
and Development of Bhanbhore Site at
19.10.12
Gharo, District Thatta
(C:190.619+R:64.687)
77 Documentation of Monuments and
Sindh
Approved
June-15
36.306
0.000
Archaeological Sites in Lower Sindh
01.10.12
Districts (PC-II) (Thatta, Badin,
Mirpurkhas, T.M Khan, Tharparkar,
T.A Yar, Sanghar & Umerkot)
(R:36.306)
78 Conservation of Heritage Buildings of
Karachi, Approved
June-15
22.124
0.000
Press Clubs of Karachi, Thatta and
Thatta
07.09.12
other Press Clubs in historical
buildings(C:20.015+R:2.109)
79 Research, Compilation, Consolidation
Karachi Approved
June-15
51.813
0.000
and Printing of History of Sindh
01.10.12
(R:51.813)
80

Establishment of Sindhi Dictionary


Board (C:35.103)

81

Sindhi Cultural Village Karachi


(C:30.341+R:1.000)

82

Rehabilitation of Wooden Roof of


Shahi Bazar Shikarpur (C:54.786)

83

Estimated ThrowExpendit- forward


ure upto
as on
June' 15 01-07-15
10
11
6.250 249.056

( Rs. in million )
Financial
Allocation for 2015-16
Progress in Financial Projection
FPA
%age upto
Capital Revenue Total
Jun'15 Jun'16 2016-17 2017-18
12
13
14
15
16
17
18
19
15.000
0.000
15.000 0.000
2
8
234.056
0.000

3.250

0.000

3.250

33.056

0.000

9.000

9.000 0.000

34

24.056

0.000

6.529

0.000

6.529

15.595

15.796

0.000

15.796 0.000

30

101

-0.201

0.000

5.280

0.000

5.280

46.533

0.000

15.000

15.000 0.000

10

39

31.533

0.000

June-15

35.103

5.000

4.625

0.000

9.625

25.478

0.000

5.000

5.000 0.000

27

42

20.478

0.000

Approved
24.12.14

June-15

31.341

0.000

8.000

0.000

8.000

23.341

22.341

1.000

23.341 0.000

26

100

0.000

0.000

Shikarpur Approved
24.11.14

June-17

54.786

0.000

19.090

0.000

19.090

35.696

35.696

0.000

35.696 0.000

35

100

0.000

0.000

Protection, Preservation and


Mirpurkha Approved
Conservation of Chitori Graveyard
s
24.01.14
(C:55.110)
Construction of Motel / Hotel at Garhi Larkana Approved
Khuda Bux Bhutto Larkano
07.04.12
(C:92.266+R:27.375)
(U/R)

June-17

55.110

0.000

15.000

0.000

15.000

40.110

40.110

0.000

40.110 0.000

27

100

0.000

0.000

June-15

119.641

40.598

39.170

0.000

79.768

39.873

10.000

0.000

10.000 0.000

67

75

29.873

0.000

85

Development of Summer Resorts at


Gorakh Hills (50% GOP Share & 50%
GOS Share)

Approved
04.08.05
(U/R)

June-15

999.000

389.232

89.638

0.000

478.870

520.130

20.000

5.000

25.000 0.000

48

50

495.130

0.000

86

Establishment of Motels, Improvement Jamshoro, Approved


/ Renovation of existing Motels /
Thatta,
09.08.12
Resorts in Sindh at Sehwan, Thatta
Umerkot
including Umerkot
(C:144.169+R:39.442)

June-15

183.611

0.000

5.500

0.000

5.500

178.111

12.795

0.000

12.795 0.000

10

165.316

0.000

84

Hyderabad Approved
07.09.12

Revised
Allocation
2014-15
Total
F.P.A.
8
9
0.000
0.000

Karachi

Dadu

[ 28 ]

PROVINCIAL
CULTURE, TOURISM & ANTIQUITIES DEPARTMENT
Actual
Location of
Status
Target
Gen.
Sector / Sub-sector /
Estimated ExpenditScheme/
Date of
Date for
Sr. No.
Name of Scheme
Cost
ure upto
District
Approval Completion
June, 14
1
2
3
4
5
6
7
87 Establishment of Tourists information Karachi, Approved
June-15
34.130
0.000
Centers at Divisional Headquarters in Hyderabad, 05.12.12
Sindh (C:34.130)
Sukkur,
Larkana &
Mirpurkha
s
88 Construction of Resorts at Baqar Lake Sanghar
Approved
June-15
47.016
0.000
(C:37.235+R:9.781)
08.04.12
89

90

91

92

93

94

95

96

97

98

Revised
Allocation
2014-15
Total
F.P.A.
8
9
13.000
0.000

Estimated ThrowExpendit- forward


ure upto
as on
June' 15 01-07-15
10
11
13.000
21.130

( Rs. in million )
Financial
Allocation for 2015-16
Progress in Financial Projection
FPA
%age upto
Capital Revenue Total
Jun'15 Jun'16 2016-17 2017-18
12
13
14
15
16
17
18
19
0.000 21.130
21.130 0.000 38
100
0.000
0.000

10.500

0.000

10.500

36.516

26.735

9.781

36.516 0.000

22

100

0.000

0.000

Improvement / Renovation of Facilities Tharparkar Approved


at Mithi Rest House at Tharparkar
05.12.12
(C:49.626+R:9.784)
Establishment of Archaeological
Sukkur
Approved
Museum at Sukkur
13.03.08
(C:26.177+R:3.352)
(U/R)
Construction of Office of the
Karachi, Approved
Department of Antiquities at Karachi Jamshoro, 31.12.08
and Sub Offices at Jamshoro and
Sukkur
(U/R)
Sukkur (C:216.611+R:18.255)
Conservation & Rehabilitation of
Thatta
Approved
Shah Jahan Mosque Thatta
16.10.08
(C:61.752+R:5.952)
Establishement of cell for scientific
Thatta,
Approved
Investigation and Rehabilitation of
Karachi
26.12.11
Traditional Mural Other paintings

June-15

59.410

0.000

7.500

0.000

7.500

51.910

10.000

0.000

10.000 0.000

13

29

41.910

0.000

June-15

29.529

12.946

4.352

0.000

17.298

12.231

12.231

0.000

12.231 0.000

59

100

0.000

0.000

June-15

234.866

146.138

4.000

0.000

150.138

84.728

15.000

0.000

15.000 0.000

64

70

69.728

0.000

June-15

67.704

20.745

5.012

0.000

25.757

41.947

10.000

0.000

10.000 0.000

38

53

31.947

0.000

June-15

55.141

22.823

4.000

0.000

26.823

28.318

22.466

5.852

28.318 0.000

49

100

0.000

0.000

Rehabilitation of Board of Revenue


Karachi Approved
Office Barrack-79
05.04.11
(C:41.210+R:18.790)
Construction of Site Museum &
Thatta
Approved
upgradation & promotion of visitors
15.11.11
facilities at Makli.
Conservation /Rehabilitation & Rescue Jacobabad Approved
of Jamia Mosque Zangipur Distt.
28.11.12
Jacobabad (C:25.785+R:6.271)
Conservation and Restoration of Old
Shikarpur Approved
Mukhtiarkari Building Shikarpur
28.11.12
(C:44.612+R:11.429)

June-15

60.000

24.249

32.350

0.000

56.599

3.401

3.401

0.000

3.401 0.000

94

100

0.000

0.000

June-15

55.554

19.755

7.500

0.000

27.255

28.299

25.877

2.422

28.299 0.000

49

100

0.000

0.000

June-15

32.056

0.000

2.000

0.000

2.000

30.056

23.785

6.271

30.056 0.000

100

0.000

0.000

June-15

56.041

0.000

27.451

0.000

27.451

28.590

17.161

11.429

28.590 0.000

49

100

0.000

0.000

Conservation/Rehabilitation of Jamia
Mosque Hyder Wagho, District
Jacobabad (C:21.158+R:7.180)

June-15

28.338

0.000

1.865

0.000

1.865

26.473

19.293

7.180

26.473 0.000

100

0.000

0.000

Jacobabad Approved
28.11.12

[ 29 ]

PROVINCIAL
CULTURE, TOURISM & ANTIQUITIES DEPARTMENT
Actual
Location of
Status
Target
Gen.
Sector / Sub-sector /
Estimated ExpenditScheme/
Date of
Date for
Sr. No.
Name of Scheme
Cost
ure upto
District
Approval Completion
June, 14
1
2
3
4
5
6
7
99 Preservation & Restoration of
Sindh
Approved
June-15
199.786
0.000
Historical Towns and Villages in Sindh
24.11.11
(Khairpur, Tharparkar, Umerkot,
Matiari, Shikarpur, Dadu, T.M Khan,
S.B.A) (C:163.241+R:37.984)
100

101

Conservation & Rehabilitation of


Hyderabad Pucca Fort
(C:399.566+R:13.274)
Establishment of M.H Panhwar
Centre for Physical Heritage
Jamshoro

Hyderabad Approved
24.11.11

Revised
Allocation
2014-15
Total
F.P.A.
8
9
4.000
0.000

Estimated ThrowExpendit- forward


ure upto
as on
June' 15 01-07-15
10
11
4.000 195.786

( Rs. in million )
Financial
Allocation for 2015-16
Progress in Financial Projection
FPA
%age upto
Capital Revenue Total
Jun'15 Jun'16 2016-17 2017-18
12
13
14
15
16
17
18
19
15.000
7.940
22.940 0.000
2
13
172.846
0.000

June-15

412.840

0.000

12.060

0.000

12.060

400.780

30.240

5.760

36.000 0.000

12

364.780

0.000

Jamshoro

Approved
11.02.14

June-17

59.918

0.000

10.000

0.000

10.000

49.918

30.000

0.000

30.000 0.000

17

67

19.918

0.000

102

Construction N.A Baloch Institute


(C:46.037+R:8.898)

Jamshoro

Approved
26.11.011

June-17

54.935

31.727

21.585

0.000

53.312

1.623

1.623

0.000

1.623 0.000

97

100

0.000

0.000

103

Establishment of Shaheed Benazir


Bhutto Museum at Sir Shah Nawaz
Bhutto Library at Larkana

Larkana

Approved
31.10.09

June-16

59.117

50.360

4.378

0.000

54.738

4.379

4.379

0.000

4.379 0.000

93

100

0.000

0.000

104

Consolidation / Improvement of
Facilities at Keenjhar Lake Thatta
(Revised)(C:43.637+R:7.831)

Thatta

Approved
31.03.11

June-16

51.468

41.246

2.378

0.000

43.624

7.844

4.745

3.099

7.844 0.000

85

100

0.000

0.000

105

Establishment of Khairpur Estate


Museum (C:46.684+R:9.004)

Khairpur

Approved
26.12.11

June-16

55.688

21.809

12.000

0.000

33.809

21.879

12.875

9.004

21.879 0.000

61

100

0.000

0.000

8129.851 1986.458

584.822

0.000

4383.57

0.000

Total (On-going schemes)

106

Culture, Tourism & Antiquities


(New Schemes)
Construction of Culture, Tourism &
Antiquities office Complex at Karachi
(Phase-I)

2571.280 5558.571

963.158 211.842 1175.000 0.000

Karachi

UnApproved

June-19

450.000

0.000

0.000

0.000

0.000

450.000

112.500

0.000

112.500 0.000

25

337.500

0.000

107

Restoration of two Vehicles of Mader-e- Karachi


Millat Fatima Jinnah

UnApproved

June-17

30.000

0.000

0.000

0.000

0.000

30.000

0.000

7.500

7.500 0.000

25

22.500

0.000

108

Re-construction of Tomb of Gen: Hosh hyderabad


UnMohammad Sheedi at District
Approved
Hyderabad

June-17

20.000

0.000

0.000

0.000

0.000

20.000

5.000

0.000

5.000 0.000

25

15.000

0.000

109

Renovation / extension of Sambara Inn


Larkana

Larkana

UnApproved

June-17

40.000

0.000

0.000

0.000

0.000

40.000

10.000

0.000

10.000 0.000

25

30.000

0.000

110

Preservation, Conservation and


Restoration of Building of Jufel Hurst
Public School

Karachi

UnApproved

June-17

30.000

0.000

0.000

0.000

0.000

30.000

10.000

0.000

10.000 0.000

33

20.000

0.000

[ 30 ]

PROVINCIAL
CULTURE, TOURISM & ANTIQUITIES DEPARTMENT
Actual
Location of
Status
Target
Gen.
Sector / Sub-sector /
Estimated ExpenditScheme/
Date of
Date for
Sr. No.
Name of Scheme
Cost
ure upto
District
Approval Completion
June, 14
1
2
3
4
5
6
7
111 Conservation of existing Building JMB Karachi
UnJune-17
40.000
0.000
Girls Secondary School Karachi
Approved

Revised
Allocation
2014-15
Total
F.P.A.
8
9
0.000
0.000

Estimated ThrowExpendit- forward


ure upto
as on
June' 15 01-07-15
10
11
0.000
40.000

( Rs. in million )
Financial
Allocation for 2015-16
Progress in Financial Projection
FPA
%age upto
Capital Revenue Total
Jun'15 Jun'16 2016-17 2017-18
12
13
14
15
16
17
18
19
10.000
0.000
10.000 0.000
0
25
30.000
0.000

112

Establishment of Sindhi Kashi


Institute at Karachi

Karachi

UnApproved

June-17

100.000

0.000

0.000

0.000

0.000

100.000

25.000

0.000

25.000 0.000

25

75.000

0.000

113

Conservation / Restoration /
Construction of Masjid Muhammad
Bin Qasim Arore, District Sukkur
Re-Construction of Shah Abdul Latif
Library Ratodero

Sukkur

UnApproved

June-17

30.000

0.000

0.000

0.000

0.000

30.000

7.500

0.000

7.500 0.000

25

22.500

0.000

Larkana

UnApproved

June-17

40.000

0.000

0.000

0.000

0.000

40.000

10.000

0.000

10.000 0.000

25

30.000

0.000

114
115

Promotion of Tourism activities and


Festivals in Sindh.

Sindh

UnApproved

June-18

30.000

0.000

0.000

0.000

0.000

30.000

0.000

7.500

7.500 0.000

25

22.500

0.000

116

Interior & Extension Conservation &


surface decoration of Khudabad
Mosque, Dadu
Missing allied facilities at Motel
Nagarparkar
Conversion of Zoo Garden into
Natural Science Museum at Tando
Muhammad Khan.

Dadu

UnApproved

June-18

40.000

0.000

0.000

0.000

0.000

40.000

10.000

0.000

10.000 0.000

25

30.000

0.000

UnApproved
T.M.Khan
UnApproved

June-17

20.000

0.000

0.000

0.000

0.000

20.000

5.000

0.000

5.000 0.000

25

15.000

0.000

June-16

5.000

0.000

0.000

0.000

0.000

5.000

3.000

2.000

5.000 0.000

100

0.000

0.000

Jacobabad

UnApproved

June-17

34.000

0.000

0.000

0.000

0.000

34.000

8.500

0.000

8.500 0.000

25

25.500

0.000

Khairpur

UnApproved
Unapproved

June-17

80.000

0.000

0.000

0.000

0.000

80.000

20.000

0.000

20.000 0.000

25

60.000

0.000

June-17

60.000

0.000

0.000

0.000

0.000

60.000

15.000

0.000

15.000 0.000

25

22.500

22.500

June-16

25.000

0.000

0.000

0.000

0.000

25.000

6.500

0.000

6.500 0.000

26

18.500

0.000

1074.000
0.000
9203.851 1986.458

0.000
584.822

799.00
5182.57

399.50
0.00

117
118

119

120
121

122

Establishment of Shaheed Mohtarma


Benazir Bhutto Public Library at
Taluka Garhi Khairo
Preservation of Old Chief Court
Session Court Khairpur
Construction of Museum, Library &
Allied Facilities at Dargah Sharif
Hazrat Allama Mian Ghulam
Muhammad Mahesar Kamal Dero at
Taluka Gambat
Establishment of Model Library at
Orangi Town, Karachi
Toatal (New Schemes)
GRAND TOTAL

Tharparkar

Khairpur

Karachi

UnApproved

0.000
0.000 1074.000 258.000 17.000 275.000 0.000
0.000 2571.280 6632.571 1221.158 228.842 1450.000 0.000

[ 31 ]

SUMMARY
EDUCATION & LITERACY DEPARTMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
(Rs. In million)
Sr
No.

Sector/Sub-Sector

ThrowOn-Going
No. of
forward as
Schemes Capital Revenue
on 01.07.15
3
4
5
6

Total

No. of
Schemes

Capital

Revenue

Total

11

12

13

14

15

16

Grand
Total
(15+16)
17

New

Total

No. of
Schemes

Capital

Revenue

10

Total
FPA

Financial Projection
2016-17

2017-18

18

19

Elementary Education

2759.743

14

419.634

181.000

600.634

10

37.500

130.000

167.500

24

457.134

311.000

768.134

502.452

1270.586

995.805

995.805

Teacher Education

551.342

77.000

15.000

92.000

25.000

35.000

60.000

102.000

50.000

152.000

0.000

152.000

199.671

199.671

Sindh Education Foundation

1946.00

0.000

0.000

0.000

0.000

512.500

512.500

0.000

512.500

512.500

0.000

512.500

716.750

716.750

Secondary Education

17709.749

46

3546.692

424.046

3970.738

20

423.000

224.000

647.000

66

3969.692

648.046

4617.738

2113.790

6731.528

6546.006

6546.006

College Education

19968.492

44

1895.811

306.766

2202.577

10

79.000

95.000

174.000

54

1974.811

401.766

2376.577

0.000

2376.577

8795.958

8795.958

Miscellaneous

7576.286

17

412.171

661.130

1073.301

24

320.000

179.750

499.750

41

732.171

840.880

1573.051

0.000

1573.051

3001.618

3001.618

Total Education & Literacy

50511.612

124

6351.308 1587.942 7939.250

71

884.500

1176.250

2060.750

195

7235.808 2764.192

10000.000

2616.242 12616.242 20255.806 20255.806

[ 32 ]

PROVINCIAL
EDUCATION & LITERACY DEPARTMENT

( Rs. in million )
Target
Estimated
Date for
Cost
Completion

Actual
Expenditure upto
June, 14

Revised
Estimated
ThrowforAllocation
Expenditward
as on
2014-15
ure upto
01-07-15
Total
F.P.A. June' 15

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Date of
Approval

Sanghar,
Shikarpur,
Jacobabad,
Kashmore
Sindh

Approved
24.12.09

June-15

607.674

150.000

40.000

0.000

190.000

124 Enhancing Girls Enrolment through


Re-opening of 400 Closed Schools
through Rural Support Programme
(RSP)
125 Up-grading Primary Girls Schools into Mirpurkhas,
Elementary Schools in Rural Areas of
Badin,
Sindh (Assisted by JICA)
T.A Yar,
Total Cost: Rs. 2076.979 M,
Hyderabad,
JICA Assistance: Rs.1667.962 M &
Jamshoro,
G.O.S. Share: Rs.409.017 M
S.B.A, Dadu,
(C: 7.536 + R: 401.481)
Larkana,
Khairpur,
Sukkur,
Ghotki and
Shikarpur

Approved
23.01.10

June-15

299.241

175.000

0.000

0.000

Approved
03.09.13

June-17

409.017

0.000

16.592

126 Rehabilitation / Re-construction of


Existing Primary & Elementary
Schools in Sindh (Damaged due to
Rain/ Flood or any other condition)
District Larkana
127 Up-gradation of Primary Schools to
Middle Schools in Sindh (2007-08
Programme) (460 Units)
(C: 1192.705 + R:109.020)
128 Construction of Two Rooms Shelterless
Primary Schools in Sindh (2007-08
Programme) (450 Units ) (C:468.152 +
R: 53.550)
129 Introduction of Computer Education in
Middle Schools in Sindh (2007-08
Programme) (230 Units)(C: 236.042 +
R: 289.340)

Larkana

Approved
27.10.14

June-16

56.134

0.000

Sindh

Approved
31.01.08

June-15

1301.725

Sindh

Approved
31.01.08

June-15

Sindh

Approved
31.01.08

June-15

Allocation for 2015-16


FPA
Capital

Revenue

Total

12

13

14

417.674

50.000

0.000

50.000

175.000

124.241

0.000

11.000

0.000

16.592

392.425

0.000

5.000

0.000

5.000

51.134

698.793

136.024

0.000

834.817

521.702

303.354

69.053

0.000

525.382

223.125

18.562

0.000

10

11

15

Financial
Progress in %age
upto

Financial Projection

Jun'15 Jun'16

2016-17

16

17

18

0.000

31

39

183.837

11.000

0.000

58

62

56.621

40.000

40.000

502.452

14

176.213

51.134

0.000

51.134

0.000

100

0.000

466.908

135.000

15.000

150.000

0.000

64

76

158.454

372.407

149.295

100.000

10.000

110.000

0.000

71

92

19.648

241.687

283.695

60.000

30.000

90.000

0.000

46

63

96.848

Elementary Education
(On-Going Schemes)
123 Provision of Missing Facilities Under
Education Sector Reforms (ESR)
(C:600.922 + R:6.752)

[ 33 ]

PROVINCIAL
EDUCATION & LITERACY DEPARTMENT

( Rs. in million )
Revised
Estimated
ThrowforAllocation
Expenditward
as on
2014-15
ure upto
01-07-15
Total
F.P.A. June' 15

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Date of
Approval

Approved
06.05.15

June-16

59.550

0.000

0.000

0.000

0.000

59.550

0.000

15.000

15.000

Approved
06.05.15

June-16

59.550

0.000

0.000

0.000

0.000

59.550

0.000

15.000

Approved
06.05.15

June-16

58.756

0.000

0.000

0.000

0.000

58.756

0.000

Approved
06.05.15

June-16

58.756

0.000

0.000

0.000

0.000

58.756

Approved
06.05.15

June-16

59.550

0.000

0.000

0.000

0.000

Approved
06.05.15

June-16

59.709

0.000

0.000

0.000

Approved
24.05.13

June-15

8.500

0.000

0.000

4085.246

1550.272

130 Provision of Furniture in Existing


Karachi
Primary / Elementary Schools in
Karachi Division
131 Provision of Furniture in Existing
Hyderabad
Primary / Elementary Schools in
Hyderabad Division,(To be funded out
of 10% share of Royalty)
132 Provision of Furniture in Existing
Mirpurkhas
Primary / Elementary Schools in
Mirpurkhas Division
133 Provision of Furniture in Existing
Sukkur
Primary / Elementary Schools in
Sukkur Division
134 Provision of Furniture in Existing
Larkana
Primary / Elementary Schools in
Larkana Division
135 Up-gradation of Primary Schools to
Karachi
Middle Schools in Malir
(C: 57.147 + R: 2.562)
136 Construction of One Additional Class
Kashmore
Room in Existing Primary Schools (03
Nos.) & Rehabilitation of Primary
School (01 No.) in District Kashmore
(C: 8.020 +R: 0.480)
Total Elementary Education (On-going Schemes)

Target
Estimated
Date for
Cost
Completion

Actual
Expenditure upto
June, 14

10

11

Allocation for 2015-16


FPA
Capital

Revenue

Total

12

13

14

15

Financial
Progress in %age
upto

Financial Projection

Jun'15 Jun'16

2016-17

16

17

18

0.000

25

22.275

15.000

0.000

25

22.275

15.000

15.000

0.000

26

21.878

0.000

15.000

15.000

0.000

26

21.878

59.550

0.000

15.000

15.000

0.000

25

22.275

0.000

59.709

15.000

0.000

15.000

0.000

25

22.355

0.000

0.000

8.500

8.500

0.000

8.500

0.000

100

0.000

285.231

0.000

1835.503

2249.743

419.634

181.000

600.634

502.452

824.555

Elementary Education
(New Schemes)
137 Provision of Furniture in Existing
S.B.A
Primary / Elementary Schools in S.B.A
Division
138 Construction of GLS Qazi Sahibdino
Tharparkar,
Soomro, Taluka Diplo, Distt.
Mirpurkhas
Tharparkar, GBPS Gh. Muhammad
& Badin
Soomro, Taluka Judho, Distt.
Mirpurkhas & GPS Abdullah Khan
Buledi, Taluka T.Bago, Distt.Badin.

UnApproved

June-18

60.000

0.000

0.000

0.000

0.000

60.000

0.000

15.000

15.000

0.000

25

22.500

UnApproved

June-18

30.000

0.000

0.000

0.000

0.000

30.000

7.500

0.000

7.500

0.000

25

11.250

[ 34 ]

PROVINCIAL
EDUCATION & LITERACY DEPARTMENT

( Rs. in million )
Revised
Estimated
ThrowforAllocation
Expenditward
as on
2014-15
ure upto
01-07-15
Total
F.P.A. June' 15

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Date of
Approval

Hyderabad

UnApproved
UnApproved
UnApproved
UnApproved
UnApproved
UnApproved
UnApproved

June-18

50.000

0.000

0.000

0.000

0.000

50.000

June-18

50.000

0.000

0.000

0.000

0.000

June-18

50.000

0.000

0.000

0.000

June-18

50.000

0.000

0.000

June-18

50.000

0.000

June-18

50.000

June-18

UnApproved

June-18

139 ECE Intervention Hyderabad Division

140 ECE Intervention Mirpurkhas Division Mirpurkhas


141 ECE Intervention Shaheed
Benazirabad Division
142 ECE Intervention Sukkur Division

S.B.A
Sukkur

143 ECE Intervention Larkana Division

Larkana

144 ECE Intervention Karachi Division

Karachi

145 Provision of Furniture in Hyderabad


Hyderabad
Division for Project "Up-grading
Primary Girls Schools into Elementary
Schools in Rural Areas of Sindh"
(Assisted by JICA)
146 Provision of Furniture in Mirpur Khas Mirpurkhas
Division for Project "Upgrading
Primary Girls Schools into Elementary
Schoolsin Rural Areas of Sindh"
(Assisted by JICA)
Total Elementary Education (New Schemes)
Total Elementary Education

Target
Estimated
Date for
Cost
Completion

Actual
Expenditure upto
June, 14

Allocation for 2015-16


FPA
Capital

Revenue

Total

12

13

14

5.000

7.500

12.500

50.000

5.000

7.500

0.000

50.000

5.000

0.000

0.000

50.000

0.000

0.000

0.000

0.000

0.000

0.000

60.000

0.000

0.000

60.000

0.000

510.000
4595.246

10

11

15

Financial
Progress in %age
upto

Financial Projection

Jun'15 Jun'16

2016-17

16

17

18

0.000

25

18.750

12.500

0.000

25

18.750

7.500

12.500

0.000

25

18.750

5.000

7.500

12.500

0.000

25

18.750

50.000

5.000

7.500

12.500

0.000

25

18.750

0.000

50.000

5.000

7.500

12.500

0.000

25

18.750

0.000

0.000

60.000

0.000

40.000

40.000

0.000

67

10.000

0.000

0.000

0.000

60.000

0.000

30.000

30.000

0.000

50

15.000

0.000
1550.272

0.000
285.231

0.000
0.000

0.000
1835.503

510.000
2759.743

37.500
457.134

130.000
311.000

167.500
768.134

0.000
502.452

171.250
995.805

Teacher Education
(On-Going Schemes)
147 Strengthening of PITE & Capacity
Building of Teachers (Revised)
(C: 305.448 + R: 17.574)
148 Re-construction of Elementary College
for Women Korangi (Phase-II)
(C: 64.326 + R:2.043)

S.B.A

Approved
12.12.13

June-15

323.022

112.500

20.000

0.000

132.500

190.522

45.000

0.000

45.000

0.000

41

55

72.761

Karachi

Approved
17.12.12

June-15

66.369

0.000

5.000

0.000

5.000

61.369

32.000

0.000

32.000

0.000

56

14.685

Approved
06.05.15

June-16

59.451

0.000

0.000

0.000

0.000

59.451

0.000

15.000

15.000

0.000

25

22.226

448.842

112.500

25.000

0.000

137.500

311.342

77.000

15.000

92.000

0.000

149 Curriculum Development for the Year


Sindh
2014-2017
Total Teacher Education (On-going Schemes)

109.671

[ 35 ]

PROVINCIAL
EDUCATION & LITERACY DEPARTMENT

( Rs. in million )
Target
Estimated
Date for
Cost
Completion

Actual
Expenditure upto
June, 14

Revised
Estimated
ThrowforAllocation
Expenditward
as on
2014-15
ure upto
01-07-15
Total
F.P.A. June' 15

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Date of
Approval

150 Strengthening of Professional


Development Centres BED College
Darsano Chhano & BED College
Sukkur
151 Capacity Building of Elementary
Schools Teachers in Karachi & Sukkur

Karachi &
Sukkur

UnApproved

June-18

60.000

0.000

0.000

0.000

Karachi &
Sukkur

UnApproved

June-18

60.000

0.000

0.000

152 Intervention for Rehabilitation of


Existing Elementary Colleges in
Karachi & Sukkur
153 Support to PPP. NODE for Conversion
of PITE into University Phase-I

Karachi &
Sukkur

UnApproved

June-18

60.000

0.000

S.B.A

UnApproved

June-18

60.000

Allocation for 2015-16


FPA
Capital

Revenue

Total

11

12

13

14

0.000

60.000

10.000

5.000

15.000

0.000

0.000

60.000

0.000

15.000

0.000

0.000

0.000

60.000

5.000

0.000

0.000

0.000

0.000

60.000

240.000
688.842

0.000
112.500

0.000
25.000

0.000
0.000

0.000
137.500

10

15

Financial
Progress in %age
upto

Financial Projection

Jun'15 Jun'16

2016-17

16

17

18

0.000

25

22.500

15.000

0.000

25

22.500

10.000

15.000

0.000

25

22.500

10.000

5.000

15.000

0.000

25

22.500

240.000
551.342

25.000
102.000

35.000
50.000

60.000
152.000

0.000
0.000

Teacher Education
(New Schemes)

Total Teacher Education (New Schemes)


Total Teacher Education

90.000
199.671

Sindh Education Foundation


(New Schemes)
154 Supporting Middle and Secondary
Sindh
Education in Sindh By Using Existing
School Infrastructure (Public and
Private ) in Sindh.
155 Strengthening of SEF and Regulatory
Sindh
Mechanism with focus on Student
Assessment and Teacher Training
Capacity
156 Introducing of Smart Learning in SEF
Sindh
Supported Schools By Way Of
Outsourcing.
Total Sindh Ed. Foundation (New Schemes)
Secondary Education
(On-Going Schemes)

UnApproved

June-18

1500.000

0.000

0.000

0.000

0.000

1500.000

0.000

400.000

400.000

0.000

27

550.000

UnApproved

June-18

50.000

0.000

0.000

0.000

0.000

50.000

0.000

12.500

12.500

0.000

25

18.750

UnApproved

June-18

396.000

0.000

0.000

0.000

0.000

396.000

0.000

100.000

100.000

0.000

25

148.000

1946.000

0.000

0.000

0.000

0.000

1946.000

0.000

512.500

512.500

0.000

716.750

[ 36 ]

PROVINCIAL
EDUCATION & LITERACY DEPARTMENT

( Rs. in million )
Revised
Estimated
ThrowforAllocation
Expenditward
as on
2014-15
ure upto
01-07-15
Total
F.P.A. June' 15

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Date of
Approval

Umerkot

Approved
09.08.12
Approved
20.08.09

June-15

249.236

117.000

61.611

0.000

June-15

1332.611

664.197

186.550

Approved
21.08.08

June-15

2006.364

798.473

Sindh

Approved
16.10.08

June-15

916.632

Sindh

Approved
21.08.08

June-15

Sindh

Approved
31.01.08

Sindh

157 Establishment of Public School


Umerkot. (C: 234.537 + R: 14.699)
158 Establishment of Public Schools in
Sindh (05 Units) (Revised)
(C: 1243.851 + R: 88.760)

159 Up-gradation of Middle Schools to


High Schools in Sindh (2008-09
Programme) (115 Units)
(C: 1582.359 + R: 424.005)
160 Re-construction of Existing High /
Secondary Schools in Sindh (2008-09
Programme) (45 Units)
(C: 877.192 + R: 39.440)
161 Establishment of Single Section High
Schools in Sindh (2008-09
Programme) (53 Units)
(C: 1092.792 + R: 200.340)
162 Up-gradation of Middle Schools to
High Schools & High Schools to Higher
Secondary Schools in Sindh (2007-08
Progamme)
(C: 3081.519 + R: 1298.825)
163 Addition of Class rooms, Construction
of Labs and Library in Existing
Secondary & Higher Secondary
Schools in Sindh (2007-08
Programme.)
(C: 885.951 + R: 339.620)
164 Rehabilitation of Existing High /
Higher Secondary Schools in Sindh
(2008-09 Programme)
165 Establishment of Public School at
Kamber @ Shahdadkot

Target
Estimated
Date for
Cost
Completion

Actual
Expenditure upto
June, 14

Allocation for 2015-16


FPA
Capital

Revenue

Total

11

12

13

14

178.611

70.625

55.928

14.697

70.625

0.000

850.747

481.864

154.442

10.000

152.205

0.000

950.678

1055.686

125.000

873.756

22.876

0.000

896.632

20.000

1293.132

1228.297

44.835

0.000

1273.132

June-15

4380.344

1083.513

230.129

0.000

Approved
31.01.08

June-15

1225.571

486.534

110.269

Sindh

Approved
16.10.08

June-15

1890.737

1281.860

Kamber

Approved
21.04.11
(U/R)

June-15

242.385

120.000

Sanghar,
T.M. Khan,
T.Allahyar,
Ghotki &
Matiari
Sindh

10

15

Financial
Progress in %age
upto

Financial Projection

Jun'15 Jun'16

2016-17

16

17

18

0.000

72

100

0.000

164.442

0.000

64

76

158.711

13.000

138.000

0.000

47

54

458.843

20.000

0.000

20.000

0.000

98

100

0.000

20.000

20.000

0.000

20.000

0.000

98

100

0.000

1313.642

3066.702

190.000

10.000

200.000

0.000

30

35

1433.351

0.000

596.803

628.768

70.000

20.000

90.000

0.000

49

56

269.384

223.992

0.000

1505.852

384.885

230.000

0.000

230.000

0.000

80

92

77.443

117.385

0.000

237.385

5.000

37.000

0.000

37.000

0.000

98

113

-16.000

[ 37 ]

PROVINCIAL
EDUCATION & LITERACY DEPARTMENT

( Rs. in million )
Revised
Estimated
ThrowforAllocation
Expenditward
as on
2014-15
ure upto
01-07-15
Total
F.P.A. June' 15

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Date of
Approval

Dadu,
Jacobabad,
Kashmore,
Karachi,
Kamber,Larkan
a, Sukkur &
Khairpur.

Approved
16.08.12
(U/R)

June-17

870.000

227.881

74.241

0.000

302.122

567.878

0.000

80.000

167 Construction / Re-construction of


Existing Govt. Girls Primary School at
Flower Lane SMCHS and
Construction / Re-construction of
Existing DPN GBSS Tunisla Line
Jamshed Town, Karachi.
168 Conversion of Selected Existing
Schools into Model Schools (Primary,
Secondary & Higher Secondary of
CDGK) (Provincial) (Revised)
(C: 1294.587 + R: 218.853)
169 Re-construction of Existing Primary /
Secondary Girls / Boys Schools at
Liaquatabad Town, Karachi (14 Units)

Karachi

Approved
31.11.12

June-15

58.151

22.500

5.655

0.000

28.155

29.996

10.000

Karachi

Approved
17.05.12

June-15

1513.440

787.954

103.454

0.000

891.408

622.032

Karachi

Approved
09.08.12

June-15

455.115

60.000

33.930

0.000

93.930

170 Repair / Renovation / Rehabilitation of


Existing Primary / Secondary Girls /
Boys Schools at Liaquatabad Town,
Karachi (15 Units)
171 Re-construction / Rehabilitation /
Addition of Missing Facilities in
Primary / Secondary Schools of
Jamshed, Landhi & Korangi Towns,
Karachi (17 Units)
172 Re-construction / Improvement /
Addition of Classrooms & Addition of
XI-XII Classes in Existing Secondary
Schools at Landhi & Korangi Towns,
Karachi (02 Units)
(C: 128.802 + R: 6.008)

Karachi

Approved
09.08.12

June-15

173.494

10.000

18.483

0.000

Karachi

Approved
09.08.12

June-15

480.237

12.500

33.930

Karachi

Approved
09.08.12

June-14

134.810

7.500

22.069

166 Sindh Basic Education Program


(SBEP) (Approved Cost: Rs.14355 M
USAID Grant: Rs.13485 M & G.O.S.
Share: Rs.870 M)(C: 651.147 +
R: 218.853)

Target
Estimated
Date for
Cost
Completion

Actual
Expenditure upto
June, 14

10

11

Allocation for 2015-16


FPA
Capital

Revenue

Total

12

13

14

15

Financial
Progress in %age
upto

Financial Projection

Jun'15 Jun'16

2016-17

16

17

18

80.000 2113.790

35

44

243.939

0.000

10.000

0.000

48

66

9.998

80.000

10.000

90.000

0.000

59

65

266.016

361.185

70.000

0.000

70.000

0.000

21

36

145.593

28.483

145.011

70.000

0.000

70.000

0.000

16

57

37.506

0.000

46.430

433.807

50.000

0.000

50.000

0.000

10

20

191.904

0.000

29.569

105.241

40.000

0.000

40.000

0.000

22

52

32.621

[ 38 ]

PROVINCIAL
EDUCATION & LITERACY DEPARTMENT

( Rs. in million )
Revised
Estimated
ThrowforAllocation
Expenditward
as on
2014-15
ure upto
01-07-15
Total
F.P.A. June' 15

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Date of
Approval

Karachi

Approved
20.12.12

June-15

612.257

0.000

84.825

0.000

84.825

Sindh

Approved
03.04.13

June-15

3500.000

75.000

800.000

0.000

Sindh

Approved
03.04.13

June-15

3742.548

25.000

448.209

Karachi

Approved
17.12.12

June-16

198.975

12.500

Khairpur

Approved
17.12.12

June-16

45.126

Karachi

Approved
25.04.14

June-17

Karachi

Approved
26.07.13

Shikarpur &
Kashmore

Approved
14.02.14

173 Re-construction / Rehabilitation /


Addition of Missing Facilities of
Primary / Secondary Schools in
Saddar, Orangi and Baldia Towns
Karachi
174 Establishment of English Medium
Schools in Sindh (25 Units) in
Cambridge System Nursery to O level
(One in Each District )
(C: 3266.925 + R: 233.075)
175 Establishment of Comprehensive
Schools in Sindh ( 25 Units ) (One in
Each District )
(C: 3550.998 + R: 191.550)
176 Re-construction of Dangerous
Government Schools of UC-11 & 12
Landhi and UC-05 Korangi
177 Establishment of Single Section High
School at Mir Ali Bazar Khairpur
(C: 41.314 + R: 3.812), (To be funded
out of 10% share of Royalty)
178 Rehabilitation / Re-construction of
Existing Primary & Secondary Schools
Korangi Town,Karachi. (04 Units )
179 Rehabilitation / Addition of Class
Rooms & Gymnasium Hall at GBPS
St.Marrie & GGSS Safia Memorial
Jamshed Town,Karachi.
180 Establishment of 06 Cluster /
Consolidated Schools in the District
Shikarpur & Kandhkot through Upgradation of 06 Existing Primary
Schools of the Govt: of Sindh Being
Managed By SRSO.
(C: 51.430 + R: 116.476)

Target
Estimated
Date for
Cost
Completion

Actual
Expenditure upto
June, 14

Allocation for 2015-16


FPA
Capital

Revenue

Total

12

13

14

527.432

70.000

0.000

70.000

875.000

2625.000

1200.000

0.000

0.000

473.209

3269.339

600.000

28.483

0.000

40.983

157.992

5.000

20.000

0.000

25.000

166.000

0.000

11.000

0.000

June-15

84.918

0.000

20.655

June-16

167.906

25.000

41.381

10

11

15

Financial
Progress in %age
upto

Financial Projection

Jun'15 Jun'16

2016-17

16

17

18

0.000

14

25

228.716

1200.000

0.000

25

59

712.500

100.000

700.000

0.000

13

31

1284.670

30.000

0.000

30.000

0.000

21

36

63.996

20.126

18.000

2.126

20.126

0.000

55

100

0.000

11.000

155.000

30.000

0.000

30.000

0.000

25

62.500

0.000

20.655

64.263

64.263

0.000

64.263

0.000

24

100

0.000

0.000

66.381

101.525

0.000

67.949

67.949

0.000

40

80

16.788

[ 39 ]

PROVINCIAL
EDUCATION & LITERACY DEPARTMENT

( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Date of
Approval

Approved
26.03.14

181 Repair / Renovation of Educational


Karachi
Institutes of Gulshan-e-Iqbal Town,
(i) GGHS Gulshan-e-Iqbal, Block-6 &
(ii) GGSS Khatoon-e-Pakistan
(Revised) Approved Cost: Rs. 76.290 M
GOS Share: Rs.58.867 M
CDGK Share: Rs.17.423 M
182 Establisment of Single Section High
Khairpur
School at Shaheed Benazir Bhutto
Model Village Tajal Taluka Nara,
District Khairpur
(C: 39.327 + R: 6.170), (To be funded
out of 10% share of Royalty)
183 Immediate Needs for Public School
Karachi
Gadap Town, Karachi
(C: 231.328 + R: 59.364)
184 Repair & Renovation of Existing Girls
Karachi
Primary School Khatoon-e-Pakistan &
Girls Secondary School Sharifabad
Karachi (AASP)
185 Up-gradation of Secondary Schools to
Sindh
Higher Secondary Schools in Sindh
(2005-06 Programme)
(C: 713.819 + R: 136.080)
186 Rehabilitation of Existing High Schools Hyderabad
& Higher Secondary Schools District
Hyderabad (AASP)
(C: 54.366 + R: 5.600),(To be funded
out of 10% share of Royalty)
187 Rehabilitation of Existing High Schools
Thatta
& Higher Secondary Schools District
Thatta (AASP)
(C: 47.887 + R: 12.040)
188 Rehabilitation of Existing High Schools Tando Allah
& Higher Secondary Schools District
Yar
T.Allah Yar (AASP)
(C: 48.060 + R: 11.755)

Target
Estimated
Date for
Cost
Completion

Actual
Expenditure upto
June, 14

Revised
Estimated
ThrowforAllocation
Expenditward
as on
2014-15
ure upto
01-07-15
Total
F.P.A. June' 15

Allocation for 2015-16


FPA
Capital

Revenue

Total

10

11

12

13

14

0.000

34.443

24.424

24.424

0.000

24.424

2.500

0.000

2.500

42.997

39.871

3.126

243.000

35.923

0.000

278.923

11.769

1.769

59.800

0.000

5.000

0.000

5.000

54.800

June-16

849.899

831.751

0.000

0.000

831.751

Approved
03.02.15

June-16

59.966

0.000

5.000

0.000

Approved
03.02.15

June-16

59.927

0.000

5.000

Approved
03.02.15

June-16

59.815

0.000

5.000

June-15

58.867

11.823

22.620

Approved
24.12.12

June-14

45.497

0.000

Approved
09.02.12
(U/R)
Approved
27.10.14

June-15

290.692

June-16

Approved
07.12.05

15

Financial
Progress in %age
upto

Financial Projection

Jun'15 Jun'16

2016-17

16

17

18

0.000

59

100

0.000

42.997

0.000

100

0.000

10.000

11.769

0.000

96

100

0.000

54.800

0.000

54.800

0.000

100

0.000

18.148

10.000

8.148

18.148

0.000

98

100

0.000

5.000

54.966

15.000

0.000

15.000

0.000

33

19.983

0.000

5.000

54.927

15.000

0.000

15.000

0.000

33

19.964

0.000

5.000

54.815

15.000

0.000

15.000

0.000

33

19.908

[ 40 ]

PROVINCIAL
EDUCATION & LITERACY DEPARTMENT

( Rs. in million )
Target
Estimated
Date for
Cost
Completion

Actual
Expenditure upto
June, 14

Revised
Estimated
ThrowforAllocation
Expenditward
as on
2014-15
ure upto
01-07-15
Total
F.P.A. June' 15

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Date of
Approval

189 Repair & Renovation of Existing Boys /


Karachi
Girls Primary & Secondary Schools STKala Board, Malir
190 Provision of Furniture in Existing
Karachi
Secondary / Higher Secondary Schools
in Karachi Division
191 Provision of Furniture in Existing
Hyderabad
Secondary / Higher Secondary Schools
in Hyderabad Division,(To be funded
out of 10% share of Royalty)

Approved
27.10.14

June-16

40.011

0.000

0.000

0.000

Approved
06.05.15

June-16

56.052

0.000

0.000

Approved
06.05.15

June-16

56.052

0.000

192 Provision of Furniture in Existing


Mirpurkhas
Secondary / Higher Secondary Schools
in Mirpurkhas Division
193 Provision of Furniture in Existing
Sukkur
Secondary / Higher Secondary Schools
in Sukkur Division
194 Provision of Furniture in Existing
Larkana
Secondary / Higher Secondary Schools
in Larkana Division
195 Rehablitation of GBHS Ghulam
Sanghar
Muhammad Dahari, Taluka Sinjhoro,
District Sanghar,(To be funded out of
10% share of Royalty)
196 Rehabilitation of Existing High Schools
Larkana
& Higher Secondary Schools District
Larkana
197 Rehabilitation of Existing High Schools
Karachi
& Higher Secondary Schools District
Karachi East.
198 Rehabilitation of Existing High Schools
Karachi
& Higher Secondary Schools District
Karachi Central.
(C: 51.000 + R: 4.000)
199 Re-construction of Dangerous
Sanghar
Elementary / High Schools in District
Sanghar (C: 22.022 + R: 4.000)

Approved
06.05.15

June-16

56.052

Approved
06.05.15

June-16

Approved
06.05.15

Allocation for 2015-16


FPA
Capital

Revenue

Total

11

12

13

14

0.000

40.011

25.000

0.000

25.000

0.000

0.000

56.052

0.000

15.000

0.000

0.000

0.000

56.052

0.000

0.000

0.000

0.000

0.000

56.052

56.952

0.000

0.000

0.000

0.000

June-16

54.495

0.000

0.000

0.000

Approved
06.05.15

June-16

14.195

0.000

0.000

Approved
27.10.14

June-16

28.180

0.000

Approved
06.05.15

June-16

56.000

Approved
06.05.15

June-16

Approved
06.05.15

June-16

10

15

Financial
Progress in %age
upto

Financial Projection

Jun'15 Jun'16

2016-17

16

17

18

0.000

62

7.506

15.000

0.000

27

20.526

15.000

15.000

0.000

27

20.526

0.000

15.000

15.000

0.000

27

20.526

56.952

0.000

15.000

15.000

0.000

26

20.976

0.000

54.495

0.000

15.000

15.000

0.000

28

19.748

0.000

0.000

14.195

14.195

0.000

14.195

0.000

100

0.000

0.000

0.000

0.000

28.180

14.000

0.000

14.000

0.000

50

7.090

0.000

0.000

0.000

0.000

56.000

14.000

0.000

14.000

0.000

25

21.000

55.000

0.000

0.000

0.000

0.000

55.000

14.000

0.000

14.000

0.000

25

20.500

26.022

0.000

0.000

0.000

0.000

26.022

7.000

0.000

7.000

0.000

27

9.511

[ 41 ]

PROVINCIAL
EDUCATION & LITERACY DEPARTMENT

( Rs. in million )
Revised
Estimated
ThrowforAllocation
Expenditward
as on
2014-15
ure upto
01-07-15
Total
F.P.A. June' 15

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Date of
Approval

Approved
06.05.15

June-16

56.000

0.000

0.000

0.000

Approved
06.05.15

June-16

54.555

0.000

0.000

Approved
06.05.15

June-16

59.980

0.000

0.000

27893.998

9011.039

2977.210

200 Re-construction of Dangerous


Karachi
Elementary / High Schools in District
Karachi East .
(C: 53.822 + R: 2.178)
201 Re-construction of Dangerous
Karachi
Elementary / High Schools in District
Karachi Central .
(C: 50.555 + R: 4.000)
202 Construction / Re-construction of
Jacobabad
Building in Existing Secondary Schools
PAF Base Shahbaz Jacobabad.
(C: 56.180 + R: 3.800)
Total Secondary Education ( On-Going Schemes)

Target
Estimated
Date for
Cost
Completion

Actual
Expenditure upto
June, 14

Allocation for 2015-16


FPA
Capital

Revenue

Total

11

12

13

14

0.000

56.000

14.000

0.000

14.000

0.000

0.000

54.555

14.000

0.000

0.000

0.000

59.980

20.000

0.000

0.000 11988.249 15905.749

3546.692

424.046

10

15

Financial
Progress in %age
upto

Financial Projection

Jun'15 Jun'16

2016-17

16

17

18

0.000

25

21.000

14.000

0.000

26

20.278

20.000

0.000

33

19.990

3970.738 2113.790

5967.506

Secondary Education
(New Schemes)
203 Improvement of Existing Public School
in Karachi Division
204 Improvement of Existing Public School
in Hyderabad Division
205 Improvement of Existing Public School
in Mirpurkhas Division
206 Improvement of Existing Public School
in Sukkur Division
207 Improvement of Existing Public School
in S.B.A Division
208 Improvement of Existing Public School
in Larkana Division
209 Re-construction of GBHS Makhdoom
Ghulam Hyder, GBHS Saeed Khan
Leghari Taluka Hala & GBPS
Panjmore, Taluka Saeedabad, Distt
Matiari,(To be funded out of 10%
share of Royalty)
210 Provision of Furniture in Existing
Secondary / Higher Secondary Schools
in S.B.A Division

Karachi
Hyderabad
Mirpurkhas
Sukkur
S.B.A
Larkana
Matiari

S.B.A

UnApproved
UnApproved
UnApproved
UnApproved
UnApproved
UnApproved
UnApproved

June-18

40.000

0.000

0.000

0.000

0.000

40.000

10.000

0.000

10.000

0.000

25

15.000

June-18

40.000

0.000

0.000

0.000

0.000

40.000

10.000

0.000

10.000

0.000

25

15.000

June-18

60.000

0.000

0.000

0.000

0.000

60.000

10.000

5.000

15.000

0.000

25

22.500

June-18

60.000

0.000

0.000

0.000

0.000

60.000

15.000

0.000

15.000

0.000

25

22.500

June-18

60.000

0.000

0.000

0.000

0.000

60.000

15.000

0.000

15.000

0.000

25

22.500

June-18

60.000

0.000

0.000

0.000

0.000

60.000

15.000

0.000

15.000

0.000

25

22.500

June-18

40.000

0.000

0.000

0.000

0.000

40.000

10.000

0.000

10.000

0.000

25

15.000

UnApproved

June-18

60.000

0.000

0.000

0.000

0.000

60.000

0.000

15.000

15.000

0.000

25

22.500

[ 42 ]

PROVINCIAL
EDUCATION & LITERACY DEPARTMENT

( Rs. in million )
Revised
Estimated
ThrowforAllocation
Expenditward
as on
2014-15
ure upto
01-07-15
Total
F.P.A. June' 15

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Date of
Approval

Karachi

UnApproved

June-18

60.000

0.000

0.000

0.000

Karachi

UnApproved

June-18

60.000

0.000

0.000

Karachi

UnApproved

June-16

50.000

0.000

Hyderabad

UnApproved
UnApproved
UnApproved

June-18

700.000

June-18

T .M.Khan

211 Repair & Renovation of Existing


Primary & Secondary Schools (Boys/
Girls) Gulshan-e-Iqbal & New Karachi
Towns Karachi
212 Re-construction of Dangerous GBSS
Camp-4 & Repair of GGSS
Camp-5 of PAF Base Sindh
Government Schools Located at P.A.F
Base Faisal, Karachi
213 Covering of Drainage Nallah Passing
Through Sindh Govt. Schools at P.A.F
Base Faisal, Karachi
214 Miscellaneous Immediate Works of
Public School Hyderabad.
215 Repair / Renovation / Restoration / Uplift of GGHSS N.J.V Karachi
216 Cluster of Schools in the U.C Allahyar
Turk, District Tando Muhammad
Khan.(To be funded out of 10% share
of Royalty)
217 Rehabilitation of Schools in the U.C
Allahyar Turk, District Tando
Muhammad Khan.(To be funded out of
10% shareofofFurniture
Royalty) to Schools
218 Provision
Constructed under SBEP in District
Sukkur
219 Provision of Furniture to Schools
Constructed under SBEP in District
Khairpur (Taluka Khairpur & Thari
Mirwah)
220 Provision of Furniture to Schools
Constructed under SBEP in District
Khairpur (Taluka Faiz Gang, Gambat,
Kingri, Kot Diji & Sobho Dero)
221 Provision of Furniture to Schools
Constructed under SBEP in District
Larkana

Target
Estimated
Date for
Cost
Completion

Actual
Expenditure upto
June, 14

Allocation for 2015-16


FPA
Capital

Revenue

Total

11

12

13

14

0.000

60.000

15.000

0.000

15.000

0.000

0.000

60.000

15.000

0.000

0.000

0.000

0.000

50.000

50.000

0.000

0.000

0.000

0.000

700.000

60.000

0.000

0.000

0.000

0.000

June-18

60.000

0.000

0.000

0.000

UnApproved

June-18

60.000

0.000

0.000

Sukkur

UnApproved

June-16

40.000

0.000

Khairpur

UnApproved

June-16

54.000

Khairpur

UnApproved

June-16

Larkana

UnApproved

June-16

Karachi
T .M.Khan

10

15

Financial
Progress in %age
upto

Financial Projection

Jun'15 Jun'16

2016-17

16

17

18

0.000

25

22.500

15.000

0.000

25

22.500

0.000

50.000

0.000

100

0.000

160.000

20.000

180.000

0.000

26

260.000

60.000

30.000

0.000

30.000

0.000

50

15.000

0.000

60.000

15.000

0.000

15.000

0.000

25

22.500

0.000

0.000

60.000

15.000

0.000

15.000

0.000

25

22.500

0.000

0.000

0.000

40.000

0.000

40.000

40.000

0.000

100

0.000

0.000

0.000

0.000

0.000

54.000

0.000

54.000

54.000

0.000

100

0.000

45.000

0.000

0.000

0.000

0.000

45.000

0.000

45.000

45.000

0.000

100

0.000

45.000

0.000

0.000

0.000

0.000

45.000

0.000

45.000

45.000

0.000

100

0.000

[ 43 ]

PROVINCIAL
EDUCATION & LITERACY DEPARTMENT

( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Date of
Approval

UnApproved

June-17

222 Re-construction of Primary &


Karachi
Secondary Schools of PAF Base
Korangi Creek of Sindh Government
Schools & Renovation of Auditorium
Hall Located at PAF Base Faisal,
Karachi
Total Secondary Education ( New Schemes)
Total Secondary Education

Target
Estimated
Date for
Cost
Completion
6

Actual
Expenditure upto
June, 14
7

Revised
Estimated
ThrowforAllocation
Expenditward
as on
2014-15
ure upto
01-07-15
Total
F.P.A. June' 15
8

150.000

0.000

0.000

1804.000
29697.998

0.000
9011.039

0.000
2977.210

Allocation for 2015-16


FPA
Capital

Revenue

Total

12

13

14

150.000

38.000

0.000

38.000

0.000
0.000 1804.000
0.000 11988.249 17709.749

423.000
3969.692

224.000
648.046

9
0.000

10
0.000

11

15
0.000

Financial
Progress in %age
upto

Financial Projection

Jun'15 Jun'16

2016-17

16

17

18

25

56.000

647.000
0.000
4617.738 2113.790

578.500
6546.006

College Education
(On-Going Schemes)
223 Establishment of Cadet College Gadap
Town, Karachi (Revised)
(C: 681.373 + R: 32.729)
224 Establishment of Boys / Girls Degree
Colleges in Sindh (23 Units)
(C: 1217.733 + R: 181.171)
225 Establishment of Cadet College at
Mithi, District Tharparkar
(C: 431.878 + R: 59.219)
226 Establishment of Cadet College for
Girls at Shaheed Benazirabad
(Re-revised)
(C: 1626.910 + R: 269.674)
227 Establishment of Benazir Bhutto
Shaheed Institute of Management
Science Dadu
(C: 402.524 + R: 275.790) (To be
funded out of 10% share of Royalty)
228 Construction / Improvement of Hostel,
Dinning Hall & Other Facilities at
Cadet Colleges at Larkana, Sanghar
and Petaro (Revised)
(C: 886.894 + R: 44.050)
229 Establishment of Cadet College Kaker,
Dadu (C: 397.770 + R: 51.533) (To be
funded out of 10% share of Royalty)

Karachi

Approved
15.02.08

June-15

714.102

587.500

60.000

0.000

647.500

66.602

66.602

0.000

66.602

0.000

91

100

0.000

Sindh

Approved
29.09.07

June-15

1398.904

1152.543

113.099

0.000

1265.642

133.262

103.262

30.000

133.262

0.000

90

100

0.000

Tharparkar

Approved
17.11.07
(U/R)
Approved
15.03.13

June-15

491.097

110.000

28.276

0.000

138.276

352.821

50.000

0.000

50.000

0.000

28

38

151.411

June-15

1896.584

690.000

113.099

0.000

803.099

1093.485

100.000

15.000

115.000

0.000

42

48

489.243

Dadu

Approved
24.02.11

June-16

678.314

635.089

43.224

0.000

678.313

0.001

40.000

10.000

50.000

0.000

100

107

-25.000

Larkana,
Sanghar &
Jamshoro

Approved
25.09.08

June-15

930.944

313.786

26.996

0.000

340.782

590.162

50.000

0.000

50.000

0.000

37

42

270.081

Dadu

Approved
21.04.11
(U/R)

June-15

449.303

150.000

46.206

0.000

196.206

253.097

40.000

0.000

40.000

0.000

44

53

106.549

S.B.A

[ 44 ]

PROVINCIAL
EDUCATION & LITERACY DEPARTMENT

( Rs. in million )
Revised
Estimated
ThrowforAllocation
Expenditward
as on
2014-15
ure upto
01-07-15
Total
F.P.A. June' 15

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Date of
Approval

Karachi

Approved
03.12.09

June-15

326.359

326.368

3.000

0.000

Larkana

Approved
05.05.11
(U/R)

June-14

427.764

125.000

0.000

Sindh

Approved
31.05.11

June-15

2424.903

907.000

Larkana

Approved
12.12.13

June-15

178.671

Khairpur

Approved
22.12.11
Approved
10.12.11
(U/R)

June-14

230 Establishment of Govt. Boys / Girls


Degree Colleges at Bin Qasim Town
and Landhi Town, Karachi (03 Units)
(C: 305.086 + R: 21.273)
231 Establishment of Shaheed Benazir
Bhutto Girls Cadet College at Garhi
Khuda Bux, Larkana
(C: 368.332 + R: 59.431)
232 Establishment of Boys / Girls Degree
Colleges in Sindh (2010-11
Programme) (23 Units).
(C: 2243.732 + R: 181.171)
233 Establishment of Shaheed Mohtarma
Benazir Bhutto Govt. College of
Education at Larkana (Revised)
(C: 158.017 + R: 20.654)
234 Establishment of Cadet College
Khairpur (C: 536.017 + R: 60.222)
235 Construction of Building of
Intermediate College (Boys) at Qazi
Ahmed, District Shaheed Benazirabad
(C: 96.202 + R: 2.448)
236 Establishment of Cadet College at
Karampur (C: 925.361 + R: 58.219)
237 Re-construction of Women Degree
College Korangi No.6, Karachi
(C: 69.052 + R: 1.114)
238 Remaining Works of Cadet College
Pano Akil (C: 154.128 + R: 45.872)
239 Construction of Women Hostels for
Teaching Staff in the Existing Girls
Colleges in Sindh
(C: 410.493 + R: 18.270)
240 Construction of Auditorium,
Compound Wall and Construction of
Water Supply System at Cadet College
Petaro (Re-revised)
(C: 125.507 + R: 37.958)

S.B.A

Kashmore
Karachi

Sukkur

Sindh

Jamshoro

Target
Estimated
Date for
Cost
Completion

Actual
Expenditure upto
June, 14

Allocation for 2015-16


FPA
Capital

Revenue

Total

11

12

13

14

329.368

-3.009

20.000

10.000

30.000

0.000

125.000

302.764

30.000

0.000

90.099

0.000

997.099

1427.804

140.000

114.000

18.020

0.000

132.020

46.651

596.240

25.000

10.000

0.000

35.000

June-15

98.650

69.049

22.400

0.000

Approved
15.03.13
Approved
13.07.11
(U/R)
Approved
10.12.11
(U/R)
Approved
09.02.12

June-16

983.580

150.000

287.344

June-15

70.166

51.364

June-15

200.000

June-15

Approved
05.11.09

June-15

10

15

Financial
Progress in %age
upto

Financial Projection

Jun'15 Jun'16

2016-17

16

17

18

0.000

101

110

-16.505

30.000

0.000

29

36

136.382

10.000

150.000

0.000

41

47

638.902

25.997

20.654

46.651

0.000

74

100

0.000

561.240

100.000

25.000

125.000

0.000

27

218.120

91.449

7.201

10.000

0.000

10.000

0.000

93

103

-1.400

0.000

437.344

546.236

80.000

0.000

80.000

0.000

44

53

233.118

18.802

0.000

70.166

0.000

10.000

0.000

10.000

0.000

100

114

-5.000

152.898

34.100

0.000

186.998

13.002

10.000

3.002

13.002

0.000

93

100

0.000

428.763

50.000

16.965

0.000

66.965

361.798

50.000

0.000

50.000

0.000

16

27

155.899

163.465

100.993

11.310

0.000

112.303

51.162

26.527

24.635

51.162

0.000

69

100

0.000

[ 45 ]

PROVINCIAL
EDUCATION & LITERACY DEPARTMENT

( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Date of
Approval

Badin

Approved
29.03.13

June-15

Ghotki

Approved
27.04.12
(U/R)

Jamshoro

Ghotki

241 Establishment of Government Degree


College Tando Bago, District Badin
(Revised) (C: 150.538 + R: 7.877)
242 Establishment of Jam Mumtaz Hussain
Dahar Government Boys Degree
College Ubauro, District Ghotki
(C: 98.119 + R:7.877)
243 Construction of Sports Complex,
Cadets Cafeteria & Lavatory Block for
Visitors, Examination Hall, Track /
Compound Wall for Riding Schools &
3 Quarters for Syces at Cadet College
Petaro (Revised)
(C: 160.124 + R: 19.185)
244 Remaining Works of Cadet College
Ghotki (C: 461.990 + R: 35.981)
245 Establishment of Five (5) IBA
Community Colleges
(C: 498.901 + R: 251.944)

246 Re-construction of Commerce & Arts


Block in Existing Government Degree
College for Men Nazimabad No.2,
Karachi (C: 71.596 + R: 3.000)
247 Establishment of Sindh College of Arts
& Design at Sukkur
(C: 1081.353 + R: 514.107)
248 Establishment of Bilawal Bhutto
Engineering College Lyari
(C: 1301.609 + R: 541.980)
249 Establishment of IT Institute at IT
College Khairpur
(C: 227.280 + R: 190.232)
250 Rehabilitation & Provision of Missing
Facilities in Existing Colleges in Sindh.
(C: 1552.466 + R: 18.668)

Target
Estimated
Date for
Cost
Completion

Actual
Expenditure upto
June, 14

Revised
Estimated
ThrowforAllocation
Expenditward
as on
2014-15
ure upto
01-07-15
Total
F.P.A. June' 15

Allocation for 2015-16


FPA
Capital

Revenue

Total

11

12

13

14

121.565

36.850

29.000

7.850

36.850

0.000

105.996

0.000

0.100

5.000

11.310

0.000

61.425

117.884

30.000

96.250

40.000

0.000

136.250

361.721

750.844

15.000

36.552

0.000

51.552

June-15

74.596

10.000

31.483

0.000

Approved
22.01.13

June-17

1595.460

25.000

100.000

Karachi

Approved
12.02.13

June-17

1843.589

0.000

Khairpur

Approved
22.01.13

June-15

417.512

Sindh

Approved
29.11.12

June-15

1571.134

158.415

86.565

35.000

0.000

June-15

105.996

86.937

19.059

Approved
29.03.13

June-16

179.309

50.115

Approved
26.11.11
Approved
01.03.13

June-15

497.971

June-15

Approved
09.08.12

Sukkur

N. Feroze,
Sukkur,
Jacobabad,
Dadu &
Umerkot
Karachi

10

15

Financial
Progress in %age
upto

Financial Projection

Jun'15 Jun'16

2016-17

16

17

18

0.000

77

100

0.000

5.100

0.000

100

105

-2.550

10.000

40.000

0.000

34

57

38.942

40.000

10.000

50.000

0.000

27

37

155.861

699.292

40.000

10.000

50.000

0.000

14

324.646

41.483

33.113

30.588

2.525

33.113

0.000

56

100

0.000

0.000

125.000

1470.460

50.000

0.000

50.000

0.000

11

710.230

0.000

0.000

0.000

1843.589

20.000

0.000

20.000

0.000

911.795

30.000

35.000

0.000

65.000

352.512

50.000

0.000

50.000

0.000

16

28

151.256

0.000

0.000

0.000

0.000

1571.134

50.000

0.000

50.000

0.000

760.567

[ 46 ]

PROVINCIAL
EDUCATION & LITERACY DEPARTMENT

( Rs. in million )
Revised
Estimated
ThrowforAllocation
Expenditward
as on
2014-15
ure upto
01-07-15
Total
F.P.A. June' 15

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Date of
Approval

Sindh

Approved
17.12.12

June-15

331.639

0.000

0.000

0.000

0.000

Larkana

Approved
29.10.13

June-17

629.258

5.000

55.000

0.000

Karachi

Approved
26.03.14

June-16

183.732

0.000

29.000

Umerkot

Approved
16.04.14
(U/R)
Approved
03.01.13

June-17

75.960

67.690

June-16

1554.824

Approved
15.05.14
Approved
27.09.12

June-16

Sukkur

251 Establishment of Computer Labs in the


Existing Colleges (One Boys & One
Girls in Each District)
(C: 229.334 + R: 102.305)
252 Establishment of Junior Section and
Solar Energy Project at Cadet College
Larkana (C: 413.339 + R: 215.919)
253 Establishment of Govt. Girls Degree
College at Kamal Khan Jokhio, Gadap
Town, Karachi
(C: 167.932 + R: 15.800)
254 Establishment of Govt. Girls Degree
College at Samaro, District Umerkot
(C: 68.083+R: 7.877)
255 Establishment of Shaheed Zulfiqar Ali
Bhutto Engineering College in Memon
Goth, Gadap Town, Karachi
(C: 1099.509 + R: 455.315)
256 Immediate Needs for Skkur IBA
(Revised ) (C: 287.561 + R: 39.979)
257 Extension of Educational Allied
Facilities at Sukkur IBA and IBA
Community College Khairpur
(C: 861.716 + R: 438.284)
258 Strengthening of Sukkur Institute of
Business Administration (Sukkur IBA)
(C: 348.208 + R:143.862)
259 Construction of Blocks B&C of New
Boys Hostel at I.B.A. Main Campus,
Karachi.
Total Cost: Rs. 270.590 M
GOS Share: Rs.230.002 M
I.B.A Share: Rs. 40.588 M
(C: 175.215 + R: 54.788)
260 Establishment of Mohtarma Shaheed
Benazir Bhutto Science & Technology
Institute at Bhit Shah
(C: 806.323 + R:376.831)

Target
Estimated
Date for
Cost
Completion

Actual
Expenditure upto
June, 14

Allocation for 2015-16


FPA
Capital

Revenue

Total

12

13

14

331.639

20.000

0.000

20.000

60.000

569.258

60.000

20.000

0.000

29.000

154.732

60.000

0.000

0.000

67.690

8.270

0.000

33.930

0.000

33.930

327.540

137.383

82.086

0.000

June-17

1300.000

130.000

33.276

Approved
24.11.11

June-17

492.070

278.446

Karachi

Approved
09.05.14

June-17

230.002

Hyderabad

Approved
22.11.12

June-17

1183.155

Karachi

Sukkur
Sukkur &
Khairpur

10

11

15

Financial
Progress in %age
upto

Financial Projection

Jun'15 Jun'16

2016-17

16

17

18

0.000

155.820

80.000

0.000

10

22

244.629

0.000

60.000

0.000

16

48

47.366

10.664

9.000

19.664

0.000

89

115

-5.697

1520.894

80.000

0.000

80.000

0.000

720.447

219.469

108.071

43.071

20.000

63.071

0.000

67

86

22.500

0.000

163.276

1136.724

40.000

20.000

60.000

0.000

13

17

538.362

57.156

0.000

335.602

156.468

40.000

24.100

64.100

0.000

68

81

46.184

0.000

80.000

0.000

80.000

150.002

65.000

10.000

75.000

0.000

35

67

37.501

0.000

0.000

0.000

0.000

1183.155

30.000

0.000

30.000

0.000

576.578

[ 47 ]

PROVINCIAL
EDUCATION & LITERACY DEPARTMENT

( Rs. in million )
Revised
Estimated
ThrowforAllocation
Expenditward
as on
2014-15
ure upto
01-07-15
Total
F.P.A. June' 15

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Date of
Approval

Sukkur

Approved
13.02.14

June-16

257.234

0.000

0.000

0.000

0.000

Karachi

Approved
30.04.07

June-15

2257.663

1962.451

23.275

0.000

S.B.A &
Karachi

Approved
03.02.15

June-18

50.828

0.000

0.000

Larkana

Approved
06.05.15

June-18

59.707

0.000

Sanghar

Approved
06.05.15

June-18

55.000

Jacobabad

Approved
28.02.13

June-16

261 Installation of Solar System and LED


Lights at Sukkur IBA
(C: 11.435 + R: 245.798)
262 Provision for Completion of Colleges
(Colleges transferred from City
District Government Karachi)
(C: 2064.941 + R: 192.722)
263 Rehabilitation of Existing College at
GBDC Sakrand, GDC Malir Cantt. &
GGDC Sheikh Zaid Gulshan-e-Iqbal
Karachi (C: 47.946 + R: 2.882)
264 Construction / Re-construction of
Building in Existing Degree Colleges
I.GBDC Rato Dero & II. GBDC
Larkano ( B.Sc Block )
265 Rehabilitation of Infrastructure of
Cadet College Sanghar.(To be funded
out of 10% share of Royalty)
266 Establishment of Cadet College
Jacobabad. (C: 901.362+R:87.377)

Target
Estimated
Date for
Cost
Completion

Actual
Expenditure upto
June, 14

Total College Education (On-going Schemes)

Allocation for 2015-16


FPA
Capital

Revenue

Total

12

13

14

257.234

20.000

0.000

20.000

1985.726

271.937

40.000

10.000

0.000

0.000

50.828

15.000

0.000

0.000

0.000

59.707

0.000

0.000

0.000

0.000

988.739

0.000

20.000

0.000

20.000

29629.986

8691.427

1665.067

10

11

15

Financial
Progress in %age
upto

Financial Projection

Jun'15 Jun'16

2016-17

16

17

18

0.000

118.617

50.000

0.000

88

90

110.969

0.000

15.000

0.000

30

17.914

15.000

0.000

15.000

0.000

25

22.354

55.000

15.000

0.000

15.000

0.000

27

20.000

968.739

50.000

0.000

50.000

0.000

459.370

0.000 10356.494 19273.492

1895.811

306.766

2202.577

0.000

8535.458

College Education
(New Schemes)
267 Remaining Work & Conversion of
GDC Sharafi Goth into Community
College Near Singer Chowrangi
Landhi, Karachi.
268 Establishment of Government Boys
Degree College at Sobho Dero, District
Khairpur
269 Provision of Furniture in Existing
Degree Colleges in Hyderabad Division
270 Provision of Furniture in Existing
Degree Colleges in Mirpurkhas
Division

Karachi

UnApproved

June-18

60.000

0.000

0.000

0.000

0.000

60.000

10.000

5.000

15.000

0.000

25

22.500

Khairpur

UnApproved

June-18

175.000

0.000

0.000

0.000

0.000

175.000

44.000

0.000

44.000

0.000

25

65.500

Hyderabad

UnApproved

June-18

60.000

0.000

0.000

0.000

0.000

60.000

0.000

15.000

15.000

0.000

25

22.500

Mirpurkhas

UnApproved

June-18

60.000

0.000

0.000

0.000

0.000

60.000

0.000

15.000

15.000

0.000

25

22.500

[ 48 ]

PROVINCIAL
EDUCATION & LITERACY DEPARTMENT

( Rs. in million )
Revised
Estimated
ThrowforAllocation
Expenditward
as on
2014-15
ure upto
01-07-15
Total
F.P.A. June' 15

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Date of
Approval

S.B.A

UnApproved
UnApproved
UnApproved
UnApproved
UnApproved

June-18

60.000

0.000

0.000

0.000

0.000

60.000

0.000

15.000

15.000

June-18

60.000

0.000

0.000

0.000

0.000

60.000

0.000

15.000

June-18

60.000

0.000

0.000

0.000

0.000

60.000

0.000

June-18

60.000

0.000

0.000

0.000

0.000

60.000

June-18

60.000

0.000

0.000

0.000

0.000

UnApproved

June-18

40.000

0.000

0.000

0.000

0.000

695.000
30324.986

0.000
8691.427

0.000
1665.067

271 Provision of Furniture in Existing


Degree Colleges in S.B.A Division
272 Provision of Furniture in Existing
Degree Colleges in Sukkur Division
273 Provision of Furniture in Existing
Degree Colleges in Larkana Division
274 Provision of Furniture in Existing
Degree Colleges in Karachi Division
275 Construction / Rehabilitation of
Hostels,Quarters for Sweepers &
Other Staff of Cadet College Petaro
276 Construction / Repair / Raising of
Compound Wall of Colleges in Sindh
(Security Threatened Colleges)
Total College Education (New Schemes)
Total College Education

Sukkur
Larkana
Karachi
Jamshoro

Sindh

Target
Estimated
Date for
Cost
Completion

Actual
Expenditure upto
June, 14

10

11

Allocation for 2015-16


FPA
Capital

Revenue

Total

12

13

14

15

Financial
Progress in %age
upto

Financial Projection

Jun'15 Jun'16

2016-17

16

17

18

0.000

25

22.500

15.000

0.000

25

22.500

15.000

15.000

0.000

25

22.500

0.000

15.000

15.000

0.000

25

22.500

60.000

15.000

0.000

15.000

0.000

25

22.500

40.000

10.000

0.000

10.000

0.000

25

15.000

0.000
0.000
695.000
0.000 10356.494 19968.492

79.000
1974.811

95.000
401.766

174.000
2376.577

0.000
0.000

260.500
8795.958

Miscellaneous
(On-Going Schemes)
277 Construction of Education Complex
Karachi ( Revised)
(C: 1101.058 + R: 3.391)
278 Improvement of Facilities & Addition /
Alteration at Sindhi Adabi Board
Jamshoro (Revised)
(C: 86.712 + R: 53.863)
279 Introduction of Chinese Language
Programme
280 Strengthening of Existing Facilities in
Education & Literacy Department,
Directorate of Planning, Development
& Research & Directorate of
Inspection / Registration of Govt.
Institutions in Sindh

Karachi

Approved
22.09.14

June-17

1104.449

5.080

20.000

0.000

25.080

1079.369

200.000

0.000

200.000

0.000

20

439.685

Jamshoro

Approved
17.01.14

June-17

140.575

71.936

26.000

0.000

97.936

42.639

32.229

10.410

42.639

0.000

70

100

0.000

Sindh

Approved
24.02.12
Approved
30.11.12

June-17

603.863

19.692

18.400

0.000

38.092

565.771

0.000

55.000

55.000

0.000

15

255.386

June-15

43.818

14.862

28.956

0.000

43.818

0.000

0.000

6.500

6.500

0.000

100

115

-3.250

Sindh

[ 49 ]

PROVINCIAL
EDUCATION & LITERACY DEPARTMENT

( Rs. in million )
Revised
Estimated
ThrowforAllocation
Expenditward
as on
2014-15
ure upto
01-07-15
Total
F.P.A. June' 15

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Date of
Approval

281 ICT Enabled Education Management


Karachi,
Information System (EMIS) in
Hyderabad,
Education and Literacy Department,
S.B.A,
Government of Sindh
Larkana &
(C: 34.000 + R: 3851.860)
Khairpur
282 Provision of Sports Facilities in High
Karachi
Schools / Colleges of Karachi Division.
(C: 49.823 + R: 9.786)
283 Construction of Residence for Staff of Tando Allah
Educational Institutions at Village
Yar
Muhammad Sadique Memon, District
Tando Allah Yar.
(C: 57.344 + R: 2.394),(To be funded
out of 10% share of Royalty)
284 Strengthening of Existing Facilities in
Karachi
Directorate of Inspection / Registration of Private Institutions in Sindh
(C: 6.250 + R: 10.000)
285 Schools Improvement Through Adopt
Karachi
a School Intervention Karachi Division
(AASP)(C: 41.992 + R: 17.957)

Approved
16.04.14

June-17

3885.860

0.000

400.000

0.000

400.000

3485.860

0.000

400.000

400.000

Approved
03.02.15

June-16

59.609

0.000

0.000

0.000

0.000

59.609

10.000

14.609

Approved
03.02.15

June-16

59.738

0.000

0.000

0.000

0.000

59.738

15.000

Approved
03.02.15

June-16

16.250

0.000

0.000

0.000

0.000

16.250

Approved
03.02.15

June-16

59.949

0.000

20.000

0.000

20.000

286 Schools Improvement Through Adopt


a School Intervention Hyderabad
Division (AASP)
(C: 54.393 + R:5.575)
287 Schools Improvement Through Adopt
a School Intervention Sukkur Division
(AASP) (C: 25.575 + R:34.408)
288 Provision of Solar Energy for
Government Schools which are Off
Grid
289 Assets Management of Education &
Literacy Department.
290 Office Automation of Director General
Planning, Development and Research,
Education & Literacy Department.

Badin

Approved
03.02.15

June-16

59.968

0.000

0.000

0.000

Sukkur

Approved
27.10.14

June-16

60.000

0.000

20.000

Sindh

Approved
03.02.15

June-16

59.354

0.000

Sindh

Approved
03.02.15
Approved
03.02.15

June-16

59.440

June-16

39.380

Sindh

Target
Estimated
Date for
Cost
Completion

Actual
Expenditure upto
June, 14

10

11

Allocation for 2015-16


FPA
Capital

Revenue

Total

12

13

14

15

Financial
Progress in %age
upto

Financial Projection

Jun'15 Jun'16

2016-17

16

17

18

0.000

10

21

1542.930

24.609

0.000

41

17.500

0.000

15.000

0.000

25

22.369

6.250

10.000

16.250

0.000

100

0.000

39.949

31.992

7.957

39.949

0.000

33

100

0.000

0.000

59.968

30.000

10.000

40.000

0.000

67

9.984

0.000

20.000

40.000

25.000

15.000

40.000

0.000

33

100

0.000

0.000

0.000

0.000

59.354

0.000

44.354

44.354

0.000

75

7.500

0.000

0.000

0.000

0.000

59.440

0.000

49.427

49.427

0.000

83

5.007

0.000

0.000

0.000

0.000

39.380

0.000

30.980

30.980

0.000

79

4.200

[ 50 ]

PROVINCIAL
EDUCATION & LITERACY DEPARTMENT

( Rs. in million )
Revised
Estimated
ThrowforAllocation
Expenditward
as on
2014-15
ure upto
01-07-15
Total
F.P.A. June' 15

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Date of
Approval

Karachi

Approved
06.05.15

June-16

59.893

0.000

0.000

0.000

Sukkur

Approved
27.10.10
(U/R)
Approved
06.05.15

June-15

53.510

52.994

0.000

June-16

59.800

0.000

6425.456

291 Construction of Scouting Facilities and


Administration Block at Training
Center Gulshan-e-Iqbal & Provision of
Missing Facilities at Provincial Scouts
Saddar Head Quarter Karachi
(C: 53.893 + R: 6.000)
292 Extension and Rehabilitation of Pir
Illahi Baksh Literacy Tower, Sukkur.
(C: 47.510 + R:6.000)
293 Construction / Re-construction of
Existing of Offices for Field Officers of
Education & Literacy Department
Larkana Division
(C: 55.384 + R: 4.416)
Total Miscellaneous (On-going Schemes)

Larkana

Target
Estimated
Date for
Cost
Completion

Actual
Expenditure upto
June, 14

Allocation for 2015-16


FPA
Capital

Revenue

Total

11

12

13

14

0.000

59.893

33.200

6.893

40.093

0.000

52.994

0.516

8.500

0.000

0.000

0.000

0.000

59.800

20.000

164.564

533.356

0.000

697.920

5727.536

10

15

Financial
Progress in %age
upto

Financial Projection

Jun'15 Jun'16

2016-17

16

17

18

0.000

67

9.900

8.500

0.000

99

115

-3.992

0.000

20.000

0.000

33

19.900

412.171

661.130

1073.301

0.000

2327.118

Miscellaneous
(New Schemes)
294 Construction of Multipurpose Halls /
Sukkur, S.BA
Career Development Centres at
& Larkana
Sukkur, S.B.A & Larkana
295 Schools Improvement Through Adopt
Larkana
a School Intervention Larkana Division
(AASP)
296 Schools Improvement Through Adopt Mirpurkhas
a School Intervention Mirpurkhas
Division (AASP)
297 Schools Improvement Through Adopt
Sukkur
a School Intervention Sukkur Division
Phase-II (AASP)
298 Schools Improvement Through Adopt
Karachi
a School Intervention Karachi Division
Phase-II (AASP)
299 Schools Improvement Through Adopt
S.B.A
a School Intervention S.B.A Division
(AASP)

UnApproved

June-18

700.000

0.000

0.000

0.000

0.000

700.000

175.000

0.000

175.000

0.000

25

262.500

UnApproved

June-18

60.000

0.000

0.000

0.000

0.000

60.000

10.000

5.000

15.000

0.000

25

22.500

UnApproved

June-18

60.000

0.000

0.000

0.000

0.000

60.000

10.000

5.000

15.000

0.000

25

22.500

UnApproved

June-18

60.000

0.000

0.000

0.000

0.000

60.000

10.000

5.000

15.000

0.000

25

22.500

UnApproved

June-18

60.000

0.000

0.000

0.000

0.000

60.000

10.000

5.000

15.000

0.000

25

22.500

UnApproved

June-18

60.000

0.000

0.000

0.000

0.000

60.000

10.000

5.000

15.000

0.000

25

22.500

[ 51 ]

PROVINCIAL
EDUCATION & LITERACY DEPARTMENT

( Rs. in million )
Revised
Estimated
ThrowforAllocation
Expenditward
as on
2014-15
ure upto
01-07-15
Total
F.P.A. June' 15

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Date of
Approval

Hyderabad

UnApproved

June-18

60.000

0.000

0.000

0.000

Karachi

UnApproved
UnApproved
UnApproved
UnApproved
UnApproved
UnApproved
UnApproved

June-18

40.000

0.000

0.000

June-18

40.000

0.000

June-18

40.000

June-18

Karachi

300 Schools Improvement Through Adopt


a School Intervention Hyderabad
Division Phase-II (AASP)
301 Schools Improvement Through PPP
Initiatives Karachi Division
302 Schools Improvement Through PPP
Initiatives Hyderabad Division
303 Schools Improvement Through PPP
Initiatives Sukkur Division
304 Schools Improvement Through PPP
Initiatives S.B.A Division
305 Schools Improvement Through PPP
Initiatives Larkana Division
306 Schools Improvement Through PPP
Initiatives Mirpurkhas Division
307 Purchase of Office Building &
Residence for Chinese Language
Programme at Karachi.
308 Complaint Management for Education
& Literacy Department, Government
of Sindh.
309 Additional Work and Renovation of
Scouts Auditorium Hall of Sindh Boys
Scouts Association Karachi
310 Provision of Patrol Leader Training
Courses for Boys Scouts and
Celeberation of Events at Regional
Level
311 Construction / Re-construction of
Divisional Sub-Head Quarters of Sindh
Boys Scouts Associations at Karachi &
Shikarpur
312 Repair / Renovation / Construction of
Office of Education Works
313 Repair & Maintenance of 21 Adopted
Schools of Thatta
314 Repair & Maintenance of 11 Adopted
Schools of Karachi

Target
Estimated
Date for
Cost
Completion

Actual
Expenditure upto
June, 14

Allocation for 2015-16


FPA
Capital

Revenue

Total

11

12

13

14

0.000

60.000

10.000

5.000

15.000

0.000

0.000

40.000

5.000

5.000

0.000

0.000

0.000

40.000

5.000

0.000

0.000

0.000

0.000

40.000

40.000

0.000

0.000

0.000

0.000

June-18

40.000

0.000

0.000

0.000

June-18

40.000

0.000

0.000

June-16

48.750

0.000

UnApproved

June-18

60.000

Karachi

UnApproved

June-18

Karachi

UnApproved

Karachi &
Shikarpur

Sindh

Hyderabad
Sukkur
S.B.A
Larkana
Mirpurkhas
Karachi

Thatta
Karachi

10

15

Financial
Progress in %age
upto

Financial Projection

Jun'15 Jun'16

2016-17

16

17

18

0.000

25

22.500

10.000

0.000

25

15.000

5.000

10.000

0.000

25

15.000

5.000

5.000

10.000

0.000

25

15.000

40.000

5.000

5.000

10.000

0.000

25

15.000

0.000

40.000

5.000

5.000

10.000

0.000

25

15.000

0.000

0.000

40.000

5.000

5.000

10.000

0.000

25

15.000

0.000

0.000

0.000

48.750

0.000

48.750

48.750

0.000

100

0.000

0.000

0.000

0.000

0.000

60.000

0.000

15.000

15.000

0.000

25

22.500

40.000

0.000

0.000

0.000

0.000

40.000

0.000

10.000

10.000

0.000

25

15.000

June-18

40.000

0.000

0.000

0.000

0.000

40.000

0.000

10.000

10.000

0.000

25

15.000

UnApproved

June-18

60.000

0.000

0.000

0.000

0.000

60.000

10.000

5.000

15.000

0.000

25

22.500

UnApproved
UnApproved
UnApproved

June-18

60.000

0.000

0.000

0.000

0.000

60.000

15.000

0.000

15.000

0.000

25

22.500

June-18

50.000

0.000

0.000

0.000

0.000

50.000

10.000

3.000

13.000

0.000

26

18.500

June-18

50.000

0.000

0.000

0.000

0.000

50.000

10.000

3.000

13.000

0.000

26

18.500

[ 52 ]

PROVINCIAL
EDUCATION & LITERACY DEPARTMENT

( Rs. in million )
Revised
Estimated
ThrowforAllocation
Expenditward
as on
2014-15
ure upto
01-07-15
Total
F.P.A. June' 15

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Date of
Approval

Sindh

UnApproved

June-18

40.000

0.000

0.000

0.000

0.000

40.000

0.000

10.000

10.000

Sindh

UnApproved

June-18

40.000

0.000

0.000

0.000

0.000

40.000

0.000

10.000

Sindh

UnApproved

June-18

60.000

0.000

0.000

0.000

0.000

60.000

10.000

5.000

1848.750
8274.206
68483.528
7043.750
75527.278

0.000
164.564
19529.802
0.000
19529.802

0.000
533.356
5485.864
0.000
5485.864

315 Establishment of Non-Formal


Education Centers in Existing Middle /
Elementary Schools in Sindh.
316 Establishment of Adult Literacy
Centers in Existing Primary / Middle /
High Schools in Sindh.
317 Emergent Works / Schemes of
Education & Literacy Department

Total Miscellaneous (New Schemes)


Total Miscellaneous
Total Education Department (On-going Schemes)
Total Eduction Department (New Schemes)
Total Education Department

Target
Estimated
Date for
Cost
Completion

Actual
Expenditure upto
June, 14

10

11

0.000
0.000 1848.750
0.000
697.920 7576.286
0.000 25015.666 43467.862
0.000
0.000 7043.750
0.000 25015.666 50511.612

Allocation for 2015-16


FPA
Capital

Revenue

Total

12

13

14

15

Financial
Progress in %age
upto

Financial Projection

Jun'15 Jun'16

2016-17

16

17

18

0.000

25

15.000

10.000

0.000

25

15.000

15.000

0.000

25

22.500

320.000 179.750
499.750
0.000
732.171 840.880 1573.051
0.000
6351.308 1587.942 7939.250 2616.242
884.500 1176.250 2060.750
0.000
7235.808 2764.192 10000.000 2616.242

674.500
3001.618
17764.306
2491.500
20255.806

[ 53 ]

SUMMARY
ENERGY DEPARTMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
Sr No.

Sub-Sector

Throwforward as
on 01.07.15

Thar Coal

Energy
TOTAL ENERGY DEPTT:-

On-Going

New

Total

No. of
Schemes

Capital

Revenue

Total

No. of
Schemes

Capital

Revenue

Total

No. of
Schemes

Capital

Revenue

Total

10

11

12

13

14

15

FPA

Grand
Total
(15+16)

16

17

(Rs. In million)
Financial Projection
2016-17

2017-18

18

19

15551.806

8277.839

555.516

8833.355

956.645

0.000

956.645

13

9234.484

555.516

9790.000

0.000

9790.000

5761.806

0.000

3210.000

5000.000

0.000

5000.000

1700.000

10.000

1710.000

6700.000

10.000

6710.000

0.000

6710.000

1500.000

0.000

18761.806

10

13277.839

555.516 13833.355

2656.645

10.000

2666.645

18

15934.484

565.516

16500.000

0.000

16500.000

7261.806

0.000

[ 54 ]

PROVINCIAL
ENERGY DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District

Status
Date of
Approval
4

Actual
Target
Estimated ExpenditDate for
Cost
ure upto
Completion
June, 14
5

Revised
Allocation
2014-15
Total
8

Estimated
ThrowforExpenditward as on
ure upto
01-07-15
F.P.A. June' 15
9
10
11

Allocation for 2015-16


Capital

Revenue

Total

12

13

14

FPA

15

Financial Progress
in %age upto

Financial Projection

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

THAR COAL
(On-Going Schemes)
318 Planning, Designing and Construction
of Thar Airport at Islamkot (Revised)

Tharparkar Approved
26.12.14

319 Preparation of Water Master Plan for Tharparkar


Thar Coalfield including
Hydrogeological Water supply and
Water Waste Management Studies (ReRevised)
320 Installation of Reverse Osmosis
Tharparkar
(Desalination) Plant at 25 villages of
Tharparparkar (Cap: Rs. 221.800
+Rev. Rs. 720.200 =T :Rs. 942.000)
321 Construction of 50 Cusecs Drainage of Tharparkar
Waste Water/Effluent Channel from
Mining Area of Thar Coalfield Unit
No.2 (Revised)
322 Improvement of road Network from
Thatta,
Thatta to Wango Mor via Sujawal,
Badin,
Badin including Construction of Five
Tharparkar
Bypasses, Repair / Reconstruction of
& Sujawal
Damaged portion of existing Bridge
over River Indus, construction of new 4Lane Bridge over River Indus,
construction of an overhead Bridge on
Railway level crossing on Badin
Bypass, Rehabilitation / Reconstruction
of Structures. (Re-Revised)(Cap: Rs.
8318.543 +Rev. Rs. 31.738 =T :Rs.
8350.281)

Dec -15

1659.915

914.123

0.000 0.000

914.123

745.792

745.792

0.000

745.792

0.000

55

100

0.000

0.000

Approved
13.01.15

June-16

787.130

87.218

232.000 0.000

319.218

467.912

0.000

467.912

467.912

0.000

41

100

0.000

0.000

Approved
24.11.11

June-16

942.000

868.603

11.500 0.000

880.103

61.897

61.293

0.604

61.897

0.000

93

100

0.000

0.000

Approved
24.10.14

June-16

6742.050

18.328

2808.585 0.000

2826.913

3915.137

2000.000

0.000

2000.000

0.000

42

72

1915.137

0.000

Approved
22.04.15

June-16

8350.281

1617.356

2618.500 0.000

4235.856

4114.425

3383.432

7.000

3390.432

0.000

51

91

723.993

0.000

[ 55 ]

PROVINCIAL
ENERGY DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District

Status
Date of
Approval
4

Actual
Target
Estimated ExpenditDate for
Cost
ure upto
Completion
June, 14
5

6
8188.630

7
2224.461

Revised
Allocation
2014-15
Total
8

Estimated
ThrowforExpenditward as on
ure upto
01-07-15
F.P.A. June' 15
9
10
11

323 Widening/Improvement of Road from Tharparkar Approved


Wango Mor to Thar Coalfield Area
26.07.13
(Phase-II) (Mile 0/0-83/2 (134.86 km)
(Revised)(Cap: Rs. 8159.600 +Rev. Rs.
29.030 =T :Rs. 8188.630)

June-16

324 Upradation of Two R.O. Plants at


Mithi and Islamkot (Cap: Rs. 230.516
+Rev. Rs. 704.304 =T :Rs. 934.820)
325 Additional and External Development
of Thar Lodge at Islamkot.
326 Installation of 06 Reverse Osmosis
water deslination plants 06 villages
Tharparkar (Cap: Rs. 108.992 +Rev.
Rs. 205.604 =T :Rs. 314.596)
Total On-Going Schemes:-

Tharparkar Approved
22.01.13

June-16

Tharparkar Approved
06.09.12
Tharparkar Approved
03.09.13

June-16

80.680

16.350

June-16

314.596

0.000

28000.102

6534.830

June-17

202.774

0.000

0.000 0.000

0.000

June-17

337.815

0.000

0.000 0.000

June-17

1880.484

0.000

June-17

1385.858

Capital

Revenue

Total

12

13

14

5891.669

2296.961

943.391

-8.571

37.000 0.000

53.350

27.330

27.330

0.000

190.604 0.000

190.604

123.992

48.992

9720.397 0.000 16255.227 11744.875

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

281.961

0.000

0.00

101

101

-9.571

0.000

27.330

0.000

66

100

0.000

0.000

75.000

123.992

0.000

61

100

0.000

0.000

8277.839

555.516

8833.355

0.000

2911.520

0.000

202.774

52.645

0.000

52.645

0.000

26

150.129

0.000

0.000

337.815

87.000

0.000

87.000

0.000

26

250.815

0.000

0.000 0.000

0.000

1880.484

470.000

0.000

470.000

0.000

25

1410.484

0.000

0.000

0.000 0.000

0.000

1385.858

347.000

0.000

347.000

0.000

25

1038.858

0.000

3806.931

0.000

0.000 0.000

0.000

3806.931

956.645

0.000

956.645

0.000

2850.286

0.000

28000.102

6534.830

9720.397 0.000 16255.227 11744.875

8277.839

555.516

8833.355

0.000

2911.520

0.000

1.000

0.00

2015.000

Financial Projection

97

0.00

5.000

15

Financial Progress
in %age upto

72

155.00

2010.000

FPA

0.000

934.820 788.391

3667.208 0.000

Allocation for 2015-16

1.000

NEW SCHEMES
327 Construction of Road from Islamkot
Tharparkar
Unupto Singhario road near Thar Coal
Approved
Block V (6 kilometers)
328 Repair and Renovation of Residential Tharparkar
UnColony and office Building of Camp
Approved
Office, Sindh Coal Authority.
329 Improvement of Road from Sujjawal
Badin
Unto Badin, Rehabilitation of damaged
Approved
road portions (52 km).
330 Improvement of Road Network from
Badin
UnBadin to Wango Mor, Rehabilitation of
Approved
Damaged Road portions, (length 32
km),(To be funded out of 10% share of
Royalty)
Total New Schemes :TOTAL ONGOING SCHEMES

[ 56 ]

PROVINCIAL
ENERGY DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District

Status
Date of
Approval
4

Actual
Target
Estimated ExpenditDate for
Cost
ure upto
Completion
June, 14
5

TOTAL NEW SCHEMES


TOTAL THAR COAL :-

Revised
Allocation
2014-15
Total
8

Estimated
ThrowforExpenditward as on
ure upto
01-07-15
F.P.A. June' 15
9
10
11

3806.931
31807.033

0.000
6534.830

0.000 0.000
0.000 3806.931
9720.397 0.000 16255.227 15551.806

5000.000

0.000

0.000 0.000

0.000

5000.000

0.000

0.000 0.000

Allocation for 2015-16


Capital

Revenue

Total

12

13

14

FPA

15

956.645
9234.484

0.000
555.516

956.645
9790.000

0.000
0.000

5000.000

5000.000

0.000

5000.000

0.000

0.000

5000.000

5000.000

0.000

5000.000

0.000

Financial Progress
in %age upto

Financial Projection

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

2850.286
5761.806

0.000
0.000

0.000

0.000

0.000

0.000

ENERGY
ON-GOING SCHEME
331 Block Allocation for Energy Initiatives

Sindh

June-16

Total Energy Schemes (On-going)

100

NEW SCHEMES
332 Framing and Devising Procedures
Sindh
Guidelines for Implementation of the
Power Generation (all types)
Transmission and Distribution Projects
in accordance with Sindh Power Policy
(All Districts)
333 Village Electrification Programme in
Sindh
Sindh (Phase-VII).
(Excluding
KESC
Licensed
Area.
334 Electrification of Goths (Villages) in
Karachi
Karachi. (Phase-VI).
KESC
Licensed
Area
335 Electrification of Off Grid Areas
Sindh
through Solar Technology Schools
(Rs. 1000.00 million), Villages (Rs.
1000.00 million).
Total Energy Schemes (New)
Total Energy Schemes
TOTAL ONGOING SCHEMES

UnApproved

June-16

10.000

0.000

0.000 0.000

0.000

10.000

0.000

10.000

10.000

0.000

100

0.000

0.000

UnApproved

June-16

1000.000

0.000

0.000 0.000

0.000

1000.000

1000.000

0.000

1000.000

0.000

100

0.000

0.000

UnApproved

June-16

200.000

0.000

0.000 0.000

0.000

200.000

200.000

0.000

200.000

0.000

100

0.000

0.000

UnApproved

June-16

2000.000

0.000

0.000 0.000

0.000

2000.000

500.000

0.000

500.000

0.000

25

1500.000

0.000

3210.000
8210.000
33000.102

0.000
0.000
6534.830

10.000 1710.000
10.000 6710.000
555.516 13833.355

0.000
0.000
0.000

1500.000
1500.000
2911.520

0.000
0.000
0.000

0.000 0.000
0.000 3210.000 1700.000
0.000 0.000
0.000 8210.000 6700.000
9720.397 0.000 16255.227 16744.875 13277.839

[ 57 ]

PROVINCIAL
ENERGY DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District

TOTAL NEW SCHEMES


TOTAL ENERGY DEPARTMENT

Status
Date of
Approval
4

Actual
Target
Estimated ExpenditDate for
Cost
ure upto
Completion
June, 14
5

6
7016.931
40017.033

7
0.000
6534.830

Revised
Allocation
2014-15
Total
8

Estimated
ThrowforExpenditward as on
ure upto
01-07-15
F.P.A. June' 15
9
10
11

Allocation for 2015-16


Capital

Revenue

Total

12

13

14

0.000 0.000
0.000 7016.931 2656.645
9720.397 0.000 16255.227 23761.806 15934.484

10.000 2666.645
565.516 16500.000

FPA

15
0.000
0.000

Financial Progress
in %age upto

Financial Projection

Jun'15 Jun'16
16
17

2016-17
18
4350.286
7261.806

2017-18
19
0.000
0.000

[ 58 ]

SUMMARY
EXCISE & TAXATION DEPARTMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
(Rs. In million)
Sr
No.

Sub-Sector

ThrowNo. of
forward as
Schemes
on 01.07.15

On-Going
Capital

Revenue

Total

No. of
Schemes

New
Capital Revenue

Total

No. of
Schemes

Total
FPA
Capital

Revenue

Total

Grand
Total
(15+16)

Financial Projection
2016-17

2017-18

10

11

12

13

14

15

16

17

18

19

4.660

4.660

0.000

4.660

0.000

0.000

0.000

4.660

0.000

4.660

0.000

4.660

0.000

0.000

Buildings

I. T. Schemes

326.547

0.000

115.340

115.340

0.000

30.000

30.000

0.000

145.340

145.340

0.000

145.340

181.207

0.000

Total Excise & Taxation Deptt:-

331.207

4.660

115.340

120.000

0.000

30.000

30.000

4.660

145.340

150.000

0.000

150.000

181.207

0.000

[ 59 ]

PROVINCIAL
EXCISE & TAXATION DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District
3

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4
5
6
7

Revised
Estimated
ThrowforAllocation for 2015-16
Allocation
Expenditward
as on
2014-15
ure upto
01-07-15
Capital Revenue Total
Total F.P.A. June' 15
8
9
10
11
12
13
14

FPA
15

Financial
Progress in %age
upto

Financial Projection

Jun'15 Jun'16 2016-17


16
17
18

2017-18
19

BUILDINGS
(On-Going Schemes)
336 Construction of Offices of Excise &
Taxation in New District (5 units)

Matiari,
T.A.Yar,
T.M.Khan,
Jamshoro,
Umerkot

Approved
5.11.09
(U.R)

June-16

Total Building PP&H:-

86.476

80.262

1.554

0.000

81.816

4.660

4.660

0.000

4.660

0.000

86.476

80.262

1.554

0.000

81.816

4.660

4.660

0.000

4.660

0.000

329.922

39.838

83.537

0.000

123.375

206.547

0.000

115.340

115.340

0.000

329.922

39.838

83.537

0.000

123.375

206.547

0.000

115.340

115.340

0.000

120.000

0.000

0.000

0.000

0.000

120.000

0.000

30.000

30.000

0.000

120.000
449.922
416.398
120.000
536.398

0.000
39.838
120.100
0.000
120.100

0.000
83.537
85.091
0.000
85.091

0.000
0.000
0.000
0.000
0.000

0.000
123.375
205.191
0.000
205.191

120.000
326.547
211.207
120.000
331.207

0.000
30.000
0.000 145.340
4.660 115.340
0.000
30.000
4.660 145.340

30.000
145.340
120.000
30.000
150.000

0.000
0.000
0.000
0.000
0.000

95

100

0.000

0.000

0.000

0.000

91.207

0.000

91.207

0.000

90.000

0.000

90.000
181.207
91.207
90.000
181.207

0.000
0.000
0.000
0.000
0.000

I. T. SCHEMES
On-Going Scheme
337 Strengthening of Excise & Taxation
Department (Revised)

Sindh

Approved
16.04.14

June-15

Total I.T. Schemes (Ongoing)

37

72

New Scheme
338 Integration / upgradation of Tax
Database and Online Tax Collection.
Total I.T. Schemes (New)
Total I.T. Schemes
Total Excise & Taxation (Ongoing)
Total Excise & Taxation (New)
Total Excise & Taxation Department

Karachi

UnApproved

June-17

25

[ 60 ]

SUMMARY
FINANCE DEPARTMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
( Rs. In million )
Sr No.

Sub-Sector

Buildings

EPR

TOTAL FINANCE DEPTT:-

Throwforward as
on 01.07.15

No. of
Schemes

On-Going
Capital

Revenue

Total

No. of
Schemes

New
Capital

Revenue

Total

10

11

No. of
Schemes

Total
FPA

Grand
Total
(15+16)

Capital

Revenue

Total

12

13

14

15

16

17

Financial Projection
2016-17

2017-18

18

19

-3.322

11.000

0.000

11.000

0.000

0.000

0.000

11.000

0.000

11.000

0.000

11.000

0.000

0.000

101.000

0.000

0.000

0.000

0.000

25.250

25.250

0.000

25.250

25.250

0.000

25.250

75.750

0.000

97.678

11.000

0.000

11.000

0.000

25.250

25.250

11.000

25.250

36.250

0.000

36.250

75.750

0.000

[ 61 ]

PROVINCIAL
FINANCE DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District
3

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4
5
6
7

Revised
Estimated
ThrowforAllocation
Expenditward as on
2014-15
ure upto
01-07-15
Total
F.P.A. June' 15
8
9
10
11

Allocation for 2015-16


Capital Revenue
12
13

Total
14

FPA
15

Financial Progress in
%age upto

Financial Projection

Jun'15
16

Jun'16
17

2016-17
18

103

115

2017-18
19

BUILDINGS
Government Office Building
(On-Going Scheme)
339 Construction of 7 new Treasury
Offices in Sindh.

Sindh

Approved
27.12.07
(UR)

Jun-15

Total Buildings :E.P.R.


(New Schemes)
340 Budget and Financial Data Analysis
and Analytical & Decision Support
Dashboards.
Total EPR :TOTAL FINANCE (ONGOING)

Karachi

Unapproved

Jun-16

96.907

96.907

3.322

0.000

100.229

-3.322

11.000

0.000

11.000

0.000

0.000

0.000

96.907

96.907

3.322

0.000

100.229

-3.322

11.000

0.000

11.000

0.000

0.000

0.000

101.000

0.000

0.000

0.000

0.000

101.000

0.000

25.250

25.250

0.000

75.750

0.000

101.000

0.000

0.000

0.000

0.000

101.000

0.000

25.250

25.250

0.000

75.750

0.000

96.907

96.907

3.322

0.000

100.229

-3.322

11.000

0.000

11.000

0.000

0.000

0.000

25

TOTAL FINANCE (NEW)

101.000

0.000

0.000

0.000

0.000

101.000

0.000

25.250

25.250

0.000

75.750

0.000

TOTAL FINANCE DEPARTMENT:-

197.907

96.907

3.322

0.000

100.229

97.678

11.000

25.250

36.250

0.000

75.750

0.000

[ 62 ]

SUMMARY
FOOD DEPARTMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
Sr
No.

Sector / Sub-Sector

ThrowNo. of
forward as
Schemes
on 01.07.15
3
4

On-Going

New

Total

No. of
Schemes

Capital

Revenue

Total

10

11

12

13

14

15

16

Grand
Total
(15+16)
17

No. of
Schemes Capital Revenue

Capital

Revenue

Total

Total
FPA

(Rs. In million)
Financial Projection
2015-16

2016-17

18

19

Food

807.219

207.219

0.000

207.219

152.781

0.000

152.781

360.000

0.000

360.000

0.000

360.000

223.610

223.610

Total Food Deptt:

807.219

207.219

0.000

207.219

152.781

0.000

152.781

360.000

0.000

360.000

0.000

360.000

223.610

223.610

[ 63 ]

PROVINCIAL
FOOD DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District
3

Actual Revised Allocation Estimated


Status
Target
ThrowforEstimated ExpenditExpendit2014-15
Date of
Date for
ward as on
Cost
ure upto
ure upto
Approval Completion
01-07-15
June, 14
Total
F.P.A. June' 15
4

10

11

Allocation for 2015-16


FPA

Financial Progress
in %age upto

Capital

Revenue

Total

12

13

14

15

16

17

79

100

Jun'15 Jun'16

Financial Projection
2016-17

2017-18

18

19

Food Security
(On-Going Schemes)
341 Rehabilitation/Renovation of
Hyderabad, Approved
Existing Godowns in Sindh
Sukkur
11.01.12
(Hyderabad and Sukkur Regions)
(C.980.01+R.9.899)
Total On Going
(New Schemes)
342 Construction of Open Platforms
/Plinth for Grain Storage in Sindh
(C.594.0+R.6.00)
Total New
Total Food Department:

Sindh

UnApproved

June-15

June-17

989.918

632.487

150.212 0.000

782.699

207.219

207.219

0.000

207.219

0.000

989.918

632.487

150.212 0.000

782.699

207.219

207.219

0.000

207.219

0.000

600.000

0.000

0.000 0.000

0.000

600.000

152.781

0.000

152.781

0.000

25

0.000

0.000

0.000

0.000

223.610

223.610

600.000

0.000

0.000 0.000

0.000

600.000

152.781

0.000

152.781

0.000

223.610

223.610

1589.918

632.487

150.212 0.000

782.699

807.219

360.000

0.000

360.000

0.000

223.610

223.610

[ 64 ]

SUMMARY
FOREST, ENVIRONMENT & WILDLIFE DEPARTMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
( Rs. In million )
S. No.

Sub-Sector

FOREST

2
3

On-Going
Throwforward as No. of
on 01.07.15 Schemes Capital Revenue
3
4
5
6

New
Total
7

No. of
Capital Revenue
Schemes
8
9
10

3283.256

140.000

410.000

550.000

90.000

ENVIRONMENT

323.000

0.000

120.000

120.000

WILDLIFE

287.066

60.000

20.000

80.000

3893.322

11

200.000

550.000

750.000

TOTAL FOREST, ENVR: &


WILDLIFE DEPTT:-

Total
Total
11

No. of
Capital Revenue
Schemes
12
13
14

Total
15

FPA

Grand
Total

16

17

Financial Projection
2015-16

2016-17

18

19

10.000 100.000

230.000

420.000 650.000

0.000 650.000 1316.628 1316.628

0.000

25.000

25.000

0.000

145.000 145.000

0.000 145.000

123.000

55.000

20.000

5.000

25.000

80.000

25.000 105.000

0.000 105.000

144.566

37.500

110.000

40.000 150.000

15

310.000

590.000 900.000

0.000 900.000 1584.194 1409.128

[ 65 ]

PROVINCIAL
FOREST, ENVIRONMENT & WILDLIFE DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District

Target
Actual
Estimated ThrowforStatus
Revised Allocation
Allocation for 2015-16
Date for Estimated ExpenditExpendit- ward as
Date of
2014-15
Completio
Cost
ure upto
ure upto
on
Approval
n
June, 14
Total
F.P.A. June' 15 01-07-15 Capital Revenue Total
4
5
6
7
8
9
10
11
12
13
14

FPA

15

Financial Progress in
%age upto

Jun'15
16

Jun'16
17

Financial Projection
2016-17
18

2017-18
19

FOREST
(On-Going Schemes)
343 Conservation, Development and
Management of Indus Delta
Mangroves to Check Sea Intrusion
(C.9.238+R.622.432)
344 Possible Role of Mangroves in
Curbing Sea Intrusion in Indus Delta.

Karachi,
Thatta,
Sajawal &
Badin
Thatta &
Sajawal

Approved
18.01.11

June-17

631.670

244.113

100.000

0.000

344.113

287.557

0.000

80.000

80.000

0.000

54

67

103.779

103.779

Approved
18.01.11

June-17

698.110

24.796

72.310

0.000

97.106

601.004

0.000

80.000

80.000

0.000

14

25

260.502

260.502

345 Mass Scale Tree Plantation Outside


Forest Area to Mitigate Climate
Change Affects in Sindh
(C.64.644+R.640.357)
346 Enhancing Forest Cover on State
Forest Lands in Sindh
(C.21.00+R.687.00)
347 Establishment and Management of
Network of Biodiversity Parks in
Sindh (Sukkur, Larkana, Ghotki,
Khairpur, Matiari, Tharparkar,
Thatta & Dadu)
(C.284.294+R.209.700)
348 Geo-referred demorcation and
construction of Earthen bunds for
protection of forest land and
upgradation of GIS Laboratory at
Hyderabad (Larkana, Kandhkot,
Shikarpur, Dadu, Sukkur, Ghotki,
Khairpur, SBA, Sanghar, Thatta,
T.M. Khan, Karachi, N. Feroze,
Tharparkar, Jacobabad, Mirpurkhas
and Badin) (C.158.161+R.91.227)

Sindh

Approved
16.04.14

June-18

705.000

0.000

73.020

0.000

73.020

631.980

10.000

90.000 100.000

0.000

10

25

265.990

265.990

Sindh

Approved
16.04.14

June-18

708.000

0.000

63.703

0.000

63.703

644.297

0.000

100.000 100.000

0.000

23

272.149

272.149

Sindh

Approved
08.04.14

June-16

494.000

0.000

10.065

0.000

10.065

483.935

60.000

30.000

90.000

0.000

20

196.968

196.968

Sindh

Approved
08.04.14

June-16

246.483

0.000

12.000

0.000

12.000

234.483

70.000

30.000 100.000

0.000

45

67.242

67.242

3483.263

268.909

331.098

0.000

600.007

2883.256 140.000

410.000 550.000

0.000

1166.628

1166.628

Sub-Total Forestry (On-Going)

[ 66 ]

PROVINCIAL
FOREST, ENVIRONMENT & WILDLIFE DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District

(New Schemes)
349 Establishment of Forest, Environment
& Wildlife Institute of Research &
Education.

Sindh

Target
Actual
Estimated ThrowforStatus
Revised Allocation
Allocation for 2015-16
Date for Estimated ExpenditExpendit- ward as
Date of
2014-15
Completio
Cost
ure upto
ure upto
on
Approval
n
June, 14
Total
F.P.A. June' 15 01-07-15 Capital Revenue Total
4
5
6
7
8
9
10
11
12
13
14

UnApproved

June-18

Sub-Total Forest (New)


Total Forest (On-Going & New)

400.000

0.000

0.000

0.000

0.000

6036.746
9520.009

268.909
537.818

0.000
331.098

0.000
0.000

0.000
600.007

400.000

FPA

15

90.000

10.000 100.000

0.000

400.000 90.000
3283.256 230.000

10.000 100.000
420.000 650.000

0.000
0.000

Financial Progress in
%age upto

Jun'15
16

Jun'16
17

25

Financial Projection
2016-17
18

2017-18
19

150.000

150.000

150.000
1316.628

150.000
1316.628

ENVIRONMENT
(Ongoing Schemes)
350 Study of Environmental & Health
Impact of pesticides and chemical
fertilizer in Sindh province.
351 Strengthening of Environmental
Monitoring System in EPA.
352 Enviornmental Awareness and
Education for Protection and
Conservation of Natural and
Ecological Resources of Sindh.

Sindh

Approved
15.05.12

June-15

33.000

0.000

0.000

0.000

0.000

33.000

0.000

20.000

20.000 0.000

61

13.000

0.000

Karachi, Approved
Hyderabad, 29.10.13
Sukkur
Sindh
Approved
29.10.13

June-15

140.000

0.000

0.000

0.000

0.000

140.000

0.000

55.000

55.000 0.000

39

60.000

25.000

June-15

115.000

0.000

0.000

0.000

0.000

115.000

0.000

45.000

45.000 0.000

39

40.000

30.000

288.000

0.000

0.000

0.000

0.000

288.000

0.000

113.000

55.000

35.000

0.000

0.000

0.000

0.000

35.000

0.000

10.000

0.000

35.000
323.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

35.000
323.000

0.000
0.000

10.000
123.000

0.000
55.000

Total Environment (Ongoing Schemes)


ENVIRONMENT
(New Schemes)
353 Establishment / Construction of
Regional Offices at Sukkur and
Hyderabad and Expansion of EPA
Building Korangi Industrial Area,
Karachi
Total Environment (New Schemes)
Total Environment

Sukkur,
UnHyderabad, Approved
Karachi

June-16

120.000 120.000

25.000

0.000

25.000 0.000

25.000 25.000
145.000 145.000

0.000
0.000

71

[ 67 ]

PROVINCIAL
FOREST, ENVIRONMENT & WILDLIFE DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District

WILDLIFE
(On-Going Schemes)
354 Conservation and Management of BioDiversity and Development of EcoTourism at Deh: Akro-II, Wetland
Complex Wildlife Sactuary
(C.26.323+R.46.60)
355 Rehabilitation & improvement of
Haleji and Langh Lakes Wildlife
sanctuary (C.107.184+R.43.787)

Target
Actual
Estimated ThrowforStatus
Revised Allocation
Allocation for 2015-16
Date for Estimated ExpenditExpendit- ward as
Date of
2014-15
Completio
Cost
ure upto
ure upto
on
Approval
n
June, 14
Total
F.P.A. June' 15 01-07-15 Capital Revenue Total
4
5
6
7
8
9
10
11
12
13
14

FPA

15

Financial Progress in
%age upto

Jun'15
16

Jun'16
17

Financial Projection
2016-17
18

2017-18
19

S.B.A.

Approved
09.08.12

June-15

72.932

0.000

5.065

0.000

5.065

67.867

30.000

10.000

40.000

0.000

62

27.867

0.000

Thatta &
Qamber

Approved
16.05.14

June-16

150.971

0.000

31.772

0.000

31.772

119.199

30.000

10.000

40.000

0.000

21

48

79.199

0.000

223.903

0.000

36.837

0.000

36.837

187.066

60.000

20.000

80.000

0.000

107.066

0.000

June-18

50.000

0.000

0.000

0.000

0.000

50.000

10.000

2.500

12.500

0.000

25

18.750

18.750

June-18

50.000

0.000

0.000

0.000

0.000

50.000

10.000

2.500

12.500

0.000

25

18.750

18.750

100.000
323.903
3995.166
6171.746
10166.912

0.000
0.000
268.909
268.909
537.818

0.000
36.837
367.935
0.000
367.935

0.000
0.000
0.000
0.000
0.000

0.000
36.837
636.844
0.000
636.844

100.000 20.000
287.066 80.000
3358.322 200.000
535.000 110.000
3893.322 310.000

5.000
25.000
550.000
40.000
590.000

25.000
105.000
750.000
150.000
900.000

0.000
0.000
0.000
0.000
0.000

37.500
144.566
1386.694
197.500
1584.194

37.500
37.500
1221.628
187.500
1409.128

Sub-Total Wildlife (On-Going)


(New Schemes)
Habitat Restoration & Development Jamshoro &
Un356 of Water Harvesting facilities at
Karachi
Approved
Khirthar National Park.
357 Habitat Restoration & Development
Kashmore,
Unof Eco-Tourism at Indus Dolphin
Ghotki & Approved
Reserve.
Sukkur
Sub-Total Wildlife (New)
Total Wildlife (On-Going & New)
Total Forest, Env: & Wildlife (On-Going Schemes)
Total Forest, Env: & Wildlife (New Schemes)
Total Forest, Env: & Wildlife Department:-

[ 68 ]

SUMMARY
GOVERNOR's SECRETARIAT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
(Rs. In million)
Sr
No.

Sector / Sub-Sector

ThrowNo. of
forward as
Schemes
on 01.07.15

On-Going
Capital

Revenue

Total

No. of
Schemes
8

New
Capital Revenue

Governor's Secretariat

710.930

56.086

48.914

105.000

95.000

Total Governor's Secretariat

710.930

56.086

48.914

105.000

95.000

10

Total

No. of
Schemes

Total
FPA
Capital

Revenue

Total

11

12

13

14

15

0.000

95.000

151.086

48.914

200.000

0.000

95.000

151.086

48.914

200.000

Grand
Total
(15+16)

Financial Projection
2016-17

2017-18

18

19

16

17

0.000

200.000

510.930

0.000

0.000

200.000

510.930

0.000

[ 69 ]

PROVINCIAL
GOVERNOR's SECRETARIAT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14

Karachi

Approved
3.3.2015

June-16

Revised
Allocation
2014-15

Estimated
ThrowforAllocation for 2015-16
Expenditward as on
ure upto
01-07-15
Capital Revenue Total
F.P.A. June' 15
9
10
11
12
13
14

FPA

Total
8

96.319

0.000

48.159

0.000

48.159

48.160

48.160

0.000

48.160

0.000

96.319

0.000

48.159

0.000

48.159

48.160

48.160

0.000

48.160

0.000

378.770

0.000

0.000

0.000

0.000

378.770

95.000

0.000

95.000

0.000

378.770
475.089

0.000
0.000

0.000
48.159

0.000
0.000

0.000
48.159

378.770 95.000
426.930 143.160

0.000
0.000

95.000
143.160

0.000
0.000

284.000

0.000

0.000

0.000

0.000

284.000

7.926

48.914

56.840

0.000

Total Information Technology (Ongoing)

284.000

0.000

0.000

0.000

0.000

284.000

7.926

48.914

56.840

Total Governor Sectt (Ongoing)


Total Governor Sectt (New)
TOTAL GOVERNOR's SECTT:-

380.319
378.770
759.089

0.000
0.000
0.000

48.159
0.000
48.159

0.000
0.000
0.000

48.159
0.000
48.159

332.160 56.086
378.770 95.000
710.930 151.086

48.914
0.000
48.914

105.000
95.000
200.000

15

Financial Progress
in %age upto

Financial Projection

Jun'15 Jun'16 2016-17


16
17
18

2017-18
19

BUILDINGS
(Ongoing Schemes)
358 Constt. & Renovation of various facilities
i.e Annexe, Wash Rooms, Press & Media
Section, Sound System and Security wall
& Road Blockers including Mechanical
Doors for Gate No. 1 at Sindh
Governor's House Karachi.
Total Buildings (Ongoing)

50

100

0.000

0.000

0.000

0.000

283.770

0.000

283.770
283.770

0.000
0.000

227.160

0.000

0.000

227.160

0.000

0.000
0.000
0.000

227.160
283.770
510.930

0.000
0.000
0.000

Buildings
(New Scheme)
359 Constt. of Multi-storyed Flats Phase-I
and II at Sindh Governor's House,
Karachi (48 X 2 = 96) i/c MT-shade.
Total Buildings (New Scheme)
Total Buildings :-

Karachi

UnApproved

June-17

25

Information Technology
(Ongoing Schemes)
360 Supply and Installation of Video Security
Surveillance System for route from Guru
Mandar to Toll Plaza & Lasbella to
Surjani, Karachi (C. 7.926+R.276.074)

Karachi

Approved
26.12.14

June-17

20

[ 70 ]

SUMMARY
HEALTH DEPARTMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
S. No.

Sub-Sector

Teaching Hospital

Other Hospitals

Medical Education

Throwforward as No. of
on 01.07.15 Schemes
3

On-Going

New

Capital

Revenue

Total

No. of
Schemes

Total

Capital

Revenue

10

Capital

Revenue

Total

11

12

13

14

15

7264.762

17

1164.196 1213.690

2377.886

220.000

25910.655

48

3416.65 2240.585

5657.235

23

1092.010

7464.430

894.739

299.682

1194.421

100.000

0.000

100.000

994.739

PHC Administration
/ Training

395.667

65.172

31.543

96.715

0.000

0.000

0.000

Nutrition

411.710

0.000

153.000

153.000

0.000

0.000

0.000

Preventive Prog:

5133.282

0.000

501.743

501.743

12.500 1087.490 1099.990

12

Foreign Aided
Projects

414.762

0.000

82.000

82.000

TOTAL

46995.268

86

5540.757 4522.243 10063.000

34

0.000

90.000

Total

No. of
Schemes

FPA

Grand
Total
(15+16)

16

17

( Rs. In million )
Financial Projection
2016-17

2017-18

18

19

310.000

23

1384.196 1303.690

2687.886

0.000

2687.886

2360.686

2099.912

335.000 1427.010

71

4508.660 2575.585

7084.245

0.000

7084.245

9863.229

8963.182

299.682

1294.421

0.000

1294.421

3085.005

3085.005

65.172

31.543

96.715

0.000

96.715

149.476

149.476

0.000

153.000

153.000 1385.270

1538.270

129.355

129.355

0.000

1601.733

2064.478

1915.560

82.000 1000.000

1082.000

207.777

124.985

0.000

0.000

1424.510 1512.490 2937.000

120

12.500 1589.233
0.000

82.000

1601.733

6965.267 6034.733 13000.000 2385.270

15385.270 17860.005 16467.474

[ 71 ]

PROVINCIAL
HEALTH DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District
3

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4
5
6
7

Revised
Allocation
Total
8

Estimated
ThrowforExpenditward as on
ure upto
01-07-15
F.P.A.
June' 15
9
10
11

Allocation for 2015-16


FPA
Capital

Revenue

Total

12

13

14

Financial
Progress in %age
upto

Jun'15 Jun'16
15

16

17

Financial Projection
2016-17

2017-18

18

19

Teaching Hospital (Ongoing)


361

Shaheed Mohtarma Benazir


Bhutto Accident, Emergency &
Trauma Centre and Ancillary
Services Complex at Civil
Hospital, Karachi. (IIIrd
Revision). (C: 3463.345+R:
2619.586)

Karachi

Approved
17.01.14

June-16

6082.931

3897.031

864.407 0.000

4761.438

1321.493

629.870

691.623

1321.493

0.000

78

100

0.000

0.000

362

Renovation Work at Sindh


Government Lyari General
Hospital Karachi. (C:
126.502+R: 6.500)

Karachi

Approved
15.3.13

June-15

133.002

0.000

13.506 0.000

13.506

119.496

50.000

0.000

50.000

0.000

10

48

69.496

0.000

363

Establishment of 25 Bedded
Trauma Center at Sindh
Government Lyari General
Hospital Karachi. (C:
275.969+R: 521.168)

Karachi

Approved
20.12.12

June-15

797.137

13.750

19.506 0.000

33.256

763.881

50.000

0.000

50.000

0.000

10

356.941

356.941

364

Strengthening and
Improvement of Jinnah
Postgraduate Medical Centre
(JPMC), Karachi. (C:
151.512+R: 271.277)

Karachi

Approved
14.02.14

June-17

422.789

0.000

0.000 0.000

0.000

422.789

100.000

50.000

150.000

0.000

35

136.395

136.395

365

Strengthening and
Improvement of National
Institute of Child Health
(NICH), Karachi. (C:
65.401+R: 133.749)

Karachi

Approved
29.10.13

June-15

199.150

10.000

47.138 0.000

57.138

142.012

35.000

25.000

60.000

0.000

29

59

41.006

0.000

366

Establishment of
Gastroenterology Unit and
Neuropscychiatry Unit at
NICH Karachi. (C: 89.66+R:
103.128)

Karachi

Approved
13.01.15

June-16

192.788

0.000

0.000 0.000

0.000

192.788

25.000

25.000

50.000

0.000

26

71.394

71.394

[ 72 ]

PROVINCIAL
HEALTH DEPARTMENT
( Rs. in million )
Location
of
Scheme/
District
3

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4
5
6
7

Revised
Allocation

Estimated
ThrowforExpenditward as on
ure upto
01-07-15
F.P.A.
June' 15
9
10
11

Karachi

Approved
30.03.12
(U/R)

June-15

339.149

0.000

0.000 0.000

0.000

Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

367

Revamping / Revitalization of
Sindh Government Qatar
Hospital Orangi Town Karachi
including Establishment of
Diagnostic Care Centre (C.
131.551+ R. 207.598)

368

Establishment of 50 bedded
Medical & Surgical ICU and
expansion of Casualty & OPD
Department at Liaquat
University Hospital,
Hyderabad.
(C: 134.530+R: 149.004)

Hyderabad Approved
20.02.12

June-15

283.534

8.939

21.610 0.000

369

Upgradation of Neonatal &


Paediatric Services at Liaquat
University Hospital,
Hyderabad.
(C: 79.205+R: 48.620),(To be
funded
out of 10%
share of
Establishment
of Cardio

Hyderabad Approved
08.04.14

June-15

127.825

0.000

Hyderabad Approved
03.12.13

June-16

366.054

June-15

290.517

370

throasic Surgery Department at


Liaquat University Hospital,
Hyderabad.
(C: 8.429+R: 357.625)
371

Establishment of Madam
Faryal Talpur Cardiac Surgery
Complex having facilities of:
i.Coronary Angiography
Cardiac Catheterized Lab
ii.Cardiac Bypass Surgery
iii. Chest Surgery at Chandka
Medical College Hospital
Larkana.
(C: 51.123+R: 239.394)

Larkana

Approved
21.04.11

Allocation for 2015-16


FPA

Financial
Progress in %age
upto

Financial Projection

Capital

Revenue

Total

12

13

14

15

16

17

339.149

50.000

0.000

50.000

0.000

15

144.575

144.575

30.549

252.985

33.183

0.000

33.183

0.000

11

22

109.901

109.901

13.506 0.000

13.506

114.319

40.000

0.000

40.000

0.000

11

42

37.160

0.000

0.000

8.429 0.000

8.429

357.625

5.000

50.000

55.000

0.000

17

151.313

151.313

40.648

2.000 0.000

42.648

247.869

16.143

33.857

50.000

0.000

15

32

98.935

98.935

Total
8

Jun'15 Jun'16

2016-17

2017-18

18

19

[ 73 ]

PROVINCIAL
HEALTH DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District
3

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4
5
6
7

Revised
Allocation
Total
8

Estimated
ThrowforExpenditward as on
ure upto
01-07-15
F.P.A.
June' 15
9
10
11

Allocation for 2015-16


FPA
Capital

Revenue

Total

12

13

14

Financial
Progress in %age
upto

Jun'15 Jun'16
15

16

17

Financial Projection
2016-17

2017-18

18

19

372

Construction of Neuro Science


Complex at CMCH Larkana,
containing:
1. Neuro Surgery Department
2. Neuro Medicine (Neurology
Department)
3. Psychiatry Department.
(C: 44.425+R: 170.210)

Larkana

Approved
24.03.11

June-15

214.635

39.566

11.522 0.000

51.088

163.547

0.000

163.545

163.545

0.000

24

100

0.001

0.000

373

Up gradation of Surgery
Department, Surgery
Equipments for OT,
Modernization of Laboratory,
Blood Bank & Establishment of
Oncology Treatment Ward (30
Bedded) at CMC Hospital,
Larkana.
(C: 33.540+R: 109.695)

Larkana

Approved
24.03.11

June-15

143.235

26.749

11.821 0.000

38.570

104.665

0.000

104.665

104.665

0.000

27

100

0.000

0.000

374

Establishment of 50 bedded
Medical & Surgical ICU and
expansion of Casualty & OPD
Department at CMC Hospital,
Larkana.
(C: 56.454+R: 122.076)

Larkana

Approved
02.03.12
(U/R)

June-14

178.530

46.249

6.058 0.000

52.307

126.223

5.000

45.000

50.000

0.000

29

57

38.112

0.000

375

Establishment of Benazir
Institute of Urology &
Transplantation (BIUT) at
Shaheed Mohtarma Benazir
Bhutto District.
(C: 332.001+R: 409.234)

S.B.A

Approved
19.08.10
(U/R)

June-15

741.235

180.000

63.506 0.000

243.506

497.729

50.000

0.000

50.000

0.000

33

40

223.865

223.865

[ 74 ]

PROVINCIAL
HEALTH DEPARTMENT
( Rs. in million )
Location
of
Scheme/
District
3

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4
5
6
7

Revised
Allocation

Estimated
ThrowforExpenditward as on
ure upto
01-07-15
F.P.A.
June' 15
9
10
11

Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

376

Establishment / Construction of
New OPD Block for
Neurosurgery, Neurology,
Urology, Peads surgery and
Construction of 2 Storey
Emergency Operation Theatre
of Surgical ICU at Peoples
Medical College Hospital
Benazirabad. PDWP on
03.12.14 T: 847.168
(C: 327.491+R: 519.677)

S.B.A

Approved
04.02.13

June-16

684.833

0.000

0.000 0.000

0.000

377

Establishment of 50 bedded
Medical & Surgical ICU and
Expansion of Casualty & OPD
Department at Ghulam
Mohammad Mahar Medical
College Hospital, Sukkur.
(Revised) App: PDWP on
27.01.2015).
(C: 59.185+R:119.345)

Sukkur

Approved
02.03.12

June-15

178.530

0.000

5.171 0.000

4262.932 1088.180 0.000

Total Teaching Hospital (Ongoing)

378

Teaching Hospitals (New)


Establishment of HMIS System
and replacement of (1000 KVA)
old Generators at JPMC,
Karachi.

11375.874

Karachi

UnApproved

June-17

100.000

0.000

Total
8

0.000 0.000

Allocation for 2015-16


FPA

Financial
Progress in %age
upto

Financial Projection

Capital

Revenue

Total

12

13

14

15

16

17

684.833

50.000

0.000

50.000

0.000

317.417

317.417

5.171

173.359

25.000

25.000

50.000

0.000

31

61.680

61.680

5351.112

6024.762

1164.196 1213.690

2377.886

0.000

1858.186

1672.412

0.000

100.000

25.000

0.000

75.000

0.000

10.000

15.000

Jun'15 Jun'16

25

2016-17

2017-18

18

19

[ 75 ]

PROVINCIAL
HEALTH DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District
3

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4
5
6
7

Revised
Allocation
Total
8

Estimated
ThrowforExpenditward as on
ure upto
01-07-15
F.P.A.
June' 15
9
10
11

Allocation for 2015-16


FPA

Financial
Progress in %age
upto

Capital

Revenue

Total

12

13

14

15

16

Jun'15 Jun'16

Financial Projection
2016-17

2017-18

17

18

19

379

Strengthening of Liaquat
Hyderabad
UnUniversity Hospital Hyderabad
Approved
/ Jamshoro including
Administration Block, Kitchen
Block, Bio-Medical Lab.
Renovation & Rehabilitation of
Old Building & replacement of
Internal Road and drainage
lines, Expansion of Casulaty
Block, Operaton Theatres,
Radiology etc.

June-17

200.000

0.000

0.000 0.000

0.000

200.000

50.000

0.000

50.000

0.000

25

75.000

75.000

380

Renovation & Rehablitation/


Improvement of Internal
Roads, Water Supply ,
Drainage , Electrification of
teaching block Peeds Medicine/
Surgery Block &water tank all
residential accomodation &
Benglows & quarters of CMCH
Larkana.

Larkana

UnApproved

June-18

240.000

0.000

0.000 0.000

0.000

240.000

60.000

0.000

60.000

0.000

25

90.000

90.000

381

Construction of Nursing Hostel


& New Operation Theatre
(EYES) and Strengthening /
Improvement of Trauma
Centre at CMCH, Larkana.

Larkana

UnApproved

June-17

200.000

0.000

0.000 0.000

0.000

200.000

50.000

0.000

50.000

0.000

25

75.000

75.000

382

Provision for Purchase of


Microscopic Endoscopy Cell
vizio in all Teaching
Hospitals.(i) Civil Hospital
Karachi, (ii) Liquat University
Hospital Hyderabad (iii)
Chandka Meedical College
Hospital, Larkana (iv Peoples
Medical College Hospital,
Benazirabad (v). GMMMCH,
Sukkur.

Karachi
UnS.B.A
Approved
Hyderabad
Larkana
Sukkur

June-16

300.000

0.000

0.000 0.000

0.000

300.000

0.000

75.000

75.000

0.000

25

112.500

112.500

[ 76 ]

PROVINCIAL
HEALTH DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

383

Location
of
Scheme/
District
3

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4
5
6
7

Upgradation/ Strengthing of
Karachi,
UnPhysiotheraphy Department at Hyderabad, Approved
all Teaching Hospitals of Sindh Larkana,
S.B.A,
Sukkur

June-17

Total Teaching Hospital New


Total Teaching Hospital (Ongoing+New)

200.000

1240.000
12615.874

0.000

Revised
Allocation
Total
8

Estimated
ThrowforExpenditward as on
ure upto
01-07-15
F.P.A.
June' 15
9
10
11

0.000 0.000

0.000

200.000

0.000
0.000 0.000
4262.932 1088.180 0.000

0.000
5351.112

1240.000
7264.762

Allocation for 2015-16


FPA

Financial
Progress in %age
upto

Capital

Revenue

Total

12

13

14

15

16

50.000

0.000

50.000

0.000

220.000
90.000
1384.196 1303.690

310.000
2687.886

0.000
0.000

Jun'15 Jun'16

Financial Projection
2016-17

2017-18

17

18

19

25

75.000

75.000

502.500
2360.686

427.500
2099.912

Other Hospitals (Ongoing)


384

Construction of 400 Bedded


Hospital at Plot # ST-08, Block10, Gulshan-e-Iqbal Karachi.
(Revised).
(C: 1076.250+R: 660.109)

Karachi

Approved
15.05.14

June-17

1736.359

209.685

40.520 0.000

250.205

1486.154

50.000

0.000

50.000

0.000

14

17

718.077

718.077

385

Up gradation / Strengthening of
Drug Testing Laboratory
Karachi.
(C: 45.050+R: 65.799)

Karachi

Approved
28.01.10
(U/R)

June-15

110.849

52.115

5.403 0.000

57.518

53.331

20.000

0.000

20.000

0.000

52

70

33.331

0.000

386

Establishment of Cardiac
Emergency Center at Baldia
Town, Karachi.
(C: 149.857+R: 149.077)

Karachi

Approved
25.02.10

June-15

298.934

62.500

43.220 0.000

105.720

193.214

50.000

0.000

50.000

0.000

35

52

71.607

71.607

387

Shaheed Mohtarma Benazir


Bhutto 200 Bedded Hospital at
Mominabad, Metroville Site
Town, Karachi.
(C: 393.033+R:162.957)

Karachi

Approved
10.02.11

June-15

555.990

79.918

43.220 0.000

123.138

432.852

50.000

0.000

50.000

0.000

22

31

191.426

191.426

388

Establishment of Institute of
Psychiatry and Trauma Unit at
Sindh Government Hospital
Saudabad, Karachi.
(C: 100.233+R: 182.312)

Karachi

Approved
11.01.12

June-15

282.545

59.952

16.207 0.000

76.159

206.386

50.000

0.000

50.000

0.000

27

45

78.193

78.193

[ 77 ]

PROVINCIAL
HEALTH DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District
3

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4
5
6
7

Revised
Allocation
Total
8

Estimated
ThrowforExpenditward as on
ure upto
01-07-15
F.P.A.
June' 15
9
10
11

Allocation for 2015-16


FPA
Capital

Revenue

Total

12

13

14

Financial
Progress in %age
upto

Jun'15 Jun'16
15

16

17

Financial Projection
2016-17

2017-18

18

19

389

Strengthening of Services
Hospital at Karachi.
(C: 43.130+R: 119.347)

Karachi

Approved
02.12.11

June-15

162.477

40.705

2.902 0.000

43.607

118.870

6.373

112.497

118.870

0.000

27

100

0.000

0.000

390

Construction of 50 bedded
Hospital at block-13 F.B Area
UC Ancholi, Gulberg Town,
Karachi. (Revised ).
(C: 261.232+R: 61.302)

Karachi

Approved
16.04.14

June-17

322.534

62.056

0.000 0.000

62.056

260.478

50.000

0.000

50.000

0.000

19

35

105.239

105.239

391

Construction of 50 Bedded
Hospital / Maternity Home in
Gulistan-e-Jouhar, Karachi.
(Revised).
(C: 262.342+R: 61.302)

Karachi

Approved
16.04.14

June-17

323.644

91.262

0.000 0.000

91.262

232.382

50.000

0.000

50.000

0.000

28

44

91.191

91.191

392

Up gradation / Strengthening of
Chemico Bacteriological
Laboratory, Karachi.
(C: 4.063+R: 164.338)

Karachi

Approved
02.02.12
(U/R)

June-15

168.401

4.059

0.000 0.000

4.059

164.342

0.000

53.000

53.000

0.000

34

111.342

0.000

393

Expansion and Improvement of


Abbasi Shaheed Hospital to the
level of Tertiary Care Hospital
with (i) Male Nursing School
(ii) Replacement of Lifts (07
Nos.) of Existing Building. (iii)
Health Management formation
System.
(C:67.743+R:477.625)

Karachi

Approved
20.02.12

June-15

945.368

169.350

81.959 0.000

251.309

694.059

25.000

25.000

50.000

0.000

27

32

322.030

322.030

394

Expansion & Improvement of


03 Urban Health Centres in
Karachi. (1) Orangi No-15 (2)
Malir City (3) Kaemari and
Additional Indoor Block at
Sindh Government Hospital,
Korangi No. 5, Karachi.
(C: 203.134+R: 164.861)

Karachi

Approved
21.07.11

June-15

367.995

147.998

34.025 0.000

182.023

185.972

39.859

146.113

185.972

0.000

49

100

0.000

0.000

[ 78 ]

PROVINCIAL
HEALTH DEPARTMENT
( Rs. in million )
Location
of
Scheme/
District
3

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4
5
6
7

Revised
Allocation

Estimated
ThrowforExpenditward as on
ure upto
01-07-15
F.P.A.
June' 15
9
10
11

Allocation for 2015-16

Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

395

Establishment of Ancillary and


other services at 400 bedded
Hospital at NIPA, Karachi.
(C: 311.882+R: 5.919)

Karachi

Approved
11.01.12

June-15

317.801

186.687

62.040 0.000

248.727

69.074

5.000

0.000

396

Establishment of Shaheed
Mohtarma Benazir Bhutto 100
Bedded Hospital near Jungle
Shah Keemari Town, Karachi.
(C: 187.937+R: 118.720)

Karachi

Approved
24.11.11

June-15

306.657

13.846

0.000 0.000

13.846

292.811

50.000

397

Construction of ENT/Eye &


Fascio Maxillary Block of
Abbasi Shaheed Hospital,
Karachi.
(C: 228.357+R: 105.821)

Karachi

Approved
17.12.12

June-15

334.178

59.903

48.467 0.000

108.370

225.808

398

Construction of 50 Bedded
Hospital at Block-13, F.B. Area,
District Central, Karachi.
(C: 255.646+R: 52.196)

Karachi

Approved
20.12.12

June-15

307.842

57.499

20.341 0.000

77.840

399

Establishment of Shaheed
Benazir Bhutto Medical
Complex at National High
Way, near Razaqabad, Bin
Qasim Town, Karachi.
(C: 1120.582+R: 308.857)

Karachi

Approved
17.12.12

June-16

1429.439

235.000

140.466 0.000

400

Construction of 100 Bedded


Hospital at PIB Colony,
Karachi.
(C: 355.425+R: 122.125)

Karachi

Approved
20.12.12

June-14

477.550

57.651

401

Establishment of Central Blood


Bank in Karachi.
(C: 118.857+R: 77.785)

Karachi

Approved
20.12.12

June-14

196.642

402

Establishment of Accident
Emergency / Trauma Center at
New Karachi.
(C: 555.779+R: 397.358)

Karachi

Approved
25.04.14

June-17

953.137

Total
8

FPA
Capital

Revenue

Total

12

13

14

Financial
Progress in %age
upto

Jun'15 Jun'16

Financial Projection
2016-17

2017-18
19

15

16

17

18

5.000

0.000

78

80

64.074

0.000

0.000

50.000

0.000

21

121.406

121.406

50.000

0.000

50.000

0.000

32

47

87.904

87.904

230.002

50.000

0.000

50.000

0.000

25

42

90.001

90.001

375.466

1053.973

100.000

0.000

100.000

0.000

26

33

476.987

476.987

48.623 0.000

106.274

371.276

50.000

0.000

50.000

0.000

22

33

160.638

160.638

42.500

30.156 0.000

72.656

123.986

47.011

0.000

47.011

0.000

37

61

76.975

0.000

0.000

0.000 0.000

0.000

953.137

50.000

0.000

50.000

0.000

451.569

451.569

[ 79 ]

PROVINCIAL
HEALTH DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District
3

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4
5
6
7

Revised
Allocation
Total
8

Estimated
ThrowforExpenditward as on
ure upto
01-07-15
F.P.A.
June' 15
9
10
11

Allocation for 2015-16


FPA

Financial
Progress in %age
upto

Capital

Revenue

Total

12

13

14

15

16

17

Jun'15 Jun'16

Financial Projection
2016-17

2017-18

18

19

403

Establishment of 100 Bedded


Hospital at Gulshan-e-Zia
Orangi Town, Karachi.
(C: 324.053+R: 126.526)

Karachi

Approved
20.02.13

June-15

450.579

12.494

21.610 0.000

34.104

416.475

40.000

0.000

40.000

0.000

16

188.238

188.238

404

Up gradation of Gazarabad
General Hospital to the level of
200 Bedded Hospital, Nishtar
Road, Saddar Town, Karachi.
(C: 208.838+R: 156.467)

Karachi

Approved
20.12.12

June-15

365.305

10.805

32.415 0.000

43.220

322.085

40.000

0.000

40.000

0.000

12

23

141.043

141.043

405

Extension of Services of SIUT,


Karachi.
(C: 975.040+R: 539.000)

Karachi

Approved
08.11.12

June-15

1514.040

100.000

375.000 0.000

475.000

1039.040

125.000

0.000

125.000

0.000

31

40

457.020

457.020

406

Establishment of
Comprehensive Diagnostic
Care Facilities at Jamshed
Town, Karachi.
(C: 78.291+R: 260.955)

Karachi

Approved
20.12.12

June-15

339.246

10.000

8.104 0.000

18.104

321.142

40.000

0.000

40.000

0.000

17

140.571

140.571

407

Establishment of Rehabilitation
Centre for Burns Patients
Landhi, Karachi.
(C: 136.348+R: 116.043)

Karachi

Approved
20.12.12

June-15

252.391

15.000

24.312 0.000

39.312

213.079

50.000

0.000

50.000

0.000

16

35

81.540

81.540

408

Up gradation of (3) Maternity


Homes in Karachi.
(i) PIB Colony. (ii). Soldier
Bazar. (iii) Patel Para, Jehangir
Road.
(C: 146.528+R: 53.243)

Karachi

Approved
29.03.13

June-15

199.771

14.986

32.415 0.000

47.401

152.370

50.000

0.000

50.000

0.000

24

49

51.185

51.185

409

Up gradation of Eid Gah


Maternity Home in to 100
Bedded Hospital, Karachi.
(C: 128.038+R: 80.010)

Karachi

Approved
20.02.13

June-15

208.048

12.499

13.506 0.000

26.005

182.043

40.000

0.000

40.000

0.000

12

32

71.022

71.022

[ 80 ]

PROVINCIAL
HEALTH DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District
3

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4
5
6
7

Revised
Allocation
Total
8

Estimated
ThrowforExpenditward as on
ure upto
01-07-15
F.P.A.
June' 15
9
10
11

Allocation for 2015-16


FPA

Financial
Progress in %age
upto

Capital

Revenue

Total

12

13

14

15

16

Jun'15 Jun'16

Financial Projection
2016-17

2017-18

17

18

19

410

Expansion & Rehabilitation of Hyderabad Approved


Sir C.J Institute of Psychiatry
23.01.12
Hyderabad including
(U/R)
Construction of New Female
Ward, Rehabilitation Centre &
OPD Block, Psychiatric
Emergency 50 Bedded Ward.
(C: 119.163+R: 31.048)

June-15

150.211

82.500

33.854 0.000

116.354

33.857

15.000

0.000

15.000

0.000

77

87

18.857

0.000

411

Establishment of Anti Snake


Venom and Anti Rabbies
Serology Laboratory in Sindh.
(Revised).
(C: 368.000+R: 223.300)

S.B.A

Approved
02.11.11

June-15

591.300

223.901

43.975 0.000

267.876

323.424

50.000

5.000

55.000

0.000

45

55

134.212

134.212

412

Construction of Accident &


Emergency Center at
Daulatpur Taluka Kazi Ahmed
District Shaheed Benazirabad.
(C: 51.768+R: 36.182)

S.B.A

Approved
10.02.11
(U/R)

June-15

87.950

42.707

45.243 0.000

87.950

0.000

1.000

0.000

1.000

0.000

100

101

-1.000

0.000

413

Strengthening of Gambat
Institute of Medical Sciences at
Gambat. (Revised).
(C: 1129.670+R: 299.551)

Khairpur

Approved
02.03.12

June-15

1429.221

350.000

195.000 0.000

545.000

884.221

100.000

0.000

100.000

0.000

38

45

392.111

392.111

414

Establishment of Allied
Facilities for Jacobabad
Institute of Medical Sciences.
(C: 450.439+R: 27.826)

Jacobabad Approved
15.11.12

June-15

478.265

125.978

119.130 0.000

245.108

233.157

205.331

27.826

233.157

0.000

51

100

0.000

0.000

415

Establishment of Pediatric
Center in Mirpurkhas.
(C: 78.383+R: 34.563)

M.Khas

Approved
09.08.12

June-14

112.946

12.500

36.753 0.000

49.253

63.693

29.130

34.563

63.693

0.000

44

100

0.000

0.000

416

Upgradation of RHC to the


level of Taluka Head Quarter
(THQ), Mirwah, District
Mirpurkhas.
(C.80.639+R.39.336).

M.Khas

Approved
03.04.13

June-15

119.975

7.500

10.805 0.000

18.305

101.670

62.334

39.336

101.670

0.000

15

100

0.000

0.000

[ 81 ]

PROVINCIAL
HEALTH DEPARTMENT
( Rs. in million )
Location
of
Scheme/
District
3

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4
5
6
7

Sanghar

Approved
27.03.10

June-15

171.817

116.684

0.000 0.000

116.684

Thatta

Approved
14.10.11
(U/R)

June-13

19.920

15.572

0.000 0.000

Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

417

Up gradation of Sindh Govt


Hospital / THQ Hospital
Shahdadpur to the level of
Institute of Medical & Health
Sciences District Sanghar.
(Revised by PDWP on 04.3.14).
T: 421.360
(C: 230.954+R: 190.406)

418

Construction of Maternity
Home at Mehar, UC Mehar,
Taluka Ghorabari District
Thatta. (C: 15.667+R: 4.253)

419

Renovation and Rehabilitation


of Paramedical Institute
Larkana.
(C: 47.948+R: 19.785)

Larkana

Approved
23.01.12

June-15

67.733

22.500

420

Providing Additional Facilities


in Rural Health Center at
Naudero Taluka Ratodero,
District Larkana. (Revised)
(C: 104.937+R: 28.465)

Larkana

Approved
18.02.15

June-16

133.402

421

Up gradation of THQ Hospitals Kamber @ Approved


at Shahdakot Qubo Saeed
Shahdakot 20.02.12
Khan, Nasirabad Sujawal and
Miro Khan.
(C: 340.163+R: 70.373)

June-13

422

Up gradation of MCH Centre


to the level of BHU at Village
Lutufullah Panhwar, Taluka
Bhiria District N'Feroze.
(C: 17.317+R: 0.812)

June-15

N'Feroze

Approved
06.02.13

Revised
Allocation

Estimated
ThrowforExpenditward as on
ure upto
01-07-15
F.P.A.
June' 15
9
10
11

Allocation for 2015-16


FPA

Financial
Progress in %age
upto

Capital

Revenue

Total

12

13

14

15

16

55.133

40.000

0.000

40.000

0.000

15.572

4.348

0.095

4.253

4.348

22.616 0.000

45.116

22.617

2.832

19.785

22.119

30.000 0.000

52.119

81.283

52.818

410.536

37.500

27.013 0.000

64.513

346.023

18.129

0.000

8.652 0.000

8.652

9.477

Total
8

Jun'15 Jun'16

Financial Projection
2016-17

2017-18

17

18

19

68

91

15.133

0.000

0.000

78

100

0.000

0.000

22.617

0.000

67

100

0.000

0.000

28.465

81.283

0.000

39

100

0.000

0.000

40.000

0.000

40.000

0.000

16

25

153.012

153.012

9.477

0.000

9.477

0.000

48

100

0.000

0.000

[ 82 ]

PROVINCIAL
HEALTH DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

423

Up gradation of Taluka
Hospital Sehwan to Syed
Abdullah Shah Institute of
Medical and Health Science at
Jamshoro.
(C: 282.866+R: 103.091)

424

Provision of Parental Iron


Isomaltoside to Treat Iron
Deficiency in District
Tharparkar.
(R: 510.000)

425

Mobile Diagnostic Services for


Breast Cancer in Sindh.
(R: 884.660).

426

427

Location
of
Scheme/
District
3

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4
5
6
7

Jamshoro

Approved
15.12.11
(U/R)

June-14

385.957

267.622

0.000 0.000

267.622

Tharparkar Approved
14.11.14

June-15

510.000

0.000

236.784 0.000

Approved
18.02.15

June-16

884.660

0.000

Approved
19.10.12

June-15

1549.395

Khairpur, Approved
Badin,
17.01.14
Mithi,
Shikarpur

June-15

4556.418

Hyderabad,
Sukkur,
Larkana,
S.B.A
M'Khas
Up gradation of THQ Hospitals T.M.Khan,
to the level of DHQ Hospitals in T. Allahyar,
Newly Created Districts in
Jamshoro
Sindh (03 Nos).
i) Tando Mohammad Khan
ii) Tando Allahyar
iii) Jamshoro. (Revised).
(C: 1084.268+R: 465.127)
Expansion & Improvement of
DHQ Hospitals in Sindh.
(04 Nos). (1) Khairpur
(2) Badin (3) Mithi (4)
Shikarpur (Revised)
(C: 3162.206+R: 1394.212)

Revised
Allocation

Estimated
ThrowforExpenditward as on
ure upto
01-07-15
F.P.A.
June' 15
9
10
11

Allocation for 2015-16


FPA

Financial
Progress in %age
upto

Capital

Revenue

Total

12

13

14

15

16

118.335

50.000

0.000

50.000

0.000

236.784

273.216

0.000

117.840

117.840

400.000 0.000

400.000

484.660

0.000

484.660

755.550

221.208 0.000

976.758

572.637

230.390

2282.999

432.204 0.000

2715.203

1841.215

400.000

Total
8

Jun'15 Jun'16

Financial Projection
2016-17

2017-18

17

18

19

69

82

68.335

0.000

0.000

46

70

77.688

77.688

484.660

0.000

45

100

0.000

0.000

342.247

572.637

0.000

63

100

0.000

0.000

100.000

500.000

0.000

60

71

670.608

670.608

[ 83 ]

PROVINCIAL
HEALTH DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District
3

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4
5
6
7

Revised
Allocation
Total
8

Estimated
ThrowforExpenditward as on
ure upto
01-07-15
F.P.A.
June' 15
9
10
11

Allocation for 2015-16


FPA
Capital

Revenue

Total

12

13

14

Financial
Progress in %age
upto

Jun'15 Jun'16
15

16

17

Financial Projection
2016-17

2017-18

18

19

428

Expansion & Improvement of


DHQ Hospital (06 Nos)
(1) Thatta (2) Dadu
(3) Naushero Feroze
(4) Mirpurkhas (5) Sanghar
(6) Mirpur Mathelo @ Ghotki
(Revised)
(C: 2154.695+R: 1084.541)

Thatta,
Approved
Dadu
30.3.12
N.Feroze
(U/R)
Mirpurkhas
Sanghar,
Ghotki.

June-15

3248.866

1848.322

316.102 0.000

2164.424

1084.442

250.000

200.000

450.000

0.000

67

80

317.221

317.221

429

Up gradation of THQ Hospitals Matiari, Approved


to the level of DHQ Hospital in
Kambar,
20.02.12
Newly Created Districts in
Umerkot,
Sindh (04 Nos). (i) Matiari.
Kashmore
(ii). Kamber @ Shahdadkot
(iii) Umerkot. (iv) Kashmore @
Kandhkot. (Revised by PDWP
on 14.11.14)
(C: 1538.205+R: 833.995)

June-15

2372.200

595.983

150.000 0.000

745.983

1626.217

300.000

200.000

500.000

0.000

31

53

563.109

563.109

430

Up gradation & Revamping of


THQ Hospitals in Sindh
(41Nos.) & Construction of
Emergency Cum Trauma
Centers in THQ Hospitals
(41 Nos.).
(C: 1415.876 +
R: 1918.285+PIU: 16.682)

Sindh

Approved
17.04.12

June-15

3334.161

1707.026

218.413 0.000

1925.439

1408.722

400.000

200.000

600.000

0.000

58

76

404.361

404.361

431

Provision of 200 Dialysis


Facilities in all Districts of
Sindh. (R: 642.921).

Sindh

Approved
18.02.15

June-17

642.921

0.000

0.000 0.000

0.000

642.921

0.000

100.000

100.000

0.000

16

271.461

271.461

3416.650 2240.585

5657.235

0.000

7467.711

7080.664

150.000

0.000

225.000

225.000

Total Other Hospital (Ongoing)

34203.705 10325.433 3672.663 0.000 13998.096 20205.609

Other Hospitals New


432

Establishment of Paeds Cardiac


Surgery Unit at NICVD,
Karachi.

Karachi

UnApproved

June-17

600.000

0.000

0.000 0.000

0.000

600.000

150.000

0.000

25

[ 84 ]

PROVINCIAL
HEALTH DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District
3

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4
5
6
7

Revised
Allocation
Total
8

Estimated
ThrowforExpenditward as on
ure upto
01-07-15
F.P.A.
June' 15
9
10
11

Allocation for 2015-16


FPA
Capital

Revenue

Total

12

13

14

Financial
Progress in %age
upto

Jun'15 Jun'16
15

16

17

Financial Projection
2016-17

2017-18

18

19

433

Establishment of Liver
Transplant centre at DUHS
Karachi.

Karachi

UnApproved

June-17

500.000

0.000

0.000 0.000

0.000

500.000

125.000

0.000

125.000

0.000

25

187.500

187.500

434

Addition of Multi discplinary


Services Department and
Institute of Physical Medicines
and Rehablitation at DUHS
Karachi.
SIUT Multi-Organ Transplant
and Biological Centre at
Kathore Karachi .

Karachi

UnApproved

June-17

500.000

0.000

0.000 0.000

0.000

500.000

125.000

0.000

125.000

0.000

25

187.500

187.500

Karachi

UnApproved

June-17

300.000

0.000

0.000 0.000

0.000

300.000

75.000

0.000

75.000

0.000

25

112.500

112.500

436

Strengthening & Improvement


of (1) 36 bedded hospital at
Dumba Goth (2) Sindh Govt.
Hospital Ibrahim Hyderi (3)
Sindh Govt. Hospital Rehri (4)
Sindh Govt.l Hospital Gadap
City (5) Qasba (6) 2 way
corridor Landhi (7) Surjani (8)
Taiser Gadap (9) Korangi
Karachi.

Karachi

UnApproved

June-17

300.000

0.000

0.000 0.000

0.000

300.000

75.000

0.000

75.000

0.000

25

112.500

112.500

437

Establishment of Admn Block


at Karachi Institute of Heart
Diseases.

Karachi

UnApproved

June-17

200.000

0.000

0.000 0.000

0.000

200.000

50.000

0.000

50.000

0.000

25

75.000

75.000

438

Purchase & Installation of MRI


@ RHC Punhal Khan Chandio,
Taluka Sakrand, District
Shaheed Benazirabad
Up gradation of RHC to the
level of Taluka Hospital Daur
District Shaheed Benazirabad.
(C:198.796+R:38.945
+T:237.741)

S.B.A

UnApproved

June-17

100.000

0.000

0.000 0.000

0.000

100.000

0.000

25.000

25.000

0.000

25

75.000

0.000

SBA

UnApproved

June-15

237.741

0.000

0.000 0.000

0.000

237.741

59.435

0.000

59.435

0.000

25

89.153

89.153

435

439

[ 85 ]

PROVINCIAL
HEALTH DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

440

Location
of
Scheme/
District
3

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4
5
6
7

Revised
Allocation
Total
8

Estimated
ThrowforExpenditward as on
ure upto
01-07-15
F.P.A.
June' 15
9
10
11

Allocation for 2015-16


FPA

Financial
Progress in %age
upto

Capital

Revenue

Total

12

13

14

15

16

Jun'15 Jun'16

Financial Projection
2016-17

2017-18

17

18

19

Up gradation of RHC to the


SBA
level of Taluka Hospital Kazi
Ahmed District Shaheed
Benazirabad.
(C:203.360+R:38.945+
T:242.305)
Establishment of Khairpur Eye Khairpur
Hospital District Khairpur, (To
be funded out of 10% share of
Construction of 10 Bedded
Khairpur
Hospital at Deh Draza Chak No
1 Barkatabad Taluka Gambat
District Khairpur. (To be
funded out of 10% share of
Royalty)
Construction of 10 Bedded
Khairpur
Hospital "Atta Muhammad
Shahani (Alias Firaq Ali)" at
village Mir Khan Shahani,
Taluka Sobho Dero
UC-Gadeji, District Khairpur
(Mir's). (To be funded out of
10%
share ofof
Royalty)
Upgradation
existing Rural
Jacobabad
Health Center to Taluka
Headquarter Hospital at Garhi
Khairo District Jacobabad

UnApproved

June-15

242.305

0.000

0.000 0.000

0.000

242.305

60.575

0.000

60.575

0.000

25

90.865

90.865

UnApproved

June-17

100.000

0.000

0.000 0.000

0.000

100.000

25.000

0.000

25.000

0.000

25

75.000

0.000

Unapproved

June-16

55.000

0.000

0.000 0.000

0.000

55.000

14.000

0.000

14.000

0.000

25

41.000

0.000

Unapproved

June-16

55.000

0.000

0.000 0.000

0.000

55.000

14.000

0.000

14.000

0.000

25

41.000

0.000

UnApproved

June-17

200.000

0.000

0.000 0.000

0.000

200.000

50.000

0.000

50.000

0.000

25

75.000

75.000

445

Establishment of Cardiology /
Kidney and Peads Hospitals at
Qasimabad, Hyderabad.

Hyderabad

UnApproved

June-17

300.000

0.000

0.000 0.000

0.000

300.000

75.000

0.000

75.000

0.000

25

112.500

112.500

446

Upgradation of Nuclear
Institute of Medicine &
Radiotherapy (NIMRA)
Jamshoro
Upgradation of Existing RHC
Kunri into THQ at Kunri
District Umerkot

Jamshoro

UnApproved

June-17

400.000

0.000

0.000 0.000

0.000

400.000

75.000

25.000

100.000

0.000

25

150.000

150.000

Umerkot

UnApproved

June-17

60.000

0.000

0.000 0.000

0.000

60.000

15.000

0.000

15.000

0.000

25

45.000

0.000

441
442

443

444

447

[ 86 ]

PROVINCIAL
HEALTH DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

448

Purchasing Of Surgical and


Medical Instruments of Anwar
Paracha Hospital In Sukkur
City
Up-gradation of Existing
Hospital into 10 bedded
Hospital at Village Misri Fakir
Khoso UC Pangrio Taluka
Tando Bago District Badin.

449

450

451

452

453

454

Construction of Rural Health


Centre, Taluka Shuja Abad,
District Mirpurkhas.
Upgradation of Shaikh
Hamdan Bin Muhammad
Hospital Khanpur Taluka
Khangarh District Ghotki.
Establishment of mortuary
facility at all Teaching &
Major Hospitals in Sindh.

Location
of
Scheme/
District
3

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4
5
6
7

Sukkur

UnApproved

June-16

140.000

0.000

0.000 0.000

0.000

140.000

Badin

Unapproved

June-16

55.000

0.000

0.000 0.000

0.000

Mirpurkhas

UnApproved

June-17

100.000

0.000

0.000 0.000

Ghotki

UnApproved

June17

60.000

0.000

Karachi,
UnHyderabad, Approved
Sukkur,
SBA,
Larkana
Sindh
UnApproved

June-17

100.000

June-17

UnApproved

June-17

Upgradation of Existing 25
RHC including Repair /
renovation & Comprehensive
Services in Sindh.
Provision of On Site Oxygen
Sindh
Generation / Medical Gasses
Plant in Sindh.
Total Other Hospital New
Total Other Hospital (Ongoing+New)

Revised
Allocation

Estimated
ThrowforExpenditward as on
ure upto
01-07-15
F.P.A.
June' 15
9
10
11

Allocation for 2015-16


FPA

Financial
Progress in %age
upto

Capital

Revenue

Total

12

13

14

15

16

0.000

35.000

35.000

0.000

55.000

14.000

0.000

14.000

0.000

100.000

25.000

0.000

0.000 0.000

0.000

60.000

15.000

0.000

0.000 0.000

0.000

100.000

100.000

0.000

0.000 0.000

0.000

1000.000

0.000

0.000 0.000

0.000

Total
8

2016-17

2017-18

17

18

19

25

52.500

52.500

0.000

25

41.000

0.000

25.000

0.000

25

37.500

37.500

0.000

15.000

0.000

25

45.000

0.000

25.000

0.000

25.000

0.000

25

75.000

0.000

100.000

25.000

0.000

25.000

0.000

25

75.000

0.000

1000.000

0.000

250.000

250.000

0.000

25

375.000

375.000

1092.010 335.000
4508.660 2575.585

1427.010
7084.245

0.000
0.000

2395.518
9863.229

1882.518
8963.182

145.000

0.000

270.542

270.542

5705.046
0.000
0.000 0.000
0.000 5705.046
39908.751 10325.433 3672.663 0.000 13998.096 25910.655

Jun'15 Jun'16

Financial Projection

Medical Education (Ongoing)


455

Establishment of Medical
College at Karachi.
(C:741.164+R:392.200+
PIU:7.836).

Karachi

Approved
15.03.12

June-15

1141.200

324.166

130.950 0.000

455.116

686.084

135.000

10.000

40

53

[ 87 ]

PROVINCIAL
HEALTH DEPARTMENT
( Rs. in million )
Location
of
Scheme/
District
3

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4
5
6
7

Revised
Allocation

Estimated
ThrowforExpenditward as on
ure upto
01-07-15
F.P.A.
June' 15
9
10
11

Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

456

Establishment of Shaheed
Benazir Bhutto Medical College
Lyari, Karachi.
(C:802.916+R:392.2+PIU:
9.877).

Karachi

Approved
09.08.12

Jun-15

1204.993

197.692

234.880 0.000

432.572

457

Purchase of Land 200 Acres for


Construction of Medical
University @ Shaheed
Benazirabad (Revised)
(C: 35.000+R:120.521).

S.B.A

Approved
30.09.11

June-15

155.521

153.682

0.000 0.000

458

Establishment of Ghulam
Muhammad Mahar Medical
College, Sukkur
(C:1690.952+R:221.028).

Sukkur

Approved
24.02.11

June-15

1911.980

319.610

459

Establishment of Medical
College at Hyderabad.
(C:984.973+R:398.671).

Hyderabad Approved
15.03.12

June-15

1394.467

460

Establishment of Constituent
Medical College of Liaquat
University of Medical & Health
Sciences at Khairpur Mirs.
(C:120.976+R:674.232).

Approved
08.11.12

June-14

461

Establishment of Medical
College at Mirpurkhas.
(C:1499.024+R:550.806).

Mirpurkhas Approved
17.12.12

462

Renovation & Rehabilitation of


Chandka Medical College and
Construction of New Noori
Girls Hostel of Shaheed
Mohtarma Benazir Bhutto
Medical University, Larkana.
(C: 1066.581+R:44.630)

Khairpur

Larkana

Total Medical Education (Ongoing)


Medical Education (New)

Approved
03.03.15

Allocation for 2015-16


FPA

Financial
Progress in %age
upto

Financial Projection

Capital

Revenue

Total

12

13

14

15

16

17

772.421

85.000

10.000

95.000

0.000

36

44

338.711

338.711

153.682

1.839

1.839

0.000

1.839

0.000

99

100

0.000

0.000

100.000 0.000

419.610

1492.370

85.000

0.000

85.000

0.000

22

26

703.685

703.685

323.181

130.950 0.000

454.131

940.336

215.000

10.000

225.000

0.000

33

49

357.668

357.668

795.208

100.000

435.526 0.000

535.526

259.682

0.000

259.682

259.682

0.000

67

100

0.000

0.000

June-15

2049.830

151.176

98.167 0.000

249.343

1800.487

140.000

10.000

150.000

0.000

12

19

825.244

825.244

June-16

1111.211

0.000

0.000 0.000

0.000

1111.211

232.900

0.000

232.900

0.000

21

439.156

439.156

1569.507 1130.473 0.000

2699.980

7064.430

894.739

299.682

1194.421

0.000

2935.005

2935.005

9764.410

Total
8

Jun'15 Jun'16

2016-17

2017-18

18

19

[ 88 ]

PROVINCIAL
HEALTH DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

463

Construction of Talib-ul-Moula
Medical College and Teaching
Hospital Hala at Matiari

Location
of
Scheme/
District
3

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4
5
6
7

Matiari

UnApproved

June-17

Total Medical Education New


Total Medical Education (Ongoing+New)

400.000

400.000
10164.410

0.000

Revised
Allocation
Total
8

Estimated
ThrowforExpenditward as on
ure upto
01-07-15
F.P.A.
June' 15
9
10
11

Allocation for 2015-16


FPA
Capital

Revenue

Total

12

13

14

Financial
Progress in %age
upto

Jun'15 Jun'16
15

16

17

25

0.000 0.000

0.000

400.000

100.000

0.000

100.000

0.000

0.000
0.000 0.000
1569.507 1130.473 0.000

0.000
2699.980

400.000
7464.430

100.000
994.739

0.000
299.682

100.000
1294.421

0.000
0.000

Financial Projection
2016-17

2017-18

18

19

150.000

150.000

150.000
3085.005

150.000
3085.005

PHC Admn/Training(Ong)
464

465

Establishment of Nursing
Training Institute at Karachi
Institute of Heart Diseases
(KIHD), Karachi. (Revised).
(C:466.714+R:23.488).
Safe Blood Transfusion
Reforms in Sindh. (All
Districts). (IIIrd Revision).
(75.227 incurred +46.715 to be
incurred).
(C:30.568+R: 91.374).

Karachi

Approved
15.5.14

June-16

490.202

87.500

53.750 0.000

141.250

348.952

50.000

0.000

50.000

0.000

29

39

149.476

149.476

Sindh

Approved
26.12.14

June-16

121.942

66.372

8.855 0.000

75.227

46.715

15.172

31.543

46.715

0.000

62

100

0.000

0.000

612.144

153.872

62.605 0.000

216.477

395.667

65.172

31.543

96.715

0.000

149.476

149.476

421.710

0.000

10.000 0.000

10.000

411.710

0.000

153.000

129.355

129.355

Total PHC Admn/Training (Ongoing)


Nutrition (Ongoing)
466

Nutrition Support Programme


Kamber, Approved
in Sindh (09 Districts)
Larkana,
12.02.14
(1)Kamber at Kandhkot (2)
Kashmore, ECNEC
Larkana (3) Kashmore (4)
Jacobabad,
Jacobabad (5) Tharparkar (6) Tharparkar
Badin (7) Umerkot (8) Sanghar
, Badin,
(9) Tando Mohammad Khan
Umerkot,
PDWP 03.05.2013 (GOS:
Sanghar,
421.710 & IDA Loan: 3696.190 T.M. Khan
+ Total 4117.900)

June-18

153.000 1385.270

39

[ 89 ]

PROVINCIAL
HEALTH DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District
3

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4
5
6
7

Total Nutrition (Ongoing)

Revised
Allocation
Total
8

Estimated
ThrowforExpenditward as on
ure upto
01-07-15
F.P.A.
June' 15
9
10
11

Allocation for 2015-16


FPA
Capital

Revenue

Total

12

13

14

421.710

0.000

10.000 0.000

10.000

411.710

0.000

153.000

Financial
Progress in %age
upto

Jun'15 Jun'16
15

16

17

153.000 1385.270

Financial Projection
2016-17

2017-18

18

19

129.355

129.355

Preventive Program (Ongoing)

467

468

469

470

471

472

473

474

Provincial Tuberculosis
Control Programme in Sindh.
(R: 1190.741).
Prevention & Control of
Blindness (PCB) in Sindh.
(R: 329.304)
Establishment of Health Sector
Reforms Unit in Sindh.
(R. 65.449)
Enhance HIV/AIDS Control
Programme in Sindh.
(R: 637.161).
Strengthening of Thalessemia
Control Activities in Sindh.
(R: 59.918).
Child Survival Program in
Sindh.
(R: 59.962).
Prevention & Control of
Hepatitis in Sindh. Chief
Minister Initiatives.
(R: 3412.115)
Extension of Malaria Control
Programme for Roll back
Malaria initiative in Sindh
(R:897.040 M)

Sindh

Approved
03.01.13

June-15

1190.741

492.270

20.000 0.000

512.270

678.471

0.000

80.000

80.000

0.000

43

50

299.236

299.236

Sindh

Approved
21.04.11

June-15

329.304

114.000

25.013 0.000

139.013

190.291

0.000

63.292

63.292

0.000

42

61

63.500

63.500

Sindh

Approved
22.12.11

June-15

65.449

27.254

23.101 0.000

50.355

15.094

0.000

1.500

1.500

0.000

57

100

6.797

6.797

Sindh

Approved
27.09.11

June-15

637.161

311.474

83.641 0.000

395.115

242.046

0.000

100.000

100.000

0.000

62

78

71.023

71.023

Sindh

Approved
29.12.11

June-14

59.918

0.000

1.000 0.000

1.000

58.918

0.000

10.000

10.000

0.000

18

48.918

0.000

Sindh

Approved
20.12.13

Jun-15

59.962

0.000

19.900 0.000

19.900

40.062

0.000

40.062

40.062

0.000

33

100

0.000

0.000

Sindh

Approved
21.07.11

June-15

3412.115

2735.604 1000.000 0.000

3735.604

-323.489

0.000

125.000

125.000

0.000

109

113

0.000

0.000

Sindh

Approved
03.01.13

June-16

897.040

108.051 0.000

815.151

81.889

0.000

81.889

81.889

0.000

91

100

0.000

0.000

4387.702 1280.706 0.000

5668.408

983.282

0.000

501.743

501.743

0.000

489.473

440.555

0.000

200.000

0.000

100.000

100.000

0.000

100.000

0.000

Total Preventive Programme (ongoing)

6651.690

707.100

Preventive Program(New)
475

Sindh Expanded Program on


Immunization. (EPI).

Sindh

UnApproved

June-18

200.000

0.000

0.000 0.000

50

[ 90 ]

PROVINCIAL
HEALTH DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

476

Maternal Neonatal Child


Health Programme in Sindh.
Prevention & Control Program
for Dengue in Sindh
Hepatitis Prevention & Control
Program in Sindh. (Chief
Minister Initiatives). Phase-II.

477
478

Location
of
Scheme/
District
3
Sindh
Sindh
Sindh

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4
5
6
7
UnApproved
UnApproved
UnApproved

Revised
Allocation
Total
8

Estimated
ThrowforExpenditward as on
ure upto
01-07-15
F.P.A.
June' 15
9
10
11

Allocation for 2015-16


FPA

Financial
Progress in %age
upto

Capital

Revenue

Total

12

13

14

15

16

Jun'15 Jun'16

Financial Projection
2016-17

2017-18

17

18

19

June-18

200.000

0.000

0.000 0.000

0.000

200.000

12.500

62.490

74.990

0.000

37

62.505

62.505

June-18

250.000

0.000

0.000 0.000

0.000

250.000

0.000

50.000

50.000

0.000

20

100.000

100.000

June-18

3500.000

0.000

0.000 0.000

0.000

3500.000

0.000

875.000

875.000

0.000

25

1312.500

1312.500

0.000
0.000 0.000
4387.702 1280.706 0.000

0.000
5668.408

4150.000
5133.282

12.500 1087.490
12.500 1589.233

1099.990
1601.733

0.000
0.000

1575.005
2064.478

1475.005
1915.560

2.000

0.000

124.985

124.985

80.000 1000.000

49

82.792

0.000

Total Preventive Programme (New)


Total Preventive Programme (ongoing+New)

4150.000
10801.690

Foreign Aided Project(Ong)


479

National Blood Transfusion


Services Sindh.
(1) Civil Hospital Karachi
(2)LUMHS Jamshoro
(3)GMMCH Sukkur
(4)PMCH Benazirabad.
(GOS:251.97+GTZ:325.53=T:
577.5

480

Establishment of Child Health


Care Institute Sukkur, Sindh
Province. ($ 46 million Korean).
PDWP on 14-11.14
(GOS:162.792+Korean soft
loan:4646.198=T:4808.99)

Karachi, Approved
Jamshoro, 18.03.10
Sukkur,
(CDWP)
S.B.A

Sukkur

Total Foreign Aided Projects (On-going)


Total Ongoing
Total New
Total Health Deptt.

Approved
13.05.15
(ECNEC)

June-14

251.970

0.000

0.000 0.000

0.000

251.970

0.000

2.000

June-18

162.792

0.000

0.000 0.000

0.000

162.792

0.000

80.000

414.762
0.000
0.000
63444.295 20699.446 7244.627
11495.046
0.000
0.000
74939.341 20699.446 7244.627

0.000
0.000
414.762
0.000 27944.073 35500.222
0.000
0.000 11495.046
0.000 27944.073 46995.268

0.000
82.000
82.000 1000.000
5540.757 4522.243 10063.000 2385.270
1424.510 1512.490 2937.000
0.000
6965.267 6034.733 13000.000 2385.270

207.777
124.985
13236.982 12532.451
4623.023 3935.023
17860.005 16467.474

[ 91 ]

SUMMARY
HOME DEPARTMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
(Rs. In million)
Sr
No.

Sub-Sector

ThrowNo. of
forward as
Schemes
on 01.07.15
3

On-Going
Capital

Revenue

Total

No. of
Schemes

New

No. of
Schemes

Capital

Revenue

Total

10

11

12

Total
FPA
Capital

Revenue

Total

13

14

15

Grand
Total
(15+16)

16

17

Financial Projection
2016-17

2017-18

18

19

Police

2556.662

14

341.183

0.000

341.183

75.175

0.000

75.175

20

416.358

0.000

416.358

0.000

416.358

1101.532

1048.773

Jails

2068.189

19

521.602

0.000

521.602

9.500

0.000

9.500

21

531.102

0.000

531.102

0.000

531.102

806.724

747.355

Information Tech (Jails)

231.703

0.000

52.540

52.540

0.000

0.000

0.000

0.000

52.540

52.540

0.000

52.540

100.000

78.199

4856.554

35

862.785

52.540

915.325

84.675

0.000

84.675

43

947.460

52.540

1000.000

0.000

1000.000

2008.255

1874.326

TOTAL

[ 92 ]

PROVINCIAL
HOME DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
6

Revised
Allocation
2014-15
Total
8

Estimated ThrowforAllocation for 2015-16


Expendit- ward as
ure upto
on
F.P.A. June' 15 01-07-15 Capital Revenue Total

10

Sindh

Approved
06.01.08
(U/R)

June-16

436.044

452.567

0.000

0.000

452.567

Karachi, Approved
Hyderabad 09.10.09

June-16

474.736

392.678

27.493

0.000

Approved
28.07.11
Approved
12.11.13

June-16

36.444

7.250

0.000

June-16

15.000

0.000

Sukkur

Approved
15.01.13

June-16

29.110

Sanghar

Approved
15.01.13

June-16

Karachi

Approved
08.04.14

Badin

Ghotki

11

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projection
2016-17

2017-18

18

19

12

13

14

15

16

17

0.000

10.000

0.000

10.000

0.000

104

106

0.000

0.000

420.171

54.565

30.000

0.000

30.000

0.000

89

95

24.565

0.000

0.000

7.250

29.194

1.000

0.000

1.000

0.000

20

23

28.194

0.000

5.000

0.000

5.000

10.000

10.000

0.000

10.000

0.000

100

0.000

0.000

6.028

23.030

0.000

29.058

0.052

0.052

0.000

0.052

0.000

100

100

0.000

0.000

53.761

12.191

23.661

0.000

35.852

17.909

17.909

0.000

17.909

0.000

67

100

0.000

0.000

June-17

805.239

0.524

223.100

0.000

223.624

581.615

120.000

0.000

120.000

0.000

28

43

230.808

230.808

Approved
12.11.13

June-16

37.198

0.000

22.849

0.000

22.849

14.349

14.349

0.000

14.349

0.000

61

100

0.000

0.000

Approved
12.11.13

June-15

25.626

0.000

15.626

0.000

15.626

10.000

10.000

0.000

10.000

0.000

61

100

0.000

0.000

BUILDINGS
Government Office Building
Police Department
(On-Going Schemes)
481 High Way Patrolling Post (105
Nos) in Sindh (Karachi,
Hyderabad, Mirpurkhas, SBA,
Sukkur, Ghotki, N. Feroze,
Larkana, Jacoababad
482 Construction of Buildings for
Sindh Police at various location
under Police Package
483 Construction of Police Station
Opp: Ziauddin Hospital Karachi
484 Construction of ( 07 Nos:) Police
Posts on Highway (KPT, PQA)
Karachi
485 Constt. of Police Station
Tamachani at Shikarpur Sukkur Road
486 Constt. of Police Station BSection, Tando Adam District
Sanghar.
487 Raising/ Construction of Watch
Tower & Boundary wall at RRF
base Al-Falah and Naval Colony
Base Kyc:
488 Construction of Police Station
(Category-C) & Bachelor
Barracks (Ground+1) at Nindo
District Badin.
489 Construction of Police
Station(Category-'C') at
Kambhra. District Ghotki

Karachi
Karachi

[ 93 ]

PROVINCIAL
HOME DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District
3

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4

490 Construction of Police Station


Shikarpur Approved
(Category-C) with Bachelor
14.03.14
Barrack (Ground + 1) at
Jahanwah Village Sheranpur
Taluka & District Shikarpur
491 Renovation / Construction of DIG Sukkur Approved
House Sukkur
14.02.14
492 Constt: of Women police station
Khairpur Approved
Khairpur
28.07.11
Police Deptt: (GOB) On-Going

Revised
Allocation
2014-15
Total

June-15

50.357

0.000

20.179

June-15

13.500

0.000

June-16

17.656

Estimated ThrowforAllocation for 2015-16


Expendit- ward as
ure upto
on
F.P.A. June' 15 01-07-15 Capital Revenue Total
9

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projection
2016-17

2017-18

18

19

10

11

12

13

14

15

16

17

0.000

20.179

30.178

30.178

0.000

30.178

0.000

40

100

0.000

0.000

6.750

0.000

6.750

6.750

6.750

0.000

6.750

0.000

50

100

0.000

0.000

13.789

2.000

0.000

15.789

1.867

1.867

0.000

1.867

0.000

89

100

0.000

0.000

1994.671

885.027

369.688

0.000

1254.715

756.479

252.105

0.000

252.105

0.000

283.567

230.808

June-17

40.698

0.000

0.000

0.000

0.000

40.698

10.175

0.000

10.175

0.000

25

15.262

15.262

June-16

60.000

0.000

0.000

0.000

0.000

60.000

15.000

0.000

15.000

0.000

25

22.500

22.500

June-18

50.000

0.000

0.000

0.000

0.000

50.000

12.500

0.000

12.500

0.000

25

18.750

18.750

June-18

50.000

0.000

0.000

0.000

0.000

50.000

12.500

0.000

12.500

0.000

25

18.750

18.750

June-18

50.000

0.000

0.000

0.000

0.000

50.000

12.500

0.000

12.500

0.000

25

18.750

18.750

Government Office Building


Police Department
(New Schemes)
493 Construction of Compound Wall Mirpurkhas
Unalongwith 04 Watch Towers in
Approved
Police Complex and Residence of
Officers of Mirpurkhas
494 Construction of Compound Wall
Larkana
Unof Police Line Larkana
Approved
495 Improvement / Strengthening of Hyderabad
UnSecurity to Police RTC
Approved
Hyderabad at Ganjo Takkar
(Construction of Compound Wall
with Watch Towers)
496 Improvement / Strengthening of
S.B.A.
UnSecurity to SCTC Sakrand
Approved
(Construction of Boundary Wall
with Watch Towers)
497 Improvement / Strengthening to
Karachi
UnPTC Saeedabad, Karachi
Approved
(Construction of Boundary Wall
with Watch Towers

[ 94 ]

PROVINCIAL
HOME DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

498 Improvement / Strengthening of


Security to PTS Larkana
(Construction of Boundary Wall
with Watch Towers)
Police Deptt: GOB (New)
Total Police Deptt: (GOB)

Location
of
Scheme/
District

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14

Larkana

UnApproved

June-18

Revised
Allocation
2014-15
Total

Estimated ThrowforAllocation for 2015-16


Expendit- ward as
ure upto
on
F.P.A. June' 15 01-07-15 Capital Revenue Total

50.000

0.000

0.000

0.000

300.698
2295.369

0.000
885.027

0.000
369.688

10

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projection
2016-17

2017-18

11

12

13

14

15

16

17

18

19

0.000

50.000

12.500

0.000

12.500

0.000

25

18.750

18.750

0.000
0.000

0.000
1254.715

300.698
1057.177

75.175
327.280

0.000
0.000

75.175
327.280

0.000
0.000

112.762
396.328

112.762
343.569

Government Servant Housing


Police Department
(On-Going Scheme)
499 Construction of Multi Storeyed
Flats for Grade 19/20 Officers
Sindh Police of Karachi ( 20 Nos)

Karachi

Approved
25.4.14

June-18

327.502

0.000

0.000

0.000

0.000

327.502

39.078

0.000

39.078

0.000

12

144.212

144.212

500 Construction of Residential


Accommodation for Constable &
Head Constable in Kyc: (616
N0s.)
Police Deptt: GSH (O.G)
Total Police Deptt: GSH
Total Police Deptt: (O-G)
Total Police Deptt: (New)
Total Police Deptt:

Karachi

Approved
8.4.14

June-18

1171.983

0.000

0.000

0.000

0.000

1171.983

50.000

0.000

50.000

0.000

560.992

560.992

1499.485
1499.485
3494.156
300.698
3794.854

0.000
0.000
885.027
0.000
885.027

0.000
0.000
369.688
0.000
369.688

0.000
0.000
0.000
0.000
0.000

0.000
0.000
1254.715
0.000
1254.715

1499.485
1499.485
2255.964
300.698
2556.662

89.078
89.078
341.183
75.175
416.358

0.000
0.000
0.000
0.000
0.000

89.078
89.078
341.183
75.175
416.358

0.000
0.000
0.000
0.000
0.000

705.204 705.204
705.204 705.204
988.770 936.011
112.762 112.762
1101.532 1048.773

Government Office Building


Jail Department
(On-Going Schemes)
501 Construction of Condemned Cells
at Central Prisons, Karachi.
502 Construction of District Jail at
Mirpur Khas for 500 Prisoners.
(Revised)
503 Construction of 04 additional
barracks at C.P. Larkana Ph-I.

Karachi

Approved
14-1-09
(U/R)

June-15

15.182

9.981

0.000

0.000

9.981

5.201

5.201

0.000

5.201

0.000

66

100

0.000

0.000

Mirpurkhas Approved
23-01-12

June-15

499.473

485.592

13.880

0.000

499.472

0.001

5.000

0.000

5.000

0.000

100

101

0.000

0.000

June-15

26.498

24.748

0.825

0.000

25.573

0.925

0.925

0.000

0.925

0.000

97

100

0.000

0.000

Larkana

Approved
10.03.07

[ 95 ]

PROVINCIAL
HOME DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

504 Construction of District Jail at


Thatta for 250 Prisoners.
505 Construction of DIG Office at
Karachi
506 Construction of New Barrack (10
Nos each 100 prisoners capacity)
at District Jail Malir Karachi
507 Repair & renovation of barrack,
Hospital Kitchen Block &
Construction of New shed
bathroom in each barrack at
central prison-I Sukkur
508 Renovation of Central Jail
Khairpur
509 Construction of New District Jail
Nawab Shah for 250 Prisoners
510 Constt: of Bakhshi Khana in the
premises of City Court Karachi.

Location
of
Scheme/
District

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4

Thatta

Approved
07-03-07
Approved
03.09.07
Approved
12.03.09
(U/R)
Approved
04.12.08

June-16

189.936

140.636

20.000

0.000

June-15

12.875

6.169

4.915

June-15

202.534

187.632

June-15

49.153

Approved
27.03.10
Approved
23.09.10
Approved
10.19.10

June-15

Karachi

Sukkur

Khairpur
S.B.A.
Karachi

Total
8

Estimated ThrowforAllocation for 2015-16


Expendit- ward as
ure upto
on
F.P.A. June' 15 01-07-15 Capital Revenue Total

Karachi

Revised
Allocation
2014-15

10

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projection
2016-17

2017-18

18

19

11

12

13

14

15

16

17

160.636

29.300

29.300

0.000

29.300

0.000

85

100

0.000

0.000

0.000

11.084

1.791

1.791

0.000

1.791

0.000

86

100

0.000

0.000

14.903

0.000

202.535

-0.001

11.991

0.000

11.991

0.000

100

106

0.000

0.000

40.139

2.288

0.000

42.427

6.726

6.726

0.000

6.726

0.000

86

100

0.000

0.000

73.310

71.656

0.100

0.000

71.756

1.554

1.554

0.000

1.554

0.000

98

100

0.000

0.000

June-16

287.194

181.222

30.000

0.000

211.222

75.972

40.000

0.000

40.000

0.000

74

87

35.972

0.000

June-15

40.789

7.392

0.000

0.000

7.392

33.397

10.000

0.000

10.000

0.000

18

43

23.397

0.000

511 Extension of District Jail Malir


for 1000 Prisoners including
raising and stregthening of
existing main Compound Wall.
512 Construction of Special Courts 3
Nos:(revised 10 Nos) @ Central
Prison Karachi (Revised).

Karachi

Approved
21.04.11

June-17

359.919

177.500

30.000

0.000

207.500

152.419

30.000

0.000

30.000

0.000

58

66

61.210

61.210

Karachi

Approved
14.03.14

June-15

119.538

0.169

40.000

0.000

40.169

79.369

79.369

0.000

79.369

0.000

34

100

0.000

0.000

513 Conversion of Barrack into ward


@ JPMC Karachi.
514 Construction of boundary wall
around District Prison Badin.
515 Rehabilitation/Renovation of
Jails in Sindh (Karachi /
Hyderabad / Dadu / Sanghar /
Badin / Mirpurkhas / S.B.A /
Sukkur / Shikarpur / Khairpur /
Larkana / Jacobabad)

Karachi

Approved
28.06.13
Approved
12.11.13
Approved
07.02.12

June-15

16.849

0.000

4.165

0.000

4.165

12.684

1.000

0.000

1.000

0.000

25

31

5.842

5.842

June-16

60.000

0.000

8.000

0.000

8.000

52.000

20.000

0.000

20.000

0.000

13

47

16.000

16.000

June-14

1048.268

576.301

84.399

0.000

660.700

387.568

40.000

0.000

40.000

0.000

63

67

173.784

173.784

Badin
Sindh

[ 96 ]

PROVINCIAL
HOME DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District
3

516 Construction of Judicial Lock-up


Sindh
in all over Sindh.(Karachi /
Hyderabad / Jamshoro / Dadu /
Sanghar / Badin / Umerkot /
Tharparkar)
517 Construction of covered passage
Sukkur
for Prisoners from Central PrisonII to District & Session Court
Sukkur.
518 Improvement / Strengthening of
Karachi,
Security of Central Prison
Hyderabad,
Karachi, Hyderabad, Sukkur,
Sukkur,
Larkana.
Larkana
519 Construction of Rooms for
Karachi,
keeping the spouses with
Hyderabad,
convicted prionsers at the Sindh
Larkana,
Central Prions Karachi, Centreal
Sukkur,
Hyd:, Central Prions Larkana,
Khairpur
Central Prison-I, Sukkur,
Central Prison-II, Sukkur,
Central Prison Khairpur, District
Prison Malir Karachi,

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
7

Total
8

Estimated ThrowforAllocation for 2015-16


Expendit- ward as
ure upto
on
F.P.A. June' 15 01-07-15 Capital Revenue Total

Approved
19.10.10

June-16

53.827

31.625

15.000

0.000

46.625

Approved
28.06.13

June-15

7.249

3.000

3.550

0.000

Approved
07.11.13

June-17

1494.441

50.000

400.000

Approved
26.12.14

June-17

138.926

0.000

4695.961 1993.762

Total Jail Deptt: (GOB) On-Going

Revised
Allocation
2014-15

10

11

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projection
2016-17

2017-18

18

19

12

13

14

15

16

17

7.202

7.202

0.000

7.202

0.000

87

100

0.000

0.000

6.550

0.699

0.699

0.000

0.699

0.000

90

100

0.000

0.000

0.000

450.000

1044.441

225.844

0.000

225.844

0.000

30

45

409.299

409.299

0.000

0.000

0.000

138.926

5.000

0.000

5.000

0.000

66.963

66.963

672.025

0.000

2665.787

2030.174

521.602

0.000

521.602

0.000

792.466

733.097

0.000

0.000

0.000

15.000

3.750

0.000

3.750

0.000

5.625

5.625

Government Office Building


Jail Department
(New Scheme)
520 Construction of Filter Plant at
District Jail Shaheed
Benazirabad

S.B.A.

UnApproved

June-16

15.000

0.000

25

[ 97 ]

PROVINCIAL
HOME DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District
3

521 Strengthening of Security of


Karachi
Barracks by providing and fixing
heavy iron grills in doors,
windows and ventilators at
District Prison Malir Karachi
Total Jail Deptt: (GOB) New Scheme
Total Jail Deptt: (GOB)
Total Jails Deptt: (Ongoing) :Total Jails Deptt: (New):Total Jails Deptt:-

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4

UnApproved

June-16

Revised
Allocation
2014-15
Total

Estimated ThrowforAllocation for 2015-16


Expendit- ward as
ure upto
on
F.P.A. June' 15 01-07-15 Capital Revenue Total

23.015

0.000

0.000

0.000

38.015
0.000
4733.976 1993.762
4695.961 1993.762
38.015
0.000
4733.976 1993.762

0.000
672.025
672.025
0.000
672.025

10

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

11

12

13

14

15

16

17

0.000

23.015

5.750

0.000

5.750

0.000

25

0.000
0.000
0.000
0.000
0.000

0.000
2665.787
2665.787
0.000
2665.787

38.015
2068.189
2030.174
38.015
2068.189

9.500
531.102
521.602
9.500
531.102

0.000
0.000
0.000
0.000
0.000

9.500
531.102
521.602
9.500
531.102

0.000
0.000
0.000
0.000
0.000

Financial Projection
2016-17

2017-18

18

19

8.633

8.633

14.258
806.724
792.466
14.258
806.724

14.258
747.355
733.097
14.258
747.355

0.000

0.000

100.000

78.199

INFORMATION TECH: (Jails)


(On-going Schemes)
522 Installation of Mobile Jammers in Karachi,
various Prisons of Sindh
Hyderabad,
Province.
Khairpur,
Sukkur,
Larkana
523 Improvement in Security System
Karachi,
by Installing CCTV System at
Hyderabad,
Central Jail Karachi, Juvenile
Sukkur,
Jail Karachi, Women Jail
Larkana
Karachi, District Prison Malir,
Karachi, Central Prioson
Hyderabad, Women Prison
Hyderabad, Juvenile Prison
Hyderabad, Central Prison
Sukkur, Central Prison Larkana,
Women Prison Larkana &
Remand Home at Central Prison,
Karachi
Total Information Tech: (Jails) :Total Home (Ongoing) :Total Home (New) :Total HOME DEPARTMENT :-

Approved
20.02.13

June-15

88.072

26.000

25.208

0.000

51.208

36.864

0.000

36.864

36.864

0.000

58

100

Approved
19.03.14

June-15

194.839

0.000

0.000

0.000

0.000

194.839

0.000

15.676

15.676

0.000

282.911
26.000
25.208
8473.028 2904.789 1066.921
338.713
0.000
0.000
8811.741 2904.789 1066.921

0.000
0.000
0.000
0.000

51.208
3971.710
0.000
3971.710

231.703
4517.841
338.713
4856.554

0.000
862.785
84.675
947.460

52.540
52.540
52.540 915.325
0.000
84.675
52.540 1000.000

0.000
0.000
0.000
0.000

100.000
78.199
1881.236 1747.307
127.019 127.019
2008.255 1874.326

[ 98 ]

SUMMARY
INDUSTRIES & COMMERCE DEPARTMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
(Rs. In million)
Sr
No.

Sector / Sub-Sector

Sindh Small Industries


Corporation

SITE limited

3
4

On-Going
ThrowNo. of
forward as
Schemes Capital Revenue
on 01.07.15
3

New
Total
7

No. of
Schemes Capital
8

Total

Revenue

Total

No. of
Schemes

10

11

12

13

57.432

85.012

865.000 1520.000 2385.000

0.000

Capital

Revenue

Total

14

15

16

85.012

865.000 1520.000 2385.000

Financial Projection
2016-17

2017-18

17

18

19

0.000

85.012

74.078

0.000

2385.000

27.580

0.000

27.580

4979.470

0.000

0.000

0.000

Printing and Stationary


Department

62.223

0.000

0.000

0.000

15.565

0.000

15.565

15.565

0.000

15.565

0.000

15.565

23.329

23.329

Directorate of Industries

57.695

0.000

0.000

0.000

14.423

0.000

14.423

14.423

0.000

14.423

0.000

14.423

21.636

21.636

5258.478

27.580

0.000

27.580

11

980.000 1520.000 2500.000

0.000

2500.000

952.420 1520.000 2472.420

14

0.000

Grand
Total
(15+16)

159.090

Total Industries Department

57.432

FPA

0.000

1297.235 1297.235

1416.278 1342.200

[ 99 ]

PROVINCIAL
INDUSTRIES & COMMERCE DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District

Status
Date of
Approval

Target
Date for
Completion

Ghotki

Approved
04.12.03
(U/R)
Approved
30.09.05
(U/R)
Approved
31.01.12
(U/R)

Actual
Estimated ExpenditCost
ure upto
June, 14

Revised
Estimated
ThrowforAllocation for 2015-16
Allocation
Expenditward as on
2014-15
ure upto
01-07-15
Capital Revenue
Total
Total F.P.A. June' 15

June-16

29.658

18.919

0.000

June-16

79.518

69.685

June-16

158.037

10

11

12

0.000

18.919

10.739

10.739

0.000

0.000

69.685

9.833

121.028

30.001

0.000

151.029

267.213

209.632

30.001

0.000

13

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projection
2016-17

2017-18

18

19

14

15

16

17

0.000

10.739

0.000

64

100

0.000

0.000

9.833

0.000

9.833

0.000

88

100

0.000

0.000

7.008

7.008

0.000

7.008

0.000

96

100

0.000

0.000

239.633

27.580

27.580

0.000

27.580

0.000

0.000

0.000

Sindh Small Industries Corporation


ON-GOING SCHEMES
524

525

526

Small Industrial Estate, Ghotki


(50 acres),(To be funded out of 10%
share of Royalty)
Up-gradation of 9 SIEs (Thatta,
Sanghar, Dadu, Hala, Badin,
Nawabshah, Rohri and I.P. Sehwan,
Mirpurkhas). ( Revised)
Artisan City, Hala (10 acres land)

Sindh

Matiari

Total On-going:
New Schemes
527

Establishment of un-developed area


of SIE Nawabshah

S.B.A

Unapproved

June-17

59.740

0.000

0.000

0.000

0.000

59.740

23.532

0.000

23.532

0.000

39

36.208

0.000

528

Establishment of un-developed area


of SIE Thatta

Thatta

Unapproved

June-17

45.320

0.000

0.000

0.000

0.000

45.320

19.784

0.000

19.784

0.000

44

25.536

0.000

529

Establishment of un-developed area


of SIE Sanghar

Sanghar

Unapproved

June-17

26.450

0.000

0.000

0.000

0.000

26.450

14.116

0.000

14.116

0.000

53

12.334

0.000

131.510
398.723

0.000
209.632

0.000
30.001

0.000
0.000

0.000
239.633

131.510
159.090

57.432
85.012

0.000
0.000

57.432
85.012

0.000
0.000

74.078
74.078

0.000
0.000

0.000

0.000

0.000

0.000

1019.470

255.000

0.000

255.000

0.000

382.235

382.235

Total (New Schemes):


Total SSIC :S.I.T.E LIMITED
NEW SCHEMES
530

Development of Infrastructure at
SITE Nooriabad, Karachi,
Hyderabad & Sukkur.

Karachi,
Approved
Hyderabad, 22.04.15
Jamshoro,
Sukkur

June-17

1,019.470

25

[ 100 ]

PROVINCIAL
INDUSTRIES & COMMERCE DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

1
531

532

533
534

2
Consultancy Services for
Establishment of Four Combined
Effluent Treatment Plant (CETP)
for Industrial Areas of Karachi
including laying of interceptor
sewers.
Improvement of infrastructure
Development at SITE Super
Highway (Phase-I & II).
Infrastructure Development of
Industrial Estate, Larkana
Revival of Sick Industrial Units

Location
of
Scheme/
District

Status
Date of
Approval

Target
Date for
Completion

Karachi

Approved
14.05.15

June-16

Karachi

Unapproved

Larkana

Unapproved
Unapproved

Sindh

Actual
Estimated ExpenditCost
ure upto
June, 14
7

20.000

0.000

0.000

0.000

0.000

June-17

440.000

0.000

0.000

0.000

June-17

2,000.000

0.000

0.000

June-17

1,500.000

0.000

4,979.470

Total SITE Ltd:-

Revised
Estimated
ThrowforAllocation for 2015-16
Allocation
Expenditward as on
2014-15
ure upto
01-07-15
Capital Revenue
Total
Total F.P.A. June' 15
9

10

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projection
2016-17

2017-18

18

19

11

12

13

14

15

16

17

20.000

0.000

20.000

20.000

0.000

100

0.000

0.000

0.000

440.000 110.000

0.000

110.000

0.000

25

165.000

165.000

0.000

0.000

2000.000 500.000

0.000

500.000

0.000

25

750.000

750.000

0.000

0.000

0.000

1500.000

0.000

1500.000 1,500.000

0.000

100

0.000

0.000

0.000

0.000

0.000

0.000

4,979.470

865.000

1,520.000

2,385.000

0.000

1297.235 1297.235

Printing & Stationery Department


NEW SCHEMES
535

Upkeeping of Buildings of Printing


and Stationary Govt. Press Karachi

Karachi

Approved
10.03.15

June-17

26.261

0.000

0.000

0.000

0.000

26.261

6.565

0.000

6.565

0.000

25

9.848

9.848

536

Up-gradation of buildings of Sindh


Government Press, Khairpur.

Khairpur

UnApproved

June-17

35.962

0.000

0.000

0.000

0.000

35.962

9.000

0.000

9.000

0.000

25

13.481

13.481

62.223

0.000

0.000

0.000

0.000

62.223

15.565

0.000

15.565

0.000

23.329

23.329

57.695

0.000

0.000

0.000

0.000

57.695

14.423

0.000

14.423

0.000

21.636

21.636

57.695
267.213
5230.898
5498.111

0.000
209.632
0.000
209.632

0.000
30.001
0.000
30.001

0.000
0.000
0.000
0.000

0.000
239.633
0.000
239.633

57.695
27.580
5230.898
5258.478

14.423
27.580
952.420
980.000

0.000
0.000
1520.000
1520.000

14.423
27.580
2472.420
2500.000

0.000
0.000
0.000
0.000

Total Printing & Stat. Deptt:Directorate of Industries


NEW SCHEMES
537

Construction of Officers residential Hyderabad


accommodation office of the Deputy
Director Industries.
Total Directorate of Ind:Total ( ON-GOING):
Total (NEW):
Total Industries & Commerce

UnApproved

June-17

25

21.636
21.636
0.000
0.000
1416.278 1342.200
1416.278 1342.200

[ 101 ]

SUMMARY
INFORMATION & ARCHIVES DEPARTMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
Sr
No.

Sub-Sector

ThrowNo. of
forward as
Schemes Capital
on 01.07.15
3
4
5

On-Going

New

Total

Revenue

Total

No. of
Schemes

Capital

Revenue

Total

No. of
Schemes

Capital

Revenue

Total

10

11

12

13

14

15

16

Grand
Total
(15+16)
17

FPA

(Rs. In million)
Financial Projection
2016-17

2017-18

18

19

Information & Archives

609.750

0.000

188.500

188.500

52.500

0.000

52.500

13

52.500

188.500

241.000

12.000

253.000

368.750

0.000

Total Information &


Archives Department

609.750

0.000

188.500

188.500

52.500

0.000

52.500

13

52.500

188.500

241.000

12.000

253.000

368.750

0.000

[ 102 ]

PROVINCIAL
INFORMATION & ARCHIVES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

2016-17

2017-18

10

11

12

13

14

15

16

17

18

19

Karachi

Approved
08.01.15
Approved
08.01.15
Approved
25.09.14
Approved
25.09.14

June-16

50.000

0.000

0.000

0.000

0.000

50.000

0.000

2.800

2.800

0.000

47.200

0.000

June-16

59.000

0.000

0.000

0.000

0.000

59.000

0.000

3.644

3.644

0.000

55.356

0.000

June-17

58.310

0.000

9.674

0.000

9.674

48.636

0.000

14.400

14.400

0.000

17

41

34.236

0.000

June-17

57.500

0.000

6.462

0.000

6.462

51.038

0.000

10.000

10.000

0.000

11

29

41.038

0.000

Approved
25.09.14
Approved
25.09.14

June-16

58.400

0.000

8.679

0.000

8.679

49.721

0.000

49.721

49.721

0.000

15

100

0.000

0.000

June-17

56.560

0.000

8.362

0.000

8.362

48.198

0.000

14.778

14.778

12.000

15

41

33.420

0.000

Karachi

Approved
25.09.14

June-16

55.900

0.000

10.612

0.000

10.612

45.288

0.000

45.288

45.288

0.000

19

100

0.000

0.000

Karachi

Approved
25.09.14

June-16

57.700

0.000

9.831

0.000

9.831

47.869

0.000

47.869

47.869

0.000

17

100

0.000

0.000

453.370

0.000

53.620

0.000

53.620

399.750

0.000

188.500

188.500

12.000

211.250

0.000

Status
Date of
Approval

Actual Revised Allocation Estimated


Target
Estimated ExpenditExpendit2014-15
Date for
Cost
ure upto
ure upto
Completion
June, 14
June' 15
Total
F.P.A.

Throwforward
as on
01-07-15

Financial
Progress in
%age upto

Location
of
Scheme/
District

Allocation for 2015-16


FPA
Capital Revenue

Total

Jun'15 Jun'16

Financial Projection

Information & Archives


On-Going Schemes
538
539
540
541

542
543

544

545

546

Capacity Building of Officers of


Information Department (R:50.000)
Establishment of Central Library of
Information Department (R:59.000)
Preservation of Rare Maps available at
Sindh Archives (Phase-I) (R:58.310)
Preservation of Fragile Judicial Record
(1866-1947) available at Sindh Archives
(Phase-I) (R:57.500)
Establishment of Reprography Lab at
Sindh Archives (R:58.400)
Preservation of Rare manuscripts
available at Sindh Archives (Phase-I)
(R:56.560)
Establishment of Exhibition Gallery
(Display & Collections of Collectibles) at
Sindh Archives (R:55.900)
Establishment of Museum at Sindh
Archives (R:57.700)
Total (On-Going Schemes)

Karachi
Karachi
Karachi

Karachi
Karachi

New Schemes
Establishment of District Archives
Hyderabad

Hyderabad

UnApproved

June-17

40.000

0.000

0.000

0.000

0.000

40.000

10.000

0.000

10.000

0.000

25

30.000

0.000

547

Establishment of District Archives


Mirpurkhas

Mirpurkhas

UnApproved

June-17

40.000

0.000

0.000

0.000

0.000

40.000

10.000

0.000

10.000

0.000

25

30.000

0.000

548

Establishment of District Archives


Sukkur
Establishment of District Archives
Larkana

Sukkur

UnApproved
UnApproved

June-17

40.000

0.000

0.000

0.000

0.000

40.000

10.000

0.000

10.000

0.000

25

30.000

0.000

June-17

40.000

0.000

0.000

0.000

0.000

40.000

10.000

0.000

10.000

0.000

25

30.000

0.000

UnApproved

June-17

50.000

0.000

0.000

0.000

0.000

50.000

12.500

0.000

12.500

0.000

25

37.500

0.000

210.000
663.370

0.000
0.000

0.000
53.620

0.000
0.000

0.000
53.620

210.000
609.750

52.500
52.500

0.000
188.500

52.500
241.000

0.000
12.000

157.500
368.750

0.000
0.000

549
550

Repair & Renovation of Sindh Archives


Complex @ Clifton-Karachi, Phase-I.
Total (New Schemes)
Total Information & Archives Department

Larkana
Karachi

[ 103 ]

SUMMARY
INFORMATION, SCIENCE & TECHNOLOGY DEPARTMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
Sr
No.

Sub-Sector

Information, Science &


Technology
Total Information, Science &
Technology Deptt:-

ThrowNo. of
forward as
Schemes
on 01.07.15

On-Going
Capital

Revenue

Total

1563.611

0.000

400.000

1563.611

0.000

400.000

No. of
Schemes

New
Capital Revenue

10

400.000

0.000

100.000

400.000

0.000

100.000

Total

No. of
Schemes

FPA

Grand
Total
(15+16)

16

17

Total

(Rs. In million)
Financial
Projection

Capital

Revenue

Total

12

13

14

15

100.000

0.000

500.000

500.000

0.000

500.000 1063.611

0.000

100.000

0.000

500.000

500.000

0.000

500.000 1063.611

0.000

11

2016-17

2017-18

18

19

[ 104 ]

PROVINCIAL
INFORMATION, SCIENCE & TECHNOLOGY DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Actual
Status Target Date
Estimated Expenditu
Date of
for
Cost
re upto
Approval Completion
June, 14

Revised
Allocation
2014-15

Estimated ThrowforAllocation for 2015-16


Expendit- ward as
ure upto
on
F.P.A. June' 15 01-07-15 Capital Revenue Total
9
10
11
12
13
14

FPA

Financial Progress
in %age upto

15

Jun'15 Jun'16
16
17

Financial
Projection

Total
8

1057.016

0.626

10.165

0.000

10.791

1046.225

0.000

282.614

282.614

0.000

28

763.611

0.000

June-15

59.686

0.000

0.500

0.000

0.500

59.186

0.000

59.186

59.186

0.000

100

0.000

0.000

June-16

59.000

0.000

0.800

0.000

0.800

58.200

0.000

58.200

58.200

0.000

100

0.000

0.000

1175.702

0.626

11.465

0.000

12.091

1163.611

0.000

400.000

400.000

0.000

763.611

0.000

Approved
01.06.12

June-15

Approved
21.11.12
Approved
31.10.14

2016-17
18

2017-18
19

INFORMATION, SCIENCE & TECHNOLOGY


(On-Going Schemes)
551 Development of a Core Geographic
Sindh
Information System (GIS) with
Specialized overlays
552 Establishment of IT Training
Karachi
Center / IT Services Center (PhaseI)
553 Barani area water availability study/ Karachi
pilot water supply project District
Malir
Total Information Tech. (On-going Schemes)
INFORMATION, SCIENCE & TECHNOLOGY
(New schemes)
554 Arfa Kareem IT City, Karachi
(Phase-II)
555 E-Portal for all Govt of Sindh
Departments (Webs for all Deptt.)
556 e-Management System for IS&T
Department, Government of Sindh.

Karachi

UnApproved
UnApproved
UnApproved

June-17

300.000

0.000

0.000

0.000

0.000

300.000

0.000

75.000

75.000

0.000

25

225.000

0.000

June-17

40.000

0.000

0.000

0.000

0.000

40.000

0.000

10.000

10.000

0.000

25

30.000

0.000

June-16

30.000

0.000

0.000

0.000

0.000

30.000

0.000

7.500

7.500

0.000

25

22.500

0.000

557 Preclinical & Clinical Studies for


drug development against infectious
diseases.
558 Establishment of Research
Incubators in Public Sector
Universities/ Institutions (Phase-I).

Karachi

UnApproved

June-17

20.000

0.000

0.000

0.000

0.000

20.000

0.000

5.000

5.000

0.000

25

15.000

0.000

Sindh

UnApproved

June-16

10.000

0.000

0.000

0.000

0.000

10.000

0.000

2.500

2.500

0.000

25

7.500

0.000

400.000
1575.702

0.000
0.626

0.000
11.465

0.000
0.000

0.000
12.091

400.000
1563.611

0.000
0.000

100.000
500.000

100.000
500.000

0.000
0.000

300.000
1063.611

0.000
0.000

Karachi
Karachi

Total Information, Science & Technology (New Schemes)


Total Information, Science & Technology

[ 105 ]

SUMMARY
IRRIGATION DEPARTMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
( Rs. in million )
Sr
No.

Sub-Sector

ThrowNo. of
forward as
Schemes
on 01.07.15

On-Going

No. of
Schemes

New
Revenue

Total

10

11

FPA

Total

1296.569

0.000

42.000

42.000

200.000

92.500

292.500

200.000

134.500

334.500

0.000

334.500

0.000

404.617

85

2751.075

0.000

2751.075

0.000

2751.075

0.000 2239.732

218

8416.335

12.000

8428.335

9457.470

0.000

98.982

14

486.090

0.000

486.090

0.000

92.500 3035.831

324

11853.500

146.500

12000.000

9457.470

Survey & Investigation

Drainage Reclamation &


Tubewells

20349.732

71

2346.458

0.000

2346.458

14

404.617

Open Canals

64746.031

175

6176.603

12.000

6188.603

43

2239.732

Small Dams Project

4939.462

12

387.108

0.000

387.108

98.982

91331.794

261

8910.169

54.000

8964.169

63

2943.331

12

Capital

Revenue

Total

13

14

15

Grand
Total
(15+16)

Revenue

Total Irrigation Department

Total

Capital

Capital

No. of
Schemes

16

17

Financial Projection
2016-17

2017-18

18

19

462.069

500.000

5886.218 11474.868

17885.805 20025.523 36292.873

486.090

850.000

3603.372

21457.470 27223.810 51871.113

[ 106 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

Survey & Investigation


(On-Going Schemes)
559

560

561

Establishment of Planning,
Monitoring & Evaluation Cell in
Irrigation & Power Department.
(Revised)
Pilot Project for performing water
monitoring, automated real time
availability telemetry system for
Rohri Canal at Selected off takes.
Feasibility Study for the
Construction of Sehwan-Manchar
Barrage and Reservoir.

Karachi

Approved
24.2.12

June-15

50.603

21.499

9.104

0.000

30.603

20.000

0.000

10.000

10.000

0.000

60

80

10.000

0.000

Hyderabad Approved
15.5.14

June-16

66.339

0.000

0.000

0.000

0.000

66.339

0.000

8.000

8.000

0.000

12

58.339

0.000

June-15

40.000

0.000

0.000

0.000

0.000

40.000

0.000

24.000

24.000

0.000

60

16.000

0.000

156.942

21.499

9.104

0.000

30.603

126.339

0.000

42.000

42.000

0.000

84.339

0.000

Jamshoro

Approved
25.9.14

Total Survey Investigation (On-going)


Survey & Investigation
(New Schemes)
562

563

564

565

Feasibility Study / Planning for


Supplying Ecological Flows into
Manchar Lake
Feasibility Study of Command
Area Development of Darawat
Dam with High Efficiency
Irrigation System
Feasibility study to Revisit
Inherent Design Problems of Ruk
Complex and other Distribution
Structure.
Procurement of Consultancy
Services for Construction of
Bukher Bridge over River Indus
between Sukkur Barrage and
Landsdowne Bridge.
Total Survey Investigation (New)
Total Survey Investigation

Dadu

UnApproved

June-18

1000.000

0.000

0.000

0.000

0.000

1000.000

200.000

50.000

250.000

0.000

25

250.000

500.000

Sukkur

UnApproved

June-17

48.230

0.000

0.000

0.000

0.000

48.230

0.000

12.000

12.000

0.000

25

36.230

0.000

Sukkur

UnApproved

June-17

25.000

0.000

0.000

0.000

0.000

25.000

0.000

6.250

6.250

0.000

25

18.750

0.000

Sukkur

UnApproved

June-17

97.000

0.000

0.000

0.000

0.000

97.000

0.000

24.250

24.250

0.000

25

72.750

0.000

1170.230
1327.172

0.000
21.499

0.000
9.104

0.000
0.000

0.000
30.603

1170.230
1296.569

200.000 92.500
200.000 134.500

292.500
334.500

0.000
0.000

377.730
462.069

500.000
500.000

[ 107 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

Drainage Reclamation & Tubewells


(On-Going Schemes)
566

567

568
569

570

571

572

573

Small Surface Drainage Scheme


Jagir Ali Akbar Near Kumb (ReRevised), (To be funded out of
10% share of Royalty)
Construction of 1RE Sub-Drain
RD-0 to 35 (Village Abdul Wahab
Khoso), Sub-Drain Qubo Saeed
Khan, 3LA Sub Drain RD-0 to 37
and Extension of 3R Sub-Drain RD
- 18 to 32 of Shahdadkot System in
Drainage Division Larkana.

Khairpur

Approved
22.04.15

June-16

120.000

30.299

1.000

0.000

31.299

88.701

22.000

0.000

22.000

0.000

26

44

66.701

0.000

Qambar

Approved
2.11.11
(UR)

June-15

146.065

69.539

1.850

0.000

71.389

74.676

8.000

0.000

8.000

0.000

49

54

66.676

0.000

Extension of 1R Western Mir Link


Drain (25 RDs)
Installation of 72 Nos. New
Tubewells in Sindh Province
(Revised)
Rehabilitation of Existing
Tubewells and Small Surface
Drainage Scheme Dingro, Jari
Agro.
Construction of Link Drains Haji
Abdullah Shah, Haji Ahmed Zour,
Budho Qambrani, Bhaneri Link
Drain of Taluka Tando Bago &
Badin (Revised)
Surface Drainage Schemes (2 Nos.)
UC Kumb Leema, Deh
Asgharabad & Extension of SubDrain WN-3R District Shaheed
Benazirabad.
Surface Drainage Scheme UC Sabu
Rahu (Nakur) & Jam Sahib
District Shaheed Benazirabad.

Badin

Approved
29.11.12
Approved
22.1.13

June-15

58.053

25.007

14.020

0.000

39.027

19.026

19.026

0.000

19.026

0.000

67

100

0.000

0.000

June-17

440.00

305.000

35.000

0.000

340.000

100.000

43.000

0.000

43.000

0.000

77

87

57.000

0.000

Approved
28.1.12

June-17

199.823

71.999

20.000

0.000

91.999

107.824

25.000

0.000

25.000

0.000

46

59

50.000

0.000

Badin

Approved
29.5.15

June-16

102.034

22.500

39.545

0.000

62.045

39.989

39.989

0.000

39.989

0.000

61

100

0.000

0.000

S.B.A

Approved
13.9.12

June-17

198.058

45.000

138.000

0.000

183.000

15.058

15.058

0.000

15.058

0.000

92

100

0.000

0.000

S.B.A

Approved
13.9.12

June-16

198.462

122.500

74.000

0.000

196.500

1.962

1.962

0.000

1.962

0.000

99

100

0.000

0.000

SBA
Khairpur
Larkana
Ghotki &
Sukkur

[ 108 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

574
575

576

577

578

579

580

581

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Surface Drainage Scheme Near


S.B.A
Nawabshah City
Construction of 20 cusecs Pumping
Matiari
Station at U.C Bhale Dino Kaka in
Deh Kaka
Construction of Sim Drainage
Khairpur
Channel near Village Jumani &
Others belongs Taluka Kotdiji,
District Khairpur (Revised), (To be
funded out of 10% share of
Royalty)
Construction of Pumping Stations
T. A. Yar
of 80 Cusecs to Control Water
Logging Salinity and Drain out
monsoon Water at Chamber,
District Tando Allahyar.
Reboring of Bore Failure Tubewell
Ghotki
and Rehabilitation of Old Direct
Disposal System of Tubewells.(To
be funded out of 10% share of
Royalty)
Construction of Surface Drainage
Sanghar
Scheme in Dobi & Akan Wari in
Taluka & District Sanghar.
De-silting of Drains & Repair of
Thatta
Regulator Gates in Taluka Mirpur
Sakro.
Construction of 3 Nos. Sub-Drain Mirpurkhas
in Taluka Digri.

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

Approved
13.9.12
Approved
7.8.14

June-16

197.692

85.000

50.000

0.000

135.000

62.692

26.000

0.000

26.000

0.000

68

81

36.692

0.000

June-15

50.590

35.590

5.665

0.000

41.255

9.335

9.335

0.000

9.335

0.000

82

100

0.000

0.000

Approved
22.4.15

June-16

75.000

11.607

1.800

0.000

13.407

61.593

17.000

0.000

17.000

0.000

18

41

44.593

0.000

Approved
3.1.13

June-17

195.200

49.977

50.000

0.000

99.977

95.223

35.000

0.000

35.000

0.000

51

69

60.223

0.000

Approved
21.2.13

June-16

69.974

25.000

25.000

0.000

50.000

19.974

19.974

0.000

19.974

0.000

71

100

0.000

0.000

Approved
3.1.13

June-17

258.482

40.000

10.500

0.000

50.500

207.982

25.000

0.000

25.000

0.000

20

29

77.982

100.000

Approved
4.10.12

June-16

90.178

30.000

13.810

0.000

43.810

46.368

20.000

0.000

20.000

0.000

49

71

26.368

0.000

Approved
22.1.13

June-17

184.090

30.000

48.000

0.000

78.000

106.090

35.000

0.000

35.000

0.000

42

61

71.090

0.000

[ 109 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

582

583

584

585

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Remodeling and C.C. Lining of


Khairpur
Carrier Drain of Talpur Wada
Pump Station, Construction of Sim
Drainage Channel near Jumani,
and Bridge over Sim Nala Village
Haji Shah & near at Pir Musafir
and MG-1L Sub-Drain near
Village Jalbani and KN-1L SubDrain Shah Hussain & Other
Taluka Kotdiji, and Re-condition
of Metalic Road, Street Light &
Brick Lining of D/Channel of
T/wells, Construction of Retaining
wall of MB-1L and Rehabilitation
of Water Course Crossing and
Resectioning Earth Work
Excavation over Main Drain
Branch & Sub Drain.. (To be
funded out of 10% share of
Royalty)
Boring & Installation of 250 Nos
Larkana /
Tubewells of 2.0 Cusecs on Solar
Shikarpur /
Energy.
Qamber /
Sukkur
Boring & Installation of 250 Nos
Badin
Tubewells on Solar Energy for
Assured Supply of 100 cusecs for
Thar Coal from LBOD Spinal
Drain RD-362.
Construction of Small Surface
Ghotki &
Drainage Scheme Chanjni. Surface
Sukkur
Drainage System

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

Approved
21.2.13

June-17

199.591

40.100

30.000

0.000

70.100

129.491

43.000

0.000

43.000

0.000

35

57

86.491

0.000

Approved
15.11.12

June-17

2087.110

500.000

180.000

0.000

680.000

1407.110

120.000

0.000

120.000

0.000

33

38

327.110

1000.000

Approved
19.10.12

June-17

1971.000

0.000

3.400

0.000

0.000

1971.000

69.779

0.000

69.779

0.000

300.000

1591.000

Approved
1.2.13

June-16

57.610

20.000

25.000

0.000

45.000

12.610

12.610

0.000

12.610

0.000

78

100

0.000

0.000

[ 110 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

586

Construction of Additional
structures along Sub-Drain Ghar
System and 2 Nos. Bridges on SubDrain Miro Khan System RD-21
near Village Wali Dino Shar and
Bridge on Sim Nala near Village
Deh Aabri, Village Faiz
Muhammad.
C.C Lining of Nurrar Branch
Drain, Mari Branch Drain & Brick
Lining of D/Channel of tubewell
No. F-188 Chandia More to
Technical College Khairpur. (To be
funded out of 10% share of
Royalty)
Construction / Extension of SubDrain S-2R from RD-24+674 to
72+194 in Taluka & District
Sanghar (Revised)
Construction of Surface Drainage
Scheme in Deh Dethki in Union
Council Shahmir Rahu Taluka
New Saeedabad District Matiari
Construction of Seepage Drain
from RD-0+000 to 12+000, Link
Drain from RD-0+000 to 2+000 &
Pumping Station Ghulam Hussain
Bhambhro along Right Side of
Rohri Main Canal at RD-245
(Revised), (To be funded out of
10% share of Royalty)
Surface Drainage scheme in Deh 5
& 6 Chak Taluka Daur District
SBA
Surface Drainage Scheme in Deh
Khajar Taluka Daulatpur Dist:
SBA

587

588

589

590

591

592

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

Larkana

Approved
27.5.14

June-16

58.560

15.000

16.000

0.000

31.000

27.560

27.560

0.000

27.560

0.000

53

100

0.000

0.000

Khairpur

Approved
8.11.12

June-17

195.000

20.000

50.000

0.000

70.000

125.000

40.000

0.000

40.000

0.000

36

56

85.000

0.000

Sanghar

Approved
27.1.15

June-17

154.103

30.000

44.000

0.000

74.000

80.103

25.000

0.000

25.000

0.000

48

64

55.103

0.000

Matiari

Approved
07.11.13

June-16

170.733

45.202

99.000

0.000

144.202

26.531

26.531

0.000

26.531

0.000

84

100

0.000

0.000

Khairpur

Approved
23.1.15

June-16

59.808

10.000

15.882

0.000

25.882

33.926

33.926

0.000

33.926

0.000

43

100

0.000

0.000

S.B.A

Approved
07.11.13

June-16

120.720

25.000

30.044

0.000

55.044

65.676

15.000

0.000

15.000

0.000

46

58

50.676

0.000

S.B.A

Approved
07.11.13

June-17

150.918

25.000

49.335

0.000

74.335

76.583

20.000

0.000

20.000

0.000

49

63

56.583

0.000

[ 111 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

593

594

595

596

597

598

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Providing Slab Over Retaining


Larkana
Wall along 2 R Sub Drain of
Larkana South System from RD8+700 to 1300+00
Installation of 40 Nos. Tubewells in
SBA
various Dehs under Directives
including Two Nos. T/Wells of
Misri Khan Jamali
Sanction Link Drain for Drain Out T. M. Khan
Rainy/Surplus Water of Four Dehs
Kas, Dhandh Dhabho, Ali Pur and
Soomra, U.C. Mula Katiyar and
Extension of Bukhari Link Drain
at RD-8 to 16 & Dhandi Link
Drain RD-10 to 16 Deh Seerani and
Sathia, Taluka Bulri Shah Karim
(Revised)
Rehabilitation of Karo Naro
Ghotki &
Surface Drain RD-0 to 270 & Sub
Sukkur
Surface Drains.
Construction of Link of German
Thatta
Dhoro Outfall Drain from RD 0.0
to 15.0 Link of Jherruck Sub Drain
from RD 0.0 to 15.0 Samki Link
Drain of Ghorabari O/F Drain RD
0 to 15, water course X-ing/Road
Bridge along Jam Sakro Outfall
Drain RD 140.0 and Construction
of Open Barrel Syphon under old
Baghar Escape for Purandas
Branch Drain at RD 0.0 (Lower
Sindh Drainage Circle)
Rehabilitation of Drainage
Thatta
Network and Allied Works in
District Thatta (PS-88)

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

Approved
09.10.13

June-16

55.964

25.000

8.000

0.000

33.000

22.964

22.964

0.000

22.964

0.000

59

100

0.000

0.000

Approved
07.11.13

June-17

270.000

25.000

200.000

0.000

225.000

45.000

45.000

0.000

45.000

0.000

83

100

0.000

0.000

Approved
27.1.15

June-16

322.163

25.000

60.000

0.000

85.000

237.163

35.000

0.000

35.000

0.000

26

37

50.000

50.000

Approved
17.1.14

June-17

296.013

25.000

65.000

0.000

90.000

206.013

26.000

0.000

26.000

0.000

30

39

66.013

100.000

Approved
12.12.13

June-17

190.000

5.000

92.000

0.000

97.000

93.000

18.000

0.000

18.000

0.000

51

61

75.000

0.000

Approved
12.12.13

June-17

175.000

10.000

46.000

0.000

56.000

119.000

25.000

0.000

25.000

0.000

32

46

94.000

0.000

[ 112 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

599

Construction of Surface Drain and


Three Pumping Stations in Taluka
Ubauro, District Ghotki. (i)
Construction of Chanali Surface
Drainage Scheme Ubauro (ii)
Construction of 2 Nos. Pumping
Station at RD-78 Ghotki Feeder
Ubauro (iii) Construction of
Pumping Station at RD-15 Masu
Wah Ubauro, District Ghotki.
Construction of Link Drain at RD
0.0 to 25 out-falling in Seerani
Branch Drain at RD 40 IP side for
Village Pir Buksho and ARO
Pusio, U.C Seerani; (ii)
Construction of Link Drain RD 0.0
to 14 out-falling in 6-R Tando Bago
Sub-Drain at RD 22 IP side for
Village Mir Ali Muhammad Talpur
Deh Motana Taluka Tando Bago;
(iii) Construction of Link Drain
RD 0.0 to 25 out-falling in 6-R
Tando bago Sub-Drain at RD 32
for Village Haji Arbab Katiar &
Ahmed Katiar & other Deh
Fatehpur Hameera Taluka Tando
Bago and (iv) Extension /
Construction of 16-AL Sub-Drain
(LBOD) length 20 RD's for Village
Kazi Suriyo Rahokro Deh Ghono
and Phusana Taluka Talhar,
District Badin

600

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

Ghotki

Approved
03.12.13

June-17

159.497

7.000

25.000

0.000

32.000

127.497

25.000

0.000

25.000

0.000

20

36

102.497

0.000

Badin

Approved
21.2.13

June-17

119.278

0.000

61.139

0.000

61.139

58.139

25.000

0.000

25.000

0.000

51

72

33.139

0.000

[ 113 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

601

602

603
604

605

606

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Restoration of 200 Nos Existing


Khairpur Approved
Tube wells under closed in Major
14.2.14
Faults & Reboring of 50 Nos. Bore
Failure Tubewells & Pacca Sim
Nala from Wali Muhammad
Kandhro to Babar Jo Goth P4L
Main Nala in District Khairpur,
(To be funded out of 10% share of
Royalty)
Rehabilitation of Naudero
Larkana Approved
Pumping Station with allied Works
12.12.13
and Rehabilitation of Remodelling
of Zakria & Hyder Chandio
System
Construction of Ladiun Branch
Thatta
Approved
Drain System (Remaining Works)
03.12.13
Re-boring / Re-installation and
Khairpur Approved
Major Repairs of Fresh Water
03.12.13
Tubewells situated in Tail Area of
Taluka Sobhodero and Gambat,
District Khairpur (15 Nos.
Tubewells of 3.00 Cusecs), (To be
funded out of 10% share of
Royalty)
Restoration/Rehabilitation of
Badin /
Approved
LBOD and Kotri Drainage
Mirpurkhas 3.12.14
Network System including
/ T.M Khan
activation of Dhoras - Phase-II
/ Thatta
Rehabilitation of SCARP Drains & Larkana Approved
Allied Structure Works in Larkana
18.2.15
Shikarpur Drainage Project

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

June-17

450.000

25.000

120.000

0.000

145.000

305.000

50.000

0.000

50.000

0.000

32

43

255.000

0.000

June-17

190.000

10.000

95.000

0.000

105.000

85.000

17.000

0.000

17.000

0.000

55

64

68.000

0.000

June-17

249.859

10.000

40.000

0.000

50.000

199.859

35.000

0.000

35.000

0.000

20

34

59.859

100.000

June-17

90.000

25.000

30.000

0.000

55.000

35.000

35.000

0.000

35.000

0.000

61

100

0.000

0.000

June-16

3458.746

0.000

4.000

0.000

4.000

3454.746

200.000

0.000

200.000

0.000

300.000

2954.746

June-17

800.000

0.000

10.000

0.000

10.000

790.000

60.000

0.000

60.000

0.000

100.000

650.000

[ 114 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

607

608

609

610

611

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Construction of Retaining Wall


Larkana /
along 2R Sub Drain of SKT System Qamberfrom RD-30 to 37 NIP Side &
Shahdadkot
Construction of Pumping Station at
RD-42 of Mirokhan Main Drain
near Dost Ali Banglow over Warah
Canal.
Installation of 50 Nos. T/Wells
Larkana,
under Directives i/c Deh
Shikarpur,
Fareedabad Barani District Dadu
Dadu
and Re-boring of 13 Nos. Bore
Failure T/Wells and Restoration of
70 T/Wells closed due to
transformers defect and 48 Nos.
closed due to 11 KVA Line
including Rehabilitation of Ruk
Gharhi Yaseen & Masiti Pumping
Station.
Construction of Sub-Drain (2L) of
Larkana
Panhwaro Main Drain System RD0 to 12+500 in Deh Lakhtia Khai
Meenho & Excavation of Ghar
Main Drain from Thorhi Bajar to
Sodhar Village & Excavation of
Panhwaro Drains System with
Damage Structture.
Construction of Pumping Station,
N. Feroze
Sim Nalas at Deh New Darbelo,
Deh Mad Aleem Taluka Kandiaro
& Bhiria, District Naushahro
Feroze.
Construction of Pumping Station
N. Feroze
and Sim Nalas at Deh Khairwah
and Deh Dabhro District
Naushahro Feroze

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

Approved
27.1.15

June-17

178.369

0.000

0.000

0.000

0.000

178.369

17.000

0.000

17.000

0.000

10

53.369

100.000

Approved
27.1.15

June-17

575.752

0.000

10.000

0.000

10.000

565.752

68.000

0.000

68.000

0.000

14

100.000

400.750

Approved
18.2.15

June-16

499.676

0.000

0.000

0.000

0.000

499.676

35.000

0.000

35.000

0.000

100.000

359.680

Approved
13.1.15

June-17

260.574

0.000

0.000

0.000

0.000

260.574

30.000

0.000

30.000

0.000

12

100.000

0.000

Approved
26.12.14

June-17

244.799

0.000

0.000

0.000

0.000

244.799

30.000

0.000

30.000

0.000

12

100.000

0.000

[ 115 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

612

Construction / Installation of
Pumping Stations At Deh Padidan,
Deh Kinder, Deh Bela Wah, Deh
Paryiya & Deh Chakar Wah In
Taluka Naushahero Feroze And
Bhiria District Naushahero Feroze.

N. Feroze

Approved
3.3.15

June-16

73.382

0.000

0.000

0.000

0.000

73.382

10.000

0.000

10.000

0.000

14

63.382

0.000

613

Removing Deficiencies and


N. Feroze
construction of Remaining works
of Phull Daulatpur Drainage
Scheme, District Naushahro
Feroze.
Surface Drainage Scheme Deh
Umerkot
Khambri, District Umerkot.
Surface Drainage Scheme in Deh
S.B.A
28 and Deh 38 Dad, U.C. ChaneserI, Taluka Nawabshah, District
Shaheed Benazirabad
Rehabilitation of Existing Seepage
S.B.A
Wells along Rohri Main Canal of
Drainage Division LBOD, Shaheed
Benazirabad.
Surface Drainage Scheme for
S.B.A
Activation of Ditch Channel
Parallel to Jamrao Canal in
Drainage Division LBOD, Shaheed
Benazirabad.
Rehabilitation of Existing Seepage
S.B.A
Wells (JRS) along Jamrao Canal of
Drainage Division LBOD, Shaheed
Benazirabad.
Surface Drainage Scheme in Deh
S.B.A
Dino Shah, Deh 73 Nasrat &
Farmabad Taluka Daur &
Sakrand, District Shaheed
Benazirabad.

Approved
27.1.15

June-17

99.826

0.000

0.000

0.000

0.000

99.826

13.000

0.000

13.000

0.000

13

86.826

0.000

Approved
6.2.15
Approved
27.1.15

June-16

61.277

0.000

0.000

0.000

0.000

61.277

13.000

0.000

13.000

0.000

21

48.277

0.000

June-17

189.182

0.000

0.000

0.000

0.000

189.182

30.000

0.000

30.000

0.000

16

59.182

100.000

Approved
27.1.15

June-16

190.233

0.000

0.000

0.000

0.000

190.233

30.000

0.000

30.000

0.000

16

60.233

100.000

Approved
27.1.15

June-17

116.410

0.000

0.000

0.000

0.000

116.410

17.000

0.000

17.000

0.000

15

99.410

0.000

Approved
27.1.15

June-17

185.906

0.000

0.000

0.000

0.000

185.906

25.000

0.000

25.000

0.000

13

55.906

100.000

Approved
27.1.15

June-17

194.816

0.000

0.000

0.000

0.000

194.816

25.000

0.000

25.000

0.000

13

64.816

100.000

614
615

616

617

618

619

Capital
12

Revenue
13

Total
14

2017-18
19

[ 116 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

620

621

622

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Rehabilitation of Existing Seepage


S.B.A
Approved
Wells along RMC and Seepage
3.3.15
Wells (JRS) along Jamrao,
Construction of Village Road
Bridge W/C aqueducts and Inlets
at various point and Extension of
existing Drains at different
locations including Allied Structues
SBA.
Construction of Pacca Saline
Sanghar/ Approved
Surface Drain in Deh Jakhrao, Deh Umerkot
27.1.15
Dodan Ja Kand, Tando Mitha
Khan, Saraji Surface Drainage
scheme Deh 12 in Jamrao and
Loharo and Construction of Sim
Nala for 1000 Acres in Deh Kunri
Taluka Khipro, District Sanghar.
Surface Drainage Scheme Deh
Matiari / Approved
Pano, Jakhri Jageer, Deh Thari,
Badin / T.
27.1.15
Deh Sita, Deh Sonehri, Deh Jhando Allahyar /
Mari. Deh Kubo Yagan, Deh
Sanghar
Shahdadpur including 1 No.
T.M Khan
Tubewell in Deh 70 of Tando
Allahyar Construction of Drainage
Scheme / Extension of Paroory
(T.M.Khan)

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

June-17

342.832

0.000

0.000

0.000

0.000

342.832

47.000

0.000

47.000

0.000

14

100.000

212.832

June-16

230.158

0.000

0.000

0.000

0.000

230.158

35.000

0.000

35.000

0.000

15

100.158

100.000

June-17

392.774

0.000

0.000

0.000

0.000

392.774

70.000

0.000

70.000

0.000

18

100.000

257.774

[ 117 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

623

Re-boring of 25 Nos. Bore failure


Tubewells including Restoration of
old direct disposal arrangement
and Re-furbishment of SCARP
Tubewells and Installation of 15
Nos. New Tubewells in different
Dehs in Tubewell Division No.II
Hala & Surface Drainage scheme
Gul Muhammad Dero Deh Narli,
Taluka Matiari and Deh Rahoki,
Deh Pangrio Rahittee and Deh
Ujano Taluka Saeedabad and Deh
Khan Muhammad Dero in Deh
Kariqadeer, District Matiari.
Installation of 1 No. New Tubewell
of 2.0 cusecs (High Saline)
including Construction of Pump
House making Direct Disposal
arrangemnet and Duty Room in
Deh Bhurghari, Suni Eid Gah,
Taluka Khairpur, (To be funded
out of 10% share of Royalty)
Rehabilitation of EKTD Main
Drain of 109 RDs and other
structural works of Tubewell
Division Khairpur and Supplying
& Fixing of new Generator sets,
Additional Transformers 500, 300,
200 KVA in Pumping Stations F, B,
G and Talpur Wada, (To be
funded out of 10% share of
Royalty)

624

625

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

Matiari

Approved
26.12.14

June-17

374.786

0.000

30.000

0.000

30.000

344.786

50.000

0.000

50.000

0.000

21

100.000

229.786

Khairpur

Approved
10.12.14

June-15

6.744

0.000

0.000

0.000

0.000

6.744

6.744

0.000

6.744

0.000

100

0.000

0.000

Khairpur

Approved
3.3.15

June-17

195.000

0.000

0.000

0.000

0.000

195.000

50.000

0.000

50.000

0.000

26

75.000

100.000

[ 118 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

626

627
628

629

630

631

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Construction of Burkoro Drain


Mirpurkhas Approved
and Wagharji to Kot Mirsin
13.1.15
Taluka Kot Ghulam Muhammad,
Mrurre Minor Drain Taluka Digri,
Tando Jan Muhammad Drain and
Drainage for Deh Sinhori U.C.
Digri.
Construction of Thatta Escape
Thatta
Approved
Drain Outfalling Indus River
22.4.15
Resectioning of Nagan Dhoro
Thatta
Approved
Outfall Drain from RD-0 to 134,
26.12.14
Sujawal Branch Drain from RD-0
to 73 and Bathoro Branch Drain
from RD-0 to 107.0
Construction of Surface Drainage
Sujawal Approved
Scheme for Deh Atharia, Deh
26.12.14
Thorki, Deh Patmakra and Deh
Wahderion, Deh Uplanki Wadi,
Taluka Jati including Deh Chach
Jahan Khan, Deh Shaikhano and
Deh Aali Samoon, Taluka Shah
Bander.
Construction of Surface Drain
Dadu
Approved
(Kanday Chukhi Branch Drain)
13.1.15
Sub-Drain 1L Kanday Chukhi i/c
Structures for Disposal of Water
Kanday Chukhi Ponded Area in
K.N. Shah
Installation of 100 New Tubewells
Larkana / Approved
Shikarpur / 27.1.15
Qamber /
Sukkur

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

June-17

340.740

0.000

0.000

0.000

0.000

340.740

35.000

0.000

35.000

0.000

10

100.000

210.740

June-17

552.721

0.000

0.000

0.000

0.000

552.721

35.000

0.000

35.000

0.000

122.721

400.000

June-17

628.992

0.000

0.000

0.000

0.000

628.992

70.000

0.000

70.000

0.000

11

100.000

478.992

June-17

150.864

0.000

0.000

0.000

0.000

150.864

17.000

0.000

17.000

0.000

11

133.864

0.000

June-17

70.713

0.000

0.000

0.000

0.000

70.713

17.000

0.000

17.000

0.000

24

53.713

0.000

June-17

560.600

0.000

20.000

0.000

20.000

540.600

45.000

0.000

45.000

0.000

12

100.000

400.600

[ 119 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

632

Rehabilitation / Restoration of
Drainage Infrastructures and
Construction of Retaining Wall
around Larkana City on various
Drains including 1R, 2R and 1R-C
Sub Drain of Larkana South
System, 1R Ghar Sub Drain and
Reconstruction of Structures
including VRBs, VRCs, Water
Course X-ings, Inlets, Junction
culverts etc.
Construction of Sub Drain &
Installation of 06 Nos. Tubewells in
Deh Langhano and Ghado, Taluka
Jhundho Marri, District Tando
Allahyar.
Construction of 3 Nos. Pumping
Station / Drains at RD 72-73
Nusrat Branch (Left Side) Near
Village Chanhee Manumal and
Near Village Usman Gahecho, Deh
Rajo Keeriyo and Deh Qasim
Khahi.Taluka Bhiria along Left
Bank of Nasrat Branch (ReRevised)
Installation of 11 Nos. New
Tubewells in Deh Noor Bozdar,
Tali, Chownro, Pir Shahbazi &
others, Renovation of Pump
Houses and Replacement of Old
Pumps Motors and Panels for 26
Nos. Sumps /Pumps of Tubwell
Division Khairpur

633

634

635

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

Larkana

Approved
18.2.15

June-17

800.000

0.000

0.000

0.000

0.000

800.000

25.000

0.000

25.000

0.000

100.000

660.000

T. A. Yar

Approved
18-2-15

June-17

169.692

0.000

0.000

0.000

0.000

169.692

25.000

0.000

25.000

0.000

15

69.850

69.850

N. Feroze

Approved
22.4.15

June-17

160.402

82.940

1.000

0.000

83.940

76.462

25.000

0.000

25.000

0.000

52

68

51.462

0.000

Khairpur

Approved
5-6-2015

June-17

100.000

0.000

0.000

0.000

0.000

100.000

25.000

0.000

25.000

0.000

25

50.000

25.000

[ 120 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

636

De-weeding of Karo Gungro


Branch Drain and Gaja Guni
Branch Drain and its system in
Tando Muhammad Khan &
Construction of Link Drain of
Umeed Ali Sub Drain RD-0.0 to
11.0 Outfalling in Umed Ali Sub
Drain at RD-18.0

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7
T.M. Khan Approved
22-4-15

June-16

Total Drainage Rec. & T.Wells (On-Going)

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

135.118

0.000

0.000

0.000

22717.712

2004.260

1987.990

0.000

0.000

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

135.118

12.000

0.000

12.000

0.000

3988.850 18728.862

2346.458

0.000

2346.458

0.000

50.000

2017-18
19
73.118

5119.965 11024.868

Drainage Reclamation &


Tubewells
(New Schemes)
637

638

639

640
641

Construction of Nala for Drain for


Sanghar
Rain Water Disposal near Village
Salahuddin Junejo and adjoining
area of Taluka Sanghar
Construction of New Drainage
Badin
Scheme Matli Phalkara Jahejo Out
Fall Drain in L.B.O.D. RD-0 to RD150
Construction of Barchani Link
T. M. Khan
Drain RD-0 to 4.0 Out-falling in
Miran Pur Branch @ RD-6.0
(Pumping Scheme).
Construction of Drainage Nullah in Sanghar
Deh Sonehri, district Sanghar
Surface Drainage Schemes in
T.A. Yar
Taluka Chamber

UnApproved

June-18

100.000

0.000

0.000

0.000

0.000

100.000

25.000

0.000

25.000

0.000

25

50.000

25.000

UnApproved

June-18

200.000

0.000

0.000

0.000

0.000

200.000

50.000

0.000

50.000

0.000

25

50.000

100.000

Unapproved

June-17

50.000

0.000

0.000

0.000

0.000

50.000

12.500

0.000

12.500

0.000

25

37.500

0.000

Unapproved
Unapproved

June-17

100.000

0.000

0.000

0.000

0.000

100.000

25.000

0.000

25.000

0.000

25

75.000

0.000

June-17

100.000

0.000

0.000

0.000

0.000

100.000

25.000

0.000

25.000

0.000

25

75.000

0.000

[ 121 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

642

643

644

645

646

647

648

649
650

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Construction of Retaining Wall


Khairpur
Unalong Tehri, Pir Mehar Shah Main
Approved
Drain and Lining of KN2L Sub
Drains and Sim Nala Pir Hothi
Disposal channel T/Well No.B-74,
KE-56 & KE-57, W/C X-ing Road
Bridges over Main Branch and
Construction of Sim Nala
Construction of Pumping Station at
Dadu
UnMehar Main Drain to Supplement
approved
Irrigation Channels in Taluka
Mehar.
Direct Disposal System of Tube
Sukkur
UnWells Installed in Deh Dubar
approved
Taluka Rohri.
Construction of Surface Drainage
Sanghar
UnScheme in Deh Sadrat Taluka &
approved
District Sanghar.
Surface Drainage Scheme in Deh
Matiari
UnGadali, Panjmoro Dethki U/C
approved
Shahmir Rahu Taluka Saeedabad,
District Matiari alongwith Direct
Disposal System of Tubewells.
Remodelling / De-Silting of Sim
Sujawal
UnNali 5-L Sujawal Upto 30 RDs and
approved
Extension of 8 RDs
Pocket Drainage System for Part
Badin
UnCommand of Dehs Kalhorki,
approved
Jhurkandi, Keranddi and Chorhal
including Badin Cantonment Area
Tapo, Taluka & District Badin.
Surface Drainage Scheme in Deh
Sanghar
UnPaee, Taluka Tando Adam
approved
Surface Drainage Scheme near
Jacobabad
UnVillage Alam Khan Odho (left over
approved
pocket).
Total Drainage Rec. & T.Wells (New)
Total Drainage Rec. & Tube Wells

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

June-18

350.000

0.000

0.000

0.000

0.000

350.000

87.000

0.000

87.000

0.000

25

100.000

163.000

June-17

54.775

0.000

0.000

0.000

0.000

54.775

13.500

0.000

13.500

0.000

25

41.275

0.000

June-17

26.696

0.000

0.000

0.000

0.000

26.696

6.700

0.000

6.700

0.000

25

19.996

0.000

June-17

41.291

0.000

0.000

0.000

0.000

41.291

10.200

0.000

10.200

0.000

25

31.091

0.000

June-18

100.000

0.000

0.000

0.000

0.000

100.000

25.000

0.000

25.000

0.000

25

70.000

5.000

June-17

46.869

0.000

0.000

0.000

0.000

46.869

11.717

0.000

11.717

0.000

25

35.152

0.000

June-18

296.000

0.000

0.000

0.000

0.000

296.000

74.000

0.000

74.000

0.000

25

100.000

122.000

June-17

55.239

0.000

0.000

0.000

0.000

55.239

14.000

0.000

14.000

0.000

25

41.239

0.000

June-18

100.000

0.000

0.000

0.000

0.000

100.000

25.000

0.000

25.000

0.000

25

40.000

35.000

1620.870
24338.582

0.000
2004.260

0.000
1987.990

0.000
0.000

0.000 1620.870
3988.850 20349.732

404.617
2751.075

0.000
0.000

404.617
2751.075

0.000
0.000

766.253
450.000
5886.218 11474.868

[ 122 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

Open Canals
(On-Going Schemes)
651

652

653

654
655

656

657

658

Assuring Water Supply for


Karachi upgrading Kinjhar Lake
System (under Urban Water
Supply). (Revised).
Training Institute of Irrigation &
Power Department Hyderabad.

Thatta

Approved
14.1.10

June-17

3422.782

2585.000

80.000

0.000

2665.000

757.782

68.000

0.000

68.000

0.000

78

80

100.000

589.782

Hyderabad Approved
17.09.09
(UR)
Constructing Stone Pitching along Khairpur Approved
RMC from RD-67 to 71 B/Sides,
04.10.12
RD-141 to 143, 186 to 191 NIP &
RD-158 to 161+500, RD - 48 to 53
Both Sides & D/S Theri Bridge
Rehabilitation / Renovation of Left Hyderabad Approved
Bank Barrage Colony Hyderabad
10.12.10
Constructing New Office Block of
Ghotki
Approved
XEN and AXEN of Mirpur
22.01.13
Irrigation Division at Mirpur
Mathelo (Revised).
Constructing stone pitching on
SBA,
Approved
weak portion of Rohri Main Canal Matiari & 17.01.14
in Rohri Division, Moro, Dad &
N.Feroze
Hala Division (Revised).
Rehabilitation & Renovation of
T. M. Khan Approved
Office Buildings (i) Akram Wah
24.02.12
Division Badin (ii) office of Rohri
Canal Circle including inspection
Bungalow Shahdadpur.
Re-Sectioning of Rice Canal from
Sukkur & Approved
RD-0 to 80
Shikarpur 24.02.12

June-16

84.156

48.461

1.250

0.000

49.711

34.445

5.000

0.000

5.000

0.000

59

65

29.445

0.000

June-15

592.490

498.873

50.000

0.000

548.873

43.617

43.617

0.000

43.617

0.000

93

100

0.000

0.000

June-16

90.152

61.364

2.300

0.000

63.664

26.488

26.488

0.000

26.488

0.000

71

100

0.000

0.000

June-16

66.803

52.679

5.700

0.000

58.379

8.424

8.424

0.000

8.424

0.000

87

100

0.000

0.000

June-17

513.000

254.998

123.000

0.000

377.998

135.002

20.000

0.000

20.000

0.000

74

78

115.002

0.000

June-16

198.950

128.645

17.700

0.000

146.345

52.605

8.000

0.000

8.000

0.000

74

78

44.605

0.000

June-17

401.000

197.500

40.000

0.000

237.500

163.500

15.000

0.000

15.000

0.000

59

63

148.500

0.000

[ 123 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

659

660

661

662

663

664

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Enhancing Capacity Building of


Karachi /
Discharge Observation in the
Hyderabad
Command of Three Barrages and
up-Gradation of Soil Mechanics &
Hydraulic Laboratory Karachi and
Workshop of Gauging SubDivision Kotri
Sindh Water Sector Improvement
Sindh
Project Phase-I (WSIP-I) (Revised
Cost Rs. 30,353 Million - World
Bank Loan) (Ghotki / Khairpur /
Sanghar / Mirpurkhas / T.M. Khan
/ Umerkot / Hyderabad / Badin /
Kashmore / Sukkur)
Sindh Flood Emergency
Sindh
Reconstruction Project for Bunds
& Canals (Flood 2010-11) ADB
Loan Scheme (T. M. Khan / S.B.A /
Jamshoro / Hyderabad / Ghotki /
Khairpur /
N. Feroze / Matiari / Larkana /
Qamber / Dadu / Sujawal / Thatta /
Kasmore / Sukkur / Shikarpur and
Rahim Yar Khan (Punjab) (Revised Cost Rs. 26,905 M)ADB
Share Rs. 19279.493 M & GoS
share Rs.7625.507 M)
Rehabilitation of Dingro Wah RDGhotki/
0 to 104.5 and Construction
Sukkur
Retaining Wall at RD 23.5 to 26.0
and Repair to Modules.
Rehabilitation of Bundh Minor
Ghotki
Providing Stone Pitching and
Repair to Modules.
Adding One Span to Regulator RDGhotki
31 of Bundh Minor and Retaining
Wall.

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

Approved
24.02.12

June-17

199.990

65.000

5.700

0.000

70.700

129.290

15.000

0.000

15.000

Approved
by
ECNEC
18.04.14

Dec-17

2397.680

2126.251

271.129

0.000

2397.380

0.300

1.000

0.000

Approved
ECNEC
3.7.14

June-16

7625.507

3147.089

509.433

0.000

3656.522

3968.985

400.000

0.000

400.000

Approved
24.02.12

June-16

64.520

29.930

20.000

0.000

49.930

14.590

14.590

0.000

Approved
24.02.12

June-15

34.087

22.752

5.314

0.000

28.066

6.021

6.021

Approved
24.02.12

June-16

26.694

8.481

9.730

0.000

18.211

8.483

8.483

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

0.000

35

43

114.290

0.000

1.000 7937.470

100

100

0.000

0.000

0.000

48

53

1000.000

2568.985

14.590

0.000

77

100

0.000

0.000

0.000

6.021

0.000

82

100

0.000

0.000

0.000

8.483

0.000

68

100

0.000

0.000

[ 124 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

665

Constructing Stone Pitching along


K.F.West Canal from RD-46.800 to
139 both sides at eroded portions.

Khairpur

Approved
09.02.12

June-16

188.391

130.000

39.300

0.000

169.300

19.091

19.091

0.000

19.091

0.000

90

100

0.000

0.000

666

Construction of Retaining Wall


along Faiz Wah RD-27 to 29.5 Both
Sides at Village Waris Ghamber
(Revised).
C.C. Lining of Faiz Bux /
Mohabbat Wah & Mahar Minor.
Construction Stone Protection Wall
and Stone Pitching B/S along
Sattah Branch RD-0 to 10 passing
City Area of Chuhar Jamali.
Makhi Farsh Link Canal Project GoP Cost Rs. 1729.912 Million (GoS Share Rs. 345.98 Million)

Khairpur

Approved
25.9.14

June-15

45.890

20.445

15.445

0.000

35.890

10.000

10.000

0.000

10.000

0.000

78

100

0.000

0.000

Khairpur

Approved
04.10.12
Approved
17.12.12

June-17

340.997

112.790

78.708

0.000

191.498

149.499

35.000

0.000

35.000

0.000

56

66

114.499

0.000

June-16

155.224

50.000

30.000

0.000

80.000

75.224

25.000

0.000

25.000

0.000

52

68

50.224

0.000

Approved
ECNEC
23.08.06

June-15

345.980

344.488

0.000

0.000

344.488

1.492

1.492

0.000

1.492

0.000

100

100

0.000

0.000

Approved
22.01.13

June-17

150.000

44.985

20.000

0.000

64.985

85.015

17.000

0.000

17.000

0.000

43

55

68.015

0.000

Approved
22.01.13

June-17

150.000

49.962

50.000

0.000

99.962

50.038

17.000

0.000

17.000

0.000

67

78

33.038

0.000

Approved
29.11.12

June-16

179.460

90.000

40.000

0.000

130.000

49.460

25.000

0.000

25.000

0.000

72

86

24.460

0.000

Approved
03.01.13

June-17

298.027

30.000

45.000

0.000

75.000

223.027

25.000

0.000

25.000

0.000

25

34

100.000

98.027

667
668

669

670

671

672

673

Thatta

Sanghar

Revitalization of Mechanical Wing Hyderabad /


of Irrigation Department.
Sukkur /
Jamshoro
Rehabilitation of Gates in Rohri
Hyderabad
Canal Circle through Mechanical
Circle.
Stone pitching along Dadu Canal
Sukkur/
@ RD 28 to 29 IP,26 to 47
Larkana
IP,75,D/S RD 81 to 102,105,126 to
128 NIP,RD 130 to 131 IP 145 to
146 IP,181 to 183,190 to 192 B.S,
RD 199 to 201,218 to 220 B.S 252
to 257 IP 310 to 330 B.S 410 to 420
B.S
Providing Retaining Wall, Stone
Ghotki
Pitching and Earth Work along
Ghotki Feeder at RD-51, 58,60, 63,
127, RD-323, 324, 347, 348 & 397

Capital
12

Revenue
13

Total
14

2017-18
19

[ 125 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

674

675
676

677

678
679

680

681

682
683

684

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Rehabilitation / Repair of
SBA
Residences, Divisional Offices &
Sub-Divisions with Construction of
Camp Office of Rohri Canal Circle
Re-construction Rehabilitation of
Kashmore
Regulator RD- 45 B.S Feeder
Rehabilitation / Replacement &
Kashmore,
Repair of Regulator / Gates of
Sukkur,
Guddu Barrage Region
Shikarpur,
Jacobabad
& Larkana
Renovation of VIP Rest House
Thatta
office Block and Boat Club at
Keenjhar Lake of Hillaya SubDivision (Revised)
Rehabilitation Bank of Kundho
Qambar
Minor RD-0 to 8
Rehabilitation of Qadirpur MinorGhotki
II RD-0 to 40 including structure
works
Rehabilitation & Reconstruction of
Sindh
Rain Damaged Office Blocks and
Residence in Nara Canal Area
Water Board (New) ( Sukkur,
Khairpur, Sanghar, Umerkot,
Mithi & Mirpurkhas)
Rehabilitation of Khesano MinorT. A. Yar
II, Hadeki Distry from RD-0 to 53,
Mell Minor Rd-0 to 25 & Lining of
Noori Distry from RD-0 to 38
(Revised)
Rehabilitation of Ratodero Branch
Larkana
from RD- 0 to Tail
Rehabilitation of Lundi Wah, Jari
Ghotki
Wah and Kazi Wah of Ghotki Area Sukkur
Water Board
Rehabilitation of Masu Wah RD Ghotki
100 to 107

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

Approved
29.11.12

June-17

154.503

5.000

70.000

0.000

75.000

79.503

17.000

0.000

17.000

0.000

49

60

62.503

0.000

Approved
01.03.13
Approved
17.12.12

June-17

1052.652

20.000

160.000

0.000

180.000

872.652

90.000

0.000

90.000

0.000

17

26

200.000

582.652

June-16

149.961

40.000

30.000

0.000

70.000

79.961

17.000

0.000

17.000

0.000

47

58

62.961

0.000

Approved
29.11.12

June-16

120.000

3.750

20.000

0.000

23.750

96.250

17.000

0.000

17.000

0.000

20

34

79.250

0.000

Approved
12.10.12
Approved
03.01.13

June-16

59.503

20.000

20.000

0.000

40.000

19.503

19.503

0.000

19.503

0.000

67

100

0.000

0.000

June-16

92.831

7.500

20.000

0.000

27.500

65.331

17.000

0.000

17.000

0.000

30

48

48.331

0.000

Approved
29.11.12

June-17

199.921

40.000

31.050

0.000

71.050

128.871

17.000

0.000

17.000

0.000

36

44

50.000

61.871

Approved
13.1.15

June-17

301.446

60.000

40.000

0.000

100.000

201.446

68.000

0.000

68.000

0.000

33

56

100.000

33.446

Approved
29.11.12
Approved
03.01.13

June-16

171.215

80.000

35.000

0.000

115.000

56.215

17.000

0.000

17.000

0.000

67

77

39.215

0.000

June-17

198.907

40.000

48.000

0.000

88.000

110.907

35.000

0.000

35.000

0.000

44

62

75.907

0.000

Approved
17.12.12

June-17

186.949

40.000

30.000

0.000

70.000

116.949

25.000

0.000

25.000

0.000

37

51

91.949

0.000

[ 126 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

685

Construction of Protection Wall


(Retaining Wall) along Kohri
Distry near Ratodero City in
Ratodero Sub-Division
Construction Retaining Wall along
Dadu Canal RD-210 Near Agani
Village and RD-282 NIP Side in
Northern Dadu Division, Larkana
Construction of Protection
(Retaining Wall) along Warah
Branch RD-89, 90, 94, 109, 114,
117, 121 IP Side (Common Bank)
and RD-100, 117 NIP Side in
Madeji Sub-Division
Restoration Work of J-Spur at
Mile 1/6 Nasrat Loop Bund
Restoration of Flood Damages to
Gaj Diversion Bund at RD-2+700,
5+000, 12+000 & 13+000 in
Southern Dadu Division
Remaining Work along J-Spur at
Mile 0/7 Abad Manguli Extension
bund in Norther Dadu Division
Larkana (Revised).

686

687

688
689

690

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

Larkana

Approved
22.01.13

June-16

59.976

5.000

5.900

0.000

10.900

49.076

8.000

0.000

8.000

0.000

18

32

41.076

0.000

Larkana

Approved
22.01.13

June-16

61.240

20.000

7.700

0.000

27.700

33.540

8.000

0.000

8.000

0.000

45

58

25.540

0.000

Larkana

Approved
22.01.13

June-16

176.989

30.000

146.000

0.000

176.000

0.989

0.989

0.000

0.989

0.000

99

100

0.000

0.000

Larkana

Approved
21.02.13
Approved
14.11.14

June-17

250.347

130.000

50.000

0.000

180.000

70.347

17.000

0.000

17.000

0.000

72

79

53.347

0.000

June-17

344.216

70.000

165.000

0.000

235.000

109.216

35.000

0.000

35.000

0.000

68

78

74.216

0.000

Approved
21.02.13

June-16

608.070

450.000

95.000

0.000

545.000

63.070

38.000

0.000

38.000

0.000

90

96

25.070

0.000

Dadu

Larkana

[ 127 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

691

Constructing stone pitching along


Rohri Main Canal from RD 193 to
205 B/S & 228 to 234 B/S, 236 to
253 B/S & 270 to 277 IP side, 290 to
294 B/S, 296 to 305 IP side, 297 to
308 NIP side & 228 to 312 NIP side,
330 to 350 B/S, Earth work along
Rohri Main Canal 201 to 207 IP
side, 204 to 207 NIP, 260 to 265 IP
side, 276 to 281 B/S, 326 to 330 IP
side, 305 to 330 NIP side & Stone
pitching and raising strenthening
banks of RMC RD-415 to 425 B/S
& 445 to 457+500 NIP side.

N. Feroze

Approved
03.09.13

June-17

1298.770

40.000

90.000

0.000

130.000

1168.770

68.000

0.000

68.000

0.000

10

15

1100.770

0.000

692

Constructing stone pitching along


Rohri Main Canal from RD-25 to
183 both Sides eroded / damaged
portions and Construction
Protection Wall on B/Sides of RD73.2 to 79.2 and RD-73.2 to RD81.0 along Rohri Main Canal, Deh
Luqman & Khanpur Taluka
Khairpur (Revised)
Construction retaining wall along
Abul Wah from RD-55+00 to
58+00 and 92+00 to 94+00 Both
Sides Gambat & Ranipur City area
and Construction retaining wall
along Mehrab Wah from RD-0+00
to 5+00 and 14+00 to 19+00 Both
Sides Sobhodero City area.
Rehabilitation along Pandhro Wah
from RD-0 to 139.2 Veeho Wah
from RD-0 to 108.7 and Ali Nawaz
Wah from RD-0 to 163.

Khairpur

Approved
03.12.14

June-17

516.387

10.000

234.968

0.000

244.968

271.419

25.000

0.000

25.000

0.000

47

52

100.000

146.419

Khairpur

Approved
03.12.13

June-17

246.165

30.000

60.000

0.000

90.000

156.165

25.000

0.000

25.000

0.000

37

47

131.165

0.000

Khairpur

Approved
12-12-13

June-17

415.000

98.000

198.541

0.000

296.541

118.459

25.000

0.000

25.000

0.000

71

77

93.459

0.000

693

694

Capital
12

Revenue
13

Total
14

2017-18
19

[ 128 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

695

Constructing stone pitching along


Nasrat Branch from RD-0 to 22 &
35 to 52 Both Sides, RD-69 to 89
NIP Side & 100 to 130 Both Sides,
RD-137.6 to 154.5 & 200 to 220.625
Both Sides & Earth work from RD22 & 35 to 52 Both Sides.

S.B.A.
N.Feroze

Approved
03.12.13

June-17

499.788

0.000

160.000

0.000

160.000

339.788

43.000

0.000

43.000

0.000

32

41

100.000

196.788

696

Earth Work along Kurkaim Minor


from RD-0 to 46+400 (Revised)
Adding Spans to Aral Regulator
and Remodelling of Leading
Channels.
Constructing Village Road Bridge
along Saeed Khan Distry at RD-22
Village Fakeer Abdul Ghafoor
Opp: Miani Forest Masu Sub
Division of Hala Division and
Prestressed Concrete Bridge Over
Khairpur Feeder West at RD14+00 Near Village Faqeer Ali
Mardan Jatoi.
Construction of Retaining Wall
along Mirwah Canal from RD-150
to 155 L/Side, 149 to 151 R/Side
and 154 to 155 R/Side.
Providing Stone Pitching on Both
Sides Mirwah Canal from RD78+600 to 93+600 D/S Bhurgri
Regulator to Shah Abdul Latif
University.
Remodeling of Masu Wah from RD0.0 to 131 & its System.

N. Feroze

Approved
7.8.14
Approved
17.01.14

June-16

110.003

30.000

6.502

0.000

36.502

73.501

17.000

0.000

17.000

0.000

33

49

56.501

0.000

June-17

299.982

110.000

30.000

0.000

140.000

159.982

25.000

0.000

25.000

0.000

47

55

50.000

84.982

Khairpur
Matiari

Approved
09.10.13

June-16

34.573

10.000

15.000

0.000

25.000

9.573

9.573

0.000

9.573

0.000

72

100

0.000

0.000

Khairpur

Approved
12.12.13

June-17

194.071

10.000

35.000

0.000

45.000

149.071

25.000

0.000

25.000

0.000

23

36

50.000

74.071

Khairpur

Approved
12.12.13

June-17

159.726

10.000

141.688

0.000

151.688

8.038

8.038

0.000

8.038

0.000

95

100

0.000

0.000

Ghotki

Approved
17.01.14

June-17

350.537

10.000

30.000

0.000

40.000

310.537

35.000

0.000

35.000

0.000

11

21

100.000

175.537

697

698

699

700

701

Dadu

Capital
12

Revenue
13

Total
14

2017-18
19

[ 129 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

702

703

704

705

706

707

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

Restoration & Rehabilitation of


Jacobabad /
Irrigation Network of Guddu
Kashmore
Barrage Region affected during
Heavy Monsoon Rains 2012,
Rehabilitation of Unhar Canal
System RD-7 to 17 both sides,
Khariro Distry, Nasir Branch, Nar
Minor and Anees Minor both sides
& Constructing flank wall at D/S
Head Regulator of Allahabad
Moosa Branch and Re-sectioning
& stone pitching along B.S Feeder
RD- 50 to 78 NIP 61 to 78 IP 82 to
90 NIP 228 to 250 IP side various
portions.
Constructing Stone Pitching and
Kashmore
Apron along K.K. Bund Mile 8/0 to
10/0 and 12/4 to 13/4.
Construction of Office Building
Larkana /
and Residence of AXEN Kamber,
Qamber
Dhamraho and Mehar SubShahdadkot
Division.
/ Dadu
Rehabilitation of Rice Canal RDLarkana /
372 to 407 and its off-takes systems
Dadu
viz, Mehar Branch, Dhamrao
Branch and Sehar Branch.

Approved
12.12.13

June-17

1600.000

255.000

770.000

0.000

1025.000

575.000

90.000

0.000

90.000

0.000

64

70

100.000

385.000

Approved
11.09.13

June-17

498.418

35.000

70.000

0.000

105.000

393.418

30.000

0.000

30.000

0.000

21

27

100.000

263.418

Approved
09.10.13

June-17

33.097

2.500

5.000

0.000

7.500

25.597

25.597

0.000

25.597

0.000

23

100

0.000

0.000

Approved
14.02.14

June-17

299.082

15.000

150.000

0.000

165.000

134.082

25.000

0.000

25.000

0.000

55

64

109.082

0.000

Construction of Stone Studs &


Pitching along Upper Nara Canal
b/w RD-225 to 575 and
Rehabilitation of Khipro Canal
from 14th Mile to 49th Mile &
Constructing Pre-stressed Bridge
at RD 415 Nara Canal (Revised)
Rehabilitation of Irrigation
Channels & Infrastructure at
Taluka Ghorabari District Thatta.

Sanghar
Sukkur,
Khaipur

Approved
3.12.14

June-16

817.616

350.000

220.000

0.000

570.000

247.616

68.000

0.000

68.000

0.000

70

78

179.616

0.000

Thatta

Approved
16.04.14

June-16

360.000

105.000

168.803

0.000

273.803

86.197

17.000

0.000

17.000

0.000

76

81

69.197

0.000

[ 130 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

708

De-silting along Rohri Main Canal


system from RD-891 to 1038 and
its off-taking channels, Nasir
Branch System from RD-0 to 80
and RD-247 to 354 and its offtaking channels including
Repair/Reconstruction of Modules
in Nasir Division Hyderabad
Construction of 06 Nos.
Desalination / R.O. Plants around
Manchhar Lake (Re-Revised)
Procurement of Machinery for
Rehabilitation of Irrigation
Infrastructure (under Chinese
Loan) -Total Cost - Rs. 1550.00
(GoS Share Rs. 232.500 M & donor
share Rs. 1317.5 M).
Strengthening and Beautification
Right Side Bunder Wall
Construction of Pre-stressed
Concrete Road Bridge at RD-81.0
& Rehabilitation of Ruk Complex
X-Regulator and its Gates at RD82.4 along Rice Canal
Lining of Darelo Minor RD-0 to
21.4 and Grhore Minor RD-0 to
26.20 (Tail Reaches) (Nara Canal
A.W.B.)
Rehabilitation work of Damaged D2R Ex: Choi Canal Begari System
including D2L & D3L
Providing Stone Pitchig along Daro
Branch RD 0 to 50 and Pinyari
Branch RD 130 to 145 both side
(Pinyari Circle)

709

710

711
712

713

714

715

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

T.A.Yar, Approved
Matiari,
17.01.14
Badin Hyd,
T.M.Khan

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

June-17

345.441

15.000

100.000

0.000

115.000

230.441

35.000

0.000

35.000

0.000

33

43

100.000

95.441

0.000

0.000

Jamshoro

Approved
22.4.15

June-16

108.634

29.965

37.035

0.000

67.000

41.634

41.634

0.000

41.634

0.000

62

100

Sindh
Except
Karachi

Approved
ECNEC
16.08.12

June-14

232.500

0.000

0.000

0.000

0.000

232.500

8.000

0.000

8.000

500.000

100.000

124.500

Sukkur

Approved
21.2.13
Approved
17.01.14

June-17

177.800

0.000

4.550

0.000

4.550

173.250

30.000

0.000

30.000

0.000

19

100.000

43.250

June-17

200.000

0.000

30.000

0.000

30.000

170.000

25.000

0.000

25.000

0.000

15

28

70.000

75.000

Mirpurkhas Approved
17.01.14

June-17

329.272

0.000

267.000

0.000

267.000

62.272

62.272

0.000

62.272

0.000

81

100

0.000

0.000

Shikarpur Approved
12.12.13

June-17

150.000

0.000

80.000

0.000

80.000

70.000

17.000

0.000

17.000

0.000

53

65

53.000

0.000

June-17

164.901

0.000

74.565

0.000

74.565

90.336

17.000

0.000

17.000

0.000

45

56

73.336

0.000

Sukkur

Thatta

Approved
12.12.13

[ 131 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

716

Reconstruction of Head Regulator


Daro Branch and Tail Regulator
Daro Branch RD 168 and
Protection Wall Town area along
Pinyari Branch 0 to 6 both side
(Pinyari Circle) - Revised
Rehabilitation / Restoration
Bifurcation / Tri Bifurcation,
Discharge Box of Tube well
Division, Ghotki including
Compound Wall of Scarp Colony
Ubaro & Pano Akil i/c Renovation
of Office Block & Bungalows
Earth Work / Stone Pitching along
Desert Canal from Mile 18 to 63
Both Sides (Various Portions)
Retaining wall along Dadu Canal
RD 598 to 608 NIP, 598 to 605 IP
(Opposite Dadu Town-Regulator
85 mile D/S Retaining wall 04 RDs
Both sides., Retaining Wall Mehar
Branch RD 7 to 13 near Village
Malook Kalhoro, X-Regulator 95th
mile D/S retaining Wall 04 RDs
Both sides and Rehabilitation of
Mahota X-Regulator RD-231

717

718

719

720

Construction of Pumping Scheme


along MNV Drain for Feeding Tail
of Pakka Distry and Khudabad
Minor

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

Thatta

Approved
29.5.2015

June-17

248.680

50.000

27.000

0.000

27.000

221.680

25.000

0.000

25.000

0.000

11

21

100.000

96.680

Ghotki

Approved
17.01.14

June-17

159.777

0.000

27.000

0.000

27.000

132.777

20.000

0.000

20.000

0.000

17

29

112.777

0.000

Jacobabad Approved
17.01.14

June-17

227.665

0.000

20.000

0.000

20.000

207.665

30.000

0.000

30.000

0.000

22

100.000

77.665

Dadu

Approved
14.02.14

June-17

299.867

10.000

70.000

0.000

120.000

179.867

40.000

0.000

40.000

0.000

40

53

100.000

39.867

Dadu

Approved
12.12.13

June-17

129.868

0.000

50.000

0.000

50.000

79.868

12.000

0.000

12.000

0.000

39

48

67.868

0.000

[ 132 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

721

Rehabilitation of Hydraulic
Structure of Dhamraho System
and Ghar Branch System,
Construction of Residences of
AXENs Kamber, Dhamraho &
Mehar Sub Divisions and
Remaining and allied works of
Kudan Pumping Station.
Earth Work and Stone Pitching
along Faridabad Ring Bund RD-0
to 7.5
Remodelling / Re-sectioning of
Branches, Minors (Revised)
Remodelling / Re-sectioning of
Darro Branch and Pinyari Branch
(PS-88) District Thatta
Rehabilitation / Resectioning of
Johi Branch from Head to Tail
(RD-0.0 to 238.560) in Southern
Dadu Division & Lining of Pahore
and Kharoo Minor
Rehabilitation of Dhori Distry,
Imdad Minor, Gandakha Right
Minor, Noorpur Distry, Patuja
Distry, Qubo Distry, Chowki
Minor & Shah Beg Distry.
Construction of Protection
(Retaining Wall) along Akil Distry
RD-7 to RD-28 B/S (in portions) &
Juneja Minor RD-6 to RD-8 B/S (in
portions).

722

723
724

725

726

727

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7
Qamber / Approved
Shahdadkot 12.12.13
& Dadu

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

June-17

149.362

5.000

30.000

0.000

30.000

119.362

17.000

0.000

17.000

0.000

20

31

102.362

0.000

Dadu

Approved
14.02.14

June-17

49.557

0.000

11.715

0.000

20.000

29.557

29.557

0.000

29.557

0.000

40

100

0.000

0.000

Thatta

Approved
14.02.14
Approved
16.04.14

June-16

321.056

0.000

20.000

0.000

20.000

301.056

38.000

0.000

38.000

0.000

18

100.000

163.056

June-17

218.800

0.000

100.000

0.000

100.000

118.800

25.000

0.000

25.000

0.000

46

57

93.800

0.000

Approved
3.3.15

June-17

299.837

0.000

0.000

0.000

0.000

299.837

35.000

0.000

35.000

0.000

12

100.000

164.837

Kamber @ Approved
Shahdadkot
3.3.15

June-15

206.788

0.000

0.000

0.000

0.000

206.788

20.000

0.000

20.000

0.000

10

100.000

86.788

Kamber @ Approved
Shahdadkot 23.1.15

June-15

51.454

0.000

0.000

0.000

0.000

51.454

6.000

0.000

6.000

0.000

12

45.454

0.000

Thatta

Dadu

[ 133 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

728

Construction of Protection
(Retaining Wall) along Warah
Branch RD-130 to RD-154 B/S (in
portions) & Providing Stone
Pitching along Tanwary Distry at
RD-0 to 10 B/S, RD-13 IP Side, RD31 B/S, RD-41 B/S, RD-50, 51, RD73 to 75 B/S.
Rehabilitation of Ghaibidero
Channel, Sultan Minor & Jumro
Minor of Ghaibidero System
(Revised)
Rehabilitation of Rabi Distry from
RD-0 to 78+200 in S.M.B. Division
Shahdadkot

729

730

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

Kamber @ Approved
Shahdadkot
3.3.15

June-17

193.000

0.000

0.000

0.000

0.000

193.000

20.000

0.000

20.000

0.000

10

63.000

110.000

Kamber @ Approved
Shahdadkot 14.5.15
(UR)

June-15

559.070

0.000

350.000

0.000

350.000

209.070

80.000

0.000

80.000

0.000

63

77

100.000

29.070

Kamber @ Approved
Shahdadkot 22.9.14
(UR)

June-16

130.190

0.000

130.000

0.000

130.000

0.190

0.190

0.000

0.190

0.000

100

100

0.000

0.000

[ 134 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

731

732

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Construction of Protection wall


Kamber @ Approved
along N.W.canal at RD 83.5 Both Shahdadkot
6.2.15
sides U/S & D/S Ruk X-Reg. &
Providing Stone Pitching along
N.W.Canal RD-26,27,28 IP Side
RD-69 IP Side, RD-75 B/S RD81,82,83 B/S, RD-84 B/S, RD-89
B/S, RD-95 to 98, RD-111 to 118
B/S, RD-119 B/S, RD-152 B/S, RD164, 165 B/S and Warah Branch
from RD-00 to 03 B/S in Garhi
Yasin Sub-Division and
Restoration of Banks along
Shahdadkot Branch RD-00 to
21,RD-80 to 95 and De-Silting
along Shahdadkot Branch RD-10
to 20, RD-64 to 95 and Providing
Stone Pitching along Shahdadkot
Branch RD-00 to 05 B/S, RD-18 IP
Side, 22 IP Side, 35 B/S & 88 IP
Side and Dismantling of damaged
road bridge along Shahdadkot
Branch De-Silting work along
N.W.Canal from RD-83.5 to 180 in
Garhi Yasin Sub-Division.
Rehabilitation of 4 Nos. Pumping
Dadu
Approved
Stations in Rice Canal Division
23.1.15
damaged during Flood 2010

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

June-15

579.096

0.000

0.000

0.000

0.000

579.096

40.000

0.000

40.000

0.000

100.000

439.096

June-16

44.426

0.000

0.000

0.000

0.000

44.426

6.000

0.000

6.000

0.000

14

38.426

0.000

[ 135 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

733

Earthwork and Stone Pitching


along Rice Canal RD-130 to RD140 both sides RD-279 NIP Side
RD-284 IP Side, RD-288, 289 NIP
Side and RD-288 IP Side 24500
feet. Earth Work along stone
pitching along Noor Wah Branch
RD-15 to 25 both sides Ganwar
Branch down stream Head
Regulator and Kania Minor Head
Regulator and Construction of
Pumping Station along K.N.Shah
Leading Channel for supplement
for tail areas of Nara Distry.
Construction of Pumping Station
along Mado Distry RD-6 for
supplement Mado Distry and
leading Channels from Ghar Main
Drain to Mado Distry and
Construction of Pumping Station
along Ghar Main Drain for
suppliment to tail areas of Mirwah
Distry Ex. Ghar Branch.
Rehabilitation of X-Regulators
Warah Branch and Head
Regulators along Dadu Canal in
Northern Dadu Division and Stone
Pitching and Raising &
Strengthening along Dadu Canal
from RD-23 to 410 in Northern
Dadu Division and Construction of
C.C Lining Along Nasrat Minor
from RD 0 to 20.
Rehabilitation / Stone pitching of
Nazar Shakh off taking from Abro
Minor Ghar Division, Larkana (7
RDs)

734

735

736

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

Kamber /
Dadu /
Larkana

Approved
18.2.15

June-17

560.000

0.000

0.000

0.000

0.000

560.000

40.000

0.000

40.000

0.000

100.000

420.000

Kamber /
Dadu

Approved
18.2.15

June-17

124.258

0.000

0.000

0.000

0.000

124.258

15.000

0.000

15.000

0.000

12

109.258

0.000

Larkana

Approved
6.2.15

June-17

599.911

0.000

0.000

0.000

0.000

599.911

45.000

0.000

45.000

0.000

100.000

454.911

Larkana

Approved
7.4.15

June-16

43.829

0.000

0.000

0.000

0.000

43.829

6.000

0.000

6.000

0.000

14

37.829

0.000

[ 136 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

737

Lining of Mangi Minor RD-0 to 11.

738

Reconstruction / Shifting of
Larkana
Upstream Flank Wall and
Construction of Divide Wall D/S
Protection Wall i/c Re-sectioning of
Warah Branch from RD-0 to 10 at
Head Regulator of Warah Branch
@ Ruk Complex RD-82 &
Construction D/S Protection Wall
and De-silting along Warah
Branch from RD-0 to 45
Construction of Pumping Station at Jamshoro
Aranjhi Phat for supplementing
tail area of Dhall Distry
Up-gradation / Rehabilitation of
Jamshoro
pumping scheme I/C Lining of
Channels in Taluka Manjhand
Prestressed Concrete Bridge over
Khairpur
Faiz Wah RD-12 near Village
Doongar Khan Burdi.
Construction of Lift System on
Khairpur
W/C No.77-BL Ex: Mirwah Canal
in Deh Noor Bozdar, Taluka Kot
Diji
Re-Sectioning & Earth work of B/S Khairpur
Banks of Mir Wah Canal RD-79 to
293.6
Re-Sectioning of Faiz Ganj Wah
Khairpur
from RD-0 to 163
Construction of Stone Pitching of
Khairpur
Mir Wah Canal (RD-103 to 293.9)
& Lalan Wah Distry
C.C Lining of Shah Nawaz Wah
Khairpur
from RD-0.0. to 53, Rahuja Minor
RD-9+5-- to 25+0, Kanasera
Minor, Junki Minor, and Retaining
Wall along Faiz Wah

739

740

741

742

743

744
745

746

Khairpur

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

Approved
23.1.15
Approved
18.2.15

June-16

46.603

0.000

25.000

0.000

25.000

21.603

21.603

0.000

21.603

0.000

54

100

0.000

0.000

June-17

210.000

0.000

0.000

0.000

0.000

210.000

20.000

0.000

20.000

0.000

10

190.000

0.000

Approved
7.4.15

June-16

33.742

0.000

0.000

0.000

0.000

33.742

8.000

0.000

8.000

0.000

24

25.742

0.000

Approved
3.12.14

June-15

391.235

0.000

0.000

0.000

0.000

391.235

35.000

0.000

35.000

0.000

100.000

256.235

Approved
10.12.14

June-16

19.958

0.000

5.000

0.000

5.000

14.958

14.958

0.000

14.958

0.000

25

100

0.000

0.000

Approved
25.9.14

June-16

19.490

0.000

5.000

0.000

5.000

14.490

14.490

0.000

14.490

0.000

26

100

0.000

0.000

Approved
18.2.15

June-17

287.006

0.000

0.000

0.000

0.000

287.006

25.000

0.000

25.000

0.000

100.000

162.006

Approved
18.2.15
Approved
18.2.15

June-16

179.697

0.000

0.000

0.000

0.000

179.697

18.000

0.000

18.000

0.000

10

100.000

61.697

June-16

283.087

0.000

0.000

0.000

0.000

283.087

30.000

0.000

30.000

0.000

11

100.000

153.087

Approved
13.1.15

June-16

497.470

0.000

100.000

0.000

100.000

397.470

40.000

0.000

40.000

0.000

20

28

100.000

257.470

[ 137 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

747

C.C Lining of Sada Rang Wah and


Water Course No. 2-R Ex. Sada
Rang Wah and Water Course No.
103-R Mirwah
Constrution Retaininng wall along
K.F. West RD- 22 to 22+530 IP RD24 to 25+250 NIP, RD- 27 to 33+50
NIP RD- 35+600 to 36 NIP and RD51+800 to 54+300 IP
Earth work for Raising /
Strengthening Bank of Minors Ex:
Khairpur Feeder West.
Construting Protection Wall along
Kupri Minor RD- 0 to 8 both Sides.

748

749

750

751

752

753

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

Khairpur

Approved
14.5.15

June-16

120.002

0.000

100.000

0.000

0.000

120.002

13.000

0.000

13.000

0.000

11

100.000

7.002

Khairpur

Approved
18.2.15

June-16

179.745

0.000

0.000

0.000

0.000

179.745

20.000

0.000

20.000

0.000

11

100.000

59.745

Khairpur

Approved
18.2.15

June-16

76.600

0.000

0.000

0.000

0.000

76.600

8.000

0.000

8.000

0.000

10

68.600

0.000

Khairpur

Approved
25.9.14

June-15

18.679

0.000

5.000

0.000

5.000

13.679

13.679

0.000

13.679

0.000

27

100

0.000

0.000

Khairpur / Approved
N.Feroze /
8.4.15
S.B.A /
Sanghar/
Matiari /
Constructing Relief Escape for
SBA
Approved
Nasrat Branch @ RD-195 NIP side
18.2.15
and Constructing Relief Escape for
Gajrah Branch @ RD-60 NIP side
and Constructing Relief Escape for
tail of Nasrat Branch system along
Chan Bandhni distry @ RD-22

June-17

457.504

0.000

0.000

0.000

0.000

457.504

50.000

0.000

50.000

0.000

11

100.000

307.504

June-16

98.400

0.000

0.000

0.000

0.000

98.400

12.000

0.000

12.000

0.000

12

86.400

0.000

Rehabilitation / Lining of
Irrigation Channels in Shaheed

June-16

1516.468

0.000

610.000

0.000

610.000

906.468

150.000

0.000

150.000

0.000

40

50

100.000

656.468

Rehabilitation of Old X-Regulator


along Rohri Main Canal (Stage-II)
(Rohri, Dad, Hala Divisions).

SBA

Approved
13.1.15

[ 138 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

754

Construction of New Bridge on


Nasrat Canal New Sangi Link to
Village Rais Malhar Khan Rajper,
U.C. Gher Gaju Taluka Bhiria,
Bridge on Sangi Minor at Village
Dilawar Shar near Haroon Shar,
U.C. Bhanbhri and Village Road
Bridges on Nusrat Canal at RD-24
Opp: Village Saeed Khan Lakho,
RD-27 Sarhar Minor-II, Mithiani
at RD-51 Dalepota and Late Miner
at RD-41 & Repair of X-Regulator
at RD-42 and C.C. Lining of
Darbelo Minor RD-21 to 27

N. Feroze

Approved
27.1.15

June-17

184.991

0.000

0.000

0.000

0.000

184.991

24.000

0.000

24.000

0.000

13

80.000

80.991

755

Construction of Stone Pitching


along Sehra Branch from RD- 21
to 23, 27 to 29, 36 to 40, 56 to 59
and adding span at RD- 42 and 63,
X-Regulator including
Rehabilitation of Darbelo Distry &
Raising & Strengthening of Sail
Distry, Budika Distry and Resectioning of Kandiaro Escape RD0 to 4.
Rehabilitation & Desilting of
Mashakh Hoti Distry RD - 0 to
60.2
C.C Lining of Chaker Distry i/c
Constructing of new & temporary
outlets from RD - 0 to 44.5 & 44.5
to 114.10 and Removing of spoils
along Zour Minor from RD - 0 to
49 both sides.
Constructing Stone Pitching along
Nasir Branch from RD-0 to 220
Both Sides (eroded portions)

N. Feroze

Approved
3.3.15

June-17

400.078

0.000

0.000

0.000

0.000

400.078

50.000

0.000

50.000

0.000

12

100.000

250.078

T.A.Yar /
Matiari

Approved
6.2.15

June-16

99.001

0.000

0.000

0.000

0.000

99.001

12.000

0.000

12.000

0.000

12

87.001

0.000

T.A.Yar,
Badin

Approved
22.4.15

June-17

575.850

0.000

0.000

0.000

0.000

575.850

60.000

0.000

60.000

0.000

10

200.000

315.850

T.A.Yar,
Badin

Approved
3.3.15

June-17

755.280

0.000

0.000

0.000

0.000

755.280

70.000

0.000

70.000

0.000

200.000

485.280

756

757

758

Capital
12

Revenue
13

Total
14

2017-18
19

[ 139 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

759

760

761

762

763

764

765

766

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

De-silting of Landhi-I Minor RD-0 T. A. Yar


to 25.4, Shaikh Moosa Minor RD-0
to 11.0, Tando Allahyar-II Distry
RD-0 to 53.30, Tando Soomro-I
Distry RD-0 to 31.6 Tando SoomroII Distry RD-0 to 43.60, Naghar
Distry RD-0 to 82.50 and Gharib
Distry RD-0 to 48.0
Rehabilitation & Renovation of
Sukkur
Sumpwell, water supply connection
and residential building i/c
drainage system and road in
barrage colony Sukkue
Up-gradation / Construction of
Matiari
Saeed Khan Pumping Station at
Ghallian Bund @ Mile 1/0 Ex:
Indus River and C.C. Lining
Miano Minor from RD-0.0 to 21.3.
C.C. Lining of Sultanpur Minor
Matiari
from RD 0+00 to 23+600 Ex: Rohri
Main Canal.
Rehabilitation and Desilting Berani Sanghar
Distry along with repair of
Modules from RD- 0 to 41.13 and
Desilting of Jam Branch RD- 0 to
70
Rehabilitation of Thar Canal
Umerkot
System & Lining of Sohrab Distry
about 24 RDs.
Rehabilitation of Sakro Branch &
Thatta
Infrastructure at Taluka Mirpur
Sakro District Thatta
Stone Apron / Stone Pitching at RD- Sukkur
23, 24, 25 Right Side and Left Side
at RD-140 to 146 L/Side & RD-184
to 186 L/Side Upper Nara Canal.

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

Approved
3.3.15

June-17

89.792

0.000

0.000

0.000

0.000

89.792

12.000

0.000

12.000

0.000

13

77.792

0.000

Approved
5-6-2015

June-17

197.606

0.000

0.000

0.000

0.000

197.606

20.000

0.000

20.000

0.000

10

177.606

0.000

Approved
27.1.15

June-16

113.257

0.000

0.000

0.000

0.000

113.257

17.000

0.000

17.000

0.000

15

96.257

0.000

Approved
10.12.14

June-15

55.399

0.000

6.000

0.000

6.000

49.399

10.000

0.000

10.000

0.000

11

29

39.399

0.000

Approved
10.12.14

June-15

49.586

0.000

22.000

0.000

22.000

27.586

27.586

0.000

27.586

0.000 0.000

100

0.000

0.000

Approved
13.1.15

June-16

883.842

0.000

120.000

0.000

140.000

743.842

100.000

0.000

100.000

0.000

16

27

200.000

443.842

Approved
24.10.14

June-17

389.966

0.000

0.000

0.000

0.000

389.966

50.000

0.000

50.000

0.000

13

100.000

239.966

Approved
6.2.15

June-16

327.097

0.000

0.000

0.000

0.000

327.097

38.000

0.000

38.000

0.000

12

100.000

189.097

[ 140 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

767

768

769

770

771

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

De-silting of Salehpat Drain from


Sukkur
Approved
RD-0 to 90 along Upper Nara
23.1.15
Canal and Restoration of damaged
portion of Drain at RD-183 L/Side
of Nara Canal.
Providing stone pitching along PFL T.M. Khan Approved
RD 120 to 130 IP side RD 135 to
& Sujawal
3.12.14
140 NIP side, RD 152 to 160 and
161 to 163 NIP side Village Abral
and Re-Sectioning of Gunj Bahar
Branch and Repair of Head
Regulator, Road Bridge, dumping
of stone pitching and
Rehabilitation of Laikpur Ex: Ali
Bahar Distry and protection wall
and Earth work and stone pitching
along Raj wah Ex: PFL RD 0 to 30
and Earth work and stone pitching
along Ghari Wah Ex: Pinyari Br.
RD 4 to 6 with cattle ramp at RD
06. Reconstruction/ repair of
regulators in Sujawal District
Rehabilitation / Re-Sectioning of
T. M. Khan Approved
Matli Branch 0 to tail & Manik
26.12.14
Wah 0 to tail and Bridge over
Fulleli in Matli City.
Rehabilitation of Saida Wah
Badin
Approved
Regulator of Jalalani Sub Division
3.3.15
of Guni Division & Remodeling /
Rehabilitation of Main Guni Canal
RD. 0 to 210 & Hassan Ali Branch
RD 0 to 60.5.
Construction of Overhead Bridge
Badin
Approved
on Left Bank Channel at RD-319.
10.12.14

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

June-16

34.396

0.000

0.000

0.000

0.000

34.396

8.000

0.000

8.000

0.000

23

26.396

0.000

June-17

350.160

0.000

0.000

0.000

0.000

350.160

40.000

0.000

40.000

0.000

11

100.000

210.160

June-16

335.585

0.000

0.000

0.000

0.000

335.585

40.000

0.000

40.000

0.000

12

100.000

195.585

June-16

270.000

0.000

0.000

0.000

0.000

270.000

35.000

0.000

35.000

0.000

13

100.000

135.000

June-15

40.630

0.000

0.000

0.000

0.000

40.630

8.000

0.000

8.000

0.000

20

32.630

0.000

[ 141 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

772

Remodelling / Raising &


Strengthening the Banks of Adio
Distry (Adio Wah) from RD- 0 to
84 B/Sides and Bridge near Village
Abdul Qayoom Mazari
Construction of Protection Wall to
Kashmore city along Kandhkot
Branch (Raj Wah) from RD- 0 to
11
Restoration / Rehabilitation of
Hairo Distry from RD- 8 to 53 and
extension from RD- 53 to 83.
Rehabilitation & Renovation of
Irrigation Colony No.1 Kashmore
including Electric works and
Construction of office Block and
Residence of Tori Sub Division @
Tori Damaged during Flood-2010
Rehabilitation and Renovation of
Geehal Pur Minor
Construction of Prestressed Bridge
over B.S. Feeder near Zahir Peer
(remaining works)
Rehabilitation & Renovation of
K.K Feeder RD- 0 to 84.
Lining of Gandher Distry RD- 0 to
40.200
De-silting along B.S.Feeder RD-0
to RD-45
Lining of New Hazaro Distry RD0 to 40
Lining of Shahpur Distributory
from RD- 0.0 to 30.0
Rehabilitation of Lal Shahbaz and
Kotri Minor.
Lining of Thull Distry.

773

774

775

776
777

778
779
780
781
782
783
784

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

Kashmore

Approved
3.3.15

June-17

100.000

0.000

0.000

0.000

0.000

100.000

12.000

0.000

12.000

0.000

12

88.000

0.000

Kashmore

Approved
18.2.15

June-17

249.752

0.000

0.000

0.000

0.000

249.752

25.000

0.000

25.000

0.000

10

100.000

124.752

Jacobabad Approved
27.1.15

June-17

184.776

0.000

0.000

0.000

0.000

184.776

25.000

0.000

25.000

0.000

14

159.776

0.000

Kashmore

Approved
22.4.15

June-16

178.820

0.000

0.000

0.000

0.000

178.820

20.000

0.000

20.000

0.000

11

100.000

58.820

Kashmore

Approved
23.1.15
Approved
23.1.15

June-15

12.596

0.000

0.000

0.000

0.000

12.596

12.596

0.000

12.596

0.000

100

0.000

0.000

June-15

11.855

0.000

0.000

0.000

0.000

11.855

11.855

0.000

11.855

0.000

100

0.000

0.000

Approved
3.3.15
Approved
8.4.15
Approved
6.2.15
Approved
26.12.14
Approved
26.12.14
Approved
26.12.14
Approved
15.9.14

June-15

99.208

0.000

0.000

0.000

0.000

99.208

12.000

0.000

12.000

0.000

12

87.208

0.000

June-17

141.157

0.000

0.000

0.000

0.000

141.157

17.000

0.000

17.000

0.000

12

50.000

74.157

June-17

800.031

0.000

0.000

0.000

0.000

800.031

100.000

0.000

100.000

0.000

12

200.000

500.031

June-17

279.380

0.000

0.000

0.000

0.000

279.380

38.000

0.000

38.000

0.000

14

241.380

0.000

June-17

193.948

0.000

0.000

0.000

0.000

193.948

30.000

0.000

30.000

0.000

15

163.948

0.000

June-17

191.211

0.000

20.000

0.000

20.000

171.211

25.000

0.000

25.000

0.000

10

24

146.211

0.000

June-16

397.065

0.000

335.000

0.000

335.000

62.065

62.065

0.000

62.065

0.000

84

100

0.000

0.000

Kashmore

Kashmore
Kashmore
Kashmore
Jacobabad
Jacobabad
Jacobabad
Jacobabad

[ 142 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

785

Remodelling of Noor Wah

786

Normal / Emergent Works for


restoration for Irrigation &
Drainage Networks

787

Establishment of Project
Management office for Barrages;
and Development of Early
Warning System for Irrigation
Department.
Restoration / Rehabilitation of
Sultani Branch, Mir Wah System,
Morjhar Branch System and Imam
Wah Jagir System.
Construction Pumping Scheme
along L.S. Bund mile 77/2 by
pumping Water from River Indus
for Supplement Tail Areas of Dadu
Canal System (To be funded out of
10% share of Royalty)
Construction of Bridge over Dadu
Canal at RD-0 To 28+500 and
Prestressed Bridge across RD-508508 at Village Phat. (To be funded
out of 10% share of Royalty)
Rectification of Regulator and
allied guided system of Head
Regulator of Warah Branch at RD82 of Rice Canal.

788

789

790

791

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7
Jacobabad Approved
6.2.15
Sukkur / Approved
Jacobabad / 22.4.15
Thatta /
Larkana /
Dadu
Hyderabad Approved
24.10.14

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

June-17

368.000

0.000

0.000

0.000

0.000

368.000

50.000

0.000

50.000

0.000

14

100.000

218.000

June-16

1027.000

0.000

0.000

0.000

0.000

1027.000

250.000

0.000

250.000

0.000

24

200.000

577.000

June-16

100.000

0.000

19.000

0.000

19.000

81.000

0.000

12.000

12.000

0.000

19

31

69.000

0.000

Badin

Approved
18.2.15

June-16

540.497

0.000

0.000

0.000

0.000

540.497

68.000

0.000

68.000

0.000

13

150.000

322.497

Dadu

Approved
6.2.15

June-17

349.986

0.000

0.000

0.000

0.000

349.986

25.000

0.000

25.000

0.000

100.000

224.986

Dadu

Approved
3.3.15

June-17

99.918

0.000

0.000

0.000

0.000

99.918

10.000

0.000

10.000

0.000

10

89.918

0.000

Larkana

Approved
13.1.15

June-17

280.980

0.000

0.000

0.000

0.000

280.980

25.000

0.000

25.000

0.000

100.000

155.980

[ 143 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

792

793

794

795

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Construction Prestressed Bridge at Khairpur /


RD-263 R.M.C Constructing
N'Feroze
Tyndel Landhi along Kot Diji Regulator at RD-158.2, Patti Machi
X-Regulator, Repair of Jhando
Mashaikh Rest House with
Compound wall & Construc-tion /
Extension water course
10-R at
RD-21 Garhi Pathan Bund
Khairpur West Feeder.
C.C Lining of Mir Rukan Minor
S.B.A/
RD - 0 to 69, Lakhmir Minor RD Matiari
0 to 24.
Conversion of Energy source of the
Sukkur
pumping station of Patni and
Umerkash Wah on Solar Energy
for ensuring the water supplies in
Tail Reach of Patni System &
Construction of Bridge 500 ft from
Katcha Bund Pano Akil.
C.C. Lining of Sui Qandar Branch,
Matiari
Paee Minor, Dhardo Minor and
Bhobhar Minor & Matiari Minor

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

Approved
3.3.15

June-17

340.000

0.000

0.000

0.000

0.000

340.000

43.000

0.000

43.000

0.000

13

100.000

197.000

Approved
6.2.15

June-17

521.116

0.000

115.000

0.000

115.000

406.116

60.000

0.000

60.000

0.000

22

34

100.000

246.116

Approved
27.1.15

June-17

225.023

0.000

0.000

0.000

0.000

225.023

25.000

0.000

25.000

0.000

11

100.000

100.023

Approved
8.4.15

June-17

934.100

0.000

0.000

0.000

0.000

934.100

95.000

0.000

95.000

0.000

10

200.000

639.100

[ 144 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

796

Rehabilitation & Strengthening of


K.B Feeder lower RD 52 to 56, RD
60 to 70 (IP side) & Rehabilitation
of Puricha Minor and Baghar
Escape & Repair of 04 Nos. Road
Bridges and Rehabilitation of Road
Bridge at RD 65 & RD 100 and
Link canal and repair of Gates &
Gearing of RD 22 Ex: Regulator
and RD 77 Ex: Regulator along
K.B Feeder Lower and
Rehabilitation of Sondo Distry
Ghar Massan, Minor and
Rehabilitation of Existing Pumping
Station along K.B. Feeder Canal @
RD-99+0 R/Side.
Remodeling of Regulators of
Gungri Large RD 20, Sujawal XRegulator RD 90 and Chahto
Large RD 108 of Darro Branch
and Providing gates in Regulators
of (i) Chahto X-Regulator RD 108
of Darro Branch, (ii) Head
Regulator Sattah Branch RD 170
to Darro Branch, (iii) Sattah
Branch X-Regulator RD 14, 26, 70
(iv) Malia Branch Head Regulator
RD 190 of Pinyari Branch, (v)
Malia Branch X-Regulator RD 6,
(vi) Mirkhana X-Regulator RD 130
of Pinyari Branch (vii) Begnah XRegulator RD 160 of Pinyari
Branch and C.C. Lining along
Fateh Wah RD-3 to 7 in City Area
of Mirpur Bathoro.

797

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

Thatta

Approved
24.10.14

June-17

586.879

0.000

0.000

0.000

0.000

586.879

40.000

0.000

40.000

0.000

150.000

396.879

Sujawal

Approved
13.1.15

June-17

349.787

0.000

0.000

0.000

0.000

349.787

35.000

0.000

35.000

0.000

10

100.000

214.787

[ 145 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

798

Re-Sectioning of Bathoro Branch


Drain from RD 0 to 107.0 and
Construction of Arbab Link Drain
RD 0 to 10 & Extension of 5R Karo
Gungro Branch Drain from RD 26
to 36.
Rehabilitation of Modules along
Gaja Branch, Re-Sectioning &
Repair of Modules RD- 0 to 65
Both Sides, Shorki Minor RD- 0 to
53 Both Sides and Re-Sectioning /
Rehabilitation of Kazia Branch
and Shadi Large including Bridge
over Akram Wah Escape RD-64 of
Kadhan Sub Division.
Supplying and Dumping stone
along D/S X-Regulator and Road
Bridge along B.S. Feeder.
Rehabilitation of Tajo Dero Sub
Branch RD-0 to 90, Garhi Chand
Distry RD-0 to 100 & Lund Minor
RD-0 to 20.5.
C.C. Lining of Muhammad Khan
Distry.
Construction of retaining wall at
RD-51, Road Bridge along
Mithiani Distry, Dalepota Minor
RD-0 to 38 and Construction of
road Bridge along Late Minor at
Rd-4, Rd-34, 38, 40, RD-14
Dalepota Minor and Strengthening
of weak portion of Dalepota and
Ubji Minor.

799

800

801

802
803

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7
T.M.Khan Approved
& Sujawal
13.1.15

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

June-18

213.660

0.000

10.000

0.000

10.000

203.660

20.000

0.000

20.000

0.000

14

100.000

83.660

Badin

Approved
3.3.15

June-17

180.000

0.000

0.000

0.000

0.000

180.000

20.000

0.000

20.000

0.000

11

75.000

85.000

Kashmore

Approved
22.4.15

June-17

145.000

0.000

0.000

0.000

0.000

145.000

20.000

0.000

20.000

0.000

14

50.000

75.000

Jacobabad Approved
27.1.15

June-17

973.682

0.000

0.000

0.000

0.000

973.682

135.000

0.000

135.000

0.000

14

150.000

688.682

Hyderabad/ Approved
T.M.Khan
8.4.15
N. Feroze Approved
18.2.15

June-17

185.276

0.000

0.000

0.000

0.000

185.276

20.000

0.000

20.000

0.000

11

75.000

90.276

June-17

75.316

0.000

0.000

0.000

0.000

75.316

40.000

0.000

40.000

0.000

53

35.316

0.000

[ 146 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

804

805

806

807

808

809

810
811

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Remodelling of Jan Muhammad


Jacobabad Approved
Distry Ex: Mirza Branch @ RD
13.1.15
75.5 of X-Regulator, Head
Regulator, Road bridges & Water
Courses Taluka Thul District
Jacobabad.
Construction of Supplementary
Khairpur Approved
Channel I.E. Tando Masti Fall to
25.9.14
Sanharo Wah to Mohabbat Wah
along Rohri Main Canal, Taluka
Kotdigi, District Khairpur.
New Manufacturing / Replacement Jamshoro Approved
of Gates of Head Regulator and X14.11.14
ing Regulators of Kotri Barrage
Region (Revised).
Pilot Project for Lining of Rohri
S.B.A
Approved
Canal from RD-616 to RD-647
3.12.14
(UR)
Rehabilitation / Replacement XGhotki,
Approved
Regulators & Head Regultors in
Mirpurkhas 28.1.12
SIDA
& Badin
Rehabilitation of Pontoon Bulk
Jamshoro Approved
Head Gates, Gates & Gearing
3.12.14
Mechanical System Including
Painting off-taking Canal Head
Regulator and Sub-Regulator
Gates and Mechanical Structure of
Kotri Barrage Head Works.
C.C. Lining of Noor Wah Ex: Thar Mirpurkhas Approved
Canal of Umerkot Sub Division.
8.4.15
Construction of Fall Structures of Mirpurkhas Approved
Nara Canal, Resection of Ranto
4.5.2015 Canal RD 0-72, Strengthening of
CDWP
Jamro Canal Sindh (Federal
Funding) Total Cost Rs. 1482.090
Million

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

June-17

194.670

0.000

40.000

0.000

40.000

154.670

30.000

0.000

30.000

0.000

21

36

100.000

24.670

June-17

59.316

0.000

20.000

0.000

20.000

39.316

10.000

0.000

10.000

0.000

34

51

29.316

0.000

June-17

350.366

0.000

30.000

0.000

30.000

320.366

40.000

0.000

40.000

0.000

20

100.000

180.366

June-15

3120.000

0.000

3000.000

0.000

3000.000

120.000

85.000

0.000

85.000

0.000

96

99

35.000

0.000

June-17

199.000

169.250

1.046

0.000

170.296

28.704

10.000

0.000

10.000

0.000

86

91

18.704

0.000

June-17

472.840

0.000

0.000

0.000

0.000

472.840

50.000

0.000

50.000

0.000

11

100.000

322.840

June-17

795.756

0.000

0.000

0.000

0.000

795.756

100.000

0.000

100.000

0.000

13

200.000

495.756

June-17

85.580

0.000

0.000

0.000

0.000

85.580

10.000

0.000

10.000

0.000

12

75.580

0.000

[ 147 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

812

Realignment / Construction of
Bund from North Side of Malir
River, Karachi
De-silting of DIM Branch from RD0 to 166.6 (Tail).
Rehabilitation and Lining of
Jamrao Canal (i) Rehabilitation of
Jamrao Canal Old from Mile 0 To
49 Mile, (ii) Rehabilitation Of Twin
Jamrao Canal Old From Mile 0 To
59 Mile And (iii) C.C.Lining
Jamrao Canal West From Mile 0
To 300 Tail
Providing Water from Lower Nara
Canal RD-455 to Tar Hashim Via
Jasro and Construction Reservoir.
Providing Stone Pitching along
S.M.Branch RD-124 to 224 IP Side
(Outer slope) and Rehabilitation of
S.M.Branch RD-124 to 224 IP Side
and De-Silting work along
S.M.Branch RD-120 to 224 in
S.M.Branch Sub-Division No. II &
III.
Construction of Retaining wall
along Sathio Wah from RD-0 to 8
R/S (Village Wari Goth) RD-8 to 14
R/S (Village Dogar / Mahar) and
RD-24 to 27 B/S (Village Khadim
Hussain Katohar)
Construction of Bridges,
Structures and other works in Left
Bank A.W.B. Badin
Rehabilitation of Bumbly SubBranch, Lathwaro Minor.

813
814

815

816

817

818

819

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7
Karachi

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

FPA

Financial Progress
in %age upto

Financial Projection

Total
14

15

Jun'15 Jun'16
16
17

2016-17
18

Allocation for 2015-16


Capital
12

Revenue
13

2017-18
19

Approved
19.11.13

June-17

2527.000

0.000

405.000

0.000

405.000

2122.000

240.000

0.000

240.000

0.000

16

26

200.000

1682.000

Mirpurkhas Approved
3.3.15
Mirpurkhas Approved
14.5.15

June-15

33.201

0.000

0.000

0.000

0.000

33.201

18.000

0.000

18.000

0.000

54

15.201

0.000

June-17

9390.354

0.000

0.000

0.000

0.000

9390.354

50.000

0.000

50.000

0.000

100.000

9240.354

Approved
18.2.2015

June-17

1246.478

0.000

0.000

0.000

0.000

1246.478

100.000

0.000

100.000

0.000

150.000

996.478

Qamber / Approved
Shikarpur
22.4.15

June-17

369.836

0.000

0.000

0.000

0.000

369.836

20.000

0.000

20.000

0.000

50.000

299.836

Khairpur

Approved
29.5.15

June-17

255.000

0.000

0.000

0.000

0.000

255.000

20.000

0.000

20.000

0.000

50.000

185.000

Badin

Approved
29.5.15

June-17

199.762

0.000

0.000

0.000

0.000

199.762

25.000

0.000

25.000

0.000

13

50.000

124.762

Gohtki /
Sukkur

Approved
29.5.15

June-17

249.270

0.000

0.000

0.000

0.000

249.270

20.000

0.000

20.000

0.000

124.635

104.635

Sanghar

[ 148 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

820

Rehabilitation / Lining of Bago


Wah, Dahar Wah Upper (its offtaking channels) / Rehabilitation of
Irrigation Colony Ghotki and Pano
Akil including Drainage System
and Rehabilitation / Brick Lining
of Pir Wah RD- 7 to 24
Rehabilitation & Renovation of 3Bedded Bungalow No.A-I/21, in
SCARP Colony, Khairpur.
Construction Irrigation Channel
Shaheed Benazir Bhutto Minor ExWarah Branch at RD-156 NIP
Side.
Construction Retaining Wall along
Saidu Dero Minor RD-0 to 12.0 B/S
(Naudero Town Limited).
Sindh Barrages Improvement
Project (Phase-I) - Rehabilitation
and Modernization of Guddu
Barrage - Total: 20241.00 M) IDA
Share Rs. 18271.00 M & GoS
Share Rs. 1970.00 M)
Constructing J Spur along Ulra
Jagir Bund Mile 4/0+125 &
Constructing 2 No T Spurs at
Mile 4/2+300 & Mile 4/4+580

821

822

823

824

825

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7
Khairpur

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Approved
29.5.15

June-17

461.107

0.000

0.000

0.000

0.000

461.107

20.000

0.000

20.000

0.000

Approved
4-3-2014
(UR)
Kamber @ Approved
Shahdadkot 24.2.2012
(UR)

June-14

6.212

0.000

0.000

0.000

0.000

6.212

6.212

0.000

6.212

0.000

June-14

135.868

85.208

0.000

0.000

85.208

50.660

10.000

0.000

10.000

0.000

Approved
9.2.12
(UR)
Kashmore, Approved
Ghotki,
by
Jacobabad ECNEC
& Sukkur 13.5.2015

June-14

116.642

69.496

0.000

0.000

69.496

47.146

10.000

0.000

10.000

June-20

1970.000

0.000

0.000

0.000

0.000

1970.000

8.000

0.000

Khairpur

June-17

1095.284

0.000

0.000

0.000

0.000

1095.284

200.000

0.000

0.000 23869.419 55787.104

6176.603

12.000

87.500

0.000

Khairpur

Larkana

Approved
14.5.15

Total Open Canal (On-Going Schemes)

79656.523 12715.362 11240.772

2017-18
19

230.554

210.554

100

0.000

0.000

63

70

40.660

0.000

0.000

60

68

37.146

0.000

8.000 1020.000

100.000

1862.000

18

895.284

0.000

200.000

0.000

6188.603 9457.470

16649.003 32950.199

Open Canal
(New Schemes)
826

Stone Pitching Work along B.S.


Feeder from RD-50 to 269 B/S in
various portions.

Kashmore
Un@Kandhkot Approved

June-18

350.000

0.000

0.000

0.000

0.000

350.000

87.500

0.000

25

100.000

162.500

[ 149 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

827

828
829

830

831

832

833

834

835

836

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Lining of Jamal Shah Distry,


SBA
UnManhoro Minore, Rehabilitation of
Approved
Channesar Escape.
Construction of Bund Sluice at RDDadu
Un248, 275 & 295 F.P. Bund.
Approved
Cement Concrete Lining of Mell
Sanghar
UnMinor from RD-0 to 34.00 in
Approved
Tando Adam-II Sub-Division.
Replacement of Deck Slab for 3
Khairpur
UnNos. Road Bridges over Rohri
Approved
Main Canal at RD-32 Begmanji,
RD-73 Luqman & RD-73.2
Luqman Old Bridge.
Re-Construction Work along S.M. ShahdadKot
UnBranch RD-00 to 120 in S.M.
Approved
Branch Division.
Enhancing Capacity of New
Larkana
UnSupport Channel from Raj-Wah
Approved
RD-34 to Kakol Wah RD-40.
Rehabilitation of Kakol Wah from
RD-40 to RD-49 and Two Gates of
Raj Wah at Manjan.
Flood Protection Bund around
Kashmore
UnKashmore Cantt Mile 0/0 to
Approved
5/5+300 (Total Length 30,000).
C.C Lining of Thar Tail Distry and UmerKot
UnMandhel Distry of Umerkot Sub
Approved
Division.
Construction Diversion / Stone
Khairpur
UnPitching & Stone Apron for
Approved
Protection the Bank of Upper Nara
Canal at various RDs ( where
ever necessary ).
Construction of C.C Lining of RD- Shikarpur
Un0 to 20.5 L. minor off taking from
Approved
Jaro Canal at RD-12.

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

FPA

Financial Progress
in %age upto

Financial Projection

Total
14

15

Jun'15 Jun'16
16
17

2016-17
18

Allocation for 2015-16


Capital
12

Revenue
13

2017-18
19

June-18

400.000

0.000

0.000

0.000

0.000

400.000

100.000

0.000

100.000

0.000

25

150.000

150.000

June-18

54.081

0.000

0.000

0.000

0.000

54.081

13.520

0.000

13.520

0.000

25

27.041

13.521

June-18

141.697

0.000

0.000

0.000

0.000

141.697

35.424

0.000

35.424

0.000

25

70.849

35.425

June-18

111.681

0.000

0.000

0.000

0.000

111.681

27.920

0.000

27.920

0.000

25

55.841

27.921

June-18

101.679

0.000

0.000

0.000

0.000

101.679

25.420

0.000

25.420

0.000

25

50.840

25.420

June-18

150.000

0.000

0.000

0.000

0.000

150.000

37.500

0.000

37.500

0.000

25

75.000

37.500

June-18

118.623

0.000

0.000

0.000

0.000

118.623

29.655

0.000

29.655

0.000

25

59.312

29.657

June-18

300.000

0.000

0.000

0.000

0.000

300.000

75.000

0.000

75.000

0.000

25

100.000

125.000

June-18

150.000

0.000

0.000

0.000

0.000

150.000

37.500

0.000

37.500

0.000

25

75.000

37.500

June-18

150.000

0.000

0.000

0.000

0.000

150.000

37.500

0.000

37.500

0.000

25

75.000

37.500

[ 150 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

837

C.C. Lining of Jam Sahab Distry


R.D-0 to 59 and Chotko Minor Rd0 to 36.0
Rehabilitation of Dahar Wah
Upper Syetm including Narly
Minor
Lining of Desert Minor from RD-0
to 150. (Wherever Necessary)
Providing Water from Thar Wah
of UmerKot to Keetari Taluka
Chachro via Dhalo jo Tar,
Kaplore, Viklore Tar, Budha
Sandha, Vichlo Par, Ratan Jo Tar
and Construction of Under Ground
Reservoirs.
C.C Lining of Jani Dero Distry

838

839
840

841
842
843

844

845

846
847
848
849

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

FPA

Financial Progress
in %age upto

Financial Projection

Total
14

15

Jun'15 Jun'16
16
17

2016-17
18

Allocation for 2015-16


Capital
12

Revenue
13

2017-18
19

SBA

UnApproved

June-18

700.000

0.000

0.000

0.000

0.000

700.000

175.000

0.000

175.000

0.000

25

200.000

325.000

Ghotki

UnApproved

June-18

100.000

0.000

0.000

0.000

0.000

100.000

25.000

0.000

25.000

0.000

25

50.000

25.000

Ghotki

UnApproved
UnApproved

June-18

300.000

0.000

0.000

0.000

0.000

300.000

75.000

0.000

75.000

0.000

25

100.000

125.000

June-18

1000.000

0.000

0.000

0.000

0.000

1000.000

250.000

0.000

250.000

0.000

25

300.000

450.000

UnApproved
UnApproved
UnApproved

June-18

250.000

0.000

0.000

0.000

0.000

250.000

62.000

0.000

62.000

0.000

25

100.000

88.000

June-18

200.000

0.000

0.000

0.000

0.000

200.000

50.000

0.000

50.000

0.000

25

80.000

70.000

June-18

40.000

0.000

0.000

0.000

0.000

40.000

10.000

0.000

10.000

0.000

25

20.000

10.000

June-18

40.000

0.000

0.000

0.000

0.000

40.000

10.000

0.000

10.000

0.000

25

20.000

10.000

June-18

200.000

0.000

0.000

0.000

0.000

200.000

50.000

0.000

50.000

0.000

25

50.000

100.000

June-18

100.000

0.000

0.000

0.000

0.000

100.000

25.000

0.000

25.000

0.000

25

50.000

25.000

June-18

100.000

0.000

0.000

0.000

0.000

100.000

25.000

0.000

25.000

0.000

25

50.000

25.000

June-18

100.000

0.000

0.000

0.000

0.000

100.000

25.000

0.000

25.000

0.000

25

50.000

25.000

June-18

200.000

0.000

0.000

0.000

0.000

200.000

50.000

0.000

50.000

0.000

25

100.000

50.000

UmerKot

Jacobabd

C.C Lining of Phakka Distry RD-o


Dadu
to 65 Division Southern Dadu.
Revitalization of Earth Moving
Kotri
Machines & Heavy / Light Vehicles
of Feeder Division of Kotri Region
Hyderabad.
Procurement of Necessary
SBA
UnAccessories for the Rest House
Approved
LBOD Colony SBA and Annexy
Building Nasrat Division, SBA.
Remodelling / Rehabilitation of
Shikarpur
UnRaees Wah, Chotta Begari & Choi
Approved
Shakh in District Shikarpur
Remodelling of Khair Shah Minor
SBA
UnApproved
Lining of Hearan Distry
T. M. Khan
UnApproved
Lining of Khariro Minor
Jacobabd
UnApproved
Lining of Gharib Distry
T.A. Yar
UnApproved

[ 151 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

850
851

852

853

854

855
856

857
858
859
860
861

862

863

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Lining of Saien Hyderi Minor &


Thatta
Indo Distry in Distt. Thatta
Providing Stone Pitching from RD- Larkana
240 to 263.5 along F.P. Bund
Saifullah Magsi Branch Division,
Shahdadkot.
Removal of Passi / Acute Curve
Jacobabd
from 31-32 Mile on the Left Bank
(NIP) of Begari Canal.
Capacity Building of Officers/
Sindh
Officials of the Irrigation
Department
Providing / Installation of Solar
Sindh
Energy System on Barrages &
Regional Offices in Sindh.
Lining of Sangi Minor from RD-0
Ghotki
to 28
Establishment of Mechanical Circle- Mirpurkhas
II and Rehabilitation / Restoration
of Infrastructure in Mechanical
Circle, Mirpurkhas
C.C. Lining of Puran Distry RD-0 Mirpurkhas
to 135.5
Remodelling of Koreja Distry.
N. Feroze

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

UnApproved
UnApproved

June-18

120.000

0.000

0.000

0.000

0.000

120.000

30.000

0.000

30.000

0.000

25

60.000

30.000

June-18

138.760

0.000

0.000

0.000

0.000

138.760

34.690

0.000

34.690

0.000

25

69.380

34.690

UnApproved

June-18

50.000

0.000

0.000

0.000

0.000

50.000

12.500

0.000

12.500

0.000

25

25.000

12.500

UnApproved

June-18

150.000

0.000

0.000

0.000

0.000

150.000

37.500

0.000

37.500

0.000

25

75.000

37.500

UnApproved

June-18

300.000

0.000

0.000

0.000

0.000

300.000

75.000

0.000

75.000

0.000

25

150.000

75.000

UnApproved
UnApproved

June-18

116.520

0.000

0.000

0.000

0.000

116.520

29.130

0.000

29.130

0.000

25

58.260

29.130

June-18

50.000

0.000

0.000

0.000

0.000

50.000

12.500

0.000

12.500

0.000

25

25.000

12.500

Unapproved
UnApproved
Normal Emergent Flood / Rain
Sindh
UnDamages in Sindh.
Approved
Lining & Retaining Wall of Sone
Jacobabad
UnWah Distry, Taluka Thul.
approved
CC Lining of Chiber Minor RD 0 N. Feroze
Unto 10+0 & Bhogri Minor RD 0 to
approved
19
Renovation / Up-gradation of Matiari
UnWassan Inspection Bungalow Hala
approved
Sub-Division.
Providing & Installation of Solar
Jamshoro
UnEnergy System at 132 Mile Dadu
Approved
Canal (Tail) Pumping Station.

June-18

400.000

0.000

0.000

0.000

0.000

400.000

100.000

0.000

100.000

0.000

25

100.000

200.000

June-18

300.000

0.000

0.000

0.000

0.000

300.000

75.500

0.000

75.500

0.000

25

150.000

74.500

June-18

500.000

0.000

0.000

0.000

0.000

500.000

125.000

0.000

125.000

0.000

25

100.000

275.000

June-18

180.000

0.000

0.000

0.000

0.000

180.000

45.000

0.000

45.000

0.000

25

50.000

85.000

June-18

180.000

0.000

0.000

0.000

0.000

180.000

45.000

0.000

45.000

0.000

25

50.000

85.000

June-18

60.000

0.000

0.000

0.000

0.000

60.000

15.000

0.000

15.000

0.000

25

30.000

15.000

0.000

0.000

0.000

0.000

200.000

50.000

0.000

50.000

0.000

25

50.000

100.000

June-18

200.000

[ 152 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

864

Allocation for Remaining Works /


Payment of Past year's ADP
approved schemes No.746,782, 652,
664, 726, 724, 730, 802, 814, 722,
630 of 2013-14, 215 of 2012-13, 182
of 2010-11, 181 of 2011-12, 209 of
2006-07, 176 of 2009-10 & ADP
No. 124 / 2009-10 (NDP)
Stone Pitching along Hyder Minor

865
866
867
868

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7
Sindh

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

UnApproved

June-18

205.886

0.000

0.000

0.000

0.000

205.886

51.473

0.000

51.473

0.000

25

50.000

104.413

UnApproved
Extension of modules from Jamaro
Sanghar
UnCanal (Karichan)
Approved
C.C Lining of Digri Distry
Mirpurkhas
Unincluding Structures (93 RDs)
Approved
Lining of Kashmore Minor
Kashmore
UnApproved

June-18

100.000

0.000

0.000

0.000

0.000

100.000

25.000

0.000

25.000

0.000

25

50.000

25.000

June-18

200.000

0.000

0.000

0.000

0.000

200.000

50.000

0.000

50.000

0.000

25

50.000

100.000

June-18

150.000

0.000

0.000

0.000

0.000

150.000

37.500

0.000

37.500

0.000

25

75.000

37.500

June-17

200.000

0.000

0.000

0.000

0.000

200.000

50.000

0.000

50.000

0.000

25

150.000

0.000

0.000
0.000 8958.927
0.000 23869.419 64746.031

2239.732
8416.335

0.000
12.000

Khairpur

Total Open Canal (New Schemes)


Total Open Canals

8958.927
0.000
0.000
88615.450 12715.362 11240.772

2239.732
0.000
8428.335 9457.470

3376.521 3342.675
20025.523 36292.873

Small Dams Projects


(On-Going Schemes)
869

870

871

872

Construction of Recharge Dam


Jamshoro
Malirriri in Union Council Jhngara
Taluka Sehwan District Jamshoro
in Central Kohistan.
Construction of Mohan & Haleli
Jamshoro
Recharge Dam in Central Kohistan
Construction of 2 Nos. Small
Storage & Delay Action Dams
Miskeen Jahan Khan Khoso and
Bartlao Dam in Taluka
Nagarparkar
Construction of Ashoro Kach
Diversion Bund Dam in Central
Kohistan

Approved
29.11.12

June-16

260.705

89.996

134.060

0.000

224.056

36.649

36.649

0.000

36.649

0.000

86

100

0.000

0.000

Approved
29.11.12

June-17

427.347

60.000

202.234

0.000

262.234

165.113

30.000

0.000

30.000

0.000

61

68

50.000

85.113

Tharparkar Approved
12.12.13

June-17

198.926

10.000

42.000

0.000

52.000

146.926

25.000

0.000

25.000

0.000

26

39

50.000

71.926

June-17

250.000

20.000

95.000

0.000

115.000

135.000

35.000

0.000

35.000

0.000

46

60

100.000

0.000

Jamshoro

Approved
12.12.13

[ 153 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

873

Construction of Kali Das Dam and


Veera Wah Dam in Nagarparkar
Area (Thar Region).
Construction of Recharge Dam
across Angai-II Nai in Central
Kohistan.
Construction of Gravity Weir /
recharge Dam across Gamrach
Dhoro in Central Kohistan &
Construction of Guwari recharge
Dam in Central Kohistan near
Jhangara Taluka Sehwan
Rehabilitation / Restoration of
Malir weirs I, II, III & Thado
Dam.
Construction of Meer Chakar Weir
along (Abdar & Mol Nai) Gaddap
Town, Karachi.
Construction of Water Reservoir of
Kotaro Dam, U.C. Toung Sharif,
Taluka Thana Bula Khan and
Construction of Small Dam at
Village Wariyal Khoso, Taluka
Manjhand, District Jamshoro.
Construction of Four (04) Nos.
Recharge Dams Dillan, Angai,
Naing & Mazarani Recharge Dam
in Upper & Central Kohistan.
Construction of Six (06) Nos.
Umeed-Jo-Wandio,
Ranasar,
Gotrawa,
Abasar,
Khane-JoWandio and Khetlai Dams in
Nagarparkar Area (Thar Region).

874

875

876

877

878

879

880

Total Small Dams (On-going)


Small Dams Projects
(New Schemes)

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7
Tharparkar Approved
18.2.15

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

June-17

703.370

0.000

0.000

0.000

0.000

703.370

35.000

0.000

35.000

0.000

50.000

618.370

Dadu

Approved
6.2.15

June-17

340.000

0.000

0.000

0.000

0.000

340.000

38.000

0.000

38.000

0.000

11

50.000

252.000

Jamshoro

Approved
6.2.15

June-17

484.608

0.000

0.000

0.000

0.000

484.608

35.000

0.000

35.000

0.000

100.000

349.608

Karachi

Approved
3.12.15

June-17

399.669

0.000

0.000

0.000

0.000

350.000

43.000

0.000

43.000

0.000

100.000

207.000

Karachi

Approved
6.2.15

June-17

366.229

0.000

0.000

0.000

0.000

366.229

50.000

0.000

50.000

0.000

14

50.000

266.229

Jamshoro

Approved
7.4.15

June-16

19.459

0.000

0.000

0.000

0.000

19.459

19.459

0.000

19.459

0.000

100

0.000

0.000

Dadu /
Jamshoro

Approved
14.5.2015

June-17

942.000

0.000

0.000

0.000

0.000

942.000

20.000

0.000

20.000

0.000

100.000

822.000

Dadu /
Jamshoro

Approved
14.5.2015

June-17

852.000

0.000

0.000

0.000

0.000

852.000

20.000

0.000

20.000

0.000

100.000

732.000

5244.313

179.996

473.294

0.000

653.290

4541.354

387.108

0.000

387.108

414.589

750.000

3404.246

[ 154 ]

PROVINCIAL
IRRIGATION DEPARTMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

881

Construction of Re-Charge Dam


across Dhal Nai in Central
Kohistan
Construction of Gravity Weir Dam
across Dhadhar Nai Upper
Khoistan

882

Total Small Dams (New Schemes)


Total Small Dams

Target
Actual
Location of
Status
Estimated Expenditu
Date
for
Scheme/
Date of
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Revised
Estimated ThrowforAllocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

Jamshoro

Unapproved

June-18

198.112

0.000

0.000

0.000

0.000

198.112

49.52800

0.000

49.528

0.000

25

50.000

98.584

Jamshoro

Unapproved

June-18

199.996

0.000

0.000

0.000

0.000

199.996

49.45400

0.000

49.454

0.000

25

50.000

100.542

398.108
5642.421

0.000
179.996

0.000
473.294

0.000
0.000

0.000
653.290

398.108
4939.462

98.982
486.090

0.000
0.000

98.982
486.090

0.000
0.000

100.000
850.000

199.126
3603.372

8910.169
2943.331

54.000
92.500

Total On-Going Schemes


Total New Schemes

107775.490 14921.117 13711.160


12148.135
0.000
0.000

0.000 28542.162 79183.659


0.000
0.000 12148.135

8964.169 9457.470
3035.831
0.000

22603.307 47379.313
4620.504 4491.801

Total Irrigation Department:-

119923.625 14921.117 13711.160

0.000 28542.162 91331.794 11853.500 146.500 12000.000 9457.470

27223.810 51871.113

[ 155 ]

SUMMARY
KATCHI ABADIS & SPATIAL DEVELOPMENT DEPARTMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
( Rs. In million )
Sr No.

Sub-Sector

Throwforward as No. of
on 01.07.15 Schemes

On-Going
Capital

Revenue

Total

No. of
Schemes

New
Capital

Revenue

Total

10

11

No. of
Schemes

Total
FPA

Grand
Total
(15+16)

Capital

Revenue

Total

12

13

14

15

16

17

Financial Projection
2016-17

2017-18

18

19

Katchi Abadis

97.137

57.120

0.000

57.120

29.880

0.000

29.880

87.000

0.000

87.000

0.000

87.000

0.000

0.000

TOTAL

97.137

57.120

0.000

57.120

29.880

0.000

29.880

87.000

0.000

87.000

0.000

87.000

0.000

0.000

[ 156 ]

PROVINCIAL
KATCHI ABADIS & SPATIAL DEVELOPMENT DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Actual
Location of
Status
Target
Estimated Expenditu
Scheme/
Date of
Date for
Cost
re upto
District
Approval Completion
June, 14
3
4
5
6
7

Revised
Allocation
2014-15
Total
8

Estimated
ThrowforAllocation for 2015-16
Expenditwar as on
ure upto
01-07-15
Capital Revenue Total
F.P.A. June' 15
9
10
11
12
13
14

FPA
15

Financial Progress
in %age upto

Financial
Projection

Jun'15 Jun'16 2016-17 2017-18


16
17
18
19

Katchi Abadis
(On Going Schemes)
883 Construction of CC Drains/ Topping/
Flooring/ Block, Sewerage and Water
Supply System in different Katchi
Abadies in SBA, Khairpur, Larkana,
Sukkur, Hyderababd, Mirpurkhas,
Thatta & Karachi

SBA,
Approved
Khairpur, 01.02.15
Larkana,
Sukkur,
Hyderababd
,
Mirpurkhas,
Thatta &
Karachi

June-16

Total Katchi Abadis (On-going Schemes)

57.120

0.000

0.000

0.000

0.000

57.120

57.120

0.000

57.120

0.000

57.120

0.000

0.000

0.000

0.000

57.120

57.120

0.000

57.120

0.000

40.017

0.000

0.000

0.000

0.000

40.017

29.880

0.000

29.880

0.000

40.017
97.137

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

40.017
97.137

29.880
87.000

0.000
0.000

29.880
87.000

0.000
0.000

100

0.000

0.000

0.000

0.000

0.000

0.000

0.000
0.000

0.000
0.000

Katchi Abadis
(New Scheme)
884 Slums Infrastructures Development
Program

Total Katchi Abadies (New Scheme)


Total Katchi Abadies

Jamshoro,
UnSBA,
Approved
Karachi,
Hyderabad

June-16

75

[ 157 ]

SUMMARY
LABOUR & HUMAN RESOURCES DEPARTMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
(Rs. In million)
Sr
No.

Sub-Sector

ThrowNo. of
forward as
Schemes
on 01.07.15

On-Going

No. of
Schemes

New

Capital
5

Revenue
6

Total
7

Labour & HR Department

187.906

42.799

47.201

90.000

5.000

5.000

Total Labour & HR Deptt:

187.906

42.799

47.201

90.000

5.000

5.000

Capital Revenue
9
10

Total
11

No. of
Schemes

Total

FPA

Grand
Total
(15+16)

Financial Projection

12

Capital
13

Revenue
14

Total
15

16

17

2016-17
18

2017-18
19

10.000

47.799

52.201

100.000

0.000

100.000

87.906

0.000

10.000

47.799

52.201

100.000

0.000

100.000

87.906

0.000

[ 158 ]

PROVINCIAL
LABOUR & HUMAN RESOURCES DEPARTMENT
(Rs. in Million)
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Actual
Status
Target Date
Estimated Expenditu
Date of
for
Cost
re upto
Approval Completion
Jun, 14
4
5
6
7

Revised
Estimated
ThrowforAllocation for 2015-16
Allocation
Expenditward as on
2014-15
ure upto
01-07-15
Capital Revenue Total
Total F.P.A. June' 15
8
9
10
11
12
13
14

FPA
15

Financial Progress
in %age upto

Financial
Projection

Jun'15 Jun'16 2016-17 2017-18


16
17
18
19

Labour & Human Resources


(On-Going Schemes)
885 Construction of Building for
Employment Exchanges in Sindh
(Phase-I)(C:46.457+R:3.624)

Karachi,
Approved
Hyderabad, 18.07.07
Mirpurkhas,
Dadu,
Sukkur
Karachi,
Approved
Badin,
27.03.10
Sanghar,
SBA,
Khairpur,
Thatta,
N'Feroze
Sukkur,
Approved
MPK, Badin, 13.10.11
Larkana

June-15

50.081

45.403

1.054

0.000

46.457

3.624

0.000

3.624

3.624

0.000

93

100

0.000

0.000

June-16

127.725

25.000

12.145

0.000

37.145

90.580

18.190

28.204

46.394

0.000

29

65

44.186

0.000

June-16

56.749

24.964

10.734

0.000

35.698

21.051

21.051

0.000

21.051

0.000

63

100

0.000

0.000

888 Establishment of Vocational Guidance


Karachi,
Approved
& Career Counseling offices in Sindh Hyderabad, 16.04.11
(R:30.000)
Larkana

June-16

30.000

0.000

0.426

0.000

0.426

29.574

0.000

15.373

15.373

0.000

53

14.201

0.000

889 Establishment of Dispensary Building


at Khairpur & Sukkur (C:8.058)

June-16

8.058

3.000

1.500

0.000

4.500

3.558

3.558

0.000

3.558

0.000

56

100

0.000

0.000

272.613

98.367

25.859

0.000

124.226

148.387

42.799

47.201

90.000

0.000

58.387

0.000

886 Construction of Building for Nine (9)


Employment Exchanges and repair /
renovation of two existing building
employment in Sindh
(C:99.701+R:28.024)

887 Consturction of office of Assistant


Director Labour (5 Units)
(C:53.843+R:2.906)

Khairpur,
Sukkur

Total Labour & H.R (On-Going Schemes)

Approved
13.10.11

[ 159 ]

PROVINCIAL
LABOUR & HUMAN RESOURCES DEPARTMENT
(Rs. in Million)
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Actual
Status
Target Date
Estimated Expenditu
Date of
for
Cost
re upto
Approval Completion
Jun, 14
4
5
6
7

Revised
Estimated
ThrowforAllocation for 2015-16
Allocation
Expenditward as on
2014-15
ure upto
01-07-15
Capital Revenue Total
Total F.P.A. June' 15
8
9
10
11
12
13
14

FPA
15

Financial Progress
in %age upto

Financial
Projection

Jun'15 Jun'16 2016-17 2017-18


16
17
18
19

Labour & Human Resources


(New Schemes)
890 Office Automation and Inforamtion
Technology Facilities for Directorate
of Labour
Total Labour & H.R (New Schemes)
Total Labour & H.R Department:

Karachi

UnApproved

June-17

39.519

0.000

0.000

0.000

0.000

39.519

5.000

5.000

10.000

0.000

39.519
312.132

0.000
98.367

0.000
25.859

0.000
0.000

0.000
124.226

39.519
187.906

5.000
47.799

5.000
52.201

10.000
100.000

0.000
0.000

25

29.519

0.000

29.519
87.906

0.000
0.000

[ 160 ]

SUMMARY
LAW, P.A, PROSECUTION & HUMAN RIGHTS DEPARTMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
(Rs. In million)
Sr
No.

Sub-Sector

On-Going

No. of
Schemes

New
Capital Revenue

Total

No. of
Schemes

FPA

Grand
Total
(15+16)

Total

Capital

Revenue

Total

Capital

Revenue

Total

10

11

12

13

14

15

16

17

2792.5921
51.895

25
2

248.613
10.000

40.000
0.000

288.613
10.000

8
0

176.387
0.000

0.000
0.000

176.387
0.000

33
2

425.000
10.000

40.000
0.000

465.000
10.000

0.000
0.000

465.000
10.000

Human Rights

135.369

0.000

40.000

40.000

0.000

0.000

0.000

0.000

40.000

40.000

0.000

40.000

Total Law, P.A, Prosec & HR

2979.856

30

258.613

80.000

338.613

176.387

0.000

176.387

38

435.000

80.000

515.000

0.000

515.000

Financial Projection
2016-17

2017-18

18

19

Law
(a) Judicial (Buildings)
(b) Prosecution

ThrowNo. of
forward as
Schemes
on 01.07.15

1198.766 1149.582
20.948
20.948
95.369

0.000

1315.083 1170.530

[ 161 ]

PROVINCIAL
LAW, P.A, PROSECUTION & HUMAN RIGHTS DEPARTMENT
( Rs. in million )
Actual
Target
Estimated Expenditu
Date for
Cost
re upto
Completion
June, 14

Gen.S
r. No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Date of
Approval

Sukkur

Approved
07.01.10

S.B.A

Approved
17.4.14
Approved
16.04.13
Approved
26.12.12
U.R
Approved
26.12.14
Approved
27.2.15
Approved
22.4.15

Revised
Allocation
2014-15
Total
8

Estimated ThrowforAllocation for 2015-16


Expendit- ward as
ure upto
on
F.P.A. June' 15 01-07-15 Capital Revenue Total
9
10
11
12
13
14

FPA

15

Financial Progress
in %age upto

Financial Projection

Jun'15 Jun'16 2016-17


16
17
18

2017-18
19

Jun-17

22.426

9.293

0.000

0.000

9.293

13.133

5.000

0.000

5.000

0.000

41

64

8.133

0.000

Jun-16

24.550

14.800

1.930

0.000

16.730

7.820

7.820

0.000

7.820

0.000

68

100

0.000

0.000

Jun-16

52.388

18.670

16.859

0.000

35.529

16.859

16.859

0.000

16.859

0.000

68

100

0.000

0.000

Jun-16

20.381

8.191

6.097

0.000

14.288

6.093

6.096

0.000

6.096

0.000

70

100

0.000

0.000

Jun-18

150.120

0.000

0.000

0.000

0.000

150.120

8.778

0.000

8.778

0.000

70.671

70.671

Jun-17

23.274

0.000

0.000

0.000

0.000

23.274

5.000

0.000

5.000

0.000

21

18.274

0.000

Jun-18

544.002

0.000

0.000

0.000

0.000

544.002

15.000

0.000

15.000

0.000

264.501

264.501

837.141

50.954

24.886

0.000

75.840

761.301

64.553

0.000

64.553

0.000

361.579

335.172

BUILDINGS
Government Servant Housing
Judicial Department
(On-Going Schemes)
891 Construction of 4 Bungalows for
Judicial Officers Civil Judge & Sr.
Civil Judge at Pano Aqil & Rohri
District Sukkur
892 Construction of 2 Nos Bungalows @
Sakrand (Revised)
893 Construction of 4 Nos Bungalows @
Tando Mohammad Khan
894 Construction of 2 Nos. Bungalows @
Matiari
895 Construction of Staff Colony of
Circuit Court Larkana (Revised)
896 Construction of 2 Nos Bungalows @
Hala
897 Construction of Residential & Studio
Apartment at Bath Island Bungalow
Nos. 2,3 & 4, Karachi
Judicial GSH (On-Going)

T.M. Khan
Matiari

Larkana
Hyderabad
Karachi

Government Servant Housing


Judicial
(New Schemes)
898 Const: of Huts/Rest House for the
Honourable Judges of Honourable
Sindh High Court of Hawksbay.
899 Re-Construction/ Rehabilitation of
Judges Lodges at Sukkur
900 Construction of Judges Lodge at
Larkana
Judicial GSH (New)
Total Judicial GSH

Karachi

UnApproved

Jun-18

50.000

0.000

0.000

0.000

0.000

50.000

12.500

0.000

12.500

0.000

25

18.750

18.750

Sukkur

Un-App

Jun-18

58.250

0.000

0.000

0.000

0.000

58.250

14.563

0.000

14.563

0.000

25

21.844

21.844

Larkana

Un-App

Jun-18

68.466

0.000

0.000

0.000

0.000

68.466

17.117

0.000

17.117

0.000

25

25.675

25.675

176.716
1013.857

0.000
50.954

0.000
24.886

0.000
0.000

0.000
75.840

176.716
938.017

44.180
108.733

0.000
0.000

44.180
108.733

0.000
0.000

66.268
427.847

66.268
401.440

[ 162 ]

PROVINCIAL
LAW, P.A, PROSECUTION & HUMAN RIGHTS DEPARTMENT
( Rs. in million )
Actual
Target
Estimated Expenditu
Date for
Cost
re upto
Completion
June, 14

Revised
Allocation
2014-15

Estimated ThrowforAllocation for 2015-16


Expendit- ward as
ure upto
on
F.P.A. June' 15 01-07-15 Capital Revenue Total
9
10
11
12
13
14

Financial Progress
in %age upto

Gen.S
r. No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Date of
Approval

901 Construction of New Annexe


Buildings No. I & II Courts in the
premises of Sindh High Court
Karachi (Re-revised)
Cost Rs. 985.825 (Capital Rs. 885.595
+ Revenue Rs. 100.230 Million)

Karachi

Approved
15.09.14

Jun-18

985.825

385.150

20.320

0.000

405.470

580.355

35.000

40.000

75.000

0.000

41

49

252.678

252.678

902 Construction of District Court


Building at Qambar (Revised)
903 Construction of District Court
Building at Kashmore @ Kandhkot

Qambar

Approved
09.02.12
Approved
15.07.06

Jun-15

177.265

155.235

11.015

0.000

166.250

11.015

11.015

0.000

11.015

0.000

94

100

0.000

0.000

Jun-15

135.602

81.313

0.000

0.000

81.313

54.289

5.000

0.000

5.000

0.000

60

64

24.645

24.645

Approved
26.12.11
U.R
Approved
24.04.08
U.R
Approved
11.05.10

Jun-15

144.608

137.608

0.000

0.000

137.608

7.000

7.000

0.000

7.000

0.000

95

100

0.000

0.000

Jun-14

87.213

75.432

17.750

0.000

93.182

0.000

6.675

0.000

6.675

0.000

107

114

0.000

0.000

Jun-15

45.556

20.188

12.864

0.000

33.052

12.504

12.504

0.000

12.504

0.000

73

100

0.000

0.000

Approved
10.07.09
U.R
Approved
10.07.09
Approved
11.09.13

Jun-15

26.851

24.704

0.000

0.000

24.704

0.000

4.000

0.000

4.000

0.000

92

107

0.000

0.000

Jun-15

21.796

0.000

0.000

0.000

0.000

21.796

5.000

0.000

5.000

0.000

23

16.796

0.000

Jun-15

135.256

5.000

15.500

0.000

20.500

114.756

8.000

0.000

8.000

0.000

15

21

53.378

53.378

Total
8

FPA

15

Financial Projection

Jun'15 Jun'16 2016-17


16
17
18

2017-18
19

Government Office Building


Judicial Department
(On-Going Schemes)

904 Construction of District Court


Building @ Matiari (Revised)
905 Provision of Bar Room & Library in
Judl: Distt: across the Sindh

Kashmore
Matiari

Sindh

906 Constt: of Bar Room Library.


Litigant Shed with Canteen & Vehicle
Shade at High Court Circuit Bench at
Larkana

Larkana

907 2 Courts for Civil Judge & Judicial


Magistrate at Rohri

Sukkur

908 1 Court for Civil Judge at Pano Aqil

Sukkur

909 Improvement/ Rehabilitation/


Renovation of City Court Building,
Karachi Campus I & II (Revised)

Karachi

910 Construction of Compound Wall


Sindh Judicial Academy at Karachi

Karachi

Approved
21.09.10

Jun-15

78.826

13.451

0.000

0.000

13.451

65.375

12.324

0.000

12.324

0.000

17

33

26.526

26.526

Khairpur

Approved
26.10.11
U.R

Jun-15

56.308

37.000

8.327

0.000

45.327

10.981

5.000

0.000

5.000

0.000

80

89

5.981

0.000

911 Construction of 4 Nos. Courts @


Gambat

[ 163 ]

PROVINCIAL
LAW, P.A, PROSECUTION & HUMAN RIGHTS DEPARTMENT
( Rs. in million )
Actual
Target
Estimated Expenditu
Date for
Cost
re upto
Completion
June, 14

Revised
Allocation
2014-15

Estimated ThrowforAllocation for 2015-16


Expendit- ward as
ure upto
on
F.P.A. June' 15 01-07-15 Capital Revenue Total
9
10
11
12
13
14

Financial Progress
in %age upto

Gen.S
r. No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Date of
Approval

912 Construction of 4 Nos. Courts @ Rato


Dero

Larkana

Jun-15

45.578

25.000

7.000

0.000

32.000

13.578

5.000

0.000

5.000

0.000

70

81

8.578

8.578

913 Construction of 2 Nos. Courts @


Mirwah

Khairpur

Approved
April,12
U.R
Approved
15.03.12
U.R
approved
17.04.14
approved
27.02.14

Jun-15

29.363

29.363

3.000

0.000

32.363

0.000

1.500

0.000

1.500

0.000

110

115

0.000

0.000

Jun-16

44.386

0.000

1.000

0.000

1.000

43.386

5.000

0.000

5.000

0.000

14

19.193

19.193

Jun-17

46.884

0.000

4.000

0.000

4.000

42.884

10.380

0.000

10.380

0.000

31

16.252

16.252

Approved
3.12.14

Jun-18

242.245

0.000

0.000

0.000

0.000

242.245

15.000

0.000

15.000

0.000

113.623

113.623

Hyderabad

Approved
3.12.14

Jun-18

77.917

0.000

0.000

0.000

0.000

77.917

8.000

0.000

8.000

0.000

10

34.959

34.959

Karachi

Approved
6.11.14

Jun-18

48.758

0.000

21.096

0.000

21.096

27.662

27.662

0.000

27.662

0.000

43

100

0.000

0.000

989.444 121.872

0.000

1111.316

1325.743

184.060

40.000

224.060

0.000

572.607

549.830

914 Construction of 2 Nos. Courts @


S.B.A.
Sakrand
915 Rehabilitation of Old High Court
Hyderabad
Building & Annexe Building at
Circuit Hyderabad
916 Construction of 16 Nos Courts at
Karachi
District Court Building Malir Karachi
917 Constt of undergrounf car parking
and Auditorium Hall @ High Court
Circuit Hyderababd
918 Installation of Lifts (5 Nos) at City
Court Premises Karachi
Judical GOB (On-Going )

919
920
921

922
923

Government Office Building


Judicial Department
(New Schemes)
Construction of Judicial Complex
Tharparkar @ Mithi
Construction of 3 Nos. Courts @
Matli
Construction of Court Building at:
District Dadu(1 No); Mirpurkhas (1
No)
Construction of Civil Court Buidling
at Mirpur Bathoro, Thatta
Construction of Civil Court Buidling
at Mirpur Sakro at Gharo, Thatta
Judical GOB (New)
Total Judical GOB
Judical Department (OG)
Judical Department (New)
Total Judical Department

2430.237

Tharparkar

UnApproved
Badin
UnApproved
Dadu,
UnMirpurkhas Approved
,
Thatta
Un-App
Thatta

Un-App

Total
8

FPA

15

Financial Projection

Jun'15 Jun'16 2016-17


16
17
18

2017-18
19

Jun-17

305.454

0.000

0.000

0.000

0.000

305.454

76.363

0.000

76.363

0.000

25

114.546

114.546

Jun-16

88.092

0.000

0.000

0.000

0.000

88.092

22.023

0.000

22.023

0.000

25

33.035

33.035

Jun-16

70.286

0.000

0.000

0.000

0.000

70.286

17.571

0.000

17.571

0.000

25

26.358

26.358

Jun-18

32.500

0.000

0.000

0.000

0.000

32.500

8.125

0.000

8.125

0.000

25

12.188

12.188

Jun-18

32.500

0.000

0.000

0.000

0.000

32.500

8.125

0.000

8.125

0.000

25

12.188

12.188

0.000
0.000
989.444 121.872
1040.397 146.758
0.000
0.000
1040.397 146.758

0.000
0.000
0.000
0.000
0.000

0.000
1111.316
1187.155
0.000
1187.155

528.832
1854.575
2087.044
705.548
2792.592

132.207
316.267
248.613
176.387
425.000

0.000
40.000
40.000
0.000
40.000

132.207
356.267
288.613
176.387
465.000

0.000
0.000
0.000
0.000
0.000

198.313
770.919
934.186
264.581
1198.766

198.313
748.142
885.002
264.581
1149.582

528.832
2959.069
3267.378
705.548
3972.926

[ 164 ]

PROVINCIAL
LAW, P.A, PROSECUTION & HUMAN RIGHTS DEPARTMENT
( Rs. in million )
Actual
Target
Estimated Expenditu
Date for
Cost
re upto
Completion
June, 14

Gen.S
r. No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Date of
Approval

Sindh

Approved
13.06.08
U.R

Jun-14

Revised
Allocation
2014-15
Total
8

Estimated ThrowforAllocation for 2015-16


Expendit- ward as
ure upto
on
F.P.A. June' 15 01-07-15 Capital Revenue Total
9
10
11
12
13
14

FPA

15

Financial Progress
in %age upto

Financial Projection

Jun'15 Jun'16 2016-17


16
17
18

2017-18
19

Government Office Building


Prosecution
(On-Going Scheme)
924 Construction of offices for the
prosecutor in Sindh. (22 Nos)

Prosecution GOB (On-Going)

256.826

253.404

0.000

0.000

253.404

256.826

253.404

0.000

0.000

359.161

300.688

10.000

0.000

310.688

48.473

300.688 10.000
554.092 10.000
1594.489 156.758

0.000
0.000
0.000

310.688
564.092
1751.247

253.404

3.422

3.422

0.000

3.422

0.000

3.422

3.422

0.000

3.422

0.000

6.578

0.000

6.578

0.000

48.473
51.895
2844.487

6.578
10.000
435.000

0.000
0.000
40.000

6.578
10.000
475.000

0.000
0.000
0.000

99

100

0.000

0.000

0.000

0.000

20.948

20.948

20.948
20.948
1219.714

20.948
20.948
1170.530

Government Servant Housing


Prosecution
(On-Going Scheme)
925 Construction of officers/officials
residential accomodation for the
prosecutors in Sindh.

Sindh

Approved
27.08.08

Jun-16

Prosecution GSH (On-Going)


Total Prosecution
TOTAL BUILDINGS :-

359.161
615.987
4588.913

87

88

HUMAN RIGHTS
(On-Going Schemes)
926 Establishment of Human Rights
Complaint Cell.
927 Free Legal Aid Centre @ District
Level.
928 Series of Awareness Compaign of
Human Rights.
Total Human Rights :Total Law, P.A, Prosec & HR (O.G)
Total Law, P.A, Prosec & HR (New)
TOTAL LAW P.A, PROSEC. & HR

Karachi
Sindh
Sindh

Approved
24.02.11
Approved
24.02.11
Approved
24.02.11

Jun-15

99.742

28.340

14.000

0.000

42.340

57.402

0.000

14.000

14.000

0.000

42

56

43.402

0.000

Jun-15

99.647

46.950

10.000

0.000

56.950

42.697

0.000

14.000

14.000

0.000

57

71

28.697

0.000

Jun-15

92.580

45.310

12.000

0.000

57.310

35.270

0.000

12.000

12.000

0.000

62

75

23.270

0.000

120.600 36.000
1715.089 192.758
0.000
0.000
1715.089 192.758

0.000
0.000
0.000
0.000

156.600
1907.847
0.000
1907.847

135.369
2274.308
705.548
2979.856

0.000
258.613
176.387
435.000

40.000
80.000
0.000
80.000

40.000
338.613
176.387
515.000

0.000
0.000
0.000
0.000

95.369
1050.502
264.581
1315.083

0.000
905.949
264.581
1170.530

291.969
4175.334
705.548
4880.882

[ 165 ]

SUMMARY
LIVESTOCK & FISHERIES DEPARTMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
S.No.

Sector/Sub-Sector

Throw
No. of
forward as
Scheme
on 01.07.15
3
4

On-Going

New

Capital

Revenue

Total

No. of
Scheme

Total

Total

No. of
Scheme

Capital

Revenue

Total

10

11

12

13

14

15

16

Grand
Total
(15+16)
17

Capital Revenue

FPA

(Rs. in million)
Financial Projection
2016-17

2017-18

18

19

Animal Husbandry

3779.823

12

315.567

431.608

747.175

12.000

108.000

120.000

20

327.567

539.608

867.175

130.000

997.175

2753.088

164.561

Fisheries

2119.761

89.723

363.272

452.995

40.000

39.830

79.830

129.723

403.102

532.825

0.000

532.825

1468.701

118.235

Total Livestock & Fisheries

5899.584

17

405.290

794.880

1200.170

11

52.000

147.830

199.830

28

457.290

942.710

1400.000

130.000

1530.000

4221.789

282.796

[ 166 ]

PROVINCIAL
LIVESTOCK & FISHERIES DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Actual
Revised Allocation Estimated ThrowforLocation of
Status Target Date
Allocation for 2015-16
Estimated Expenditure
Expendit2014-15
Scheme/
Date of
for
ward as on
Cost
upto June,
ure upto
District
Approval Completion
01-07-15
14
Capital Revenue
Total
Total
F.P.A. June' 15
3
4
5
6
7
8
9
10
11
12
13
14

FPA
15

Financial
Progress in %age Financial Projection
upto

Jun'15 Jun' 16
16
17

2016-17
18

2017-18
19

Livestock
Animal Husbandry
(On-Going Schemes)
929 Strengthening of Viral and Protozoan Hyderabad Approved
Disease Diagnostic Facilities at
13.01.15
Central Veterinary Diagnostic
laboratory (CVDL), Tando Jam Revised (C: 21.399 + R: 209.448)
930 Provision of Sheds, Improved
Hyderabad Approved
laboratory for semen collection,
16.08.13
preparation and preservation for
genetically improved animals
(C:106.755 + R: 92.772)

June-16

230.847

101.733

40.738

0.000

142.471

88.376

0.000

88.376

88.376

0.000

62

100

0.000

0.000

June-16

199.527

0.000

0.000

0.000

0.000

199.527

40.000

10.000

50.000

0.000

25

149.527

0.000

931 Strengthening of Sindh Poultry


Vaccine Centre Korangi, Karachi
(C:70.091 + R:132.432)

Karachi

Approved
31.12.08
(U/R)

June-15

202.523

180.567

3.654

0.000

184.221

18.302

14.302

4.000

18.302

0.000

91

100

0.000

0.000

932 Establishment of Bio-safety Lab &


Quality Enhancement Cell of Highly
Pathogenic Virus Vaccine
Dev.(C:81.327 + R:103.317)
933 Establishment of Bhambhore Dairy
Village and Processing Zone for Meat
Animals with Public Private
Participation at District Thatta
(C:2428.830 + R:372.000)

Karachi

Approved
03.04.13

June-15

184.644

4.988

46.821

0.000

51.809

132.835

81.326

51.509

132.835

0.000

28

100

0.000

0.000

Thatta

Approved
30.03.12

June-14

2800.830

621.634

0.000

0.000

621.634

2179.196

50.000

25.000

75.000

0.000

22

25

2104.196

0.000

Badin,
Approved
Khairpur, 10.02.11
SBA &
Tharparka
r

June-16

169.627

75.610

5.612

0.000

81.222

88.405

0.000

88.405

88.405

0.000

48

100

0.000

0.000

934 Establishment of Disease Control


Zone of Livestock in Sindh
(C:0.000+R:169.627)

[ 167 ]

PROVINCIAL
LIVESTOCK & FISHERIES DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Actual
Revised Allocation Estimated ThrowforLocation of
Status Target Date
Allocation for 2015-16
Estimated Expenditure
Expendit2014-15
Scheme/
Date of
for
ward as on
Cost
upto June,
ure upto
District
Approval Completion
01-07-15
14
Capital Revenue
Total
Total
F.P.A. June' 15
3
4
5
6
7
8
9
10
11
12
13
14

FPA
15

Financial
Progress in %age Financial Projection
upto

Jun'15 Jun' 16
16
17

2016-17
18

2017-18
19

935 Project on Sustainable Livestock


Development for Rural Sindh - Total
Cost Rs.877.500, Rs. 702.00 million
JICA Grant & Rs.175.500 Provincial
Contribution (C:9.493 + R:166.007)

Badin,
Approved
Hyd.,
02.07.13
Matiari, T.
Allahyar &
T.M. Khan

June-18

175.500

17.179

16.500

146.254

33.679

141.821

0.000

35.000

35.000

130.000

19

39

53.411

53.411

936 Establishment of Stationery and


Mobile Veterinary Diagnostic lab.
Units for disease confirmation and
control in Milk and Meat zone of
Sindh Province.(C:9.219 + R:47.661)

Badin,
Approved
Hyderabad, 29.01.13
Mirpurkha
s & Thatta.

June-16

56.881

4.373

13.353

0.000

17.726

39.155

1.500

37.655

39.155

0.000

31

100

0.000

0.000

937 Generation & Dev. of effective


Vaccines to prevent Recurring
infections of Newcastle Disease in
Peacock & Rural Poultry (C:13.162 +
R: 46.788)
938 Establishment of Cattle Colonies with
District and Private participation
Phase-I - Revised (C:1377.272 +
R:64.178)
939 Surveillance & Characterization of
Circulating Pathogens of Poultry in
Sindh including Avian Influenza
Containment Programme.
(Karachi, Sukkur, Larkana, Hyd.
M.Khas, Tharparkar & Thatta)
(C:78.978 + R: 119.444)
940 Expansion of Poultry Hatcheries &
Backyard Farming in Sindh including
Poultry Controlled Atmosphere Shed Revised (N.Feroze, Ghotki,
Kashmore, Tharparkar, Umerkot &
Karachi) (C:125.591 + R:121.785)

Karachi & Approved


Tharparka 29.10.13
r

June-15

59.950

0.000

13.125

0.000

13.125

46.825

13.162

33.663

46.825

0.000

22

100

0.000

0.000

Khairpur,T Approved
harparkar 23.01.12
& Umerkot

June-16

1441.450

1173.637

89.634

0.000

1263.271

178.179

74.000

10.000

84.000

0.000

88

93

94.179

0.000

Total Animal Husbandry (Ongoing)

Sindh

Approved
03.04.13

June-15

198.422

4.354

40.970

0.000

45.324

153.098

31.381

38.000

69.381

0.000

23

58

83.717

0.000

Sindh

Approved
17.06.10

June-15

247.376

172.472

32.466

0.000

204.938

42.438

9.896

10.000

19.896

0.000

83

91

22.542

0.000

5967.577

2356.547

302.873

3308.157

315.567

431.608

747.175

130.000

2507.572

53.411

146.254 2659.420

[ 168 ]

PROVINCIAL
LIVESTOCK & FISHERIES DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Animal Husbandry
(New Schemes)
941 Establishment of Vaccine Training
Facility at Karachi

Actual
Revised Allocation Estimated ThrowforLocation of
Status Target Date
Allocation for 2015-16
Estimated Expenditure
Expendit2014-15
Scheme/
Date of
for
ward as on
Cost
upto June,
ure upto
District
Approval Completion
01-07-15
14
Capital Revenue
Total
Total
F.P.A. June' 15
3
4
5
6
7
8
9
10
11
12
13
14

FPA
15

Financial
Progress in %age Financial Projection
upto

Jun'15 Jun' 16
16
17

2016-17
18

2017-18
19

Karachi

UnApproved

June-17

59.950

0.000

0.000

0.000

0.000

59.950

0.000

15.000

15.000

0.000

25

44.950

0.000

942 Programme for Women


Empowerment through rehabilitation
of Rural Poultry in Sindh (Karachi,
Tharparker, Jamshoro, Dadu,
Larkana & Jacobabad).

Sindh

UnApproved

June-18

59.500

0.000

0.000

0.000

0.000

59.500

0.000

15.000

15.000

0.000

25

22.250

22.250

943 Provision of Model Veterinary


Centres in the Arid zone of Sindh
(Tharparkar, Khairpur, Jamshoro,
Dadu, Ghotki, Hyd, Umerkot &
T.Allahyar ).

Sindh

UnApproved

June-17

54.916

0.000

0.000

0.000

0.000

54.916

12.000

3.000

15.000

0.000

27

39.916

0.000

944 Introduction of High Yielding Boer


Goat breed in Sindh ( Khairpur,
Larkana, Hyd, Matiari, SBA,
T.Allahyar, Badin & Umerkot)

Sindh

UnApproved

June-16

59.500

0.000

0.000

0.000

0.000

59.500

0.000

15.000

15.000

0.000

25

49.500

0.000

945 Provision for Purchase of Ultra Sound


Machines and X-ray Plants for
District Veterinary Hospitals
Jacobabad, Khairpur, SBA,
Hyderabad, Karachi, Badin, Thatta,
Sanghar & Mirpurkhas

Sindh

UnApproved

June-18

59.500

0.000

0.000

0.000

0.000

59.500

0.000

15.000

15.000

0.000

25

22.250

22.250

946 Provision for Purchase of Hay and


Silage Machines for Progressive Dairy
farmers for Enhancement of Milk &
Meat Production in Sindh (Dadu,
Larkana, Shikarpur, Sukkur, Ghotki,
N. Feroze, T.M.Khan, Tando
Allahyar)

Sindh

UnApproved

June-18

59.500

0.000

0.000

0.000

0.000

59.500

0.000

15.000

15.000

0.000

25

22.250

22.250

[ 169 ]

PROVINCIAL
LIVESTOCK & FISHERIES DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

947 Improvement of Artificial


Insemination Services in Sindh.
(Larkana, Kamber, Jamshoro,
Khairpur, SBA, Sanghar,
Mirpurkhas, Hyd, Badin and Thatta)
948 Surra (Trypnosomiasis) Control
Program in Arid and Coastal Zone of
Sindh (Thatta, Badin, Tharparkar,
U/Kot, Sanghar, Khairpur &
Jamshoro)

Actual
Revised Allocation Estimated ThrowforLocation of
Status Target Date
Allocation for 2015-16
Estimated Expenditure
Expendit2014-15
Scheme/
Date of
for
ward as on
Cost
upto June,
ure upto
District
Approval Completion
01-07-15
14
Capital Revenue
Total
Total
F.P.A. June' 15
3
4
5
6
7
8
9
10
11
12
13
14

FPA
15

Financial
Progress in %age Financial Projection
upto

Jun'15 Jun' 16
16
17

2016-17
18

2017-18
19

Sindh

UnApproved

June-18

59.800

0.000

0.000

0.000

0.000

59.800

0.000

15.000

15.000

0.000

25

22.400

22.400

Sindh

UnApproved

June-18

59.000

0.000

0.000

0.000

0.000

59.000

0.000

15.000

15.000

0.000

25

22.000

22.000

Total Animal Husbandry (New)

471.666

0.000

0.000

0.000

0.000

471.666

12.000

108.000

120.000

0.000

245.516

111.150

Total Animal Husbandry

6439.243

2356.547

302.873

3779.823

327.567

539.608

867.175

130.000

2753.088

164.561

Fisheries
(On-Going Schemes)
949 Rehabilitation & Renovation of
Karachi Fish Harbour, External
services. Phase-I (C: 0.000 + R:
1438.021)

146.254 2659.420

Karachi

Approved
26.07.13

June-16

1438.021

0.000

8.000

0.000

8.000

1430.021

0.000

182.555

182.555

0.000

13

1247.466

0.000

950 Rehabilitation of Pilot Shrimp Farm


Garho as Training & Research
Centre (C:118.044 + R:143.748)

Thatta

Approved
08.09.11
(U/R)

June-15

261.792

190.084

8.489

0.000

198.573

63.219

0.000

63.219

63.219

0.000

76

100

0.000

0.000

951 Revival of Fishing Industry in the


Coastal Belt of District Thatta
(C:0.000+R:868.601)
952 Model Village for Fishermen at
Hawksbay, Zero Point Badin,
Manchhar lake & Keenjhar lake
Thatta (C:430.295 + R:51.530)

Thatta

Approved
29.09.11

June-16

868.601

756.971

19.132

0.000

776.103

92.498

0.000

92.498

92.498

0.000

89

100

0.000

0.000

Badin,
Dadu &
Thatta

Approved
19.01.07

June-16

481.825

382.920

24.195

0.000

407.115

74.710

59.710

15.000

74.710

0.000

84

100

0.000

0.000

Sindh

Approved
28.04.07

June-16

784.013

587.100

53.900

0.000

641.000

143.013

30.013

10.000

40.013

0.000

82

87

103.000

0.000

953 Strengthening and Improvement of


Fish and Shrimp Hatcharies in Sindh
(Karachi, Thatta, Badin, Dadu,
N.Feroze, Shikarpur & Sukkur) (C:
579.963 + R:204.068)

[ 170 ]

PROVINCIAL
LIVESTOCK & FISHERIES DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Actual
Revised Allocation Estimated ThrowforLocation of
Status Target Date
Allocation for 2015-16
Estimated Expenditure
Expendit2014-15
Scheme/
Date of
for
ward as on
Cost
upto June,
ure upto
District
Approval Completion
01-07-15
14
Capital Revenue
Total
Total
F.P.A. June' 15
3
4
5
6
7
8
9
10
11
12
13
14

955 Establishment of Fish Bio Diversity


Hatchery & Training and Extension
Institute at Manchar Lake, District
Jamshoro and Khairpur-(Phase-I).
956 Development of Public Water (lakes)
and surveillance of Coastal waters to
improve productivity & enhance
availability of fish (Thatta, Badin,
Hyderabad, Jamshoro, SBA &
Sanghar)

Jamshoro
Un&
Approved
Khairpur.
Sindh

Un Approved

15

Jun'15 Jun' 16
16
17

2016-17
18

2017-18
19

1350.466

0.000

3834.252

1917.075

113.716

0.000

2030.791

1803.461

89.723

363.272

452.995

0.000

June-18

59.800

0.000

0.000

0.000

0.000

59.800

0.000

15.000

15.000

0.000

25

22.400

22.400

June-18

198.000

0.000

0.000

0.000

0.000

198.000

40.000

10.000

50.000

0.000

25

74.000

74.000

June-18

58.500

0.000

0.000

0.000

0.000

58.500

0.000

14.830

14.830

0.000

25

21.835

21.835

Total Fisheries (Ongoing Schemes)

Fisheries
(New Schemes)
954 Construction of Fishermen Colony at Hyderabad,
UnMurad Shah Mian and Rylo Mian at
Jamshoro Approved
Down Stream Kotri Barrage (Phase-I)

FPA

Financial
Progress in %age Financial Projection
upto

Total Fisheries (New Schemes)

316.300

0.000

0.000

0.000

0.000

316.300

40.000

39.830

79.830

0.000

118.235

118.235

Total Fisheries (on-going & New Schemes)

4150.552

1917.075

113.716

0.000

2030.791

2119.761

129.723

403.102

532.825

0.000

1468.701

118.235

Total L&F (Ongoing Schemes)

9801.829

4273.622

416.589

146.254 4690.211

5111.618

405.290

794.880

1200.170 130.000

3858.038

53.411

Total L&F (New Schemes)

787.966

0.000

0.000

787.966

52.000

147.830

199.830

363.751

229.385

10589.795

4273.622

416.589

5899.584

457.290

942.710

1400.000 130.000

4221.789

282.796

Total Livestock & Fisheries Deptt:

0.000

0.000

146.254 4690.211

0.000

[ 171 ]

SUMMARY
LOCAL GOVERNMENT DEPARTMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
Sr
No.

Sub-Sector

Water Supply & Sanitation

Buildings

Roads

Water & Drainage

Energy

ThrowNo. of
forward as
Schemes
on 01.07.15
3
4

On-Going

New

Total

Capital

Revenue

Total

No. of
Schemes

Capital

Revenue

Total

No. of
Schemes

Capital

Revenue

Total

10

11

12

13

14

15

FPA
16

Grand
Total
(15+16)
17

(Rs. In million)
Financial Projection
2016-17

2017-18

18

19

16262.305

43

5050.977

0.000

5050.977

22

944.137

0.000

944.137

65

5995.114

0.000

5995.114

0.000

5995.114

6290.140

3488.120

57.538

27.498

1.583

29.081

2.500

0.000

2.500

29.998

1.583

31.581

0.000

31.581

25.957

0.000

4532.598

0.000

4532.598

85

2413.446

0.000

2413.446

6946.044

0.000

6946.044

0.000

6946.044 11322.976

4545.004

22677.2106

104

189

370.649

79.403

0.000

79.403

0.000

0.000

0.000

79.403

0.000

79.403

0.000

79.403

291.246

0.000

79.400

4.000

0.000

4.000

15.500

0.000

15.500

19.500

0.000

19.500

0.000

19.500

59.900

0.000

Education

1032.465

19

551.884

105.137

657.021

9.518

0.000

9.518

22

561.402

105.137

666.539

0.000

666.539

207.018

158.909

Livestock

99.609

23.600

7.200

30.800

0.000

0.000

0.000

23.600

7.200

30.800

0.000

30.800

68.809

0.000

Health

1653.770

25

312.774

67.154

379.928

0.000

0.000

0.000

25

312.774

67.154

379.928

0.000

379.928

1273.842

0.000

Environment

499.000

0.000

0.000

0.000

0.000

124.750

124.750

0.000

124.750

124.750

0.000

124.750

374.250

0.000

150.000

0.000

20.000

20.000

0.000

0.000

0.000

0.000

20.000

20.000

0.000

20.000

130.000

0.000

1526.601

18

283.222

16.869

300.091

266.250

0.000

266.250

21

549.472

16.869

566.341

0.000

566.341

960.260

0.000

44408.548

221

10865.956

117

3651.351

124.750

3776.101

338

14517.307

342.693 14860.000

0.000

14860.000 21004.397

8192.032

17514.635

141

2409.341

Water Supply
Drainage
13 Rehabilitation of non- functional
water supply and drainage schemes
14 Allocation for Small Schemes (07
Nos)
15 Rural Development

6725.654
6385.840
4387.383

66
73
1

15.758

TOTAL L.G., PHE, RD & HTP DEPTT:-

10 Information Technolgoy
11 Other Local Govt. Schemes
Sub-Total Local Government:12 Public Health Engingeering

217.943 11083.899
0.000

2409.341

59

490.659

0.000

490.659

200

2900.000

0.000

2900.000

0.000

2900.000

7307.318

7307.318

963.652
1029.931
400.000

0.000
0.000
0.000

963.652
1029.931
400.000

27
32
0

288.673
201.986
0.000

0.000
0.000
0.000

288.673
201.986
0.000

93
105
1

1252.325
1231.917
400.000

0.000
0.000
0.000

1252.325
1231.917
400.000

0.000
0.000
0.000

1252.325
1231.917
400.000

2736.665
2576.962
1993.692

2736.665
2576.962
1993.692

15.758

0.000

15.758

0.000

0.000

0.000

15.758

0.000

15.758

0.000

15.758

0.000

0.000

3592.994

15

286.11

500.000

786.110

11

213.89

0.000

213.890

26

500.000

500.000

1000.000

0.000

1000.000

2592.994

0.000

65516.177

377

13561.407

717.943 14279.350

187

4355.900

124.750

4480.650

564

17917.307

842.693 18760.000

0.000

18760.000 30904.709 15499.350

[ 172 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

957 Repair and Renovation of Rain Water


System in Block - 11 F.B Area Karachi

Karachi

Approved
21.11.12

June-16

49.258

0.000

5.000

0.000

5.000

44.258

20.000

0.000

20.000

0.000

10

51

0.000

0.000

958 Construction of New 100 MGD Pump


House (Equipped with M&E Pumping
Machineries) at Dhabeji (Revised)
959 Construction Of Clifton Pumping
Station (Sewerage) Adjacent To CID
Centre Damaged/ Massive Destruction
Occured Due To Heavy Explosive
Attack by the terrorists at CID Centre
adjacent to Clifton Pumping Station.
(Revised)
960 Rehab. of sewerage system in Clifton,
Block-4, Karachi.

Karachi

Approved
27.06.14

June-17

1620.860

6.100

0.000

0.000

6.100

1614.760

1400.000

0.000

1400.000

0.000

87

214.760

0.000

Karachi

Approved
03.12.14

June-17

507.954

177.280

20.000

0.000

197.280

310.674

310.674

0.000

310.674

0.000

39

100

0.000

0.000

Karachi

Approved
15.9.11

June-15

17.494

7.500

4.997

0.000

12.497

4.997

4.997

0.000

4.997

0.000

71

100

0.000

0.000

961 Provision of Sewage / drainage


disposal i.e. main box drain 8400 ft and
connecting secondary sewer at Yar
Mohammad Goth and surrounding
goths settlements UC-8 Gadap Town,
Karachi.
962 Up-gradation of Dhabeji Pumping
Station

Karachi

Approved
15.11.12

June-16

90.880

0.000

58.380

0.000

58.380

32.500

32.500

0.000

32.500

0.000

64

100

0.000

0.000

Karachi

Approved
22.4.15

June-17

1233.720

0.000

0.000

0.000

0.000

1233.720

200.000

0.000

200.000

0.000

16

515.000

515.000

963 Provision of Sewage / drainage


disposal i/c. main box drain 10465 ft
and connecting secondary sewer at
Ramzan Goth and surrounding goths
settlements UC-8 Gadap Town,
Karachi.
964 Provision of Sewage / drainage
disposal i.e. main box drain 12100 ft
and connecting secondary sewer 18250
at Lassi Goth nallah at UC-4 Gadap
Town, Karachi.
965 Rural water supply for 38 goths of Bin
Qasim Town, Karachi (Phase-I)
966 Establishment of water testing
laboratory at Chilya, Karachi.

Karachi

Approved
15.11.12

June-16

104.733

0.000

99.734

0.000

99.734

4.999

4.999

0.000

4.999

0.000

95

100

0.000

0.000

Karachi

Approved
15.11.12

June-16

152.073

0.000

94.573

0.000

94.573

57.500

35.000

0.000

35.000

0.000

62

85

22.500

0.000

Karachi

Approved
22.01.13
Approved
13.11.13

June-16

300.000

24.808

165.000

0.000

189.808

110.192

110.192

0.000

110.192

0.000

63

100

0.000

0.000

June-15

30.740

0.000

7.870

0.000

7.870

22.870

22.870

0.000

22.870

0.000

26

100

0.000

0.000

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

2017-18
19

LOCAL GOVERNMENT
WATER SUPPLY & SANITATION
(On Going Schemes)

Karachi

[ 173 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
FPA

Financial
Progress in %age
upto

Financial Projection

Total
14

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Karachi

Approved
14.03.14

June-16

276.790

0.000

120.000

0.000

120.000

156.790

156.790

0.000

156.790

0.000

43

100

0.000

0.000

Karachi

Approved
15.04.15

June-16

19.926

0.000

0.000

0.000

0.000

19.926

19.926

0.000

19.926

0.000

100

0.000

0.000

Karachi

Approved
20.12.12

June-15

141.783

91.291

0.000

0.000

91.291

50.492

50.492

0.000

50.492

0.000

64

100

0.000

0.000

Karachi

Approved
22.01.13

June-15

35.110

17.555

0.000

0.000

17.555

17.555

17.555

0.000

17.555

0.000

50

100

0.000

0.000

Karachi

Approved
15.5.2015

June-16

18.085

0.000

0.000

0.000

0.000

18.085

8.085

0.000

8.085

0.000

45

10.000

0.000

Karachi

Approved
1.3.13

June-16

30.531

0.000

0.000

0.000

0.000

30.531

30.531

0.000

30.531

0.000

100

0.000

0.000

Karachi

Approved
15.4.15

June-16

34.300

0.000

0.000

0.000

0.000

34.300

10.000

0.000

10.000

0.000

29

24.300

0.000

Karachi

Approved
14.5.15
Approved
03.3.11
Approved
03.3.11
Approved
03.3.11
Approved
12.5.11

June-17

6025.240

0.000

0.000

0.000

0.000

6025.240

1150.000

0.000

1150.000

0.000

19

2437.620

2437.620

June-15

478.861

360.461

98.397

0.000

458.858

20.003

20.003

0.000

20.003

0.000

96

100

0.000

0.000

June-15

263.294

139.371

103.902

0.000

243.273

20.021

20.021

0.000

20.021

0.000

92

100

0.000

0.000

June-15

119.083

83.788

10.424

0.000

94.212

24.871

24.871

0.000

24.871

0.000

79

100

0.000

0.000

June-16

267.570

166.706

50.821

0.000

217.527

50.043

50.043

0.000

50.043

0.000

81

100

0.000

0.000

Larkana

Approved
31.12.13

June-15

99.110

12.997

45.113

0.000

58.110

41.000

41.000

0.000

41.000

0.000

59

100

0.000

0.000

Larkana

Approved
14.03.14

June-16

70.000

0.000

10.000

0.000

10.000

60.000

30.000

0.000

30.000

0.000

14

57

30.000

0.000

967 Providing / Laying and Replacement of


Power Feeder 300 MM 11 kv, H.T
Armoured Cable along with
Upgradation of KESC Substations of
KW&SB Bulk Pumping Stations
968 Replacement of Sewerage lines U.C4,
U.C 8 and U.C 10 of Saddar Town
District South Karachi
969 Construction and repair of nallah from
Golden Town to Azeempura road,
Shah Faisal Colony.
970 Providing sewerage line, CC flooring
and improvement of roads at various
locations of District Malir and District
East
971 Providing 6" dia pipe line for RKV
pumping station and Renovation at
RKV Pumping station Model Colony
UC 01
972 Providing Lying Jointing and Testing
110 mm polyetheline Pipielne for
solving the water problem in Gulshan-eSikandarabad Keamari, Karachi
973 Removal of Damaged Portion for
Providing and Laying 250 MM PE
Pipe to Sea Side Near TP-II Grex
Village Keamari Town
974 65 MGD Additional Water Supply
from Haleji to Pipri
975 Improvement and Extension of water
supply in Badin city.
976 Improvement & Extension of Drainage
in Badin city
977 Improvement & Extension of Drainage
in Tando Bago city
978 Construction of CC topping Roads /
Streets and CC drains in various
colonies of Larkana City.
979 Construction of CC block and CC
drains in various villages of taluka
Ratodero. PS-37
980 Construction of Paver Block & CC
Drains in Various Streets of Larkana
City

Badin
Badin
Badin
Larkana

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

2017-18
19

[ 174 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

981 Sewerage System (Phase-II) Works @


Taluka Qasimabad Hyderabad,(To be
funded out of 10% share of Royalty)
982 Urban Drainage Scheme Bhan
Saeedabad (Improvement &
Extension). (To be funded out of 10%
share of Royalty)
983 Urban Drainage Scheme Sehwan
(Improvement and Extension) Taluka
Sehwan (District Jamshoro).
984 Construction / Rehabilitation of water
supply and drainage of Talty,
Karampur, Murad Ali Shah, Wahur &
adjoining areas, (To be funded out of
10% share of Royalty)
985 Construction of c.c. street in Union
Council Piaro Lund 2870 rft, U.C.
Dasori 4780 rft, U.C. Tando Soomro
4780 rft, U.C. Shahpur Rizivi 4780 rft,
U.C. Jhando Mari 6700 rft, U.C.
Mirabad 3820 rft, & U.C. Missan 970
rft. (total 28700 rft) i/c drains and
culverts. Taluka Jhando Mari District
Tando Allahyar,(To be funded out of
10% share of Royalty)
986 Drainage scheme at village Tando
Soomro Taluka Jhando Mari District
Tando Allahyar,(To be funded out of
10% share of Royalty)
987 Construction of (55 Nos) Tough Tiles /
Paver roads and drainage schemes in
District Kashmore,(To be funded out of
10% share of Royalty)
988 Constt. Of open drainage system i/c CC
Toping of different streets of Khairpur
city at the original level
989 Construction of Drainage system at
UCs Mori, Babarloi Machyoon Tando
Masti, Therhi, Nizamani, Shadi
Shaheed District Khairpur, (To be
funded out of 10% share of Royalty)

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
4

Hyderabad Approved
09.2.12
U.R

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

FPA

Financial
Progress in %age
upto

Financial Projection

Total
14

15

Jun'15 Jun'16
16
17

2016-17
18

Allocation for 2015-16


Capital
12

Revenue
13

2017-18
19

June-16

917.857

517.857

162.687

0.000

680.544

237.313

150.000

0.000

150.000

0.000

74

90

87.313

0.000

Jamshoro

Approved
12.3.13

June-16

192.178

48.969

60.208

0.000

109.177

83.001

83.001

0.000

83.001

0.000

57

100

0.000

0.000

Jamshoro

Approved
12.3.13

June-16

305.600

45.000

100.000

0.000

145.000

160.600

54.690

0.000

54.690

0.000

47

65

105.910

0.000

Jamshoro

Approved
08.04.14

June-16

199.056

0.000

49.528

0.000

49.528

149.528

30.000

0.000

30.000

0.000

25

40

119.528

0.000

T. A. Yar

Approved
09.05.14

June-16

60.000

0.000

30.000

0.000

30.000

30.000

30.000

0.000

30.000

0.000

50

100

0.000

0.000

T. A. Yar

Approved
03.10.12

June-15

30.000

0.000

17.350

0.000

17.350

12.650

12.650

0.000

12.650

0.000

58

100

0.000

0.000

Kashmore

Approved
24.05.13

June-16

126.931

0.000

0.000

0.000

0.000

126.931

25.000

0.000

25.000

0.000

20

101.931

0.000

Khairpur

Approved
15.02.15

June-16

50.000

0.000

5.000

0.000

5.000

45.000

12.500

0.000

12.500

0.000

10

35

32.500

0.000

Khairpur

Approved
08.04.15

June-16

139.555

0.000

30.000

0.000

30.000

109.555

33.750

0.000

33.750

0.000

21

46

75.805

0.000

[ 175 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

990 Construction of Development Schemes


Drainage, Water Supply and Road for
various Villages of Taluka and District
Khairpur, (To be funded out of 10%
share of Royalty)
991 Providing Water Supply & Drainage
schemes at various places of District
SBA.
992 Larkana Development Plan.

Khairpur

Approved
22.04.15

June-16

100.000

0.000

40.000

0.000

40.000

60.000

60.000

0.000

60.000

0.000

40

100

0.000

0.000

S.B.A

Approved
16.04.14

June-16

425.000

0.000

200.000

0.000

200.000

225.000

50.000

0.000

50.000

0.000

47

59

175.000

0.000

Larkana

June-16

747.420

0.000

0.000

0.000

0.000

747.420

500.000

0.000

500.000

0.000

67

247.420

0.000

993 Construction of Paver Block & Drains


in various Streets of Larkana City.

Larkana

Approved
24-10-14
Approved
14.03.14

June-16

70.000

0.000

34.000

0.000

34.000

36.000

36.000

0.000

36.000

0.000

49

100

0.000

0.000

Approved
22.11.12

June-16

40.000

14.329

10.000

0.000

24.329

15.671

15.671

0.000

15.671

0.000

61

100

0.000

0.000

Approved
14-05-15

June-16

1.750

0.000

0.000

0.000

0.000

1.750

1.750

0.000

1.750

0.000

100

0.000

0.000

Approved
14-05-15

June-16

1.620

0.000

0.000

0.000

0.000

1.620

1.620

0.000

1.620

0.000

100

0.000

0.000

Approved
19-05-15
Approved

June-16

400.000

0.000

301.069

0.000

301.069

98.931

98.931

0.000

98.931 0.000

75

100

0.000

0.000

June-16

144.459

0.000

0.000

0.000

0.000

144.459

36.115

0.000

36.115

0.000

25

108.344

0.000

Approved

June-16

195.000

0.000

0.000

0.000

0.000

195.000

48.750

0.000

48.750

0.000

25

146.250

0.000

994 Construction of surface drains, Pavers


Sukkur
mettaling of Road & Supply of
Electricity & Transformers at various
Streets of iron Market, Golimar
Sukkur. (To be funded out of 10%
share of Royalty)
995 Providing laying Sewer line Street
Karachi
No.4, 5 and 27 Model Colony District
Korangi.(To be funded out of 10%
share of Royalty)
996 Providing Sewerage Line Gulshan-eKarachi
Jamali UC Gujro District East.(To be
East
funded out of 10% share of Royalty)
997 Various Development Schemes (4 Nos.). Jacobabad
998 Urban Water Supply scheme Bhan
Jamshoro
Saeedabad (Imp & Ext) Taluka
Sehwan Sharif District Jamshoro
999 Rural Water Supply scheme for
Jamshoro
different villages of UC Channa (River
Indus source) Taluka Sehwan Sharif
District Jamshoro
Total Water & Sanitation (On-going schemes)

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

16133.821

1714.012

1934.053

0.000

3648.065

12485.756

5050.977

0.000

5050.977

0.000

1000.000

0.000

0.000

0.000

0.000

1000.000

250.000

0.000

250.000

0.000

4454.181

2017-18
19

2952.620

WATER SUPPLY & SANITATION


(New Schemes)
1000 Revamping of Gujjar Nallah including
Service road KMC

Karachi

UnApproved

June-17

25

450.000

450.000

[ 176 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Karachi

UnApproved

June-16

15.000

0.000

0.000

0.000

0.000

Karachi

UnApproved

June-16

50.000

0.000

0.000

0.000

Karachi

UnApproved
UnApproved
UnApproved
UnApproved
UnApproved

June-16

392.660

0.000

0.000

June-16

11.271

0.000

June-16

226.510

June-16

155.260

1001 P/L sewerage line of 12" dia at UC-II


Muslimabad (internal), Rasool Khan
Street till Bilal Colony Eidgah
Muslimabad and at UC -II
Muslimabad Gulzar Mosque to Hazrat
Mir Street
1002 Construction of water supply &
sewerage system at Jamshed Town
Karachi
1003 Rehabilitaiton of Hub Canal

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

1004 Providing / laying sewerage lines in


Karachi
village Shaheed Makhdoom Bilawal
1005 Constt / Reh of pitcher nallah in
Karachi
Saddar lyari
1006 Constt of Reh, of Kalri Nallah in Lyari Karachi
Machar Colony
1007 P/L 24", 15", 12" and 8" dia RCC pipe
Karachi
replacement of old under size sewer at
Khoso Goth, Shah Faisal Colony,
Karachi.
1008 UP-Gradation of Pipri Filter
Karachi
UnPlant/Pumping Station
Approved
1009 Improvement of sewerage line in
Karachi
Uninternal areas, Sikandarabad,
Approved
Sultanabad, Salehabad and Keamari
Karachi.
1010 Construction of water supply &
Hyderabad
Unsewerage system at Latifabad,
Approved
Hyderabad,(To be funded out of 10%
share of Royalty)
1011 Water Supply Scheme of village
Jamshoro
Unranokhoso, bako khoso and marium
Approved
colony, Jamshoro, (To be funded out of
10% share of Royalty)
1012 Rural Drainage Scheme Manhayoon
Jamshoro
UnJamshoro, (To be funded out of 10%
Approved
share of Royalty)
1013 Imp. & Ext. of Water Supply (Pir
Dadu
UnMurad Nako) Dadu City (To be
Approved
funded out of 10% share of Royalty)
1014 Rehab. & Imp. Of Sewerage / Drainage Shikarpur
UnSystem of Shikarpur
Approved

Allocation for 2015-16

FPA

Financial
Progress in %age
upto

Financial Projection

Jun'15 Jun'16
16
17

2016-17
18

Capital
12

Revenue
13

Total
14

15

15.000

3.750

0.000

3.750

0.000

25

11.250

0.000

0.000

50.000

12.500

0.000

12.500

0.000

25

37.500

0.000

0.000

0.000

392.660

98.165

0.000

98.165

0.000

25

294.495

0.000

0.000

0.000

0.000

11.271

2.818

0.000

2.818

0.000

25

0.000

0.000

0.000

0.000

0.000

0.000

226.510

56.628

0.000

56.628

0.000

25

169.882

0.000

0.000

0.000

0.000

0.000

155.260

38.815

0.000

38.815

0.000

25

116.445

0.000

2017-18
19

June-16

77.861

0.000

0.000

0.000

0.000

77.861

19.465

0.000

19.465

0.000

25

58.396

0.000

June-17

900.000

0.000

0.000

0.000

0.000

900.000

225.000

0.000

225.000

0.000

25

70.000

30.000

June-17

48.000

0.000

0.000

0.000

0.000

48.000

12.000

0.000

12.000

0.000

25

36.000

0.000

June-16

50.000

0.000

0.000

0.000

0.000

50.000

12.500

0.000

12.500

0.000

25

37.500

0.000

June-16

80.000

0.000

0.000

0.000

0.000

80.000

20.000

0.000

20.000

0.000

25

60.000

0.000

June-16

59.071

0.000

0.000

0.000

0.000

59.071

14.768

0.000

14.768

0.000

25

44.303

0.000

June-16

32.913

0.000

0.000

0.000

0.000

32.913

0.000

25

24.684

0.000

June-17

256.640

0.000

0.000

0.000

0.000

256.640

0.000

25

192.480

0.000

8.229

64.160

0.000

0.000

8.229

64.160

[ 177 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
4

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

1015 Saaf Suthro Sindh Programme Sindh


UnScaling up of Rural Sanitation (Total
Approved
Cost = Rs. 850 Million with 20% by
GoS and 80% by Grant-in-Aid)
1016 Rehabilitation of drainage works &
Kamber @
Unconstruction of new CC flooring in
Shahdadkot Approved
village Ber Sharif, Taluka Kamber
1017 Constuction of Drainage B123and
N. Feroze
UnSewerage Scheme at village Baquar
Approved
Khan Maree, Taluka Mehrabpur, N.
Feroze
1018 Re-Construction of Nallah Baldia No.2
Karachi
UnHub River Road in UC-8 Baldia Zone,
Approved
KMC (West) Phase-II.
1019 Construction/improvement of Culvert
Karachi
UnOver Orangi Nallah UC-04, Site Zone.
Approved

June-18

170.000

0.000

0.000

0.000

0.000

170.000

42.500

0.000

42.500

0.000

25

70.000

30.000

June-18

48.000

0.000

0.000

0.000

0.000

48.000

12.000

0.000

12.000

0.000

25

18.000

18.000

June-18

20.000

0.000

0.000

0.000

0.000

20.000

5.000

0.000

5.000

0.000

25

7.500

7.500

June-16

85.143

0.000

0.000

0.000

0.000

85.143

21.285

0.000

21.285

0.000

25

63.858

0.000

June-16

18.220

0.000

0.000

0.000

0.000

18.220

4.554

0.000

4.554

0.000

25

13.666

0.000

1020 Installation of Filtration Plant at Allah


Wala Town and 48-E, F, F1 Area,
Korangi. (2 Nos.).
1021 Providing and Laying sewerage &
water system, improvement of streets,
CC flooring & repair/maintenance of
internal roads i/c electrical items in
different areas of Manzoor Colony,
Akhtar Colony & Azam Basti.

Karachi

UnApproved

June-16

15.000

0.000

0.000

0.000

0.000

15.000

3.750

0.000

3.750

0.000

25

11.250

0.000

Karachi

UnApproved

June-17

65.000

0.000

0.000

0.000

0.000

65.000

16.250

0.000

16.250

0.000

25

48.750

0.000

3776.549
19910.370

0.000
1714.012

0.000
1934.053

0.000
0.000

0.000 3776.549
3648.065 16262.305

944.137
5995.114

0.000
0.000

944.137
5995.114

0.000
0.000

1835.959
6290.140

535.500
3488.120

Total Water & Sanitation (New Schemes)


Total Water & Sanitation (schemes)
BUILDINGS
(On-Going Schemes)
1022 Construction of Revenue Complex at
Khairpur, (To be funded out of 10%
share of Royalty)
1023 Construction of Distrct Election
Commissioner's Office, Khairpur and
residence at first floor, Khairpur, (To
be funded out of 10% share of Royalty)
1024 Constt. Of Taluka Office and other
required Building in Qazi Ahmed

Khairpur

Approved
13.01.11

June-15

21.882

2.780

9.910

0.000

12.690

9.192

9.192

0.000

9.192

0.000

58

100

0.000

0.000

Khairpur

Approved
04.02.15

June-16

30.457

0.000

4.000

0.000

4.000

26.457

8.000

0.000

8.000

0.000

13

39

18.457

0.000

SBA

Approved
24.02.11

June-15

79.620

75.358

2.679

0.000

78.037

1.583

0.000

1.583

1.583

0.000

98

100

0.000

0.000

[ 178 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

SBA

Approved
17.01.14

June-15

1025 Estabilshment of Town Committee @


Village Punhal Khan Chandio Taluka
Sakrand District Shaheed Benazirabad

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Total Buildings (On-Going Schemes)

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

27.483

6.871

10.306

0.000

17.177

10.306

10.306

0.000

10.306

0.000

159.442

85.009

26.895

0.000

111.904

47.538

27.498

1.583

29.081

0.000

10.000

0.000

0.000

0.000

0.000

10.000

2.500

0.000

2.500

0.000

10.000
169.442

0.000
85.009

0.000
26.895

0.000
0.000

0.000
111.904

10.000
57.538

2.500
29.998

0.000
1.583

2.500
31.581

0.000
0.000

63

100

2017-18
19

0.000

0.000

18.457

0.000

7.500

0.000

BUILDINGS
(New Schemes)
1026 Construction of Boundary wall at ISI
Head Quarters, Sukkur
Total Buildings (New Schemes)
Total Buildings

Sukkur

Unapproved

June-16

25

7.500
25.957

0.000
0.000

ROADS
On-Going Schemes
1027 Widening / Reconditioning of Road
T. M. Khan
from 70 Mori to Village Sobho Khan
Chandio (10.80 km),(To be funded out
of 10% share of Royalty)
1028 Widening / Improvement of Main
Karachi
Hawksbay Road, Karachi.
1029 Construcstion of link road from Moro
N. Feroze
Bhandi Road to Village Sain bux
Zardari to Ali Nawaz Zardari Road
Mile 0/0-1/2 (2.4 km)
1030 Construction of Under pass at Nasim
Hyderabad
Nagar Chowk Qasimabad Hyderabad
1031 Widening/Reconditioning/Construction
S.B.A
of Road from Chanessar Pangrio Mori
Road to Connect Nawabshah Qazi
Ahmed Road mile 0/0-3/1
(5.02
km)(Revised)
1032 Rehabilitation of City roads of
Khairpur
Khairpur i/c Side drains. (To be
funded out of 10% share of Royalty)
1033 Construction of Zulfiiqar Oil Tanker
Karachi
Parking Terminal Ph-II Zulfiqarabad
Karachi (KMC). (To be funded out of
10% share of Royalty)
1034 Rehabilitation of City roads of Badin
Badin
i/c Side drains.

Approved
25.06.10
(U/R)

June-17

59.908

62.487

0.000

0.000

62.487

-2.579

5.000

0.000

5.000

0.000

104

113

0.000

0.000

Approved
11.01.12
Approved
07.05.12

June-17

1136.000

302.850

211.000

0.000

513.850

622.150

123.000

0.000

123.000

0.000

45

56

249.575

249.575

June-15

12.000

7.000

2.500

0.000

9.500

2.500

2.500

0.000

2.500

0.000

79

100

0.000

0.000

Approved
13.12.11
Approved
13.12.11

June-17

198.310

40.000

0.000

0.000

40.000

158.310

0.001

0.000

0.001

0.000

20

20

79.155

79.155

June-15

169.328

98.893

5.000

0.000

103.893

65.435

45.000

0.000

45.000

0.000

61

88

10.218

10.218

Approved
13.01.11
(U/R)
Approved
22.11.12

June-16

227.467

108.764

50.000

0.000

158.764

68.703

25.703

0.000

25.703

0.000

70

81

21.500

21.500

June-15

429.960

214.981

214.979

0.000

429.960

0.000

5.000

0.000

5.000

0.000

100

101

0.000

0.000

Approved
19.10.12

June-16

99.747

50.000

25.000

0.000

75.000

24.747

24.747

0.000

24.747

0.000

75

100

0.000

0.000

[ 179 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Badin

Approved
19.10.12
Approved
01.06.12

June-16

199.911

80.500

5.000

0.000

85.500

114.411

20.000

0.000

20.000

0.000

43

53

47.206

47.206

June-17

250.000

103.542

100.000

0.000

203.542

46.458

46.458

0.000

46.458

0.000

81

100

0.000

0.000

Approved
29.11.12

June-15

716.835

300.000

416.835

0.000

716.835

0.000

5.000

0.000

5.000

0.000

100

101

0.000

0.000

1038 Rehabilitation of Adam Khan Road,


Karachi
Approved
(KMC)
17.08.07
1039 Construction of link road from
Sanghar
Approved
Sanghar to Head Jamarao road to
21.11.12
village Choudhary Asif Warraich road
near work shop. (To be funded out of
10% share of Royalty)
1040 Development Schemes of Taluka
Larkana
Approved
Ratodero.
22.01.13
1041 Construction of Road from Village
S.B.A
Approved
Muneer Ahmed Khero to Village Haji
27.05.13
Muhammad Rahim Mahar Near Jamal
Shah, Taluka Kazi Ahmed
1042 Improvement/ Construction of Road
Mirpurkhas Approved
from Tando Ghulam Ali Digri Sugar
03.01.13
Mill Road and main Naga Road via
Mandra Walla Deh 155, Deh 160, Deh
154-A & B, Deh 161, Deh 150 7th Mile
Mori, Digri Minor Road, Deh 149 A&B and Deh 143-A&B. Mile 0/015/0=24.15 km
1043 Widening and reconditioning of road
Khairpur Approved
from (Dual carriage way) Rohri Canal
29.11.12
Bridge to new National Highway near
Shah Hussain Chowk mile 0/0-0/6 (1.21
Kms), (To be funded out of 10% share
of Royalty)

June-16

209.920

126.000

10.000

0.000

136.000

73.920

23.800

0.000

23.800

0.000

65

76

25.060

25.060

June-15

14.894

9.447

5.447

0.000

14.894

0.000

2.234

0.000

2.234

0.000

100

115

0.000

0.000

June-17

483.197

116.410

65.544

0.000

181.954

301.243

80.000

0.000

80.000

0.000

38

54

110.622

110.622

June-16

31.000

2.000

14.163

0.000

16.163

14.837

14.837

0.000

14.837

0.000

52

100

0.000

0.000

June-16

190.000

20.000

48.000

0.000

68.000

122.000

25.000

0.000

25.000

0.000

36

49

48.500

48.500

June-15

46.573

6.562

29.848

0.000

36.410

10.163

10.163

0.000

10.163

0.000

78

100

0.000

0.000

1035 Construction of 20 Kms Roads in


District Badin.
1036 Improvement / Reconditioning of
Bunder Road including face lifting,
Grills for side walls both side of River
Indus side drain, footpath and river
view platform (4 Nos) mile 0/0-2/3 (3.82
Kms). (To be funded out of 10% share
of Royalty)
1037 Constt: of Overhead Bridge over main
Railway line at Thehri Phatak along
National Highway Khairpur city, (To
be funded out of 10% share of Royalty)

Sukkur

Khairpur

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

2017-18
19

[ 180 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
4

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

FPA

Financial
Progress in %age
upto

Financial Projection

Total
14

15

Jun'15 Jun'16
16
17

2016-17
18

Allocation for 2015-16


Capital
12

Revenue
13

2017-18
19

1044 Providing Access to Shaheed


Karachi
Approved
Benazirabad town (Deh Mandiari
11.09.13
Hawksbay) and adjoining villages
(LDA)
1045 Rehabilitation of Road from Sui Gas
Khairpur Approved
Road to Tharri Mirwah 0/0-8/0
15.09.14
(12.43 km), (To be funded out of 10%
share of Royalty)
1046 Constt: / Reconditioning of roads
Kashmore @ Approved
(22 Nos) in District Kashmore @
Kandhkot
24.05.13
Kandhkot.
1047 Constt: of 5 Kms roads in District
Sanghar
Approved
Sanghar. (To be funded out of 10%
25.09.13
share of Royalty)
1048 Reconditioning / Constt: of road from Kashmore @ Approved
Indus Highway Abdul Sattar Bhayo
Kandhkot
25.09.13
Tori Bunglow to Qyais Bhayo Road
mile 0/0-3/6 (6 Kms).
1049 Rehabilitation of Road from Tatri
Larkana
Approved
Mori to Rawat Khero road Taluka
07.10.13
Dokri
1050 Improvement /Construction of Road
Ghotki
Approved
from village Allahyar Chachar to
11.02.14
village mazar Chachar via Hamid
Chachar (2.5 km) Taluka Ubaro. (To
be funded out of 10% share of Royalty)

June-18

818.000

150.000

150.000

0.000

300.000

518.000

114.000

0.000

114.000

0.000

37

51

202.000

202.000

June-17

115.610

10.000

15.000

0.000

25.000

90.610

25.000

0.000

25.000

0.000

22

43

32.805

32.805

June-16

123.845

0.000

10.000

0.000

10.000

113.845

25.000

0.000

25.000

0.000

28

44.423

44.423

June-16

52.035

4.000

3.530

0.000

7.530

44.505

15.000

0.000

15.000

0.000

14

43

14.753

14.753

June-15

44.046

0.000

10.000

0.000

10.000

34.046

34.046

0.000

34.046

0.000

23

100

0.000

0.000

June-16

37.578

0.000

10.000

0.000

10.000

27.578

18.000

0.000

18.000

0.000

27

75

4.789

4.789

June-16

23.727

0.000

4.000

0.000

4.000

19.727

6.000

0.000

6.000

0.000

17

42

6.864

6.864

1051 Widening and reconditioning of Tando T. M. Khan Approved


Muhammad Khan Bulri Shah Karim
29.10.13
Road from Ditta Wah at mile 19/2 to
Qadir Dino Shah Mori via Jinhan
Soomro road mile 0/0-3/1
(5 Kms).

June-16

64.823

10.000

40.757

0.000

50.757

14.066

14.066

0.000

14.066

0.000

78

100

0.000

0.000

1052 Construction of Overhead Bridge over


Khairpur Approved
New National Highway at Shah
09.05.14
Hussain By-pass Chowk (2300 Rft)
1053 Widening and Reconditioning of Link
Matiari
Approved
Road from National Highway (East) to
14.03.12
Shah Waliullah Oriental College
Mansoorah Road Mile 0/0-2/4".
1054 Improvement / Reconditioning of roads Hyderabad Approved
of Latifabad
26.04.13

June-16

883.088

0.000

350.000

0.000

350.000

533.088

200.000

0.000

200.000

0.000

40

62

166.544

166.544

June-15

30.309

25.873

2.218

0.000

28.091

2.218

2.218

0.000

2.218

0.000

93

100

0.000

0.000

June-15

20.000

0.000

10.000

0.000

10.000

10.000

10.000

0.000

10.000

0.000

50

100

0.000

0.000

[ 181 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Karachi

Approved
04.02.15

June-16

54.015

0.000

25.000

0.000

25.000

29.015

29.015

0.000

29.015

0.000

46

100

0.000

0.000

N. Feroze

Approved
04.03.15

June-15

40.000

0.000

0.000

0.000

0.000

40.000

10.000

0.000

10.000

0.000

25

15.000

15.000

Karachi

Approved
04.02.15

June-16

58.619

0.000

5.000

0.000

5.000

53.619

20.000

0.000

20.000

0.000

43

16.810

16.810

Khairpur

Approved
04.03.15

June-17

38.484

0.000

0.000

0.000

0.000

38.484

10.484

0.000

10.484

0.000

27

14.000

14.000

Karachi

Approved
09.05.14

June-16

75.444

0.000

20.000

0.000

20.000

55.444

25.000

0.000

25.000

0.000

27

60

15.222

15.222

Khairpur

Approved
08.04.15

June-16

802.292

0.000

56.000

0.000

56.000

746.292

150.000

0.000

150.000

0.000

26

298.146

298.146

Karachi

Approved
04.02.15
Approved
04.02.15

June-15

59.304

0.000

7.000

0.000

7.000

52.304

20.000

0.000

20.000

0.000

12

46

16.152

16.152

June-16

56.414

0.000

22.870

0.000

22.870

33.544

15.000

0.000

15.000

0.000

41

67

9.272

9.272

Karachi

Approved
02.01.15

June-16

49.353

0.000

25.000

0.000

25.000

24.353

15.000

0.000

15.000

0.000

51

81

4.677

4.677

Kashmore

Approved
03.06.15

June-17

35.260

0.000

0.000

0.000

0.000

35.260

8.260

0.000

8.260

0.000

23

13.500

13.500

1055 Improvement of internal (5 Nos)


Roads of Shahdman Town No.1 North
Nazimabad Karachi (4 Kms)
1056 Construction of link road from Lakha
road Hot Khan Jalbani to village
Ghulam Abbas Vighio Taluka
Mehrabpur, Distt: Naushehro Feroze
(3.2 Kms)
1057 Rectonstruction of Road and strom
water Drain from Dental College to 2k
Stop Block-M & North Nazimabad
(3.1 km)
1058 Construction of link road from village
Ghulam Abid to Zanwar Saindad
Darban, Union Council Sami, Taluka
Sobhodero road mile 0/0-2/4(4.0 Km).
(To be funded out of 10% share of
Royalty)
1059 Construction of road of Internal Area
of Mughal Hazara Goth, Gulistan-eJuhar,Block-4&4A (5 Kms).
1060 Construction/Rehabilitation of 21 Nos
schemes of Khairpur including
masonary structure Khairpur
1061 Construction/Improvement of Internal
Roads in Malir (5.00 km)
1062 Construction /Improvement of Road
from Al-Rehman Residency Sector 48A to W-22 Bus Stop (Sector 48-C)
Korangi No 1/2 (UC-4 Korangi Town)
(4.5 Kms)
1063 Construction of Brohi Masjid Road
(Dilbahar Colony) Hawksbay Maripur,
District Muncipal Committee (South)
Karachi (3.5 Kms)
1064 Construction of Road from Kandhkot
Malguzar (Lohi Pull) road to village
Mureed Khan Khoso road mile 0/0-2/6
(4.42 Km),(To be funded out of 10%
share of Royalty)

Karachi

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

2017-18
19

[ 182 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Capital
12

Revenue
13

Total
14

FPA

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

Approved
04.02.15

June-16

46.000

0.000

7.000

0.000

7.000

39.000

15.000

0.000

15.000

0.000

15

48

12.000

12.000

Approved
04.03.15

June-17

45.918

0.000

0.000

0.000

0.000

45.918

10.000

0.000

10.000

0.000

22

17.959

17.959

Approved
04.02.15
Approved
22.04.15
Approved
15.04.15

June-16

55.392

0.000

10.000

0.000

10.000

45.392

10.000

0.000

10.000

0.000

18

36

17.696

17.696

June-16

69.698

0.000

0.000

0.000

0.000

69.698

28.000

0.000

28.000

0.000

40

20.849

20.849

June-16

50.000

0.000

0.000

0.000

0.000

50.000

25.000

0.000

25.000

0.000

50

12.500

12.500

Approved
04.03.15

June-17

55.000

0.000

0.000

0.000

0.000

55.000

13.000

0.000

13.000

0.000

24

21.000

21.000

Approved
04.02.15

June-16

26.921

0.000

0.000

0.000

0.000

26.921

10.921

0.000

10.921

0.000

41

8.000

8.000

Approved
02.01.15

June-16

35.105

0.000

18.500

0.000

18.500

16.605

16.605

0.000

16.605

0.000

53

100

0.000

0.000

Approved
02.01.15

June-16

22.897

0.000

18.000

0.000

18.000

4.897

4.897

0.000

4.897

0.000

79

100

0.000

0.000

Approved
11.11.14
Approved
14.11.14

June-16

14.637

0.000

0.000

0.000

0.000

14.637

14.637

0.000

14.637

0.000

100

0.000

0.000

June-16

65.203

0.000

7.500

0.000

7.500

57.703

15.000

0.000

15.000

0.000

12

35

21.352

21.352

Larkana

Approved
11.11.14

June-16

10.695

0.000

7.500

0.000

7.500

3.195

3.195

0.000

3.195

0.000

70

100

0.000

0.000

Larkana

Approved
11.11.14

June-16

16.987

0.000

11.250

0.000

11.250

5.737

5.737

0.000

5.737

0.000

66

100

0.000

0.000

Larkana

Allocation for 2015-16

Financial
Progress in %age
upto

1065 Construction of road Haibat Shaheed Kashmore @


Station village Saddam Hussain UCKandhkot
Tangwani-3 Taluka Tangwani.
(3.5 Kms).
1066 Construction of road from Mendhre-jo- Umerkot
Par to village Khalifo Missri Samejo
UC-Khokhrapar, Taluka and District
Umerkot 0/0-2/0 (3.2 Kms)
1067 Construction of road from Dalmia
Karachi
road to Shanti Nagar (3.5 Kms).
1068 Construction of Road in Mirpurkhas (6 Mirpurkhas
Kms)
1069 Construction of Road in Sangar
Sanghar
(6.00 Kms).(To be funded out of 10%
share of Royalty)
1070 Construction of Road from goth
N. Feroze
Saindad Banbhan to village Moli Dino
Nangore (Pir Ghulam Ali Musfir)
Road Mile 0/0-3/1 (5.0 KM)
1071 Rehabilitation of road Larkana
Larkana
Khairpur road to Naonabad to Dargah
Syed Bukhari.
1072 Rehabilitation of road from Bakrani to
Larkana
Larkana Khairpur road via Dolat
Knokhar via Mujawar.
1073 Construction of road Sewane Sarik to
Larkana
Jadam Shaikh to village Ali Hassan
Lashari village Kori and Village
Bhand.
1074 Construction of road village Kodrani.
Larkana
1075 Remaining work and construction of
road Dargah Peer Mihban and village
Chakhro and Jamali.
1076 Remaining road from Larkana
Khairpur road to village Hatri Ghulam
Shah.
1077 Construction of road from Bridge
Dadu Canal to village Mohallah Sangi
& Sial Mohallah and via Masood
Chandio street and Muzaffar Chandio
st.village Madbhu to Bakrani road.

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

[ 183 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

1078 Rehabilitation of road from Madhu


bridge to Larkana Khairpur road.
1079 Rehabilitation of road from Dargah
Mashore road to village Dadhra
Kalhoro.
1080 Construction of road from Badha
Sekwani road Damrahwah bridge to
Noorpur Gadhi via Sukhio Gadhi.
1081 Road from Mehrab Kalhoro to Sanwal
Kalhoro village.
1082 Road from Channa Bridge to village
Sher Muhammad Jenejo.
1083 Rehabilitation road Tatri to Veehar.

Larkana

Approved
11.11.14
Approved
02.01.15

June-16

12.954

0.000

0.000

0.000

0.000

12.954

12.954

0.000

12.954

0.000

100

0.000

0.000

June-16

34.715

0.000

8.750

0.000

8.750

25.965

10.965

0.000

10.965

0.000

25

57

7.500

7.500

Larkana

Approved
02.01.15

June-16

30.601

0.000

9.500

0.000

9.500

21.101

10.101

0.000

10.101

0.000

31

64

5.500

5.500

Larkana

June-16

21.633

0.000

6.250

0.000

6.250

15.383

15.383

0.000

15.383

0.000

29

100

0.000

0.000

June-17

24.787

0.000

6.250

0.000

6.250

18.537

10.537

0.000

10.537

0.000

25

68

4.000

4.000

June-17

17.559

0.000

0.000

0.000

0.000

17.559

10.559

0.000

10.559

0.000

60

3.500

3.500

1084 Construction of road from Dargah


Mashore road to Yar Muhammad
Lashari Mohalla Bhagan Lashari.
1085 Remaining road from Larkana
Khairpur to Mujawar village.
1086 Construction of road from Larkana
Khairpur road to village Banho Jatoi.
1087 Construction of Road: a) from Reti
Marowala road along Naseer Minor b)
from Khumbra to village Fiayaz
Indhar along Gohram Minor. c) from
Bahadur Memon road along Ghotki
Feeder to villaghe Raheem Bux Lakho.
[7.00 Kms], (To be funded out of 10%
share of Royalty)
1088 Construction of Internal road of
Kashmore city.(To be funded out of
10% share of Royalty)
1089 Construction of Link Road from
Khadim Hussain Zardari to Village
Munawar Zadari and Sultan Meleno to
Lala Israr Mile 0/0-5/5 (9.00 KMS),(To
be funded out of 10% share of Royalty)

Larkana

Approved
02.01.15
Approved
02.01.15
Approved
02.01.15
Approved
11.11.14

June-16

14.576

0.000

0.000

0.000

0.000

14.576

14.576

0.000

14.576

0.000

100

0.000

0.000

Approved
02.01.15
Approved
02.01.15
Approved
13.01.15

June-16

13.445

0.000

6.250

0.000

6.250

7.195

7.195

0.000

7.195

0.000

46

100

0.000

0.000

June-16

8.168

0.000

8.168

0.000

8.168

0.000

1.200

0.000

1.200

0.000

100

115

-1.200

0.000

June-16

96.786

0.000

3.000

0.000

3.000

93.786

20.000

0.000

20.000

0.000

24

36.893

36.893

Kashmore

Approved
14.05.15

June-18

149.923

0.000

3.000

0.000

3.000

146.923

25.000

0.000

25.000

0.000

19

60.962

60.962

Sanghar

Approved
09.06.11
(U/R)

June-16

41.811

41.811

0.000

0.000

41.811

0.000

6.271

0.000

6.271

0.000

100

115

-3.136

-3.136

T.A. Yar

Approved
18.02.15

June-16

77.409

0.000

0.000

0.000

0.000

77.409

10.000

0.000

10.000

0.000

13

33.705

33.705

1090 Widening /Reconditioning of link road


from Tail Mori to Tando Allahyar
Sugar Mill via Sobhraj mile 2/0-5/6
(6.03 Kms).

Larkana

Larkana
Larkana

Larkana
Larkana
Ghotki

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

2017-18
19

[ 184 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
4

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

1091 Road from Shahpur Chakkar to


Sanghar
Approved
Maqsoodo Rind Taluka
15.04.15
Shahdadpur.(To be funded out of 10%
share of Royalty)
1092 Construction of road from Wori Dhora Tharparkar Approved
Road to Saringhiar Taluka Chachro (5
04.02.15
Kms)
1093 Reconditioning of Road from PARCO
Karachi
Approved
Petrol Pump (Super Highway) to
14.05.15
Khatm-e-Naabowat Chowk, Scheme 33
1094 Constt: / Improvement of road in
Karachi
Approved
sector-33,34,49,50 & 51 of Korangi,
29.05.15
Karachi
1095 Construction/Reconditioning of Road
Jacobabad Approved
Jacobabad-Thul Road to RQC
14.11.14
Highway Mile 0/0-9/4 (15.29 km)
1096 Reconditioning of road from Hira
Sukkur
Approved
Hospital to Ghanta Ghar patch work
18.02.15
and asphalt concrete i/c link Teer
Chowk to Bunder Road, Al-Habib
Hotel to Karam Ali Shah and link to
Shamsabad (3.5 Kms), (To be funded
out of 10% share of Royalty)
1097 Construction of road in constituency of
Karachi
Approved
NA-252 in Corridor Zone-VII, KMC.
21.02.12

June-16

19.903

0.000

0.000

0.000

0.000

19.903

9.903

0.000

9.903

0.000

50

5.000

5.000

June-16

57.915

0.000

0.000

0.000

0.000

57.915

11.804

0.000

11.804

0.000

20

23.056

23.056

June-16

184.680

0.000

0.000

0.000

0.000

184.680

25.000

0.000

25.000

0.000

14

79.840

79.840

June-17

163.174

0.000

0.000

0.000

0.000

163.174

17.000

0.000

17.000

0.000

10

73.087

73.087

June-17

416.738

0.000

30.000

0.000

30.000

386.738

40.000

0.000

40.000

0.000

17

173.369

173.369

June-17

116.715

0.000

34.385

0.000

34.385

82.330

20.000

0.000

20.000

0.000

29

47

31.165

31.165

June-17

27.568

13.784

0.000

0.000

13.784

13.784

13.784

0.000

13.784

0.000

50

100

0.000

0.000

1098 Rehabilitation of roads of Taluka City Hyderabad Approved


and Latifabad, District Hyderabad.(To
27.01.15
be funded out of 10% share of Royalty)

June-17

543.593

0.000

430.924

0.000

430.924

112.669

20.000

0.000

20.000

0.000

79

83

46.335

46.335

1099 Contruction of Road from Hirar


Tharparkar Approved
Chandia road to Karoro mile 0/0-15/0
18.02.15
(24.00 Km).
1100 Construction of Road from Khensar to Tharparkar Approved
Khiro veryam 0/0-18/5 (30KM)
18.02.15
1101 Improvement of Road from Kumb to
Khairpur Approved
Police Training Center with link to
13.01.15
Jiskani Pir Guddu mile 0/0-20/0 (32.18
Km).
1102 Reconstruction of link road from Daur
SBA
Approved
Bye-pass Road to (Un-named railway
03.03.15
Phatak) road mile 0/0-0/4+110 (0.83
KM)

June-16

353.659

0.000

30.000

0.000

30.000

323.659

60.000

0.000

60.000

0.000

25

131.830

131.830

June-16

431.378

0.000

30.000

0.000

30.000

401.378

58.509

0.000

58.509

0.000

21

171.435

171.435

June-17

289.186

0.000

55.491

0.000

55.491

401.378

35.000

0.000

35.000

0.000

19

31

183.189

183.189

June-16

24.660

0.000

0.000

0.000

0.000

24.660

24.660

0.000

24.660

0.000

100

0.000

0.000

[ 185 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

1103 Construction/Improvement of internal Jacobabad


roads of Thul City.
1104 Hawksbay Elevated Freeway
Karachi
(11.5 KM)
1105 Construction of road from Asian Bank
SBA
road @ 3/6 to village Sultan Sethar (to
connect Rahimdad Mari) road Mile 0/02/4 (4.00 KM).
1106 Construction of road from Ali Akber
SBA
Brohi road 0/0 to village Rahimdad
Mari (to connect Asian Bank) road
Mile 0/0-2/4 (4.00 KM).
1107 Construction of road from Jam Sahib SBA
Mudh Jamrao road @ Mile 3/0 to
village Muhammad Hassan Chandio
via village Abbass Ali Chandio road
Mile 0/0-3/1 (5.00 KM).
1108 Raising & Widening/Reconditioning of
Sanghar
sanghar shahdadpur road @Ghundan
road mile 5/0-8/0 (4.82 Km)(asphalt
concrete),(To be funded out of 10%
share of Royalty)
1109 Construction / Rehabilitation of
Hyderabad
Various Premixed Carpet Roads CC
Roads & Sewerage / Drainage Works
at Qasimabad, Hyderabad & various
village around.
1110 Construction and Rehabilitation of
Hyderabad
Hyderabad Rural Road Taluka Tando
Jam.
1111 Construction of Storm Water Drains
S.B.A
and Rehabilitation of Damaged roads
of Nawabshah Town during rains
2011. (Revised)
1112 Reconditioning / Construction of
S.B.A
District Roads of Shaheed
Benazirabad.
1113 Construction/ Reconditioning of Rural
S.B.A
Roads of District Shaheed
Benazirabad.
1114 Construction of Bus Terminal and Taxi Larkana
Stand Retodero and Naudero Cities of
Taluka Retodero (2 Nos.).

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
6

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

Approved
08.02.14
Approved
09.05.14
Approved
08.04.15

June-17

249.007

0.000

100.000

0.000

100.000

149.007

30.000

0.000

30.000

0.000

40

52

59.504

59.504

June-16

35.100

0.000

0.000

0.000

0.000

35.100

12.000

0.000

12.000

0.000

34

11.550

11.550

June-17

34.687

0.000

0.000

0.000

0.000

34.687

12.000

0.000

12.000

0.000

35

11.344

11.344

Approved
08.04.15

June-17

35.733

0.000

0.000

0.000

0.000

35.733

14.000

0.000

14.000

0.000

39

10.867

10.867

Approved
08.04.15

June-17

44.513

0.000

0.000

0.000

0.000

44.513

15.000

0.000

15.000

0.000

34

14.757

14.757

Approved
03.03.15

June-17

135.057

0.000

0.000

0.000

0.000

135.057

10.000

0.000

10.000

0.000

62.529

62.529

Approved
29-05-15

June-17

1053.299

0.000

400.000

0.000

400.000

653.299

100.000

0.000

100.000

0.000

38

47

553.299

0.000

Approved
14-05-15

June-17

1571.000

0.000

0.000

0.000

0.000

1571.000

100.000

0.000

100.000

0.000

1471.000

0.000

Approved
14-11-14

June-17

484.650

6.882

75.000

0.000

81.882

402.768

106.790

0.000

106.790

0.000

17

39

295.978

0.000

Approved
22.01.13

June-17

2683.897

1362.360

618.589

0.000

1980.949

702.948

115.590

0.000

115.590

0.000

74

78

587.358

0.000

Approved
16.04.14

June-16

600.530

68.000

176.530

0.000

244.530

356.000

50.000

0.000

50.000

0.000

41

49

306.000

0.000

Approved
09.02.12

June-16

153.896

8.836

50.030

0.000

58.866

95.030

50.000

0.000

50.000

0.000

38

71

45.030

0.000

[ 186 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

1115 Improvement Old Indus Highwary


(Larkana Town Portion Left Over
Portion of NHA) Mile 191/0-198/4 I/C
Link Connection Larkana Naudero
Road Total Length 8/4 Mile (13.60
K.M) (Revised).
1116 Construction/Reconditioning of Roads
district Larkana.
1117 Rehabilitation / Improvement of
Internal Roads in Lyari Town (PhaseIII-Revised).
1118 Repair and Improvement of
Roads/Streets from UC-1 to UC-11
Lyari (Revised).
1119 Construction of flyover at Golimar
Intersection Nazimabad No. 1.

Larkana

Approved
14-11-14

June-17

756.47

Larkana

Approved
14.03.14
Approved
14.05.15

June-16

Karachi

Karachi

1120 Construction of 3 Lane Flyover at


Malir 15 at Shahrah -e-Faisal Karachi
(Revised).
1121 Improvement /Reconditioning of Road
from Malir Halt Phattak to Faruqu
Masjid Saudabad Malir Karachi (1.5
km).
1122 Construction of Road from Navy Wall
to Chashma Goth in Bin Qasim Town.

Karachi

1123 Widening of Bridge of Shafiq Mor on


Shah Waliullah Road, Karachi.
1124 Constt, of Shaheed Benazeer Bhutto
Flyover at Shaheen Complex.
1125 Constt of Madar-e-Jamhoriyat Nusrat
Bhutto Under pass at Mehran Hotel.
1126 Improvement of Road from Safora
Chowrangi to Saadi Town.

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

FPA

Financial
Progress in %age
upto

Financial Projection

Total
14

15

Jun'15 Jun'16
16
17

2016-17
18

Allocation for 2015-16


Capital
12

Revenue
13

2017-18
19

0.000

0.000

0.000

0.000

756.470

200.000

0.000

200.000

0.000

26

556.470

0.000

608.532

23.301

125.000

0.000

148.301

460.231

30.000

0.000

30.000

0.000

24

29

430.231

0.000

June-16

230.613

0.000

100.629

0.000

100.629

129.984

129.984

0.000

129.984

0.000

44

100

0.000

0.000

Approved
14.05.15

June-16

201.694

0.000

50.992

0.000

50.992

150.702

150.702

0.000

150.702

0.000

25

100

0.000

0.000

Approved
04.10.12
(U/R)
Approved
16.04.14

June-16

334.776

0.000

100.000

0.000

100.000

234.776

30.000

0.000

30.000

0.000

30

39

204.776

0.000

June-16

999.179

266.260

200.260

0.000

466.520

532.659

532.659

0.000

532.659

0.000

47

100

0.000

0.000

Karachi

Approved
11.02.14

June-16

38.000

0.000

29.500

0.000

29.500

8.500

8.500

0.000

8.500

0.000

78

100

0.000

0.000

Karachi

Approved
02.04.14

June-16

59.843

0.000

56.542

0.000

56.542

3.301

3.301

0.000

3.301

0.000

94

100

0.000

0.000

Karachi

Approved
03.12.13
Approved
17.05.12
Approved
27.04.12
Approved
14.11.14

June-16

99.044

14.997

58.856

0.000

73.853

25.191

25.191

0.000

25.191

0.000

75

100

0.000

0.000

June-16

536.075

0.000

0.000

0.000

0.000

536.075

8.000

0.000

8.000

0.000

528.075

0.000

June-16

458.761

0.000

300.000

0.000

300.000

158.761

223.000

0.000

223.000

0.000

65

114

-64.239

0.000

June-16

74.765

0.000

70.766

0.000

70.766

3.999

3.999

0.000

3.999

0.000

95

100

0.000

0.000

1127 Mirpurkhas Development Project


Mirpurkhas Approved
(Road Component).
12.02.13
1128 Retrofiting/reconstruction of the
Karachi
Approved
damaged components of Jam Sadiq Ali
06.02.15
Bridge.
(U/R)
1129 Various Development schemes of
Kamber @ Approved
Kamber@Shahdadkot (31 Nos.).
Shahdadkot 22.04.15
1130 Various Development Schemes (25
Tharparkar Approved
Nos.).
18.02.15

June-16

369.281

0.000

169.289

0.000

169.289

199.992

100.000

0.000

100.000

0.000

46

73

99.992

0.000

June-16

125.922

0.000

125.922

0.000

125.922

0.000

2.000

0.000

2.000

0.000

100

102

-2.000

0.000

June-16

743.371

0.000

0.000

0.000

0.000

743.371

185.842

0.000

185.842

0.000

25

557.529

0.000

June-16

397.115

0.000

0.000

0.000

0.000

397.115

397.115

0.000

397.115

0.000

100

0.000

0.000

Karachi

Karachi
Karachi
Karachi

[ 187 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
4

Total Roads (On-Going)

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

24760.095

3655.540

5519.314

0.000

9174.854 15752.924

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

8404.219

2835.920

4532.598

0.000

4532.598

0.000

ROADS (NEW SCHEMES)


1131 Construction of new development road
Larkana
schemes (5.00 km) NA-205, Taluka
Dokri, District Larkano
1132 Construction of Flyover Bridge 500 Rft Larkana
at Larkano City (2 Nos.)
1133 Development Works of Taluka
Dadu
Khairpur Nathan Shah.
1134 Reconstruction of road from Kandiaro N. Feroze
to Mohbat Dero Chodaky road mile 0/05/4
1135 Rehabilitation / Construction of Major
Karachi
Roads of KMC
1136 Construction of link road from Dau
Jacobabad
Muhammadpur Road to village
Rizwanabad Mile 0/0-2/5 (4.24 KM)
1137 Rehabilitation of road from
SBA
Hamayoon, Sher Muhammad Thaheem
road to Pir Zaman Shah.
1138 Construction of road from Sultankot,
SBA
Jaggan road to Kot Shahzain.
1139 Renovation with asphalt dual carriage
T. A. Yar
way road in Tando Allahyar town
portion mile 0/0-3/0 (4.83 Km),(To be
funded out of 10% share of Royalty)

UnApproved

June-17

62.795

0.000

0.000

0.000

0.000

62.795

15.699

0.000

15.699

0.000

25

23.548

23.548

UnApproved
UnApproved
UnApproved

June-17

200.000

0.000

0.000

0.000

0.000

200.000

50.000

0.000

50.000

0.000

25

75.000

75.000

June-17

180.000

0.000

0.000

0.000

0.000

180.000

45.000

0.000

45.000

0.000

25

67.500

67.500

June-17

85.518

0.000

0.000

0.000

0.000

85.518

21.380

0.000

21.380

0.000

25

32.069

32.069

UnApproved
UnApproved

June-17

200.000

0.000

0.000

0.000

0.000

200.000

50.000

0.000

50.000

0.000

25

75.000

75.000

June-17

33.545

0.000

0.000

0.000

0.000

33.545

8.386

0.000

8.386

0.000

25

12.580

12.580

UnApproved

June-17

17.180

0.000

0.000

0.000

0.000

17.180

4.295

0.000

4.295

0.000

25

6.443

6.443

UnApproved
UnApproved

June-17

30.080

0.000

0.000

0.000

0.000

30.080

7.520

0.000

7.520

0.000

25

11.280

11.280

June-17

150.000

0.000

0.000

0.000

0.000

150.000

37.500

0.000

37.500

0.000

25

56.250

56.250

1140 Reconditioning of road from


Manghanwari to village Hassan
Phulpoto and Sain Dino Maitlo Taluka
Kingri (4.00 KM).
1141 Construction / Reconditioning of road
from Kamal Shah to K.B. Allah Bux
road mile 0/0-3/0 (4.81 Km)
1142 Construction/Reconditioning of road
from Rahimabad to Lodra via Chol
Canal right bank mile 0/0-7/5 (12.26
KM)
1143 Construction of internal roads and
improvement of drainage system in
Shikarpur City.

Khairpur

UnApproved

June-17

40.000

0.000

0.000

0.000

0.000

40.000

10.000

0.000

10.000

0.000

25

15.000

15.000

Shaikarpur

UnApproved

June-17

53.820

0.000

0.000

0.000

0.000

53.820

13.455

0.000

13.455

0.000

25

20.183

20.183

Shaikarpur

UnApproved

June-17

114.039

0.000

0.000

0.000

0.000

114.039

28.510

0.000

28.510

0.000

25

42.765

42.765

Shaikarpur

UnApproved

June-17

149.799

0.000

0.000

0.000

0.000

149.799

37.450

0.000

37.450

0.000

25

56.175

56.175

[ 188 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Khairpur

UnApproved

June-17

45.000

0.000

0.000

0.000

0.000

45.000

11.250

0.000

11.250

0.000

25

16.875

16.875

Khairpur

UnApproved
UnApproved

June-17

80.000

0.000

0.000

0.000

0.000

80.000

20.000

0.000

20.000

0.000

25

30.000

30.000

June-17

70.000

0.000

0.000

0.000

0.000

70.000

17.500

0.000

17.500

0.000

25

26.250

26.250

Karachi

UnApproved

June-17

56.000

0.000

0.000

0.000

0.000

56.000

14.000

0.000

14.000

0.000

25

21.000

21.000

Karachi

UnApproved

June-17

56.000

0.000

0.000

0.000

0.000

56.000

14.000

0.000

14.000

0.000

25

21.000

21.000

Karachi

UnApproved

June-17

20.000

0.000

0.000

0.000

0.000

20.000

5.000

0.000

5.000

0.000

25

7.500

7.500

Karachi

UnApproved

June-17

56.000

0.000

0.000

0.000

0.000

56.000

14.000

0.000

14.000

0.000

25

21.000

21.000

Karachi

UnApproved
UnApproved

June-17

49.000

0.000

0.000

0.000

0.000

49.000

12.250

0.000

12.250

0.000

25

18.375

18.375

June-17

40.000

0.000

0.000

0.000

0.000

40.000

10.000

0.000

10.000

0.000

25

15.000

15.000

1153 Construction of road Markazi Imam


Karachi
UnBargah Jaffar Tayirah Malir Karachi
Approved
(5 Km) (55' wide)
1154 Construction of road from Tando Jan Mirpurkhas
UnMuhammad Dehi road at point 57
Approved
Mori to village Muhammad Salim
Dada Deh 197 and Link to
Muhammad Asif Deh 201 District
Mirpur Khas (4.5 Km)
1155 Rehabilitation of Boro Sahib Khan
Badin
Unroad to Jafer farm to village Munawar
Approved
Farm 0/0-2/3 (3.8 km).

June-17

60.000

0.000

0.000

0.000

0.000

60.000

15.000

0.000

15.000

0.000

25

22.500

22.500

June-17

50.000

0.000

0.000

0.000

0.000

50.000

12.500

0.000

12.500

0.000

25

18.750

18.750

June-17

25.222

0.000

0.000

0.000

0.000

25.222

6.305

0.000

6.305

0.000

25

9.458

9.458

1144 Rehabilitation of road from Khora


Ripri Regulator road to Pir Jeelani 05
Km.
1145 Reconditioning of road from Hingorja
to Sami road (10 KM).
1146 Rehabilitation of road from Filter
Plant to Dargha Yousuf Shah Darsano
Channo,Karachi.(5.00Km)
1147 Improvement of road from
Razzakabad via Pir Sarhandi Goth to
Sheedi Goth, Bin Qasim
Town,Karachi.(4.00 Km)
1148 Construction of Metal road from
Gonga Ghot to Jalbani Ghot UC-5
Gharibabad district Malir.(4.00 Km)
1149 Rehabilitation of roads internal Streets
Block-4 Bathisland PS-112 Saddar
Town, Karachi.
1150 Improvement of Shahzad Khalil road
from Shaheed-e-Millat road to Stadium
road Jamshed Town, District East,
KMC
1151 Improvement of Internal roads in
Keamari (PS-89).
1152 Construction of Link road from
Boharo Keti Bunder road from Jat
Stop to village molvi Mohd Alim Jat
UC Mehar taluka Ghora Bari (4.0 km)

Karachi

Thatta

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

2017-18
19

[ 189 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

1156 Construction of Road from village


Hassu Kanhar to Fateh Ali Chandio
via Mureed Kalhoro and Saeed Khan
Chandio (4 km) Taluka Kingri
1157 Construction of Road from Naushahro
Feroze Mithiani Road to Village Dhani
Bux Samo 3.5 km
1158 Construction of Road in Villages
Sobho Khan Chang to Ali Murad
Chang, Umar Memon, Haji Ghulam
Jan Brohi, Wahid Bux Khaskheli to
Mehrabpur at Taluka Mehrabpur
(10.00 Km)
1159 Improvement of road from Piaro Road
to village ARZ Muhammad mile 0/02/1 (Phase-I) [3.325 Km] (To be
funded out of 10% share of Royalty)

Khairpur

UnApproved

June-17

40.000

0.000

0.000

0.000

0.000

40.000

10.000

0.000

10.000

0.000

25

27.000

15.000

N. Feroze

UnApproved

June-17

35.000

0.000

0.000

0.000

0.000

35.000

8.750

0.000

8.750

0.000

25

26

27.000

13.125

N. Feroze

UnApproved

June-17

100.000

0.000

0.000

0.000

0.000

100.000

25.000

0.000

25.000

0.000

25

26

27.000

37.500

Dadu

UnApproved

June-17

30.000

0.000

0.000

0.000

0.000

30.000

7.500

0.000

7.500

0.000

25

26

27.000

11.250

1160 Improvement of Azam Basti Main road


DMC South (3.2 Km)
1161 Reconditioning of road from Tharu
Shah Mithiani road to village Suleman
Dehraj via Azmat Dero road (4.5 Km)

Karachi

UnApproved
UnApproved

June-17

41.600

0.000

0.000

0.000

0.000

41.600

10.400

0.000

10.400

25

15.600

15.600

June-17

40.500

0.000

0.000

0.000

0.000

40.500

10.125

0.000

10.125

0.000

25

15.188

15.188

UnApproved

June-17

88.800

0.000

0.000

0.000

0.000

88.800

22.200

0.000

22.200

0.000

25

33.300

33.300

UnApproved

June-17

45.000

0.000

0.000

0.000

0.000

45.000

11.250

0.000

11.250

0.000

25

16.875

16.875

UnApproved

June-17

39.000

0.000

0.000

0.000

0.000

39.000

9.750

0.000

9.750

0.000

25

14.625

14.625

UnApproved

June-17

48.000

0.000

0.000

0.000

0.000

48.000

12.000

0.000

12.000

0.000

25

18.000

18.000

UnApproved

June-17

50.000

0.000

0.000

0.000

0.000

50.000

12.500

0.000

12.500

0.000

25

18.750

18.750

N. Feroze

1162 Construction of road from German


N. Feroze
Mori to Kamaldero via Pipri Bund
road mile 0/0-7/0(4.2 Km)
1163 Construction of road from Ali
Kashmore @
Muhammad Khoso new road Toj
Kandhkot
Shakh Top to village Zulfiqar
Golo(5.00 Km) UC Daulatpur Taluka
Kandhkot.
1164 Construction of road from Haji Gada
Kashmore
Ali Khan Nindwani, Deh Huzuro
District Khashmore.(To be funded out
of 10% share of Royalty)
1165 Construction/Improvement of road
Karachi
from Jinnah Square to Saudabad -15
Malir Karachi.(4 Km)
1166 Improvement of Dawat-e-Islami road
Karachi
(3.5 Km) District Municipal
Corporation south Karachi.(3.5 Km)

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

2017-18
19

[ 190 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

1167 Construction of Road in Mohallah Al


Reheem Raza Block F-II, Abdullah
Shah Gazi Goth Malir Karachi(3.5km)

Karachi

UnApproved

June-17

30.000

0.000

0.000

0.000

0.000

30.000

7.500

0.000

7.500

0.000

25

11.250

11.250

1168 Construction of roads from National


Highway to village Bingo Bullo and
from village Agro to Mulla Ally,
Taluka Pano Aqil (3.2 Kms), (To be
funded out of 10% share of Royalty)
1169 Construction of road from County
Garden road to Sachal Goth
1170 Construction of road from NawabshahSarhari road (Bakhshio Jamali) to
village Afzil / Mahar Ali Bhangwar,
UC Gupchani, Taluka Daur.

Sukkur

UnApproved

June-17

25.000

0.000

0.000

0.000

0.000

25.000

6.250

0.000

6.250

0.000

25

9.375

9.375

Karachi

UnApproved
UnApproved

June-17

31.732

0.000

0.000

0.000

0.000

31.732

7.933

0.000

7.933

0.000

25

11.900

11.900

June-17

26.400

0.000

0.000

0.000

0.000

26.400

6.600

0.000

6.600

0.000

25

9.900

9.900

SBA

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

2017-18
19

1171 Construction of road from NawabshahSarhari road to connect NawabshahVarr road via Haji Muhammad Bux
Brohi, Allah Dito Magsi, Jan
Muhammad Brohi and Ghulam Hyder
Zardari, UC Khadhar & Gupchani,
Taluka Sakrand & Daur, Mile 0/0-3/1

SBA

UnApproved

June-17

55.000

0.000

0.000

0.000

0.000

55.000

13.750

0.000

13.750

0.000

25

20.625

20.625

1172 Rehabilitation / re-carpeting of


internal roads of Block -2, Clifton,
DMC (South), Karachi
1173 Construction of road alongwith side
drains and foot paths from Shah Petrol
Pump to Bab-e-Khayber, Metroville
Site, Karachi
1174 Widening and Reconditioning of road
from Hot Khan Jalbani to Siyalabad
(Railway Station), Taluka Mehrabpur,
District Naushehro Feroze.

Karachi

UnApproved

June-17

40.000

0.000

0.000

0.000

0.000

40.000

10.000

0.000

10.000

0.000

25

15.000

15.000

Karachi

UnApproved

June-17

100.000

0.000

0.000

0.000

0.000

100.000

25.000

0.000

25.000

0.000

25

37.500

37.500

N. Feroze

UnApproved

June-17

30.000

0.000

0.000

0.000

0.000

30.000

7.500

0.000

7.500

0.000

25

11.250

11.250

Hyderabad

UnApproved
UnApproved

June-17

80.000

0.000

0.000

0.000

0.000

80.000

20.000

0.000

20.000

0.000

25

30.000

30.000

June-17

55.000

0.000

0.000

0.000

0.000

55.000

13.750

0.000

13.750

0.000

25

20.625

20.625

1175 Improvement of road in Unit Nos.


2,7,8,9,10 & 11 latifabad, Hyderabad.
1176 Reconditioning / Rehabilitation Hazrat
Bilal Umer Farooq Road (25 ft),
Korangi Industrial area.

Karachi

[ 191 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

1177 Construction of Road Tangwani Shakh


to village Muqadam Siddiq, UC Saiful,
Taluka Tangwani, District Kashmore.

Kashmore

UnApproved

June-17

39.000

0.000

0.000

0.000

0.000

39.000

9.750

0.000

9.750

0.000

25

14.625

14.625

1178 Construction of road Abad Hussain


Zardari to village Shah Nawaz
Zardari, Taluka Moro, District
Naushehro Feroze.
1179 Improvement of road from National
High Way to Rahib Khan Mooro (3.5
Kms)
1180 Construction of 2nd track of Road
5000 from Road 8000 to Road 4000,
Korangi Town, Karachi.
1181 Rehabilitation of Road from Jackson
Para to Bank Al-Habib Keamari PS-89
Sindh Karachi
1182 Construction of Road from Jackson
Market to Bank Al-Habib District
South Karachi
1183 Improvement of Road in UC No 3,4,5
Landhi Zone DMC Korangi
1184 Rehabilitation / Improvement of Roads
in Different areas in PS-109 Lyari
Karachi
1185 Construction of road at village
Muhammad Khan Sethar to Old
village Lal Bux Shahani new village
Muhammad Alam Shahani Taluka
Daur District (S.B.A)(4.00 km)
1186 Improvement and Repair of Internal
Roads in Block J, K and I North
Nazimabad, Karachi.
1187 Reconditioning of Road from Lodra
Stop to Habibullah Kehar Village
4.00 km.
1188 Construction of road including
drainage from RD 20000 Mori Dokri
distributory regulator on Bagi - Dokri
road upto Sher Muhammad Junejo
village

N. Feroze

UnApproved

June-17

40.000

0.000

0.000

0.000

0.000

40.000

10.000

0.000

10.000

0.000

25

15.000

15.000

N. Feroze

UnApproved

June-17

25.000

0.000

0.000

0.000

0.000

25.000

6.250

0.000

6.250

0.000

25

9.375

9.375

Karachi

UnApproved

June-17

86.750

0.000

0.000

0.000

0.000

86.750

21.687

0.000

21.687

0.000

25

32.532

32.532

Karachi

UnApproved

June-17

17.882

0.000

0.000

0.000

0.000

17.882

4.471

0.000

4.471

0.000

25

6.706

6.706

Karachi

UnApproved

June-17

18.000

0.000

0.000

0.000

0.000

18.000

4.500

0.000

4.500

0.000

25

6.750

6.750

Karachi

UnApproved
UnApproved

June-17

30.000

0.000

0.000

0.000

0.000

30.000

7.500

0.000

7.500

0.000

25

11.250

11.250

June-17

49.896

0.000

0.000

0.000

0.000

49.896

12.474

0.000

12.474

0.000

25

18.711

18.711

S.B.A

UnApproved

June-17

50.000

0.000

0.000

0.000

0.000

50.000

12.500

0.000

12.500

0.000

25

18.750

18.750

Karachi

UnApproved

June-17

60.000

0.000

0.000

0.000

0.000

60.000

15.000

0.000

15.000

0.000

25

22.500

22.500

Shikarpur

UnApproved

June-17

50.000

0.000

0.000

0.000

0.000

40.000

12.500

0.000

12.500

0.000

25

13.750

13.750

Larkana

UnApproved

June-17

40.000

0.000

0.000

0.000

0.000

40.000

10.000

0.000

10.000

0.000

25

15.000

15.000

Karachi

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

2017-18
19

[ 192 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Sanghar

UnApproved

June-17

40.000

0.000

0.000

0.000

0.000

40.000

10.000

0.000

10.000

0.000

25

15.000

15.000

Karachi

UnApproved
UnApproved

June-17

45.000

0.000

0.000

0.000

0.000

45.000

11.250

0.000

11.250

0.000

25

16.875

16.875

June-17

60.000

0.000

0.000

0.000

0.000

60.000

20.000

0.000

20.000

0.000

33

20.000

20.000

UnApproved

June-17

40.000

0.000

0.000

0.000

0.000

40.000

10.000

0.000

10.000

0.000

25

15.000

15.000

1193 Construction of Roads in Tando Allah


T. A. Yar
UnYar (10 Kms),(To be funded out of
Approved
10% share of Royalty)
1194 Construction of Road from Tando Jan Mirpurkhas
UnMohammad Jhudo Road via link Road
Approved
Allah Bachayo Laghari via Khushi
Mohammad Arain Deh 202 (4.00 km)

June-18

80.000

0.000

0.000

0.000

0.000

80.000

20.000

0.000

20.000

0.000

25

30.000

30.000

June-17

36.000

0.000

0.000

0.000

0.000

36.000

9.000

0.000

9.000

0.000

25

27.000

13.500

1195 Road Radhan to Usman Kaalhoro


Chowk to Noorullah Hesbane.
1196 Construction of Link road from
Larkana Circular and @ mile 2/0 to
village Islam Din Malgani
1197 Road from Maher Wada to Village
Bakapur via Hullio Village to Larkana
Maher Wada Road.
1198 Rehabilitation & Widening of Road
from Larkana Randan Road to Usman
Kalhoro.
1199 Rehabilitation & Widening of Road
from Larkana Radan road to Village
Yaro Lakhar.
1200 Rehabilitation&Widening of road from
Bakrani Bridge to village Syed Bachal
Shah via Village Gul Mulo Tunio.(To
be funded out of 10% share of Royalty)

UnApproved
UnApproved

June-17

15.000

0.000

0.000

0.000

0.000

15.000

3.750

0.000

3.750

0.000

25

27.000

5.625

June-17

15.000

0.000

0.000

0.000

0.000

15.000

3.750

0.000

3.750

0.000

25

27.000

5.625

Larkana

UnApproved

June-17

20.000

0.000

0.000

0.000

0.000

20.000

5.000

0.000

5.000

0.000

25

27.000

7.500

Larkana

UnApproved

June-17

15.000

0.000

0.000

0.000

0.000

15.000

3.750

0.000

3.750

0.000

25

27.000

5.625

Larkana

UnApproved

June-17

13.000

0.000

0.000

0.000

0.000

13.000

3.250

0.000

3.250

0.000

25

27.000

4.875

Larkana

UnApproved

June-17

14.000

0.000

0.000

0.000

0.000

14.000

3.500

0.000

3.500

0.000

25

27.000

5.250

1189 Construction and Rehabiulitation of


Ghlam Nabi Shah Rkoad from
irrigation rest house Khahi road upto
village sarhandi via Muhammad siddiq
Abu Bhai road (04 km),(To be funded
out of 10% share of Royalty)
1190 Improvement of Internal roads in
Garden West, Karachi 5 km.
1191 Rehabilitation of Roads from Lasi
Goth to Samu Goth and adjoining
areas Gadap, Karachi.
1192 Construction of Road from village
Behram Brohi to village Noor
Mohammad Rasani via village Daulat
Brohi District Jacobabad 5 Kms.

Karachi

Jacobabad

Larkana
Larkana

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

2017-18
19

[ 193 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Larkana

UnApproved

June-17

10.000

0.000

0.000

0.000

0.000

10.000

2.500

0.000

2.500

0.000

25

27.000

3.750

Larkana

UnApproved

June-17

18.000

0.000

0.000

0.000

0.000

18.000

4.500

0.000

4.500

0.000

25

27.000

6.750

Khairpur

UnApproved

June-17

50.000

0.000

0.000

0.000

0.000

50.000

12.500

0.000

12.500

0.000

25

27.000

18.750

Khairpur

UnApproved

June-17

40.000

0.000

0.000

0.000

0.000

40.000

10.000

0.000

10.000

0.000

25

27.000

15.000

Khairpur

UnApproved

June-17

15.000

0.000

0.000

0.000

0.000

15.000

3.750

0.000

3.750

0.000

25

27.000

5.625

Larkana

UnApproved
UnApproved

June-18

500.000

0.000

0.000

0.000

0.000

500.000

125.000

0.000

125.000

0.000

25

27.000

187.500

June-17

40.000

0.000

0.000

0.000

0.000

40.000

10.000

0.000

10.000

0.000

25

27.000

15.000

Karachi

UnApproved

June-17

50.000

0.000

0.000

0.000

0.000

50.000

12.500

0.000

12.500

0.000

25

27.000

18.750

Karachi

Approved
03-12-14
UnApproved

June-17

404.926

0.000

0.000

0.000

0.000

404.926

101.232

0.000

101.232

0.000

25

303.694

0.000

June-17

129.511

0.000

0.000

0.000

0.000

129.511

32.250

0.000

32.250

0.000

25

97.261

0.000

Karachi

UnApproved

June-17

53.138

0.000

0.000

0.000

0.000

53.138

13.285

0.000

13.285

0.000

25

39.853

0.000

Karachi

UnApproved

June-17

785.217

0.000

0.000

0.000

0.000

785.217

196.305

0.000

196.305

0.000

25

588.912

0.000

Karachi

UnApproved

June-17

83.937

0.000

0.000

0.000

0.000

83.937

20.984

0.000

20.984

0.000

25

62.953

0.000

Sanghar

UnApproved

June-16

500.000

0.000

0.000

0.000

0.000

500.000

500.000

0.000

500.000

0.000

100

0.000

0.000

1201 Road from Jumo Maitlo road to Yar


Muhammad Jatoi 1/2 Km.(To be
funded out of 10% share of Royalty)
1202 Reconditioning of road from Moenjo
daro radan road to Jukhra. (3 km) UCtatre
1203 Recondition of road from Thari
Mirwah to Hekal via Hussain Bux
Dasti Taluka Thari Mirwah.
1204 Construction of Road from Sanghar
Tajjal Road to Faqir Ali Hassan Mangi
visa Gulan Mulo & Bagh-e-Zehra
Taluka Nara.
1205 Construction/Re-construction of
Bridge over Goondararo Minor, Deh
Tapa Goondararo, Taluka Kotdiji.
1206 Rehabilitation / Construction of Roads
of Larkana City
1207 Reconditioning of Road from Tando
Soomro to Bahar Khan Mirjat
(4.5 Km).(To be funded out of 10%
share of Royalty)
1208 Construction / Rehabilitation of
internal main roads at Orangi
Township
1209 Construction of Flyover at Korangi
Crossing.
1210 Balance work for improvement and
rehabilitation of 150 ft wide road in
sector 23 from Road 3000 to Raod 5000
at Korangi.
1211 Retrofiting and Widening of existing
PIDC Bridge on M.T Khan Road
Karachi.
1212 Rehabilitation/reconstruction of
National Highway (N-5) from Jinnah
Terminal fly over to Quidabad flyover.
1213 Rehabilitation of Dockyard Road from
ICI Bridge to Pakistan Navy Dockyard
KMC.
1214 Various Development Schemes of road
and electrification (24 Nos.).

T. A. Yar

Karachi

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

2017-18
19

[ 194 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Dadu

UnApproved

June-16

1215 Various Development Schemes (54


Nos.). (To be funded out of 10% share
of Royalty)
Total Roads (New Schemes)
Total Roads (New & Ongoing)

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
6

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

400.000

0.000

0.000

0.000

6934.287
31694.382

0.000
3655.540

0.000
5519.314

0.000
0.000

0.000

FPA

Financial
Progress in %age
upto

Financial Projection

Total
14

15

Jun'15 Jun'16
16
17

2016-17
18

Allocation for 2015-16


Capital
12

Revenue
13

400.000

400.000

0.000

400.000

0.000

0.000 6924.287
9174.854 22677.211

2413.446
6946.044

0.000
0.000

2413.446
6946.044

0.000
0.000

100

2017-18
19

0.000

0.000

2918.757
11322.976

1709.084
4545.004

WATER & DRAINAGE


(On-Going Schemes)
1216 Construction of Retention Weir / Dam
at Khand Jhang near Tapo Moidan,
UC-3, GADAP Town, Karachi.

Karachi

Approved
27.09.12

June-16

379.846

35.000

3.600

0.000

38.600

341.246

50.000

0.000

50.000

0.000

10

23

291.246

0.000

1217 Construction of Retention Weir / Dam


at Gajjan Khan Village, GADAP
Town, Karachi.
1218 Construction of two Retention Weirs in
the Rural Area Karachi at Mohin
Chotto M. Siddique Chotta Moelari Pir
Bukhsh Chotta Deh Kand Jhang,
Tappo Maidan, Gadap Town, Karachi

Karachi

Approved
27.09.12

June-16

196.188

96.000

95.188

0.000

191.188

5.000

5.000

0.000

5.000

0.000

97

100

0.000

0.000

Karachi

Approved
01.01.10
(U/R)

June-15

280.063

262.060

3.600

0.000

265.660

14.403

14.403

0.000

14.403

0.000

95

100

0.000

0.000

1219 Earth work Remodeling Umar Kas


Minor/Wah DSP Office to Newyard
Bridge mil 0/002+660. (To be funded
out of 10% share of Royalty)

Sukkur

Approved
22.11.12

June-16

20.000

0.000

10.000

0.000

10.000

10.000

10.000

0.000

10.000

0.000

50

100

0.000

0.000

876.097

393.060

112.388

0.000

505.448

370.649

79.403

0.000

79.403

0.000

291.246

0.000

36.800

0.000

18.400

0.000

18.400

18.400

4.000

0.000

4.000

0.000

14.400

0.000

36.800

0.000

18.400

0.000

18.400

18.400

4.000

0.000

4.000

0.000

14.400

0.000

26.000

0.000

0.000

0.000

0.000

26.000

6.500

0.000

6.500

0.000

19.500

0.000

Total Water & Drainage :ENERGY


On-going Schemes
1220 Solar Powered LED Street Lights
Model Project at Gadap Town, Malir,
Karachi
Total Energy :ENERGY
New Schemes
1221 Providing Solar Energy for UC Therhi
Taluka & District Khairpur

Karachi

Khairpur

Approved
09.01.13

Unapproved

June-16

June-17

50

61

25

[ 195 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Jacobabad

Unapproved

June-17

1222 Installation of 5 Tubewells on Solar


Energy at village Sheranpur,
Karampur, Nazarpur & Nazar
Muhammad.
Total Energy :Total Energy :-

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
6

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

35.000

0.000

0.000

0.000

0.000

35.000

9.000

0.000

9.000

0.000

61.000
97.800

0.000
0.000

0.000
18.400

0.000
0.000

0.000
18.400

61.000
79.400

15.500
19.500

0.000
0.000

15.500
19.500

0.000
0.000

26

2017-18
19

26.000

0.000

45.500
59.900

0.000
0.000

EDUCATION
(On-going Schemes)
1223 Construction of Two Roomed Building
and Additional Class rooms to Existing
Primary Schools, Taluka Ratodero (16
Units)
(C: 70.163 + R: 3.625)
1224 Repair / Re-construction / Renovation
of Elementary Primary and Secondary
Schools in Karachi
(C: 182.121 + R: 0.599)
1225 Repair / Re-construction / Renovation
of Elementary Primary and Secondary
Local Bodies Schools in Karachi

Larkana

Approved
03.12.13

June-15

73.788

22.523

21.346

0.000

43.869

29.919

25.599

4.320

29.919

0.000

59

100

0.000

0.000

Karachi

Approved
03.01.13

June-15

182.720

0.000

20.000

0.000

20.000

162.720

29.000

0.000

29.000

0.000

11

27

66.860

66.860

Karachi

Approved
03.01.13

June-15

197.904

0.000

15.000

0.000

15.000

182.904

24.289

0.000

24.289

0.000

20

79.308

79.308

1226 Rehabilitation of Mumtaz College


Khairpur, Taluka Khairpur
1227 Rehabilitation of Superior Science
College Khairpur, Taluka Khairpur
1228 Rehabilitation of Women College
Khairpur, Taluka Khairpur
1229 Construction & Establishment of
Science Laboratories for High School
Khairpur (C: 12.056 + R: 1.000)
1230 Rehabilitation of Government Naz
High School Khairpur, Taluka
Khairpur
1231 Rehabilitation of Middle School Waris
Ghambhir U.C. Mehar Ali, Taluka
Khairpur,(To be funded out of 10%
share of Royalty)
1232 Nawabshah Package for Education
(Revised) (Cap:Rs.1627.473 m Rev.Rs.184.801 m)

Khairpur

Approved
21.11.14
Approved
21.11.14
Approved
21.11.14
Approved
21.11.14

June-16

20.000

0.000

10.000

0.000

10.000

10.000

10.000

0.000

10.000

0.000

50

100

0.000

0.000

June-16

10.000

0.000

5.000

0.000

5.000

5.000

5.000

0.000

5.000

0.000

50

100

0.000

0.000

June-16

15.000

0.000

7.500

0.000

7.500

7.500

7.500

0.000

7.500

0.000

50

100

0.000

0.000

June-16

13.056

0.000

10.000

0.000

10.000

3.056

3.056

0.000

3.056

0.000

77

100

0.000

0.000

Khairpur

Approved
21.11.14

June-16

10.000

0.000

5.000

0.000

5.000

5.000

5.000

0.000

5.000

0.000

50

100

0.000

0.000

Khairpur

Approved
21.11.14

June-16

4.000

0.000

2.000

0.000

2.000

2.000

2.000

0.000

2.000

0.000

50

100

0.000

0.000

S.B.A

Approved
08.11.12

June-16

1812.274

1605.980

134.865

0.000

1740.845

71.429

71.429

0.000

71.429

0.000

96

100

0.000

0.000

Khairpur
Khairpur
Khairpur

[ 196 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

1233 Integrated rehabilitation and provision


of missing facilities to existing
elementry schools Taluka Ratodero,
District Larkana (50 units).
(Cap:Rs.193.343 m - Rev.Rs.2.325 m)

Larkana

Approved
21.02.14

June-16

195.668

107.280

30.031

0.000

137.311

58.357

56.032

2.325

58.357

0.000

70

100

0.000

0.000

1234 Integrated rehabilitation and provision


of missing facilities to existing
elementry schools, District Larkana
(69 units).
(Cap:Rs.294.413 m - Rev.Rs.1.500 m)

Larkana

Approved
21.02.14

June-16

295.913

146.505

50.450

0.000

196.955

98.958

97.458

1.500

98.958

0.000

67

100

0.000

0.000

1235 Construction of Begum Nusrat Bhutto


woman library and multipurpose hall
at Larkana.(Cap:Rs.100.819 m Rev.Rs.39.215 m)

Larkana

Approved
20.01.14

June-17

140.034

58.900

41.919

0.000

100.819

39.215

0.000

39.215

39.215

0.000

72

100

0.000

0.000

1236 Establishment of Begum Nusrat Bhutto


Girls Degree College, Larkana
(Cap:Rs.133.299 m - Rev.Rs.9.810 m)

Larkana

Approved
16.04.14

June-16

143.109

0.000

25.000

0.000

25.000

118.109

60.190

9.810

70.000

0.000

17

66

48.109

0.000

1237 Construction of additional lecture halls


(10 Nos.) @ Govt. Girls Degree College
Larkana.
(Cap:Rs.38.590 m Rev.Rs.2.000 m)
1238 Integrated rehabilitation of existing
Elementry Schools in District Larkana
(15 Units). (Cap:Rs.50.605 m Rev.Rs.0.360 m)
1239 Construction of (2 Nos) of New rooms
of Reference Section of Sir Shah
Nawaz Bhutto Memorial Library,
Larkana
(Cap:Rs.14.467 m - Rev.Rs.10.339 m)

Larkana

Approved
16.04.14

June-16

40.590

0.000

18.295

0.000

18.295

22.295

20.295

2.000

22.295

0.000

45

100

0.000

0.000

Larkana

Approved
16.04.14

June-16

50.965

0.000

23.803

0.000

23.803

27.162

26.802

0.360

27.162

0.000

47

100

0.000

0.000

Larkana

Approved
16.04.14

June-16

24.806

0.000

6.233

0.000

6.233

18.573

8.234

10.339

18.573

0.000

25

100

0.000

0.000

1240 Repair, renovation and Rehabilitation


of existing Primary / Secondary School
of Lyari. (Phase-III). (Cap:Rs.150.047
m - Rev.Rs.15.120 m)

Karachi

Approved
12.02.13

June-16

165.217

0.000

50.047

0.000

50.047

115.170

100.000

15.170

115.170

0.000

30

100

0.000

0.000

1241 Repair, Renovation and Rehabilitation


of existing school buildings of Lyari
(Phase-I).
(Cap:Rs.136.471 m - Rev.Rs.47.468 m)

Karachi

Approved
08.09.11

June-16

183.939

141.460

22.381

0.000

163.841

20.098

0.000

20.098

20.098

0.000

89

100

0.000

0.000

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

2017-18
19

[ 197 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
4

Total Education (Ongoing Schemes) :-

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

FPA

Financial
Progress in %age
upto

Financial Projection

Total
14

15

Jun'15 Jun'16
16
17

2016-17
18

Allocation for 2015-16


Capital
12

Revenue
13

3578.983

2082.648

498.870

0.000

2581.518

997.465

551.884

105.137

657.021

0.000

June-17

15.000

0.000

0.000

0.000

0.000

15.000

4.518

0.000

4.518

0.000

June-17

10.000

0.000

0.000

0.000

0.000

10.000

2.500

0.000

2.500

0.000

June-17

10.000

0.000

0.000

0.000

0.000

10.000

2.500

0.000

2.500

0.000

35.000
3613.983

0.000
2082.648

0.000
498.870

0.000
0.000

0.000
2581.518

35.000
1032.465

9.518
561.402

0.000
105.137

9.518
666.539

0.000
0.000

2017-18
19

194.277

146.168

30

5.241

5.241

25

3.750

3.750

25

3.750

3.750

12.741
207.018

12.741
158.909

EDUCATION
(New Schemes)
1242 Construction of High School at
Shikarpur
UnMazarjo Taluka Khanpur
Approved
1243 Up-gradation / Reconstruction of KMC Karachi
UnSchools # 17, 26 & 27
Approved
1244 Rehabilitation of Baldia School
Hyderabad
UnBuilding Situated in Hyderabad City
Approved
Education (New Schemes)
Total Education
LIVESTOCK
(Ongoing Scheme)
1245 Rehabilitation and Construction / Reconstruction of veterinary Hospital /
Dispensaries and Centres in District
Khairpur (39 Units)
(C:137.511+R:1.461)
1246 Construction of Veterinary Centres at
various villages of District Shaheed
Benazirabad.
(C:Rs.34.359+R:7.200)

Khairpur

Approved
17.04.12

June-15

138.972

45.163

5.000

0.000

50.163

88.809

20.000

0.000

20.000

0.000

36

50

68.809

0.000

S.B.A

Approved
12.02.13

June-16

41.559

17.180

13.579

0.000

30.759

10.800

3.600

7.200

10.800

0.000

74

100

0.000

0.000

180.531

62.343

18.579

0.000

80.922

99.609

23.600

7.200

30.800

0.000

68.809

0.000

Total Livestock :HEALTH


(On-going Schemes)
1247 Rehabilitation of District Council
Medical Dispensaries, Maternity
Homes in District Khairpur (24 Units).
(C: 89.681+R: 11.265)
1248 Rehabilitation of RHC's various
Taluka at Sobhodero, Kingri, Faizganj
& Thari Mirwah (04 Nos). (C:
261.993+R: 50.208)

Khairpur

Approved
17.04.12

June-16

100.946

69.611

18.500

0.000

88.111

12.835

1.570

11.265

12.835

0.000

87

100

0.000

0.000

Khairpur

Approved
17.05.12

June-16

312.201

118.267

27.500

0.000

145.767

166.434

50.000

0.000

50.000

0.000

47

63

116.434

0.000

[ 198 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Khairpur

Approved
08.01.14

June-15

59.143

4.999

3.000

0.000

7.999

51.144

5.000

0.000

5.000

0.000

14

22

46.144

0.000

Khairpur

Approved
11.02.14

June-15

23.218

0.000

2.000

0.000

2.000

21.218

5.000

0.000

5.000

0.000

30

16.218

0.000

1251 Construction of Government


Khairpur Approved
Dispensary at village (i) Qadir Bux
17.12.12
Jalbani UC Machyoon taluka and
district Khairpur (ii) Hafeez Chandio
taluka Kingri district Khairpur (iii)
Kumbai Metlo UC Pir Mangio taluka
and district Khairpur (iv) Pir Bux
Metlo UC Morai taluka and district
Khairpur. (C: 18.000+R: 6.000)
1252 Construction of New Khairpur
Khairpur Approved
Building for District TB Hospital at
18.02.15
Khairpur.
(C: 140.690+R: 18.439)
1253 Construction of Heart Centre near
Khairpur Approved
Civil Hospital, Khairpur.
18.02.15
(C: 203.820+R: 253.360)
1254 Construction of RHC at village Pir Bux Shikarpur Approved
Shujra, Tehsil Khanpur, District
02.01.15
Shikarpur.
(C: 52.760+R: 7.240)
1255 Construction of 10 Beded Hospital at
Shikarpur Approved
village Mazarjo, Taluka Khanpur,
02.01.15
District Shikarpur.
(C: 52.775+R: 7.225)
1256 Construction of BHU at village Haji
Mirpurkhas Approved
Huzoor Bux Lashari, Deh Walwari,
08.01.14
Taluka Sindhri, district Mirpurkhas.
(C: 23.214+R: 9.000)
1257 Construction of Shaheed Mohtarma
Mirpurkhas Approved
Benazir Bhutto Charity Hospital at
03.12.14
Mirpurkhas City. (Revised).
(C: 75.817+R:24.183) (Rs. 68.479
incurred+Rs. 31.521 to be incurred)

June-15

24.000

10.000

5.000

0.000

15.000

9.000

3.000

6.000

9.000

0.000

63

100

0.000

0.000

June-16

159.129

0.000

30.000

0.000

30.000

129.129

48.815

0.000

48.815

0.000

19

50

80.314

0.000

June-16

457.180

0.000

10.000

0.000

10.000

447.180

40.000

0.000

40.000

0.000

11

407.180

0.000

June-16

60.000

0.000

0.000

0.000

0.000

60.000

5.000

0.000

5.000

0.000

55.000

0.000

June-16

60.000

0.000

0.000

0.000

0.000

60.000

16.536

0.000

16.536

0.000

28

43.464

0.000

June-15

32.214

2.500

20.714

0.000

23.214

9.000

0.000

9.000

9.000

0.000

72

100

0.000

0.000

June-17

100.000

68.421

28.962

0.000

97.383

2.617

2.558

0.059

2.617

0.000

97

100

0.000

0.000

1249 Up-gradation of Basic Health Unit


(BHU) at the level of Rural Health
Centre (RHC) at Kolab Jail, Taluka
Kingri, District Khairpur.
(C:44.695+R:14.448)
1250 Construction of BHU at village
Khuwaja Ghulam Rasool UC Noorpur,
Taluka Kingri, District Khairpur.
(C: 20.073+R: 3.145)

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

2017-18
19

[ 199 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

1258 Completion of works RHC Mehendhre


jo Parr and RHC Ahori Farm Taluka
and District Umerkot. (Revised).

Umerkot

Approved
02.01.15

June-16

110.000

85.150

2.000

0.000

87.150

22.850

22.850

0.000

22.850

0.000

79

100

0.000

0.000

1259 Construction of 10 Beded Hospital at


village Bacha Bund, Taluka Pithoro,
District Umerkot.
(C: 52.760+R: 7.240)
1260 Up-gradation of Rural Health Centre
Chuhar Jamali to the level of Taluka
Hospital Shah Bander at Chuhar
Jamali (24 Beded and Musafirkhana)
District Thatta.
(C: 27.118+R: 20.551)
1261 Construction of 2 BHUs in Kot Lashari
and Naon Wahan UC Talti, Taluka
Sehwan, District Jamshoro. (C:
41.705+R: 3.112)
1262 Construction of Government
Dispensaries in Taluka Sakrand and
Kazi Ahmed District Shaheed
Benazirabad (04 Nos.).
(C: 20.297+R: 2.888)
1263 Construction of 10 Beded Hospital at
village Ali Nawaz Shahani, Union
Council Sohelo, Taluka Daur at
District Shaheed Benazirabad.
(C:52.744+R:7.256)
1264 Construction of 10 Bedded Hospital at
Village Khadim Hussain Zardari,
Taluka Shahdadpur, District Sanghar.
(C: 53.637+R: 6.363),(To be funded out
of 10% share of Royalty)

Umerkot

Approved
02.01.15

June-17

60.000

0.000

0.000

0.000

0.000

60.000

5.000

0.000

5.000

0.000

55.000

0.000

Thatta/
Sujawal

Approved
08.01.14

June-15

47.669

0.000

0.500

0.000

0.500

47.169

3.000

0.000

3.000

0.000

44.169

0.000

Jamshoro

Approved
11.02.14

June-15

44.817

0.000

2.575

0.000

2.575

42.242

3.000

0.000

3.000

0.000

12

39.242

0.000

SBA

Approved
25.04.14

June-16

23.185

0.000

20.000

0.000

20.000

3.185

0.297

2.888

3.185

0.000

86

100

0.000

0.000

SBA

Approved
15.05.15

June-16

60.000

0.000

0.000

0.000

0.000

60.000

15.000

0.000

15.000

0.000

25

45.000

0.000

Sanghar

Approved
13.05.15

June-16

60.000

0.000

20.712

0.000

20.712

39.288

3.000

0.000

3.000

0.000

35

40

36.288

0.000

T. A. Yar

Approved
10.09.14

June-16

31.598

14.062

3.374

0.000

17.436

14.162

14.162

0.000

14.162

0.000

55

100

0.000

0.000

1265 Up gradation of Medical Dispensary to


the level of BHU at village Muhammad
hassan Dal Taluka Chambar District
Tando Allahyar. (Revised)
(C.20.810+R.2.026)
(C: 29.333+R: 2.265) (Rs.12.031
work done + Rs. 19.567 to be done).

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

2017-18
19

[ 200 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
4

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

1266 Up-gradation of BHU to RHC at


T. A. Yar Approved
Khawaja Goth Sultanabad District
04.02.15
Tando Allahyar.
(C: 49.826+R: 5.876),(To be funded out
of 10% share of Royalty)
1267 Improvement / Reconstruction of
Karachi
Approved
Hospitals and MCH Centres in
22.01.13
Karachi. (C: 193.326)
1268 Construction of 10 Beded Hospital at
T. M. Khan Approved
village Ghohram Khan Chandio
02.01.15
Taluka Tando Ghulam Hyder, District
T.M. Khan. (C: 38.667+R: 4.655),(To
be funded out of 10% share of Royalty)

June-16

55.702

0.000

0.000

0.000

0.000

55.702

2.000

0.000

2.000

0.000

53.702

0.000

June-16

193.326

0.000

77.111

0.000

77.111

116.215

2.000

0.000

2.000

0.000

40

41

114.215

0.000

June-16

43.322

0.000

0.000

0.000

0.000

43.322

2.000

0.000

2.000

0.000

41.322

0.000

1269 Rehabilitation of Peoples Medical


College Hospital Nawabshah District
SBA. (Cap: Rs,87.802 + Rev.20.000)
1270 Rehabilitation/Renovation of existing
various Health Facilities i/c (06 Nos)
Ambulances in District Larkana.
(Cap:Rs.125.300 m - Rev.Rs.20.000 m)
1271 Construction of Medical Dispensaries
in various villages of District Larkana
(11 Nos.)
(Cap:Rs.55.973 m Rev.Rs.7.942 m)

S.B.A

Approved
22.01.13

June-16

107.802

87.802

10.000

0.000

97.802

10.000

0.000

10.000

10.000

0.000

91

100

0.000

0.000

Larkana

Approved
16.04.14

June-16

145.300

0.000

25.150

0.000

25.150

120.150

20.000

20.000

40.000

0.000

17

45

80.150

0.000

Larkana

Approved
16.04.14

June-16

63.915

0.000

12.987

0.000

12.987

50.928

42.986

7.942

50.928

0.000

20

100

0.000

0.000

2434.667

460.812

320.085

0.000

780.897

1653.770

312.774

67.154

379.928

0.000

1273.842

0.000

499.000

0.000

0.000

0.000

0.000

499.000

0.000

124.750

124.750

0.000

374.250

0.000

499.000

0.000

0.000

0.000

0.000

499.000

0.000

124.750

124.750

0.000

374.250

0.000

150.000

0.000

0.000

0.000

0.000

150.000

0.000

20.000

20.000

0.000

130.000

0.000

Total Health
ENVIRONMENT
(New Scheme)
1272 Upgradation of Fire Services for High
Rise Buildings. (KMC)
Total Environment

Karachi

Unapproved

June-16

25

INFORMATION TECHNOLOGY
(On-going Scheme)
1273 Providing and fixing of CCTV
Cameras, Walk through gates, metal
detectors, for main district offices,
hospitals, sensitive public & religious
places of District Khairpur.

Khairpur

Approved
08.04.15

June-17

13

[ 201 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
4

Total Information Technology :-

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

150.000

0.000

0.000

0.000

0.000

150.000

0.000

20.000

20.000

0.000

June-16

13.134

0.000

3.284

0.000

3.284

9.850

9.850

0.000

9.850

0.000

25

June-16

7.882

3.941

3.000

0.000

6.941

0.941

0.000

0.941

0.941

0.000

June-16

35.140

6.000

5.000

0.000

11.000

24.140

24.140

0.000

24.140

June-17

95.926

19.932

9.640

0.000

29.572

66.354

5.000

0.000

June-16

11.504

4.948

1.544

0.000

6.492

5.012

5.012

June-16

14.695

0.000

7.500

0.000

7.500

7.195

June-16

19.000

0.000

0.000

0.000

0.000

June-16

45.000

0.000

0.000

0.000

June-16

27.716

0.000

0.000

0.000

June-17

19.867

0.000

10.000

0.000

10.000

Approved
04.02.15
Approved
16.04.14
Approved
08.04.15

June-17

57.649

0.000

6.000

0.000

June-16

36.843

0.000

17.922

June-16

117.365

80.000

Approved
21.02.13

June-17

114.998

0.000

2017-18
19

130.000

0.000

100

0.000

0.000

88

100

0.000

0.000

0.000

31

100

0.000

0.000

5.000

0.000

31

36

61.354

0.000

0.000

5.012

0.000

56

100

0.000

0.000

7.195

0.000

7.195

0.000

51

100

0.000

0.000

19.000

19.000

0.000

19.000

0.000

100

0.000

0.000

0.000

45.000

15.000

0.000

15.000

0.000

33

30.000

0.000

0.000

27.716

12.362

0.000

12.362

0.000

45

15.354

0.000

9.867

9.867

0.000

9.867

0.000

50

100

0.000

0.000

6.000

51.649

20.000

0.000

20.000

0.000

10

45

31.649

0.000

0.000

17.922

18.921

18.921

0.000

18.921

0.000

49

100

0.000

0.000

0.000

0.000

80.000

37.365

37.365

0.000

37.365

0.000

68

100

0.000

0.000

0.000

0.000

0.000

114.998

10.000

0.000

10.000

0.000

104.998

0.000

OTHER LOCAL GOVERNMENT


(On going Schemes)
1274 Constt: of Ladies & Children Park at
Khairpur Approved
Mir Ali Bazar Khairpur (Branch
17.12.12
Higher Secondary School Khairpur)
1275 Construction of Shaheed Mohammad
Larkana
Approved
Anwer Bhutto memorial library at
03.01.13
village Bangul Dero taluka Ratodero
1276 Construction of Public Park various
Hyderabad Approved
places in Latifabad
03.01.13
1277 Construction of Model Library at
Karachi
Approved
Korangi, Karachi
17.12.12
1278 Rehabilitation / Renovation of Jaral
Larkana
Approved
Shah Dargah at Larkana (Revised)
15.04.15
1279 Construction of remaining works at
Khairpur Approved
District Scout Head quarter at old
21.11.14
National Highway Taluka/ District
Khairpur.
1280 Construction of play ground at
Khairpur Approved
Dabbar, Taluka Khairpur.
15.04.15
1281 Establishment of Zoological Park in
Khairpur Approved
Khairpur.
15.04.15
1282 Constt: of Compound wall for
SBA
Approved
Graveyards (05 Nos) in Distt: SBA
09.05.14
1283 Internal development for street roads,
Karachi
Approved
water supply and drainage lines at
11.11.14
village Baloch Khan Gabool, Sector 34A, Scheme-33, SUPARCO Road
1284 Constt: of Internal roads of Maroora
Goth near SUPARCO Karachi.
1285 Construction of Open Air Theatre at
District Shaheed Benazirabad
1286 Construction of Makrani Masjid,
Bunder Road Sukkur. (Revised). (To be
funded out of 10% share of Royalty)

Karachi

1287 Construction of Bilawal Bhutto


Zardari People's Park at Larkana.
(Cap:Rs.100.445 m - Rev.Rs.14.553 m)

Larkana

S.B.A
Sukkur

[ 202 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Larkana

Approved
01.06.12

June-17

641.155

0.000

0.000

0.000

0.000

641.155

10.000

0.000

10.000

0.000

Hyderabad Approved
12.02.13
(UR)
Karachi
Approved
18.02.15

June-16

56.792

43.906

12.886

0.000

56.792

0.000

0.000

8.000

8.000

0.000

100

June-16

77.077

50.224

18.925

0.000

69.149

7.928

0.000

7.928

7.928

0.000

90

June-16

400.000

0.000

320.490

0.000

320.490

79.510

79.510

0.000

79.510

0.000

1791.743

208.951

416.191

0.000

625.142

1166.601

283.222

16.869

300.091

0.000

0.000

0.000

0.000

0.000

50.000

12.500

0.000

12.500

0.000

25

1288 Construction of Bakhtawar People's


Park at Moen jo Daro.
(Cap:Rs.632.945 m - Rev.Rs.8.210 m)
1289 Establishment of Project Directorate

1290 Project Management and


Implementation Unit for special
initiative with regard to Lyari
Development (Revised).
1291 Various Development Schemes (7 Nos.).

Malir
Karachi
Total Other Local Govt. (On-going Schemes)

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Approved
08.04.15

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

80

2017-18
19

631.155

0.000

114

-8.000

0.000

100

0.000

0.000

100

0.000

0.000

866.510

0.000

OTHER LOCAL GOVERNMENT


(New Schemes)
1292 Renovation & Rehabilitation of
Sukkur &
UnTemples in Various UC's of Sukkur &
Shikarpur approved
Shikarpur.
1293 Construction of Internal roads drains,
Karachi
Unwater supply and sewerage line in
Approved
Sector 6-A & 7A in Scheme-33, Super
Highway
1294 Various Development Schemes
Kashmore @
Un(12 Nos.)
Kandhkot Approved

June-17

50.000

37.500

0.000

June-18

75.000

0.000

0.000

0.000

0.000

75.000

18.750

0.000

18.750

0.000

25

56.250

0.000

June-16

400.000

0.000

165.000

0.000

165.000

235.000

235.000

0.000

235.000

0.000

41

100

0.000

0.000

525.000
2316.743
50102.179
11840.836
61943.015

0.000
208.951
8662.375
0.000
8662.375

165.000
581.191
8864.775
165.000
9029.775

0.000
266.250
16.869
566.341
217.943 11083.899
124.750 3776.101
342.693 14860.000

0.000
0.000
0.000
0.000
0.000

93.750
960.260
15715.941
5288.457
21004.397

0.000
0.000
5934.708
2257.325
8192.032

Other Local Govt. (New Schemes)


Total Other Local Govt.
TOTAL ONGOING
TOTAL NEW
TOTAL LOCAL GOVERNMENT :-

0.000
165.000
360.000
266.250
0.000
790.142 1526.601
549.472
0.000 17527.150 32742.712 10865.956
0.000
165.000 11665.836 3651.351
0.000 17692.150 44408.548 14517.307

PUBLIC, HEALTH & ENGINEERING


Water Supply Schemes (On Going)
1295 Extension of Water Supply Scheme of
Village Mori Manger, Shaikh Hafiz
and Alam Abro Taluka & District
Hyderabad (Modified)
1296 Ultra Filtration Water supply Scheme
Tando Jam District Hyderabad

Hyderabad Approved
25.09.13

June-16

25.410

1.250

20.410

0.000

21.660

3.750

3.750

0.000

3.750

0.000

85

100

0.000

0.000

Hyderabad Approved
07.08.14

June-18

617.441

0.000

0.000

0.000

0.000

617.441

100.000

0.000

100.000

0.000

16

258.721

258.721

[ 203 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Badin

Approved
03.02.15

June-16

13.709

0.000

0.000

0.000

0.000

13.709

13.709

0.000

13.709

0.000

100

0.000

0.000

Badin

Approved
04.02.15
Approved
04.01.15
Approved
04.02.15

June-16

5.729

0.000

0.000

0.000

0.000

5.729

5.729

0.000

5.729

0.000

100

0.000

0.000

June-16

3.614

0.000

0.000

0.000

0.000

3.614

3.614

0.000

3.614

0.000

100

0.000

0.000

June-16

7.851

0.000

0.000

0.000

0.000

7.851

7.851

0.000

7.851

0.000

100

0.000

0.000

Approved
17/10/12
Approved
25/09/13

June-16

19.024

1.250

14.024

0.000

15.274

3.750

3.750

0.000

3.750

0.000

80

100

0.000

0.000

June-16

37.950

5.000

20.000

0.000

25.000

12.950

12.950

0.000

12.950

0.000

66

100

0.000

0.000

Approved
04.02.15
Mirpurkhas Approved
24.10.12
1305 Water Supply Scheme for Bilaro Deh
Mirpurkhas Approved
381 and various Villages of nearest UC
24.10.12
Mirwah
1306 Water Supply Scheme for Lund
Mirpurkhas Approved
Villages and Ch. Villages at UC Jhilori
29.03.13

June-16

6.685

0.000

0.000

0.000

0.000

6.685

6.685

0.000

6.685

0.000

100

0.000

0.000

June-16

11.700

2.814

4.700

0.000

7.514

4.186

4.186

0.000

4.186

0.000

64

100

0.000

0.000

June-16

20.121

0.000

15.121

0.000

15.121

5.000

5.000

0.000

5.000

0.000

75

100

0.000

0.000

June-18

60.339

0.000

10.000

0.000

10.000

50.339

12.000

0.000

12.000

0.000

17

36

19.170

19.170

1307 Rural Water Supply Scheme Kalwari


(village Muhammad Hashim Bhurgri)
1308 Rehabilitation of Rural Water Supply
Scheme Dengan Bhurgari
1309 Water Supply Scheme Nasar pur

June-16

7.940

0.000

0.000

0.000

0.000

7.940

7.940

0.000

7.940

0.000

100

0.000

0.000

June-16

7.681

0.000

0.000

0.000

0.000

7.681

7.681

0.000

7.681

0.000

100

0.000

0.000

June-17

98.540

20.000

8.000

0.000

28.000

70.540

15.000

0.000

15.000

0.000

28

44

27.770

27.770

June-16

129.186

102.500

19.186

0.000

121.686

7.500

7.500

0.000

7.500

0.000

94

100

0.000

0.000

June-17

576.000

424.617

77.192

0.000

501.809

74.191

22.000

0.000

22.000

0.000

87

91

26.096

26.096

June-17

78.180

15.000

8.000

0.000

23.000

55.180

15.000

0.000

15.000

0.000

29

49

20.090

20.090

June-16

38.945

10.000

9.000

0.000

19.000

19.945

19.945

0.000

19.945

0.000

49

100

0.000

0.000

June-17

451.448

200.000

103.750

0.000

303.750

147.698

28.000

0.000

28.000

0.000

67

73

59.849

59.849

1297 Water Supply Scheme for Muhammad


Umer Memom (Kaziabad) and
adjoining vilages Taluka Badin
1298 Water supply Scheme village Peer
Mian Ali Sharif
1299 Water supply Scheme village
Muhammad Suleman Solangi
1300 WaterSupply Scheme at Village Haji
Ghulam Mohammad Arain District
Badin
1301 W/S Scheme Khasai. (To be funded
out of 10% share of Royalty)
1302 Water Supply Scheme Village
Mohammad Khan Shoro (Dabhoo)
Taluka Kotri
1303 W/S Scheme Yameen Palari Taluka
Thana Bula Khan.
1304 Water Supply Scheme Nafees Nagar.

1310 Water Supply Scheme Chamber


Town.(To be funded out of 10% share
of Royalty)
1311 Bulk Water Supply Scheme of various
villages of Gadap Town.
1312 Rural W/S Scheme Abdullah Gabol
Goth UC-5 Songal Gadap Town.
1313 Rural W/S Scheme Tharo Mengal UC5 Songal Gadap Town.
1314 Imp: & Ext: of Urban W/S Scheme
Shahdadpur i/c Filtration.(To be
funded out of 10% share of Royalty)

Badin
Badin

Jamshoro
Jamshoro

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Jamshoro

Mirpurkhas Approved
03.01.15
Mirpurkhas Approved
04.02.15
T. A. Yar Approved
26.10.13
T. A. Yar Approved
03.12.09
Karachi
Karachi
Karachi
Sanghar

Approved
14.12.07
Approved
22.01.13
Approved
17.10.12
Approved
14.01.10

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

2017-18
19

[ 204 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

1315 Sanghar W/S from Bakhoro Canal


Scheme i/c Filter Plant.(To be funded
out of 10% share of Royalty)
1316 Water Supply Scheme for Sarhari
Taluka Shahdadpur
1317 Water Supply Scheme Phase - II Jhol
City, District Sanghar,(To be funded
out of 10% share of Royalty)
1318 Water Supply Scheme at Village Shadi
Khan Bhano Jo Taluka
Shahdadpur.(To be funded out of 10%
share of Royalty)
1319 Construction of Feeding Channel for
Water Supply Schemes Dar, District
Sanghar,(To be funded out of 10%
share of Royalty)
1320 Rural W/S Scheme Keenjhar Lake
Chakhro to Karo Palari to Makar Paio
Barch Hasan Jakhoro Siddique Jeand
and Saleh Mohammad Palari (Revised)

Sanghar

Approved
14.01.10

June-18

356.187

144.999

15.00

0.000

159.999

196.188

12.000

0.000

12.000

0.000

45

48

92.094

92.094

Sanghar

Approved
03.05.13
Approved
08.04.15

June-17

140.433

0.000

10.000

0.000

10.000

130.433

18.000

0.000

18.000

0.000

20

56.217

56.217

June-17

59.876

0.000

10.000

0.000

10.000

49.876

18.000

0.000

18.000

0.000

17

47

15.938

15.938

Sanghar

Approved
04.02.15

June-16

3.405

0.000

0.000

0.000

0.000

3.405

3.405

0.000

3.405

0.000

100

0.000

0.000

Sanghar

Approved
13.01.15

June-16

5.224

0.000

0.000

0.000

0.000

5.224

5.224

0.000

5.224

0.000

100

0.000

0.000

Thatta

Approved
25.11.14

June-16

58.270

50.730

0.000

0.000

50.730

7.540

7.540

0.000

7.540

0.000

87

100

0.000

0.000

1321 Water Supply Scheme Abdul Majeed


Colony.
1322 Water Supply Scheme in Letstop City,
UC Chubandi, Tehsil Mirpur Sakro.

Thatta.

Approved
24.10.12
Approved
17.10.12

June-16

46.263

10.000

13.456

0.000

23.456

22.807

22.807

0.000

22.807

0.000

51

100

0.000

0.000

June-16

29.720

0.000

19.720

0.000

19.720

10.000

10.000

0.000

10.000

0.000

66

100

0.000

0.000

1323 Improvement Water Supply System,


Ward No.2, Sakro City, Tehsil Mirpur
Sakro.
1324 Water Supply Scheme at UC Dhabeji
Taluka Mirpur Sakro and UCs Tando
Hafiz Shah and Ongar
1325 Rural W/S Scheme Satiayano
Sharif.(To be funded out of 10% share
of Royalty)
1326 Urban W/S Scheme Umerkot Ph-V
(Filtration) (Revised).
1327 Pipe Line W/S Scheme Enroute
Villages Chore Khokharapar.
1328 Water Supply Scheme Nabisar Thar .

Thatta

Approved
24.10.12

June-17

43.817

0.000

7.500

0.000

7.500

36.317

15.000

0.000

15.000

0.000

17

51

10.659

10.659

Thatta

Approved
30.05.13

June-18

172.328

0.000

20.000

0.000

20.000

152.328

15.000

0.000

15.000

0.000

12

20

68.664

68.664

Sujawal

Approved
02.02.15

June-16

19.936

0.000

5.000

0.000

5.000

14.936

14.936

0.000

14.936

0.000

25

100

0.000

0.000

Umerkot

Approved
02.11.11
Approved
02.08
Approved
27.12.07
Aproved
24.10.12

June-16

650.00

610.600

10.000

0.000

620.600

29.400

29.400

0.000

29.400

0.000

95

100

0.000

0.000

June-16

231.420

190.833

12.000

0.000

202.833

28.587

28.587

0.000

28.587

0.000

88

100

0.000

0.000

June-16

72.642

58.584

10.000

0.000

68.584

4.058

4.058

0.000

4.058

0.000

94

100

0.000

0.000

June-16

20.820

1.750

8.000

0.000

9.750

11.070

11.070

0.000

11.070

0.000

47

100

0.000

0.000

1329 W/S Scheme at Village Khet Singh


(Ibrahim Mangrio) Taluka Umerkot

Sanghar

Thatta

Umerkot
Umerkot
Umerkot

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

2017-18
19

[ 205 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Umerkot

Aproved
24.10.12

June-17

37.030

0.000

8.000

0.000

8.000

29.030

15.000

0.000

15.000

0.000

22

62

7.015

7.015

Umerkot

Approved
04.02.15

June-16

5.264

0.000

0.000

0.000

0.000

5.264

5.264

0.000

5.264

0.000

100

0.000

0.000

Tharparkar Approved
14.01.10
Tharparkar Approved
24.10.12

June-17

506.876

319.650

60.000

0.000

379.650

127.226

55.000

0.000

55.000

0.000

75

86

36.113

36.113

June-16

37.500

5.000

24.000

0.000

29.000

8.500

8.500

0.000

8.500

0.000

77

100

0.000

0.000

Tharparkar Approved
08.12.14

June-17

52.992

0.000

0.000

0.000

0.000

52.992

12.000

0.000

12.000

0.000

23

20.496

20.496

Tharparkar Approved
03.02.15

June-16

4.800

0.000

0.000

0.000

0.000

4.800

4.800

0.000

4.800

0.000

100

0.000

0.000

1336 Rehabilitation of Rural Water Supply Tharparkar Approved


Scheme Saranghar
03.02.15
1337 Upgradation of Pipe Line Water
Tharparkar Approved
Supply Scheme Naukot-Mithi upto
13.01.15
Chelhar
1338 Change of source and Rehabilitation of Tharparkar Approved
Existing Urban Water Supply Diplo
13.01.15
District Tharparkar
1339 Water Supply Schemes of various
Dadu
Approved
villages of Taluka K.N.Shah & Mehar.
22.01.13
(To be funded out of 10% share of
Royalty)
1340 Imp: & Ext: of Water Supply Scheme
Dadu
Approved
Bothoro. (To be funded out of 10%
24.10.12
share of Royalty)
1341 Water Supply Scheme (Filtration)
Dadu
Approved
Dadu. (To be funded out of 10% share
27.09.13
of Royalty)
1342 Water Supply Scheme Sohrab Bhatti
Dadu
Approved
Taluka Mehar. (To be funded out of
04.02.15
10% share of Royalty)
1343 Water Supply Schemes of Taluka Johi.
Dadu
Approved
(To be funded out of 10% share of
25.02.15
Royalty)

June-16

7.894

0.000

0.000

0.000

0.000

7.894

7.894

0.000

7.894

0.000

100

0.000

0.000

June-18

959.690

0.000

0.000

0.000

0.000

959.690

15.000

0.000

15.000

0.000

472.345

472.345

June-18

246.60

0.000

0.000

0.000

0.000

246.600

20.000

0.000

20.000

0.000

113.300

113.300

June-17

67.307

10.000

6.000

0.000

16.000

51.307

15.000

0.000

15.000

0.000

24

46

18.154

18.154

June-16

21.834

0.000

16.834

0.000

16.834

5.000

5.000

0.000

5.000

0.000

77

100

0.000

0.000

June-18

754.737

0.000

0.000

0.000

0.000

754.737

20.000

0.000

20.000

0.000

367.369

367.369

June-16

6.840

0.000

0.000

0.000

0.000

6.840

6.840

0.000

6.840

0.000

100

0.000

0.000

June-17

38.1620

0.000

0.000

0.000

0.000

38.162

15.000

0.000

15.000

0.000

39

11.581

11.581

1330 Installation of R.O. Plant at Village


Fatah Mohammad Rajar capacity
10000 Gallons per day i/c One year
O/M cost.
1331 Construction of Water tanks at various
locations of PS -69 District Umerkot
(08Nos)
1332 Pipe Line W/S Scheme Lunio Dano
Dandhal Nagarparkar.
1333 Water Supply Scheme for Mithi Town,
Meghwar Paro, Bheel Paro, Kumbhar
Paro, Faqeer Paro, Kolhi Paro Mithi
Town.
1334 Installaion of 10 Nos Tube Well in 07
Union Councils of PS-62, District
Tharparkar
1335 Water Supply Scheme New Abad,
Bajeer Paro, Hajam Paro, Rolla
Colony, Kumbhar Colony UC-Chelhar

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

2017-18
19

[ 206 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

N. Feroze

June-16

58.700

41.906

12.00

0.000

53.906

4.794

4.794

0.000

4.794

0.000

92

100

0.000

0.000

June-17

81.331

38.211

10.000

0.000

48.211

33.120

10.000

0.000

10.000

0.000

59

72

11.560

11.560

June-17

585.700

78.750

163.50

0.000

242.250

343.450

25.000

0.000

25.000

0.000

41

46

159.225

159.225

1347 Imp: & Ext for Rural W/S Scheme


Bahu Khoso Taluka Thull
1348 Improvement & Extension of Urban
Water Supply Scheme Lakhi
(Filtration).

Jacobabad

Approved
10.03.12
Approved
21.11.07
Approved
11.04.12
Approved
17.10.12
Approved
05/2009

June-16

14.968

1.250

9.968

0.000

11.218

3.750

3.750

0.000

3.750

0.000

75

100

0.000

0.000

June-17

167.400

104.728

12.000

0.000

116.728

50.672

15.000

0.000

15.000

0.000

70

79

17.836

17.836

1349 Extention & Rehabilitation of existing


W/S Scheme Shahdad Kot Town.

Kamber @ Approved
Shahdadkot 14.02.14

June-18

456.918

0.000

100.000

0.000

100.000

356.918

35.000

0.000

35.000

0.000

22

30

160.959

160.959

1350 Construction of W/S Scheme of various Kamber @ Approved


villages (15 Nos.) of District Kamber @ Shahdadkot 04/2013
Shahdad Kot.(To be funded out of 10%
share of Royalty)
1351 Water Supply Scheme for Village
Khairpur Approved
Dhupwaro.
17.10.12

June-16

83.492

2.500

73.492

0.000

75.992

7.500

7.500

0.000

7.500

0.000

91

100

0.000

0.000

June-16

19.470

1.245

14.470

0.000

15.715

3.755

3.755

0.000

3.755

0.000

81

100

0.000

0.000

1352 W/S Scheme in Village Kot Mir


Mohammad.
1353 Providing the Facility of Drinking
Ground Water to Khairpur City
(Remaining Areas 09 villages)
(Revised)
1354 Providing and installing Reverse
Osmosis plants in various location of
NA-199
1355 Imp: & Ext: of W/S Scheme New Gud
UC Purano Abad Taluka Bakrani.

Approved
17.10.12
Approved
08.04.15

June-16

28.636

0.000

12.000

0.000

12.000

16.636

16.636

0.000

16.636

0.000

42

100

0.000

0.000

June-16

214.828

20.000

179.205

0.000

199.205

15.623

15.623

0.000

15.623

0.000

93

100

0.000

0.000

Sukkur

Approved
17.12.12

June-16

30.500

5.000

11.144

0.000

16.144

14.356

14.356

0.000

14.356

0.000

53

100

0.000

0.000

Larkana

Approved
24.10.12

June-16

22.165

0.000

17.165

0.000

17.165

5.000

5.000

0.000

5.000

0.000

77

100

0.000

0.000

Shaheed
Approved
Benazirabad 17.10.12

June-16

10.870

1.250

5.870

0.000

7.120

3.750

3.750

0.000

3.750

0.000

66

100

0.000

0.000

1357 Water Supply Scheme (Filtration)


Shaheed
Approved
Sakrand Town
Benazirabad 28.05.14
1358 Water Supply Scheme Daharki, (To be
Ghotki
Approved
funded out of 10% share of Royalty)
01.03.13

June-18

400.473

0.000

0.000

0.000

0.000

400.473

45.000

0.000

45.000

0.000

11

177.737

177.737

June-17

199.400

0.000

50.000

0.000

50.000

149.400

15.000

0.000

15.000

0.000

25

33

67.200

67.200

1344 Urban Water Supply Scheme Darya


Khan Mari (Revised).
1345 Imp: & Ext: of Water Supply Scheme
Bhirya City
1346 Urban W/S Scheme Thull Town.

1356 Water Supply Scheme Deh-89


Nawabshah

N. Feroze
Jacobabad

Shikarpur

Khairpur
Khairpur

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

2017-18
19

[ 207 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
4

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

1359 Construction of Water Supply Scheme Kashmore @ Approved


for Kashmore Town.
Kandhkot
25.02.15

June-17

30.1940

0.000

0.000

0.000

0.000

30.194

15.194

0.000

15.194

0.000

50

7.500

7.500

1360 Water Supply Scheme Muhammad


Arif Khan Jakhrani U.C Sodhi.

June-16

5.6790

0.000

0.000

0.000

0.000

5.679

5.679

0.000

5.679

0.000

100

0.000

0.000

9286.084

2479.417

1235.707

0.000

3715.124

5570.960

963.652

0.000

963.652

0.000

2303.654

2303.654

June-17

11.879

0.000

0.000

0.000

0.000

11.879

2.969

0.000

2.969

0.000

25

4.455

4.455

June-17

39.556

0.000

0.000

0.000

0.000

39.556

9.889

0.000

9.889

0.000

25

14.834

14.834

June-17

24.000

0.000

0.000

0.000

0.000

24.000

6.000

0.000

6.000

0.000

25

9.000

9.000

June-18

103.012

0.000

0.000

0.000

0.000

103.012

25.753

0.000

25.753

0.000

25

38.630

38.630

June-17

15.000

0.000

0.000

0.000

0.000

15.000

3.750

0.000

3.750

0.000

25

5.625

5.625

June-17

15.000

0.000

0.000

0.000

0.000

15.000

3.750

0.000

3.750

0.000

25

5.625

5.625

June-17

20.288

0.000

0.000

0.000

0.000

20.288

5.072

0.000

5.072

0.000

25

7.608

7.608

June-17

16.480

0.000

0.000

0.000

0.000

16.480

4.120

0.000

4.120

0.000

25

6.180

6.180

June-17

27.484

0.000

0.000

0.000

0.000

27.484

6.871

0.000

6.871

0.000

25

10.307

10.307

June-17

13.900

0.000

0.000

0.000

0.000

13.900

3.475

0.000

3.475

0.000

25

5.213

5.213

Kashmore @ Approved
Kandhkot
08.12.14

Total. W/S On-Going


Water Supply (New)
1361 W/S Scheme for Aliabad & New Ali
Hyderabad
UnAbad
Approved
1362 Drainking Water and repair of road
Karachi
Unfor Pir Bux Brohi Goth, UC-8
Approved
Mangopir Gadap Town.
1363 Water Supply Scheme Through Pipe
Umerkot
UnLine from Chore for village Hawele
Approved
Arisar taluka & District Umerkot.
1364 Replacement of Pumping Machinery,
Umerkot
UnRenovation of Civil Structure and
Approved
Extension of Pipiline for piped water
supply system (3Nos) maintained by
Pak Army in Taluka Umerkot and
Charcho
1365 Improvemnet & Extension W/S Scheme Mirpurkhas
UnShah Bux Lashari.
Approved
1366 Water Supply Scheme Guloo Bughi
Mirpurkhas
UnMirpurkhas
Approved
1367 Rural Water Supply Schemes for
Thatta
Unvillage Allahdina Mirbahar
Approved
1368 Drinking Water for Goth Haji Yousuf
Thatta
UnKatyar Kharo Chan
Approved
1369 Construction of HSR Tank (0.1 MGD)
Thatta.
Unand repair of Water Supply Scheme
Approved
Mirpur Sakro
1370 Rural Water Supply Scheme from
Thatta
UnGharo City to Village Yousuf
Approved
Khaskhali Via Bhutto Agriculture
Farm Deh Gharibabad No.3 Tappo
Gharo U.C Dhabeji Taluka Miprur
Sakro.

[ 208 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
4

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

1371 Water Supply Scheme for village


Tharparkar
UnGandhi Ji Dhani, Villlage Laplo,
Approved
Baharo, village Adam Rind, Tar Abdul
Rahim Sama, Bhuro Sandh, Goondi

June-17

57.870

0.000

0.000

0.000

0.000

57.870

14.468

0.000

14.468

0.000

25

21.701

21.701

1372 Water Supply Scheme Village Shadi


Rind Taluka Chachro
1373 Provision of Drinking Water Supply
Connection from main Water Tank
No.7 or main Sazda Tube wells Taluka
Chachro
1374 Improvement & Extension of Rural
Water Supply Scheme Kantio District
Tharparkar.
1375 Construction of RCC Underground
Reservior for R.O Plant,
Improvememnt and Extension of
Distribution Network for mithi and
Islamkot Town District Tharparkar
1376 Water Supply Scheme for village Mir
Ali Shah Deh Thorlo Taluka Tando
Bagho District Badin
1377 Water supply Scheme village
Muhammad Rahim Chang &
Adjoining Villages.
1378 Construction of Over Head Tank water
supply scheme for village Matal
Samejo Keh Khani,(To be funded out
of 10% share of Royalty)
1379 Water Supply Scheme for village
Sanjar Chang, Bachal Khaskheli and
Ramzan Khaskheli.(To be funded out
of 10% share of Royalty)
1380 Rural Water Supply Scheme with
source of water for Deh Nondani,
Makhan Khaskheli, Allan Wanko
Bheel, Deh Nonddani UC Chang from
West Jamrao Canal.(To be funded out
of 10% share of Royalty)
1381 Water Supply Scheme village Tariq
Mumtaz adjoining @ (Nooriabad)
Taluka Thana Bola Khan.

UnApproved
Tharparkar
UnApproved

June-17

20.00

0.000

0.000

0.000

0.000

20.000

5.000

0.000

5.000

0.000

25

7.500

7.500

June-17

25.00

0.000

0.000

0.000

0.000

25.000

6.250

0.000

6.250

0.000

25

9.375

9.375

Tharparkar

UnApproved

June-17

35.229

0.000

0.000

0.000

0.000

35.229

8.807

0.000

8.807

0.000

25

13.211

13.211

Tharparkar

UnApproved

June-19

485.690

0.000

0.000

0.000

0.000

485.690

121.422

0.000

121.422

0.000

25

182.134

182.134

Badin

UnApproved

June-17

13.031

0.000

0.000

0.000

0.000

13.031

3.258

0.000

3.258

0.000

25

4.887

4.887

Badin

UnApproved

June-17

13.178

0.000

0.000

0.000

0.000

13.178

3.295

0.000

3.295

0.000

25

4.942

4.942

Sanghar

UnApproved

June-17

12.000

0.000

0.000

0.000

0.000

12.000

3.000

0.000

3.000

0.000

25

4.500

4.500

T. A. Yar

UnApproved

June-17

23.964

0.000

0.000

0.000

0.000

23.964

5.991

0.000

5.991

0.000

25

8.987

8.987

T. A. Yar

UnApproved

June-17

34.696

0.000

0.000

0.000

0.000

34.696

8.674

0.000

8.674

0.000

25

13.011

13.011

Jamshoro

UnApproved

June-17

20.445

0.000

0.000

0.000

0.000

20.445

5.111

0.000

5.111

0.000

25

7.667

7.667

Tharparkar

[ 209 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

1382 Construction of Water Supply in


Village Rais Muhammad Khan
Chandio U.C Ratokot Taluka Larkana

Larkana

UnApproved

June-17

12.500

0.000

0.000

0.000

0.000

12.500

3.125

0.000

3.125

0.000

25

4.688

4.688

1383 Water Supply Scheme Village Sim,


Uris Leghari & Mureed Babar Taluka
Johi. (To be funded out of 10% share
of Royalty)
1384 Water Supply Scheme at Village Loung
Mahesar Taluka Mehar, District Dadu,
(To be funded out of 10% share of
Royalty)
1385 Water Supply Scheme from Sathio
Wah to Village Hidayatullah Katohar
& others Villages
1386 Rehabilitation of Water Supply
Scheme Manghanwari Taluka Kingri
1387 Water Supply Scheme for Village
Sobho Khan Chang & Kamal Chang
UC Jeando Rajper, Taluka Mehrabpur
Dictrict N Feroze

Dadu

UnApproved

June-17

12.487

0.000

0.000

0.000

0.000

12.487

3.122

0.000

3.122

0.000

25

4.683

4.683

Dadu

UnApproved

June-17

12.305

0.000

0.000

0.000

0.000

12.305

3.076

0.000

3.076

0.000

25

4.615

4.615

Khairpur

UnApproved

June-17

12.700

0.000

0.000

0.000

0.000

12.700

3.175

0.000

3.175

0.000

25

4.763

4.763

Khairpur

UnApproved
UnApproved

June-17

17.000

0.000

0.000

0.000

0.000

17.000

4.250

0.000

4.250

0.000

25

6.375

6.375

June-17

60.000

0.000

0.000

0.000

0.000

60.000

15.000

0.000

15.000

0.000

25

22.500

22.500

N. Feroze

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Total.W/S (New)
Total.W/S (On-Going + New)

1154.694
10440.778

0.000
2479.417

0.000
1235.707

0.000
0.000

0.000
3715.124

1154.694
6725.654

Allocation for 2015-16


Capital
12

288.673
1252.325

Revenue
13

0.000
0.000

Total
14

288.673
1252.325

0.000
0.000

433.011
2736.665

2017-18
19

433.011
2736.665

Drainage Schemes (On-Going)


1388 Constt: of Surface Drains and CC
Hyderabad Approved
block at various villages / U.C's of
24.10.12
District Hyderabad. (25 Villages)
1389 Imp: & Extt: of Drainge Scheme Nindo
Badin
Approved
Shehar (Rural)
24.10.12
1390 Drainage System and C.C. Block in
Tharparkar Approved
Mithi Town, Islamkot Town.(3 Nos
24.10.12
villages).
1391 Construction of Sewerage Line Dia 18" Mirpurkhas Approved
& 12"dia UC-1 to UC-8 Mirpurkhas
29.03.13
City.
1392 Constt: of Drg: Scheme for Daud Goth Karachi
Approved
& Yousuf Goth Baldia Town.
14.01.10
1393 Rural D/S for Moach Goth, Karachi.
Karachi
Approved
27.03.10
1394 Rehab: of Sewerage System at
Karachi
Approved
Abdullah Goth Bin Qasim Town.
03.05.13

June-17

29.125

1.250

5.000

0.000

6.250

22.875

10.000

0.000

10.000

0.000

21

56

6.438

6.438

June-16

31.729

5.000

14.500

0.000

19.500

12.229

12.229

0.000

12.229

0.000

61

100

0.000

0.000

June-17

59.334

0.000

13.000

0.000

13.000

46.334

12.000

0.000

12.000

0.000

22

42

17.167

17.167

June-18

141.547

0.000

16.000

0.000

16.000

125.547

15.000

0.000

15.000

0.000

11

22

55.274

55.274

June-17

218.425

84.995

8.00

0.000

92.995

125.430

15.000

0.000

15.000

0.000

43

49

55.215

55.215

June-17

198.537

89.799

9.176

0.000

98.975

99.562

15.000

0.000

15.000

0.000

50

57

42.281

42.281

June-17

76.341

10.000

2.500

0.000

12.500

63.841

15.000

0.000

15.000

0.000

16

36

24.421

24.421

[ 210 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

1395 P/L Sewerage Line Ibrahim Hydri Bin


Qasim Town Karachi.
1396 Rural Drainge Scheme Chanesar Goth
and Khamiso Goth & Surrounding
village Gadap Town.
1397 Rural Drainge Scheme Haji Sain
Rakhio and Surrounding Villages
Gadap Town.
1398 Rural Drainage Scheme Mohammad
Hashim Jokhio Goth, Deh Kharkharo
Gadap Town.
1399 Improvement & Extension of Rural
Drainage scheme Wali Mohammad &
en-routed villages Bin Qasim Town.

Karachi

Aproved
26.07.13
Approved
11.09.13

June-17

85.777

10.000

2.500

0.000

12.500

73.277

18.000

0.000

18.000

0.000

15

36

27.639

27.639

June-17

138.473

0.000

3.000

0.000

3.000

135.473

12.000

0.000

12.000

0.000

11

61.737

61.737

Karachi

Approved
25.07.13

June-17

110.788

0.000

3.000

0.000

3.000

107.788

12.000

0.000

12.000

0.000

14

47.894

47.894

Karachi

Approved
06.02.15

June-18

84.123

0.000

0.000

0.000

0.000

84.123

12.000

0.000

12.000

0.000

14

36.062

36.062

Karachi

Approved
16.03.15

June-17

47.000

0.000

0.000

0.000

0.000

47.000

12.000

0.000

12.000

0.000

26

17.500

17.500

1400 Urban Drainage Scheme Tando


Allahyar.(To be funded out of 10%
share of Royalty)
1401 Imp / Ext. Dranage scheme Masan
Waddi District Tando Allahyar.(To be
funded out of 10% share of Royalty)

T. A. Yar

Approved
3/2007

June-16

262.216

238.962

23.254

0.000

258.216

4.000

4.000

0.000

4.000

0.000

98

100

0.000

0.000

T. A. Yar

Aproved
17.10.12

June-16

27.807

0.000

22.807

0.000

22.807

5.000

5.000

0.000

5.000

0.000

82

100

0.000

0.000

1402 C.C Block Works Various Villages of


Tando Allahyar.(To be funded out of
10% share of Royalty)
1403 Imp: & Ext: of Drainage Scheme
Jhando Maree.
1404 Removal of hazardous dirty water
logging / seepage water accumulated
behind village Bakhar Jamali Taluka
Saeedabad,(To be funded out of 10%
share of Royalty)
1405 Sanghar Draiange Scheme Ph-IV.

T. A. Yar

Aproved
17.10.12

June-17

33.158

0.000

5.000

0.000

5.000

28.158

12.000

0.000

12.000

0.000

15

51

8.079

8.079

T. A. Yar

Approved
04.02.15
Approved
24.10.12

June-17

11.259

0.000

0.000

0.000

0.000

11.259

11.259

0.000

11.259

0.000

100

0.000

0.000

June-17

59.968

0.000

8.000

0.000

8.000

51.968

12.000

0.000

12.000

0.000

13

33

19.984

19.984

June-18

322.781

72.497

12.000

0.000

84.497

238.284

22.000

0.000

22.000

0.000

26

33

108.142

108.142

1406 Rural Drainage Scheme Village


Soomar Khaskheli. (To be funded out
of 10% share of Royalty)
1407 Imp: & Rehab: of Drainage Scheme
Ghulamllah Taluka Mirpur Sakaro.

Sanghar

Approved
10.12.09
Approved
24.10.12

June-16

18.073

1.250

13.073

0.000

14.323

3.750

3.750

0.000

3.750

0.000

79

100

0.000

0.000

Thatta

Aproved
17.10.12

June-17

54.400

5.000

8.000

0.000

13.000

41.400

12.000

0.000

12.000

0.000

24

46

14.700

14.700

Thatta

Approved
01.03.13

June-18

150.152

0.000

8.000

0.000

8.000

142.152

15.000

0.000

15.000

0.000

15

63.576

63.576

1408 Rehabilitation of Urban Drainage


Scheme Mirpur Sakro

Karachi

Matiari

Sanghar

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

2017-18
19

[ 211 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Thatta

Approved
01.03.13
Approved
05.11.14

June-17

77.332

0.000

8.000

0.000

8.000

69.332

12.000

0.000

12.000

0.000

10

26

28.666

28.666

June-16

19.822

0.000

5.000

0.000

0.000

19.822

10.000

0.000

10.000

0.000

50

4.911

4.911

Jamshoro

Approved
21.07.11

June-17

99.400

58.750

8.000

0.000

66.750

32.650

12.000

0.000

12.000

0.000

67

79

10.325

10.325

Jamshoro

Approved
01.03.13

June-17

127.000

10.000

10.000

0.000

20.000

107.000

15.000

0.000

15.000

0.000

16

28

46.000

46.000

T. M. Khan Approved
21.04.12

June-17

202.780

54.000

102.500

0.000

156.500

46.280

18.000

0.000

18.000

0.000

77

86

14.140

14.140

T. M. Khan Approved
24.10.12

June-17

37.080

0.000

8.000

0.000

8.000

29.080

12.000

0.000

12.000

0.000

22

54

8.540

8.540

T. M. Khan Approved
02.10.14

June-16

6.000

0.000

0.000

0.000

0.000

6.000

6.000

0.000

6.000

0.000

100

0.000

0.000

T. M. Khan Approved
02.10.14

June-16

13.700

0.000

0.000

0.000

0.000

13.700

13.700

0.000

13.700

0.000

100

0.000

0.000

Kamber @ Approved
Shahdadkot
6/2008
Kamber @ Approved
Shahdadkot 24.10.12

June-17

648.500

192.420

102.500

0.000

294.920

353.580

75.000

0.000

75.000

0.000

45

57

139.290

139.290

June-16

29.083

5.000

4.000

0.000

9.000

20.083

10.000

0.000

10.000

0.000

31

65

5.042

5.042

Kamber @ Approved
Shahdadkot 14.11.14

June-18

119.278

0.000

0.000

0.000

0.000

119.278

10.000

0.000

10.000

0.000

54.639

54.639

1420 Drainage Scheme for Shahdad Kot


Kamber @ Approved
City including R.C.C Nala (06 Nos.)
Shahdadkot 14.11.14
District Shahdad Kot (Revised)
1421 Ext: & Rehab: of Drg:Scheme for Kot Khairpur Approved
Diji Kot Bungalow.
24.12.09
1422 Constt: of Drainage schemes CC Block, Khairpur Approved
CC Drains at various Villages (16 Nos)
13.01.15
District Khairpur.

June-18

442.780

5.000

189.262

0.000

194.262

248.518

25.000

0.000

25.000

0.000

44

50

111.759

111.759

June-16

116.446

78.715

17.732

0.000

96.447

19.999

19.999

0.000

19.999

0.000

83

100

0.000

0.000

June-18

271.100

0.000

12.500

0.000

12.500

258.600

20.000

0.000

20.000

0.000

12

119.300

119.300

1409 Drainage Scheme Shaikh Abdul


Majeed Colony (Dhabeji).
1410 Rural Draigne Scheme Satayano
Sharif.(To be funded out of 10% share
of Royalty)
1411 Disposal of Sewerage/Sullage (i/c
treatment plant) of Behar Colony,
Khanzada Colony, Ghosia Colony &
Gharibabad into K.B Feeder.
1412 Drainage Scheme Subhanallah Colony
i/c Nala from Zone "B" Kotri upto
Subhanallah Colony Disposal of Kotri
Town (Taluka Kotri). (To be funded
out of 10% share of Royalty)
1413 Improvement & Extension of Urban
Drainage Scheme Tando Muhammad
Khan
1414 Rural Drainage Scheme Saeed Pur
Takkar. (To be funded out of 10%
share of Royalty)
1415 Rural Driange Scheme for Village
Hafiz Mohammad Khaskheli,(To be
funded out of 10% share of Royalty)
1416 Rural Draiange Scheme Wasi Malook
Shah.(To be funded out of 10% share
of Royalty)
1417 Imp: & Ext: Drainage Scheme
Kamber.
1418 Constt: of Drainage System for village
for various Village of District Kamber
Shahdadkot.(To be funded out of 10%
share of Royalty)
1419 Drg: Sch: for Miro Khan Town,(To be
funded out of 10% share of Royalty)

Sujawal

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

2017-18
19

[ 212 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

1423 Construction of Drainage Scheme UC


Mori Doongries.
1424 Drainage Scheme in Village Abul
Khair Ujjan Tehsil Kingri District
Khairpur.
1425 Improvement & Extension of Drainage
Scheme Naudero.
1426 Drainage Scheme Rato Dero.

Khairpur

Aproved
17.10.12
Approved
04.06.15

June-16

18.726

0.000

8.726

0.000

8.726

10.000

10.000

0.000

10.000

0.000

47

100

0.000

0.000

June-16

10.302

0.000

0.000

0.000

0.000

10.302

10.302

0.000

10.302

0.000

100

0.000

0.000

June-17

215.700

180.760

7.300

0.000

188.060

27.640

12.000

0.000

12.000

0.000

87

93

7.820

7.820

June-16

275.700

204.978

65.709

0.000

270.687

5.013

5.013

0.000

5.013

0.000

98

100

0.000

0.000

1427 Imp: & Ext: of Drainage Scheme New


Gud UC Purano Abad Taluka Bakrani.

Larkana

Approved
30.09.08
Approved
30.09.08
Approved
24.10.12

June-16

23.619

0.000

18.620

0.000

18.620

4.999

4.999

0.000

4.999

0.000

79

100

0.000

0.000

1428 Development Schemes relating to


Drainage Sector C.C.Drains and C.C
Bloks in various Muhalla of U.C -07
Larkana City.
1429 Development Schemes of NA-204
Larkana Construction of C.C.Drains
i/c C.C Bloks for various U.Cs Larkana

Larkana

Approved
24.10.12

June-16

21.387

0.000

11.387

0.000

11.387

10.000

10.000

0.000

10.000

0.000

53

100

0.000

0.000

Larkana

Approved
24.10.12

June-17

31.462

0.000

6.000

0.000

6.000

25.462

10.000

0.000

10.000

0.000

19

51

7.731

7.731

1430 Constt: of C.C Block and CC drains in


various villages (10 Nos) Taluka Rato
Dero District Larkana
1431 Constt: of C.C Block and CC Drains in
various Villages of Taluka Rato Dero
(9 villages). .
1432 Construction of C.C Block and C.C
Drains (Open Drains) in UC-I and UCII Taluka Rato Dero
1433 Construction of C.C Block and C.C
Drains for various Colonies/Muhalla of
Rato Dero Town Garhi Khuda Bux
Bhutto and Buguldero
1434 Construction of C.C. Drains and C.C.
Block of various U.C's of PS-38 Taluka
/ District Larkana,
1435 Construction of CC Drains and CC
Block at for various UC's of Larkana
City (20 Villages)
1436 C.C.Block of streets and Drainage
System at Village Zakria Mahesar U.C.
Kothi Kalhori Taluka Larkana.
1437 Ext: & Imp: of existing sewerage
system of Lakana City.

Larkana

Approved
03.04.13

June-18

216.300

2.220

7.500

0.000

9.720

206.580

30.000

0.000

30.000

0.000

18

88.290

88.290

Larkana

Approved
03.04.13

June-17

144.798

23.300

27.000

0.000

50.300

94.498

25.000

0.000

25.000

0.000

35

52

34.749

34.749

Larkana

Approved
03.04.13

June-17

81.210

5.000

12.000

0.000

17.000

64.210

25.000

0.000

25.000

0.000

21

52

19.605

19.605

Larkana

Approved
03.04.13

June-17

92.600

5.000

8.000

0.000

13.000

79.600

18.000

0.000

18.000

0.000

14

33

30.800

30.800

Larkana

Approved
24.10.12

June-17

34.723

0.000

6.000

0.000

6.000

28.723

10.000

0.000

10.000

0.000

17

46

9.362

9.362

Larkana

Approved
11.05.12

June-17

40.000

0.000

7.000

0.000

7.000

33.000

10.000

0.000

10.000

0.000

18

43

11.500

11.500

Larkana

Approved
24.10.12

June-16

13.174

0.000

8.174

0.000

8.174

5.000

5.000

0.000

5.000

0.000

62

100

0.000

0.000

Larkana

Approved
14.02.14

June-17

829.400

25.000

300.000

0.000

325.000

504.400

25.000

0.000

25.000

0.000

39

42

239.700

239.700

Khairpur

Larkana
Larkana

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

2017-18
19

[ 213 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

1438 Development Scheme of Taluka Mehar


and K.N. Shah District Dadu NA-233.
(To be funded out of 10% share of
Royalty)
1439 Imp: & Ext: Drainage Scheme Dadu
City.

Dadu

Approved
25.09.13

June-16

15.000

0.000

10.000

0.000

10.000

5.000

5.000

0.000

5.000

0.000

67

100

0.000

0.000

Dadu

Approved
30.09.08

June-17

589.700

216.000

50.000

0.000

266.000

323.700

20.000

0.000

20.000

0.000

45

48

151.850

151.850

1440 Basic Human facilities of Drainage


Scheme scheme Johi.
1441 Imp: & Ext: of Rural Drg: Scheme
Dabhro Taluka Kandiaro.
1442 Drainage scheme (Rural) for village
Lutuf Manghar UC-Dali Pota Taluka
Bhiria District Naushero Feroze.
1443 Drainge Scheme at Village Mosa Khan
Rajar.
1444 Drainage scheme village Sabab Abro
District Naushero Feroze.
1445 Drainage Scheme Darya Khan Jalbani

Dadu

Approved
05/2013
Approved
30.12.09
Approved
24.10.12

June-18

322.100

20.000

50.000

0.000

70.000

252.100

18.000

0.000

18.000

0.000

22

27

117.050

117.050

June-17

47.078

28.382

13.661

0.000

42.043

5.035

5.035

0.000

5.035

0.000

89

100

0.000

0.000

June-16

19.445

0.000

14.445

0.000

14.445

5.000

5.000

0.000

5.000

0.000

74

100

0.000

0.000

Approved
24.10.12
Approved
24.10.12
Approved
24.10.12

June-16

27.070

0.000

10.000

0.000

10.000

17.070

17.070

0.000

17.070

0.000

37

100

0.000

0.000

June-16

17.809

1.250

12.809

0.000

14.059

3.750

3.750

0.000

3.750

0.000

79

100

0.000

0.000

June-17

50.245

0.000

10.000

0.000

10.000

40.245

13.504

0.000

13.504

0.000

20

47

13.371

13.371

Approved
24.10.12

June-16

24.000

5.000

13.608

0.000

18.608

5.392

5.392

0.000

5.392

0.000

78

100

0.000

0.000

1447 Construction of Surface Drains C.C.


Shikarpur Approved
Block of various U.Cs/Villages of
29.03.13
Taluka Shikarpur.
1448 Construction of Surface Drains and
Shikarpur Approved
CC block at various villages / U.C's of
24.10.12
City Shikarpur (14 schemes)
1449 Rehabilitation Drainge Scheme Village
Shaheed
Approved
New Batho.
Benazirabad 28.05.14
1450 Urban Drainge Scheme Kaiynat Nagar
Shaheed
Approved
Benazirabad 28.05.14
1451 Rehabilitation of Drinage Scheme
Shaheed
Approved
village Hassan Jamali.
Benazirabad 28.05.14
1452 Drainge Scheme Ali Nawaz Magsi Deh
Shaheed
Approved
19 Jalalani, UC Pir Zakri, Taluka
Benazirabad 17.10.12
Sakrand.
1453 Drainage Scheme for various village
Shaheed
Approved
Shaheed Banazirabad
Benazirabad 25.11.14
1454 Imp: of Rural Drainge Scheme Mureed
Shaheed
Approved
Khan Zardari/Ali Hassan Zardari.
Benazirabad 12.01.15

June-17

94.839

10.000

15.000

0.000

25.000

69.839

15.000

0.000

15.000

0.000

26

42

27.420

27.420

June-17

35.716

5.000

10.000

0.000

15.000

20.716

10.000

0.000

10.000

0.000

42

70

5.358

5.358

June-16

12.537

0.000

6.537

0.000

6.537

6.000

6.000

0.000

6.000

0.000

52

100

0.000

0.000

June-17

45.680

0.000

10.000

0.000

10.000

35.680

12.000

0.000

12.000

0.000

22

48

11.840

11.840

June-16

18.165

0.000

10.000

0.000

10.000

8.165

8.165

0.000

8.165

0.000

55

100

0.000

0.000

June-16

23.716

0.000

13.716

0.000

13.716

10.000

10.000

0.000

10.000

0.000

58

100

0.000

0.000

June-16

5.513

0.000

0.000

0.000

0.000

5.513

5.513

0.000

5.513

0.000

100

0.000

0.000

June-17

48.910

0.000

3.000

0.000

0.000

48.910

12.000

0.000

12.000

0.000

25

18.455

18.455

1446 Drainage Scheme Village Moledino


Rajper

N. Feroze
N. Feroze

N. Feroze
N. Feroze
N. Feroze

N. Feroze

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

2017-18
19

[ 214 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
4

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

1455 Rehabilitaiton of Rural Drainage


Shaheed
Approved
Scheme Mari Jalbani, Khyber
Benazirabad 08.04.15
Lakhmir, Karam Khan Jamali, Punhal
Khan Chandio, Noor Bohra
1456 Drainage Scheme for Village Dari
Kashmore Approved
Taluka Kandhkot.
24.10.12
1457 Drainage Scheme for Village Ghouspur Kashmore Approved
Town Taluka Kandhkot.(To be funded
24.10.12
out of 10% share of Royalty)

June-18

148.917

0.000

0.000

0.000

0.000

148.917

30.000

0.000

30.000

0.000

20

59.459

59.459

June-17

48.612

10.000

21.000

0.000

31.000

17.612

17.612

0.000

17.612

0.000

64

100

0.000

0.000

June-17

54.639

15.000

20.000

0.000

35.000

19.639

19.639

0.000

19.639

0.000

64

100

0.000

0.000

1458 Badani Drainge Scheme (Improvement


& Extension) Taluka Kashmore
1459 Drainage Scheme Mirpur Mathelo
(To be funded out of 10% share of
Royalty)
1460 Drainage Scheme Ghotki city (Mega
Project), (To be funded out of 10%
share of Royalty)
Total.Drg: (On-Going)

Kashmore

Approved
14.05.14

June-17

71.343

0.000

0.000

0.000

0.000

71.343

15.000

0.000

15.000

0.000

21

28.172

28.172

Ghotki

Approved
12.02.13

June-17

380.884

20.000

187.942

0.000

207.942

172.942

25.000

0.000

25.000

0.000

55

61

73.971

73.971

Ghotki

Approved
05.01.15

June-18

362.530

0.000

0.000

0.000

0.000

362.530

25.000

0.000

25.000

0.000

168.765

168.765

8884.863

1699.528

1619.438

0.000

3306.966

5577.897

1029.931

0.000

1029.931

0.000

2273.983

2273.983

Drainage Schemes (New)


1461 Drainage Schemes for village Bahar
Khan Mirjat District Tando
Allahyar,(To be funded out of 10%
share of Royalty)
1462 Drainage Scheme Masu Bozdar.(To be
funded out of 10% share of Royalty)

T. A. Yar

UnApproved

June-18

33.094

0.000

0.000

0.000

0.000

33.094

8.274

0.000

8.274

0.000

25

12.410

12.410

T. A. Yar

UnApproved

June-18

20.000

0.000

0.000

0.000

0.000

20.000

5.000

0.000

5.000

0.000

25

7.500

7.500

1463 Construction of Rural Drainage


Scheme Mir Munwar Ali Talpur
Taluka & District Tando Allahyar.
1464 Rural Drainage scheme Landhi (Rural)
U.C Manik Thahim Taluka Tando
Adam. (To be funded out of 10% share
of Royalty)
1465 Drainage scheme Khahi city Taluka
Khipro District Sanghar
1466 Drainage schemes village Dhani Buksh
wassan
1467 Improvement and Extension Drainage
Scheme Sofi Fakir Taluka and District
Umerkot

T. A. Yar

UnApproved

June-18

17.022

0.000

0.000

0.000

0.000

17.022

4.256

0.000

4.256

0.000

25

6.383

6.383

Sanghar

UnApproved

June-18

15.775

0.000

0.000

0.000

0.000

15.775

3.943

0.000

3.943

0.000

25

5.916

5.916

Sanghar

UnApproved
UnApproved
UnApproved

June-18

65.000

0.000

0.000

0.000

0.000

65.000

16.250

0.000

16.250

0.000

25

24.375

24.375

June-18

12.000

0.000

0.000

0.000

0.000

12.000

3.000

0.000

3.000

0.000

25

4.500

4.500

June-18

14.670

0.000

0.000

0.000

0.000

14.670

3.666

0.000

3.666

0.000

25

5.502

5.502

Sanghar
Umerkot

[ 215 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Thatta

UnApproved
UnApproved

June-18

15.000

0.000

0.000

0.000

0.000

15.000

3.750

0.000

3.750

0.000

25

5.625

5.625

June-18

15.000

0.000

0.000

0.000

0.000

15.000

3.750

0.000

3.750

0.000

25

5.625

5.625

1470 Drainage Scheme for Buhara Taluka


Thatta
UnMirpur Sakro.
Approved
1471 New Drainage System for Hashimabad,
Thatta
UnThatta
Approved
1472 Construction of Drainage System
Thatta
UnBughan City U.C Keti Bandar
Approved
1473 Construction of Drainage Scheme
Tharparkar
UnDifferent Mohala Mithi Town
Approved
1474 Drainage Scheme for Old Madina
Jamshoro
UnNagar Village Abdullah Chawro,
Approved
Jamshoro, (To be funded out of 10%
share of Royalty)
1475 Construction of Drainage Scheme for
Matiari
UnVillage Sanghar Soomro. (To be
Approved
funded out of 10% share of Royalty)
1476 Rural Drainage Scheme for Village
Matiari
UnAmin Lakho District Matiari
Approved
1477 Draiange Scheme Nandhi Duberji
Mirpurkhas
UnApproved
1478 Reh: of Drg: Sch: Village Mar: Jalbani
Shaheed
UnDeh Hala Walar UC Karam Jamali
Benazirabad Approved
Taluka Sakrand
1479 Drg: Sch: for Village Allah Bux Kuber,
Shaheed
Un(To be funded out of 10% share of
Benazirabad Approved
Royalty)
1480 Drg: Sch: for Village Nim Taluka Qazi
Shaheed
UnAhmed
Benazirabad Approved
1481 Drg: Sch: for Village Loung Khan
Shaheed
UnSoomro
Benazirabad Approved
1482 Drg: Sch: for Village Sardar Raza
Shaheed
UnMuhammad Dahri
Benazirabad Approved
1483 Drg: Sch: for Village Nawab Wali
Shaheed
UnMuhammad
Benazirabad Approved

June-18

43.630

0.000

0.000

0.000

0.000

43.630

10.908

0.000

10.908

0.000

25

16.361

16.361

June-18

29.198

0.000

0.000

0.000

0.000

29.198

7.300

0.000

7.300

0.000

25

10.949

10.949

June-18

34.145

0.000

0.000

0.000

0.000

34.145

8.535

0.000

8.535

0.000

25

12.805

12.805

June-18

40.000

0.000

0.000

0.000

0.000

40.000

10.000

0.000

10.000

0.000

25

15.000

15.000

June-18

50.000

0.000

0.000

0.000

0.000

50.000

12.500

0.000

12.500

0.000

25

18.750

18.750

June-18

17.078

0.000

0.000

0.000

0.000

17.078

4.270

0.000

4.270

0.000

25

6.404

6.404

June-18

25.000

0.000

0.000

0.000

0.000

25.000

6.250

0.000

6.250

0.000

25

9.375

9.375

June-18

22.000

0.000

0.000

0.000

0.000

22.000

5.500

0.000

5.500

0.000

25

8.250

8.250

June-18

18.165

0.000

0.000

0.000

0.000

18.165

4.541

0.000

4.541

0.000

25

6.812

6.812

June-18

24.068

0.000

0.000

0.000

0.000

24.068

6.017

0.000

6.017

0.000

25

9.026

9.026

June-18

27.915

0.000

0.000

0.000

0.000

27.915

6.979

0.000

6.979

0.000

25

10.468

10.468

June-18

16.608

0.000

0.000

0.000

0.000

16.608

4.152

0.000

4.152

0.000

25

6.228

6.228

June-18

15.263

0.000

0.000

0.000

0.000

15.263

3.816

0.000

3.816

0.000

25

5.724

5.724

June-18

29.980

0.000

0.000

0.000

0.000

29.980

7.495

0.000

7.495

0.000

25

11.243

11.243

1468 Sewerage Facilites at PMA Nur Goth


village at Gujju Thatta
1469 Construction of Drainage Schemes in
Chhato Chand City, Gujjo City,
Ghulamullah City, Gharo City, Mirpur
Sakro City, Buhara City, Jungshahni
City, Jhimpir City, Sonehri City,
Gulmanda City, Ghulam Muhammad
Brohi. District Thatta.

Thatta

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

2017-18
19

[ 216 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Dadu

UnApproved
UnApproved
UnApproved
UnApproved
UnApproved
UnApproved
UnApproved
UnApproved

June-18

39.988

0.000

0.000

0.000

0.000

39.988

9.997

0.000

9.997

0.000

25

14.996

14.996

June-18

12.000

0.000

0.000

0.000

0.000

12.000

3.000

0.000

3.000

0.000

25

4.500

4.500

June-18

10.500

0.000

0.000

0.000

0.000

10.500

2.625

0.000

2.625

0.000

25

3.938

3.938

June-18

17.835

0.000

0.000

0.000

0.000

17.835

4.459

0.000

4.459

0.000

25

6.688

6.688

June-18

33.274

0.000

0.000

0.000

0.000

33.274

8.319

0.000

8.319

0.000

25

12.478

12.478

June-18

12.600

0.000

0.000

0.000

0.000

12.600

3.150

0.000

3.150

0.000

25

4.725

4.725

June-18

21.135

0.000

0.000

0.000

0.000

21.135

5.284

0.000

5.284

0.000

25

7.926

7.926

June-18

45.000

0.000

0.000

0.000

0.000

45.000

11.250

0.000

11.250

0.000

25

16.875

16.875

UnApproved

June-18

15.000

0.000

0.000

0.000

0.000

15.000

3.750

0.000

3.750

0.000

25

5.625

5.625

807.943
9692.806

0.000
1699.528

0.000
1619.438

0.000
0.000

0.000
3306.966

807.943
6385.840

201.986
1231.917

0.000
0.000

201.986
1231.917

0.000
0.000

302.979
2576.962

302.979
2576.962

0.000

1484 Reconstruction of Drainage system for


Dadu Taluka (6 Nos:)
1485 Drainge Scheme Amorte Sharif Ghari
Yaseen.
1486 Providing new scheme for Mohalla
Dabar (2 Nos:)
1487 Drainage Scheme Village Danwro U/C
Khanpur Taluka Khairpur
1488 Drainage Scheme at Kingri Muhalla
Pir-jo-Goth
1489 Drainage Scheme Rind Hajano
Villagers
1490 Drainage Scheme Fateh Ali Chandio
UC-Noorpur Taluka Kingri.
1491 Drainage Scheme for village Hassu
Kanher Taluka Kingri, District
Khairpur
1492 Drainge Scheme for Khouhi Jalaji.

Shikarpur
Khairpur
Khairpur
Khairpur
Khairpur
Khairpur
Khairpur

N. Feroze

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Total. Drainage (New)


Total. Drainage (On-Going + New)
1493 Rehabilitation of non- functional water
supply and drainage schemes
1494 Allocation for 07 Schemes of ADP 2014-15

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

Sindh

Approved

June-18

4590.000

0.000

202.617

202.617

4387.383

400.000

0.000

400.000

Sindh

Approved

June-16

53.127

6.875

30.494

37.369

15.758

15.758

0.000

15.758

22814.074
1962.637
24776.711

4185.820
0.000
4185.820

3088.256
0.000
3088.256

7262.076 15551.998
0.000 1962.637
7262.076 17514.635

2409.341
490.659
2900.000

0.000
0.000
0.000

2409.341
490.659
2900.000

2017-18
19

13

1993.692

1993.692

70

100

0.000

0.000

6571.329
735.989
7307.318

6571.329
735.989
7307.318

tobe completed during 2015-16

(ADP 2014-15 No. 1694 - Rs. 2.625),


(ADP 2014-15 No. 1810 - Rs. 2.00),
(ADP 2014-15 No. 1723 - Rs. 2.500),
(ADP 2014-15 No. 1779 - Rs. 2.178),
(ADP 2014-15 No. 1766 - Rs. 0.955),
(ADP 2014-15 No. 1754 - Rs. 3.00),
(ADP 2014-15 No. 1880 - Rs. 2.500)
Total-PHED-On-Going
Total-PHED-New
Total (PHE) Water Supply & Drainage
RURAL DEVELOPMENT
Communication (On-Going Schemes)

0.000
0.000
0.000

0.000
0.000
0.000

[ 217 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

1495 Constt: of C.C Topping in Village


Ghulam Nabi Brohi and Ismail Brohi
UC Jam Sahib Taluka Daur.(ii) C.C.
Topping in village Pheroze Shah
Pharsi UC Ismail Khan Brohi & Ali
Murad Brohi UC Jam Sahib Taluka
Daur (iii) C.C Topping in Ward No:
3,7,8, UC Daur Taluka Daur (iv) C.C
Topping in Raza Abad Town UC
Bandhi Taluka Daur (v) C.C Topping
in Rehman Abad UC to WN UC
Bandhi Taluka Daur Taluka Daur (vi)
C.C. Topping in streets of Jam Sahib
City Taluka Daru (vii) Brick pavement
in village Fram Abad Town UC Abdul
Hassan Taluka Daur

S.B.A

Approved
25.04.14

June-16

90.000

0.000

40.000

0.000

40.000

50.000

50.000

0.000

50.000

0.000

44

100

0.000

0.000

1496 Construction of C.C Topping, Brick


Pavement & Open Surface Drain
(Drainage System) Water Tank In (i)
Ghareeb Abad U/C Daur, (ii) Village
Aitabar Khan Rind U/C Jamal Shah,
(iii) Village Wali Mohammad U/C Abul
Hassan, (iv) Village Foji Mohammad
Siddique U/C Abul Hassan, (v) Village
Haji Khan Mohammad Jalbani U/C
Daur, (vi) Village Ahmed Khan Chhuto
U/C Ghulam Hyder Shah Taluka Daur
District Shaheed Benazeerabad.

S.B.A

Approved
18.04.14

June-16

51.000

0.000

21.000

0.000

21.000

30.000

30.000

0.000

30.000

0.000

41

100

0.000

0.000

1497 Construction of C.C Topping and


Open Surface Drain U.C Satryoon
District Umer Kot (ii) Construction of
C.C Topping, and Open Surface Drain
U.C Taluka Pithoro District Umer Kot.
(iii) Maintenace & Repair of Road
from Mirpurkhas Umerkot Road to
Sohrab Shaikh to Abdul Karim Khoso
15 Kms (iv) Construc-tion of Road in
Various Villages of PS-69. 5.0Km.

Umerkot

Approved
09.05.14

June-16

71.260

0.000

42.756

0.000

42.756

28.504

28.504

0.000

28.504

0.000

60

100

0.000

0.000

Mirpurkhas Approved
18.11.14

June-16

9.000

8.000

0.000

0.000

8.000

1.000

1.000

0.000

1.000

0.000

89

100

0.000

0.000

1498 Construction of C.C road from


Government Girls High School, Old
Mirpurkhas to Link main Road

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

2017-18
19

[ 218 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Karachi

Approved
06.02.15

June-16

120.000

0.0000

0.000

0.000

0.000

120.000

30.000

0.000

30.000

0.000

25

90.000

0.000

1500 Improvement of Road Latifabad No. 2, Hyderabad Approved


7, 8, 9, 10 and 11 Hyderabad
06.02.15
1501 Constt: of Jhampir Road to Village Lal
Thatta
Approved
Bux Manchari U.C. Jhampir District
13.11.14
Thatta (3.2 Kms)
1502 Constt: of Road Ibrahim Jakhro to
Thatta
Approved
village Bharam Burfat UC Jangshahi
13.11.14
Taluka & District Thatta (5 Kms)
1503 Construction of Link/approach road to Hyderabad Approved
villages of 500 population Hyderabad
29.05.15

June-16

150.000

0.0000

0.000

0.000

0.000

150.000

20.000

0.000

20.000

0.000

13

130.000

0.000

June-16

15.000

0.0000

0.000

0.000

0.000

15.000

15.000

0.000

15.000

0.000

100

0.000

0.000

June-16

20.000

0.0000

0.000

0.000

0.000

20.000

8.356

0.000

8.356

0.000

42

11.644

0.000

June-17

180.000

0.000

0.000

0.000

0.000

180.000

36.000

0.000

36.000

0.000

20

144.000

0.000

706.260

8.000

103.756

0.000

111.756

594.504

218.860

0.000

218.860

0.000

375.644

0.000

1499 Construction of Metalled road from


Juma Himayati Goth, Sharjeel
Muhalla till Maria Public School,
DinoGoth to Ali Muhammad Goth
(Rahri Goth). Dur Muhammad Goth
till Water Supply scheme UC-05,
Arfani House Tomb to Kamba Mohlla,
Link Road ISorty Mills), Manu Mirani
Goth Bin Qasim Town, cattle Colony
District Malir. Shahjee Muhalla till
Maria Public School, District Malir

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Total Communication (Ongoing schemes)

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

2017-18
19

Communication (New schemes)


1504 Construction of Link/approach road to
villages of 500 population Sukkur
Division
1505 Rehabilitation / Reconditioning of Link
Road from Kakar Pipri Road to Bordi
Road, Taluka K.N. Shah District Dadu.

Sukkur,
Khairpur
Ghotki
Dadu

UnApproved

June-17

198.530

0.000

0.000

0.000

0.000

198.530

49.640

0.000

49.640

0.000

25

148.890

0.000

UnApproved

June-17

20.000

0.000

0.000

0.000

0.000

20.000

5.000

0.000

5.000

0.000

25

15.000

0.000

1506 Const. of road from Rato Dero Sher


Muhammad Thahem Road to
Zulfiqarabad including link to village
Chachar Taluka Garhi Khero
1507 Construction of Road from Water
Course No. 11 to village Phulai Maitla,
Taluka District Khairpur

Jacobabad

UnApproved

June-17

32.000

0.000

0.000

0.000

0.000

32.000

8.000

0.000

8.000

0.000

25

24.000

0.000

Khairpur

UnApproved

June-17

0.000

0.000

0.000

0.000

30.000

7.500

0.000

7.500

0.000

25

22.500

0.000

30.000

[ 219 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Sujawal

UnApproved

June-17

30.000

0.000

0.000

0.000

0.000

30.000

7.500

0.000

7.500

0.000

25

22.500

0.000

Dadu

UnApproved

June-17

20.000

0.000

0.000

0.000

0.000

20.000

5.000

0.000

5.000

0.000

25

15.000

0.000

Jacobabad

UnApproved

June-17

15.000

0.000

0.000

0.000

0.000

15.000

4.000

0.000

4.000

0.000

27

11.000

0.000

1511 Construction of Road from Salar


Shikarpur
distrybutory to village Abdul Sattar
taluka Garhi Yaseen
1512 Construction of Link Road from Sultan N. Feroze
Ali Wighio road to Jagan Khan
Lashari Taluka Mehrabpur District
Naushahro Feroze
1513 Constt:/Reconditioning of Rurl Roads
N.Feroze,
of Districts N.Feroze, Kashmore @
Kashmore,
Kandhkot & Sh. Benazirabad
S.B.A

UnApproved

June-17

30.000

0.000

0.000

0.000

0.000

30.000

7.500

0.000

7.500

0.000

25

22.500

0.000

UnApproved

June-17

30.000

0.000

0.000

0.000

0.000

30.000

7.500

0.000

7.500

0.000

25

22.500

0.000

UnApproved

June-17

422.000

0.000

0.000

0.000

0.000

422.000

106.000

0.000

106.000

0.000

25

316.000

0.000

827.530
1533.790

0.000
8.000

0.000
103.756

0.000
0.000

0.000
111.756

827.530
1422.034

207.640
426.500

0.000
0.000

207.640
426.500

0.000
0.000

619.890
995.534

0.000
0.000

4000.000

2000.000

0.000

0.000

2000.000

2000.000

0.000

500.000

500.000

0.000

1500.000

0.000

4000.000

2000.000

0.000

0.000

2000.000

2000.000

0.000

500.000

500.000

0.000

1500.000

0.000

1508 Construction of Road around Dargah


Sufi Shah Inayat Shaheed and from
Sim Nala to Dargah Makhdoom SadarUdin, Khoso Goth
1509 Construction of road from MaherRadhan road to village Ali Hyder
Jhatial taluka Maher
1510 Development of existing Graveyard at
village Sheranpur Taluka Garhi Khero

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Total Communication Schemes (New)


Total Communication Schemes

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

2017-18
19

Housing and Community Amenities


(On-going scheme)
1514 Installation of Solar Light in Municipal
and Town Committees of Sindh

Sindh

Approved
22.09.14

June-16

Total Housing & Community Amenities

50

63

Water (On-going schemes)


1515 Installation of Tubewells for drinking
water for the villages of Taluka
Chachro & Nagrparkar District
Tharparkar
1516 Installation of Tubewells for drinking
water for the villages of Taluka Mithi
& Islamkot District Tharparkar @
Mithi

Tharparkar Approved
18.11.14

June-16

40.000

0.000

16.032

0.000

16.032

23.968

15.000

0.000

15.000

0.000

40

78

8.968

0.000

Tharparkar Approved
18.11.14

June-16

40.000

0.000

14.000

0.000

14.000

26.000

16.000

0.000

16.000

0.000

35

75

10.000

0.000

[ 220 ]

PROVINCIAL
LOCAL GOVERNMENT DEPARTMENT

( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

1517 Installation 10 Nos Tube Well in 07


Union Councils of PS-62, District
Tharparkar
1518 Installation of 4 Solar Tube Wells in
the UC Manahro, Taluka Kazi Ahmed
District Shaheed Benazirabad.

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
4

Tharparkar Approved
8.12.14
S.B.A

Approved
29.5.15

Actual
Revised Allocation Estimated ThrowforExpenditExpendit2014-15
ward as on
ure upto
ure upto
01-07-15
Total
F.P.A. June' 15
June, 14
7
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial
Progress in %age
upto

Financial Projection

15

Jun'15 Jun'16
16
17

2016-17
18

2017-18
19

June-17

52.992

0.000

2.000

0.000

2.000

50.992

25.000

0.000

25.000

0.000

51

25.992

0.000

June-16

30.000

0.000

0.000

0.000

0.000

0.000

7.500

0.000

7.500

0.000

25

0.000

0.000

162.992

0.000

32.032

0.000

32.032

130.960

63.500

0.000

63.500

0.000

67.460

0.000

15.000

0.000

0.000

0.000

0.000

15.000

3.750

0.000

3.750

0.000

11.250

0.000

15.000

0.000

0.000

0.000

0.000

15.000

3.750

0.000

3.750

0.000

11.250

0.000

25.000

0.000

0.000

0.000

0.000

25.000

6.250

0.000

6.250

0.000

18.750

0.000

0.000
6.250
0.000
10.000
500.000
786.110
0.000
213.890
500.000 1000.000
842.693 18760.000

0.000
0.000
0.000
0.000
0.000
0.000

Total Water (Ongoing schemes)


Sanitation (On-going scheme)
1519 P/L sewerage line of 12" dia at UC-II
Muslimabad (internal), Rasool Khan
Street till Bilal Colony Eidgah
Muslimabad and at UC -II
Muslimabad Gulzar Mosque to Hazrat
Mir Street

Karachi

Approved
23.04.15

June-16

Total Sanitation (Ongoing scheme)

25

Sanitation (New Scheme)


1520 Construction of Rural Drainage
Scheme village Daim Dhamrah i.c. Jan
Mohammad Brohi
Total Sanitation (New scheme)
Total Sanitation
Total Rural Development (On-going)
Total Rural Development (New)
Total Rural Development Deptt
Grand Total :-

Sanghar

UnApproved

June-16

25.000
0.000
0.000
40.000
0.000
0.000
4884.252
2008.000
135.788
852.530
0.000
0.000
5736.782
2008.000
135.788
92456.508 14856.195 12253.819

0.000
25.000
0.000
6.250
0.000
0.000
40.000
10.000
0.000 2143.788 2740.464
286.110
0.000
0.000
852.530
213.890
0.000 2143.788 3592.994
500.000
0.000 27098.014 65516.177 17917.307

25

18.750
0.000
30.000
0.000
1954.354
0.000
638.640
0.000
2592.994
0.000
30904.709 15499.350

[ 221 ]

SUMMARY
MATCHING ALLOCATION
ANNUAL DEVELOPMENT PROGRAMME 2015-16
( Rs. In million )

S. No.

Sub-Sector

Throwforward as
on 01.07.15
3

On-Going

New

Total
FPA

No. of
Schemes

Capital

Revenue

Total

No. of
Schemes

Capital

Revenue

Total

No. of
Schemes

Capital

Revenue

Total

10

11

12

13

14

15

16

Grand
Total
(15+16)
17

Financial Projection
2016-17

2017-18

18

19

PP&H

14796.500

3500.000

0.000

3500.000

0.000

0.000

0.000

3500.000

0.000

3500.000

0.000

3500.000

6775.500

7021.000

Water & Drainage

10612.410

500.000

0.000

500.000

0.000

0.000

0.000

500.000

0.000

500.000

0.000

500.000

5056.205

5056.205

Total Matching All:

25408.910

4000.000

0.000

4000.000

0.000

0.000

0.000

4000.000

0.000

4000.000

0.000

4000.000 11831.705 12077.205

[ 222 ]

PROVINCIAL
MATCHING ALLOCATION
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
6

Revised
Allocation
2014-15
Total
8

Estimated
ThrowforExpenditward as on
ure upto
01-07-15
F.P.A. June' 15

Approved
19.09.07

June-17

3991.000

970.000

1000.000 0.000

Approved
22.12.11

June-18

12775.500

0.000

16766.500

10

11

Allocation for 2015-16


FPA
Capital

Revenue

Total

12

13

14

Financial Progress
in %age upto

Financial Projection

Jun'15 Jun'16

2016-17

2017-18

18

19

15

16

17

1000.000

0.000

49

74

1000.000

1021.000

20

5775.500

6000.000

6775.500

7021.000

5056.205

5056.205

5056.205

5056.205

PHYSICAL PLANNING & HOUSING


Local Govt. Department
KW&SB
(On-Going Schemes)
1521 Greater Karachi Sewerage Plan
Karachi
(S-III) [Cost Rs. 7982.00 million
with Federal Share of Rs.
3991.00 million]
1522 Greater Karachi Water Supply
Karachi
Scheme (K-IV Phase-I, 260
MGD) Cost Rs. 25.551 Billion
with 50% by GoS.
Total Physical Planning & Housing :-

1970.000

2021.000

1000.000

0.000

0.000 0.000

0.000 12775.500

2500.000

0.000

2500.000

0.000

970.000

1000.000 0.000

1970.000 14796.500

3500.000

0.000

3500.000

0.000

10612.410

0.000

0.000 0.000

0.000 10612.410

500.000

0.000

500.000

0.000

10612.410

0.000

0.000 0.000

0.000 10612.410

500.000

0.000

500.000

0.000

27378.910

970.000

1000.000 0.000

1970.000 25408.910

4000.000

0.000

4000.000

0.000

Water & Drainage


Irrigation Department
(Ongoing Schemes)
1523 Makhi Farash Link Canal
Project (Chotiari Phase-II) for
Water Supply to Thar Coal
Total Water & Drainage :Total Matching Allocation :-

Tharparkar

UnApproved

June-17

11831.705 12077.205

[ 223 ]

SUMMARY
MINES & MINERAL DEVELOPMENT DEPARTMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-2016
(Rs. In million)
Sr
No.

Sub-Sector

Mines and Mineral Development


TOTAL Mines & Mineral

ThrowNo. of
forward as
Schemes
on 01.07.15
3
4

Capital

Revenue

Total

10

11

12

13

14

15

16

Grand
Total
(15+16)
17

On-Going

New

No. of
Schemes Capital Revenue

Total

Total

No. of
Schemes

Capital

Revenue

Total

FPA

Financial Projection
2016-17

2017-18

18

19

356.454

7.458

112.748

120.206

0.000

29.794

29.794

7.458

142.542

150.000

0.000

150.000

176.805

23.650

356.454

7.458

112.748

120.206

0.000

29.794

29.794

7.458

142.542

150.000

0.000

150.000

176.805

23.650

[ 224 ]

PROVINCIAL
MINES & MINERAL DEVELOPMENT DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Actual
Estimated
Revised
Location of Status
Target Date
ThrowforEstimated Expenditu Allocation 14-15 ExpenditScheme/
Date of
for
ward as on
Cost
re upto
ure upto
District
Approval Completion
01-07-15
Total F.P.A. June' 15
Jun, 14
3
4
5
6
7
8
9
10
11

Allocation for 2015-16


Capital Revenue
12
13

FPA

Total
14

15

Financial Progress
in %age upto

Financial
Projection

Jun'15 Jun'16 2016-17 2017-18


16
17
18
19

MINES & MINERAL DEVELOPMENT


ONGOING SCHEMES
1524 Feasibility Study of Granite Deposits in Tharparkar Approved
district Thar
29.9.06
(U/R)
1525 E-Govt. Agency Specific General
Karachi Approved
Application - Websit on Geo-Data
29.10.05
Phase-II setup of Geo-Data Centre
(U/R)

June-16

50.000

24.880

0.000

0.000

24.880

25.120

0.000

10.070

10.070

0.000

50

70

15.050

0.000

June-16

31.667

25.326

0.776

0.000

26.102

5.565

0.000

5.565

5.565

0.000

82

100

0.000

0.000

1526 Establishment of Central Rescue


Station at Tharparkar

Tharparkar Approved
21.10.05
(U/R)

June-16

179.006

75.650

0.000

0.000

75.650

103.356

7.458

50.165

57.623

0.000

42

74

45.733

0.000

1527 Establishment of Mine Polytrade


Training Institutes at
Lakhra/Jamshoro (Revised)

Jamshoro Approved
06.05.10

June-16

186.583

84.874

6.709

0.000

91.583

95.000

0.000

23.628

23.628

0.000

49

62

71.372

0.000

1528 Establishment of Rescue Station &


Occupational Disease & Detection
Centre at Lakhra/Jamshoro (Revised)

Jamshoro Approved
08.05.10

June-16

207.932

155.129

15.531

0.000

170.660

37.272

0.000

16.272

16.272

0.000

82

90

21.000

0.000

June-16

20.000

4.952

2.000

0.000

6.952

13.048

0.000

7.048

7.048

0.000

35

70

0.000

0.000

675.188

370.811

25.016

0.000

395.827

279.361

7.458

112.748

120.206

0.000

153.155

0.000

77.093

0.000

0.000

0.000

0.000

77.093

0.000

29.794

29.794

0.000

23.650

23.650

77.093
752.281

0.000
370.811

0.000
25.016

0.000
0.000

0.000
395.827

77.093
356.454

0.000
7.458

29.794
142.542

29.794
150.000

0.000
0.000

1529 Environmental Impact Assessment due


to Mining Activities in Sindh

Sindh

Approved
06.03.06

Total Mines & Mineral Dev. (On-Going Schemes)


MINES & MINERAL DEVELOPMENT
NEW SCHEMES
1530 Identification of minerals and study of
identified minerals in terms of quantity
and quality leading to marketabilty

Sindh

Total Mines & Mineral Dev. (New Schemes)


Total Mines & Mineral Development

Unapproved

June-17

39

23.650
176.805

23.650
23.650

[ 225 ]

SUMMARY
MINORITIES AFFAIRS DEPARTMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
(Rs. In million)
Sr
No.

Sub-Sector

ThrowNo. of
forward as
Schemes
on 01.07.15

On-Going

No. of
Schemes

New
Capital Revenue

Total

No. of
Schemes

FPA

Grand
Total
(15+16)

Total

Financial Projection

Capital

Revenue

Total

Capital

Revenue

Total

2016-17

2017-18

10

11

12

13

14

15

16

17

18

19

Minorities Affairs

1938.698

12

542.000

0.000

542.000

25.000

0.000

25.000

13

567.000

0.000

567.000

0.000

567.000

1371.698

0.000

Total Minorities Affairs Deptt:

1938.698

12

542.000

0.000

542.000

25.000

0.000

25.000

13

567.000

0.000

567.000

0.000

567.000

1371.698

0.000

[ 226 ]

PROVINCIAL
MINORITIES AFFAIRS DEPARTMENT

(Rs. in Million)
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Actual
Status Target Date
Estimated ExpenditDate of
for
Cost
ure upto
Approval Completion
Jun, 14
4
5
6
7

Revised
Estimated
Allocation
Expendit2014-15
ure upto
Total F.P.A. June' 15
8
9
10

Throwforward
as on
01.07.15
11

Allocation for 2015-16


Capital Revenue
12
13

Total
14

FPA
15

Financial Progress
in %age upto
Jun'15
16

Jun'16
17

Financial
Projection
2016-17
18

2017-18
19

Minorities Affairs
(On-Going Schemes)
1531 Construction/ Repair and Renovation/
Restoration of Religious Places of
Minorities in Sindh (Karachi, Ghotki,
Thatta, Sukkur, Matiari, Shikarpur,
Sanghar, Tharparkar, Larkana,
Umerkot & Khairpur Mirs, )

Sindh

Approved
24.11.11

June-15

99.063

51.563

23.750

0.000

75.313

23.750

23.750

0.000

23.750

0.000

76

100

0.000

0.000

1532 Repair / Renovation of various


Mandirs in Sindh (Karachi, Dadu,
Thatta, Tharparkar, Jamshoro,
Hyderabad, Larkana, N.Feroze,
Khairpur Mirs, Matiari, T.Allahyar)

Sindh

Approved
24.01.12

June-15

59.170

44.170

7.500

0.000

51.670

7.500

7.500

0.000

7.500

0.000

87

100

0.000

0.000

1533 Reconstruction / Uplift / Expansion of


Minorities Places in Sindh (Karachi,
Shikarpur, Jamshoro, Umerkot,
Thatta, Hyderabad)

Sindh

Approved
24.01.12

June-15

57.690

35.190

11.250

0.000

46.440

11.250

11.250

0.000

11.250

0.000

80

100

0.000

0.000

1534 Consolidation / Rehabilitation at Saadh


Bello Sukkur (C:483.031+R:4.000)

Sukkur

Approved
13.03.12

June-17

487.031

199.600

50.022

0.000

249.622

237.409

125.000

0.000

125.000

0.000

51

77

112.409

0.000

1535 Implementation of various


Development Schemes of Minorities in
Sindh (Jamshoro, Ghotki, Karachi,
Khairpur, Jacobabad, Larkana,
Kandhhkot @Kashmore, Sukkur,
N.Feroze, Dadu, Shaheed Benazirabad,
Sanghar, Mirpurkhas, Umerkot,
Tharparkar, Matiari, Jacobabad,
Jamshoro, Thatta, Shikarpur,Tando
Allahyar) (C:704.565)

Sindh

Approved
15.03.13

June-17

704.565

50.000 129.095

0.000

179.095

525.470

157.500

0.000

157.500

0.000

25

48

367.970

0.000

Karachi

Approved
22.04.15

June-17

99.642

0.000

0.000

99.642

25.000

0.000

25.000

0.000

25

74.642

0.000

1536 Repair / Renovation of various


Mandirs in Karachi Division
(C:99.642)

0.000

0.000

[ 227 ]

PROVINCIAL
MINORITIES AFFAIRS DEPARTMENT

(Rs. in Million)
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

1537 Repair / Renovation of various


Mandirs in Sukkur Division
(C:149.703)

Actual
Status Target Date
Estimated ExpenditDate of
for
Cost
ure upto
Approval Completion
Jun, 14
4
5
6
7

Revised
Estimated
Allocation
Expendit2014-15
ure upto
Total F.P.A. June' 15
8
9
10

Throwforward
as on
01.07.15
11

Allocation for 2015-16


Capital Revenue
12
13

Total
14

FPA
15

Financial Progress
in %age upto
Jun'15
16

Jun'16
17

Financial
Projection
2016-17
18

2017-18
19

Sukkur,
Ghotki,
Khairpur,
N.Feroze,
SBA
Larkana,
Kambar,
Shikarpur,
Jacobabad,
Kashmore

Approved
22.04.15

June-17

149.703

0.000

0.000

0.000

0.000

149.703

20.000

0.000

20.000

0.000

13

129.703

0.000

Approved
22.04.15

June-17

149.860

0.000

0.000

0.000

0.000

149.860

20.000

0.000

20.000

0.000

13

129.860

0.000

1539 Repair / Renovation of Gauoshala Pir


Jo Goth Khairpur (C:39.962)

Khairpur

Approved
17.04.15

June-16

39.962

0.000

0.000

0.000

0.000

39.962

18.000

0.000

18.000

0.000

45

21.962

0.000

1540 Provsion of Marble Flooring of SSD


Dham Raharki Sahib Darbar Taluka
Dherki District Ghotki (C:19.982)

Ghotki

Approved
17.04.15

June-16

19.982

0.000

0.000

0.000

0.000

19.982

9.000

0.000

9.000

0.000

45

10.982

0.000

Hyderabad, Approved
Tando
22.04.15
Allahyar,
T.M Khan,
Matiari,
Badin,
Thatta,
Jamshoro,
Dadu
Mirpurkhas, Approved
Tharparkar, 17.04.15
Umerkot,
Sanghar

June-17

289.663

0.000

0.000

0.000

0.000

289.663

62.500

0.000

62.500

0.000

22

227.163

0.000

June-17

284.507

0.000

0.000

0.000

0.000

284.507

62.500

0.000

62.500

0.000

22

222.007

0.000

380.523 221.617

0.000

602.140

1838.698

542.000

0.000

542.000

0.000

1296.698

0.000

1538 Repair / Renovation of various


Mandirs in Larkana Division
(C:149.860)

1541 Repair / Renovation of various


Mandirs in Hyedreabad Division
(C:289.663)

1542 Repair / Renovation of various


Mandirs in Mirpurkhas
Division(C:284.507)

Total Minorities Affairs (On-Going)

2440.838

[ 228 ]

PROVINCIAL
MINORITIES AFFAIRS DEPARTMENT

(Rs. in Million)
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Minorities Affairs
(New Scheme)
1543 Construction of Minority Religious
Places in Sindh
Total Minorities Affairs (New)
Total Minorities Affairs

Sindh

Actual
Status Target Date
Estimated ExpenditDate of
for
Cost
ure upto
Approval Completion
Jun, 14
4
5
6
7

UnApproved

June-17

100.000

100.000
2540.838

0.000

Revised
Estimated
Allocation
Expendit2014-15
ure upto
Total F.P.A. June' 15
8
9
10

Throwforward
as on
01.07.15
11

Allocation for 2015-16


Capital Revenue
12
13

0.000

0.000

0.000

100.000

25.000

0.000

0.000
0.000
380.523 221.617

0.000
0.000

0.000
602.140

100.000
1938.698

25.000
567.000

0.000
0.000

Total
14

FPA
15

25.000 0.000

25.000
567.000

0.000
0.000

Financial Progress
in %age upto
Jun'15
16

Jun'16
17

25

Financial
Projection
2016-17
18

2017-18
19

75.000

0.000

75.000
1371.698

0.000
0.000

[ 229 ]

SUMMARY
NEW DEVELOPMENT INITIATIVES
ANNUAL DEVELOPMENT PROGRAMME 2015-16
(Rs. In million)
Sr
No.

Sub-Sector

Throwforward as No. of
on 01.07.15 Schemes
3

On-Going

Capital
5

Revenue
6

New

No. of
Schemes
Total
7

Capital
9

Revenue
10

Total
15

16

17

Total

No. of
Schemes
Total
11

FPA

Grand
Total
(15+16)

12

Capital
13

Revenue
14

Financial Projection
2016-17
18

2017-18
19

New Development Initiatives

5000.000

5000.000

0.000 5000.000

0.000

0.000

0.000

5000.000

0.000

5000.000

0.000

5000.000

0.000

0.000

Total New Development


Initiatives:-

5000.000

5000.000

0.000 5000.000

0.000

0.000

0.000

5000.000

0.000

5000.000

0.000

5000.000

0.000

0.000

[ 230 ]

PROVINCIAL
NEW DEVELOPMENT INITIATIVES
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District
3

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4

Revised
Allocation
2014-15
Total
8

Estimate
Throwford
Expendit- ward as on
ure upto 01-07-15
F.P.A.
June' 15
9
10
11

Allocation for 2015-16


FPA
Capital Revenue

12

13

June-16

5000.000

0.000

0.000

0.000

0.000

5,000.000

5000.000

0.000

5000.000

0.000

0.000

0.000

0.000

5000.000

5000.000

0.000

Total
14

Financial Progress
in %age upto

Financial
Projection

Jun'15 Jun'16 2016-17 2017-18


15

16

17

18

19

5000.000

0.000

100

0.000

0.000

5000.000

0.000

0.000

0.000

NEW DEVELOPMENT INITIATIVES


On-going Scheme
1544 New Development Initiatives
Total New Development Initiatives:-

Sindh

[ 231 ]

SUMMARY
PLANNING & DEVELOPMENT DEPARTMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
(Rs. In million)
Sr
No.

Sector/Sub-Sector

ThrowOn-Going
No. of
forward as
Schemes
on 01.07.15
Capital Revenue
3

Total
7

2110.317 2114.445

No. of
Schemes

New

No. of
Schemes

FPA

Grand
Total
(15+16)

Total

Financial Projection

Capital

Revenue

Total

Capital

Revenue

Total

2016-17

2017-18

10

11

12

13

14

15

16

17

18

19

0.000

216.555

216.555

13

4.128

2326.872

2331.000

9.345

2340.345

4613.990

2305.596

Economic Policy & Research

9250.586

10

4.128

Coastal Development Auth.

616.682

200.000

30.305

230.305

0.000

0.000

0.000

200.000

30.305

230.305

0.000

230.305

193.189

193.189

PP&H

7338.750

969.000

200.000

1169.000

0.000

0.000

0.000

969.000

200.000

1169.000

6126.790

7295.790

3084.875

3084.875

Total P&D Department:-

17206.018

13

1173.128 2340.622 3513.750

0.000

216.555

216.555

16

1173.128 2557.177

3730.305

6136.135

9866.440

7892.054

5583.660

[ 232 ]

PROVINCIAL
PLANNING AND DEVELOPMENT DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status Target Date


Actual
Estimated
Date of
for
Exp. upto
Cost
Approval Completion
June, 14
6

Revised
Allocation
2014-15
Total

F.P.A.

Est. Exp. Throwforupto


ward as on
June' 15 01-07-15
10

11

Allocation for 2015-16


FPA
Capital

Revenue

Total

12

13

14

Approved
20.02.12

June-16

978.694

121.342

100.000

0.000

221.342

757.352

0.000

150.000

150.000

Approved
30.03.12

June-16

639.332

417.917

150.000

0.000

567.917

71.415

0.000

71.415

Approved
22.03.11

June-16

3000.000 1221.158

200.000

0.000 1421.158

1578.842

0.000

Approved
24.05.13
Approved
01.03.13
Approved
04.03.15

June-16

124.000

69.357

20.000

0.000

89.357

34.643

June-16

100.000

0.000

0.000

0.000

0.000

June-18

200.400

0.000

0.000

0.000

Approved
16.08.13

June-16

412.200

0.000

25.000

Approved
14.05.15

June-16

199.420

0.000

Approved
28.02.15

June-17

4916.028

Approved
29.05.15

June-16

199.000

Financial
Progress in
%age upto

Financial
Projection

Jun'15 Jun'16 2016-17


15

18

2017-18

16

17

19

0.000

23

38

607.352

0.000

71.415

0.000

89

100

0.000

0.000

240.000

240.000

0.000

47

55

1338.842

0.000

0.000

34.643

34.643

0.000

72

100

0.000

0.000

100.000

0.000

25.000

25.000

0.000

25

75.000

0.000

0.000

200.400

0.000

12.681

12.681

9.345

93.860

93.860

0.000

25.000

387.200

0.000

100.000

100.000

0.000

30

287.200

0.000

43.714

0.000

43.714

155.706

4.128

151.578

155.706

0.000

22

100

0.000

0.000

0.000

0.000

0.000

0.000

4916.028

0.000 1300.000 1300.000

0.000

26

0.000

0.000

0.000

0.000

199.000

0.000

25.000

0.000

13

10769.074 1829.774

538.714

0.000 2368.488

8400.586

4.128 2110.317 2114.445

9.345

ECONOMIC POLICY & RESEARCH


(On-Going Schemes)
1545 Establishment of Directorate of Urban
Karachi
Policy and Strategic Planning Unit in
Sindh (Revised).
1546 Strengthening of Monitoring &
Karachi
Evaluation Cell P&D including out
sourcing for Third Party Monitoring
(Revised)
1547 Community Development Program
Sindh
through Civil Society Organizations and
others, including Corporate Sector
(Revised)
1548 Establishment of Sindh Data Centre in
Karachi
Bureau of Statistics.
1549 Automation of Planning and
Karachi
Development Department
1550 Sustainable Land Management Project
Tharparkar /
to Combat Desertification in Sindh
Umerkot/
(Sindh component Rs. 372.710 million,
Sanghar
GOS share Rs. 200.400 million)
1551 Preparation of Development - Master
Sindh
Plan of 19 Districts headquarter town of
Sindh.
1552 Strengthening of Planning & DevelopKarachi
ment Department, Govt. of Sindh.
(C:191.292+R:8.128)
1553 Expansion of UC Based Poverty
Sindh
Reduction Programme in Umerkot,
Khairpur, Sanghar, Badin, Thatta &
Mirpurkhas
1554 Prepartion of Sindh GDP
Sindh
Total EPR (On-Going Schemes)

25.000

1808.014 1808.014

87.000

87.000

4297.268 1988.874

[ 233 ]

PROVINCIAL
PLANNING AND DEVELOPMENT DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status Target Date


Actual
Estimated
Date of
for
Exp. upto
Cost
Approval Completion
June, 14

1555 Establishment of Regional Offices of


MEC at Karachi and Larkana

Karachi,
Larkana

June-16

1556 Support for Implementation of World


Bank Reform (under T.A) to enhance
capacity of M&E Cell in P&D
Department
1557 Research & Training for Planning &
Development and Human Resource
Development
Total EPR (New Schemes)

Karachi

Approved
26.12.14
(U/R)
UnApproved

UnApproved

Revised
Allocation
2014-15

Est. Exp. Throwforupto


ward as on
June' 15 01-07-15

Allocation for 2015-16


FPA
Capital

Revenue

Total

12

13

14

Total

F.P.A.

600.000

0.000

0.000

0.000

0.000

600.000

0.000

153.514

153.514

June-17

175.000

0.000

0.000

0.000

0.000

175.000

0.000

43.000

June-17

75.000

0.000

0.000

0.000

0.000

75.000

0.000

850.000

0.000

0.000

0.000

0.000

850.000

0.000

11619.074 1829.774

538.714

0.000 2368.488

9250.586

10

11

Financial
Progress in
%age upto

Financial
Projection

Jun'15 Jun'16 2016-17


15

18

2017-18

16

17

19

0.000

26

223.243

223.243

43.000

0.000

25

66.000

66.000

20.041

20.041

0.000

27

27.480

27.480

216.555

216.555

0.000

316.723

316.723

4.128 2326.872 2331.000

9.345

(New Schemes)

Karachi

Total EPR (Ongoing+New)

4613.990 2305.596

Coastal Development Authority (CDA)


(On-Going Schemes)
1558 Improvement of Major Fisherman's
Settlements and Rehabilitation of Flood
Affected Areas in Coastal Areas of
Thatta, Sujawal and Badin (C:652.534
+R:127.085)
Sub-Total CDA (On-Going)

Thatta
Sujawal &
Badin

Approved
22.01.13

June-16

779.619

47.484

115.453

0.000

162.937

616.682

200.000

30.305

230.305

0.000

21

50

779.619

47.484

115.453

0.000

162.937

616.682

200.000

30.305

230.305

0.000

June-18

7000.000

100.000

425.000 2512.430

525.000

6475.000

969.000

0.000

969.000

3876.790

21

June-17

926.000

32.250

30.000 2844.000

62.250

863.750

0.000

200.000

200.000

2250.000

28

7926.000

722.250

455.000 5356.430

587.250

7338.750

969.000

200.000 1169.000

6126.790

193.189

193.189

193.189

193.189

WATER SUPPLY & SANITATION


(On-going)
1559 Sindh Cities Improvement Programme ($
Sukkur,
Approved
400 million i/c GOS share, $ 100 million) Shikarpur,Kh 24.8.08
Tranche-II
airpur,
Larkana,
Jacobabad,
Gohtki
1560 Sindh Municipal Services Delivery
Jacobabad, Approved
Program (SMSDP) (Total cost Rs.6866
Dadu &
16.08.12
million including US Grant Rs.5940
Kamber
ECNEC
million and GOS Share Rs.926 million)
Total Water Supply & Sanitation:-

2753.000 2753.000

331.875

331.875

3084.875 3084.875

[ 234 ]

PROVINCIAL
PLANNING AND DEVELOPMENT DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status Target Date


Actual
Estimated
Date of
for
Exp. upto
Cost
Approval Completion
June, 14
4

Revised
Allocation
2014-15
Total

F.P.A.

Est. Exp. Throwforupto


ward as on
June' 15 01-07-15
10

11

Allocation for 2015-16


FPA
Capital

Revenue

Total

12

13

14

Financial
Progress in
%age upto

Financial
Projection

Jun'15 Jun'16 2016-17


15

16

17

18

2017-18
19

TOTAL P&D DEPTT (Ongoing):-

19474.693 2599.508 1109.167 5356.430 3118.675 16356.018 1173.128 2340.622 3513.750

6136.135

7575.331 5266.937

TOTAL P&D DEPTT (New) :TOTAL P&D DEPTT:-

850.000
0.000
0.000
0.000
0.000
850.000
0.000 216.555 216.555
20324.693 5304.669 1109.167 5356.430 3118.675 17206.018 1173.128 2557.177 3730.305

0.000
6136.135

316.723 316.723
7892.054 5583.660

[ 234 ]

SUMMARY
POPULATION WELFARE DEPARTMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
(Rs. In million)
Sr
No.

Sub-Sector

Throwforward as No. of
on 01.07.15 Schemes

On-Going
Capital Revenue

Population Welfare

1079.940

50.500

Total Population Welfare


Deptt:-

1079.940

50.500

6
0.000

0.000

New

No. of
Schemes
Total
7

Capital Revenue
8

10

50.500

0.000 249.500

50.500

0.000

249.500

Total

FPA

Grand
Total
(15+16)

16

17

Total

No. of
Schemes

Financial Projection

Capital

Revenue

Total

12

13

14

15

249.500

50.500

249.500

300.000 0.000

300.000 405.690

249.500

50.500

249.500

300.000 0.000

300.000

11

2016-17

2017-18

18

19

405.690

374.250

374.250

[ 235 ]

PROVINCIAL
POPULATION WELFARE DEPARTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of Status
Target
Actual Exp.
Estimated
Scheme/
Date of
Date for
upto June,
Cost
District
Approval Completion
14
3

Karachi

Approved
15.03.13

June-14

Revised
Est. Exp. ThrowforAllocation
upto ward as on
2014-15
June' 15 01-07-15
Total
F.P.A.
8
9
10
11

Allocation for
2015-16
Capital
12

Revenue
13

FPA
Total
14

15

Financial
Progress in %age
upto

Financial
Projection

Jun'15 Jun'16 2016-17 2017-18


16
17
18
19

POPULATION WELFARE
ONGOING SCHEMES
1561 Construction of Office/ Hostel/
Residential Building for
Population Welfare Training
Institute (PWTI) Karachi. (C:

119.000

7.060

30.000 0.000

37.060

81.940

50.500

0.000

50.500

0.000

119.000

7.060

30.000 0.000

37.060

81.940

50.500

0.000

50.500

0.000

998.000

0.000

0.000 0.000

0.000

998.000

0.000

249.500

249.500

0.000

Total Population Welfare (New):-

998.000

0.000

0.000 0.000

0.000

998.000

0.000

249.500

249.500

0.000

374.250 374.250

Total Population Welfare Deptt:-

1117.000

7.060

30.000 0.000

37.060

1079.940

50.500

249.500

300.000

0.000

405.690 374.250

Total Population Welfare (On-going) :NEW SCHEMES


1562 Costed Implementation Plan
(CIP) for Family Planning PhaseI

Sindh

UnApproved

June-16

31

74

25

31.440

0.000

31.440

0.000

374.250 374.250

[ 236 ]

SUMMARY
PROVINCIAL ASSEMBLY
ANNUAL DEVELOPMENT PROGRAMME 2015-16
Sr
No.

Sub-Sector

ThrowNo. of
forward as
Schemes
on 01.07.15
3
4

Capital

Revenue

Total

No. of
Schemes

Capital

Revenue

Total

No. of
Schemes

Capital

Revenue

Total

10

11

12

13

14

15

16

Grand
Total
(15+16)
17

On-Going

New

Total
FPA

(Rs. In million)
Financial Projection
2016-17

2017-18

18

19

Provincial Assembly

5593.010

995.000

0.000

995.000

5.000

0.000

5.000

1000.000

0.000

1000.000

0.000

1000.000

510.000

500.000

Total Provincial Assembly:-

5593.010

995.000

0.000

995.000

5.000

0.000

5.000

1000.000

0.000

1000.000

0.000

1000.000

510.000

500.000

[ 237 ]

PROVINCIAL
PROVINCIAL ASSEMBLY
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Actual
Location of
Status
Target Date
Estimated Expenditu
Scheme/
Date of
for
Cost
re upto
District
Approval Completion
June, 14
6

Revised
Allocation
2014-15
Total
8

Estimated
ThrowforExpenditward as on
ure upto
01-07-15
F.P.A. June' 15
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial Progress
in %age upto

15

Jun'15 Jun'16
16
17

Financial
Projection
2016-17
18

2017-18
19

1563 Engaging consulting Architect &


Engineering firm Architectural &
Structural Designs of Construction
of New Sindh Assembly Hall, at
Karachi

Karachi

Approved
08.06.07
(UR)

June-16

24.400

28.120

0.000

0.000

28.120

-3.720

0.100

0.000

0.100

0.000

115

116

0.000

0.000

1564 Constt: of New Sindh Assembly


Hall, Karachi. (Revised)
1565 Construction of Sindh
Parliamentarians Residences,
Karachi.

Karachi

Approved
17.01.14
Approved
08.04.14

June-16

4658.775

3028.285

1115.245

0.000

4143.530

515.245

515.245

0.000

515.245

0.000

89

100

0.000

0.000

June-17

5266.320

0.000

199.835

0.000

199.835

5066.485

479.655

0.000

479.655

0.000

13

9949.495

3056.405

1315.080

0.000

4371.485

5578.010

995.000

0.000

995.000

0.000

15.000

0.000

0.000

0.000

0.000

15.000

5.000

0.000

5.000

0.000

15.000
9964.495

0.000
3056.405

0.000
1315.080

0.000
0.000

0.000
4371.485

0.000
5.000
0.000 1000.000

0.000
0.000

BUILDINGS
Govt. Office Building
(On going Schemes)

Karachi

Total Govt. Office Building (On-Going

500.000 500.000

500.000 500.000

Govt. Office Building


(New Schemes)
1566 Construction of Speaker's House
at Karachi.

Karachi

Total Govt. Office Building (New Scheme)


Total Provincial Assembly Deptt:-

UnApproved

June-15

15.000
5.000
5593.010 1000.000

33

10.000

0.000

10.000
0.000
510.000 500.000

[ 238 ]

SUMMARY
PROVINCIAL OMBUDSMAN
ANNUAL DEVELOPMENT PROGRAMME 2015-16
Sr
No.

Sub-Sector

ThrowNo. of
forward as
Schemes
on 01.07.15
3
4

Capital

Revenue

Total

No. of
Schemes

Capital

Revenue

Total

No. of
Schemes

Capital

Revenue

Total

10

11

12

13

14

15

16

Grand
Total
(15+16)
17

On-Going

New

Total
FPA

(Rs. In million)
Financial Projection
2016-17

2017-18

18

19

Provincial Ombudsman

10.681

10.681

0.000

10.681

0.000

0.000

0.000

10.681

0.000

10.681

0.000

10.681

0.000

0.000

Total Provincial Ombudsman

10.681

10.681

0.000

10.681

0.000

0.000

0.000

10.681

0.000

10.681

0.000

10.681

0.000

0.000

[ 239 ]

PROVINCIAL
PROVINCIAL OMBUDSMAN
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Actual
Location of
Status Target Date
Estimated Expenditu
Scheme/
Date of
for
Cost
re upto
District
Approval Completion
June, 14
3

Sindh

Approved
17.04.07
(U.R)

Jun-15

Revised
Allocation
2014-15
Total
8

Estimated
ThrowforAllocation for 2015-16
Expenditward as on
ure upto
01-07-15
Capital Revenue Total
F.P.A. June' 15
9
10
11
12
13
14

FPA

15

Financial Progress
in %age upto

Financial
Projection

Jun'15 Jun'16 2016-17 2017-18


16
17
18
19

Provincial Ombudsman
(On going Schemes)
1567 Construction of Provincial
Ombudsman Regional Offices-cumResidences (3 Nos.)at Mirpurkhas,
Larkana and Nawabshah and
purchase of plots (Headquarter and
Nine 09 Regional Offices Phase-I)

Total Provincial Ombudsman

75.000

57.423

6.896

0.000

64.319

10.681

10.681

0.000

10.681

0.000

75.000

57.423

6.896

0.000

64.319

10.681

10.681

0.000

10.681

0.000

86

100

0.000

0.000

0.000

0.000

[ 240 ]

SUMMARY
REHABILITATION DEPARTMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
ThrowNo. of
forward as
Schemes
on 01.07.15
3
4

Sr
No.

Sub-Sector

Rehabilitation (Provincial Disaster


Management Authority)

1508.971

Total Rehabilitation Deptt:-

1508.971

Capital

Revenue

Total

No. of
Schemes

Capital

Revenue

Total

No. of
Schemes

Capital

Revenue

Total

10

11

12

13

14

15

16

Grand
Total
(15+16)
17

151.971

0.000

151.971

368.029

130.000

498.029

520.000

130.000

650.000

0.000

151.971

0.000

151.971

368.029

130.000

498.029

520.000

130.000

650.000

0.000

On-Going

New

Total
FPA

(Rs. In million)
Financial Projection
2016-17

2017-18

18

19

650.000

553.971

305.000

650.000

553.971

305.000

{241}

PROVINCIAL
REHABILITATION DEPARTMENT
(Rs. in Million)
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Status
Target Date
Scheme/
Date of
for
District
Approval Completion
3

Thatta,
Jamshoro

Approved
08.12.14

June-16

Actual
Estimated Expenditure
Cost
upto June,
14
6

Revised
Allocation
2014-15
Total
8

Estimated
ThrowforAllocation for 2015-16
Expenditward as on
ure upto
01-07-15
Capital Revenue Total
F.P.A. June' 15
9
10
11
12
13
14

FPA

15

Financial Progress
in %age upto

Financial
Projection

Jun'15 Jun'16 2016-17


16
17
18

2017-18
19

Provincial Disaster Management


Authority (PDMA)
(Ongoing Schemes)
1568 Provision & Installation of hand
pumps in Kohistan areas

199.971

0.000

48.000

0.000

48.000

151.971

151.971

0.000

151.971

0.000

199.971

0.000

48.000

0.000

48.000

151.971

151.971

0.000

151.971

0.000

June-17

1000.000

0.000

0.000

0.000

0.000

1000.000

300.000

90.000

390.000

0.000

June-16

357.000

0.000

0.000

0.000

0.000

357.000

68.029

40.000

108.029

0.000

Total Rehabilition Department (New Scheme)

1357.000

0.000

0.000

0.000

0.000

1357.000

368.029

130.000

498.029

Total Rehabilition Department :-

1556.971

0.000

48.000

0.000

48.000

1508.971

520.000

130.000

650.000

Total Rehabilitation Department (Ongoing Schemes)

24

100

0.000

0.000

0.000

0.000

39

305.000

305.000

30

248.971

0.000

0.000

553.971

305.000

0.000

553.971

305.000

Provincial Disaster Management


Authority (PDMA)
(New Schemes)
1569 Establishment of Sindh Emergency
Rescue Services (1122) (Phase-I)
1570 Disaster Preparedness &
Management Project

Sindh
Sindh

UnApproved
UnApproved

[ 242 ]

SUMMARY
SERVICES, GENERAL ADMINISTRATION &
COORDINATION DEPARTMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
Sr
No.

Sub-Sector

Buildings

Environment

Others
Total SGA&CD :-

ThrowNo. of
forward as
Schemes
on 01.07.15
3
4

On-Going
Capital

Revenue

Total

No. of
Schemes

24134.011

17

3375.999

5819.064

20.000
29973.075

New

0.000

0.000

0.000

2175.778

0.000

0.000

0.000

0.000

17

3375.999

0.000 3375.999

23

2444.779

3645.000 10244.506 10244.506

840.986 3016.764

0.000

3016.764

2802.300

0.000

5.000

0.000

5.000

7.500

7.500

845.986 6666.764

0.000

Total

11

12

13

14

15

269.001

32

3645.000

840.986 3016.764

2175.778

5.000

0.000

845.986 3290.765

40

5820.778

10

269.001

0.000

Revenue

15

0.000 3645.000

Capital

Revenue

0.000 3375.999

16

Total

No. of
Schemes

Capital

0.000

5.000

(Rs. In million)
Financial Projection

Grand
Total
(15+16)
17

Total

5.000

FPA

2016-17

2017-18

18

19

6666.764 13054.306 10252.006

[ 243 ]

PROVINCIAL
SERVICES, GENERAL ADMINISTRATION & COORDINATION DEPTT:
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

1571
1572
1573

1574

1575

1576

1577

1578

1579

Buildings
(Ongoing Schemes)
Construction of New
Secretariat Complex No. 7
Construction of New
Secretariat Complex No. 8
Sindh Government Officer's
Club at GOR Bath Island
Karachi
Repair/renovation of existing
AS/DS Flats, Bath Island,
Karachi (Phase-II) (Revised)
Renovation & Rehabilitation of
Block No.A, AA & AB
Jacoblines Flats of staff of
Commissioner Karachi
Renovation of Sindh
Secretariat No.I and II Karachi
including renovation /
improvement of Mosque Sindh
Sectt. Building No.1 and
installation of Generator at
Tughlaq House, Sindh Sectt.
No.2, Karachi
Rehabilitation and
reconstruction of residential
area of Commissioner Office
(4, Club Road), Karachi
Improvement of path and allied
work at GOR Bath Island,
Karachi from Bungalow No. 5,
6, 7 & 12 upto Punjab House
and Officer Mess.
Development of Zulfiqarabad

Location
of
Scheme/
District
3

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4
5
6
7

Revised
Estimated
ThrowforAllocation
Expenditward as on
2014-15
ure upto
01-07-15
Total F.P.A. June' 15
8
9
10
11

Karachi

Approved
05.04.12
Approved
05.04.12
Approved
Revised
17.01.14
Approved
13.01.115

June-17

4726.000

60.070

127.987 0.000

188.057

4537.943

498.109

June-17

4703.000

60.952

101.317 0.000

162.269

4540.731

June-16

538.715

186.542

85.000 0.000

271.542

June-16

129.684

68.887

11.296 0.000

Karachi

Approved
14.03.14

June-16

70.940

0.000

Karachi

Approved
14.03.14

June-16

124.727

Karachi

Approved
27.01.15

June-16

Karachi

Approved
07.01.14

Thatta

Approved

Karachi
Karachi

Karachi

FPA

Financial
Progress in %age
upto

Total
14

15

Jun'15 Jun'16
16
17

0.000

498.109

0.000

200.000

0.000

200.000

0.000

267.173

267.173

0.000

267.173

80.183

49.501

49.501

0.000

40.000 0.000

40.000

30.940

30.940

0.000

70.000 0.000

70.000

54.727

67.553

0.000

0.000 0.000

0.000

June-16

20.317

10.158

0.627 0.000

10.785

June-17

13952.720

685.480

65.790 0.000

Allocation for 2015-16


Capital
12

Revenue
13

Financial Projection
2016-17
18

2017-18
19

15

2019.917

2019.917

2170.366

2170.366

0.000

50

100

0.000

0.000

49.501

0.000

62

100

0.000

0.000

0.000

30.940

0.000

56

100

0.000

0.000

54.727

0.000

54.727

0.000

56

100

0.000

0.000

67.553

67.553

0.000

67.553

0.000

100

0.000

0.000

9.532

9.532

0.000

9.532

0.000

53

100

0.000

0.000

751.270 13201.450

1900.000

0.000

1900.000

0.000

19

5650.725

5650.725

[ 244 ]

PROVINCIAL
SERVICES, GENERAL ADMINISTRATION & COORDINATION DEPTT:
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District
3

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4
5
6
7

Revised
Estimated
ThrowforAllocation
Expenditward as on
2014-15
ure upto
01-07-15
Total F.P.A. June' 15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial
Progress in %age
upto

15

Jun'15 Jun'16
16
17

Financial Projection
2016-17
18

2017-18
19

1580 Construction of Office-cumKhairpur / Approved


residences for staff of Enquiries N. Feroze 01.05.10
and Anti-Corruption
Establishment at Khairpur and
Naushahroferoze
1581 Construction of office and
Sindh
Approved
residences of Enquiries and
14.01.10
Anti-Corruption Establishment
at Matiari, Tando Allahyar,
Tando Muhammad Khan,
Ghotki, Kashmore, Kumbar
and Jamshoro

June-16

59.423

42.410

12.250 0.000

54.660

4.763

4.763

0.000

4.763

0.000

92

100

0.000

0.000

June-17

221.575

106.900

23.637 0.000

130.537

91.038

91.038

0.000

91.038

0.000

59

100

0.000

0.000

1582 Construction of New Circuit


House, Khairpur (Revised)

Khairpur

Approved
15.09.14

June-16

124.527

69.413

10.000 0.000

79.413

45.114

45.114

0.000

45.114

0.000

64

100

0.000

0.000

S.B.A

Approved
20.02.14

June-17

59.736

0.000

10.000 0.000

10.000

49.736

49.736

0.000

49.736

0.000

17

100

0.000

0.000

Sukkur

Approved
17.01.14

June-16

15.000

0.000

8.000 0.000

8.000

7.000

7.000

0.000

7.000

0.000

53

100

0.000

0.000

1585 Reconstruction of IVth/Vth


Sukkur Approved
type quarters at Commissioner
17.01.14
House Sukkur
1586 Construction of office Complex Mirpurkhas Approved
at Taluka Shujabad
27.1.2015

June-16

20.000

0.000

10.000 0.000

10.000

10.000

10.000

0.000

10.000

0.000

50

100

0.000

0.000

June-17

78.743

0.000

3.000 0.000

3.000

75.743

75.743

0.000

75.743

0.000

100

0.000

0.000

1587 Construction of Official


Residence for Assistant
Commissioner and
Mukhtiarkar, Taluka K.N.
Shah, Dadu

June-16

15.070

0.000

0.000 0.000

0.000

15.070

15.070

0.000

15.070

0.000

100

0.000

0.000

24927.730

1290.812

578.904 0.000

1869.716 23058.014

3375.999

0.000

3375.999

0.000

9841.008

9841.008

1583 Construction of Circuit House,


Nawabshah
1584 Renovation of Commissioner
House Sukkur

Total Buildings (On-going Schemes)

Dadu

Approved
07.11.14

[ 245 ]

PROVINCIAL
SERVICES, GENERAL ADMINISTRATION & COORDINATION DEPTT:
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

Revised
Estimated
ThrowforAllocation
Expenditward as on
2014-15
ure upto
01-07-15
Total F.P.A. June' 15
8
9
10
11

Location
of
Scheme/
District
3

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4
5
6
7

Karachi

UnApproved

June-17

10.000

0.000

0.000 0.000

0.000

10.000

2.50000

0.000

2.500

0.000

25

3.750

3.750

Karachi

UnApproved

June-15

10.000

0.000

0.000 0.000

0.000

10.000

2.50000

0.000

2.500

0.000

25

3.750

3.750

Karachi

UnApproved

June-17

400.000

0.000

0.000 0.000

0.000

400.000

100.00000

0.000

100.000

0.000

25

150.000

150.000

Karachi

UnApproved

June-17

60.000

0.000

0.000 0.000

0.000

60.000

15.00000

0.000

15.000

0.000

25

22.500

22.500

Karachi

UnApproved

June-17

60.000

0.000

0.000 0.000

0.000

60.000

15.00000

0.000

15.000

0.000

25

22.500

22.500

Karachi

UnApproved
UnApproved
UnApproved

June-17

60.000

0.000

0.000 0.000

0.000

60.000

15.00000

0.000

15.000

0.000

25

22.500

22.500

June-16

25.000

0.000

0.000 0.000

0.000

25.000

6.25000

0.000

6.250

0.000

25

9.375

9.375

June-16

41.438

0.000

0.000 0.000

0.000

41.438

10.35950

0.000

10.360

0.000

25

15.539

15.539

UnApproved
UnApproved

June-17

85.382

0.000

0.000 0.000

0.000

85.382

21.34600

0.000

21.346

0.000

25

32.018

32.018

June-16

27.487

0.000

0.000 0.000

0.000

27.487

6.87200

0.000

6.872

0.000

25

10.308

10.308

UnApproved

June-17

83.000

0.000

0.000 0.000

0.000

83.000

20.75000

0.000

20.750

0.000

25

31.125

31.125

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial
Progress in %age
upto

15

Jun'15 Jun'16
16
17

Financial Projection
2016-17
18

2017-18
19

Buildings (New Schemes)


1588 Construction of Boundary Wall
around defunct Sindh Arid
Zone Development Authority
plot i.e. ST-9, ST-9/1, ST-10
Block-16, Scheme-36, Gulistane-Jauhar Karachi
1589 Renovation of residence of
Chief Justice Sindh High Court
at Bath Island, Karachi
1590 Construction of Residential
Block in GOR - I at Bath
Island, Karachi
1591 Renovation & rehabilitation of
Sindh Secretariat Building
No.3, 5 & 6.
1592 Renovation & rehabilitation of
flats at GOR at Shadman Town
Karachi
1593 Renovation & rehabilitation of
flats at GOR-II, SMCHS
1594 Renovation & rehabilitation of
flats of Humayun House
1595 Renovation & rehabilitation of
Secretaries flats at GOR-I,
Bath Island, Karachi
1596 Construction of Circuit House,
Larkana
1597 Rehabilitation & renovation of
Commissioner Office, Sukkur
1598 Rehabilitation and
reconstruction of Residential
Building in ADC Colony,
Sukkur

Karachi
Karachi

Larkana
Sukkur
Sukkur

[ 246 ]

PROVINCIAL
SERVICES, GENERAL ADMINISTRATION & COORDINATION DEPTT:
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District
3

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4
5
6
7

1599 Strengthening of security of


Hyderabad
UnShahbaz Building by
Approved
construction of watch tower,
guard room, raising of
compound wall and
rehabilitation of block A, B, C,
D, Shahbaz Building
1600 Renovation of Commissioner
Hyderabad
UnHouse, Hyderabad
Approved
1601 Construction of Sindh House at Gawadar
UnGawadar, Balochistan
Approved
1602 Establishment /construction of Tharparker
Uninfrastructure/government
Approved
offices for Taluka Dahli &
Kheme-jo-Par

Revised
Estimated
ThrowforAllocation
Expenditward as on
2014-15
ure upto
01-07-15
Total F.P.A. June' 15
8
9
10
11

Allocation for 2015-16


Capital
12

Revenue
13

Total
14

FPA

Financial
Progress in %age
upto

15

Jun'15 Jun'16
16
17

Financial Projection
2016-17
18

2017-18
19

June-16

40.000

0.000

0.000 0.000

0.000

40.000

10.00000

0.000

10.000

0.000

25

15.000

15.000

June-17

17.327

0.000

0.000 0.000

0.000

17.327

4.33200

0.000

4.332

0.000

25

6.498

6.498

June-17

80.000

0.000

0.000 0.000

0.000

80.000

20.00000

0.000

20.000

0.000

25

30.000

30.000

June-17

76.363

0.000

0.000 0.000

0.000

76.363

19.09100

0.000

19.091

0.000

25

28.636

28.636

1075.997

0.000

0.000 0.000

0.000

1075.997

269.001

0.000

269.001

0.000

403.498

403.498

26003.727

1290.812

578.904 0.000

1869.716 24134.011

3645.000

0.000

3645.000

0.000

1790.000

0.000

0.000 0.000

1297.947

492.053

1790.000

0.000

Total Buildings (New Schemes)


Total Buildings

10244.506 10244.506

ENVIRONMENT
(New Schemes)
1603 Establishment of Six Garbage
Transfer Stations with Material
Recovery (MR) and Refused
Derived Fuel (RDF) facility in
Karachi.
(C:1297.947+R:492.053)

Karachi

UnApproved

June 16

0.000

1790.000

100

0.000

0.000

[ 247 ]

PROVINCIAL
SERVICES, GENERAL ADMINISTRATION & COORDINATION DEPTT:
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District
3

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4
5
6
7

Revised
Estimated
ThrowforAllocation
Expenditward as on
2014-15
ure upto
01-07-15
Total F.P.A. June' 15
8
9
10
11

FPA

Financial
Progress in %age
upto

Total
14

15

Jun'15 Jun'16
16
17

Allocation for 2015-16


Capital
12

Revenue
13

Financial Projection
2016-17
18

2017-18
19

1604 Integrated solid waste


Management Project
Nawabshah Municipal
Committee, Shaheed
Benazirabad District. (Phase I)
(Front end Collection System
and two Garbage Transfer
Stations).
Total Cost
= 446.664 M
N.M.C Share = 154.000 M
ADP Share = 292.664 M
(C:97.581+R:195.083)

S.B.A

UnApproved

June 16

292.664

0.000

0.000 0.000

0.000

292.664

97.581

195.083

292.664

0.000

100

0.000

0.000

1605 Development of New Sanitary


Engineered Landfill Site in
Karachi. (C:840+R:210)
1606 Development of Sanitary
Engineered existing 02 Landfill
Sites & their Scientific
improvement. (C:880+R:220)

Karachi

UnApproved

June 16

1050.000

0.000

0.000 0.000

0.000

1050.000

223.00000

39.500

262.500

0.000

25

787.500

0.000

Karachi

UnApproved

June 16

1100.000

0.000

0.000 0.000

0.000

1100.000

233.75000

41.250

275.000

0.000

25

825.000

0.000

S.B.A

UnApproved

June 16

400.000

0.000

0.000 0.000

0.000

400.000

75.00000

25.000

100.000

0.000

25

300.000

0.000

Larkana

UnApproved

June 16

696.400

0.000

0.000 0.000

0.000

696.400

144.50000

29.600

174.100

0.000

25

522.300

0.000

1607 Integrated Municipal Solid


Waste Management Project
Nawabshah Municipal
Committee (Phase-II) LFS
+MRF. (C:320+R:80)
1608 Integrated Municipal Solid
Waste Management Project
Municipal Corporation,
Larkana (Phase-I).
Total Cost
= 850.000 M
L.M.C Share = 132.000 M
NSUSC Share = 21.600 M
ADP Share
= 696.400 M
(C:545+R:151.4)

[ 248 ]

PROVINCIAL
SERVICES, GENERAL ADMINISTRATION & COORDINATION DEPTT:
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

1609 Integrated Municipal Solid


Waste Management Project
Municipal Corporation,
Larkana (Phase-II) LFS +
MRF. (C:395+R:95)
Total Environment

Location
of
Scheme/
District
3

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4
5
6
7

Larkana

UnApproved

June 16

Revised
Estimated
ThrowforAllocation
Expenditward as on
2014-15
ure upto
01-07-15
Total F.P.A. June' 15
8
9
10
11

FPA

Financial
Progress in %age
upto

Total
14

15

Jun'15 Jun'16
16
17

Allocation for 2015-16


Capital
12

Revenue
13

490.000

0.000

0.000 0.000

0.000

490.000

104.00000

18.500

122.500

0.000

5819.064

0.000

0.000 0.000

0.000

5819.064

2175.778

840.986

3016.764

0.000

20.000

0.000

0.000 0.000

0.000

20.000

0.000

5.000

5.000

0.000

0.000
20.000
1869.716 23058.014
0.000 6915.061
1869.716 29973.075

0.000
3375.999
2444.779
5820.778

5.000
0.000
845.986
845.986

5.000
3375.999
3290.765
6666.764

0.000
0.000
0.000
0.000

25

Financial Projection
2016-17
18

2017-18
19

367.500

0.000

2802.300

0.000

7.500

7.500

Others
(New Schemes)
1610 Implementation of Capacity
Building (Phase-II)
Total Others
TOTAL SGA&CD (ON-GOING)
TOTAL SGA&CD (NEW)
TOTAL SGA&CD

Karachi

Unapproved

June-16

20.000
24927.730
6915.061
31842.791

0.000
0.000 0.000
1290.812 578.904 0.000
0.000
0.000 0.000
1290.812 578.904 0.000

25

7.500
7.500
9841.008 9841.008
3213.298
410.998
13054.306 10252.006

[ 249 ]

SUMMARY
SINDH BOARD OF INVESTMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
(Rs. In million)
Sr
No.

Sub-Sector

ThrowNo. of
forward as
Schemes
on 01.07.15
3
4

On-Going

New

No. of
Schemes Capital Revenue

Capital

Revenue

Total

Total

Total

No. of
Schemes

Capital

Revenue

Total

10

11

12

13

14

15

16

FPA

Sindh Board of Investment

1185.587

0.000

260.000

260.000

0.000

0.000

0.000

0.000

260.000

260.000

0.000

Total Sindh Board of Investment

1185.587

0.000

260.000

260.000

0.000

0.000

0.000

0.000

260.000

260.000

0.000

Grand Financial Projection


Total
(15+16) 2016-17 2017-18
17
18
19
260.000 925.587
260.000

925.587

0.000
0.000

[ 250 ]

PROVINCIAL
SINDH BOARD OF INVESTMENT
( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Revised
Actual
Estimated
Status Target Date
ThrowforAllocation for 2015-16
Estimated Expendit Allocation 14- ExpenditDate of
for
war as on
15
Cost
ure upto
ure upto
Approval Completion
01-07-15
Jun, 14
Capital Revenue
Total
Total FPA June' 15

1611 Investment Promotion in Sindh


(Revised)

Sindh

Approved
17.1.14

June-16

173.150

85.654

1612 Marketing of Sindh for attracting


Investment (Revised)

Sindh

Approved
17.1.14

June-17

248.000

1613 Marble City (Revised)

Karachi

Approved
08.11.12

June-16

140.000

1614 Khairpur Special Economic Zone (ReRevised)

Khairpur

Approved
08.04.15

June-16

1987.013

1615 Modernization / Rehabilitation and


Establishment of Agro Based
Industrial Units in Rural Areas of
Sindh ( Agro Cluster Development
Programme) for Small and Medium
Enterprises

Sindh

Approved
30-09-08

June-16

18.500

5.860

1616 Entrepreneurship Development


Programme.
Total Sindh Board of Investment :-

Sindh

Approved
30-03-12

June-16

50.000

36.255

FPA

Financial Progress
in %age upto

Financial
Projection

Jun'15 Jun'16 2016-17


18

2017-18

10

11

12

13

14

15

16

17

19

4.184 0.000

89.838

83.312

0.000

14.000

14.000

0.000

52

60

69.312

0.000

60.079

3.195 0.000

63.274

184.726

0.000

14.000

14.000

0.000

26

31

170.726

0.000

58.044

18.161 0.000

76.205

63.795

0.000

15.796

15.796

0.000

54

66

47.999

0.000

926.801 232.843 0.000

1159.644

827.369

0.000

200.000

200.000

0.000

58

68

627.369

0.000

0.000 0.000

5.860

12.640

0.000

2.459

2.459

0.000

32

45

10.181

0.000

0.000 0.000

36.255

13.745

0.000

13.745

13.745

0.000

73

100

0.000

0.000

2616.663 1172.693 258.383 0.000

1431.076

1185.587

0.000

260.000

260.000

0.000

925.587

0.000

SINDH BOARD OF INVESTMENT


On-going Scheme

[ 251 ]

SUMMARY
SOCIAL WELFARE DEPARTMENT
ANNUAL DEVELOPMENT PROGRAME 2015-16
(Rs. In million)
Sr
No.

Sub-Sector

ThrowNo. of
forward as
Schemes
on 01.07.15

On-Going

No. of
Schemes

New

No. of
Schemes

FPA

Grand
Total
(15+16)

Total

Financial Projection

Capital

Revenue

Total

Capital

Revenue

Total

Capital

Revenue

Total

2016-17

2017-18

10

11

12

13

14

15

16

17

18

19

Social Welfare

607.393

37.643

122.357

160.000

32.500

7.500

40.000

70.143

129.857

200.000

0.000

200.000

381.143

26.250

Total Social Welfare Department

607.393

37.643

122.357

160.000

32.500

7.500

40.000

70.143

129.857

200.000

0.000

200.000

381.143

26.250

[ 252 ]

PROVINCIAL
SOCIAL WELFARE DEPARTMENT
( Rs. in million )
Actual
Status
Target
Estimated Expenditu
Date of
Date for
Cost
re upto
Approval Completion
June, 14

Revised
Allocation
2014-15

Estimated
ThrowforAllocation for 2015-16
Expenditward as on
ure upto
01-07-15
Capital Revenue Total
F.P.A. June' 15
9
10
11
12
13
14

Financial
Projection

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

1617 Capacity Building of Officers /


Officials of Social Welfare
Department, Government of Sindh

Sindh

Approved
20.02.13

June-15

7.500

0.652

2.500

0.000

3.152

4.348

0.000

4.348

4.348

0.000

42

100

0.000

0.000

1618 Establishment & Strengthening of


Darul Atfal & Rehabilitation of
Street Children Through Civil
Society Organization Karachi
(C:106.153+R:218.387)
1619 Establishemnt of Darul Aman at
Mirpurkhas & Jacobabad
(C:69.940 + R:19.104)

Karachi

Approved
28-01.10

June-16

314.540

79.665

13.845

0.000

93.510

221.030

12.643

40.904

53.547

0.000

30

47

167.483

0.000

Mirpurkhas, Approved
Jacobabad 05.05.11

June-15

89.044

42.652

27.288

0.000

69.940

19.104

0.000

19.104

19.104

0.000

79

100

0.000

0.000

1620 Establishment of Community


Karachi, Approved
Development Center for She Male Hyderabad, 05.05.11
Person 03 Units in Sindh.
Sukkur
1621 Strengthening / up-gradation of
Sindh
Approved
existing rehablitation center for
15.09.14
phycially Handicapped persons &
rehablitation center for multiple
handicapped children through out
sindh. (RCPH 05 - Karachi,
Hyderabad, Mirpurkhas,
Khairpur, Sukkur) RCMHC 12
(West, Central, South, Malir,
Thatta, Badin, Dadu, SBA,
Sanghar, Shikarpur, Larkana,
Jacobabad) (Revised) (C:130.994 +
R:68.916)

June-15

73.748

23.174

7.573

0.000

30.747

43.001

0.000

43.001

43.001

0.000

42

100

0.000

0.000

June-17

199.910

0.000

0.000

0.000

0.000

199.910

25.000

15.000

40.000

0.000

20

159.910

0.000

684.742

146.143

51.206

0.000

197.349

487.393

37.643

122.357

160.000

0.000

327.393

0.000

Total
8

FPA

15

Financial Progress
in %age upto

Jun'15 Jun'16 2016-17 2017-18


16
17
18
19

Social Welfare
(On-Going Schemes)

Sub Total Social Welfare (Ongoing)

{252}

[ 253 ]

PROVINCIAL
SOCIAL WELFARE DEPARTMENT
( Rs. in million )
Actual
Status
Target
Estimated Expenditu
Date of
Date for
Cost
re upto
Approval Completion
June, 14

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Karachi

UnApproved

Karachi

UnApproved

Revised
Allocation
2014-15
Total
8

Estimated
ThrowforAllocation for 2015-16
Expenditward as on
ure upto
01-07-15
Capital Revenue Total
F.P.A. June' 15
9
10
11
12
13
14

FPA

15

Financial Progress
in %age upto

Financial
Projection

Jun'15 Jun'16 2016-17 2017-18


16
17
18
19

June-18

70.000

0.000

0.000

0.000

0.000

70.000

17.500

0.000

17.500

0.000

25

26.250

26.250

June-17

50.000

0.000

0.000

0.000

0.000

50.000

15.000

7.500

22.500

0.000

45

27.500

0.000

120.000
804.742

0.000
146.143

0.000
51.206

0.000
0.000

0.000
197.349

120.000
607.393

32.500
70.143

7.500
129.857

40.000
200.000

0.000
0.000

53.750
381.143

26.250
26.250

Social Welfare
(New Scheme)
1622 Establishment of Rehabilitation
Centre for Senior Citizens at
Karachi.
1623 Strenthening and up-gradation of
Social Welfare Training Institute,
Karachi.
Sub Total Social Welfare (New)
Total Social Welfare Department:-

{253}

[ 254 ]

SUMMARY
SPECIAL EDUCATION DEPARTMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
(Rs. In million)
Sr
No.

Sub-Sector

ThrowNo. of
forward as
Schemes
on 01.07.15

On-Going

Capital
5

Revenue
6

Total
7

Special Education

800.000

0.000

0.000

Total Special Education Deptt:-

800.000

0.000

0.000

No. of
Schemes

New

Capital Revenue
9
10

0.000

170.000

30.000

0.000

170.000

30.000

Total
11

No. of
Schemes

Total

FPA

Grand
Total
(15+16)

Financial Projection

12

Capital
13

Revenue
14

Total
15

16

17

2016-17
18

2017-18
19

200.000

170.000

30.000

200.000

0.000

200.000

300.000

300.000

200.000

170.000

30.000

200.000

0.000

200.000

300.000

300.000

[ 255 ]

PROVINCIAL
SPECIAL EDUCATION DEPARTMENT
(Rs. in Million)
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Actual
Status
Target Date
Estimated ExpendiDate of
for
Cost
ture upto
Approval Completion
June, 14
6

Revised
Estimated
ThrowforAllocation for 2015-16
Allocation
Expenditward
as on
2014-15
ure upto
01-07-15
Capital Revenue Total
Total F.P.A. June' 15

10

11

12

Sindh

UnApproved

June-18

280.000

0.000

0.000 0.000

0.000

280.000

60.000

Mirpurkhas,
UnLarkana,
Approved
Hyderabad

June-18

280.000

0.000

0.000 0.000

0.000

280.000

June-18

240.000

0.000

0.000 0.000

0.000

800.000

0.000

0.000 0.000

0.000

13

FPA

Financial Progress
in %age upto

Financial
Projection

Jun'15 Jun'16 2016-17 2017-18

14

15

16

17

18

19

10.000

70.000

0.000

25

105.000

105.000

60.000

10.000

70.000

0.000

25

105.000

105.000

240.000

50.000

10.000

60.000

0.000

25

90.000

90.000

800.000

170.000

30.000

200.000

0.000

300.000

300.000

Special Education
(New Schemes)
1624 Repair & Renovation of Existing 43
Special Education Institutes of Sindh
Excluding Centers of Excellence
1625 Establishment of Schools for Special
Children at Mirpurkhas, Larkana &
Hyderabad, Divisional Headquarters
(3 Nos.)
1626 Establishment of Taluka Level Special
Education Centers & Campaigning
Programme throughout Sindh

Total Special Education Deptt:-

Sindh

UnApproved

[ 256 ]

SUMMARY
SPECIAL INITIATIVE DEPARTMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
(Rs. In million)
Sr
No.

Sub-Sector

ThrowNo. of
forward as
Schemes
on 01.07.15

On-Going
Capital

Revenue

Total

No. of
Schemes

New
Capital

Revenue

Total

Total

No. of
Schemes

Capital

Revenue

Total

FPA

Grand
Total
(15+16)

Financial Projection
2016-17

2017-18

18

19

10

11

12

13

14

15

16

17

Special Initiative

8573.614

3294.669

395.331

3690.000

725.000

125.000

850.000

11

4019.669

520.331

4540.000

0.000

4540.000

2136.561 1252.000

Total Special Initiatives


Department:-

8573.614

3294.669

395.331

3690.000

725.000

125.000

850.000

11

4019.669

520.331

4540.000

0.000

4540.000

2136.561 1252.000

[ 257 ]

PROVINCIAL
SPECIAL INITIATIVES DEPARTMENT
(Rs. in Million)
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Actual
Status
Target
Estimated Expenditur
Date of
Date for
Cost
e upto June,
Approval Completion
14
4
5
6
7

Revised
Estimated
ThrowforAllocation for 2015-16
Allocation
Expenditward as on
2014-15
ure upto
01-07-15
Capital Revenue
Total
Total F.P.A. June' 15
8
9
10
11
12
13
14

FPA
15

Financial Progress
in %age upto

Financial
Projection

Jun'15 Jun'16 2016-17 2017-18


16
17
18
19

Special Initiatives
(On-Going Schemes)
1627 Establishment of Drinking Water Hubs
Sindh
Approved
(Phase-II) for 750 Units
27-04-12
(C.3823.768+R.176.232)
1628 Establishment of Drinking Water Hubs Tharparkar Approved
(Phase-III) for 750 Units
26-03-14
(C.5051.96+R.202.04)
1629 Solar Power Generation for Water
Sindh
Approved
Filtration Plants- Drinking Water
27.06.14
Hubs Projects (Phase-I & II) (Revised)
(C.2080+R.55)
1630 Pilot Project for 6 Bedded Mobile
Sindh
Approved
24.02.15
Emergency Health Care Units
(MEHCU) (Revised)
1631 Clean Drinking Water for all (O&M
Sindh
Approved
Component) by Government of Sindh
05.01.08

June-15

4000.000

June-17

1632 Provincial Project Implementation Unit


(Clean drinking Water for all) Project
1633 Allocation for various development
schemes for District Thatta and
Sujawal
1634 New Drainage System for Thatta City

3341.650

500.000

0.000

3841.650

158.350

158.350

0.000

158.350

0.000

96

100

0.000

0.000

5254.000

0.000 4040.000

0.000

4040.000

1214.000 1000.000

0.000

1000.000

0.000

77

96

107.000

107.000

June-15

2135.000

0.000 1560.000

0.000

1560.000

575.000

575.000

0.000

575.000

0.000

73

100

0.000

0.000

June-16

1537.000

0.000 1150.000

0.000

1150.000

387.000

0.000

387.000

387.000

0.000

75

100

0.000

0.000

June-15

971.540

276.487

0.000

0.000

276.487

695.053

12.000

0.000

12.000

0.000

28

30

18.000

20.000

22.283

0.000

0.000

22.283

14.331

0.000

8.331

8.331

0.000

61

84

6.000

0.000

Sindh

Approved
10.05.06

June-15

36.614

Thatta,
Sujawal

Approved
25.04.14

June-16

1500.000

0.000

550.000

0.000

550.000

950.000

950.000

0.000

950.000

0.000

37

100

0.000

0.000

Thatta

Approved
22.11.12
Approved
22.04.15

June-16

192.000

0.000

10.000

0.000

10.000

182.000

99.319

0.000

99.319

0.000

57

82.681

0.000

June-17

997.880

0.000

0.000

0.000

0.000

997.880

500.000

0.000

500.000

0.000

50

497.880

0.000

0.000 11450.420

5173.614 3294.669

395.331

3690.000

0.000

711.561

127.000

1635 Establishment of IBA Campus Thatta


Thatta
(C.773.37+R.224.51)
Total Special Initiative (On-going Schemes)

16624.034

3640.420 7810.000

Special Initiative
(New Schemes)
1636 Establishment of Drinking Water Hubs
(Phase-IV) for 500 Units
1637 Establishment of Project Management
Unit (PMU) for Drinking Water Hubs
Projects
Total Special Initiative (New Schemes)
TOTAL Special Initiatives Deptt:-

Sindh
Sindh

UnApproved
UnApproved

June-17

3000.000

0.000

0.000

0.000

0.000

3000.000

725.000

25.000

750.000

0.000

25

Jun-17

400.000

0.000

0.000

0.000

0.000

400.000

0.000

100.000

100.000

0.000

25

3400.000 725.000
8573.614 4019.669

125.000
520.331

850.000
4540.000

0.000
0.000

3400.000
20024.034

0.000
0.000
3640.420 7810.000

0.000
0.000
0.000 11450.420

1125.000 1125.000
300.000

0.000

1425.000 1125.000
2136.561 1252.000

[ 258 ]

SUMMARY
SPORTS & YOUTH AFFAIRS DEPARTMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
(Rs. In million)
Sr
No.

Sub-Sector

Sports

Youth Affairs
Total Sports & Youth Affairs
Deptt:

ThrowNo. of
forward as
Schemes
on 01.07.15

On-Going
Capital

Revenue

Total

New
No. of
Schemes Capital Revenue

Total

Total

No. of
Schemes

Capital

Revenue

Total

FPA

Grand
Total
(15+16)

Financial Projection
2016-17

2017-18

18

19

10

11

12

13

14

15

16

17

3761.534

25

646.654

24.363

671.017

10

145.000

10.000

155.000

35

791.654

34.363

826.017

0.000

826.017

1467.759 1235.259

694.57

13

73.431

55.552

128.983

10.000

35.000

45.000

19

83.431

90.552

173.983

0.000

173.983

260.294

4456.104

38

720.085

79.915

800.000

16

155.000

45.000

200.000

54

875.085

124.915

1000.000

0.000

1000.000 1728.052 1495.552

260.294

[ 259 ]

PROVINCIAL
SPORTS & YOUTH AFFAIRS DEPARTMENT

( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Actual
Location of Status
Target
Estimated ExpenditScheme/
Date of
Date for
Cost
ure upto
District
Approval Completion
June, 14
6

Revised
Allocation
2014-15
Total
8

Estimated ThrowExpendit- forward


ure upto
as on
F.P.A. June' 15 01-07-15
9
10
11

Allocation for 2015-16


Capital Revenue
12
13

Total
14

FPA

15

Financial
Progress in
%age upto

Financial
Projection

Jun'15 Jun'16 2016-17 2017-18


16
17
18
19

1638 Construction of Sports Stadium in


Sindh (8 Nos) (Part-I). (Matiari,
Jamshoro, Hyderabad, Tharparkar,
Sanghar, Shikarpur, Jacobabad &
Tando Allahyar)(C:225.704)

Sindh

Approve
d
28.03.06
(U/R)

June-18

225.704

208.410

0.000 0.000

208.410

17.294

5.000

0.000

5.000

0.000

92

95

6.147

6.147

1639 Construction of Mini Sports Complex


at Kunri (Revised) (C:72.490)

Umerkot

Approve
d
12.02.07
Hyderabad Approve
d
15.10.08

June-16

72.490

39.831

0.000 0.000

39.831

32.659

5.268

0.000

5.268

0.000

55

62

13.696

13.696

June-16

158.504

111.870

0.000 0.000

111.870

46.634

20.000

0.000

20.000

0.000

71

83

13.317

13.317

Sports
(On-Going Schemes)

1640 Consolidation / Improvement and


Additional Facilities at Sindh Sports
Board Complex, Hyderabad
(C:158.504)
1641 Construction of Sports Stadium
covering remaining Districts in Sindh
(8 units) (N'Feroze, Khairpur,
Ghotki, Kamber, Kashmore, Dadu,
T.M. Khan and Matiari)(C:519.400)

Sindh

Approve
d
07.02.09

June-18

519.400

167.714

25.750 0.000

193.464

325.936

20.000

0.000

20.000

0.000

37

41

152.968

152.968

1642 Construction of Atheletic Track and


Football Ground at Karachi, Sukkur
and Larkana (C:558.130+R:21.744)

Karachi
Sukkur
Larkana

Approve
d
26.03.09

June-17

579.874

233.925

30.750 0.000

264.675

315.199

25.660

0.000

25.660

0.000

46

50

144.770

144.770

1643 Promotion of Popular Traditional


Sports in Sindh. (Karachi, Larkana,
Khairpur, Sanghar, Jamshoro, Dadu,
Jacobabad, Benazirabad, Sukkur,
Mirpurkhas, Thatta)(C:100.100)

Sindh

Approve
d
21.05.09

June-17

100.100

53.000

14.769 0.000

67.769

32.331

0.000

20.000

20.000

0.000

68

88

6.165

6.165

1644 Construction of Sindh Sports


Complex Nazimabad
(C:42.015+R:7.983)

Karachi

Approve
d
23.01.10

June-16

49.998

45.635

0.000 0.000

45.635

4.363

0.000

4.363

4.363

0.000

91

100

0.000

0.000

1645 Construction of Cricket Stadium at


Mehrabpur (C:36.037+R:1.205)

N.Feroze

June-16

37.242

19.206

0.000 0.000

19.206

18.036

9.000

0.000

9.000

0.000

52

76

4.518

4.518

1646 Construction of Sports Stadium at


Landhi Industrial Area, Landhi Town
(C:59.880)

Karachi

Approve
d
27.03.10
Approve
d
24.09.11

June-17

59.880

25.710

6.590 0.000

32.300

27.580

27.580

0.000

27.580

0.000

54

100

0.000

0.000

[ 260 ]

PROVINCIAL
SPORTS & YOUTH AFFAIRS DEPARTMENT

( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Actual
Location of Status
Target
Estimated ExpenditScheme/
Date of
Date for
Cost
ure upto
District
Approval Completion
June, 14

Total
8

Allocation for 2015-16


Capital Revenue
12
13

Total
14

FPA

Financial
Projection

Jun'15 Jun'16 2016-17 2017-18


16
17
18
19

1647 Installation of Astroturf at Khalid


Bin Waleed Hockey Ground, PECHS
(C:57.730+R:2.185)
1648 Construction of Sports Stadium at
Karachi (5 Units) Gulberg, New
Karachi, Landhi, Orangi and Baldia
Towns(Revised) (C:832.366+R:30.263)

Karachi

Approve
d
24.09.11
Approve
d
19.10.12

June-17

59.915

26.800

0.000 0.000

26.800

33.115

2.000

0.000

2.000

0.000

45

48

15.558

15.558

June-18

862.629

485.707

25.000 0.000

510.707

351.922

2.000

0.000

2.000

0.000

59

59

174.961

174.961

1649 Construction of Sports Complex at


Sukkur (C:1755.000)

Sukkur

June-18

1755.000

160.000

99.286 0.000

259.286 1445.000 200.000

0.000

200.000

0.000

15

26

622.500

622.500

Dadu

Approve
d
19.11.09
Approve

June-17

59.637

22.000

0.000 0.000

22.000

37.637

2.000

0.000

2.000

0.000

37

40

17.819

17.819

Karachi

d
21.02.12
Approve

June-16

57.117

0.000

24.997 0.000

24.997

32.120

32.120

0.000

32.120

0.000

44

100

0.000

0.000

1652 Construction of Sports Gymnasium at Hyderabad Approve


Polytechnic Institute (STEVTA)
d
(C:37.742)
16.01.13

June-16

37.742

0.000

5.000 0.000

5.000

32.742

32.742

0.000

32.742

0.000

13

100

0.000

0.000

1653 Development of Shadab Sports


Ground Orangi Town
(C:57.886+R:2.016)

1651 Laying of Blue Hockey Turf at


Hockey Club of Pakistan Ground,
Karachi (C:57.117)

1654 Construction of Grassy Cricket


Ground at Thari Mirwah (C:20.792)

d
16.01.13

Karachi

Approve
d
16.01.13

June-17

59.902

0.000

5.000 0.000

5.000

54.902

5.000

0.000

5.000

0.000

17

24.951

24.951

Khairpur

Approve
d
26.08.13
Approve
d
26.08.13

June-16

20.792

0.000

5.000 0.000

5.000

15.792

15.792

0.000

15.792

0.000

24

100

0.000

0.000

June-17

41.522

0.000

2.500 0.000

2.500

39.022

30.000

0.000

30.000

0.000

78

4.511

4.511

Approve
d
26.08.13
Approve
d
26.08.13

June-17

42.211

0.000

2.500 0.000

2.500

39.711

25.000

0.000

25.000

0.000

65

7.356

7.356

June-16

59.999

0.000

5.000 0.000

5.000

54.999

54.999

0.000

54.999

0.000

100

0.000

0.000

Approve
d
26.08.13

June-16

59.999

5.000

32.016 0.000

37.016

22.983

15.000

0.000

15.000

0.000

62

87

3.992

3.992

1655 Construction of Grassy Cricket


Ground at village Tharo Khan Mengal
U/C 5 Gadap Town
(C:39.404+R:2.117)

Karachi

1656 Construction of Sports Club, Umer


Muhallah Faqeer Colony Orangi
Town (C:42.211)
1657 Construction of Football Ground and
Sports Gymnasium Indoor Hall
(C:59.999)

Karachi

1658 Construction of Players Hostel (Boys


& Girls) and Fitness Gym at Railway
Ground (C:59.999)

15

Financial
Progress in
%age upto

1650 Construction of Malakhara Stadium


at Sehwan Sharif (C:59.637)

Estimated ThrowExpendit- forward


ure upto
as on
F.P.A. June' 15 01-07-15
9
10
11

Karachi

Revised
Allocation
2014-15

T. A. Yar

Sukkur

[ 261 ]

PROVINCIAL
SPORTS & YOUTH AFFAIRS DEPARTMENT

( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Actual
Location of Status
Target
Estimated ExpenditScheme/
Date of
Date for
Cost
ure upto
District
Approval Completion
June, 14
3

1659 Supply & Installation of Flood Lights


including Generator at Annu Bhai
Cricket Ground Nazimabad No.4,
Liaquatabad Zone, DMC Central
(C:47.243)

Karachi

Approve
d
26.08.13

1660 Rehabilitation and Installation of


Flood Lights at Malir Football
Stadium, Saudabad (C:50.564)

Karachi

1661 Construction of Academy Players


Hostel & Allied Facilities at NNG
Ground at Block-H, North Nazimabad
(C:60.000)

Karachi

1662 Laying of Synthetic Hockey Turf at


Shaheed Zulfiqar Ali Bhutto Sports
Complex (Revised) (C:87.926)

Total
8

Estimated ThrowExpendit- forward


ure upto
as on
F.P.A. June' 15 01-07-15
9
10
11

Allocation for 2015-16


Capital Revenue
12
13

Total
14

FPA

Financial
Projection

Jun'15 Jun'16 2016-17 2017-18


16
17
18
19

June-16

47.243

0.000

4.000 0.000

4.000

43.243

43.243

0.000

43.243

0.000

100

0.000

0.000

Approve
d
26.08.13

June-16

50.564

0.000

5.000 0.000

5.000

45.564

30.000

0.000

30.000

0.000

10

69

7.782

7.782

Approve
d
19.12.13

June-17

60.000

0.000

5.000 0.000

5.000

55.000

26.500

0.000

26.500

0.000

53

14.250

14.250

Mirpurkhas Approve
d
03.03.14

June-16

87.926

70.176

0.000 0.000

70.176

17.750

17.750

0.000

17.750

0.000

80

100

0.000

0.000

5165.390

1674.984

298.158 0.000

1973.142 3141.534 646.654

24.363

671.017

0.000

1235.259 1235.259

UnApprove
d
UnApprove
d

June-18

80.000

0.000

0.000 0.000

0.000

80.000

20.000

0.000

20.000

0.000

25

30.000

30.000

June-18

60.000

0.000

0.000 0.000

0.000

60.000

15.000

0.000

15.000

0.000

25

22.500

22.500

1665 Construction of Boundry Wall and


Mirpurkhas
UnInstallation of Flood Lights for
Approve
Synthetic Hockey Ground at Shaheed
d
Z.A Bhutto Sports Complex
1666 Mirpurkhas(CMD)
Construction of Jahangir Memorial
Karachi
UnFootball Ground (Taj Mohammad
Approve
Ground) ST-5, Block-K, North
d
Nazimabad, Karachi.
1667 Upgradation of Pakistan Railway
Karachi
UnStadium I.I Chundrigar Road
Approve
d

June-18

60.000

0.000

0.000 0.000

0.000

60.000

15.000

0.000

15.000

0.000

25

22.500

22.500

June-18

40.000

0.000

0.000 0.000

0.000

40.000

10.000

0.000

10.000

0.000

25

15.000

15.000

June-18

40.000

0.000

0.000 0.000

0.000

40.000

10.000

0.000

10.000

0.000

25

15.000

15.000

1664 Multipurpose Ground Pavilion and


Allied Facilities at Garhi Khairo
District Jacobabad

S.B.A

15

Financial
Progress in
%age upto

Total Sports (On-Going Schemes)


Sports
(New Schemes)
1663 Laying of Synthetic Hockey Turf at
Nawabshah

Revised
Allocation
2014-15

Jacobabad

[ 262 ]

PROVINCIAL
SPORTS & YOUTH AFFAIRS DEPARTMENT

( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Actual
Location of Status
Target
Estimated ExpenditScheme/
Date of
Date for
Cost
ure upto
District
Approval Completion
June, 14
3

1668 laying of Old Hockey Turf at KCCA


Ground NIPA

Karachi

1669 Laying of Synthetic Hockey Turf at


Luqman Hockey Ground

Khairpur

UnApprove
d
UnApprove
d
UnApprove
d
UnApprove
d
Un-

1670 Laying of Synthetic Hockey Turf


Dadu

Dadu

1671 Construction of Sports Ground


Multipurpose hall at Mehar Town

Dadu

1672 Traing of Coaches of Different Games


in Sindh

Sindh

Total Sports (New Schemes)


Total Sports :-

Revised
Allocation
2014-15
Total
8

Estimated ThrowExpendit- forward


ure upto
as on
F.P.A. June' 15 01-07-15
9
10
11

Allocation for 2015-16


Capital Revenue
12
13

Total
14

FPA

Financial
Projection

Jun'15 Jun'16 2016-17 2017-18


16
17
18
19

June-18

40.000

0.000

0.000 0.000

0.000

40.000

10.000

0.000

10.000

0.000

25

15.000

15.000

June-18

100.000

0.000

0.000 0.000

0.000

100.000

25.000

0.000

25.000

0.000

25

37.500

37.500

June-18

100.000

0.000

0.000 0.000

0.000

100.000

25.000

0.000

25.000

0.000

25

37.500

37.500

June-18

60.000

0.000

0.000 0.000

0.000

60.000

15.000

0.000

15.000

0.000

25

22.500

22.500

June-18

40.000

0.000

0.000 0.000

0.000

40.000

0.000

10.000

10.000

0.000

25

15.000

15.000

620.000
5785.390

0.000
1674.984

0.000 0.000
298.158 0.000

0.000 620.000 145.000


1973.142 3761.534 791.654

10.000
34.363

155.000
826.017

0.000
0.000

Approve
d

15

Financial
Progress in
%age upto

232.500 232.500
1467.759 1235.259

Youth Affairs
(On going Schemes)
1673 Construction of Regional Youth
Development Centres in Sindh
(5 Units) (C:268.111+R:60.600)

June-17

328.711

189.000

53.430 0.000

242.430

86.281

20.000

0.000

20.000

0.000

74

80

33.141

33.141

1674

June-16

59.980

28.000

13.719 0.000

41.719

18.261

0.000

10.000

10.000

0.000

70

86

4.131

4.131

June-16

374.791

175.000

17.734 0.000

192.734

182.057

22.760

0.000

22.760

0.000

51

57

79.649

79.649

June-16

25.000

16.545

3.250 0.000

19.795

5.205

0.000

5.205

5.205

0.000

79

100

0.000

0.000

June-16

25.131

10.976

2.339 0.000

13.315

11.816

0.000

5.000

5.000

0.000

53

73

3.408

3.408

June-16

59.500

28.500

15.729 0.000

44.229

15.271

15.271

0.000

15.271

0.000

74

100

0.000

0.000

1675

1676
1677

1678

Hyderabad, Approve
Larkana,
d
Mirpurkhas, 24.12.09
Khairpur,
S.B.A
Youth Empowerment Space (YES)
Sindh
Approve
(C:10.765+R:49.215)
d
22.09.10
Construction of Youth Development
Karachi
Approve
Centre at ST-42, Block-14, Gulistan-ed
Johar, Karachi
09.08.12
Youth Skill Competetion Programme
Sindh
Approve
(All Districts) (R:25.000)
d 24.9.11
Youth Health Awareness Programme
Sindh
Approve
(C:25.131)
d
19.08.11
Establishment of Skills Training
Karachi
Approve
Centre for Disabled Youth
d
(C:41.999+R:17.501)
04.05.12

[ 263 ]

PROVINCIAL
SPORTS & YOUTH AFFAIRS DEPARTMENT

( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Actual
Location of Status
Target
Estimated ExpenditScheme/
Date of
Date for
Cost
ure upto
District
Approval Completion
June, 14

1681 Youth to Youth Program (R:25.000)

1682 Inspiring Pakistani Youth to Reach


Excellence through Counseling and
Training in Sindh (Phase-II)
(R:59.839)
1683 Leadership Empowerment and
Development (LEAD) for Youth
Collective Sharing Togetherness
(Phase-II)(C:4.012+R:55.887)
1684 Youth Promotion and Development
Through Private Sector (R:52.156)
1685 Construction of Youth Hostel at
Jacobababad (C:57.469)

Capital Revenue
12
13

Total
14

FPA

15

Financial
Projection

Jun'15 Jun'16 2016-17 2017-18


16
17
18
19

Karachi

Approve
d
29.03.12

June-16

23.322

11.420

4.662 0.000

16.082

7.240

5.400

1.840

7.240

0.000

69

100

0.000

0.000

Sindh

Approve
d
15.08.11

June-16

15.000

10.913

1.538 0.000

12.451

2.549

0.000

2.549

2.549

0.000

83

100

0.000

0.000

Karachi, Approve
Sanghar,
d
Mirpurkhas, 24.09.11
Sukkur,
Khairpur
Karachi
Approve
d
26.06.12

June-16

25.000

9.010

4.260 0.000

13.270

11.730

0.000

5.958

5.958

0.000

53

77

2.886

2.886

June-16

59.839

15.000

13.209 0.000

28.209

31.630

0.000

10.000

10.000

0.000

47

64

10.815

10.815

Karachi

Approve
d
26.06.12

June-16

59.899

15.000

11.494 0.000

26.494

33.405

0.000

10.000

10.000

0.000

44

61

11.703

11.703

Sindh

Approve
d
14.12.12
Approve

June-16

52.156

0.000

0.500 0.000

0.500

51.656

0.000

5.000

5.000

0.000

11

23.328

23.328

June-17

57.469

0.000

0.000 0.000

0.000

57.469

10.000

0.000

10.000

0.000

17

23.735

23.735

1165.798

509.364

141.864 0.000

651.228

514.570

73.431

55.552

128.983

0.000

192.794

192.794

30.000

0.000

0.000 0.000

0.000

30.000

0.000

7.500

7.500

0.000

11.250

11.250

Jacobabad

d
07.11.12

Total Youth Affairs (On-Going Schemes)


Youth Affairs
(New Schemes)
1686 Youth Skill Development Program
(Through Private Sector)

Total
8

Allocation for 2015-16

Financial
Progress in
%age upto

1680 Establishment of Mobile Skill


Development Units for Under
Privileged Youth. (Karachi Division,
Hyderabad, Dadu, Jamshoro, Thatta,
Badin, Mirpurkhas, Umerkot,
Sanghar, Tharparkar, Sukkur, S.B.A,
N.Feroze, Khairpur, Ghotki, Larkana,
Qambar, Shikarpur, Jacobabad &
Kashmore)(R:15.000)

Estimated ThrowExpendit- forward


ure upto
as on
F.P.A. June' 15 01-07-15
9
10
11

1679 Establishment of Youth Hostel for


Girls at Karachi University
(C:21.481+R:1.841)

Revised
Allocation
2014-15

Karachi &
UnSukkur
approved

June-17

25

[ 264 ]

PROVINCIAL
SPORTS & YOUTH AFFAIRS DEPARTMENT

( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Actual
Location of Status
Target
Estimated ExpenditScheme/
Date of
Date for
Cost
ure upto
District
Approval Completion
June, 14
3

1687 Establishment of Skills Developoment


Training Centre at Sukkur (Through
Private Sector)

Sukkur

Unapproved

1688 Youth Computer Literacy and


Awareness Program
1689 Establishment of Library for Youth at
Kashmor (Through Private Sector)

Sindh

Revised
Allocation
2014-15
Total
8

Estimated ThrowExpendit- forward


ure upto
as on
F.P.A. June' 15 01-07-15
9
10
11

Allocation for 2015-16


Capital Revenue
12
13

Total
14

FPA

Financial
Projection

Jun'15 Jun'16 2016-17 2017-18


16
17
18
19

June-17

30.000

0.000

0.000 0.000

0.000

30.000

0.000

7.500

7.500

0.000

25

11.250

11.250

Unapproved
Kashmore
Unapproved

June-17

30.000

0.000

0.000 0.000

0.000

30.000

0.000

7.500

7.500

0.000

25

11.250

11.250

June-17

30.000

0.000

0.000 0.000

0.000

30.000

0.000

7.500

7.500

0.000

25

11.250

11.250

1690 Hiring of Consultancy Service For


Sindh
UnNew Initiatives for Youth Affairs
approved
1691 Woman Skill Development Centre at
Kashmore
UnKashmore
approved
Total Youth Affairs (New Schemes)
Total Youth Affairs
Total S&YA (On-going)
Total S&YA (New)
TOTAL SPORTS & YOUTH AFFAIRS DEPTT:

June-17

20.000

0.000

0.000 0.000

0.000

20.000

0.000

5.000

5.000

0.000

25

7.500

7.500

June-17

40.000

0.000

0.000 0.000

0.000

40.000

10.000

0.000

10.000

0.000

25

15.000

15.000

180.000
1345.798
6331.188
800.000
7131.188

0.000
509.364
2184.348
0.000
2184.348

35.000
45.000
90.552 173.983
79.915 800.000
45.000 200.000
124.915 1000.000

0.000
0.000
0.000
0.000
0.000

0.000
141.864
440.022
0.000
440.022

0.000
0.000
0.000
0.000
0.000

0.000 180.000 10.000


651.228 694.570 83.431
2624.370 3656.104 720.085
0.000 800.000 155.000
2624.370 4456.104 875.085

15

Financial
Progress in
%age upto

67.500
67.500
260.294 260.294
1428.052 1428.052
300.000 300.000
1728.052 1495.552

[ 265 ]

SUMMARY
STEVTA
ANNUAL DEVELOPMENT PROGRAMME 2015-16
(Rs. In million)
Sr
No.

Sub-Sector

ThrowNo. of
forward as on
Schemes
01.07.15

On-Going
Capital

Revenue

Total

No. of
Schemes

New
Capital

Revenue

Total

No. of
Schemes

Total
FPA
Capital

Revenue

Total

Grand
Total
(15+16)

Financial Projection
2016-17

2017-18

10

11

12

13

14

15

16

17

18

19

STEVTA

3499.506

540.945

259.055

800.000

200.000

0.000

200.000

740.945

259.055

1000.000

268.595

1268.595

1249.753

1249.753

Total STEVTA

3499.506

540.945

259.055

800.000

200.000

0.000

200.000

740.945

259.055

1000.000

268.595

1268.595

1249.753

1249.753

[ 266 ]

PROVINCIAL
STEVTA

( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Actual Revised Allocation


Location of Status
Target
Estimated Expenditu
2014-15
Scheme/
Date of
Date for
Cost
re upto
District
Approval Completion
Total
F.P.A.
June, 14
6

Estimated
ThrowforAllocation for 2015-16
Expenditward as on
ure upto
01-07-15 Capital Revenue Total
June' 15

10

11

Sindh

Approved
26.05.11
(U/R)

June-16

431.404

107.540

150.000

0.000

257.540

Sindh

Approved
03.03.11
(U/R)

June-14

3482.741

1124.200

287.000

0.000

1411.200

Larkana

Approved
06.02.15

June-15

114.957

33.658

25.000

0.000

58.658

56.299

Kashmore Approved
@
06.02.15
Kandhkot
(U/R)
Sindh
Approved
17.01.14

June-16

36.020

25.987

5.000

0.000

30.987

5.033

June-16

540.811

0.000

58.042

0.000

4605.933

1291.385

525.042

0.000

12

13

14

FPA

Financial Progress
in %age upto

Financial
Projection

Jun'15 Jun'16 2016-17 2017-18


15

16

17

18

19

173.864 268.595

60

100

0.000

0.000

STEVTA
(On-Going Schemes)
1692 Sindh Skills Development Project
(Component BBSYDP-I and
STEVTA-II & III) (Rs.2155.230
million)
IDA Share: Rs.1724.184 million
G.O.S Share:
million
1693 Umbrella
PC-IRs:431.046
for Incomplete
Schemes Transferred from
Education and Labour Departments
to STEVTA [Karachi (21 Units),
Khairpur, N'Feroze, Badin,
Tharparkar (2 Units each),
Jacobabad, Umerkot, Tando
Allahyar, Hyderabad, Sujawal,
Kashmore and Sanghar (1 Unit
each)](C: 2017.461 + R: 1465.280)
1694 Establishment of Mono Technic
Institute at Garhi Khuda Bux
(Revised) (C: 48.515 + R: 66.442)
1695 Establishment of Vocational
Training Centre at Kashmore
(C: 19.380 + R: 16.640)
1696 Rehabilitation / Renovation and Reconstruction of TEVT Institutes in
Sindh Phase-I (Khairpur,
Hyderabad, Thatta, Karachi,
Kamber, Jamshoro & N.Feroze)
(C: 417.420 + R: 123.391)
Total STEVTA (On-Going Schemes)

173.864

0.000

173.864

2071.541 300.299

28.892

329.191

0.000

41

50

871.175

871.175

0.000

56.299

56.299

0.000

51

100

0.000

0.000

10.000

0.000

10.000

0.000

86

114

-2.484

-2.484

58.042

482.769 230.646

0.000

230.646

0.000

11

53

126.062

126.062

1816.427

2789.506 540.945

259.055

994.753

994.753

800.000 268.595

[ 267 ]

PROVINCIAL
STEVTA

( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Actual Revised Allocation


Location of Status
Target
Estimated Expenditu
2014-15
Scheme/
Date of
Date for
Cost
re upto
District
Approval Completion
Total
F.P.A.
June, 14
3

UnApproved

June-17

UnApproved

Estimated
ThrowforAllocation for 2015-16
Expenditward as on
ure upto
01-07-15 Capital Revenue Total
June' 15

10

11

260.000

0.000

0.000

0.000

0.000

260.000

June-17

100.000

0.000

0.000

0.000

0.000

UnApproved

June-17

150.000

0.000

0.000

0.000

UnApproved

June-16

200.000

0.000

0.000

710.000
5315.933

0.000
1291.385

0.000
525.042

12

FPA

Financial Progress
in %age upto

Financial
Projection

Jun'15 Jun'16 2016-17 2017-18

13

14

15

16

17

18

19

87.500

0.000

87.500

0.000

34

86.250

86.250

100.000

25.000

0.000

25.000

0.000

25

37.500

37.500

0.000

150.000

37.500

0.000

37.500

0.000

25

56.250

56.250

0.000

0.000

200.000

50.000

0.000

50.000

0.000

25

75.000

75.000

0.000
0.000

0.000
1816.427

STEVTA
(New Schemes)
1697 Establishment of Government
Sindh
Vocational Centres for Girls (09
Units) in Sindh (Larkana, Khairpur
& Naushehro Feroze (2 Units each)
and Mirpurkhas, Umerkot &
Tharparkar (1 Unit each)
1698
Karachi,
Modernization of Government
Hyderabad,
College of Technology, SITE
S.B.A,
Karachi, Hyderabad, S.B.A,
Khairpur
Khairpur and Mirpurkhas
& M. khas
1699 Rehabilitation / Renovation and ReSindh
construction of TEVT Institutes in
Sindh Phase-II
1700 Construction / Re-construction and
Sindh
Raising of Boundary walls along
with Fixing of Bared Wires / Grills &
Main gates and Construction of
guard rooms at STEVTA Intitutions.

Total STEVTA (New Schemes)


Total STEVTA :

710.000 200.000
3499.506 740.945

0.000 200.000
0.000
259.055 1000.000 268.595

255.000 255.000
1249.753 1249.753

[ 270 ]

SUMMARY
UNIVERSITIES / BOARDS
ANNUAL DEVELOPMENT PROGRAMME 2015-16
(Rs. In million)
Sr
No.

Sector / Sub-Sector

ThrowNo. of
forward as
Schemes
on 01.07.15
3

On-Going
Capital

Revenue

Total

No. of
Schemes
8

New
Capital Revenue
9

10

Total
11

No. of
Schemes

Total
FPA

Grand
Total
(15+16)

Financial Projection

Capital

Revenue

Total

12

13

14

15

404.835

2000.000

0.000

2000.000

5694.490 5694.490

404.835 2000.000

0.000

2000.000

5694.490 5694.490

Universities / Boards

13388.980

21

1195.165

404.835 1600.000

400.000

0.000

400.000

22

1595.165

TOTAL

13388.980

21

1195.165

404.835 1600.000

400.000

0.000

400.000

22

1595.165

16

17

2016-17

2017-18

18

19

[ 271 ]

PROVINCIAL
UNIVERSITIES AND BOARDS

( Rs. in million )
Location
of
Scheme/
District
3

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4
5
6
7

Revised
Estimated
ThrowforAllocation for 2015-16
Allocation
Expenditward as on
2014-15
ure upto
01-07-15
Capital Revenue Total
Total F.P.A. June' 15
8
9
10
11
12
13
14

1706 Establishment of Trauma Centre,


BSL-3-LAB and provision of
support services at Institute of Chest
Diseases Ojha Campus of Dow
University of Health Sciences
Karachi. (C: 297.580+R: 383.704)
1707 Strengthening of Institute of Physical
Medicine and Rehabilitation of
Disable at DUHS, Karachi. (C:
61.250+R: 183.126)

Karachi

Approved
24.03.11

June-16

681.284

112.500

40.518

0.000

153.018

528.266

50.000

50.000

100.000

0.000

22

37

214.133

214.133

Karachi

Approved
22.12.11

June-16

244.376

60.000

2.353

0.000

62.353

182.023

40.000

10.000

50.000

0.000

26

46

66.012

66.012

1708 Establishment of Department of


Serobiological and providing power
generation by gas along with heat
recovery system at Ojha Campus of
DUHS, Karachi.
(C: 310.811+R: 99.454)
1709 Establishment of Shaheed Benazir
Bhutto University of Veterinary and
Animal Sciences Sakrand & Campus
@ Larkano (Phase-I)
(C:949.935 + R:320.496)
1710 Establishment of Quaid-e-Awam
University of Engineering Science &
Technology, Constituent College /
Campus at Larkana
1711 Construction of Shaheed Benazir
Bhutto Hostel Blocks, Security
Arrangements (Electronic
Equipment), Sewerage Treatment
Facilities, Beautification &
Improvement of QUEST, District
Shaheed Benazirabad.
1712 Establishment of 02 New
Departments & Provision of Missing
Facilities in the QUEST, Nawabshah

Karachi

Approved
11.01.12

June-16

410.265

54.046

25.000

0.000

79.046

331.219

50.000

0.000

50.000

0.000

19

31

140.610

140.610

S.B.A. &
Larkana

Approved
24.05.13
(U/R)

June-16

1270.432

47.000

30.477

0.000

77.477

1192.955

150.000

50.000

200.000

0.000

22

496.478

496.478

Larkana

Approved
13.01.11

June-15

2636.908

1058.173 100.000

0.000

1158.173

1478.735

50.000

50.000

100.000

0.000

44

48

689.368

689.368

S.B.A

Approved
28.10.10
(U/R)

June-15

156.798

115.588

25.605

0.000

141.193

15.605

15.605

0.000

15.605

0.000

90

100

0.000

0.000

S.B.A

Approved
22.01.13

June-16

604.165

35.000

19.483

0.000

54.483

549.682

40.000

20.000

60.000

0.000

19

244.841

244.841

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

FPA

Financial Progress
in %age upto

15

Jun'15 Jun'16
16
17

Financial Projection
2016-17
18

2017-18
19

UNIVERSITIES AND BOARDS


(On-going Schemes)

[ 272 ]

PROVINCIAL
UNIVERSITIES AND BOARDS

( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

1713 Immediate Needs of QUEST,


Nawabshah
1714 Rehabilitation of the Damages
Caused to Quaid-e-Awam University
of Engineering, Science &
Technology ( QUEST ), District
Shaheed Benazirabad During Rains /
Floods of 2011
1715 Development of New Infrastructure
and Other Essential Facilities for
Establishment of Mehran University
College of Engineering and
Technology at Kharipur Mirs
1716 Development of Remaining Essential
Facilities Required for
Establishment of Mehran University
College of Engineering and
Technology at Khairpur Mirs
1717 Establishment of Khairpur College
of Agriculture Engineering and
Technology at Khairpur Mirs
Constituent College of Sindh
Agriculture University Tandojam
1718 Establishment of Innovation &
Entrepreneurship Center (IEC)-An
Extension of MUET, Jamshoro.
1719 Immediate Needs for Establishment
of Benazir Bhutto Shaheed
University at Lyari Karachi
1720 Establishment of Faculty of
Pharmacy at Benazir Bhutto
Shaheed University Lyari in Joint
Venture with Benazir Bhutto
Medical University Larkana
1721 Establishment of Model School at
Shah Abdul Latif University
Khairpur (Revised)

Location
of
Scheme/
District
3

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4
5
6
7

Revised
Estimated
ThrowforAllocation for 2015-16
Allocation
Expenditward as on
2014-15
ure upto
01-07-15
Capital Revenue Total
Total F.P.A. June' 15
8
9
10
11
12
13
14

Approved
02.11.2011
Approved
07-11-13

June-15

194.062

141.939

16.781

0.000

158.720

35.342

30.342

5.000

35.342

0.000

82

100

0.000

0.000

June-16

59.263

0.000

5.000

0.000

5.000

54.263

54.263

0.000

54.263

0.000

100

0.000

0.000

Khairpur

Approved
19.08.10
(U/R)

June-15

998.290

703.581

30.000

0.000

733.581

264.709

200.000

64.709

264.709

0.000

73

100

0.000

0.000

Khairpur

Approved
28.01.12

June-15

847.728

224.915 120.000

0.000

344.915

502.813

95.552

20.000

115.552

0.000

41

54

193.631

193.631

Khairpur

Approved
08.11.12

June-15

601.750

111.590 230.000

0.000

341.590

260.160

30.000

20.000

50.000

0.000

57

65

105.080

105.080

Jamshoro

Approved
24.05.13

June-17

195.321

5.000

26.983

0.000

31.983

163.338

143.338

20.000

163.338

0.000

16

100

0.000

0.000

Karachi

Approved
10.02.11
(U/R.R)

June-15

609.531

578.405

10.000

0.000

588.405

21.126

0.000

21.126

21.126

0.000

97

100

0.000

0.000

Karachi

Approved
28.10.13

June-17

46.297

0.000

20.642

0.000

20.642

25.655

25.655

0.000

25.655

0.000

45

100

0.000

0.000

Khairpur

Approved
03.04.13

June-17

89.198

75.438

5.384

0.000

80.822

8.376

4.376

4.000

8.376

0.000

91

100

0.000

0.000

S.B.A
S.B.A

FPA

Financial Progress
in %age upto

15

Jun'15 Jun'16
16
17

Financial Projection
2016-17
18

2017-18
19

[ 273 ]

PROVINCIAL
UNIVERSITIES AND BOARDS

( Rs. in million )
Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location
of
Scheme/
District
3

Actual
Status
Target
Estimated ExpenditDate of
Date for
Cost
ure upto
Approval Completion
June, 14
4
5
6
7

Revised
Estimated
ThrowforAllocation for 2015-16
Allocation
Expenditward as on
2014-15
ure upto
01-07-15
Capital Revenue Total
Total F.P.A. June' 15
8
9
10
11
12
13
14

FPA

Financial Progress
in %age upto

15

Jun'15 Jun'16
16
17

Financial Projection
2016-17
18

2017-18
19

1722 Immediate Needs of Sindh


Mirpurkhas Approved
University Campus at Mirpurkhas
& Badin
15.03.13
and Badin
1723 Establishment of Shaheed Mohtarma Karachi
Approved
Benazir Bhutto Chair & Convention
15.03.13
Centre at Karachi University

June-17

1043.684

0.000

0.000

0.000

0.000

1043.684

0.000

10.000

10.000

0.000

516.842

516.842

June-17

442.041

0.000

28.483

0.000

28.483

413.558

40.000

10.000

50.000

0.000

18

181.779

181.779

1724 Establishment of Shaheed Zulfiqar


Ali Bhutto University of Law at
Karachi
1725 Estabishment of Shikarpur
University Campus
1726 Establsihment of Women University
at Sukkur

Karachi

Approved
27.09.13

June-17

1145.178

36.841

89.350

0.000

126.191

1018.987

75.000

50.000

125.000

0.000

11

22

446.994

446.994

Shikarpur

Approved
20.1.2.12
Approved
22.01.13

June-17

988.484

0.000

0.000

0.000

0.000

988.484

10.000

0.000

10.000

0.000

489.242

489.242

June-17

2710.000

0.000

0.000

0.000

0.000

2710.000

91.034

0.000

91.034

0.000

3360.016 826.059

0.000

404.835 1600.000

0.000

Sukkur

Total (On-going Schemes):-

15975.055

4186.075 11788.980 1195.165

1309.483 1309.483

5094.490 5094.490

New Schemes
1727 Block Allocation for new schemes

Sindh

Total (New Schemes):TOTAL UNIVERSITIES AND BOARDS:-

Unapproved

June-18

1600.000
1600.000
17575.055

0.000

0.000

0.000

0.000
0.000
3360.016 826.059

0.000
0.000

0.000

1600.000

400.000

0.000

400.000

0.000

0.000 1600.000 400.000


0.000 400.000
4186.075 13388.980 1595.165 404.835 2000.000

0.000
0.000

25

600.000

600.000

600.000 600.000
5694.490 5694.490

[ 274 ]

SUMMARY
WATER SCHEMES FOR THAR COAL DEVELOPMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
Sr
No.

Sub-Sector

Water Schemes for Thar


Coal Development

Total Water Schemes for


Thar Coal Development

ThrowNo. of
forward as
Schemes
on 01.07.15
3
4

On-Going

New

Capital

Revenue

Total

No. of
Schemes

Capital

Revenue

Total

No. of
Schemes Capital

10

11

12

13

16

Grand
Total
(15+16)
17

Total
Revenue

Total

14

15

FPA

( Rs. in million )
Financial Projection
2016-17

2017-18

18

19

12775.371

3000.000

0.000

3000.000

0.000

0.000

0.000

3000.000

0.000

3000.000

0.000

3000.000

4000.000

5559.634

12775.371

3000.000

0.000

3000.000

0.000

0.000

0.000

3000.000

0.000

3000.000

0.000

3000.000

4000.000

5559.634

[ 275 ]

PROVINCIAL
WATER SCHEMES FOR THAR COAL DEVELOPMENT
( Rs. in million )
Gen.Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District
3

Target
Actual
Status
Date for Estimated ExpenditDate of
CompletCost
ure upto
Approval
ion
June, 14
4

Revised
Allocation
2014-15
Total
8

Estimated
Allocation for 2015-16
Throwfwd
Expenditas on
ure upto
01-07-15
Capital Revenue Total
F.P.A. June' 15
9

10

11

12

13

14

FPA

Financial Progress
in %age upto

Financial Projection

Jun'15 Jun'16 2016-17


15

16

17

18

2017-18
19

Water Schemes for Thar Coal


Development
(On-Going Schemes)
1728

Water Carrier from Nabisar to


Islamkot Thar Coalfield (Revised)

Tharparkar Approved
16.04.14
(UR)

June-16

9950.149

512.890 3731.000

0.000

4243.890

5706.259 1500.000

0.000 1500.000 0.000

43

58

2000.000 2206.259

1729

Construction of Water Carrier


from LBOD Spinal Drain RD 362 to Nabisar for Thar Coal
Power Generation Units (Revised)

Tharparkar Approved
ECNEC
02.03.15

June-16

12472.160

4203.000 1415.785

0.000

5618.785

6853.375 1500.000

0.000 1500.000 0.000

45

57

2000.000 3353.375

22422.309

4715.890 5146.785

0.000

9862.675 12559.634 3000.000

0.000 3000.000 0.000

Total Water Schemes for Thar


Coal Development

4000.000 5559.634

[ 276 ]

SUMMARY
WOMEN DEVELOPMENT DEPARTMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
(Rs. In million)
Sr
No.

Sub-Sector

ThrowNo. of
forward as
Schemes
on 01.07.15

On-Going
Capital

Revenue

Total

No. of
Schemes

New
Capital Revenue

Total

No. of
Schemes

Total
FPA
Capital

Revenue

Total

Grand
Total
(15+16)

Financial Projection
2016-17

2017-18

10

11

12

13

14

15

16

17

18

19

Women Development

1128.122

112.661

207.339

320.000

62.500

17.500

80.000

10

175.161

224.839

400.000

0.000

400.000

394.105

320.000

Total Women Development :-

1128.122

112.661

207.339

320.000

62.500

17.500

80.000

10

175.161

224.839

400.000

0.000

400.000

394.105

320.000

[ 277 ]

PROVINCIAL
WOMEN DEVELOPMENT DEPARTMENT
( Rs. in million )
Actual
Status
Target
Estimated Expenditu
Date of
Date for
Cost
re upto
Approval Completion
June, 14

Revised
Estimated ThrowforAllocation for 2015-16
Allocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15 Capital Revenue Total

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

1730 Establishment of Media Cell in the


Directorate of Women Development, Karachi.
1731 Implementation of Gender Reforms
Action Plan Sindh (GRAP).

Karachi

Approved
29.06.11

June-15

59.302

37.173

6.739

Karachi

Approved
01.12.11

June-16

544.770

18.176

1732 Establishment of Working Women


Hostel in Benazirabad

S.B.A

Approved
29.06.11

June-15

13.762

1733 Establishment of Women


Development Complex at
Benazirabad
1734 Advocacy for Women
Empowerment in Sindh (All
Districts).
1735 Women Development complex at
Sukkur (C:189.218 +R:21.089)

S.B.A

Approved
08.10.09

June-16

Sindh

Approved
29.06.11

Sukkur

FPA

Financial Progress
in %age upto

Financial Projection

Jun'15 Jun'16 2016-17

2017-18

10

11

12

13

14

15

16

17

18

19

0.000

43.912

15.390

0.000

15.390

15.390

0.000

74

100

0.000

0.000

26.000

0.000

44.176

500.594

0.000

69.086

69.086

0.000

21

217.491

200.000

0.530

0.000

0.000

0.530

13.232

0.000

13.232

13.232

0.000

100

0.000

0.000

44.767

0.369

6.239

0.000

6.608

38.159

0.000

25.000

25.000

0.000

15

71

13.159

0.000

June-16

49.386

0.978

6.000

0.000

6.978

42.408

0.000

30.000

30.000

0.000

14

75

12.408

0.000

Approved
05.05.11

June-16

210.307

60.000

37.646

0.000

97.646

112.661

112.661

0.000

112.661

0.000

46

100

0.000

0.000

Karachi
Approved
Hyderabad, 30.08.10
Sukkur,
Larkana,
SBA
Sindh
Approved
01.12.11

June-15

11.502

2.871

3.000

0.000

5.871

5.631

0.000

5.631

5.631

0.000

51

100

0.000

0.000

June-15

95.575

3.597

11.931

0.000

15.528

80.047

0.000

49.000

49.000

0.000

16

68

31.047

0.000

0.000

221.249

808.122

112.661

207.339

320.000

0.000

0.000

0.000

250.000

62.500

0.000

62.500

0.000

Women Development Department


(On-Going Schemes)

1736 Mediation for Women in all


Divisional H.Q in Sindh through
institutionalized Alternate Dispute
Resolution (ADR)

1737 Establishment of Day care centers 3


in Karachi and one each at
divisional Head quarter in Sindh
(Karachi, Hyderabad, Sukkur,
Larkana, SBA, Mirpurkhas)
Total Women Dev. Deptt. (Ongoing Schemes)
New Schemes
1738 Establishment of Women
Development Complex at Karachi

Karachi

1029.371

UnApproved

June-18

250.000

123.694

0.000

97.555

0.000

274.105

25

93.750

200.000

93.750

[ 278 ]

PROVINCIAL
WOMEN DEVELOPMENT DEPARTMENT
( Rs. in million )
Actual
Status
Target
Estimated Expenditu
Date of
Date for
Cost
re upto
Approval Completion
June, 14

Gen.
Sr.
No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Sindh

UnApproved

June-18

1739 Establishment of Women Complaint


Cells at Sanghar, Qamber,
Kashmore, Jamshoro, Khairpur,
Shikarpur, Badin, Ghotki, Naushero
Feroze, Thatta, T. A. Yar, Umerkot,
Tharparkar, Dadu, Matiari.
Total Women Dev. Deptt. (New Schemes)
Total Women Development Deptt:-

Revised
Estimated ThrowforAllocation for 2015-16
Allocation
Expendit- ward as
2014-15
ure upto
on
Total
F.P.A. June' 15 01-07-15 Capital Revenue Total

70.000

0.000

0.000

0.000

10
0.000

FPA

Financial Progress
in %age upto

Financial Projection

Jun'15 Jun'16 2016-17

2017-18

11

12

13

14

15

16

17

18

19

70.000

0.000

17.500

17.500

0.000

25

26.250

26.250

320.000

0.000

0.000

0.000

0.000

320.000

62.500

17.500

80.000

0.000

1349.371

123.694

97.555

0.000

221.249

1128.122

175.161

224.839

400.000

0.000

120.000
394.105

120.000
320.000

[ 279 ]

SUMMARY
WORKS & SERVICES DEPARTMENT
ANNUAL DEVELOPMENT PROGRAMME 2015-16
(Rs. In million)
Sr
No.

Sub-Sector

ThrowNo. of
forward as
Schemes
on 01.07.15
3

On-Going

New

Capital

Revenue

Total

No. of
Schemes

Capital

Revenue

10

Total
Total

No. of
Schemes

Capital

Revenue

Total

11

12

13

14

15

FPA

16

Financial Projection

Grand
Total
(15+16)

2016-17

2017-18

17

18

19

Works & Services Department


A)

Normal Roads

General

2187.484

13

203.954

0.000

203.954

0.000

0.000

0.000

13

203.954

0.000

203.954

0.000

203.954

991.765

974.258

Improvement

31583.549

205

2575.627

0.000

2575.627

31

1059.431

0.000

1059.431

236

3635.058

0.000

3635.058

0.000

3635.058

14108.871

13981.620

Construction

19474.330

290

3354.169

0.000

3354.169

35

870.036

0.000

870.036

325

4224.205

0.000

4224.205

0.000

4224.205

7799.158

7204.280

Bridges

2481.836

98.000

0.000

98.000

0.000

0.000

0.000

98.000

0.000

98.000

0.000

98.000

1183.090

1183.090

55727.200

514

6231.750

0.000

6231.750

66

1929.467

0.000

1929.467

8161.217

0.000

8161.217

0.000

8161.217

24082.884

23343.248

Total Normal Roads

6
580

B)

Strategic Roads

Improvement

253.055

16.000

0.000

16.000

0.000

0.000

0.000

16.000

0.000

16.000

0.000

16.000

118.528

118.528

Construction

7601.892

16

135.102

0.000

135.102

0.000

0.000

0.000

16

135.102

0.000

135.102

0.000

135.102

3733.395

3733.395

Total Strategic Roads

7854.947

18

151.102

0.000

151.102

0.000

0.000

0.000

18

151.102

0.000

151.102

0.000

151.102

3851.922

3851.922

Foreign Aided Project

2172.353

231.000

0.000

231.000

0.000

0.000

0.000

231.000

0.000

231.000

1211.500

1442.500

1559.606

1559.606

231.000

1211.500

C)

Total Foreign Aided Projects


Total Roads & Bridges:D)

Buildings

E)

I. T. Schemes
Total W&Services Deptt:-

2172.353

231.000

0.000

231.000

0.000

0.000

0.000

231.000

0.000

65754.499

536

6613.852

0.000

6613.852

66

1929.467

0.000

1929.467

602

8543.319

0.000

1007.804

379.142

0.000

379.142

41.000

0.000

41.000

10

420.142

0.000

420.142

0.000

420.142

350.943

236.719

36.539

0.000

36.539

36.539

0.000

0.000

0.000

0.000

36.539

36.539

0.000

36.539

0.000

0.000

6992.994

36.539

7029.533

69

1970.467

0.000

1970.467

8963.461

36.539

9000.000

1211.500 10211.500

29845.355

28991.495

66798.842

544

613

8543.319 1211.500

1442.500
9754.819

1559.606
29494.412

1559.606
28754.776

[ 280 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
6

Actual
Exp. upto
Jun, 14
7

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

Larkana

Approved
09.05.09

June-17

507.624

434.610

18.000

0.000

452.610

55.014

20.000

0.000

Sindh

Approved
23.12.06

June-18

1305.395

793.729

43.700

0.000

837.429

467.966

15.000

Sindh

Approved
19.03.09

June-18

564.200

357.943

14.230

0.000

372.173

192.027

Mirpurkhas/ Approved
Umerkot
04.06.12

June-18

182.275

68.207

10.000

0.000

78.207

Approved
04.06.12

June-18

130.065

22.500

10.000

0.000

Hyderabad, Approved
T.A.Yar,
04.06.12
Karachi
Construction of various roads in District Khairpur/ Approved
Khairpur and N'Feroze.
N'Feroze
30.06.12
Construction / Improvement of
Sukkur / Approved
Provincial Roads in District Sukkur &
Ghotki.
03.05.12
Ghotki
Construction of various roads in District Shikarpur / Approved
Shikarpur, Jacobabad & Kashmore @
Jacobabad / 03.05.12
Kandhkot.
Kashmore
Scheme proposed by the MPA's of
Thatta /
Approved
District Thatta & Badin (MPA program)
Badin
04.06.12

June-16

88.748

47.500

10.000

June-18

255.939

77.079

June-18

117.001

June-18

Improvement / Re-alignment of curves of


existing roads

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

20.000

0.000

89

93

17.507

0.000

15.000

0.000

64

65

226.483

10.000

0.000

10.000

0.000

66

68

91.014

104.068

10.000

0.000

10.000

0.000

43

48

47.034

32.500

97.565

10.000

0.000

10.000

0.000

25

33

43.783

0.000

57.500

31.248

31.248

0.000

31.248

0.000

65

100

0.000

16.870

0.000

93.949

161.990

13.534

0.000

13.534

0.000

37

42

74.228

60.550

12.000

0.000

72.550

44.451

10.000

0.000

10.000

0.000

62

71

17.226

158.918

63.451

18.000

0.000

81.451

77.467

10.000

0.000

10.000

0.000

51

58

33.734

June-18

178.392

88.923

13.972

0.000

102.895

75.497

10.000

0.000

10.000

0.000

58

63

32.749

June-18

491.107

326.660

7.500

0.000

334.160

156.947

9.172

0.000

9.172

0.000

68

70

73.888

WORK & SERVICES


GENERAL (ON-GOING)
1740

1741

1742

Construction / Improvement of
Provincial roads in District Larkana 80
Kms.
Construction of road network for better
Rural access by Provincial Government
in Lower Sindh 250.0 Kms. (Matiari,
T.A.Yar, T.M. Khan, Dadu, Jamshoro,
Badin, Thatta, M'Khas, Thar, U/Kot,
Sanghar, SBA)
Emergent restoration of damaged roads
& bridges in Sindh (Thatta, Larkana,
Dadu, Kambar, Jamshoro & Shikarpur)

1743

Construction of various roads proposed


by MPA's of District Mirpurkhas and
Umerkot (MPA program)

1744

Construction of schemes proposed by


MPA's of District Dadu & Jamshoro
(MPA program)
Scheme proposed by MPA's of
Hyderabad Division (MPA program)

1745

1746
1747

1748

1749

1750

Dadu /
Jamshoro

Sindh

Approved
06.03.09

[ 281 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

1751

1752

Up-grading of (44 Nos.) Vulnerable Unmanned Level Crossing in Sindh (Hyd,


Matiari, Jamshoro, TA Yar, N.F, Dadu,
Larkana, Shikarpur, Kandhkot, Jcd,
Ghotki)
Construction / Improvement of roads in
Tando Muhammad Khan District 22.00
km,(To be funded out of 10% share of
Royalty)
TOTAL GENERAL (ON-GOING)

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
6

Actual
Exp. upto
Jun, 14
7

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

Sindh

Approved
09.05.14

June-18

565.411

0.000

0.000

0.000

0.000

565.411

5.000

0.000

T.M.Khan

Approved
08.04.15

June-18

165.833

0.000

8.000

0.000

8.000

157.833

50.000

4710.908

2341.152

182.272

0.000

2523.424

2187.484

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

5.000

0.000

280.206

0.000

50.000

0.000

35

53.917

203.954

0.000

203.954

0.000

991.765

IMPROVEMENT (ON-GOING)
1753

Widening / Reconditioning Hala


Shahdadpur Sanghar with asphalt
surface Mile 0/0-43/1 = 43-1 = 69.58 Km

Sanghar

Approved
19.01.07

June-18

700.133

146.795

14.000

0.000

160.795

539.338

10.000

0.000

10.000

0.000

23

24

264.669

1754

Construction / Improvement of road


from Ruk Garhi Yaseen Amrote New
Sharo Abro Mile 0/0-12/2 (19.6 Km)
W/R of road from Rohri to Shadi
Shaheed mile 0/4-18/5 (29.76 Kms)
W/R of road from Haleji MP Check Post
upto 3/3 MTTS and Watch Tower mile
0/0-19/2. (31 Kms)
Widening / Reconditioning Shaikh
Bhirkio Tando Allahyar via Bukera
Makan Sharif road mile 0/0-14/0 = 14 -0
(M) = 22.52 Kms.
Reconditioning of road from
Benazirabad to Daur via 60th mile with
Asphalt mile 0/0-20/5 (33.20 km)
Reconditioning of Arab Machiraod at
mile 67/0 Hasseb Khan Gorchani via
Mohammad Ali Bhurgri mile 0/0-6/0
(9.60 km)
W/R of road from Umerkot to Kunri
mile 0/0-21/2 (34.19 Kms)

Shikarpur

Approved
14.07.08

June-16

342.152

179.831

162.214

0.000

342.045

0.107

40.000

0.000

40.000

0.000

100

112

0.000

Sukkur

Approved
12.03.09
Approved
31.03.09

June-16

342.281

309.450

32.831

0.000

342.281

0.000

15.000

0.000

15.000

0.000

100

104

0.000

June-16

252.557

231.289

21.268

0.000

252.557

0.000

10.000

0.000

10.000

0.000

100

104

0.000

T. A. Yar

Approved
19.11.13

June-18

127.445

72.472

3.500

0.000

75.972

51.473

8.000

0.000

8.000

0.000

60

66

21.737

S.B.A

Approved
20.08.11

June-18

413.088

255.000

30.000

0.000

285.000

128.088

18.000

0.000

18.000

0.000

69

73

55.044

S.B.A

Approved
22.05.12

June-17

85.865

42.500

10.981

0.000

53.481

32.384

5.000

0.000

5.000

0.000

62

68

22.384

Umerkot

Approved
15.08.12

June-17

263.832

125.658

112.981

0.000

238.639

25.193

5.000

0.000

5.000

0.000

90

92

17.193

1755
1756

1757

1758

1759

1760

Sukkur

[ 282 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

1761

W/R of road from Kandiaro - Taharu


Shah via Derbelo.
W/R of road from Nasarpur Bus Stop to
the Old Railway Phattak Tando
Allahyar mile 0/0-6/3 (10.25 Kms).
Improvement of road from Al Noor
Sugar Mill to village Hubeeri road mile
0/0-17/5 (28. Kms)
Improvement of road from Manhoro
road to village Ghulam Muhammad
Punjabi road mile 0/0-8/1 (13.00 Kms)
W/R of road from Babarloi Mori to
Wada Machayoon (23.00 Kms)
W.R of road from 68th mile Mori to 3
Chak via wasni Bitt road mile 0/0-12/0
(19.30 Kms).
W/R of road from Bandhi Shehzado
Dahri to connect ADB road via Chutto
Pitafi road mile 0/0-7/0 (11.26 Kms)

N. Feroze

Approved
24.01.12
Approved
16.01.12
(U/R)
Approved
25.05.11

June-18

199.902

69.750

15.000

0.000

84.750

115.152

5.000

0.000

June-17

109.628

123.889

0.000

0.000

123.889

-14.261

2.000

June-18

136.811

80.000

3.500

0.000

83.500

53.311

W/R of road from Doultpur to Pubjo


road mile 0/0-10/0 (16.10 Km).
W/R of road from Kazi Ahmed Jamal
Shah road to Pubjo road mile 0/0-10/0
(16.10 Kms).
W/R of road from Subzi Mundi via
Shakal Jamali to Gupchani road mile 0/015/0 (24.13 Kms)
W/R of road from Salehpat to
Sikanderabad mile 0/0-25/2 (40.25 Kms)

1762

1763

1764

1765
1766

1767

1768
1769

1770

1771

1772

1773

W/R of road from Ghulam Bund to


Dhandi Sangrar via Fakirabad mile 0/010/0 (16.00 Kms)
W/R of road from Shaikh Bhirkio road
to village Nanger Wassan mile 0/0-5/0
(8.0 Kms)

Location of
Scheme/
District

T. A. Yar

S.B.A

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
6

Actual
Exp. upto
Jun, 14
7

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

5.000

0.000

42

45

55.076

0.000

2.000

0.000

113

115

0.000

6.000

0.000

6.000

0.000

61

65

23.656

S.B.A

Approved
25.05.11

June-16

59.670

45.000

14.670

0.000

59.670

0.000

9.000

0.000

9.000

0.000

100

115

0.000

Khairpur

Approved
29.05.12
Approved
24.02.12

June-18

396.258

185.575

20.000

0.000

205.575

190.683

6.000

0.000

6.000

0.000

52

53

92.342

June-18

205.243

100.317

7.613

0.000

107.930

97.313

6.000

0.000

6.000

0.000

53

56

45.657

S.B.A

Approved
31.01.12

June-16

98.977

61.976

10.416

0.000

72.392

26.585

26.585

0.000

26.585

0.000

73

100

0.000

S.B.A

Approved
31.01.12
Approved
31.01.12

June-18

158.023

85.612

5.490

0.000

91.102

66.921

6.000

0.000

6.000

0.000

58

61

30.461

June-18

163.099

98.612

7.500

0.000

106.112

56.987

6.000

0.000

6.000

0.000

65

69

25.494

S.B.A

Approved
31.01.12

June-16

180.448

179.028

6.000

0.000

185.028

-4.580

1.000

0.000

1.000

0.000

103

103

0.000

Sukkur

Approved
09.05.12

June-18

714.587

424.755

110.000

0.000

534.755

179.832

17.000

0.000

17.000

0.000

75

77

81.416

Sukkur

Approved
12.04.12

June-16

152.176

91.500

34.700

0.000

126.200

25.976

25.976

0.000

25.976

0.000

83

100

0.000

Hyderabad Approved
01.03.12

June-18

68.902

19.150

8.491

0.000

27.641

41.261

5.000

0.000

5.000

0.000

40

47

18.131

S.B.A

S.B.A

[ 283 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

1774

1775
1776

1777

1778

1779

1780

1781

1782
1783
1784

1785
1786

1787

Location of
Scheme/
District
3

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
4

Actual
Exp. upto
Jun, 14
7

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

FPA

Financial Progress
in %age upto

Jun'15 Jun'16
15

16

17

Financial Projec
2016-17
18

W/R of National Highway Chandan


Matiari
Approved
Escape to Oderolal Station via Deh Dari
01.03.12
Road 6/1-14/1
Reconditioning of road from Johi to
Dadu
Approved
Wahi Pandhi mile 0/0-14/0 (22.54Kms)
01.03.12
W/R of road from Main Mirpurkhas Mirpurkhas Approved
Mirwah road to meet Mirwah - Kot
16.05.12
Ghulam Muhammad road via Mir
Khalid Landhi mile 0/0-17/0 (27.37).
W/R of road from 60th Mile Mori to 72
S.B.A
Approved
mile road via 68th Mile road mile 0/024.02.12
12/0 (19.30 Kms)
W/R of road from Thari Mirwah Bozdar Khairpur Approved
Wada road mile 0/0-8/0 (12.88 Kms)
02.04.12

June-18

215.257

54.250

85.000

0.000

139.250

76.007

7.000

0.000

7.000

0.000

65

68

34.504

June-17

189.909

57.654

106.368

0.000

164.022

25.887

10.000

0.000

10.000

0.000

86

92

0.000

June-18

207.585

112.992

44.000

0.000

156.992

50.593

5.000

0.000

5.000

0.000

76

78

22.797

June-18

218.669

112.000

9.613

0.000

121.613

97.056

5.000

0.000

5.000

0.000

56

58

46.028

June-16

106.775

69.000

26.000

0.000

95.000

11.775

11.775

0.000

11.775

0.000

89

100

0.000

W/R of Road from Moula Dad Road to


Dargah Rahmatpur mile 0/0-10/0 (16.09
Kms).
Reconditioning of road from kashmore
to Badani via Gehalpur mile 0/0-20/0
(32.18 Kms).
W/R road form Larkana Arija Mahi
Makool Meena road mile 0/0-13/0
(21.00Kms)
Rehabilitation of Rain Damages of Road
during 2011 in Sanghar
Rehabilitation of Roads Damaged during
rains of year 2011
Rehabilitation of Rain affected roads
2011 (Shikarpur, Jacobabad &
Kashmore).
Rehabilitation of various roads in Rain
affected or others
W/R of road from Digri to Rajo Khanani
via Bhudho qambrani Deh-170 Mile 0/0 20/4 (33.0 Kms)
Improvement of Hyderabad Tando Fazal
Seri road mile 0/0-24/0 = 24-0 (M) =
38.64 Kms.

Jacobabad

Approved
20.01.12

June-18

199.339

37.500

2.000

0.000

39.500

159.839

5.000

0.000

5.000

0.000

20

22

77.420

Kashmore

Approved
29.08.12

June-18

192.932

42.500

2.000

0.000

44.500

148.432

5.000

0.000

5.000

0.000

23

26

71.716

Larkana

Approved
28.01.12

June-18

175.129

70.494

41.123

0.000

111.617

63.512

5.000

0.000

5.000

0.000

64

67

29.256

Approved
20.02.12
Sujawal
Approved
20.02.12
Shikarpur / Approved
Jacobabad / 20.02.12
Kashmore
Khairpur / Approved
N'Feroze
20.02.12
Badin
Approved
30.01.08

June-18

220.000

82.000

12.736

0.000

94.736

125.264

8.000

0.000

8.000

0.000

43

47

58.632

June-18

267.390

195.620

17.000

0.000

212.620

54.770

8.000

0.000

8.000

0.000

80

83

23.385

June-18

311.808

139.903

12.736

0.000

152.639

159.170

25.000

0.000

25.000

0.000

49

57

67.085

June-18

274.479

190.721

15.000

0.000

205.721

68.758

10.000

0.000

10.000

0.000

75

79

29.379

June-18

237.985

98.000

8.000

0.000

106.000

131.985

5.000

0.000

5.000

0.000

45

47

63.493

Hyderabad Approved
26.12.05

June-17

146.744

102.500

15.000

0.000

117.500

29.244

5.000

0.000

5.000

0.000

80

83

19.244

Sanghar

[ 284 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

1788

Location of
Scheme/
District
3

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
4

Actual
Exp. upto
Jun, 14
7

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

FPA

Financial Progress
in %age upto

Jun'15 Jun'16
15

16

17

Financial Projec
2016-17
18

W/R of Mirpurkhas Tando Adam road


T. A. Yar Approved
with Asphalt Carpet mile 0/0-25/5 =
02.03.06
(41.25 km)
W/R of Kot Gulam Muhammad Jhudo
Mirpurkhas Approved
via Sikriery and Tando Jam Mohammad
07.01.08
mile 0/0-31/2 (50.0 Kms)
Widening / Reconditioning Sanghar
Mirpurkhas Approved
Mirpurkhas asphalt surface mile 0/0-15/3
19.01.07
(24.74 Kms)
Widening / Reconditioning of Bulri Shah T.M.Khan Approved
Karim to Khorwah Chowk mile 0/0-21/0
06.06.05
=21-0 (M) = 33.81 Kms.
Widening / Reconditioning of Tando
T. A. Yar Approved
Allahyar Mirwah road Mile 5/4 - 21/0 =
03.03.07
15-4 (M) = 24.95 Kms.
Improvement National Highway to
Thatta
Approved
Jhampeer via Farm Road Mile 0/0-19/4 =
03.03.07
19-4 (M) = 31.39 Kms.
Improvement / Construction of
Thatta
Approved
Ghulamullah to Garho road i/c Bridge
09.04.08
over Creek and Construction of link
upto National Highway on west of Garho
Town mile 0/0-25/5 (41.23)
W/R N'Feroze Paddidan Phull meet Kot
N. Feroze Approved
Kumb Kot Lalu Road mile 0/0-24/0
29.03.07
(38.61 Kms).
W/R of road from Karachi Thatta
Thatta
Approved
Hyderabad road to Jhimpir mile 0/0-16/0
26.09.12
(25.76 Kms)
W/R of road from 60 mile road to 3 chak
S.B.A
Approved
suhello road mile 0/0-13/0 (asphalt)
04.10.12

June-16

258.331

136.529

141.331

0.000

277.860

-19.529

5.000

0.000

5.000

0.000

108

109

0.000

June-18

239.104

76.646

103.000

0.000

179.646

59.458

5.000

0.000

5.000

0.000

75

77

27.229

June-18

731.415

249.451

15.000

0.000

264.451

466.964

10.000

0.000

10.000

0.000

36

38

228.482

June-18

85.238

46.500

4.000

0.000

50.500

34.738

5.000

0.000

5.000

0.000

59

65

14.869

June-17

153.130

107.000

15.000

0.000

122.000

31.130

5.000

0.000

5.000

0.000

80

83

24.130

June-18

117.651

37.282

6.000

0.000

43.282

74.369

5.000

0.000

5.000

0.000

37

41

34.685

June-18

283.362

60.222

7.000

0.000

67.222

216.140

5.000

0.000

5.000

0.000

24

25

105.570

June-18

139.903

58.210

12.890

0.000

71.100

68.803

5.100

0.000

5.100

0.000

51

54

31.852

June-18

321.299

67.000

10.000

0.000

77.000

244.299

5.000

0.000

5.000

0.000

24

26

119.650

June-18

250.854

38.000

27.736

0.000

65.736

185.118

5.000

0.000

5.000

0.000

26

28

90.059

1798

W/R of Thatta Pir Patho to Ghorabari


road (40 Kms)

Thatta

June-18

379.688

80.000

104.000

0.000

184.000

195.688

10.000

0.000

10.000

0.000

48

51

92.844

1799

Reonditioning of road from Mianshoro


via Kallay Bux Rind Sakrand City road
mile 0/0-3/5 (5.83 Kms).

S.B.A

June-18

70.305

11.000

10.000

0.000

21.000

49.305

7.000

0.000

7.000

0.000

30

40

21.153

1789

1790

1791

1792

1793

1794

1795

1796

1797

Approved
04.09.12
(U/R)
Approved
31.12.12

[ 285 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

1800

W/R of Johi Bhan road 0/0-11/4 (18.40


Kms). (To be funded out of 10% share of
Royalty)
Improvement of road Indus Highway
(Old Alignment) mile 5/6-17/4 (18.92
Kms) (Asphalt)
W/R of road from Bubak Ralilway
Station to Shah Bukhari via Talti road
mile 0/0-6/0
W/R of road from Nawabshah Kazi
Ahmed road to Waris Ali Shah road mile
0/0-6/0 (9.65 Kms)
W/R of road from Desert Area road to
Hazrat Hout Fakir via Serai Mohabat
Sethar road mle 0/0-5/4 (8.85 Kms)

Dadu

Approved
29.04.13

June-18

234.845

46.000

80.000

0.000

126.000

108.845

5.000

0.000

Jamshoro

Approved
29.04.13

June-18

293.196

24.500

12.000

0.000

36.500

256.696

5.000

Jamshoro

Approved
30.01.13

June-16

117.178

59.957

34.972

0.000

94.929

22.249

S.B.A

Approved
31.12.12

June-18

171.423

17.000

15.000

0.000

32.000

S.B.A

Approved
31.12.12

June-18

189.202

20.000

16.981

0.000

W/R road from Jam Sahib to Hazrat


Hout Fakir road mile 0/0-15/0 (24.14
Kms)
W/R of road from Bandhi Manhoro road
to Makkand road mile 0/0-8/6 (14.07
Kms) (1 1/2 Carpet).
Reconditioning of road from Mashakh to
Chattan Shah via Syed Budhal Shah
road mile 0/0-7/0 (11.26 Kms)
W/R of road from Sakrand to var via
Khadhar road mile 0/0-9/0 (14.50 Kms)

S.B.A

Approved
08.01.13

June-18

401.935

20.000

8.491

S.B.A

Approved
15.01.13

June-18

234.423

30.000

S.B.A

Approved
31.12.12

June-18

85.321

S.B.A

Approved
15.01.13

June-18

Reconditioning of road from Daulatpur


Pubjo road @ mile 1/1 to Village Ismail
Dahri via Shaahand road mile 0/0-4/3
(7.0 Kms)
Reconditioning of road from Al-Noor
Sugar Mill Hubeeri road @ mile 7/6 to
Trimore road mile 0/0-5/7 (9.45 Kms)

S.B.A

Approved
31.12.12

S.B.A

Approved
31.12.12

1801

1802

1803

1804

1805

1806

1807

1808

1809

1810

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
6

Actual
Exp. upto
Jun, 14
7

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

5.000

0.000

54

56

51.923

0.000

5.000

0.000

12

14

125.848

22.249

0.000

22.249

0.000

81

100

0.000

139.423

5.000

0.000

5.000

0.000

19

22

67.212

36.981

152.221

5.000

0.000

5.000

0.000

20

22

73.611

0.000

28.491

373.444

5.000

0.000

5.000

0.000

184.222

7.236

0.000

37.236

197.187

5.000

0.000

5.000

0.000

16

18

96.094

15.000

6.368

0.000

21.368

63.953

5.000

0.000

5.000

0.000

25

31

29.477

302.483

35.000

16.114

0.000

51.114

251.369

5.000

0.000

5.000

0.000

17

19

123.185

June-18

69.230

12.000

10.000

0.000

22.000

47.230

5.000

0.000

5.000

0.000

32

39

21.115

June-18

94.470

12.000

15.000

0.000

27.000

67.470

5.000

0.000

5.000

0.000

29

34

31.235

[ 286 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

1811

Reconditioning of road from Manhoro


Chowdgi Ghulam Muhammad Panjabi
@ mile 6/2 to Village Sonhri via Thull
Minor road mile 0/0-5/6 (9.40 Kms)
Reconditioning of road from Yousif
Dahri mori Regulator to Bandhi via
Manhoro road mile 0/0-10/0 (16.09 Kms)

S.B.A

Approved
31.12.12

S.B.A

W/R of road from Nationial Highway @


mile 208 Sarkari Khoh to connect Kazi
Ahmed Jamal Shah road mile 0/0-7/4
(12.0 Kms)
W/R of road from National Highway @
mile 209 Nawab Wali Muhammad to
connect Doulatpur Pubjo road via
Ramzan Rahu road mile 0/0-6/4 (10.40
Kms)
Reconditioning of road from MatiariNasarpur road to village Kot Zainul
Abidin Shah road mile 0/0-3/1 (5.03
Kms),(To be funded out of 10% share of
Royalty)
W/R of Road from National Highway
Kamoon Shaheed to Khambhra mile 0/07/0 (11.27 kms),(To be funded out of
10% share of Royalty)
W/R of Road from Retti to Kehar Dahar
via Marowala mile 0/0-6/0 (66 Kms),(To
be funded out of 10% share of Royalty)

1812

1813

1814

1815

1816

1817

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

June-18

87.197

12.000

5.000

0.000

17.000

70.197

5.000

0.000

Approved
15.01.13

June-18

264.024

14.000

100.000

0.000

114.000

150.024

5.000

S.B.A

Approved
31.12.12

June-18

183.893

14.000

7.000

0.000

21.000

162.893

S.B.A

Approved
31.12.12

June-18

157.032

14.000

7.000

0.000

21.000

Matiari

Approved
01.03.13

June-16

40.832

11.000

12.000

0.000

Ghotki

Approved
19.04.13

June-18

145.149

10.000

16.000

Ghotki

Approved
19.04.13

June-18

110.980

10.000

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

5.000

0.000

19

25

32.599

0.000

5.000

0.000

43

45

72.512

5.000

0.000

5.000

0.000

11

14

78.947

136.032

5.000

0.000

5.000

0.000

13

17

65.516

23.000

17.832

17.832

0.000

17.832

0.000

56

100

0.000

0.000

26.000

119.149

5.000

0.000

5.000

0.000

18

21

57.075

12.736

0.000

22.736

88.244

5.000

0.000

5.000

0.000

20

25

41.622

1818

W/R of Road from Ubauro to Retti mile


0/0-6/4 (10.47 Kms) (Rs.4.004 m. (To be
funded out of 10% share of Royalty)

Ghotki

Approved
19.04.13

June-18

136.321

13.000

12.736

0.000

25.736

110.585

5.000

0.000

5.000

0.000

19

23

52.793

1819

W/R of Road from Retti to Kamoon


Shaheed mile 0/0-7/0 (11.27 kms),(To be
funded out of 10% share of Royalty)

Ghotki

Approved
19.04.13

June-18

173.100

23.000

16.980

0.000

39.980

133.120

5.000

0.000

5.000

0.000

23

26

64.060

[ 287 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

1820

Reconditioning of Road from Mirpur to


Mohammadpur mile 4/0-8/0 (6.40
Kms),(To be funded out of 10% share of
Royalty)
Improvement of 5 Km Katchi Para
Internal roads streets mile 0/0-3/1.
W/R of road from Majeed Keerio to
Mudd bungalow road mile 0/0-11/7(19.11
Kms)
Widening/ Reconditioning of road from
Indus Highway to Aminani Sharif via
Cattle Farm road mile 0/0-5/0(8 Km).

Ghotki

Approved
14.01.13

Karachi

1821
1822

1823

1824

1825

1826

1827
1828

1829
1830

Reconditioning of road from Punj Mori


to village Jhalo UC Siyal mile 0/0-6/4
(10.4Km)
Improvement of road from Jamshoro
road National Highway Bye Pass road
via J.J.V.L Gas Company road mile 0/06/0 (9.66 Kms)
Improvement / Construction of road
from Rajputana Hospital to National
Highway Bypass via Gulistan-e-Sajjad
village Budho Palari Makhdoom Rafiquz-Zaman road dual carriageway road
mile 0/0-2/4 (4.0Kms)
W/R of Road from Khanpur Mahar to
Sardargarh (24 Kms)
Reconditioning of road from Chatto
Mori to Jhumiro Mori via village Haji
Mohammad Ramzan Chandio road mile
0/0-5/2 (8.45 Kms)
W/R of road from Khorwah to Khorwah
Chowk mile 0/0-8/0 (12.88)
Improvement of road from Artillery
Chak to Eido Nohrio Goth mile 0/0-5/0
(8.00 Kms).

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

June-16

50.376

13.000

12.736

0.000

25.736

24.640

24.640

0.000

Approved
02.11.12
Approved
29.01.13

June-18

81.618

30.000

12.736

0.000

42.736

38.882

5.000

June-18

374.278

100.000

115.000

0.000

215.000

159.278

Dadu

Approved
17.05.13

June-17

138.702

50.000

50.472

0.000

100.472

Dadu

Approved
24.11.13

June-17

80.501

23.000

24.181

0.000

Hyderabad Approved
04.10.12

June-18

220.567

0.000

15.000

Hyderabad Approved
06.02.13

June-18

300.548

0.000

Approved
22.11.12
Approved
04.09.13

June-18

202.901

June-16

Approved
29-04-13
Approved
27.01.14

S.B.A

Sukkur
Badin

Badin
Badin

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

24.640

0.000

51

100

0.000

0.000

5.000

0.000

52

58

16.941

8.000

0.000

8.000

0.000

57

60

75.639

38.230

20.055

0.000

20.055

0.000

72

87

9.088

47.181

33.320

5.000

0.000

5.000

0.000

59

65

14.160

0.000

15.000

205.567

5.000

0.000

5.000

0.000

100.284

37.249

0.000

37.249

263.299

5.000

0.000

5.000

0.000

12

14

129.150

0.000

100.000

0.000

100.000

102.901

5.000

0.000

5.000

0.000

49

52

48.951

55.176

3.125

26.000

0.000

29.125

26.051

26.051

0.000

26.051

0.000

53

100

0.000

June-18

178.992

10.000

4.000

0.000

14.000

164.992

5.000

0.000

5.000

0.000

11

79.996

June-18

122.766

0.000

10.000

0.000

10.000

112.766

5.000

0.000

5.000

0.000

12

53.883

[ 288 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

1831

Improvement / Const: of road from


Nindo Shahar to village Budho Dasti via
Deh Khakhar mile 0/0-7/3 (11.87 Kms).

Badin

Approved
27.01.14

June-18

147.417

0.000

10.000

0.000

10.000

137.417

5.000

0.000

1832

Improvement of road from Talhar Bye


Pass (Badin road to Tando Bago road)
mile 0/0-1/0 (1.61 Kms).
Improvement of road from Sujawal Jhati (Khorwah) Chowk to Jati Road
mile 8/0-13/0 (8.00 Kms)
Improvement of road from Seerani to
Ahmed Rajo mile 0/0-15/4 (24.95 Kms)

Badin

Approved
01.03.13

June-16

41.168

7.500

11.168

0.000

18.668

22.500

22.500

Badin

Approved
27.03.14

June-18

108.790

5.000

5.000

0.000

10.000

98.790

Badin

Approved
27.03.14

June-18

360.582

0.000

4.000

0.000

4.000

W/R Badin - Kadhan road mile 9/0-16/0


(11.50 Kms) (Phase-II)
Improvement of road form Dehi to
Tando Jan Muhammad mile 0/0-16/0
(25.76 Kms)
Improvement of road from Kadhan to
Nindo mile 9/0-12/0 (4.83 Kms) (PhaseII)
W/R of road from Tando Bago road to
Olya Raj Seen mile 0/0-8/0 (12.87 Kms)

Badin

Approved
29.04.13
Approved
03.01.13

June-18

271.582

25.000

50.000

0.000

June-18

405.919

0.000

0.000

Badin

Approved
19.04.13

June-18

75.203

0.000

Badin

Approved
29.04.13

June-18

169.001

1839

Improvement of road from Piaro Station


to Sita road mile 0/0-9/2 (15.0 Kms).

Dadu

Approved
31.12.13

June-18

1840

W/R of road Thana Bula Khan Bypass


mile 0/0-2/4 (4.00 Kms).
W/R of road Kotri Sher Shah Soori road
mile 0/0-9/6 (15.70 Kms)
W/R / Const: of road from Karo Khaho
to Sher Shah Soori road mile 0/0-5/3
(8.65 Kms)
Reconditioning of road from Nawabshah
Kazi Ahmed @ mile 16/0 to Dargah
Jamal Shah via Allah Bux Kubar road
mile 0/0-6/5 (10.66 Kms)

Jamshoro

Approved
29.04.13
Approved
29.04.13
Approved
29.04.13
Approved
19.02.14

1833

1834

1835
1836

1837

1838

1841
1842

1843

Location of
Scheme/
District

Badin

Jamshoro
Thatta

S.B.A

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
6

Actual
Exp. upto
Jun, 14
7

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

5.000

0.000

10

66.209

0.000

22.500

0.000

45

100

0.000

5.000

0.000

5.000

0.000

14

46.895

356.582

5.000

0.000

5.000

0.000

175.791

75.000

196.582

17.000

0.000

17.000

0.000

28

34

89.791

0.000

0.000

405.919

5.000

0.000

5.000

0.000

200.460

10.491

0.000

10.491

64.712

5.000

0.000

5.000

0.000

14

21

29.856

12.500

12.736

0.000

25.236

143.765

5.000

0.000

5.000

0.000

15

18

69.383

129.467

10.000

10.736

0.000

20.736

108.731

5.000

0.000

5.000

0.000

16

20

51.866

June-18

89.468

2.500

6.000

0.000

8.500

80.968

5.000

0.000

5.000

0.000

10

15

37.984

June-18

193.851

2.000

7.000

0.000

9.000

184.851

5.000

0.000

5.000

0.000

89.926

June-18

93.414

0.000

53.774

0.000

53.774

39.640

5.000

0.000

5.000

0.000

58

63

17.320

June-18

121.753

0.000

5.245

0.000

5.245

116.508

5.000

0.000

5.000

0.000

55.754

[ 289 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District
3

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
4

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

FPA

Financial Progress
in %age upto

Jun'15 Jun'16
15

16

17

Financial Projec
2016-17
18

1844

Improvement of Kangoro - Tando


Mirpurkhas Approved
Ghulam Ali road mile 0/0-4/0 (6.40 Kms)
25.02.15

June-16

55.247

0.000

27.623

0.000

27.623

27.624

27.624

0.000

27.624

0.000

50

100

0.000

1845

Reconditioning of road from village


Hyderabad Approved
Morio Meerbahar to Molidino Mirbahar
road mile 0/0-3/0 (4.83 Kms)

June-18

53.289

0.000

8.491

0.000

8.491

44.798

5.000

0.000

5.000

0.000

16

25

19.899

1846

Recondition of road from Sehri Sugar


T.M.Khan
Mills to Norai Sharif mile 0/0-3/6 (6.00
Kms)
Improvement of road from Manzoor Ali
T. A. Yar
Pitafi to Dad Jarwar Mile 0/0-3/2 (5.02
Kms)
W/R of road from Chamber to
T. A. Yar
Hyderabad Gulab Laghari Shaikh
Bhirkio road via Miran Khori Jalal Mori
including links to village Abdul Rehman
Memon and Riaz Memon 0/0-12/4 (20.12
Kms) Asphalt 2" Thick
W/R road from Sujawal road mile to
Sujawal
village Sher Ali Abad mile 0/0-2/4 (4.0
Kms)
Reconditioning of Road from Larkana
Larkana
Ratodero Road to village Zangeja mile
0/0-2/0 i/c Drain Construction of road
from Block and Boundary Wall of Eid
Gah
Improvement of Road off taking from
Larkana
Ratoder Shahdadkot Motorway @ mile
17/7 to Dhing Allah Bux Leghari mile 0/06/4 (10.4 Kms).
W/R Nasirabad to Badeh Road mile 0/0Larkana
2/0 (Remaining Work) 2" thick asphalt
(3.2 Kms).
Reconditioning of Road from Ratodero
Larkana
Naudero Road to village Daro Illahi Bux
mile 0/0-1/7 (3.0 kms)

Approved
21.05.13

June-17

42.610

1.250

8.792

0.000

10.042

32.568

5.000

0.000

5.000

0.000

24

35

13.784

Approved
01.03.13

June-17

35.080

0.000

6.000

0.000

6.000

29.080

5.000

0.000

5.000

0.000

17

31

12.040

Approved
11.07.13

June-18

289.082

10.000

116.560

0.000

126.560

162.522

80.000

0.000

80.000

0.000

44

71

41.261

Approved
22.02.13

June-18

47.026

0.500

1.000

0.000

1.500

45.526

5.000

0.000

5.000

0.000

14

20.263

Approved
10.10.12

June-16

21.100

0.000

0.000

0.000

0.000

21.100

21.100

0.000

21.100

0.000

100

0.000

Approved
28.11.12

June-16

27.805

0.000

6.792

0.000

6.792

21.013

21.013

0.000

21.013

0.000

24

100

0.000

Approved
28.11.12

June-18

54.090

0.000

6.792

0.000

6.792

47.298

6.000

0.000

6.000

0.000

13

24

20.649

Approved
28.11.12

June-18

31.850

0.000

0.000

0.000

0.000

31.850

6.000

0.000

6.000

0.000

19

12.925

1847

1848

1849

1850

1851

1852

1853

[ 290 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

1854

Reconditioning of Road village Khair


Mohammad Joyo to Sajan Joyo mile 0/00/5 (i/c 3000 Rft Retaining Wall)
Reconditioning of road from Kambar
Ratodero Road to Wali dad Veesar mile
0/0-1/2 (2.41 Kms)
Reconditioning of road from Larkana
Naudero Road to Hassan Wahan mile
0/0-1/1 (1.81 Kms)
Reconditioning of Halani Mehrabpur
Road (1.0 Km)
Reconditioning of Road from Phull
Masur Ji Wah Road to village Din
Mohammad Leghari via Budho Leghari
mile 0/0-3/0 (5.0 Kms)
Reconditioning of Road from Lalu
Maachi to Sahib Khan Chandio mile 0/01/2 (2.0 kms)
Reconditioning of Road from National
Highway to Jamali Pump to Phul Bughio
mile 0/0-2/4 (4.0 kms)
Reconditioning of Road from National
Highway Qalandari pump to village
Marri Road mile 0/0-1/7 (3.0 Kms)
Reconditioning of Road from Moro Jatoi
Road to village Gula Patho Road mile 0/01/2 (2.0 kms)
W/R of Road from Shikarpur to Jagir
mile 0/0-1/4 (2.4 Kms)
Reconditioning of Road from Shikarpur
Zarkhail Road to Fakir Din Mohammad
Kehar mile 0/0-2/0 (3.2 Kms)

Larkana

Approved
28.11.12

Larkana

1855

1856

1857
1858

1859

1860

1861

1862

1863
1864

1865

Reconditioning of Road from Garhi


Hassan to Mir Abdullah Khan Sarki
Taluka Thull (6 Km)

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

June-16

17.021

0.000

0.000

0.000

0.000

17.021

17.021

0.000

Approved
28.11.12

June-16

17.522

0.000

0.000

0.000

0.000

17.522

17.522

Larkana

Approved
28.02.13

June-16

18.959

0.000

0.000

0.000

0.000

18.959

N. Feroze

Approved
21.05.13
Approved
26.03.13

June-16

16.660

0.000

0.000

0.000

0.000

June-17

40.522

1.000

5.982

0.000

N. Feroze

Approved
20-03-13

June-16

17.965

1.000

6.792

N. Feroze

Approved
26.03.13

June-17

27.176

1.000

N. Feroze

Approved
26.03.13

June-16

20.576

N. Feroze

Approved
23.01.13

June-16

Sukkur

Approved
19.12.12
Approved
28.02.13

Approved
28.11.12

N. Feroze

Shikarpur

Jacobabad

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

17.021

0.000

100

0.000

0.000

17.522

0.000

100

0.000

18.959

0.000

18.959

0.000

100

0.000

16.660

16.660

0.000

16.660

0.000

100

0.000

6.982

33.540

5.000

0.000

5.000

0.000

17

30

14.270

0.000

7.792

10.173

10.173

0.000

10.173

0.000

43

100

0.000

2.000

0.000

3.000

24.176

18.000

0.000

18.000

0.000

11

77

3.088

1.000

6.792

0.000

7.792

12.784

12.784

0.000

12.784

0.000

38

100

0.000

20.177

1.000

6.792

0.000

7.792

12.385

12.385

0.000

12.385

0.000

39

100

0.000

June-18

28.528

0.000

0.000

0.000

0.000

28.528

5.000

0.000

5.000

0.000

18

11.764

June-16

21.246

1.250

8.491

0.000

9.741

11.505

11.505

0.000

11.505

0.000

46

100

0.000

June-18

54.952

0.000

4.245

0.000

4.245

50.707

6.000

0.000

6.000

0.000

19

22.354

[ 291 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

1866

Reconditioning of Road from Daharki


Bye pass road mile 0/0-1/4 (2.40 kms),(To
be funded out of 10% share of Royalty)

Ghotki

Approved
19.04.12

1867

W/R of Road from Adilpur to Mathelo


mile 0/0-7/0 (11.20 Kms),(To be funded
out of 10% share of Royalty)
Improvement of Road from jagh
Regulator to village Mohammad
Ibrahim Jat , Taluka Faiz Gunj, UC Kot
Lalu (2.5 Kms)
Rehabilitation of Road from Khanan
Shah Mangi Mohalla Nizamani Road
upto Hopital Road including Masonry
Structrue (1.20 kms)
Rehabilitation of Road from Old
National Highway near NIC to Sanjar
Khan Katohar (2.21 Kms)
Rehabilitation of (Dual Carriagway)
road from National Highway near Staff
Quarters to Jillani Mohalla i/c Asphalt
concrete (1.0 Km)
Recondition of Road from Rahuja Minor
to Kot Pul (3.0 kms)
Reconditioning / Construction of Road
from N.H.Way to village Abdul Sattar
Phulpoto (3.0 kms)
Reconditioning of Road from Kandhkot
Saifal Road to Kamran Khan Bajkani
0/0-2/0 (3.2 Kms),(To be funded out of
10% share of Royalty)

Ghotki

1868

1869

1870

1871

1872
1873

1874

1875
1876

Improvement / Construction of Road


from Sirgo to Samo Chacar (4.0 km)
Improvement of Road from Fakir
Mohammad Path Road to Darawahan
Shakh mile 0/0-2/6 (4.40 kms)

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

June-16

23.337

0.000

0.000

0.000

0.000

23.337

23.337

0.000

Approved
15.03.13

June-18

144.645

5.000

25.000

0.000

30.000

114.645

15.000

Khairpur

Approved
28.02.13

June-16

14.231

7.116

2.000

0.000

9.116

5.115

Khairpur

Approved
19.12.12

June-16

10.412

0.000

0.000

0.000

0.000

Khairpur

Approved
19.12.12

June-16

14.725

7.363

6.252

0.000

Khairpur

Approved
28.02.13

June-16

24.068

0.000

5.000

Khairpur

Approved
23.01.13
Approved
23.01.13

June-16

18.162

0.000

June-16

20.954

Kashmore

Approved
28.11.12

June-16

Sukkur

Approved
22.03.13
Approved
22.03.13

Khairpur

Sukkur

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

23.337

0.000

100

0.000

0.000

15.000

0.000

21

31

49.823

5.115

0.000

5.115

0.000

64

100

0.000

10.412

10.412

0.000

10.412

0.000

100

0.000

13.615

1.110

1.110

0.000

1.110

0.000

92

100

0.000

0.000

5.000

19.068

19.068

0.000

19.068

0.000

21

100

0.000

0.000

0.000

0.000

18.162

18.162

0.000

18.162

0.000

100

0.000

0.000

1.500

0.000

1.500

19.454

19.454

0.000

19.454

0.000

100

0.000

22.568

0.000

0.000

0.000

0.000

22.568

22.568

0.000

22.568

0.000

100

0.000

June-18

51.255

0.000

3.792

0.000

3.792

47.463

5.000

0.000

5.000

0.000

17

21.232

June-17

28.470

0.000

3.792

0.000

3.792

24.678

16.678

0.000

16.678

0.000

13

72

4.000

[ 292 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

1877

Improvement of Road from Trimunhi


road to Fakir Mohammad Path Road
mile 0/0-2/4 (4.0 kms)
W/R of Road from N.H.Way to Nabi
Shah Road (5.0 kms)
Improvement of road from Kandhra to
Dodanko via Wah Burira mile 0/0-4/0.
Improvement / Reconditioning of Road
from Salehpat Sikandarabad to Titrohi
via village Niazri mile 0/0-4/0 (6.83 Kms)

Sukkur

Approved
26.03.13

Sukkur

Improvement /Reconditioning of road


from Patni to Arrore via village
Abeejano mile 0/0-4/0 (6.44 Kms)
Improvement / Construction of Road
from R.Q.C Highway (near Dreha to
village Gill mile 0/0-1/0 (1.609)
W/R of Road from Mathelo to Jarwar
mile 0/0-6/0 (.60 Kms),(To be funded out
of 10% share of Royalty)
W/R of Road from National Highway at
Railway Phattak to village Agro (2 Kms)

1878
1879
1880

1881

1882

1883

1884

1885

1886

1887

1888

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

June-18

31.474

0.000

0.000

0.000

0.000

31.474

5.000

0.000

Approved
23.01.13
Approved
19.12.12
Approved
22.03.13

June-18

50.156

0.000

4.292

0.000

4.292

45.864

5.000

June-16

51.428

0.000

51.428

0.000

51.428

0.000

June-18

51.551

0.000

4.292

0.000

4.292

Sukkur

Approved
19.12.12

June-16

52.626

0.000

52.626

0.000

Sukkur

Approved
28.11.12

June-16

25.248

0.000

1.000

Ghotki

Approved
15.03.13

June-18

136.599

0.000

Sukkur

Approved
26.03.13

June-17

49.734

W/R of link Road from Gharo coast


Guard post to Ghulamullah via Babro
town mile 0/0-7/4+400' (12.00 kms)
Reconditioning of road from Johi Bhan
road Mangneja Khudabad Minor UC
Yar Muhammad Kalhoro mile 0/04/2(7.2 Km) .
Renovation / reconditioning of road from
village Rasheed Arain, Taluka Tando
Bagho, Districst Badin to Jhuda Sangi
Pharaho road mile 0/0-2/1 (3.5 Kms)

Thatta

Approved
19.04.13

June-18

Dadu

Approved
17.04.13

Badin

W/R of road from Saeedabad to Shaheed


Benazirabad road including Bridge over
Rohri Canal mile 6/0-25/0 (30.00 Km).
(Revised)

S.B.A

Sukkur
Sukkur

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

5.000

0.000

16

13.237

0.000

5.000

0.000

19

20.432

3.000

0.000

3.000

0.000

100

106

0.000

47.259

5.000

0.000

5.000

0.000

18

21.130

52.626

0.000

3.000

0.000

3.000

0.000

100

106

0.000

0.000

1.000

24.248

24.248

0.000

24.248

0.000

100

0.000

0.000

0.000

0.000

136.599

5.000

0.000

5.000

0.000

65.800

4.141

1.000

0.000

5.141

44.593

5.000

0.000

5.000

0.000

10

20

19.797

163.826

0.500

7.000

0.000

7.500

156.326

5.000

0.000

5.000

0.000

75.663

June-18

43.788

5.000

11.645

0.000

16.645

27.143

8.000

0.000

8.000

0.000

38

56

9.572

Approved
06.03.14

June-16

21.916

0.000

0.000

0.000

0.000

21.916

21.916

0.000

21.916

0.000

100

0.000

Approved
05.06.15

June-18

1844.812

150.000

810.000

0.000

960.000

884.812

75.000

0.000

75.000

0.000

52

56

404.906

[ 293 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

1889

Widening & Reconditioning of


Ghorabari to Gharo road mile 0/0-15/4
(25.00 kms)
Improvement / Repair of road from
Baghan Jangisar road to Muhammad
Hussain otho via Dargah khair shah
road mile 0/0-3/6 (6.0 kms)
Rehabilitation/Improvement of Road
from Qayas Bhayo Tori Bunglow to
Manjhi Pul via RD 219 Mujahidabad
Allah Bux Bahalkni and Rais
Inayatullah Bhayo Mile 0/0-12/0 (19.31
Km)
Widening / Reconditioning of Tando
Bago to Dehi Digri road mile 0/0-16/0
(25.76 kms).
W/R Badin Khoski Wango road mile
9/0-27/4 (Phase-I) 29.60 kms.
W/R of road from Nawabshah Daur @
Lashari Stop to Sher Ali Shah Daur
Jamal Shah road including connecting
village Nathani Imamuddin Keerio and
Deen Muhammad Zardari Mile 0/0-8/0
(12.87Kms)
W/R of road from Gambat Agra upto
Razidero road mile 0/0-11/0
Provision for Improvement of roads in
Sindh (N.Feroze, Khairpur, Suk, Gotki,
Shikarpur, Larkano, Shahdadko,
J'abad, Kashmore, Thatta, Hyderabad,
TA Yar, T.M. Khan, Matiari, M.Khas,
Sujawal, Thar, Sanghar, U.Kot, Badin,
Jamshoro, S.B.A. Dadu & Karachi)

Thatta

Approved
16.05.14

June-18

390.868

0.000

11.000

0.000

11.000

379.868

5.000

0.000

Thatta

Approved
16.05.14

June-18

53.742

0.000

17.858

0.000

17.858

35.884

5.000

Kashmore

Approved
25.04.14

June-18

912.188

0.000

140.000

0.000

140.000

772.188

Badin

Approved
19.02.05
(U/R)
Approved
13.11.08
Approved
26.06.12

June-16

86.215

96.215

0.000

0.000

96.215

June-17

445.904

439.904

6.000

0.000

June-17

67.786

18.000

22.000

Approved
30.01.08
Approved
24.03.15

June-16

126.226

137.300

June-18

2324.114

1890

1891

1892

1893
1894

1895
1896

Location of
Scheme/
District

Badin
S.B.A

Khairpur
Sindh

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
6

Actual
Exp. upto
Jun, 14
7

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

5.000

0.000

187.434

0.000

5.000

0.000

33

43

15.442

200.000

0.000

200.000

0.000

15

37

286.094

-10.000

1.000

0.000

1.000

0.000

112

113

0.000

445.904

0.000

18.000

0.000

18.000

0.000

100

104

0.000

0.000

40.000

27.786

6.000

0.000

6.000

0.000

59

68

10.893

0.000

0.000

137.300

-11.074

5.000

0.000

5.000

0.000

109

113

0.000

0.000

420.000

0.000

420.000

1904.114

45.000

0.000

45.000

0.000

18

20

929.557

1897

Improvement of Mataro Kario Ganhwar


to Kharwah road 0/0-24/0 - 38.64 Kms

Badin

Approved
05.06.15

June-18

622.044

0.000

0.000

0.000

0.000

622.044

35.000

0.000

35.000

0.000

293.522

1898

Improvement of Dhadhar road from


Bhaddo Kohli Goth to village Dr. Ashraf
Bhurgri (6 Kms)

Badin

Approved
13.03.15

June-18

51.278

0.000

5.000

0.000

5.000

46.278

8.000

0.000

8.000

0.000

10

25

19.139

[ 294 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

1899

Reconditioning of road from Talhar Rajo Khanani road to mile 0/0-9/0 (14.48
Kms)
W/R of road from Govt. Boys Primary
school Sita village road mile 0/0-5/0
(8.045 Kms). (To be funded out of 10%
share of Royalty)
W/R of road from Mounder Naka to Gul
Muhammad Dawach mile 0/0-10/0 (16.00
Kms) (To be funded out of 10% share of
Royalty)
Improvement of road from Kandi
Chukhi to Kumb village mile 0/0-3/1 (5.0
kms), (To be funded out of 10% share of
Royalty)
Improvement of road from Mehar to
Dokri via Radhan = (45.05 Kms), (To be
funded out of 10% share of Royalty)

Badin

Approved
14.05.15

June-18

133.336

0.000

0.000

0.000

0.000

133.336

5.000

0.000

Dadu

Approved
03.03.15

June-18

110.192

0.000

0.000

0.000

0.000

110.192

5.000

Dadu

Approved
03.03.15

June-18

217.041

0.000

0.000

0.000

0.000

217.041

Dadu

Approved
19.03.15

June-18

37.244

0.000

4.320

0.000

4.320

Dadu

Approved
18.02.15

June-18

357.891

0.000

0.000

0.000

Improvement / Construction of Road


from National Highway Bogo Wah on
Both site (10.00 Kms).(To be funded out
of 10% share of Royalty)
Widening & Reconditioning of Thull
bahu Khoso road Mile 7/5-14/0
(10.25Kms)
W/R of road from Mirpur Buriro to
village Garhi Syed (5.03Kms)
Improvement of road from Sheer Shah
Soori road to Koro Brohi = (3.20 kms)

Ghotki

Approved
18.02.15

June-18

260.815

0.000

0.000

Jacobabad

Approved
08.04.15

June-18

154.174

0.000

Jacobabad

Approved
22.04.15
Approved
19.03.15

June-17

85.760

June-16

Approved
19.03.15
Kamber- Approved
Shahdadkot 22.04.15

1900

1901

1902

1903

1904

1905

1906
1907

1908
1909

Improvement of road from Bhan Johi


road Larwarah Machi (4.42 Kms)
Improvement of road from Kamber
Gabidero (35.00 Kms)

Location of
Scheme/
District

Jamshoro

Jamshoro

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
6

Actual
Exp. upto
Jun, 14
7

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

5.000

0.000

64.168

0.000

5.000

0.000

52.596

1.000

0.000

1.000

0.000

108.021

32.924

5.000

0.000

5.000

0.000

12

25

13.962

0.000

357.891

1.000

0.000

1.000

0.000

178.446

0.000

0.000

260.815

5.000

0.000

5.000

0.000

127.908

3.000

0.000

3.000

151.174

35.000

0.000

35.000

0.000

25

58.087

0.000

20.000

0.000

20.000

65.760

60.000

0.000

60.000

0.000

23

93

2.880

18.523

0.000

5.000

0.000

5.000

13.523

13.523

0.000

13.523

0.000

27

100

0.000

June-16

28.462

0.000

7.200

0.000

7.200

21.262

21.262

0.000

21.262

0.000

25

100

0.000

June-18

703.056

0.000

0.000

0.000

0.000

703.056

20.000

0.000

20.000

0.000

341.528

[ 295 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

1910

Reconditioning of road from Karampur


Magsi road to Arsullah Banglani ,
Sodho, Banglani via village Jumo Khan
Dakhan to connect Thull Tangwani road
(24.93Kms)
Reconditioning of road from Tripuli
along Gandher minor to village Sanwal
Mazari (5.0Kms )
W/R of Road from Indus Highway to
Magsi via Karampur (24.05Kms)
Improvement of road from Thull Saifal
road to Mari Sardar Sher Muhammad
(5.00Kms),(To be funded out of 10%
share of Royalty)
Reconditioning of road from Khuhra
Ripri road mile (16.09 Kms)
Rehabilitation of road Hingorja Sagyoon
of Taluka Sobho Dero (6.0 Kms)

Kashmore

Approved
08.04.15

June-18

199.318

0.000

11.400

0.000

11.400

187.918

70.000

0.000

Kashmore

Approved
26.03.15

June-18

54.820

0.000

0.000

0.000

0.000

54.820

5.000

Kashmore

Approved
06.03.15
Approved
26.03.15

June-18

443.389

0.000

200.000

0.000

200.000

243.389

June-17

41.131

0.000

2.000

0.000

2.000

Approved
06.02.15
Approved
19.03.15

June-18

199.674

0.000

100.000

0.000

June-18

47.245

0.000

0.000

Rehabilitation of road from Gambat to


Ranipur (6.40 Kms)
Reconditioning of road from Sagyoon to
Waryam Sial Abdul Karim Kharal road
mile 0/0-4/0(6.43Kms)
Reconditioning of road from Mithri to
Hamayoon via Rahim Bux Wassan
(5.00Kms)
W/R i/c Raising of Beero Chandio Town
i/c Side Drain i/c Footh Path.
W/R of Larkana Mirokhan road mile
1/6-17/0 (24.53 Kms)
W/R National Highway to Mori Yousuf
Khan Hajano via Dargah Hazrat Syed
Ahmed Shah Lakyari road (7.00 Kms)

Khairpur

Approved
06.02.15
Approved
28.01.15

June-18

82.560

0.000

June-18

46.737

Khairpur

Approved
12.01.15

June-16

Larkana

Approved
22.04.15
Approved
22.04.15
Approved
18.03.15

W/R of road National Highway to Tando


Adam via Bhit Shah mile 0/0-17/0 (27.20
Kms)

Sanghar

Approved
27.01.15

1911

1912
1913

1914
1915

1916
1917

1918

1919
1920
1921

1922

Location of
Scheme/
District

Kashmore

Khairpur
Khairpur

Khairpur

Larkana
Matiari

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
6

Actual
Exp. upto
Jun, 14
7

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

70.000

0.000

41

58.959

0.000

5.000

0.000

24.910

150.000

0.000

150.000

0.000

45

79

46.695

39.131

25.000

0.000

25.000

0.000

66

7.066

100.000

99.674

8.000

0.000

8.000

0.000

50

54

45.837

0.000

0.000

47.245

5.000

0.000

5.000

0.000

11

21.123

40.000

0.000

40.000

42.560

5.000

0.000

5.000

0.000

48

55

18.780

0.000

8.000

0.000

8.000

38.737

5.000

0.000

5.000

0.000

17

28

16.869

49.603

0.000

20.000

0.000

20.000

29.603

29.603

0.000

29.603

0.000

40

100

0.000

June-18

64.697

0.000

0.000

0.000

0.000

64.697

6.000

0.000

6.000

0.000

29.349

June-18

527.355

0.000

0.000

0.000

0.000

527.355

20.000

0.000

20.000

0.000

253.678

June-18

124.105

0.000

10.000

0.000

10.000

114.105

40.000

0.000

40.000

0.000

40

37.053

June-18

747.346

0.000

0.000

0.000

0.000

747.346

1.000

0.000

1.000

0.000

373.173

[ 296 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

1923

Improvement of Khyber to Tando Adam


via Oderolal mile 0/0-15/0 (24.0 Kms)

Sanghar

Approved
27.01.15

June-18

515.874

0.000

0.000

0.000

0.000

515.874

1.000

0.000

1924

W/R of road from village Sardar Shadi


Khan Almani to Tharushah city Aasi
Chowk road (7.64Kms)
W/R of Moro Manahyoon, Mithani to
N'Feroze Bhurund (29.5 Kms).
Reconditioning of road from Sobho
Trimoho Road Bhombhatpur to Dargah
Khanan Shah, Bus stop to Village
Shahan Bhagat (6.00 Kms)
Reconditioning of road from National
Highway to village Roshanabad road
Reconditioning of road from Maqsoodo
Rind Lundo to Abu Bakar Zardari
House road mile 0/0-3/1 (5.0 Kms)

N. Feroze

Approved
06.02.15

June-18

131.790

0.000

1.700

0.000

1.700

130.090

15.000

N. Feroze

Approved
06.02.15
Approved
13.03.15

June-18

442.221

0.000

0.000

0.000

0.000

442.221

June-18

55.612

0.000

0.000

0.000

0.000

Approved
19.03.15
Approved
26.03.15

June-16

10.045

0.000

0.000

0.000

June-18

37.471

0.000

0.000

W/R of road from Maqsoodo Rind to


Sanghar
Shahpurchakar road mile 0/0-8/0= (12.87
Kms)
Improvement of road from Madeji to
Shikarpur
Dakhan Road mile 5/0-8/0 (5.00Kms)
W/R of road from RQC Lakhi Ghulam
Shikarpur
Shah to Khanpur upto Shikarpur
Rustam road (11.50 Kms)
Improvement / Construction of road
Sujawal
from Bathoro to Dewan Sugar Mill along
Fateh Wah road mile 0/0-7/0 (11.27 kms).

Approved
14.05.15

June-18

176.771

0.000

Approved
19.03.15
Approved
29.05.15

June-18

59.755

June-18

Approved
05.06.15

1933

Widening / Reconditioning of road from


Jati to Ladyoon mile 0/0-15/7 (25.52 Km)

Sujawal

1934

Widening / Reconditioning of road from


Jati to Khorwah mile 13/0-32/0= (31.0
Km)
Wideining / Reconditioning of road from
Bagerji to Jahano (Asphalt)(5.40Kms)

1925
1926

1927
1928

1929

1930
1931

1932

1935

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Jun'15 Jun'16

Financial Projec
2016-17

16

17

1.000

0.000

257.437

0.000

15.000

0.000

13

57.545

15.000

0.000

15.000

0.000

213.611

55.612

6.000

0.000

6.000

0.000

11

24.806

0.000

10.045

10.045

0.000

10.045

0.000

100

0.000

0.000

0.000

37.471

5.000

0.000

5.000

0.000

13

16.236

0.000

0.000

0.000

176.771

3.000

0.000

3.000

0.000

86.886

0.000

0.000

0.000

0.000

59.755

12.000

0.000

12.000

0.000

20

23.878

231.761

0.000

0.000

0.000

0.000

231.761

10.000

0.000

10.000

0.000

110.881

June-18

109.289

0.000

0.000

0.000

0.000

109.289

10.289

0.000

10.289

0.000

49.500

Approved
03.03.15

June-18

306.209

0.000

0.000

0.000

0.000

306.209

10.000

0.000

10.000

0.000

148.105

Sujawal

Approved
08.04.15

June-18

410.803

0.000

0.000

0.000

0.000

410.803

10.000

0.000

10.000

0.000

200.402

Sukkur

Approved
18.02.15

June-18

109.000

0.000

0.000

0.000

0.000

109.000

7.000

0.000

7.000

0.000

51.000

S.B.A
Sanghar

FPA

Financial Progress
in %age upto

15

Khairpur

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

18

[ 297 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

1936

W/R of road from Arrore Bachal Shah


to Choundko (32.18 Kms)
W/R of road from Nirch Regulator to
B.H.U Sultanpur (13.05 Kms)
W/R of road from Sukkur Airport to
Baharo village via Bagerji & Tamachani
(with Asphalt)(19.3Kms)
Reconditioning of road from Sindh Small
Industries to Gulshan Iqbal Quershi
vilage via Mehran Marble Shwaim
Facotri to Quershi Goth (16.09 Kms)

Sukkur

Approved
06.02.15
Approved
06.02.15
Approved
18.02.15

June-18

342.324

0.000

16.500

0.000

16.500

325.824

7.000

0.000

June-18

222.393

0.000

0.000

0.000

0.000

222.393

7.000

June-18

313.688

0.000

0.000

0.000

0.000

313.688

Sukkur

Approved
18.02.15

June-18

278.006

0.000

0.000

0.000

0.000

T. A. Yar

Approved
22.04.15

June-18

732.492

0.000

0.000

0.000

T.M.Khan

Approved
29.05.15

June-18

246.617

0.000

0.000

Approved
08.04.15

June-18

139.940

0.000

Approved
19.03.15

June-16

17.491

Approved
29.05.15
Approved
22.04.15

June-18

1937
1938

1939

1940

1941

1942

1943

1944
1945

1946

1947

Widening / Reconditioning Tando


Allahyar - Tando Adam road (28.96
Kms)
Improvement of road from 70 Mori to
Khorwah mile 0/0-13/2 (21.23 Kms.(To
be funded out of 10% share of Royalty)

Location of
Scheme/
District

Sukkur
Sukkur

W/R of road from Chuhar Jamali Shah


Sujawal
Bandar road to village Haji Allah Dino
Mandro road mile 0/0-6/6 (10.86
Kms),(To be funded out of 10% share of
Royalty)
Widening / Reconditioning of road from
Umerkot
Umerkot Chore road to village Khararo
Syed (1.5 kms)
Improvement of Rustam Sher Ali Jatoi
Shikarpur
Road Mile 1/0-3/1 (3.6 Kms)
Widening / Reconditioing of Road from
Umerkot
Samara to Buchabund Road (23.00
Kms)
Widening / Reconditioning of Road from Khairpur
Agra to Sobodero via Haji Mohammad
Tahir Khuhro Road mile 0/0-5/0 (7.0
KMS).
Reconditioning of Road from Deh 170 B Mirpurkhas
to Tando Jan Muhammad Taluka Digri
(24.0 Kms)

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
6

Actual
Exp. upto
Jun, 14
7

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

7.000

0.000

159.412

0.000

7.000

0.000

107.697

7.000

0.000

7.000

0.000

153.344

278.006

8.000

0.000

8.000

0.000

135.003

0.000

732.492

5.000

0.000

5.000

0.000

363.746

0.000

0.000

246.617

10.000

0.000

10.000

0.000

118.309

0.000

0.000

0.000

139.940

5.000

0.000

5.000

0.000

67.470

0.000

3.000

0.000

3.000

14.491

14.491

0.000

14.491

0.000

17

100

0.000

80.568

0.000

0.000

0.000

0.000

80.568

8.000

0.000

8.000

0.000

10

36.284

June-18

282.053

0.000

0.000

0.000

0.000

282.053

5.000

0.000

5.000

0.000

138.527

Approved
06.02.15

June-18

160.810

0.000

0.000

0.000

0.000

160.810

5.000

0.000

5.000

0.000

77.905

Approved
14.05.15

June-18

197.066

0.000

0.000

0.000

0.000

197.066

2.000

0.000

2.000

0.000

97.533

[ 298 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

1948

Improvement of Road from Bhutta


Mohallah, Sarwary Colony Hala road
(4.0 Kms)
Reconiditiong of Road from Kameja
Shakh to Village Mehar Shah (3.5 Kms)

Matiari

Approved
13.03.15

Matiari

1950

W/R of road from Kumb Nawabshah to


Daood Ji Mori to Village Muharram
Khan Nagore via Ibraheem Larak road
mile 0/0-2/4 (4.00 Kms)

1951

1949

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

June-18

56.894

0.000

5.000

0.000

5.000

51.894

3.000

0.000

Approved
13.03.15

June-16

29.837

0.000

5.000

0.000

5.000

24.837

24.837

N. Feroze

Approved
03.03.15

June-18

65.180

0.000

0.000

0.000

0.000

65.180

Reconditioning of road:
T.M.Khan
i) Reconditioning of road from village
Asghrabad to village Wasi Malook Shah
via Wasi Malook Shah Minor UC
Saeedpur Taluka Bulri Shah Karim road
mile 0/0-3/3 + 330 (5.53 kms) (Approved
Cost of Rs. 37.994 Million)
ii) Reconditioning of link road from
Cattle Farm road to village Hafiz Shah
U/C Saeed Matto Taluka Bulri Shah
Karim road mile 0/0-5/0 (8.0 kms) )
(Approved Cost of Rs. 42.688 Million)
iii) Reconditioning of link road from
Shaikh Bhirkio road to village Sambhani
Check post U/C Shaikh Bhirkio Taluka
Tando Muhammad Khan road mile 0/03/0+330 (5.53 kms) (Approved Cost of
Rs. 30.769 Million )
iv) Reconditioning of road from Old Bus
Stop to village Sobho Khan Leghari via
college road U/C-2 Taluka Tando
Muhammad Khan road mile 0/0-0/5 (1.0
kms) (Approved Cost of Rs. 9.533
Million)

Approved
08.04.15

June-18

122.350

0.000

0.000

0.000

0.000

122.350

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

3.000

0.000

14

24.447

0.000

24.837

0.000

17

100

0.000

7.000

0.000

7.000

0.000

11

29.090

15.000

0.000

15.000

0.000

12

53.675

[ 299 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

1952

W/R of road from Nawabshah-Sakrand


road to Punhal Khan Chandio, UC Dalel
Dero, Taluka Sakrand mile 0/0-4/0 (with
asphalt surface)

S.B.A

Approved
14.05.15

June-18

157.505

0.000

0.000

0.000

0.000

157.505

5.000

0.000

1953

Improvement of road from Tando


T.M.Khan
Muhammad Khan Mula Katiar Road
(17.60 Kms)
W /R road from Varr Sarhari road to
S.B.A
connect Sarhari Sakrand Road via
Mahar Ali Jamali road (Asphalt Surface)
(6.44 Km)
W/R of road from Dhani Parto Chandio
S.B.A
to connect Pangrio Mori Chanecer Road
(5.0 km)
Improvement / Reconditioning of road
Umerkot
Bucha Bund to Ghulam Nabi Shah
(23.35 Km),
Widening & Reconditioning of Badin Badin
Tando Bago - Jhudo Road (Via Pangrio)
from 12'-0 Feet to 24'-0 Feet Width

Approved
29.05.15

June-18

106.560

0.000

0.000

0.000

0.000

106.560

12.000

Approved
22.04.15

June-18

111.017

0.000

0.000

0.000

0.000

111.017

Approved
22.04.15

June-18

95.333

0.000

0.000

0.000

0.000

Approved
08.04.15

June-18

179.278

0.000

0.000

0.000

Approved
21.01.11

June-18

787.600

636.657

37.750

0.000

39662.542

7492.411

4824.317

1954

1955

1956

1957

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

TOTAL IMPROVEMENT (ONGOING)

Actual
Exp. upto
Jun, 14
7

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

5.000

0.000

76.253

0.000

12.000

0.000

11

47.280

5.000

0.000

5.000

0.000

53.009

95.333

5.000

0.000

5.000

0.000

45.167

0.000

179.278

5.000

0.000

5.000

0.000

87.139

674.407

113.193

15.000

0.000

15.000

0.000

86

88

49.097

0.000 12316.728 27345.815

2575.627

0.000

2575.627

0.000

12496.794

IMPROVEMENT (NEW)
1958

1959

1960

Improvement of road from Hatim Jatoi


Phatak to Phulji Station road (11.06
Kms), (To be funded out of 10% share of
Royalty)
Improvement of road from Phulji Station
to Piaro Station road (10.00 Kms), (To be
funded out of 10% share of Royalty)

Dadu

UnApproved

June-18

110.784

0.000

0.000

0.000

0.000

110.784

27.696

0.000

27.696

0.000

25

41.544

Dadu

UnApproved

June-18

67.904

0.000

0.000

0.000

0.000

67.904

16.976

0.000

16.976

0.000

25

25.464

W/R of road from Mirpur to Bago


Dhahoo road (10.45 Kms).(To be funded
out of 10% share of Royalty)

Ghotki

Un-approved June-18

92.008

0.000

0.000

0.000

0.000

92.008

23.002

0.000

23.002

0.000

25

34.503

[ 300 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

1961

1962

1963

1964

1965

1966
1967

1968

1969

1970
1971

1972

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Kashmore

Unapproved

June-18

159.217

0.000

0.000

0.000

0.000

159.217

39.804

0.000

Kashmore

Unapproved

June-18

106.804

0.000

0.000

0.000

0.000

106.804

26.700

Reconditioning of road from Sui Line


Kashmore
UnJune-18
purani via Attal Mazari upto Pat Feeder
approved
(9.65Kms),(To be funded out of 10%
share of Royalty)
Reconditioning of road from Magsi Stop Kashmore
UnJune-18
upto Jan Mohammad Khoso
approved
(16.9Kms),(To be funded out of 10%
share of Royalty)
Rehabilitation / Construction of road
Khairpur
UnJune-18
from Sagyoon road to village Mehmood
approved
Channa road(6.44Kms)
Improvement / Reconditioning of various Khairpur
UnJune-18
roads Khairpur (8 Units)
approved
Improvement / Rehabilitation / ReLarkana
UnJune-18
Construction of Damaged portions over
approved
Head Bridge Over Railway Line
Larkano
Improvement of road from Matiari to
Matiari Un-approved June-18
Allah Dino Sand road mile 0/0-15/0
(24.15 Kms)
Improvement of road from Allah wala
Matiari Un-approved June-18
Chowk to Shah Habib Petrol pump via
Dargah Shah Abdul Latif Bhittai Bhit
Shah road mile 0/0-2/0
Reconditioning of Samaro Jhudo road
MirpurkhasUn-approved June-18
mile 0/0-14/5 (42.00 Kms)
W / R of road from 60th mile road to
S.B.A Un-approved June-18
Nawabshah Daur road mile 0/0-3/96
(6.03 km)
Reconditioning of road from Yousif
S.B.A Un-approved June-18
Dahri Mori Regulator to Moro road mile
0/0-12/0 (19.31 Km)

96.749

0.000

0.000

0.000

0.000

96.749

156.325

0.000

0.000

0.000

0.000

60.540

0.000

0.000

0.000

200.000

0.000

0.000

60.000

0.000

349.153

Reconditioning of road from kandhkot


Malaggzar road @ point 27 mile to
Rasaldar (8.04Kms)
Reconditioning of road from RD-45 via
Rais Khan upto Badani (11.66 Kms)

Actual
Exp. upto
Jun, 14
7

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

39.804

0.000

25

59.707

0.000

26.700

0.000

25

40.052

24.187

0.000

24.187

0.000

25

36.281

156.325

39.080

0.000

39.080

0.000

25

58.623

0.000

60.540

15.135

0.000

15.135

0.000

25

22.703

0.000

0.000

200.000

50.000

0.000

50.000

0.000

25

75.000

0.000

0.000

0.000

60.000

15.000

0.000

15.000

0.000

25

22.500

0.000

0.000

0.000

0.000

349.153

87.288

0.000

87.288

0.000

25

130.933

54.962

0.000

0.000

0.000

0.000

54.962

13.740

0.000

13.740

0.000

25

20.611

372.772

0.000

0.000

0.000

0.000

372.772

93.193

0.000

93.193

0.000

25

139.790

170.619

0.000

0.000

0.000

0.000

170.619

42.655

0.000

42.655

0.000

25

63.982

348.665

0.000

0.000

0.000

0.000

348.665

87.166

0.000

87.166

0.000

25

130.750

[ 301 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

1973

Reconditioning of road from Gupchani


Chowdagi stop to Shahdadpur road mile
0/0-13/ (20.91 Km)
W/R of road from Malook Shar to
Sachal Khaskheli via Ghulam Qadir
Dahri mile 0/0-7/0 (11.0 Kms)
Reconditioning of Shahdadpur Hingoro
road to Lundo Town road mile 0/0-8/0
(12.87 Kms)
Improvement of road from Faizu Jahan
Khan Indus Highway Sardar Fateh
Muhammad Khan Jatoi upto
Nepreiabad (12.010Kms)
Improvement of road from Ruk to Lakhi
(7.00Kms)
Reconditioning of road from Palijani
Station to Tando Adam via Shahpur
road mile 0/0-6/0 (9.6 Kms)
W/R of road from Bago Wah Pull to
village Sardar Muhammad Khan Ghoto,
National Highway to village Sardar
Muhammad Khan Ghoto via Jari Wah
(20 Kms).(To be funded out of 10%
share of Royalty)
Reconditioning of road from parillal line
to mohalla Saleemabad via Faizabad
Colony upto Red Palace Hotel near old
National Highway i/c masonary
structure 1/2 premixed carpet (4 Kms)

S.B.A

Un-approved June-18

291.894

0.000

0.000

0.000

0.000

291.894

72.974

0.000

S.B.A

Un-approved June-18

283.025

0.000

0.000

0.000

0.000

283.025

70.756

Sanghar Un-approved June-18

102.348

0.000

0.000

0.000

0.000

102.348

June-18

172.726

0.000

0.000

0.000

0.000

UnJune-18
approved
Un-approved June-18

82.773

0.000

0.000

0.000

206.918

0.000

0.000

1974

1975

1976

1977
1978

1979

1980

Location of
Scheme/
District

Shikarpur

Shikarpur
Matiari

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
4

Unapproved

Actual
Exp. upto
Jun, 14
7

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

72.974

0.000

25

109.460

0.000

70.756

0.000

25

106.135

25.587

0.000

25.587

0.000

25

38.381

172.726

43.182

0.000

43.182

0.000

25

64.772

0.000

82.773

20.693

0.000

20.693

0.000

25

31.040

0.000

0.000

206.918

51.730

0.000

51.730

0.000

25

77.594

Ghotki

Unapproved

June-18

155.022

0.000

0.000

0.000

0.000

155.022

38.755

0.000

38.755

0.000

25

58.134

Khairpur

Unapproved

June-18

60.000

0.000

0.000

0.000

0.000

60.000

15.000

0.000

15.000

0.000

25

22.500

1981

Rehabilitation / Reconditioning of road


from Thehri Phatak to Wari Goth upto
link road Kandhra via Central Jail (with
Asphalt Carpet) (10.4 Kms)

Khairpur

Unapproved

June-18

120.000

0.000

0.000

0.000

0.000

120.000

30.000

0.000

30.000

0.000

25

45.000

1982

Reconditioning of road from Telegraph


Colony to Muslim Town (3.2 Kms)

Jamshoro

Unapproved

June-18

29.000

0.000

0.000

0.000

0.000

29.000

7.250

0.000

7.250

0.000

25

21.800

[ 302 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

1983

Reconditioning of road from Begu Kaka


to village Agro Rahu Taluka Saeedabad
(3.2 Kms),(To be funded out of 10%
share of Royalty)
Reconditioning of road from Sarri to
Molh (4.5 Kms)
Reconditioning / Construction of road
from Indus Highway to connect peerjan
Bajkani road (along inspection path of
Uner Shakh) via Nawab Khan Dahani
road mile 0/0-4/2 (7 Kms)

Matiari

Unapproved

Jamshoro

1984
1985

1986

1987

1988

Reconditioning of road from Garhi


Khero to Osta Muhammad road upto
Balochistan Border (4 Kms)
Reconditioning of road Mirpur Mathelo
to Keenjhar Fateh Ali Khan via Dad
Laghari (4 Kms),(To be funded out of
10% share of Royalty)
Wideining / Reconditioning of link Road
from Moro Bandhi to Village Shah Beg
Sabki via Dewan jo Kayo road Mile 0-05/0 (8.00 km)
TOTAL IMPROVEMENT (NEW)
TOTAL IMPROVEMENT:-

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

June-18

28.000

0.000

0.000

0.000

0.000

28.000

7.000

0.000

Unapproved
Unapproved

June-18

48.000

0.000

0.000

0.000

0.000

48.000

12.000

June-18

85.000

0.000

0.000

0.000

0.000

85.000

Jacobabad

Unapproved

June-18

40.000

0.000

0.000

0.000

0.000

Ghotki

Unapproved

June-18

40.000

0.000

0.000

0.000

N. Feroze

UnApproved

June-18

86.527

0.000

0.000

0.000

4237.735
43900.277

0.000
7492.411

0.000
4824.317

Kashmore

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

7.000

0.000

25

22.500

0.000

12.000

0.000

25

18.000

21.250

0.000

21.250

0.000

25

31.875

40.000

10.000

0.000

10.000

0.000

25

15.000

0.000

40.000

10.000

0.000

10.000

0.000

25

15.000

0.000

86.527

21.632

0.000

21.632

0.000

25

32.448

0.000
0.000 4237.735
0.000 12316.728 31583.549

1059.431
3635.058

0.000
0.000

1059.431
3635.058

0.000
0.000

1612.077
14108.871

CONSTRUCTION (ON-GOING)
1989
1990

1991

Construction of Road in Village Photo


Khan Zardari Mile 0/0-2/3 (3.2 Km)
Const: / Improvement of road from
N'Feroze to Nawabshah.mile 8/0-38/0 &
48/0-54/0 (57.00 Kms)
Construction of Road from Indus
Highway at Mile 157/0 to Suprio Bund
along Rajwah inspection Park Mile 0/010/0 16 Kms), (To be funded out of 10%
share of Royalty)

N. Feroze
S.B.A

Dadu

Approved
12.12.13
Approved
27.03.09

June-18

37.416

0.000

5.227

0.000

5.227

32.189

5.000

0.000

5.000

0.000

14

27

0.000

June-18

590.056

294.979

35.000

0.000

329.979

260.077

5.000

0.000

5.000

0.000

56

57

127.539

Approved
06.12.08

June-18

117.082

39.750

10.000

0.000

49.750

67.332

5.000

0.000

5.000

0.000

42

47

31.166

[ 303 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

1992

Construction of road from Kaser Dasti


to Village Wahid Bux Mazari Mangwani
mile 0/0-4/0 (6.44 Kms),(To be funded
out of 10% share of Royalty)

Ghotki

Approved
04.02.09

1993

Construction of road from Thano


Ahmed Khan to Astan Ghru Bal Puri
Garh road mile 0/0-9/0 (14.50 Kms).
Construction of road Lakha Kandiyari
(Kondayari road) to Village Zanwar
Khair Mohamamd Lashari Via Haji
Allah Wadhayo Bhanbhan mile 0/0-8/6.
Bhango Pholare road (Ameer Poto) to
Village Ghulam Rasool Janwari Via
Kamalo Bhango Haji Murad Burdi pir
Bux Jarper & Kalhora Village mile 0/07/4 (12.0 Kms).
Construction of road NHA Via Mehar
Shah Main Drain up to Wada Mehesar
Road road mile 0/0-7/0 (11.26 Kms)

Jamshoro

1997

Cosntruction of road Khora Kamal Dero


Road to Mohammad Islmail Via Golo
Wahan road mile 0/0-4/4 (7.0 Kms).

1998

Construction of link road from Ghazi


Sanghar
Khan Hingorjo - ADP road to Village
Tar @ Mile 0/0-8/1 13.0 Kms
Construction of road Jamalpur to
Shikarpur
Village Samiullah Shah Rashidi UC
Mirzapur mile 0/0-4/4 (7.0 Kms)
Construction of road from Long Fakir to
Sukkur
Saleh Pat Nara Canal Bridge mile 0/0-9/4
(15.2 Kms).
Construction of road from Chachro
Tharparkar
vakiro to Aday-Jo-Tar mile 0/0-44/0 = 440 (M) = 70.84 Kms.

1994

1995

1996

1999

2000

2001

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

June-18

83.810

45.802

9.000

0.000

54.802

29.008

8.000

0.000

Approved
17.11.08

June-18

86.118

38.700

6.000

0.000

44.700

41.418

5.000

Khairpur

Approved
16.01.10

June-16

101.636

23.500

3.000

0.000

26.500

75.136

Khairpur

Approved
09.02.10

June-17

84.080

42.750

12.000

0.000

54.750

Khairpur

Approved
02.02.10

June-16

84.527

52.500

26.685

0.000

Khairpur

Approved
09.02.10

June-16

50.663

22.000

25.000

Approved
03.02.10

June-18

138.468

38.500

Approved
11.12.09

June-18

107.107

Approved
12.03.09

June-18

Approved
10.01.05

June-18

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

8.000

0.000

65

75

0.000

0.000

5.000

0.000

52

58

18.209

5.000

0.000

5.000

0.000

26

31

35.068

29.330

5.000

0.000

5.000

0.000

65

71

20.330

79.185

5.342

5.342

0.000

5.342

0.000

94

100

0.000

0.000

47.000

3.663

3.663

0.000

3.663

0.000

93

100

0.000

33.000

0.000

71.500

66.968

6.000

0.000

6.000

0.000

52

56

30.484

6.600

0.000

0.000

6.600

100.507

1.000

0.000

1.000

0.000

49.754

212.383

125.850

18.000

0.000

143.850

68.533

5.000

0.000

5.000

0.000

68

70

31.767

392.010

242.400

66.000

0.000

308.400

83.610

6.000

0.000

6.000

0.000

79

80

0.000

[ 304 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

2002

Construction of road from Kaloi to Diplo


via Luss Farm mile 0/0-39/2 = 39-2 (M)
= 63.19 Kms.
Construction of road from Diplo Sajai
Gurrah Bah To Naukot road mile 0/035/0 = 35-0 (M) = 56.35 Kms.
(a) Construction of road from Ratnor to
Annupani mile 0/0-13/6 = 13-6 (M) =
22.13 Kms.
(b) Liakro to Kapuri Jasar mile 0/0-14/3
= 14-3 (M) = 23.14 Kms.
Construction of road from Jalo-joChaunro to Khokrapar mile 0/0-21/7 =
21-7 (M) = 35.21 Kms.
Construction of road from Bostan
Nabisar road to Jamal Lashari Via Palio
Khan Rind with link Sawan Khan Rind
& Sultan Chandio Mile 0/0-8/6 (14.0
Kms)
Construction of road from Talpur Wada
to village Khawaja (3.00 Kms).
Construction of Vee Hingorja to
Veenjhanihari road mile 0/0-10/0 (16
Kms)
Construction of Sindh Coastal Highway
Sakro / Gaghar Phatak - Keti Bandar Shah Ghorabari/ Bunder - Ali Bunder
(Ghaghar Phatak - Keti Bunder Phase-1)
of 90.0 Kms
Construction of road Diplo - Islamkot
road to Konral via Verhar Taluka Diplo
(10.00 Kms).
Construction of road from Mouladad
Phatak Jacobabad to Bye Pass via Haji
Lakhmire Brohi, Taluka Garhi Khairo
(3.00 Kms)

2003

2004

2005

2006

2007
2008

2009

2010

2011

Location of
Scheme/
District
3

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
4

Tharparkar Approved
31.12.04
(U/R)
Tharparkar Approved
10.01.05
(U/R)
Tharparkar Approved
28.12.04
(U/R)

Actual
Exp. upto
Jun, 14
7

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

FPA

Financial Progress
in %age upto

Jun'15 Jun'16
15

16

17

Financial Projec
2016-17
18

June-18

534.840

356.000

50.000

0.000

406.000

128.840

6.000

0.000

6.000

0.000

76

77

61.420

June-16

492.692

495.892

0.000

0.000

495.892

-3.200

1.000

0.000

1.000

0.000

101

101

0.000

June-16

353.187

360.552

0.000

0.000

360.552

-7.365

1.000

0.000

1.000

0.000

102

102

0.000

Umerkot

Approved
02.03.06

June-18

423.650

284.500

0.000

0.000

284.500

139.150

1.000

0.000

1.000

0.000

67

67

69.075

Umerkot

Approved
01.11.07

June-16

78.876

57.191

8.000

0.000

65.191

13.686

13.686

0.000

13.686

0.000

83

100

0.000

Approved
21.02.11
Tharparkar Approved
26.09.12

June-16

19.143

9.643

0.000

0.000

9.643

9.500

9.500

0.000

9.500

0.000

50

100

0.000

June-18

299.954

5.000

15.500

0.000

20.500

279.454

6.000

0.000

6.000

0.000

136.727

Approved
07.01.07

June-18

2407.949

1132.874

220.000

0.000

1352.874

1055.075

30.000

0.000

30.000

0.000

56

57

512.538

Tharparkar Approved
23.05.12

June-18

178.406

0.000

0.000

0.000

0.000

178.406

1.000

0.000

1.000

0.000

88.703

Jacobabad

June-16

19.276

8.800

0.000

0.000

8.800

10.476

10.476

0.000

10.476

0.000

46

100

0.000

Khairpur

Thatta

Approved
31.12.11

[ 305 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

2012

Location of
Scheme/
District
3

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
4

Actual
Exp. upto
Jun, 14
7

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

FPA

Financial Progress
in %age upto

Jun'15 Jun'16
15

16

17

Financial Projec
2016-17
18

Construction of Main Jhullori-Dengan


Mirpurkhas Approved
road to Main Umerkot road, connect 78
24.01.12
mile Mori road / Sugar Mill road via
Tawakal Lashari, Wagho Kolhi, Dhani
Buksh Malkani & Hemraj Kolhi village
mile 0/0-7/4 (12.08 Kms)
Construction of road from village
Tharparkar Approved
Alamsar to village Jessejopar taluka
23.05.12
Chachro mile 0/0-3/6 (6.00 Kms)
Construction of road from village
Tharparkar Approved
Jessejopar to village Neblo Taluka
23.05.12
Chachro mile 0/0-6/2 (10.00 Kms).
Construction of road from Kamber
Larkana Approved
Railway Track, new Nazar Mohalla
17.10.12
alongwith Rice Canal IP Side to Circular
By-Pass 5.00 Kms
Construction of roads in UC Khudadad
Dadu
Approved
Taluka Dadu (7.44 Kms), (To be funded
26.10.11
out of 10% share of Royalty)

June-18

114.061

55.052

8.491

0.000

63.543

50.518

5.000

0.000

5.000

0.000

56

60

22.759

June-18

129.996

0.000

0.000

0.000

0.000

129.996

1.000

0.000

1.000

0.000

64.498

June-18

163.204

0.000

0.000

0.000

0.000

163.204

1.000

0.000

1.000

0.000

81.102

June-18

59.953

21.995

8.491

0.000

30.486

29.467

5.000

0.000

5.000

0.000

51

59

0.000

June-16

58.475

27.800

16.163

0.000

43.963

14.512

14.512

0.000

14.512

0.000

75

100

0.000

2017

Construction of Road from Guddu along


Patt Feeder Canal upto RD-109 Shahi
Wah upto Border of Balouchistan
Province mile 0/0-9/0 =90-0 M=144.90
Kms (Taluka Kashmore).

Jacobabad

Approved
23.05.12

June-18

987.500

395.236

0.000

0.000

395.236

592.264

5.000

0.000

5.000

0.000

40

41

293.632

2018

Construction of Road from Sanhri Sarak Jacobabad


to Noor Wah mile 0/0-18/6 (30.0 Kms)

Approved
15.04.05

June-18

133.129

67.000

17.000

0.000

84.000

49.129

7.000

0.000

7.000

0.000

63

68

21.065

2019

Constrcution / Repair of road from


Tando Bago Jhudo road at mile 17/0 to
connect Tando Bago Digri road at point
Alamabad mile 0/0-8/6 (14.08 Kms)

Badin

Approved
09.04.08

June-16

69.146

58.000

10.146

0.000

68.146

1.000

8.000

0.000

8.000

0.000

99

110

0.000

2020

Construction of road from Dehi Tando


Jan Mohammad road @ point 57 Mori
to Jhudo with link to village Haji
Ibrahim Jalo and village Rori village
Ghulam Mustafa Brohi 0/0-12/0 (19.2
km)

Badin

Approved
08.01.08

June-18

119.388

68.500

8.000

0.000

76.500

42.888

6.000

0.000

6.000

0.000

64

69

18.444

2013

2014

2015

2016

[ 306 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

2021

2022

2023

2024

2025

2026

2027

2028
2029

2030

2031

2032

Location of
Scheme/
District
3

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
4

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

FPA

Financial Progress
in %age upto

Jun'15 Jun'16
15

16

17

Financial Projec
2016-17
18

Reconstruction of road from Phardo


Badin
Approved
Jamali to Khudro mile 0/0-7/0 (11.20
30.01.08
Kms)
Construction of Hyderabad Mirpurkhas Hyderabad Approved
Bye pass road mile 0/0-6/4 = 6-4 = 10.46
19.09.05
Kms.
Construction of Tando Ahmed Khan
Jamshoro Approved
Karchat Center (Kherthar National
27.10.05
Park) Thano Bulla Khan mile 0/0-45/0 =
45-0 (M) = 72.45 Kms.
Construction of Mirpurkhas By pass
Mirpurkhas Approved
road connect Hyderabad road Tando
22.02.07
Adam road Khan road and Sindhri road
with over head bridge near Ratanabad
Road Mile 0/0-11/0 (M) = 17.71 Kms .
Construction of road from Nawabshah
Sanghar
Approved
Shahdadpur Hala Khyber road mile 0/003.05.06
38/4 = 38-4 (M) = 61.98 Kms.
Construction of road from MKhas to
Sanghar
Approved
NShah along old alignment Road Mile
01.03.07
0/0-43/0 = 43-0 (M) = 69.23 Kms.
Construction of Southern Bypass at
T. A. Yar Approved
Tando Allahyar road mile 0/0-5/4 = 5-4
14.07.07
(M) = 8.85 Kms.
Construction of Naukot By- Pass road
Mirpurkhas Approved
mile 0/0-7/4 = 7-4 (M) = 12.07 Kms.
08.11.03
Construction of road from Gujjo - Jung
Thatta
Approved
Shahi - Nooriabad road mile 2/4-39/0 =
08.11.03
36-4 = (M) = 58.76 Kms.
Construction of Road from Annupani to
Umerkot Approved
Bhittala mile 0/0-17/0 = 17-0 (M) = 27.37
08.11.03
Kms.
Construction of link road from Cheeta
Umerkot Approved
Chowk to Haji Arab via Mokaryar Haji
07.05.08
Adam Nohri mile 0/0-9/3 (15 Kms)

June-16

62.523

50.000

12.523

0.000

62.523

0.000

9.000

0.000

9.000

0.000

100

114

0.000

June-18

208.123

7.000

0.000

0.000

7.000

201.123

5.000

0.000

5.000

0.000

98.062

June-18

167.996

93.000

10.000

0.000

103.000

64.996

5.000

0.000

5.000

0.000

61

64

29.998

June-18

248.017

92.500

9.000

0.000

101.500

146.517

5.000

0.000

5.000

0.000

41

43

70.759

June-18

251.084

76.675

25.472

0.000

102.147

148.937

5.000

0.000

5.000

0.000

41

43

71.969

June-18

548.969

117.407

13.000

0.000

130.407

418.562

5.000

0.000

5.000

0.000

24

25

206.781

June-18

549.668

61.500

80.000

0.000

141.500

408.168

20.000

0.000

20.000

0.000

26

29

194.084

June-18

68.456

29.700

0.000

0.000

29.700

38.756

1.000

0.000

1.000

0.000

43

45

18.878

June-18

181.193

92.747

6.000

0.000

98.747

82.446

7.000

0.000

7.000

0.000

54

58

37.723

June-18

237.028

75.090

80.000

0.000

155.090

81.938

7.000

0.000

7.000

0.000

65

68

37.469

June-18

121.500

61.400

5.000

0.000

66.400

55.100

5.000

0.000

5.000

0.000

55

59

25.050

Const: of road from Umerkot to Soofi


Dhoro Naro road on Krowah Path via
Hurabad 7 mile mori 18.00 Kms

June-17

90.000

36.450

32.000

0.000

68.450

21.550

7.000

0.000

7.000

0.000

76

84

0.000

Umerkot

Approved
02.01.08

[ 307 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

2033

Construction of Road from Tajjal Lakh


Shairf Padaro Road mile 0/0-28/4 (14.0
Kms)
Construction of Road from Pholri Road
to RD-463 of Nara Canal upto Pir bux
Gaho with link to village Baseero mile
0/0-36/0 (58.0 Kms)
Construction of Road from Nara Tajjal
Gate Road to Khumbhraho Channel
(Nauabad).
Construction of Road from Pacca Chang
Bangho Road to Ranjo Mashori via Pir
Ghulamullah Shah to village Khaskheli
@ Attah Mohammad mashori 11.0 Km

Khairpur

Approved
29.03.07

June-18

224.060

109.645

25.356

0.000

135.001

89.059

5.000

0.000

Khairpur

Approved
19.01.07

June-18

305.240

128.750

16.981

0.000

145.731

159.509

6.000

Khairpur

Approved
07.03.08

June-18

50.713

9.566

0.000

0.000

9.566

41.147

Khairpur

Approved
20.02.08

June-16

63.888

46.095

17.794

0.000

63.889

Construction of Road from Malak


Chowdagi to Nandi Thari (12.0 Km)
Construction of Road from Kumb Kot
Lalu Jhangu Road to village Talpur
Wadda manzoor Phull to Siyal village
Road mile 0/0-7/0 (11.26 kms)
Construction of Road from Haji
Mohammad Hassan Chang to Fakir
Amir bux majeedano & Wali
Mohammad Majeedano
Construction of road from Kot Lalu
Nawab Shah Road to Wadero Abdullah
Lakhejo Kabool Ahmed Rajper Liaquat
Rajer and Korhi Jalal Ji (13 Km)

Khairpur

Approved
20.02.08
Approved
20.02.08

June-17

64.397

17.800

12.736

0.000

June-16

65.312

32.000

8.491

Khairpur

Approved
20.02.08

June-16

72.730

16.250

Khairpur

Approved
11.01.08

June-18

75.704

Construction of Road from Setharija Pir


Budhro Road Haji Rajper via Khaskheli
viallage 14.0 Km
Construction of Road from Palyo Fakir
Chang to Mir Wah Bridge village Fakir
Waryiam Shar to Bungalow Pir Shahb
Pagaro Bungalow Road (12.0 km)

Khairpur

Approved
11.01.08

June-18

Khairpur

Approved
07.01.08

June-16

2034

2035

2036

2037
2038

2039

2040

2041

2042

Location of
Scheme/
District

Khairpur

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
6

Actual
Exp. upto
Jun, 14
7

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

5.000

0.000

60

62

42.030

0.000

6.000

0.000

48

50

76.755

6.000

0.000

6.000

0.000

19

31

17.574

-0.001

2.022

0.000

2.022

0.000

100

103

0.000

30.536

33.861

6.000

0.000

6.000

0.000

47

57

25.861

0.000

40.491

24.821

24.821

0.000

24.821

0.000

62

100

0.000

8.491

0.000

24.741

47.989

5.000

0.000

5.000

0.000

34

41

21.495

16.000

8.317

0.000

24.317

51.387

5.000

0.000

5.000

0.000

32

39

23.194

58.110

49.995

8.115

0.000

58.110

0.000

6.000

0.000

6.000

0.000

100

110

0.000

67.379

16.050

12.736

0.000

28.786

38.593

5.000

0.000

5.000

0.000

43

50

16.797

[ 308 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

2043

Construction of Road from machhka


Road to Miani Road via Ghulam Hyder
Dashti (0/0-2/0 (3.21 Kms),(To be funded
out of 10% share of Royalty)

Ghotki

Approved
23.01.13

2044

Construction of road from Shah Bukhari


road to Lundi Shakh mile 0/0-4/1 (6.62
kms)
Construction of road from Asgharabad
to village Zardari Abad American Farm
to old village Piyaro Faqeer Zardari road
mile 0/0-3/1 (5.00 Kms)

Jamshoro

S.B.A

2045

2046

2047

2048

2049

2050

2051

2052

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

June-18

32.670

10.000

6.792

0.000

16.792

15.878

15.878

0.000

Approved
26.03.13

June-16

68.662

19.262

23.491

0.000

42.753

25.909

25.909

Approved
31.12.12

June-18

97.737

10.000

14.926

0.000

24.926

72.811

Construction of road from Al-Noor


S.B.A
Sugar Mill @ mile 4/0 to connect
Doulatput Pubjo road mile 0/0-5/0 (8.05
Kms)
Construction of road from Sahib Khan
S.B.A
Zardari road mile 1/5 to village Chakar
Khan Shahani via Zafarullah Dahri road
mile 0/0-2/0 (3.20 Kms)
Construction of Road from Larkana
Larkana
Ratodero Road at village Fatehpur to
village Haji Motayo Jagirani via Khair
Mohammad Jagirani (Parellel to
Mirwah) mile 0/0-1/4 (2.40 Kms)
Construction of Road from main Thull / Jacobabad
Jacobabad Road (Lakhi Pir) to village
Amir Khan Khoso via Lal bux Khoso to
link Road Zanglipur / Bahadurpur Road
(Chatri Masjid) (4.5 Kms)

Approved
31.12.12

June-18

130.898

25.767

8.490

0.000

34.257

Approved
08.01.13

June-16

44.247

13.000

8.491

0.000

Approved
28.11.12

June-16

35.898

8.000

15.000

Approved
28.11.12

June-17

52.593

18.000

Construction of Road from over the top


of Kupri minor Tunia Pull to Shahal
Dhani road mile 0/0-1/2 (2.0 kms)
Construction of Road Imam Bux
Katohar to village Mohammad Arab
Katohar Road mile 0/0-2/0 (3.20 kms)
Construction of Road Mahar Pull to
Mithal Jagirani Road mile 0/0-0/7 (2.0
Kms)

Khairpur

Approved
19.12.12

June-16

21.344

Khairpur

Approved
23.01.13

June-16

Khairpur

Approved
23.01.13

June-18

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

15.878

0.000

51

100

0.000

0.000

25.909

0.000

62

100

0.000

5.000

0.000

5.000

0.000

26

31

33.906

96.641

7.000

0.000

7.000

0.000

26

32

44.821

21.491

22.756

22.756

0.000

22.756

0.000

49

100

0.000

0.000

23.000

12.898

15.000

0.000

15.000

0.000

64

106

0.000

6.000

0.000

24.000

28.593

5.000

0.000

5.000

0.000

46

55

21.593

1.000

3.198

0.000

4.198

17.146

17.146

0.000

17.146

0.000

20

100

0.000

16.806

1.500

3.615

0.000

5.115

11.691

11.691

0.000

11.691

0.000

30

100

0.000

53.339

2.500

27.500

0.000

30.000

23.339

10.000

0.000

10.000

0.000

56

75

6.669

[ 309 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

2053
2054

2055
2056

2057

2058

2059

2060

2061
2062

Location of
Scheme/
District

Construction of Road and retaining wall


Khairpur
at village Wari Goth (1.40 km)
Construction / Reconditioning of Road
Khairpur
Hajan Shah Primary School to village
Ghulam Rasool Solangi via Buxo
Wahan and villgae Abdul Aziz (2.60
kms)
Construction of Road Backside of Atteri
Khairpur
to village Razi Goth (2.40 kms)
Constrcution of Internal roads different
Karachi
areas of the consttuency No. Ps-128 Ucs
2,3,4,5 Landhi Distt: Malir 0/0-3/1 (5.0
Kms)
Land Acquisition for Construction of
Hyderabad
Tando Jam Bye - Pass road along
Hyderabad Mirpurkhas road mile 0/06/0 (9.66 Kms).
Construction of road from Pholari road
Khairpur
to village Fakir Zafar Ali Hesbani mile
0/0-4/4
Construction of road from Pateji
Dadu
Regulator to Mehar - Faridabad road
mile 3/0 via Ganja Saeed Jo Goth along
Kakol Branch mile 0/0-6/2 (10 Kms), (To
be
funded out of
of Royalty) Mirpurkhas
Construcstion
of 10%
road share
from Hyderabad
road to meet Mirwah road near Abdin
Pump (Mirpurkhas Southern Bypass)
mile 0/0-7/4( 12.07 km)

Approved
23.01.13
Approved
19.12.12

Approved
23.01.13
Approved
02.11.12

Construction of road from MNV Drain


to Buthi road mile 0/0-2/0 (3.2 Km). (To
be
funded outof
ofroad
10%from
shareSukhio
of Royalty)
Construction
Mori
to Amir Peer Mori via Budhar
Babariyoon including links to Qadir Bux
Chahwan, Roshan Chahwani Wadero
Qaim Panhwar Wali Muhammad Bughio
Haji Ali Akbar Chahwan Ghulam Nabi
Bughio and Nasurllah Bughio mile 0/05/0 (8 Km)

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

June-16

29.596

5.000

3.910

0.000

8.910

20.686

20.686

0.000

June-16

21.543

7.750

9.438

0.000

17.188

4.355

7.213

June-16

25.257

4.000

10.087

0.000

14.087

11.170

June-17

50.739

16.250

2.547

0.000

18.797

Approved
27.03.11

June-18

169.088

34.072

0.000

0.000

Approved
12.12.11

June-18

53.803

19.061

0.837

Approved
28.01.12

June-18

78.157

33.939

Approved
15.01.13

June-18

383.726

Dadu

Approved
13.12.12

June-16

Jamshoro

Approved
31.01.13

June-16

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

20.686

0.000

30

100

0.000

0.000

7.213

0.000

80

113

-1.429

14.500

0.000

14.500

0.000

56

113

0.000

31.942

5.000

0.000

5.000

0.000

37

47

24.942

34.072

135.017

5.000

0.000

5.000

0.000

20

23

65.008

0.000

19.898

33.905

5.000

0.000

5.000

0.000

37

46

14.453

1.698

0.000

35.637

42.520

6.000

0.000

6.000

0.000

46

53

18.260

140.000

100.000

0.000

240.000

143.726

75.000

0.000

75.000

0.000

63

82

34.363

28.339

13.000

9.634

0.000

22.634

5.705

5.705

0.000

5.705

0.000

80

100

0.000

124.370

68.166

33.436

0.000

101.602

22.768

22.768

0.000

22.768

0.000

82

100

0.000

[ 310 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

2063

Construction of village Ghani Kehar


pacca road to village Jaffar Jat Manwani
mile 0/0-1/2 (2.0 Kms)
Construction of road from National
Highway Safyan mori to village Manak
Behrani mile 0/0-3/6 (6.00 Kms).

Sujawal

Approved
16.09.13

Thatta

2065

Construction of road from Nadirabad


Ariyana Noor from Babra road to village
Nazir Brohi mile 0/0-2/4 (4.0 Kms)

2066

2064

2067
2068

2069

2070

2071

2072
2073

2074

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

June-16

21.140

0.000

0.000

0.000

0.000

21.140

21.140

0.000

Approved
16.09.13

June-18

58.517

0.000

3.396

0.000

3.396

55.121

5.000

Thatta

Approved
29.04.13

June-18

39.256

0.500

2.547

0.000

3.047

36.209

Construction of road from Shah Nasir


Bridge to Shah Nasir Mazar mile 0/0-1/2
(2.0 Kms)
Construction of road from Jungshahi to
Babrho Jakhro mile 0/0-1/4 (2.41 Kms)

Sujawal

Approved
29.04.13

June-18

61.689

0.750

3.396

0.000

4.146

Thatta

Approved
31.12.12

June-16

20.365

0.500

1.698

0.000

Construction of road from Karachi


National Highway to village Muhammad
Khan Brohi (2.0 Kms)
Construction of road from Chach Jehan
Khan road at mile 0/6 to village Haji
Dilawar via Raboo Otho mile 0/0-3/1 (5.0
Kms)
Const. of National Highway Arbab Bhai
Khan Babur to meeting Railway station
mile 0/0-7/4 (12.06 Kms)
Construction of road from Karo Khaho
to Saifal Nai Baran along RBOD link to
Mir Garhi (Amanullah Memon) Farm)
I/C 250 Rft. Pre-stressed Bridge mile 0/07/0 (11.27 Kms)

Thatta

Approved
31.12.12

June-16

18.201

0.500

1.698

Sujawal

Approved
16.09.13

June-18

50.369

0.000

Thatta

Approved
29.04.13

June-18

194.372

Thatta

Approved
20.11.13

June-18

Sujawal

Approved
16.09.13
Approved
31.12.12
Approved
31.12.12

Const. of road from Saleh Abro Road


mile 0/0-3/1 (5.0 Kms)
Construction of link road from SakroGarho road upto village Haji Qasim Jat
Mile 0/0-1/7 (3.00 Kms)
Construction of road from Hingorjo to
Ghulam Mallah via Ladho Mallah mile
0/0-1/2 (2.00 Kms)

Thatta

Thatta

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

21.140

0.000

100

0.000

0.000

5.000

0.000

14

25.061

5.000

0.000

5.000

0.000

20

15.605

57.543

5.000

0.000

5.000

0.000

15

26.272

2.198

18.167

18.167

0.000

18.167

0.000

11

100

0.000

0.000

2.198

16.003

16.003

0.000

16.003

0.000

12

100

0.000

1.700

0.000

1.700

48.669

5.000

0.000

5.000

0.000

13

21.835

1.250

5.000

0.000

6.250

188.122

5.000

0.000

5.000

0.000

91.561

188.535

0.000

3.000

0.000

3.000

185.535

5.000

0.000

5.000

0.000

90.268

June-18

47.251

0.000

3.396

0.000

3.396

43.855

5.000

0.000

5.000

0.000

18

19.428

June-16

27.867

0.500

2.547

0.000

3.047

24.820

24.820

0.000

24.820

0.000

11

100

0.000

June-16

19.193

0.500

1.698

0.000

2.198

16.995

16.995

0.000

16.995

0.000

11

100

0.000

[ 311 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

2075

Construction of road from Udassi link


road to Haji Ibrahim Baloch road mile
0/0-1/2 (2.00 Kms)
Construction of road from Bhai Khan
Chandio via Kanti Wah to village Rasool
Bux Baloch mile 0/0-1/7 (3.0 Kms)

Thatta

Approved
12.03.13

Thatta

Construction of road from Ahmed Khan


Meerani Pandi Khan Zangiani mile 0/01/7 (3.00 Kms)
Construction of road from Village
Boohar to Village Hussain Samejo Paka
road Karmalak mile 0/0-1/2 (2.0 Kms)

2076

2077

2078

2079

2080

2081

2082

2083

2084

2085

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

June-16

19.990

0.500

0.350

0.000

0.850

19.140

19.140

0.000

Approved
12.03.13

June-17

29.222

0.000

0.000

0.000

0.000

29.222

5.000

Thatta

Approved
12.03.13

June-16

28.186

0.500

2.547

0.000

3.047

25.139

Sujawal

Approved
24.09.13

June-16

19.392

0.000

0.000

0.000

0.000

Jamshoro

Approved
24.09.13

June-18

41.622

0.000

0.000

0.000

Karachi

Approved
12.03.13

June-18

38.589

2.000

0.000

Hyderabad Approved
12.03.13

June-16

23.770

2.000

Hyderabad Approved
12.03.13

June-18

40.190

Const. / Impt.of road from Mustafaf


Hyderabad Approved
Park to Sakhi Pir road via Liaquat
12.03.13
Colony City Hyderabad road mile 0/00/7
Construction of road from J.J.V.L Gas
Hyderabad Approved
Company to village Zain Farm road mile
21.01.13
0/0-1/7 (3.0 Kms).
Construction of road from Village
Hyderabad Approved
Bhutto Hajano Darya Baig Mughal road
01.03.13
to Vakri Band Road 0/0-1/0

June-18

Construction of road from Dargah


Baqar Shah Jilani to Astan Guru
Manghal Gur Mile 0/0-1/7 (3.00 Kms)
Constrcution of Main Bijli Nagar Road
UC - I Orangi Town, Karchi mile 0/0-1/2
(2.0 Kms)
Construction of road from Bus Stand
Goth Ahmed Khan Almani to Otaq
Ahmed Khan Almani mile 0/0-1/0 (1.61
Km)
Construction / Improvement of road
from Zacha Khana Preatabad to
Mustafa Park road mile 0/0-0/6 (1.2 km)

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

19.140

0.000

100

0.000

0.000

5.000

0.000

17

22.222

25.139

0.000

25.139

0.000

11

100

0.000

19.392

19.392

0.000

19.392

0.000

100

0.000

0.000

41.622

6.000

0.000

6.000

0.000

14

17.811

0.000

2.000

36.589

1.000

0.000

1.000

0.000

17.795

0.000

0.000

2.000

21.770

21.770

0.000

21.770

0.000

100

0.000

0.000

0.000

0.000

0.000

40.190

5.000

0.000

5.000

0.000

12

17.595

47.373

0.000

0.000

0.000

0.000

47.373

5.000

0.000

5.000

0.000

11

21.187

June-18

45.535

0.000

3.396

0.000

3.396

42.139

5.000

0.000

5.000

0.000

18

18.570

June-16

26.475

0.000

2.547

0.000

2.547

23.928

23.928

0.000

23.928

0.000

10

100

0.000

[ 312 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

2086

2087

2088

2089

2090

2091

2092

2093

Location of
Scheme/
District
3

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
4

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

FPA

Financial Progress
in %age upto

Jun'15 Jun'16
15

16

17

Financial Projec
2016-17
18

Construction of road from village Gul


Hyderabad Approved
Muhammad Jaffri Khoso to Village
12.03.13
Khawand Bux Khoso Touching to Grid
Tower No. 4 via lands of late Noor
Muhammad Shoro, Saeed Minor, Deh
Shah Bukhari Taluka Qasimabad road
mile 0/0-1/2 (2 Kms).
Costruction of road from Achar Mallah Hyderabad Approved
(Gundi Belo) on Left Bank of Saeed
12.03.13
Minor to Khawand Bux Khoso UC-4
Deh Saleh Bukhari Taluka Qasimabad
road mile 0/0-1/2
Complete Repair of 5.00 Km Mattled
Hyderabad Approved
Road from 1 mile lined Channel Parallel
01.03.13
to flood protective Bund, crossing the
Akund M.I Kazi. Govt. School across the
B.H.U Hospital, Akhund M.I Kazi
further in Murl Shape road , crossing the
Gul Muhammad Khoso village

June-16

27.288

3.000

0.000

0.000

3.000

24.288

24.288

0.000

24.288

0.000

11

100

0.000

June-16

24.729

3.000

0.000

0.000

3.000

21.729

21.729

0.000

21.729

0.000

12

100

0.000

June-18

39.255

0.000

2.547

0.000

2.547

36.708

5.000

0.000

5.000

0.000

19

15.854

Construction of road from Johi Chhinni


road to Kamal Khan Rodnani mile 0/01/3 (2.60 Kms), (To be funded out of
10% share of Royalty)
Construction of road from Jhalo to
Nazar Muhammad Jamali mile 0/0-2/0
(3.20 Kms)
Construction of road from Faiz
Muhammad Leghari road to Noor
Muhammad Leghari mile 0/0-3/0 (4.80
Kms)
Construction of road from Faiz
Muhammad Leghari road to Village Ali
Murtaza Leghari mile 0/0-1/2 (2.00 Kms)

Dadu

Approved
15.03.13

June-16

24.327

7.000

1.698

0.000

8.698

15.629

15.629

0.000

15.629

0.000

36

100

0.000

Dadu

Approved
15.03.13

June-16

34.772

7.000

1.000

0.000

8.000

26.772

26.772

0.000

26.772

0.000

23

100

0.000

Dadu

Approved
15.03.13

June-18

53.401

0.000

2.700

0.000

2.700

50.701

5.000

0.000

5.000

0.000

14

22.851

Dadu

Approved
15.03.13

June-16

22.040

0.000

0.000

0.000

0.000

22.040

22.040

0.000

22.040

0.000

100

0.000

Construction of road from Chakar Khan


Sahol to Ghulam Muhammad Sahol mile
0/0-2/0 (3.22 Kms)

Dadu

Approved
23.09.13

June-18

36.748

0.000

2.547

0.000

2.547

34.201

5.000

0.000

5.000

0.000

21

14.601

[ 313 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

2094

Construction of road from Chakar Khan


Sahol Ghulam Muhammad to Gul
Muhammad Khudabad Pathan mile 0/02/0 (3.22 Kms), (To be funded out of
10% share of Royalty)
Construction of road from Khambher Meer Muhammad Minor via Ohovi
umed Ali Babar village 0/0-2/4 (4.00
Kms), (To be funded out of 10% share of
Royalty)
Construction of road from MaharAghamani road to Basic Health Unit
Aghamani via village Fayaz Kalhoro
road mile 0/0-0/5 (1.0 Kms).
Construction of link road from Tando
Adam Shahdadpur road from Ahmed
Burra to Old Sutiyar via Khan
Muhammad Thahim mile 0/0-3/2 (5.20
Kms)
Construction of road from Maqsoodo
Rind Nawabshah road to Soomro village
parallel to Bajhi Rind i/c approach
Mushtaq Rind mile 0/0-1/4+330 (2.50
Kms)
Construction of road form
Shahpurchakar via Pir Wachayo Shah to
Village Rasool Bux Dahri road mile 0/01/0 (1.61 Kms)
Construction of road from Tando Adam
Jhot road to Daim Thahim mile 0/0-1/2
(2.0 Kms)
Construction of road from Dargah
Manthar Faqir to village Gul
Muhammad Rajar via village Jamd
Rajar road mile 0/0-1/2 (2.00 Kms).
Construction of road from National
Highway (Gudam) to Ali Murad Shoro
mile 0/0-2/4 (4.00 Kms)

Dadu

Approved
23.09.13

Dadu

2095

2096

2097

2098

2099

2100

2101

2102

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

June-18

40.003

0.000

0.800

0.000

0.800

39.203

5.000

0.000

Approved
27.02.14

June-18

46.682

1.250

3.396

0.000

4.646

42.036

5.000

Dadu

Approved
15.03.13

June-16

11.108

2.255

2.000

0.000

4.255

6.853

Sanghar

Approved
28.02.13

June-18

47.679

0.000

3.396

0.000

3.396

Sanghar

Approved
27.03.13

June-16

24.640

0.000

0.000

0.000

Sanghar

Approved
27.03.13

June-16

17.902

0.000

0.000

Sanghar

Approved
28.02.13

June-16

20.669

0.000

Sanghar

Approved
27.03.13

June-16

21.686

Jamshoro

Approved
12.02.13

June-17

33.140

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

5.000

0.000

14

17.102

0.000

5.000

0.000

10

21

18.518

6.853

0.000

6.853

0.000

38

100

0.000

44.283

5.000

0.000

5.000

0.000

18

19.642

0.000

24.640

24.640

0.000

24.640

0.000

100

0.000

0.000

0.000

17.902

17.902

0.000

17.902

0.000

100

0.000

0.000

0.000

0.000

20.669

20.669

0.000

20.669

0.000

100

0.000

0.000

0.000

0.000

0.000

21.686

21.686

0.000

21.686

0.000

100

0.000

0.000

1.000

0.000

1.000

32.140

5.000

0.000

5.000

0.000

18

25.140

[ 314 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

2103

Const. of road from village Tariq


Khokhar to Jamot Farm mile 0/0-1/6
(2.82 Kms)
Construction of road from village
Mithan Sathio Deh Sathyar road mile 0/01/7+330' (1.50 km)
Const. of road from village Moula Bux
Lashari to Haji Saeed Khan Jamali via
Drigh Mori mile 0/0-1/0
Const. of road 13 Nos. & Const. of
Bridges 03 Nos. Schemes Taluka Tando
Ghulam Hyder road mile,(To be funded
out of 10% share of Royalty)

T. A. Yar

Approved
03.05.13

T.M.Khan

2104

2105

2106

2107

2108

2109

2110

2111

2112

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

June-18

43.786

0.000

0.000

0.000

0.000

43.786

5.000

0.000

Approved
21.05.13

June-16

17.961

0.000

0.000

0.000

0.000

17.961

17.961

T.M.Khan

Approved
15.03.13

June-16

23.455

0.000

0.000

0.000

0.000

23.455

T.M.Khan

Approved
04.09.12

June-18

63.590

1.250

1.850

0.000

3.100

Const. of road from Machi Mori road at


Jamali Sim Nali to connect Kak Sector
mile 0/0-5/0 (8.00 Kms)
Const. of road from Village Muhammad
Hashim Mallah to village Chanesar Dasti
via Amb Mori mile 0/0-6/4 (10.46 Kms)

Badin

Approved
29.04.13

June-18

122.515

15.000

15.000

0.000

Badin

Approved
29.04.13

June-18

174.347

0.000

8.491

Const. of road from Nindo Luwari


Sharif road to village Haji muhammad
Boohar Sunhi Gooni inspection path mile
0/0-4/3 (7.04 Kms)
Const. of road from Badin - Karachi
road western path of Imam Wah to
Village Nangar Nohrio mile 0/0-3/1 (5.00
Kms)
Const. of road from Tando Bago Pangrio
road at Khalifo Qasim to Pangrio Wango
road via AC Chak Yaqoob Shah mile 0/06/2 (10.00 Kms)
Const. of road from village Army Farm
Otaq of Kazi Aijaz road to village Ali
Nawaz Dars UC Dehi Jarkas mile 0/0-4/0
(6.44 Kms)

Badin

Approved
20.03.13

June-18

89.468

0.000

Badin

Approved
26.03.13

June-18

55.326

Badin

Approved
20.03.13

June-18

Badin

Approved
10.03.14

June-18

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

5.000

0.000

11

19.393

0.000

17.961

0.000

100

0.000

23.455

0.000

23.455

0.000

100

0.000

60.490

8.000

0.000

8.000

0.000

17

26.245

30.000

92.515

5.000

0.000

5.000

0.000

24

29

43.758

0.000

8.491

165.856

5.000

0.000

5.000

0.000

80.428

2.000

0.000

2.000

87.468

5.000

0.000

5.000

0.000

41.234

0.000

4.245

0.000

4.245

51.081

5.000

0.000

5.000

0.000

17

23.041

187.564

6.250

8.491

0.000

14.741

172.823

5.000

0.000

5.000

0.000

11

83.912

94.908

0.000

6.792

0.000

6.792

88.116

20.000

0.000

20.000

0.000

28

34.058

[ 315 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

2113

2114

2115
2116

2117

2118

2119

2120

2121

2122

2123

Location of
Scheme/
District
3

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
4

Construction & Extension of road from


Badin
Talhar T. Bago to village Khado road
Mile 0/0-1/2 (2.00 Kms)
Construction of mettalled Road from the
Larkana
Bridge of Dadu Canal at Pir Sher to
Noor Khan Jatoi 0/0-0/7.
Construction of Road in village Lal Bux
Larkana
Shaikh i/c storm Water Drains.
Construction of Road from Bacho
Larkana
Wahan to village Abdul Majeed Chandio
along 5-L Zakria Sim Drain mile 0/0-1/4
(2.4Kms)
Construction of Road from village
Larkana
Khuda Bux Mohel to Dargah Pir
Chozal ali Shah mile 0/0-1/0 (1.60 Km)
Construction of Road from Sukkur
Larkana
Naudero Road to village Budho Khokhar
mile 0/0-0/4 (0.80 Km)
Construction of Road from Larkana
Larkana
naudero Road at Quaid Awam
Agriculture Farm to village Jeewan
Bhutto mile 0/0-1/2 (2.0 Km)
Construction of Road from Thull Bye
Jacobabad
pass (Shahfique Ahmed Khoso ) to
village Hassanabad non inspection of
Moosa Allahabad Shakh (4.0 kms)
Construction of Road from village
Jacobabad
Hassanabad to village Noor Hassan
Jafri / village Kandrani along inspection
path Moosa Allahabad Shakh (4.0 Kms)

Approved
08.10.13

Construction of Road from Jacobabad


Shah Ghazi Road to village Mir Ghulam
Abbas Khan Jakhrani U.C Ahmedpur
Taluka Jacobabad (3 Kms)
Construction of Road from Dilmurad
Railway Station Manjhipur Road to
village Haji Rasool Bux Katohar Taluka
Thull (5.0 Kms)

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

June-16

23.445

0.000

0.000

0.000

0.000

23.445

23.445

0.000

Approved
17.10.12

June-16

19.467

0.000

0.000

0.000

0.000

19.467

19.467

Approved
28.11.12
Approved
28.11.12

June-18

38.503

0.000

0.000

0.000

0.000

38.503

June-18

29.501

0.000

0.000

0.000

0.000

Approved
23.01.13

June-16

18.692

0.000

0.000

0.000

Approved
28.11.12

June-16

13.991

0.000

0.000

Approved
28.11.12

June-16

22.820

0.000

Approved
28.11.12

June-18

50.067

Approved
28.11.12

June-18

Jacobabad

Approved
28.02.13

Jacobabad

Approved
28.02.13

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

23.445

0.000

100

0.000

0.000

19.467

0.000

100

0.000

5.000

0.000

5.000

0.000

13

16.752

29.501

5.000

0.000

5.000

0.000

17

24.501

0.000

18.692

18.692

0.000

18.692

0.000

100

0.000

0.000

0.000

13.991

13.991

0.000

13.991

0.000

100

0.000

0.000

0.000

0.000

22.820

22.820

0.000

22.820

0.000

100

0.000

0.000

4.245

0.000

4.245

45.822

4.000

0.000

4.000

0.000

16

20.911

49.153

2.000

3.396

0.000

5.396

43.757

6.000

0.000

6.000

0.000

11

23

18.879

June-18

37.185

0.000

0.000

0.000

0.000

37.185

6.000

0.000

6.000

0.000

16

15.593

June-18

59.202

2.500

4.245

0.000

6.745

52.457

18.000

0.000

18.000

0.000

11

42

17.229

[ 316 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

2124

Construction of Road from Irshad Khan


Luhar via Ramzan Dakhan Lal Shah
Bari Taluka Garhi Khairo (5 Kms)

Jacobabad

Approved
28.02.13

2125

Construction of Road from Dilmurad


Railway Station Manjhipur Road to
village Sardar Abdul karim Katohar
Taluka Thull (5 Kms)
Construction of Road from Dakhan
Bungalow to Ramdal Jakhrani via
Godho Dashti (2.0 Kms)
Construction of Road from Manghar
Phatak to Chandol Shakh via Mengal
Chachar and Mohammad Khan
Jakhrani (1.5 Km)
Construction of road from Motal Mahar
to Haji Walayat Pull (2.0 Km)
Construction of Road from Jacobabad
Thull road to village Piyaro Arbani via
Dargah Azeem Shah Sachal Mirani
village & Ghulam Shabbir Mirani village
Taluka Jacobabad (3.0 kms)
Construction of Thull Bahu Khoso Road
to village Ghulam Rasool Khoso mile 0/02/0 (3.21 Kms).
Construction of link road from Tunio Ali
Shah to main Road Khairo-Dero, Taluka
Ratodero (2.0 kms)
Construction of Road in village Wazir ali
Zardari & Pahalwan Yaqoob Siyal (2.0
Kms)
Construction of metalled road for village
Haji Pir Bux Zardari UC Khairwah
Taluka Moro from Gajjan Road to
village Haji Pir Bux Zardari (2.0 kms)

Jacobabad

Construction of various roads of villages


of UC Talti, UC Bhan and UC Bubak

2126

2127

2128
2129

2130

2131

2132

2133

2134

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

June-18

57.653

0.000

4.245

0.000

4.245

53.408

7.000

0.000

Approved
28.02.13

June-18

59.813

1.250

4.245

0.000

5.495

54.318

12.000

Jacobabad

Approved
28.11.12

June-18

24.413

0.000

0.000

0.000

0.000

24.413

Jacobabad

Approved
28.11.12

June-16

18.454

0.000

0.000

0.000

0.000

Kashmore

Approved
28.11.12
Approved
28.02.13

June-18

24.067

0.000

0.000

0.000

June-18

40.824

0.000

0.000

Jacobabad

Approved
28.02.13

June-17

34.565

0.000

Larkana

Approved
17.10.12

June-16

16.752

N. Feroze

Approved
23.01.13

June-16

N. Feroze

Approved
23.01.13

Jamshoro

Approved
08.04.14

Jacobabad

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

7.000

0.000

20

23.204

0.000

12.000

0.000

29

21.159

6.000

0.000

6.000

0.000

25

16.413

18.454

18.454

0.000

18.454

0.000

100

0.000

0.000

24.067

6.000

0.000

6.000

0.000

25

16.067

0.000

0.000

40.824

7.000

0.000

7.000

0.000

17

16.912

2.547

0.000

2.547

32.018

8.000

0.000

8.000

0.000

31

22.018

0.000

0.000

0.000

0.000

16.752

16.752

0.000

16.752

0.000

100

0.000

23.385

0.000

0.000

0.000

0.000

23.385

23.385

0.000

23.385

0.000

100

0.000

June-16

23.425

0.000

0.000

0.000

0.000

23.425

23.425

0.000

23.425

0.000

100

0.000

June-18

290.463

0.000

4.000

0.000

4.000

286.463

4.000

0.000

4.000

0.000

141.232

[ 317 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

FPA

Financial Progress
in %age upto

Jun'15 Jun'16
15

16

17

Financial Projec
2016-17
18

2135

Construction of Road from Mehrabpur


Siyal Abad road to village Chibhar
Banbhan Road mile 0/0-1/7 (3.0 kms)

N. Feroze

Approved
19.12.12

June-17

32.950

1.000

0.000

0.000

1.000

31.950

6.000

0.000

6.000

0.000

21

22.950

2136

Construction of Road from Sada Wah


Pacci Mori to Baba Ashique Hussain
Dargah, Taluka Bhiria City, Bhiria
Road (3.0 kms)
Construction of Road from Tharushah
Mithiari Road to village haji Shah
Mohammad Panhwar via village Lutuf
Panhwar mile 0/0-2/4.
Construction of Road from village Sakhi
Abad via village Mohammad Yousif
Brohi Taluka Mehrabpur (2.0 kms)

N. Feroze

Approved
19.12.12

June-17

33.859

1.000

2.547

0.000

3.547

30.312

7.000

0.000

7.000

0.000

10

31

22.312

N. Feroze

Approved
19.12.12

June-18

48.276

0.000

0.000

0.000

0.000

48.276

5.000

0.000

5.000

0.000

10

21.638

N. Feroze

Approved
19.12.12

June-16

22.998

0.000

0.000

0.000

0.000

22.998

22.998

0.000

22.998

0.000

100

0.000

Construction of Road from Dali Mori


link Road to Lakha Mori (2.0 Kms)
Construction of Road from village Fazul
Sahito to village Gul Mohammad Shah
Taluka Kandiaro (1.0 Km)

N. Feroze

Approved
23.01.13
Approved
19.12.12

June-16

23.257

1.000

0.000

0.000

1.000

22.257

22.257

0.000

22.257

0.000

100

0.000

June-16

11.334

5.667

1.698

0.000

7.365

3.969

3.969

0.000

3.969

0.000

65

100

0.000

Construction of link road from village


Sahib Khan Lund to village Khooh
Meenhon (2 Kms),(To be funded out of
10% share of Royalty)
Construction of road from Mathelo
Jarwar to Beero Malano mile 0/0-1/4
(2.40 kms),(To be funded out of 10%
share of Royalty)
Construction of Road from Amir Bux
Unar to to village Islam Khan Lashari
Taluka Mirpur Mathelo 0/0-1/0 (1.60
Km),(To be funded out of 10% share of
Royalty)

Ghotki

Approved
19.12.12

June-16

19.618

0.000

0.000

0.000

0.000

19.618

19.618

0.000

19.618

0.000

100

0.000

Ghotki

Approved
28.11.12

June-16

22.101

0.000

0.000

0.000

0.000

22.101

22.101

0.000

22.101

0.000

100

0.000

Ghotki

Approved
28.11.12

June-16

16.826

0.000

0.000

0.000

0.000

16.826

16.826

0.000

16.826

0.000

100

0.000

2137

2138

2139
2140

2141

2142

2143

N. Feroze

[ 318 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

2144

Construction of road from Khanpur


Mahar-Sardar Garh Road to village
Ganhwar Khan Malik 0/0-1/2 (2.0
kms,(To be funded out of 10% share of
Royalty)
Construction of Road from FFC Factory
to connect Mirpur Mathelo road on LP
Path Massu Wah mile 0/0-2/0 (3.32
Kms),(To be funded out of 10% share of
Royalty)
Construction of Road from village Saleh
Mahar to village Allah Bux Bullo via
village Lal Mohammad Bullo, Taluka
Ghotki (4.0 Kms),(To be funded out of
10% share of Royalty)

Ghotki

Approved
28.11.12

Ghotki

2147

2148

2145

2146

2149

2150

2151

2152

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

June-16

19.015

0.000

0.000

0.000

0.000

19.015

19.015

0.000

Approved
23.01.13

June-18

42.525

0.000

1.250

0.000

1.250

41.275

5.000

Ghotki

Approved
28.11.12

June-18

36.673

0.000

0.000

0.000

0.000

36.673

Construction of road from Thari Seneso


to Resident of Ahmed Ali Janvri & Fouj
Ali Janvri road mile 0/0-1/7 (3.0 kms)

Khairpur

Approved
23.01.13

June-16

33.594

0.000

16.000

0.000

16.000

Construction of road from Balouch


Khan Zardar to Government High
School Muhammad Shah road mile 0/01/6 (2.80 Kms).
Construction of Road from Rattal
Mallah to Sui Gas upto Babar Wada
Road mile 0/0-2/0 (3.20 Kms)
Construction of road from Waryam
Wandiar to village Mir Khan Mangnejo
road mile 0/0-/2 (2.00 Kms)
Construction of Road from Setharija
Thari Road via Sim Nala village Makan
Kubar Deh Khuda Bux Kubhar UC
Setharija Road mile 0/0-1/0 (1.60 Km)

Khairpur

Approved
23.01.13

June-16

30.928

0.000

6.625

0.000

Khairpur

Approved
23.01.13

June-18

33.680

0.500

2.547

Khairpur

Approved
23.01.13

June-16

19.378

0.000

Khairpur

Approved
23.01.13

June-16

18.127

Construction of Road to village Allah


Dino Jiskani village Sultan Jiskani Road
mile 0/0-2/0 (3.20 Kms)

Khairpur

Approved
23.01.13

June-18

37.430

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

19.015

0.000

100

0.000

0.000

5.000

0.000

15

18.138

4.000

0.000

4.000

0.000

11

16.337

17.594

17.594

0.000

17.594

0.000

48

100

0.000

6.625

24.303

24.303

0.000

24.303

0.000

21

100

0.000

0.000

3.047

30.633

5.000

0.000

5.000

0.000

24

23.633

10.000

0.000

10.000

9.378

9.378

0.000

9.378

0.000

52

100

0.000

0.000

0.000

0.000

0.000

18.127

18.127

0.000

18.127

0.000

100

0.000

0.000

0.000

0.000

0.000

37.430

4.000

0.000

4.000

0.000

11

16.715

[ 319 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

2153

Constrcution of road from Bozdar Wada


(BHU) to village Bangal Khan Jiskani,
Ali Gulab Jiskani and village Haji Mevo
Road mile 0/0-2/0 (3.2 Kms)

Khairpur

Approved
23.01.13

2154

Construction of Road from village Sain


Bux Zardari to Abid Hussain Zardari
Taluka Moro Road mile 0/0-1/2 (2.0 kms)

N. Feroze

2155

Construction of Road from Ripri


Gambat Road to village Bandul Junejo
Road mile 0/0-1/2 (2.0 kms)
Construction of road from newaro
Shahani link road to village Fateh
Mohammad Darban Road mile 0/0-1/0

2156

2157

2158

2159

2160

2161

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

June-18

37.430

0.000

0.000

0.000

0.000

37.430

4.000

0.000

Approved
23.01.13

June-17

25.756

0.000

0.000

0.000

0.000

25.756

6.000

Khairpur

Approved
23.01.13

June-16

21.221

1.000

1.274

0.000

2.274

18.947

Khairpur

Approved
19.12.12

June-16

19.203

1.000

1.698

0.000

2.698

Construction of road from Khariri road


to village Mohammad ali Shar Taluka
Thari Mirwah Road mile 0/0-1/0 (1.60
Km)
Construction of Road from village
Rustam Khan Lashari Taluka Faiz Gunj
Road mile 0/0-1/7 (3.0 kms).
Construction of Road from Sagyoon
Khan Wahan road to village Gohram
Haryar UC Sagyoon Taluka Sobhodero
Road mile 0/0-1/4 (2.40 kms)

Khairpur

Approved
23.01.13

June-16

15.328

7.664

1.698

0.000

Khairpur

Approved
23.01.13

June-18

30.347

1.000

12.547

Khairpur

Approved
19.12.12

June-16

26.617

1.000

Construction of Road from village


Kareem Ali Siyal to Wang Sharif UC
Sagyoon Taluka Sobhodero Road mile
0/0-1/6 (2.80 kms)
Construction of Road from village
Mohabbatpur to Imdad Sahito UC Pir
Hayat Shah Taluka Sobhodero Road
mile 0/0-1/2 (2.0 kms).

Khairpur

Approved
23.01.13

June-17

32.869

Khairpur

Approved
23.01.13

June-16

26.258

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

4.000

0.000

11

16.715

0.000

6.000

0.000

23

19.756

18.947

0.000

18.947

0.000

11

100

0.000

16.505

16.505

0.000

16.505

0.000

14

100

0.000

9.362

5.966

5.966

0.000

5.966

0.000

61

100

0.000

0.000

13.547

16.800

5.000

0.000

5.000

0.000

45

61

19.800

1.698

0.000

2.698

23.919

23.919

0.000

23.919

0.000

10

100

0.000

1.000

2.547

0.000

3.547

29.322

5.000

0.000

5.000

0.000

11

26

22.322

1.000

0.000

0.000

1.000

25.258

25.258

0.000

25.258

0.000

100

0.000

[ 320 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

2162

Construction of Road from N.H.Way to


village Jogi to Watiya UC Hingorija
Taluka Sobhodero Road mile 0/0-1/2 (2.0
kms)
Construction of Pacca metalled road
from village Sakhi Saeed Khan Lakho to
village Nabi Bux Lakho Taluka Bhiria
(1.60 km)
Construction of Road from Thari
Dedano Road to haji Mian Dad Khan
Mandan road mile 0/0-1/7 (3.0 kms)
Construction of Road from kamil
jagirani to Pir Hassan Shah road mile
0/0-2/2 (3.62 kms)
Construction of Road village Pir Koko
Road to Adam Khan Mehrani via
Rasool Bux Morejo road mile 0/0-1/7 (3.0
kms)
Construction of Road from village Haji
Imdad to Waris Ghambheer Goth (2.40
Kms)
Construction of road from Ali Dost
Khorkhani to village Haji Allan
Phulpoto on path of Bazar Wah road
mile 0/0-1/2 (2.40 kms)
Construction of road from village Shah
Bux & Jumo Phulpoto (1.60 Kms)

Khairpur

Approved
19.12.12

Khairpur

Construction of road from B.Pump


Station to village Nangar Chandio Road
mile 0/0-2/3 (3.82 Kms)
Construction of road from Sobho Khan
Gabol to Pir Bhalo to Ghazi Khan
Gabol (1.60 Km)
Construction of road from Danwro to
village Syed (1.60 km)
Construction of road from village
Miandad Jalbani (1.60 Km)

2163

2164

2165

2166

2167

2168

2169

2170

2171

2172
2173

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

June-16

21.495

1.000

0.000

0.000

1.000

20.495

20.495

0.000

Approved
19.12.12

June-16

18.333

1.000

0.000

0.000

1.000

17.333

17.333

Khairpur

Approved
23.01.13

June-18

32.256

0.000

0.000

0.000

0.000

32.256

Khairpur

Approved
23.01.13

June-18

45.010

0.000

0.000

0.000

0.000

Khairpur

Approved
23.01.13

June-18

30.963

0.000

0.000

0.000

Khairpur

Approved
23.01.13

June-17

26.640

0.000

0.000

Khairpur

Approved
23.01.13

June-16

22.446

1.000

Khairpur

Approved
19.12.12

June-16

17.780

Khairpur

Approved
19.12.12

June-18

Khairpur

Approved
23.01.13

Khairpur

Approved
23.01.13
Approved
23.01.13

Khairpur

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

20.495

0.000

100

0.000

0.000

17.333

0.000

100

0.000

4.000

0.000

4.000

0.000

12

14.128

45.010

6.000

0.000

6.000

0.000

13

19.505

0.000

30.963

4.000

0.000

4.000

0.000

13

13.482

0.000

0.000

26.640

6.000

0.000

6.000

0.000

23

20.640

4.000

0.000

5.000

17.446

17.446

0.000

17.446

0.000

22

100

0.000

0.000

2.000

0.000

2.000

15.780

15.780

0.000

15.780

0.000

11

100

0.000

40.842

1.000

9.500

0.000

10.500

30.342

5.000

0.000

5.000

0.000

26

38

12.671

June-16

17.188

0.000

2.000

0.000

2.000

15.188

15.188

0.000

15.188

0.000

12

100

0.000

June-16

18.330

0.000

2.000

0.000

2.000

16.330

16.330

0.000

16.330

0.000

11

100

0.000

June-16

16.881

0.000

0.000

0.000

0.000

16.881

16.881

0.000

16.881

0.000

100

0.000

[ 321 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

2174

Construction of road from Shadi


Shaheed Road to Mohammad Pannah
Morejo (1.40 km)
Construction of A.G Balouch to Ali
Hyder Jalbani (1.40 km)
Construction of Road Ghulam
Mohammad Burdi to village Sabzal
Khan Burdi Road mile 0/0-1/7 (3.0 kms)

Khairpur

Approved
19.12.12

Khairpur

Construction of road from Bago Daro


via Iqbal Dasti to Noor Bozdar (3.21
Kms)
Construction of road from byepass
Hingorija to to Samyoon (3.21 Kms)
Construction of Road village Tajo Khan
Sakhani to village Saleem Shah (1.60
km)
Construction of internal road village
Jiskani road mile 0/0-1/0 (1.60 Km)
Construction of remaining portion of
road from Serai Piyaro Khan to Gambat
(3.41 Kms)
Construction of road from Trimunhi to
Dargah Samita to Shah Ali Taluka
Sobhodero
Construction of Road from Sanghar
road to village Shahan Sahito & village
Urs Sahito (3.41 Kms)
Construction of Road from Kathore to
Sanghar Road (3.41 Kms)
Construction of Road from Ahmed Bux
Shar to Lakh Mir Shah Road mile 0/01/7 (3.0 kms)
Construction of Road alongwith Bridge
on Mirwah Canal RD-129 Deh Daro (1.0
km)
Construction of Road Gadeji Setharija
Road to Hingorja Minor alongwith
Bridge (1.50 km)

2175
2176

2177

2178
2179

2180
2181

2182

2183

2184
2185

2186

2187

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

June-16

16.520

0.000

0.000

0.000

0.000

16.520

16.520

0.000

Approved
23.01.13
Approved
23.01.13

June-16

18.040

0.000

0.000

0.000

0.000

18.040

18.040

June-18

31.454

0.750

2.547

0.000

3.297

28.157

Khairpur

Approved
23.01.13

June-17

33.917

0.750

2.547

0.000

3.297

Khairpur

Approved
23.01.13
Approved
23.01.13

June-18

58.546

1.000

4.245

0.000

June-16

16.933

1.000

1.698

Approved
23.01.13
Approved
23.01.13

June-16

15.523

7.762

June-17

36.352

Khairpur

Approved
19.12.12

June-18

Khairpur

Approved
23.01.13

Khairpur

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

16.520

0.000

100

0.000

0.000

18.040

0.000

100

0.000

5.000

0.000

5.000

0.000

10

26

0.000

30.620

5.000

0.000

5.000

0.000

10

24

23.620

5.245

53.301

5.000

0.000

5.000

0.000

17

24.151

0.000

2.698

14.235

14.235

0.000

14.235

0.000

16

100

0.000

1.036

0.000

8.798

6.725

6.725

0.000

6.725

0.000

57

100

0.000

0.000

2.547

0.000

2.547

33.805

17.000

0.000

17.000

0.000

54

25.805

47.163

1.250

3.396

0.000

4.646

42.517

5.000

0.000

5.000

0.000

10

20

18.759

June-18

31.812

0.000

0.000

0.000

0.000

31.812

3.000

0.000

3.000

0.000

14.406

Approved
23.01.13
Approved
23.01.13

June-16

30.620

0.000

2.547

0.000

2.547

28.073

28.073

0.000

28.073

0.000

100

0.000

June-18

30.736

0.000

0.000

0.000

0.000

30.736

3.000

0.000

3.000

0.000

10

13.868

Khairpur

Approved
23.01.13

June-18

32.937

0.000

0.000

0.000

0.000

32.937

3.000

0.000

3.000

0.000

14.969

Khairpur

Approved
19.12.12

June-16

17.913

1.500

0.000

0.000

1.500

16.413

16.413

0.000

16.413

0.000

100

0.000

Khairpur

Khairpur

Khairpur
Khairpur

Khairpur

18

[ 322 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

2188

Construction of Road Pir Gul Shah to


Shar Khaskheli Jhindo Wahan road mile
0/0-3/0 (4.82 Kms)
Construction of Road from new
N.H.Way to Abdul Wahid Wassan road
mile 0/0- 1/0 (1.60 km)
Construction of road from Choudaku
Dargah Shah Rasheed to Sono Khan
Gopang Road mile 0/0-1/2 (2.0 Km)
Construction of Road from Sim Nala to
village Faiz Mohammad Chakrani UC
Deh Sohu Road mile 0/0-1/2 (2.0 km)

Khairpur

Approved
19.12.12

Khairpur

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

June-18

53.280

1.000

4.245

0.000

5.245

48.035

4.000

0.000

Approved
23.01.13

June-16

18.245

0.000

0.000

0.000

0.000

18.245

18.245

Khairpur

Approved
23.01.13

June-16

20.898

0.000

0.000

0.000

0.000

20.898

Khairpur

Approved
23.01.13

June-16

21.040

0.000

0.000

0.000

0.000

Construction of Road from Old


N.H.Way to Madina Colony Khairpur
Road mile 0/0-1/2 (2.0 km)
Construction of road from Pir Wassan
Mehrabpur to village Faiz Mohammad
Jojai Road mile 0/0-1/2 (2.0 kms)

Khairpur

Approved
19.12.12

June-16

21.330

0.000

0.000

0.000

Khairpur

Approved
23.01.13

June-16

22.269

0.000

0.000

Construction of Road from Ahmedpur


Ripri Road to Fateh Mohammad
Narejovia Shakhrani Anwar Ali Shah
mile 0/0-1/0 (91.60 kms)
Construction of Road from Sagyoon
Khan Wahan Road to Shah Nawaz
Kalhoro UC Sagyoon Tauka Sobhodero
Road mile 0/0- 1/2 (2.0 km)

Khairpur

Approved
23.01.13

June-16

17.710

1.000

Khairpur

Approved
23.01.13

June-18

25.744

2196

Construction of Road from Ahmedpur


Road to Sodhal Khan Shar via Malhar
Shar Road mile 0/0-1/2 (2.0 Km)

Khairpur

Approved
23.01.13

June-16

2197

Construction of Road from Bindho Faiz


Mohammad Road village Almani Narejo
to Chuttal Narejo Road mile 0/0-1/2 (2.0
kms)

Khairpur

Approved
23.01.13

June-16

2189

2190

2191

2192

2193

2194

2195

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

4.000

0.000

10

17

22.018

0.000

18.245

0.000

100

0.000

20.898

0.000

20.898

0.000

100

0.000

21.040

21.040

0.000

21.040

0.000

100

0.000

0.000

21.330

21.330

0.000

21.330

0.000

100

0.000

0.000

0.000

22.269

22.269

0.000

22.269

0.000

100

0.000

5.189

0.000

6.189

11.521

11.521

0.000

11.521

0.000

35

100

0.000

0.000

0.000

0.000

0.000

25.744

6.000

0.000

6.000

0.000

23

0.000

17.435

0.000

0.000

0.000

0.000

17.435

17.435

0.000

17.435

0.000

100

0.000

22.620

1.000

1.698

0.000

2.698

19.922

19.922

0.000

19.922

0.000

12

100

0.000

[ 323 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

2198

Construction of Road from Sanghar


Road to village Mohammad Bachal
Mehrani Taluka Nara (3.0 kms)
Construction of road from Wada Bhatti
to Ali gohar and from Bhillo Jo Bhit to
village Muhammad Hashim Bhatti from
Main road Bolooji Bhits (2.0 kms)

Khairpur

Approved
23.01.13

Khairpur

Construction of Road from Bozdar Dubi


Road to via BHU village Bangal Khan
Jiskani to via Ali Gulab Jiskani, Haji
Muvio Goth Mile 2/1-4/0 (3 Km)
Construction of road namely "New goth
Pathano road village Illahi bux Unar,
Taluka sobhodero (2.0 kms)
Construction of Road from village Lahiri
from Khuhra Guarisabad road to
National Highway village Labiri (1.5
Km)
Construction of Road from Nabi Shah to
Larkana Khairpur Road via Mehtani
Minor (4.0 kms)
Construction of Road from Saidi lower
to Larkana Khairpur Road, via Ghulam
Rasool Jagirani (1.6 Km)
Construction of Road from village Badal
to Larkana Khairpur Road (1.2 Km)
Construction of Road from village
Mujahid to Larkana Khairpur Road, via
River Bund (1.0 Km)
Construction of Road from village Sono
Bhatti to Larkana Khairpur Road (2.0
km)
Construction of Road from Mehtani to
Larkana Khairpur Road, via River
Bandh, (3.2 kms)
Construction of Road from Khuhro to
Larkana Khairpur Road (3.20 Kms)

2199

2200

2201

2202

2203

2204

2205

2206

2207

2208

2209

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

June-17

28.869

0.000

0.000

0.000

0.000

28.869

5.000

0.000

Approved
23.01.13

June-16

21.325

11.390

0.000

0.000

11.390

9.935

9.935

Khairpur

Approved
23.01.13

June-18

32.506

0.000

0.000

0.000

0.000

32.506

Khairpur

Approved
23.01.13

June-16

24.221

1.000

1.698

0.000

2.698

Khairpur

Approved
28.02.13

June-16

23.289

1.000

1.698

0.000

Khairpur

Approved
23.01.13

June-18

41.474

1.000

3.396

Khairpur

Approved
28.02.13

June-16

30.196

1.000

Khairpur

Approved
28.02.13

June-16

13.392

Khairpur

Approved
28.02.13

June-16

Khairpur

Approved
28.02.13

Khairpur

Khairpur

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

5.000

0.000

17

21.869

0.000

9.935

0.000

53

100

0.000

3.000

0.000

3.000

0.000

14.753

21.523

21.523

0.000

21.523

0.000

11

100

0.000

2.698

20.591

20.591

0.000

20.591

0.000

12

100

0.000

0.000

4.396

37.078

5.000

0.000

5.000

0.000

11

23

16.039

2.547

0.000

3.547

26.649

26.649

0.000

26.649

0.000

12

100

0.000

6.696

1.698

0.000

8.394

4.998

4.998

0.000

4.998

0.000

63

100

0.000

12.972

6.486

1.698

0.000

8.184

4.788

4.788

0.000

4.788

0.000

63

100

0.000

June-16

15.471

0.000

0.000

0.000

0.000

15.471

15.471

0.000

15.471

0.000

100

0.000

Approved
23.01.13

June-17

32.349

2.500

0.000

0.000

2.500

29.849

5.000

0.000

5.000

0.000

23

22.849

Approved
23.01.13

June-17

26.921

1.500

0.000

0.000

1.500

25.421

6.000

0.000

6.000

0.000

28

19.421

[ 324 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

2210

Construction of road tough Tile in UC


Dari, Taluka Kandhkot (1.50 kms)
Construction of Road from Arrore
Bachal Shah road to village Kadan Khan
Chakrani (2.0 kms)
Construction of road from metal Road
from village Faiz Mohammad Kandhro
to village Ali Murad Junejo 92.0 km)

Kashmore

Approved
28.02.13
Approved
17.10.12

Sukkur

Construction of Road from Salehpat


Sangrar Road to village Doulat Chachar
(2.0 kms)
Construction of Road from Bara to
village ali Murad Bhambhro (3.0 kms)
Construction of Road from Lakho
Phulpoto Sim Nala (2.40 km)
Construction of Road from Dinho Malik
Gohar to Bhambhoo Malano via Thatt
minor mile 0/0-1/2 (2.0 km)
Construction of road from Latif Dino
Palh to Trimunh Road mile 0/0-1/2 (2.0
kms)
Construction of Road from Kandri to Pir
Bukhari mile 0/0-1/4 (2.40 kms)
Construction of road from Rasoolpur to
Patni mile 0/0-2/0 (3.22 Kms)
Construction of Road from Mola Ali
Check Post to village Bagro Bullo i/c 30
Rft Bridge over Mahesro Wah (2.0 km)
Construction of Road from Sadhuja to
Shaheed Pul (4.0 kms)
Construction of road from Gulan Shah
Road to Gudpur (3.0 kms)
Construction of Bachal Bund Phulani
(3.0 Kms)

Sukkur

2211

2212

2213

2214
2215
2216

2217

2218
2219
2220

2221
2222
2223

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

June-16

13.258

0.000

0.000

0.000

0.000

13.258

13.258

0.000

June-16

20.083

0.000

1.000

0.000

1.000

19.083

19.083

Approved
17.10.12

June-16

20.930

0.000

1.000

0.000

1.000

19.930

Sukkur

Approved
19.12.12

June-16

19.476

0.000

0.000

0.000

0.000

Sukkur

Approved
19.12.12
Approved
23.01.13
Approved
19.12.12

June-18

36.826

0.000

1.000

0.000

June-16

24.112

0.000

1.000

June-16

23.365

0.000

Sukkur

Approved
19.12.12

June-16

20.845

Sukkur

Approved
17.10.12
Approved
17.10.12
Approved
17.10.12

June-16

Approved
17.10.12
Approved
17.10.12
Approved
17.10.12

Sukkur

Sukkur
Sukkur

Sukkur
Sukkur

Sukkur
Sukkur

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

13.258

0.000

100

0.000

0.000

19.083

0.000

100

0.000

19.930

0.000

19.930

0.000

100

0.000

19.476

19.476

0.000

19.476

0.000

100

0.000

1.000

35.826

3.000

0.000

3.000

0.000

11

16.413

0.000

1.000

23.112

23.112

0.000

23.112

0.000

100

0.000

1.000

0.000

1.000

22.365

22.365

0.000

22.365

0.000

100

0.000

0.000

0.000

0.000

0.000

20.845

20.845

0.000

20.845

0.000

100

0.000

23.534

0.000

0.000

0.000

0.000

23.534

23.534

0.000

23.534

0.000

100

0.000

June-18

34.035

0.000

1.218

0.000

1.218

32.817

3.000

0.000

3.000

0.000

12

14.909

June-16

22.531

0.000

1.000

0.000

1.000

21.531

21.531

0.000

21.531

0.000

100

0.000

June-18

57.627

0.000

1.745

0.000

1.745

55.882

5.000

0.000

5.000

0.000

12

25.441

June-18

45.909

0.000

1.500

0.000

1.500

44.409

4.000

0.000

4.000

0.000

12

20.205

June-16

46.151

0.000

1.500

0.000

1.500

44.651

6.000

0.000

6.000

0.000

16

19.326

[ 325 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

2224

Construction of Road from village


Sadhuja to Piral Chachar via Wahid Bux
Mangi, Syed Arbab ali Shah & Jan
Muhammad Solangi (1.60 Km)
Construction of Pacca road from Qazi
Wah to village Muhammad Bux Chachar
2.92 kms)
Construction of Road from village Khoso
to Village Saleh Arain UC Sultanpur
(1.0Km)
Construction of road from Halaji
Dhandhi link road to village Junnas (1.0
km)
Construction of Road from National
Highway to village Haji Mevo Khan via
Pir Tajjo (1.5 Km)
Construction of road from Dadloi
Chechro Road @ mile 0/2 to Dadloi
minor 0/0-1/7 (3.0 kms)
Construction of Road from Fish Farm to
Dadloi minor mile 0/0-1/4 (2.41 Kms)

Sukkur

Approved
17.10.12

Sukkur

2225

2226

2227

2228

2229

2230

2231
2232

2233

2234

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

June-18

15.906

0.000

1.500

0.000

1.500

14.406

14.406

0.000

Approved
17.10.12

June-16

23.462

0.000

1.500

0.000

1.500

21.962

21.962

Sukkur

Approved
17.10.12

June-16

13.795

6.803

1.698

0.000

8.501

5.294

Sukkur

Approved
17.10.12

June-16

11.011

5.503

1.698

0.000

7.201

Sukkur

Approved
19.12.12

June-16

15.887

0.000

0.000

0.000

Sukkur

Approved
17.10.12

June-17

29.925

0.000

1.490

Sukkur

Approved
28.11.12

June-16

22.801

0.000

Approved
17.10.12
Approved
28.02.13

June-16

30.799

June-18

Approved
19.12.12

Approved
28.11.12

Construction of road from Vohri to


Sukkur
Moula Ali mile 0/0-2/0 (3.22 kms)
Construction of Road from Kotpull
Khairpur
Shadi Dhoodan to village Manghelo
Khan Jalbani via Sabul Khan Jalbani
mile 0/0-1/2 (2.0 kms)
Construction of Road from village Khan
N. Feroze
Muhammad Khaskheli / Asari to
Mukhtiarabad via Sobho Khan Chang
and Ashique Khaskheli, Taluka
Mehrabpur (5.0 Kms)
Construction of link road from village
Larkana
Mavalkot to Warish Dino Machi mile 0/03/0 (4.83 Kms)

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

14.406

0.000

100

0.000

0.000

21.962

0.000

100

0.000

5.294

0.000

5.294

0.000

62

100

0.000

3.810

3.810

0.000

3.810

0.000

65

100

0.000

0.000

15.887

15.887

0.000

15.887

0.000

100

0.000

0.000

1.490

28.435

5.000

0.000

5.000

0.000

22

21.435

0.000

0.000

0.000

22.801

22.801

0.000

22.801

0.000

100

0.000

0.000

1.047

0.000

1.047

29.752

5.000

0.000

5.000

0.000

20

21.252

26.195

0.000

0.000

0.000

0.000

26.195

6.000

0.000

6.000

0.000

23

0.000

June-18

55.141

1.250

4.245

0.000

5.495

49.646

5.000

0.000

5.000

0.000

10

19

22.323

June-18

54.506

0.000

4.245

0.000

4.245

50.261

5.000

0.000

5.000

0.000

17

22.631

[ 326 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

2235

Construction of link road from Kambar


Ratodero Road Labano Khan Khokhar
to connect Panjoo Lorar mile 0/0-1/2

Larkana

Approved
21.05.13

2236

Construction of road from RD 97 Takani


Thatta
Regulator to village Mirza Khan Gabol
Mile 0/0-1/7 (3.00 Kms)
Construction of road Bridge over
Thatta
Jungshahi Nadi near village Mungar
Khan M. Hassan Palijo road mile 0/0-0/6
(1.20 Kms)
Construction of road from Arbab
Thatta
Masood to village Wali Muhammad
pitafi and onwards to Darrar Hotel
Thagio Stop Mile 0/0-3/0 (4.82 Kms)
Construction of link Road from village
N. Feroze
Hoat Khan Jalbani link road Sobho
Chang Taluka Mehrabpur (3 kms)
Construction of road of villages UC
Jamshoro
Khudabad and UC Dal
Construction of road from Torri to Gaji
Dadu
Shah road mile 0/0-1/6 (2.80 Km).
Execution of Development schemes (6.0
Thatta
Kms) road porpsed by Mrs. Rukhsana
Shah).
Construction of Road along Khirthar
Shikarpur /
Canal from Garhi Yasin Disrict
Jacobabad
Shikarpur to Garhi Khairo District
Jacobabad mile 0/0-14/4 (23.33 km)
Construction of 100 Rft Bridge at Naseer T. A. Yar
Canal Bashirabad Chamber Mirwah
road mile 5/1-5/6 approaches.
Construction of road from Chamber
T. A. Yar
Mirwah road near 32 Nail Mori to
Kandiari Farm Cane Gate Tando Allah
yar Sugar Mills mile 0/0-0/5 (120.550
kms)

2237

2238

2239

2240
2241
2242

2243

2244

2245

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

June-16

22.629

0.000

0.000

0.000

0.000

22.629

22.629

0.000

Approved
12.03.13

June-17

31.005

0.499

0.500

0.000

0.999

30.006

5.000

Approved
03.01.13

June-18

67.853

0.000

0.000

0.000

0.000

67.853

Approved
12.03.13

June-18

51.312

0.500

4.245

0.000

4.745

Approved
28.02.13

June-16

22.444

2.500

15.000

0.000

Approved
29.05.14
Approved
15.03.13
Approved
16.04.14

June-18

140.238

0.000

33.491

June-18

23.492

5.000

June-18

56.804

Approved
17.12.12

June-18

Approved
19.11.13
Approved
27.01.14

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

22.629

0.000

100

0.000

0.000

5.000

0.000

19

23.006

5.000

0.000

5.000

0.000

31.427

46.567

5.000

0.000

5.000

0.000

19

20.784

17.500

4.944

1.144

0.000

1.144

0.000

78

83

0.000

0.000

33.491

106.747

5.000

0.000

5.000

0.000

24

27

50.874

4.195

0.000

9.195

14.297

14.297

0.000

14.297

0.000

39

100

0.000

0.000

4.245

0.000

4.245

52.559

10.000

0.000

10.000

0.000

25

21.280

450.357

2.000

150.000

0.000

152.000

298.357

110.000

0.000

110.000

0.000

34

58

94.179

June-18

79.752

5.000

34.000

0.000

39.000

40.752

8.000

0.000

8.000

0.000

49

59

16.376

June-16

38.970

5.000

22.500

0.000

27.500

11.470

11.470

0.000

11.470

0.000

71

100

0.000

[ 327 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

2246

Construction of road from Kalro link


road to village Kot Makhdoom Piniladho
village Ali Akbar Jakhro mile 0/0-2/4

Matiari

Approved
22.07.14

2247

Construction of road from Basic Health


Unit (B.H.U) Mattaro Mandharo road @
Mile 5/4 to village Uris Bhatti mile 0/04/2 (6.80 km)
Construction of Fly over Bridge at
Berani Railway Phattak at Tando Adam

Badin

Sanghar

2248

2249

2250

2251

2252

2253

2254

2255

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

June-18

54.143

0.000

16.508

0.000

16.508

37.635

5.000

0.000

Approved
21.04.14

June-18

66.869

0.000

31.000

0.000

31.000

35.869

20.000

Approved
22.01.10

June-18

393.640

327.714

3.200

0.000

330.914

62.726

Const: of road from Bachal Shah road to T. A. Yar Approved


village Ameer Bhaugwar to Hyder
07.01.12
Mehkani road 0/0-1/4 (2.41 km).
Construction of mettled road Indus
Dadu
Approved
Highway to Murad Khushik via Birmani
26.10.11
Bagh Ali Qureshi Palio Lohar mile 0/02/1+330' (3.50 Kms)
Construction of road from Johi Bhan
Dadu
Approved
road to village Chak via Mosa Panhwar,
13.12.12
Gulan Panhwar road mile 0/0-1/2 (2.00
Km).
Construction of road from Khalifo
Badin
Approved
Qasim Jhudo road to Olya Khan Shah
17.11.08
road via Talib Odejo and Noor Kiryo
mile 0/0-6/4 (10.45 Kms)
Construction of road Gadap to Mole
Karachi
Approved
road mile 10/6-33/6 = 23-0 (M) = 37.03
06.06.05
Kms.
Construction of road from Mirpurkhas - Mirpurkhas Approved
Khan road to village Khan Bahadur
19.03.15
Ghulam Muhammad Wasan mile 0/0-3/2
(5.20 Kms)
Construction / Re-Construction of road
Jacobabad Approved
from Thul Bahu Khoso road at mile 6/6
08.04.15
to village Ashfaquabad via Dost
Mohammad Bhangar (10.00 Kms)

June-16

19.740

7.803

3.000

0.000

10.803

June-16

24.741

6.741

0.600

0.000

June-16

21.176

7.976

0.000

June-16

74.800

74.800

June-16

95.368

June-18

June-18

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

5.000

0.000

30

40

16.318

0.000

20.000

0.000

46

76

7.935

1.000

0.000

1.000

0.000

84

84

30.863

8.937

8.937

0.000

8.937

0.000

55

100

0.000

7.341

17.400

17.400

0.000

17.400

0.000

30

100

0.000

0.000

7.976

13.200

13.200

0.000

13.200

0.000

38

100

0.000

0.360

0.000

75.160

-0.360

8.000

0.000

8.000

0.000

100

111

0.000

95.368

0.000

0.000

95.368

0.000

0.100

0.000

0.100

0.000

100

100

0.000

44.948

0.000

5.000

0.000

5.000

39.948

1.000

0.000

1.000

0.000

11

13

0.000

120.438

0.000

20.000

0.000

20.000

100.438

43.919

0.000

43.919

0.000

17

53

28.260

[ 328 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

2256

2257

2258

2259

2260

2261

2262
2263

2264

2265

Location of
Scheme/
District
3

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
4

Construction of road rom Kumb


Khairpur
Narodhoro road to village Abdul
Rasheed Punjabi Dadan Khan Shambani
and village Muhammad Hassan Panjabi
(5.00Kms)
Construction of road from Larkana
Larkana
Rashid Waggan road Nazar Muhllah
along with sim Nala (both side) to Murad
Shah i/c 10000rft Retaining Wall =
(6.00Kms)
Construction/Wideining/Recoditioning
N. Feroze
Asphalt Concrete road from N.H.Way to
village Allah Dito Bhumbhoo i/c Babal
Faqir Graveyard road
Construction / Improvement of road
S.B.A
from Girls Caddet College road to
Nawabshah sarari road mile 0/0-2/4 (4.50
Kms)
Construction of road from Sanghar
Sanghar
Shadadpur at Manji Chandio to Bhit
Dhano via G. Rasool Salah Channar
Khair Muhammad Brohi and Babul
Marri road mile 0/0-3/1 (5.00 Kms)
Construction / Reconstruction of road
Shikarpur
from Shikarpur _ Jacobabad RQC
Highway to Khanpur Thull via
Rahimabad road along Choi Shkah
(14.48Kms)
Construction of road from Haji Allah
Sujawal
Dino Mandro to Jend Zangejo.
Construction of road Khanto Mori to
Sujawal
village Gogani via Sattar Jamali (5 Kms)

Approved
12.01.15

Construction of road Qadar Dino Shah


to Rajan Shah Mori via Haji Abbas
Charan (8 Kms)
Construction / Reconditioning of road
from Dhandhi to Khanpur via
Thikaratho i/c Bye-Pass (32.18 Kms)

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

June-18

56.198

0.000

12.500

0.000

12.500

43.698

5.000

0.000

Approved
29.05.15

June-18

121.514

0.000

0.000

0.000

0.000

121.514

8.000

Approved
30.03.15

June-17

30.303

0.000

0.000

0.000

0.000

30.303

Approved
19.03.15

June-18

44.179

0.000

0.000

0.000

0.000

Approved
26.03.15

June-18

51.995

0.000

0.000

0.000

Approved
18.02.15

June-18

257.730

0.000

0.000

Approved
03.03.15
Approved
08.04.15

June-18

138.007

0.000

June-18

65.360

Sujawal

Approved
08.04.15

June-18

Sukkur

Approved
06.02.15

June-18

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

5.000

0.000

22

31

19.349

0.000

8.000

0.000

56.757

5.000

0.000

5.000

0.000

17

23.303

44.179

6.000

0.000

6.000

0.000

14

19.090

0.000

51.995

5.000

0.000

5.000

0.000

10

23.498

0.000

0.000

257.730

10.000

0.000

10.000

0.000

123.865

0.000

0.000

0.000

138.007

8.000

0.000

8.000

0.000

65.004

0.000

0.000

0.000

0.000

65.360

5.000

0.000

5.000

0.000

30.180

108.379

0.000

0.000

0.000

0.000

108.379

5.000

0.000

5.000

0.000

51.690

399.566

0.000

0.000

0.000

0.000

399.566

8.000

0.000

8.000

0.000

195.783

[ 329 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

2266
2267
2268

2269

2270

2271

2272

2273

2274

2275

2276

2277

Location of
Scheme/
District
3

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
6

Actual
Exp. upto
Jun, 14
7

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

Construction of Mirpur Bathoro Bye


Thatta
Pass road mile 0/0-7/4 (12 Kms)
Construction of Haleji-Nooriabad road
Thatta
to Jungshahi Eidgah road
Construction of road from Dargah Khair
Thatta
Shah road to village Muhammad Hassan
Otho road
Construction of Road from Moaj Khan
T. A. Yar
Stop at Nasarpur road to Quba Stop via
Village Pir Muhammad Chachak (5.5
Km)
Construction of Road from village Rais Mirpurkhas
porho Khan Laghari to village Rais
Haji Mohd Ismail Laghari.(3.3 KM)

Approved
22.04.15
Approved
19.03.15
Approved
19.03.15

June-18

602.004

0.000

0.000

0.000

0.000

602.004

12.000

0.000

June-16

23.999

0.000

0.000

0.000

0.000

23.999

23.999

June-18

43.068

0.000

8.000

0.000

8.000

35.068

Approved
14.05.15

June-18

88.630

0.000

0.000

0.000

0.000

Approved
13.03.15

June-18

33.379

0.000

0.000

0.000

Construction of Road National Highway


Village Abdullah Buriro to Village
Sawan Buriro UC Daras Moro (3.00
Km)
Construction of Road from Haji Baig
Mohammad Panhwar to Mitho than
Marri District N'Feroze (4.00 Km)
Construction of Link Road Dewna
Shakh to village Mula Baharo via Landi
Muhammad Yaqoob Sahito to connect
with Dehat Road 0/0-3/0 (5.0 Kms)

N. Feroze

Approved
19.03.15

June-18

36.934

0.000

0.000

N. Feroze

Approved
19.03.15

June-18

35.815

0.000

N. Feroze

Approved
13.03.15

June-18

57.799

Construction of road from Khanpur


Ghotki
Approved
Mahar road to village Dhamaji via
18.02.15
Naseeb Khan plot (5 km)
Reconstruction of black top road from
Mirpurkhas Approved
Tando Jan Muhammad - Jhuddo road
19.03.15
Nasirabad to Ghuram Bhatti (4.0 Kms.)

June-18

Construction of road from Memon


Mohalla to Bhirya By Pass (3.22 Kms)
(Modified 4.00 Kms)
Construction of road schemes of Kazi
Ahmed at Daulatpur (17 Kms)

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

12.000

0.000

0.000

23.999

0.000

100

0.000

5.000

0.000

5.000

0.000

19

30

15.034

88.630

18.208

0.000

18.208

0.000

21

35.211

0.000

33.379

5.000

0.000

5.000

0.000

15

14.190

0.000

0.000

36.934

5.000

0.000

5.000

0.000

14

15.967

0.000

0.000

0.000

35.815

8.000

0.000

8.000

0.000

22

13.908

0.000

0.000

0.000

0.000

57.799

8.000

0.000

8.000

0.000

14

24.900

60.256

0.000

2.500

0.000

2.500

57.756

30.000

0.000

30.000

0.000

54

13.878

June-18

28.818

0.000

0.000

0.000

0.000

28.818

5.000

0.000

5.000

0.000

17

21.818

0.000

N. Feroze

Approved
18.02.15

June-16

88.447

0.000

20.000

0.000

20.000

68.447

68.447

0.000

68.447

0.000

23

100

S.B.A

Approved
12.02.13

June-18

221.447

0.000

0.000

0.000

0.000

221.447

13.447

0.000

13.447

0.000

18
295.002

104.000

[ 330 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

2278

Construction of road from Sangrar


Salehpat at mile 7/3 to old FFR road link
to FFR, MTTS mile 0/0-3/3 (5.42 Kms)

Sukkur

Approved
19.12.09

June-16

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

TOTAL CONSTRUCTION (ON-GOING)

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

45.092

45.092

0.000

0.000

24766.543

6800.471

1971.886

0.000

45.092

FPA

Financial Progress
in %age upto

Jun'15 Jun'16
15

16

17

100

104

0.000

2.000

0.0

2.000

0.000

8772.357 15994.185

3354.169

0.000

3354.169

0.000

Financial Projec
2016-17
18
0.000

6494.104

CONSTRUCTION (NEW)
2279

Construction of road from Thull


Jacobabdad at Noor Wah to Hayderpur
Wago upto Baqapur road (11.0Kms)

Jacobabad

Unapproved

June-18

151.306

0.000

0.000

0.000

0.000

151.306

37.827

0.000

37.827

0.000

25

56.740

2280

Construction of road from Karim Bux to


village Mohammad Ismail Khoso
through Hairo Shakh (5.00Kms)
Constuction of road from Manjhi Pull @
Kandhkot Saifal road to Tangwani
Town along I.P of Tangwani Shakh
(8.00Kms)
Construction of Larkana Naudero road
Circular road to connect iNdus Highway
(N-55) at the Larkano By-Pass.

Jacobabad

Unapproved

June-18

67.391

0.000

0.000

0.000

0.000

67.391

16.848

0.000

16.848

0.000

25

25.272

Kashmore

Unapproved

June-18

199.828

0.000

0.000

0.000

0.000

199.828

49.957

0.000

49.957

0.000

25

74.936

Larkana

Unapproved

June-18

247.956

0.000

0.000

0.000

0.000

247.956

61.989

0.000

61.989

0.000

25

92.984

2281

2282

2283

Construction of road from Arija ByePass to Gud Purani to Yar Muhammad


Huilo along path of Glipsy ,minor

Larkana

Unapproved

June-18

60.024

0.000

0.000

0.000

0.000

60.024

15.006

0.000

15.006

0.000

25

22.509

2284

Construction of raod from village


Muhammad Waris Bhurt to Haji Shah
Muhammad Panhwar via village Mithio
Mari road mile 0/0-2/7(6 Kms)
Construction of road from NHW to
Gohram Nago Fakir Zardari via Pai
forest road mile 0/0-6/7
Construction of road rom Raza
Mohammad Wadayo to Khan Dhoro via
Baqa Mohammad Jaffari

N. Feroze

Unapproved

June-18

54.595

0.000

0.000

0.000

0.000

54.595

13.648

0.000

13.648

0.000

25

20.474

S.B.A

Unapproved

June-18

161.002

0.000

0.000

0.000

0.000

161.002

40.250

0.000

40.250

0.000

25

60.376

Shikarpur

Unapproved

June-18

66.784

0.000

0.000

0.000

0.000

66.784

16.696

0.000

16.696

0.000

25

25.044

2285

2286

[ 331 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

Shikarpur

Unapproved

June-18

100.420

0.000

0.000

0.000

0.000

100.420

25.105

0.000

Thatta

Unapproved

June-18

100.839

0.000

0.000

0.000

0.000

100.839

25.210

Badin

Unapproved

June-18

45.000

0.000

0.000

0.000

0.000

45.000

Jacobabad

Unapproved

June-18

100.000

0.000

0.000

0.000

0.000

Kashmore

Unapproved

June-18

140.000

0.000

0.000

0.000

Sujawal

Unapproved

June-18

120.000

0.000

0.000

Construction / Improvement of Internal


Roads of Five (05) Towns of District
Jacobabad (10 Kms)
Construction / Improvement of Internal
Roads of Six (06) Towns of District
Kashmore @ Kandhkot (14 Kms)

Jacobabad

Unapproved

June-18

100.000

0.000

Kashmore

Unapproved

June-18

170.000

Construction of link road from


Kandhkot Saifal road at Sobho Ogahi to
Lohi Pul via Jangu Essani, Raza
Mohammad Bangwar upto Kandhkot
Malguzar road mile 0/0-10/2

Kashmore

Unapproved

June-18

250.000

2288

Construction of Haleji-Nooriabad road


to Zaroni Farm road I/C 300 RFT PreStressed Bridge
Construction of road from Mataro
Khorwah road mile 13/4 Jam Wah Mori
to village Muhammad Mosa Sahito via
Qasim Samoon (4.00 Kms)
Construction of road from Dilmurad
Manjhipur road to village Saleem Khoso
via Ganj Bux Golo Faiz Muhammad
Khoso, Asghar Khoso, Wahab Khoso
connect to Desert Canal UC Karim Bux
Taluka Thul.
Construction of link road from Thul
Tangwani road to village Engineer
Majid Hussain Noonari via Pir Bux
Noonari, Haji Muhammad Noonari upto
connect Khuda Bux Noonari Pre-stress
Bridge 140 Rft. (0/0-7/4)
Construction of link road through Sim
Nala Raj Malik road at point village
Muhammad Ayoub Thaeem to village
Mamu Bhadaee Taluka Jati (12 Kms)

2291

2292

2293

2294

2295

Actual
Exp. upto
Jun, 14

Constuction of road from Nim Laro to


village Rohilo Khan Jaffari (7.00 Kms)

2290

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

2287

2289

Location of
Scheme/
District

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

25.105

0.000

25

37.658

0.000

25.210

0.000

25

37.815

11.250

0.000

11.250

0.000

25

16.875

100.000

25.000

0.000

25.000

0.000

25

37.500

0.000

140.000

35.000

0.000

35.000

0.000

25

52.500

0.000

0.000

120.000

30.000

0.000

30.000

0.000

25

45.000

0.000

0.000

0.000

100.000

25.000

0.000

25.000

0.000

25

37.500

0.000

0.000

0.000

0.000

170.000

42.500

0.000

42.500

0.000

25

63.750

0.000

0.000

0.000

0.000

250.000

62.500

0.000

62.500

0.000

25

93.750

[ 332 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

FPA

Financial Progress
in %age upto

Jun'15 Jun'16
15

16

17

Financial Projec
2016-17
18

2296

Construction of road from Pir Garho to


Muhammad Saleh Khaskheli (3.2 Kms)

Khairpur

Unapproved

June-18

30.000

0.000

0.000

0.000

0.000

30.000

7.500

0.000

7.500

0.000

25

11.250

2297

Construction of Kandhkot By-Pass road


connecting Indus Highway to Kandhkot
Saifal road (7 Kms)
Rehabilitation and Widening of road
from Naudero Chowk City Larkana to
River Indus protective bund via villages
Masuhab and Akil (6 Kms)
Construction of road from RQC
Highway to Chohi Shakh via Mithapur
(3.2 Kms)
Construction of road from Dilmurad
Manjhipur road to village Sakhi Hamzo
Khan Khoso (7.0 Kms)
Construction of road from Karampur
link road to Mohro village Mir Imdad
Khan Bijarani (3.2 Kms)
Construction of link road from BS
Feeder RD 219 to Saifal road along
Sheran Minor inspection path (15 Kms)

Kashmore

Unapproved

June-18

85.000

0.000

0.000

0.000

0.000

85.000

21.250

0.000

21.250

0.000

25

31.875

Larkana

Unapproved

June-18

70.000

0.000

0.000

0.000

0.000

70.000

17.500

0.000

17.500

0.000

25

26.250

Shikarpur

Unapproved

June-18

42.000

0.000

0.000

0.000

0.000

42.000

10.500

0.000

10.500

0.000

25

15.750

Jacobabad

Unapproved

June-18

84.000

0.000

0.000

0.000

0.000

84.000

21.000

0.000

21.000

0.000

25

31.500

Kashmore

Unapproved

June-18

48.000

0.000

0.000

0.000

0.000

48.000

12.000

0.000

12.000

0.000

25

18.000

Kashmore

Unapproved

June-18

190.000

0.000

0.000

0.000

0.000

190.000

47.500

0.000

47.500

0.000

25

71.250

Construction of link road from Yar Ali


Kashmore
UnBangwar to Mushtaq Ahmed Bangwar
approved
(5 Kms)
Construction of road from Karo Keti
Matiari
Unvillage to Golo Unar (5 Kms)
approved
Construction of road from Kharoro
Umerkot
UnBypass road to Kacholi via Otaq Sarfraz
approved
Ali Shah (3.5 Kms)
Construction of road from Ramjago
Mirpurkhas
Unroad to village Rais Abdullah Bhurgri
approved
via Nadeem Bhurgri to Rafique Bhurgri
(5 Kms)
Construction of road from Chaheen
N. Feroze
UnShakh to Darya Khan Jalbani (3 Kms)
approved

June-18

56.000

0.000

0.000

0.000

0.000

56.000

14.000

0.000

14.000

0.000

25

21.000

June-18

52.000

0.000

0.000

0.000

0.000

52.000

13.000

0.000

13.000

0.000

25

19.500

June-18

45.000

0.000

0.000

0.000

0.000

45.000

11.250

0.000

11.250

0.000

25

16.875

June-18

52.000

0.000

0.000

0.000

0.000

52.000

13.000

0.000

13.000

0.000

25

19.500

June-18

42.000

0.000

0.000

0.000

0.000

42.000

10.500

0.000

10.500

0.000

25

15.750

2298

2299

2300

2301

2302

2303

2304
2305

2306

2307

[ 333 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

2308

Constuction of link road Asian


Development to Setharki Shakh village
Soomar Khan Korai (6 Kms)
Construction of road from PS Golodaro
to village Mohammad Yousuf Jafiri (6
Kms)
Construction of road with
Improvement of SW Drain from
Salahuddin Ayoubi road to Junejo
Town, Jamsheed Town
Construction/Imrprovement of various
Roads in UC Talti (9.60 Km)
Construction/Improvement of various
roads in UC Bubak & Dall (13.9 Km)
Construction / Imrpovement of various
Roads in UC Siyal, UC Khudadad & UC
Pipri (17.0 Km)
TOTAL CONSTRUCTION (NEW)
TOTAL CONSTRUCTION

N. Feroze

Unapproved

Shikarpur

2309

2310

2311
2312
2313

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

June-18

58.000

0.000

0.000

0.000

0.000

58.000

14.500

0.000

Unapproved

June-18

62.000

0.000

0.000

0.000

0.000

62.000

15.500

Karachi

Unapproved

June-18

50.000

0.000

0.000

0.000

0.000

50.000

Dadu

Unapproved
Unapproved
Unapproved

June-18

96.000

0.000

0.000

0.000

0.000

June-18

130.000

0.000

0.000

0.000

June-18

153.000

0.000

0.000

0.000

3480.145
28246.688

0.000
6800.471

0.000
1971.886

0.000
0.000

Dadu
Dadu

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

18

14.500

0.000

25

21.750

0.000

15.500

0.000

25

23.250

12.500

0.000

12.500

0.000

25

18.750

96.000

24.000

0.000

24.000

0.000

25

36.000

0.000

130.000

32.500

0.000

32.500

0.000

25

48.750

0.000

153.000

38.250

0.000

38.250

0.000

25

57.375

0.000 3480.145
8772.357 19474.330

870.036
4224.205

0.000
0.000

870.036
4224.205

0.000
0.000

1305.055
7799.158

BRIDGES (ON-GOING)
2314

2315

2316

2317

2318

Construction of new bridges in Sindh


(Shikarpur, Larkana, Khairpur,
Sukkur, S.B.A., Jamshoro & Dadu.)
Construction of Over Head Bridge on
Railway Southern Side of Railway
Station Sabzi Mandi Side (1475RFt)
Construction of overhead bridge
including approaches on Railway
Crossing @ 5/3 of TandoAdam Circular
road.
Construction of Abdul Salam Thahim
Flyover Bridge at Shahdadpur over Jatia
Railway Phatak
Construction of Overhead Bridge on
Railway line between Kotri City and the
Industrial Area kotri. District Jamshoro

Sindh

Approved
31.12.08

June-17

593.079

478.471

57.000

0.000

535.471

57.608

15.000

0.000

15.000

0.000

90

93

0.000

S.B.A

Approved
04.10.12

June-16

252.893

100.000

152.893

0.000

252.893

0.000

20.000

0.000

20.000

0.000

100

108

0.000

Sanghar

Approved
24.07.12

June-16

207.490

129.978

77.464

0.000

207.442

0.048

5.000

0.000

5.000

0.000

100

102

0.000

Sanghar

Approved
03.06.13

June-18

688.231

12.500

105.000

0.000

117.500

570.731

25.000

0.000

25.000

0.000

17

21

272.866

Jamshoro

Approved
03.12.14

June-18

1274.449

0.000

1.000

0.000

1.000

1273.449

28.000

0.000

28.000

0.000

622.725

[ 334 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

2319

Construction of Bilawal Bhutto Zardari


Flyover Bridge Jail Phatak (Railway
Crossing) Jacobabad.
TOTAL BRIDGES (ON-GOING)

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Jacobabad

Approved
22.04.15

June-18

Actual
Exp. upto
Jun, 14
7

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

FPA

Financial Progress
in %age upto

Jun'15 Jun'16
15

16

17

Financial Projec
2016-17
18

580.000

0.000

0.000

0.000

0.000

580.000

5.000

0.000

5.000

0.000

287.500

3596.142

720.949

393.357

0.000

1114.306

2481.836

98.000

0.000

98.000

0.000

June-18

329.830

198.637

32.619

0.000

231.256

98.574

8.000

0.000

8.000

0.000

70

73

45.287

June-18

268.481

9.000

105.000

0.000

114.000

154.481

8.000

0.000

8.000

0.000

42

45

73.241

598.311

207.637

137.619

0.000

345.256

253.055

16.000

0.000

16.000

0.000

1183.090

STRATEGIC ROADS
IMPROVEMENT (ON-GOING)
2320
2321

W/R Sindhri Khipro Hatung with link to


Sanghar
Approved
Kamil Hingoro 67.00 Kms
22.02.07
W/R Mithi to Chelhar Mile 0/0-14/4
Tharparkar Approved
(23.20 Kms).
07.01.13
TOTAL IMPROVEMENT (ON-GOING)

118.528

STRATEGIC ROADS
CONSTRUCTION (ON-GOING)
2322

2323
2324
2325
2326

2327

2328

Construction of road from Chanesser to


Baghsar via Lanwari Pir Pakhorai mile
27/6-51/6 (38.64 Kms)
Construction of road from Chotiaryoon
to Hathungo Mile 0/0-40/0.

Ghotki

Approved
17.04.10

June-18

498.965

248.000

15.962

0.000

263.962

235.003

7.000

0.000

7.000

0.000

53

54

114.002

Sanghar

Approved
25.09.06

June-18

393.329

264.986

13.549

0.000

278.535

114.794

7.000

0.000

7.000

0.000

71

73

53.897

Construction of road from Usman Behan


Sanghar
Approved
to Chotiaryoon mile 0/0-57/4.
25.09.06
Construction of road from Dubar to
Sukkur
Approved
Bhelani Mile 0/0-12/0 (19.30 KM)
21.01.08
Construction of road from chachro
Tharparkar Approved
Waori Hirar Vaghiji - Veri Bahroo to
10.01.05
Dano Dhandhal mile 0/0-78/0 = 78-0 (M)
= 125.58 Kms.
Construction of road from Kunri
Tharparkar Approved
Chelhar Thar Nabisar to Chelchar Road
27.12.05
Mile 0/0-25/0 = 25-0 (M) = 40.25 Kms.

June-18

600.138

265.500

10.000

0.000

275.500

324.638

8.000

0.000

8.000

0.000

46

47

158.319

June-17

161.628

125.930

6.500

0.000

132.430

29.198

15.500

0.000

15.500

0.000

82

92

6.849

June-18

812.490

387.598

105.000

0.000

492.598

319.892

10.000

0.000

10.000

0.000

61

62

154.946

June-16

279.352

248.750

24.000

0.000

272.750

6.602

6.602

0.000

6.602

0.000

98

100

0.000

Construction of road from Mithi to


Tharparkar Approved
Trighatio (Tagai viaGodhgar &
23.12.06
Mahayari mile 0/0-31/0 = 31-0 (M) = 50.0
Kms.

June-18

426.410

149.500

11.000

0.000

160.500

265.910

10.000

0.000

10.000

0.000

38

40

127.955

[ 335 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

2329

Const: of road from Ali Bunder to


Nagarparkar road mile 0/0-129/2 (208.0
Kms)
Construction of road from Mithi
Loonhair Kharo AmroGogasar Katho
to Nohto noon Road Mile 0/0-28/0 = 28-0
(M) = 45.08 Kms.
Construction of road from Mithi Diplo
road at Point Winger Well to Saghror
Taranjowat Bhadoro to Dodo Jat, mile
0/0-40/0 (64.36 Kms).
Construction of Link road from Kaplore
to Jhamrari via Village Manaro Sultan
mile 0/0-13/2.
Construction of road from Thario-jo-Tar
to Dano via Pilo mile 0/0-31/6.
Construction of road from Tebhre
Bhambhro to Saeedao via Dodhar
Samoon Road Mile 0/0-53/0 (85.33 Kms)

2330

2331

2332

2333
2334

2335
2336
2337

Location of
Scheme/
District
3

Actual
Exp. upto
Jun, 14
7

FPA

Financial Progress
in %age upto

Jun'15 Jun'16
15

16

17

Financial Projec
2016-17
18

Tharparkar Approved
29.05.07

June-18

4185.804

500.651

16.981

0.000

517.632

3668.172

10.000

0.000

10.000

0.000

12

13

1829.086

Tharparkar Approved
18.12.06

June-18

426.410

167.500

176.127

0.000

343.627

82.783

10.000

0.000

10.000

0.000

81

83

36.392

Mirpurkhas Approved
18.12.06

June-18

574.800

215.150

20.472

0.000

235.622

339.178

7.000

0.000

7.000

0.000

41

42

166.089

Tharparkar Approved
24.12.09

June-18

241.279

84.500

0.000

0.000

84.500

156.779

5.000

0.000

5.000

0.000

35

37

75.890

Tharparkar Approved
24.12.09
Umerkot Approved
14.10.06

June-18

565.174

89.000

20.000

0.000

109.000

456.174

8.000

0.000

8.000

0.000

19

21

224.087

June-18

898.000

132.040

0.000

0.000

132.040

765.960

7.000

0.000

7.000

0.000

15

15

379.480

June-18

340.316

118.528

6.208

0.000

124.736

215.580

7.000

0.000

7.000

0.000

37

39

104.290

June-18

357.067

75.802

6.792

0.000

82.594

274.473

7.000

0.000

7.000

0.000

23

25

133.737

June-18

435.259

83.304

5.200

0.000

88.504

346.756

10.000

0.000

10.000

0.000

20

23

168.378

11196.421

3156.739

437.791

0.000

3594.530

7601.892

135.102

0.000

135.102

0.000

Construction of road from New Chore to Umerkot


Mendhrejopar mile 0/0-28/4.
Construction of road from Kunri to
Umerkot
kantio Cheel Bund Khuri (50.00 Kms)
Construction of Three link roads
Umerkot
connecting Umerkot with Mehander-JOPar.
i) Jaloo-Jo-Chaunro to Mehandre-Jo-Par
(28.17 Kms)
ii) Mehandre-jo-par to Anupani via
Sakhro (14.08 Kms)
iii) Construction of road from New
Chore to Nengrar. (25.35 Kms)
TOTAL CONSTRUCTION (ON-GOING)
FOREIGN AIDED PROJECTS
(ON-GOING)

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

Approved
12.09.06
Approved
02.01.08
Approved
12.12.05

3733.395

[ 336 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

2338

Sindh Road Sector Development


Program (Ex-ADB Assisted Loan No.
1892-1893 (SF) & OPEC 899-P (All over
sindh)

Sindh

Approved
28.09.02

June-17

2339

Japanese Assisted Rural Road


Sindh
Construction Project-II Sindh (JICA)
(Larkana, Shikarpur, Dadu, Thatta,
Hyderabad, Jacobabad, Khairpur and
Sukkur) (92.70% JICA Loan
Rs.8824.310 Million - 7.30% GOS Share
Rs.651.00 Million)
Reconstruction of Nawabshah Sanghar
SBA /
road 61 km (85% Chinese Loan Rs.
Sanghar
1780.747 Million - 15% GOS funding Rs.
314.212 Million)
Sindh Provincial Road Improvement
Sindh
Project Assisted by Asian Development
Bank (328 Kms), ADB Assisted (Total
Rs.22750.00 million (87% ADB Loan
Rs.19780.00 million, 13% GOS Share
Rs.2970 million)
TOTAL FOREIGN AIDED (ON-GOING)
TOTAL FOREIGN AIDED

Approved
06.11.08

June-17

651.000

Approved
13.09.13

June-17

Approved
20.05.15

June-17

2340

2341

A)
B)
C)
E)
F)
G)
H)

I)

GENERAL (ON-GOING)
IMPROVEMENT (ON-GOING)
IMPROVEMENT (NEW)
CONSTRUCTION (ON-GOING)
CONSTRUCTION (NEW)
BRIDGES (ON-GOING)
STRATEGIC ROADS
i) IMPROVEMENT (ON-GOING)
ii) CONSTRUCTION (ON-GOING)
FOREIGN AID PROJECTES (ONGOING)
TOTAL ROAD & BRIDGES
BUILDINGS
(On-Going Schemes)

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion
6

Actual
Exp. upto
Jun, 14
7

14419.600 15291.209

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14
236.250

0.000 15527.459 -1107.859

501.000

149.000

0.000

650.000

314.212

0.000

5.000

0.000

2970.000

0.000

0.000

0.000

18354.812 15792.209
18354.812 15792.209

390.250
390.250

4710.908
39662.542
4237.735
24766.543
3480.145
3596.142

2341.152
7492.411
0.000
6800.471
0.000
720.949

182.272
4824.317
0.000
1971.886
0.000
393.357

598.311
207.637
11196.421 3156.739
18354.812 15792.209

137.619
437.791
390.250

110603.558 36511.567

8337.492

FPA

Financial Progress
in %age upto

Jun'15 Jun'16
15

16

17

Financial Projec
2016-17
18

70.000

0.000

70.000

0.000

108

108

0.000

1.000

1.000

0.000

1.000

211.500

100

100

0.000

5.000

309.212

120.000

0.000

40

94.606

0.000

2970.000

40.000

0.000

1465.000

0.000 16182.459
0.000 16182.459

2172.353
2172.353

231.000
231.000

0.000
0.000

0.000 2523.424 2187.484


0.000 12316.728 27345.815
0.000
0.000 4237.735
0.000 8772.357 15994.185
0.000
0.000 3480.145
0.000 1114.306 2481.836

203.954
2575.627
1059.431
3354.169
870.036
98.000

0.000
0.000
0.000
0.000
0.000
0.000

253.055
7601.892
2172.353

16.000
135.102
231.000

0.000 44849.059 65754.499

8543.319

0.000
345.256
0.000 3594.530
0.000 16182.459

120.000 1000.000

40.000

0.000

231.000 1211.500
231.000 1211.500
203.954
2575.627
1059.431
3354.169
870.036
98.000

1559.606
1559.606

0.000
0.000
0.000
0.000
0.000
0.000

991.765
12496.794
1612.077
6494.104
1305.055
1183.090

0.000
0.000
0.000

16.000
0.000
135.102
0.000
231.000 1211.500

118.528
3733.395
1559.606

0.000

8543.319 1211.500

29494.412

[ 337 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

2342

Construcation of Residences for Staff of


Sindh House i/c 2 Room Apartment
Studio app: Police Barrack and Mosque
(R/Revised)
Construction of huts in the peripheral of
Sindh House Murree (R/Revised)

Islamabad

Approved
22.04.15

June-16

171.380

97.868

0.000

0.000

97.868

73.512

73.512

0.000

Muree

Approved
25.04.14

June-14

106.813

53.684

8.300

0.000

61.984

44.829

44.829

Re-construcation of Peons Colony


Hyderabad Approved
behind Shahbaz Building Hyderabad.
12.10.09
Construction of 28 Nos. Suits at Sindh
Islamabad Approved
House Islamabad (right Wing Block-I
03.05.13
and Left Wing Block-II)
Construction of Office Block for Deputy Islamabad Approved
Supdt. Of Police Controller resident
31.01.09
Engineer & Allied work at Sindh House
Islamabad
Construction of Boundary wall for
Islamabad Approved
improvement of Security arrangement at
10.03.12
SHI
Renovation / Rehabilitation of Sindh
Islamabad Approved
House Islamabad
26.12.14

June-15

112.450

61.636

12.000

0.000

73.636

38.814

June-15

325.338

0.000

10.000

0.000

10.000

June-15

27.698

15.347

0.000

0.000

June-15

18.869

14.233

0.000

June-17

363.100

0.000

1125.648

June-15

2343

2344
2345

2346

2347

2348

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

FPA

Financial Progress
in %age upto

Jun'15 Jun'16

Financial Projec
2016-17

15

16

17

73.512

0.000

57

100

0.000

0.000

44.829

0.000

58

100

0.000

38.814

0.000

38.814

0.000

65

100

0.000

315.338

70.000

0.000

70.000

0.000

25

122.669

15.347

12.351

12.351

0.000

12.351

0.000

55

100

0.000

0.000

14.233

4.636

4.636

0.000

4.636

0.000

75

100

0.000

0.000

0.000

0.000

363.100

135.000

0.000

135.000

0.000

37

114.050

242.768

30.300

0.000

273.068

852.580

379.142

0.000

379.142

0.000

48.812

0.000

0.000

0.000

0.000

48.812

13.000

0.000

13.000

0.000

27

35.812

June-15

48.812

0.000

0.000

0.000

0.000

48.812

13.000

0.000

13.000

0.000

27

35.812

June-15

57.600

0.000

0.000

0.000

0.000

57.600

15.000

0.000

15.000

0.000

26

42.600

155.224
1280.872

0.000
242.768

0.000
30.300

0.000
0.000

0.000
273.068

155.224
1007.804

41.000
420.142

0.000
0.000

41.000
420.142

0.000
0.000

Total Buildings (On-going)

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

18

236.719

(New Schemes)
2349
2350
2351

Constt. of Chief Engineer Building


Office / residence Sukkur
Constt. of Chief Engineer Highway
Office / residence Sukkur
Construction of Office Block for
Superintending Engineer Provincial
Building Circle Hyderabad and XEN
Hyderabad
Total Buildings (New)
Total Buildings

Sukkur

UnApproved
Sukkur
UnApproved
Hyderabad
UnApproved

114.224
350.943

[ 338 ]

PROVINCIAL
WORKS & SERVICES DEPARTMENT
( Rs. in million )
Gen.
Sr. No.

Sector / Sub-sector /
Name of Scheme

Asset Management System and


automation of composite schedule of
rates for W&S Deptt.
Total S&T
TOTAL W&S (ONGOING)
TOTAL W&S (NEW)
TOTAL WORKS & SERVICES DEPTT:-

Sindh

Approved
24.03.14

June-15

Location of
Scheme/
District

Status
Target
Estimated
Date of
Date for
Cost
Approval Completion

Actual
Exp. upto
Jun, 14

Revised
Throw forAllocation for
Est. Exp.
Allocation 2014ward as
2015-16
upto
15
on
June'
15
Capital Revenue Total
Total
F.P.A.
01-07-15
8
9
10
11
12
13
14

56.619

0.000

20.080

56.619
0.000
104067.946 36754.336
7873.104
0.000
111941.049 36754.336

20.080
8387.872
0.000
8387.872

FPA

Financial Progress
in %age upto

Jun'15 Jun'16
15

16

17

0.000

35

100

Financial Projec
2016-17
18

I.T. Schemes
(On-going Schemes)
2352

0.000

20.080

36.539

0.000

0.000
20.080
36.539
0.000 45142.208 58925.738
0.000
0.000 7873.104
0.000 45142.208 66798.842

0.000
6992.994
1970.467
8963.461

36.539

36.539

36.539
36.539
0.000
36.539 7029.533 1211.500
0.000 1970.467
0.000
36.539 9000.000 1211.500

0.000

0.000
26814.000
3031.355
29845.355

Das könnte Ihnen auch gefallen