Tender document against Very Short Term Tender No.

104/EUCC
(V)/LESA/2013-14

Construction of new 33/11 kV 1x5 MVA Sub station for


MalihabadTahsil

Cost of document :Rs. 550.00 (Non refundable)


Earnest Money :Rs. 11500.00
Date of opening :07.11.2013

e/;kWpy fo|qr forj.k fuxe fyfeVsM


vYidkyhu fufonk lwpuk
v/kksgLrk{kjh }kjk fuEufyf[kr fufonkvksa ds le{k muds lEeq[k vafdr dk;ksZa dks laikfnr djkus gsrq vuqHkoh ,oa
n{k Bsdsnkjksa ls nks Hkkxksa esa vyx&vyx eqgjcUn fufonk;sa fnukWd 07-11-2013 dks 14-00 cts rd vkeaf=r dh tkrh gSa] tks
mlh fnu 15-00 cts fufonknkrkvksa vFkok muds vf/kd`r izfrfuf/k;ksa ds le{k v/kksgLrk{kjh vFkok muds ukfer izfrfuf/k ds
}kjk [kksyh tk;saxhA fufonk [kqyus dh frfFk dks vodk'k gksus dh fLFkfr esa fufonk;sa mijksDr fu/kkZfjr le; rd vxys dk;Z
fnol esa izkIr@ [kksyh tk;saxhA fufonk ds izFke Hkkx esa 1 /kjksgj jkf'k] 2 QeZ dh lk[k dh iqfV gsrq vfHkys[k 4
vuqHko ds laca/k esa foxr okksZa esa leku dk;Z dks laikfnr djus laca/kh vuqcU/k@vuqcU/kksa dh lwph izLrqr djuk gksxkA
fufonk ds f}rh; Hkkx esa enokj njsa o okf.kfT;d krsZa nsuh gksaxhA fufofnr dk;Z dh ek=k 10% rd ?kV&c<+ ldrh gSA
izR;sd fufonk izi= dk ewY; fufonk ds lEeq[k vafdr vizfrns; O;kikj dj lEefyr djrs gq,] vf/kkklh vfHk;Urk]
fo0u0fu0[ka0 r`rh;] yslk] y[ku ds i{k esa ns; cSad MkV@ cSadlZ psd vFkok udn Hkqxrku dj [kqyus dh frfFk ls ,d
fnu iwoZ rd izkIr fd;s tk ldrs gSA fufonk izi= e/;kWpy fo|qr forj.k fuxe fy0 dh osclkbV www.mvvnl.in ls Hkh
izkIr@MkmuyksM fd;s tk ldrs gSaA osc lkbV ls izkIr fd;s x;s fufonk izi= dk ewY; dk cSad MkV fufonk ds izFke Hkkx
esa j[kuk vfuok;Z gksxkA izR;sd fufonk dh /kjksgj jkf'k fufonk ds lEeq[k vafdr dk jkVh;d`r cSad }kjk tkjh cSad MkV@
,QMhvkj@ lhMhvkj@ VhMhvkj vf/kkklh vfHk;Urk] fo0u0fu0[ka0 r`rh;] yslk] y[ku ds i{k es ns;] layXu djuk
gksxkA fufonk ds izFke Hkkx esa okWfNr vgZdkjh krsZa iw.kZ djus okys fufonknkrkvksa dh gh fufonk dk f}rh; Hkkx ;Fkk lEHko
mlh fnu [kksyk tk;sxkA
1fufonk la0 104@foufuea ia0@yslk@ 2013&14 % 33@11 dsoh 1x5 ,eoh, fo|qr midsUnz eksguykyxat
rglhy dk fuekZ.k dk;ZA fufonk dk izi= ewY; 550@& /kjksgj /kujkfk :0 11500-00
2fufonk la0 105@foufuea ia0@yslk@ 2013&14 % fuekZ.k gsrq izLrkfor 33@11 dsoh fo|qr midsUnz
eksguykyxat rglhy dks iksfkr djus gsrq 132 dsoh midsUnz ih0th0vkbZ0 ls 33 dsoh Hkwfexr ykbu dk fuekZ.k
dk;ZA fufonk dk izi= ewY; 5500@& /kjksgj /kujkfk :0 32000-00
1fufonk la0 106@foufuea ia0@yslk@ 2013&14 % fuekZ.k gsrq izLrkfor 33@11 dsoh fo|qr midsUnz
eksguykyxat rglhy ls 11 dsoh mifjxkeh ,oa Hkwfexr ikskdksa dk fuekZ.k dk;ZA fufonk dk izi= ewY; 5500@&
/kjksgj /kujkfk :0 38000-00
4fufonk la0 107@foufuea ia0@yslk@ 2013&14 % 33@11 dsoh 1x5 ,eoh, fo|qr midsUnz efygkckn rglhy
dk fuekZ.k dk;ZA fufonk dk izi= ewY; 550@& /kjksgj /kujkfk :0 11500-00
5fufonk la0 108@foufuea ia0@yslk@ 2013&14 % fuekZ.k gsrq izLrkfor 33@11 dsoh fo|qr midsUnz efygkckn
rglhy dks iksfkr djus gsrq 132 dsoh midsUnz jghekckn ls 33 dsoh Hkwfexr ,oa mifjxkeh ykbu dk fuekZ.k
dk;ZA fufonk dk izi= ewY; 5500@& /kjksgj /kujkfk :0 50000-00
6fufonk la0 109@foufuea ia0@yslk@ 2013&14 % fuekZ.k gsrq izLrkfor 33@11 dsoh fo|qr midsUnz efygkckn
rglhy ls 11 dsoh mifjxkeh ikskdksa dk fuekZ.k dk;ZA fufonk dk izi= ewY; 550@& /kjksgj /kujkfk :0 5500-00

v/kh{k.k vfHk;Urk
fo|qr uxjh; fuekZ.k e.My iape
yslk Hkou] jsthMsUlh]
jkV fgr esa fctyh cpk;sa

INSTRUCTIONS TO TENDERERS
1.00

GENERAL INSTRUCTIONS:

1.02

Tenderers are requested to go through the instructions carefully & furnish complete
information along with their tender bid offer, failing which their tender may not be
considered at all. Tender shall be received in two parts, each part shall be in separate
covers as under:

a)

Tender Bid part-I: Shall contain Earnest Money for Rs. 11500.00 in the shape of
DD/FDR/CDR/TDR duly pledged in favour of EE, EUCD-III, LESA, Lucknow. Part-I of the
tender bid shall also contain (i) A Class License certificate issued by Directorate
Electrical Safety (ii) Proof the credibility (iii) List of agreements or photocopy of
agreements executed with them for such type of work in support of their past
experience/performance. The relevant records shall be self-attested with company seal.
The sealed cover of this part of the bid, shall be super-scribed "Tender bid part-I (Earnest
Money) against Short Term Tender Specifications No.104/EUCC (V)/ LESA/ 2013-14 due
for opening on 17.11.2013 at 15:00 hrs.

b)

Tender Bid Part-II: Shall contain price schedule. This part of the tender bid shall be
superscripted "Tender Bid PartII (Technical, Commercial & prices) against Short Term
Tender Specifications No. 104/EUCC (V)/ LESA/ 2013-14 due for opening on 17.11.2013
at 15:00 hrs.
Only such firms need tender who are having sufficient experience of the work or
are authorized representative of such firms and can produce satisfactory evidence that
they have necessary resources & organization to undertake the work tendered for the
satisfaction of the tendering authority.
In case of any inconsistency of the provisions of Form 'A', the provisions under special
conditions of the tender will super cede/prevail.
Tenderers are requested to submit the price schedule appendix duly filled in (item by
item) as required and should strictly follow the instructions & notes supplementary there
to facilitate the tendering authority to prepare Comparative Statements.
Tenderers should quote the earliest completion period of the Tendered work.
Any portion of terms & conditions as laid down in the condition of the contract, Form 'A'
enclosed along with nature of work etc. which is not clear to the tenderer should be got
clarified before submission of the tender. Tenderers are requested to adhere to all clauses
to the contract Form 'A' to facilitate finalization of the contract. In case, they are unable
to do so, should state any particular clause of the conditions which may not be acceptable
to them & should support alternative for consideration.
The tendering authority does not suggest pledge to accept the lowest of any tender &
reserves to himself the right of rejecting the whole or any portion of the tender as he may
think fit without assigning any reason for non acceptance or selection.
Tendering authority reserves the right to revise or amend the tender. Such revision &
amendment, if any, will be communicated to all tenderers as amendment or addenda to
this invitation of the tender.
Any action on the part of the tenderer to revise the price/prices and/or the change the
structure of price/prices at his own instance after opening of tenders may result in
rejection of tender & also debarring him form submission of the tenderers to the MVVNL/
Corporation at least for one year.
Any approach etc., officially or otherwise on the part of the tender or his representative
shall tender his offer liable to be summarily rejected.
Tenders of those tenderers, who have not purchased the tender specification shall not be
read at the time of opening and shall be rejected outright.
The price of tender specification will not be refunded under any circumstance whatsoever.
Cont'd 2

1.02
1.03
1.04
1.05

1.06
1.07
1.08

1.09
1.10
1.11

:2:
1.12
1.13
1.14
1.15
1.16
1.17
2.00
2.01
2.02
2.03

2.04
2.05

2.06
3.0
3.01
3.02
3.03
4.00
5.00
5.02
5.02
5.03
6.00
6.02
6.02

In case of ambiguous or self contradictory terms/conditions mentioned in the tender


specification, interpretations as advantageous to the MVVNL/Corporation shall be taken
without any reference to accept the deviations or not.
Any overwriting /omitting/erasing etc. in the tender should be duly signed & stamped.
In no case payment will be made by the Letter of Credit.
In no case, MVVNL/Corporation will be held responsible to arrange the T&P for execution
of the tendered work.
Tender Bid Part-I (Earnest Money) should contain in the shape FDR/CDR/DD issued by
nationalized/ scheduled bank.
In no. case, MVVNL will be held responsible to arrange the T&P or other equipments.
Tender Bid Part-I (Earnest Money) should contain the following:
The part one of the tender bid shall contain the Earnest Money amount to Rs. 11500.00
(Rs. Eleven thousand five hundredonly) & documents with respect to pre-qualification of
tenderer.
In case part quantity offered, Earnest Money deposit shall be reduced proportionately.
Tenderers are required to furnish Earnest Money amount in the form of Bank
Draft/FDR/CDR of any scheduled bank duly pledged in favour of Executive Engineer,
Electricity Urban Construction Division (III), LESA, Lucknow which should be submitted
along with the tender bid Part-I. Tender will not be considered without Earnest Money.
The firm registered with DGS&D, Store Purchase Section of Director of Industries, U.P.
Kanpur, U.P. Small Scale Industries Corpn. Kanpur or any other Government
Agency/Institutions shall not be exempted from deposition of Earnest Money.
The Earnest Money deposited by the tenderer will be refunded after finalization of tender,
in the event of his tender being rejected/not accepted. In the event of tender being
accepted, the Earnest Money shall be retained by the tendering authority and adjusted
against the security deposit specified under and shall be released only on satisfactory
completion of work.
It may be noted clearly that in case the offer is not with the valid Earnest Money, Part-II
of the tender bid, will not be opened.
Only tender of those tenderers shall be considered who have sufficient experience for
execution of such type of works during past & have necessary resources & organization to
under take the work tendered for to the satisfaction of the tendering authority.
All the tenderers must furnish a list of agreements executed with them during last three
years.
All the tenderers must submit past performance reports of any of such type of works
carried out by them.
The tendered quantity may vary ( + ) 10% .
TENDER FORM:
Tender form duly filled in, shall be submitted by the tenderer with tender Bid Part-II.
VALIDITY OF TENDER: 180 days from the date of opening of the tender.
Valid current income tax clearance certificate be also submitted.
Schedule of completion of tendered works be also mentioned in enclosed Annexure-II
Tender Proforoma at Sl. No. 16.
Any other information, which may be considered necessary by the tenderer but not
covered in the specification be also submitted.
PRICES:
The tenderers are to quote prices in the enclosed Price Schedule item wise (Proforma
enclosed) duly typed both in words as well as in figures.
The quoted prices shall be firm & firm in all respect through the currency of the
contract/agreement. No variation in the prices shall be allowed in any circumstances.

6.03
6.04

Tenderer should note clearly that the tenders with variable prices shall not be considered
at all.
Any other another charges/duties/taxes/levies etc. should be specifically mentioned
separately in the price schedule.
Cont'd 3

:3:
7.00

8.00
9.00

SCHEDULE OF DEVIATION FROM GENERAL CONDITIONS OF FORM 'A' & SPECIAL


CONDITIONS TENDER SPECIFICATION NO.104/EUCC(V)/LESA/2013-14
The tenderers should clearly state whether all the provisions of tender specification
application to this tender, are acceptable to them & incase of any deviations the same
should be clearly mentioned and submitted along with their tender in the enclosed
proforma.
PAYMENT:
Running payment will be made once during the month subject to the availability of the
funds.
DISPUTE:
For any dispute arising out of this tender in between the tendering authority and the
Contractor. The Chief Engineer, LESA, 4-A, GokhaleMarg, Lucknow will decide the dispute
and his decision will be binding on both the parties.
Superintending Engineer (V)

ANNEXURE-I
TENDER FORM
Tender Specn. No.104/EUCC(V)2013-14
From:

To:

The Superintending Engineer,


Electricity Urban Construction Circle (V), LESA,
MadhyanchalVidyutVitran Nigam Limited,
LESA Bhawan, Residency,
Lucknow.

Sub:- Offer for execution of works required for Construction of new 33/11 kV 1x5 MVA Sub
station for MalihabadTahsilagainst Tender Specifications No. 104/EUCC (V)/ LESA/
2013-14 due for opening on 17.11.2013 at 15:00 hrs.
Sir,

With reference to your invitation to tender for the above I/We hereby offer to the
MadhyanchalVidyutVitran Nigam Limited the items in the schedule of the prices and delivery annexed or
such portion thereof as you determine in strict accordance with the annexed Special conditions of
contract. Form "A", Specifications and schedule of price/ rates to the satisfaction of the purchaser and
in default thereof to any way to UPPCL/ MVVNL the sum of money mentioned in the said conditions.
The rates quoted are firm and in full satisfaction of all claims.
If/We agree to abide by this tender for the period of 180 days from the date fixed for receiving
the same. The offer shall remain valid upto six months from the date of opening of offer.
A sum of Rs..in the form of
as
Earnest Money has been forwarded duly pledged, the full value of which shall be retained by the
MadhyanchalVidyutVitran Nigam Limited against the Security Deposit specified in the said conditions of
contract.
I/We hereby undertake and agree to execute a contract in the form annexed hereto in
accordance with the condition of contract.
Yours faithfully,
Signature of the Tenderer
Date day of
Witness:
Address

ANNEXURE II
TENDER PROFORMA
(To be filled & submitted by the Tenderer in Tender Bid Part II)
IMPORTANT INSTRUCTIONS TO THE TENDERERS
Your tender shall not be considered, if you fail to submit this proforma duly filled. Replies should
be complete without ambiguity and should be clearly written against each item.
Terms such as Refer covering letter etc. shall not be acceptable. You may, however, attach
extra sheets, if the space is not sufficient.
Sl.
No
1.
2.

Particulars

3.

Specification No. against which you have tendered.


Receipt No.& Date by which cost of tender
specification was deposited by you.
Name & Address of the tenderer.

4.

Address of contractor

5.

Weather tenderer is Contractor or Petty Contractor


with power of attorney of agents of manufacturer
(authentic proof regarding agents of manufacturer
to be enclosed)
Amount of earnest money deposited with full
details be submitted here.
Quantity offered (If there are two or more items,
state quantities separately with unites)
Do you agree to all conditions of Form - A & tender
specification & if not, state the modifications clearly
in the schedule enclosed which you would desire in
Form A & other terms & conditions (It may please
be noted the it shall be entirely at the discretion of
the competent authority to accept or reject the
modifications proposed.)
Pl. state clearly (answer Yes / No.), if you would
agree to undertake the works in case the
medications as suggested under Sl. No. 8 is not
acceptable to the corporation without imposing any
further condition / conditions from the site.
Name & Detailed address of your Authorised
representative against this order / agreement.
Name & detailed address of tenderer/ proprietor /
partners / Directors be given.
Give two references who can certify your financial
status & capability to undertake such supply order
one of the reference should be schedule Bank of
India.
Do you confirm that are no typographical errors/
omissions in your tender & all other documents,

6.
7.
8.

9.

10.
11.
12.

13.

forming part of the tender (answer Yes / No)


What is the validity period of your Tender?
What is the completion / delivery period, pl. state if
the completion is guaranteed under penalty?
16. What is your Completion period?
17. What is your Terms of Payment?
18. Are you agreeable to the completion period being
reckoned from the date of receipt of letter of
acceptance by you ?
19
Do you agree to furnish security deposit, if order is
placed with you (Answer Yes / No) ?
20
Give Details of License issued by Electricity Safety
Directorate
21. Pl. enclosed the certified copy of the latest income
tax clearance certificate.
22
Weather all the schedule & documents required
have been submitted or not?
TECHNICAL SPACIFICATIONS / PRICES :
14.
15.

23
24
25
26

27

Is the work/item offered is according to the


specifications of the tendering authority.
Pl. indicate clearly if the quoted prices are Firm &
Firm in all respect through out the currency of the
contract / agreement.
If the quoted rate are inclusive of any taxes /
duties / other charges, give details of such taxes /
duties / other charges, included & at that rate(s)
Pl state, if you would claim any other charges over
& above the prices as extra, which are not covered
above. If Yes, Pl. state each separately indicating
the amount in Rs. Against each per unit basis.
Do you offer any discount and if so, then what is
the rebate / discount in Rs. Per unit ?

Signature of the tenderer with Co. seal.


Place:
Address:
Date:

ANNEXURE-III
DEVIATIONS FROM TERMS AND CONDITIONS OF TENDER DOCUMENT/ FORM "A" & OTHER
TERMS & CONDITIONS OF UPPCL/MVVNL AGAINST TENDER NO. 104/EUCC (V)/ LESA/2013-14
DUE FOR OPENING ON 17.11.2013 AT 15.00 hrs.
I/We the undersigned have carefully examined the General Conditions of contract form A and
other terms & conditions of the tender specification and I/We hereby confirm that all the terms
& conditions contained in form A and other terms and conditions of tender specification under
reference are acceptable to me/us with the following deviations:
S.No. Description Clause Stipulated
No. etc.
MVVNL
1
2

in
3

UPPCL/ Deviation offered


4

Remark, if any
5

Signature of contractor with seal


Date
Place:
Address:

Annexure-IV

Bill of Quantity for execution of works required for Construction of new 33/11 kV 1x5 MVA Sub
station for MalihabadTahsilagainst Tender Specifications No. 104/EUCC (V)/ LESA/ 2013-14 due for
opening on 17.11.2013 at 15:00 hrs.
Sl.
No.
1

Description of Works

Unit

Qty.

No.
No.
No.
No.
No.
No.
No.
No.
No.
M.
No.
M.
M.
No.
M.
M.
Kg.
Kg.
Kg.
Kg.
Kg.
Kgs.
No.
No.
Mtr.
No.

1
2
1
1
6
1
6
1
3
300
48
80
160
1
50
90
2808
1260
380
386
180
5468.2
4
4
250
12

RMT

120

RMT

120

RMtr.

570

Carriage of all the concerning material from store center to JE's dump store& from dump store
to the site work including loading,unloading and proper stacking at the site etc.
Material of 33/11 KV S/S

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

4
a)

33/11 KV Transformer 5 MVA


33 KV VCB 800 Amp.
33 KV Control PannelSingle Transformer
33 KV Control pannel single Circuit Feeder
33 KV Lightening Arrester 400 Amp.
33 KV Line Isolator
33KV Current Transformer 200/100/1
11 KV Incoming VCB 400/200/5A
11 KV Out going VCB 200/100/5A
ACSR Panther Conductor for Bus Bar
Disc Insulator B/S 7000 KN
11 KV 3x300mm2 XLPE Cable
11 KV 3x185mm2 XLPE Cable
Cost of 63 KVA Transformer
11 KV 3x70mm2 XLPE cable
LT cable 3.5x70/35 mm2
Rail 90 Ibs/13mtr.
Ms Channel 125X65 mm FOR CT POST INSULATOR
MS Channel 100X50 mm FOR CABLE STAND
M.S. Angle 75X75X6 mm FOR CT POST INSULATOR
M.S. Angle 65X65X6 mm FOR TERMINAL GANTRY/BUSBAR GANTRY
MS Round Bar 32mm
ST Pole 11 Mt Long
ST Pole 9 Mt Long
ACSR weasul conductor
33 kv pin insulator
Construction of Toe wall around the outdoor Switchyard of the S/s of size 0.75 Mt.At
Base and 0.23 Mt. At top as per RESSPO Norms by lst class bricks in the ratio 1:6, Base
concreting of the wall to be done in ratio 1:6:12 and plaster 12 mm thick in ratio 1:4.
Fabrication of switchyard fencing with wire mesh 10SWG(37mmx50mm) as per drawing
along with Fabrication of one number gate made of MS Angle, MS Channel, MS Flat together
with locking arrangement, its Installation including the cost of civil material, angle 50x50x6mm.
EARTH MAT Laying of earth mat in the switchyard by laying of M.S. Round of 32 mm dia in
500 mm deep trenches with M.S. Round 32mm dia,3 Mtr. Long earth electrodes as per
drawing. The work includes welding of the M.S. Round ,connecting all steel structures in the
switchyard with the earth mat by means of G.I. strips of size 50x6mm as per item below.( M.S.
Round bar 32mm provided by Department )
Excavation of earth for laying mat

b)

Driving of earth electrode.

c)

Laying of earthmat (M.S.) Bar including cutting, shaping and binding etc)

d)

Preparation of joints, proper making and welding; of main earthmat bar joints and applying,
bitumen, bitumen impregnated on joints I.e. End Joints. Cross Joints, Lap Joints.

e)

Welding of riser strip with earthmat and department structure body (One set means one riser
strip welding to main equipments).
PLINTH OF 5 MVA.33/11 KV T/Fs Construction of plinth of size 3.46x3.46 Mtr. For 5 MVA
T/F HAVING 0.4 Mtr. Above ground level . The work including excavation of foundation .base
concreting in CC 1:6:12 ratio (cement ,fine sand & brick ballast)first class brick work in cement
morter of ratio 1:4 foundation CC in 1:4:8 ratio (cement ,fine sand & brick blast) and RCC
working ratio 1:2:4 (cement ,coarse sand and store grit of 20mm gauge using MS Bars of
10mm dia( tor ) in reinforcement including its cutting ,bending &binding in required shape
.The work also includes laying of 2 Nos . 3.46 Mts.Long each rail places complete with cutting
welding & proper fitting etc. The plinth will be made as per drawing and shall be plastered/
finished on top and sides of the plinth .
FABRICATION ,ERECTION & GROUTING OF S/S STRUCTURE. (A) BUS BAR GANTRY
Fabrication, erection, & grouting of Bus bar gantry using rail pole and channel as per RESPO
Drg. No. RES- 38. (All steel section supplied by contractor )
B) ISOLATOR STRUCTURE
Fabrication of isolator structures 3.5 Mtr. In height as per
drawing No. RES 39.Digging of two Nos .pits of size 1.075x0.9x0.3 Mtr. providing stone pad at
the bottom of the pit and grouting pad at the bottom of the pit and grouting of two legs of the
isolator structure in CC (cement coarse sand and stone grit of 20m.m gauge)of the ratio 1:4:8
in block of 1.075Mtrx0.3 mm including supply of all T&P complete in all respect. The work
includes dragging, shifting upto 40 mtrs.Raising and erecting the two legs with runner in
proper allignment, and level and plumb .Both plinths of the isolator structure shall be properly
finished with smoothening of edges. (All steel section supplied by contractor )
D) LIGHTENING ARRESTOR & C.T.STRUCTURE Fabrication of lightening arrestor/CT
structure/.as per drawing No. Res-39 Digging of two Nos. pits of size 1.075x0.3x0.3Mtr
providing stone pad at the bottom of the pit and grouting of two legs of the above structures in
CC (Cement, coarse sand and stone grit of 20mm gauge) of ratio 1:4:8 in block of 1.075Mtr
X0.3Mtr including supply of all civil material complete in all respect. The work includes
dragging, shifting up to 40Mtrs. raising and erecting the two legs with runner of isolator in
proper alignment, level and plumb. Both plinths of the structures shall be properly finished with
chambering of edges etc. (All steel section supplied by contractor )

7-

8-

PLINTH FOR VCB Construction of plinth of size 2.0 mtr x 1.5 mtr x 0.9 mtr suitable for
erection of upper structure for 33KV VCB including grouting of anchor bolts in proper alignment
and level. Scope of work includes excavation of foundation base concreting in CC
1:6:12(cement, fine sand & brick ballast ),1st class brick work in cement mortor of ratio 1:4 CC
in ratio 1:4:8 and RCC work in ratio 1:2:4(cement coarse sand and stone grit of 20mm gauge
)as per drawing.

No.

65

RMtr.

570

No.

265

RMT

200

NO.

NO.

No.

NO.

NO.

NO.

NO.

NO.

ERECTION & INSTALLATION OF 33/11KV,5MVA TRANSFORMERS


A)Erection and installation of 33/11kV,5MVA transformer in a leveled position on the plinth. The
work include shifting of transformer to the site of installation within the substation premises,
assembling fixing and fitting of all accessories and filling of transformer oil to the desired level
and insuring that there is no leakage. All the jump ring & connection are included in the scope
of work.
B) Earthing by way of boring and lowering of "B" class GI pipe 50mm dia from ground upto the
water level (minimum 40 meter deep) as per standard practice
C) Fabrication and grouting of M.S Channel 100x50x6mm in L shape & in proper size and
alignment to provide support for the two separate earthing strips for power transformer neutral
including supply and fixing of two nos. Flexible copper bonds for neutral ear thing.

D) Fabrication and erection of cable support made of two pieces of M.S channel
100x50mm,3.0 Mtr. long joined to each other by means of 5 Nos.M.S Flat 50x6mm places of
size 150mm long each by welding at equal intervals as per drawing and grouting in a block of
size300x300x700mm complete with one coat of ready mixed primer and two coats of
alluminum paint. This includes provinding of four nos M.S clamp made of M.S flat holding the
cable including nuts and bolts and fixing of XLPE Cable.

NO.

NO.

NO.

NO.

NO.

No.

job

NO.

NO.

A) Laying of Earth mate for earthing of indoor equipments by means of M.S strip 50x6mm
connecting to Pipe type earthing as per RESSPO norms. Joints will be welded with high quality
are welding.

job

15

supply and Installation of 24 Volt 15 AH sine wave Battery and batter y Charger Complete and
Charger including its commisioning.

NO.

16

Supply & FIXING OF Rubber matt 2x1.5mtr

NO.

NO.

Mtr

70

9-

INSTALLATION OF ISOLATORS Assembling and installation of line /bus isolator on the


isolator structure adjusting of opening mechanism in proper alignment so as to ensure smooth
operation of the same in case of line isolator proper operation of earth links shall also be
insured. The work includes fabrication for proper flexing if required.
INSTALLATION OF LIGHTENING ARRESTORS

1011-

Assembling and installation Mounting of 3Nos (1 set) lightening arrestors on the L.A.Structure/
complete with making earth connections(separate)and line connections the work includes
fabrication for proper fixing if required.
INSTALLATION OF CT
Installation of 3 Nos.(1 set) CTs on the /CTs structure . Along with C.T. J/B. The work includes
fabrication for proper fixing if required.

1213-

INSTALLATION OF VCB Installation of 33KV VCB complete work including commissioning.


INSTALLATION OF SWITCHGEARS IN CONTROLROOM
A) Shifting carefully & safely 11KV I/C & O/G switchgear from outside of the switchgear room,
including grouting the two No.100x50x6mm channels pieces (each 800mm long including
cutting to size) and foundation bolts in 1;2:4 CC (including cutting of CC of the floor and
finishing of floor)as per direction of Engineer in charge, placing and fixing of switchgear on
foundation providing G.I. Nuts & Bolts of proper size in proper position and alignment and
checking, complete work with Mounting of P.T on incoming S/G.
B) Fixing and making bus bar connections in between all switchgearsafter cleaning and tapping
with H.T. Tape, empire tape and PVC tape properly, providing and fixing of 6 mm thick Bakelite
separators and plugging of all opening & holes with plastic compound complete work including
cost of all material (except copper Bus Bars)strictly to the satisfaction of site in- charge.
C) Shifting carefully & installation of 33KV single circuit transformer control panel in control
room including grouting of above.
D) Shifting carefully & installation of 33KV single circuit line control feeder panel in control
room including grouting of above.

14

17

18

EARTHING OF 11KV & 33KV SWITCHGEARS

Fabrication and erection of exposer type D/P for 11 KV line, on 11 m long S.T. pole with
fixing of necessary clamp & other accessories like one no. Top channel 100x50.-1.3m long
,Angle 65x65x6mm , its grouting 300mm above ground Level ,painting of pole .
H.T.CABLE LAYING
A) Laying & dressing of 11KV,3X300sq.mm under ground cable from 5MVA T/F to 11KV
incoming switchgear in the trench 450 mm wide,900mm deep providing 150mm fine sand,
cushion beneath and 150mm fine sand cushion above the cable. The cable shall be duly
protected by bricks, sand & stone slab .The work includes supplying of fine sand , bricks and
stone slab are refilling and ramming of the left out soil ,closing the trench and leveling. Spare
cable shall be left and burried in the trench in the shape of rings at both ends cable laying work
includes unrolling cutting mage ring and sealing both ends of the cable.

B) Laying & dressing of 11KV,3X185sq.mm under ground cable in the trench 450 mm
wide,900mm deep providing 150mm fine sand,cushion beneath and 150mm fine sand cushion
above the cable. The cable shall be duly protected by Ist class bricks/stone slab. The work
includes supplying of fine sand & bricks & stone slab and refilling and ramming of the left out
soil and leveling. Spare cable shall be left and buried in the trench in the shape of rings at both
ends.
C) Laying & dressing of 11KV,3X70sq.mm under ground cable from 63KVA T/F to 11KV
outgoing switchgear in the trench 450 mm wide,900mm deep providing 150mm fine sand,
cushion beneath and 150mm fine sand cushion above the cable. The cable shall be duly
protected by bricks, sand & stone slab .The work includes supplying of fine sand , bricks and
stone slab are refilling and ramming of the left out soil ,closing the trench and leveling. Spare
cable shall be left and burried in the trench in the shape of rings at both ends cable laying work
includes unrolling cutting mage ring and sealing both ends of the cable.
19

120

Mtr

42

SUPPLY & FIXING OF 11KV CABLE ENDS


A)Supply & fixing of 11KV,3x300sq.mm XLPE Cable out door jointing kits after carefully
removing the insulation of the cable duly plumbing and taping of cable providing, fixing and
crimpling of proper size good quality lugs and complete work including cost of material such as
insulating tapes, cotton tape, plumbing material and lugs etc.

NO.

B)Supply & fixing of 11KV,3x300sq.mm XLPE Cable In door jointing kits on switchgears after
carefully removing the insulation of the cable,duly plumbing and taping of cable providing,fixing
and crimpling of proper size good quality lugs,duly plumbing and taping of cable with good
Quality of cotton tape ,empire tape, HT Tape and PVC Tape, properly fixing of lugs on
switchgears and boxes complete in all respect including cost of material such as insulating
Tapes ,cotton Tape,Plumbing material and lugs etc.

NO.

C)Supply & fixing of 11KV,3x185sq.mm XLPE Cable out door jointing kits after carefully
removing the insulation of the cable duly plumbing and taping of cable providing, fixing and
crimpling of proper size good quality lugs and complete work including cost of material such as
insulating tapes, cotton tape, plumbing material and lugs etc.

NO.

NO.

NO.

NO.

NO.
NO.

2
8

job

D)Supply & fixing of 11KV,3x185 sq.mm XLPE Cable In door jointing kits on switchgears after
carefully removing the insulation of the cable, duly plumbing and taping of cable providing,
fixing and crimpling of proper size good quality lugs, duly plumbing and taping of cable with
good Quality of cotton tape ,empire tape, HT Tape and PVC Tape, properly fixing of lugs on
switchgears and boxes complete in all respect including cost of material such as insulating
Tapes ,cotton Tape, Plumbing material and lugs etc.
E)Supply & fixing of 11KV,3x70sq.mm XLPE Cable out door jointing kits after carefully removing
the insulation of the cable duly plumbing and taping of cable providing, fixing and crimpling of
proper size good quality lugs and complete work including cost of material such as insulating
tapes, cotton tape, plumbing material and lugs etc.
F)Supply & fixing of 11KV,3x70sq.mm XLPE Cable In door jointingkits on switchgears after
carefully removing the insulation of the cable, duly plumbing and taping of cable providing,
fixing and crimpling of proper size good quality lugs, duly plumbing and taping of cable with
good Quality of cotton tape ,empire tape, HT Tape and PVC Tape, properly fixing of lugs on
switchgears and boxes complete in all respect including cost of material such as insulating
Tapes ,cotton Tape, Plumbing material and lugs etc.
G) Hosting of 11kv cable with 100 mm Dia ,3.5 mtr. Long MS Pipe on the feeder cable before
mounting the cable on the double pole,lifting,mounting and clamping of 11KV feeder cable
boxes on the feeder double pole structure and making connection including supply of cable
mounting clamps The work includes the sealing of GI Pipes lower end of the Pipe is to be
buried into the earth by about one foot.
H) Hosting of 11 KV cable to 11 switchgear & 33/11 KV T/F & 11/0.4 KV Cable Stand
33kv SECTIONAL BUS BAR AND STRINGING

20

Mtr

Stringing of 33KV bus bar using of ACSR Panther Conductor including fixing of Disc insulators.
Strings and tension fitting complete with sagging of bus bar etc. and making vertical/Horizontal
jumper connection through PG Clamps and connecting all the equipments with each other
through connecting clamps.Work includes all the jump ring from terminal gantry to bus bar and
from bus bar to transformer (2no. T/f bay's)

21
22

Construction of S/S T/F plinth of size 1.5x1.5x1 m with 1ST class Bricks, cores Sand , Cement
& stone Ballets in Ratio 1:2:4 with RCC Top duly plasterd fixing of two No. channel of size
125x65 mm on the top of the plinth for placement of T/F (All the material will be arranged by
the contractor .)
Shifting of 63 KVA T/F on T/F Plinth and commissioning including jumping with the system (
All the required matrial for above job shall be provided by contractor)

No.

No.

NO.

NO.

job

job

RMT

40

NO.

80

RMT

300

RMT

400

RMT

50

job

STATION/SWITCYARD LIGHTING

23

A) Erection of 9 Mt. STP after excavation of earth in any type of soil and grouting of CC in ratio
1:4:8 (cement coarse sand & brick ballast) as per RESSPO Drg. With plinth.
B)Fixing & supply of 250 watt. sodium vapor lamp complete fitting and of standard quality ISI
mark with water light fittings, elbow etc.complete in all respect and suitable for above supports.
C) Laying and spreading of 3.5 x 70/35 Sq.mm PVC LT cable from 11/.04 kv,63KVA T/F to LT
Distribution Board in switchgear room after digging the trench, laying cable and refilling of
trench including connection at both ends after providing and crimpling of lugs of proper
size,complete work.
D)Providing and laying of 2 x 6 sq. mm. aluminum cable from S.G. room to street light
supports after digging of trench, laying of cable,providing a brick on top of cable , refilling of
trench, making connections at poles with street light fittings, complete in all respect.

24

Construction of cable trench of size 300x300 mm including brick work 1:4 in wall of the trench
brick ballst work in 1:5:10 on foundation plaster 12 mm thick with coarse sand 1:4 and surface
finishing with cement : providing MS strip at an interval of 0.5 M & MS angle running on both
the edges of trench.
Construction of welded frame type control cable trench cover 0.5 M long suitable for trench
(SI. No. 14)including cost of MS/Torr Bar.

25

26

Supply and Laying of following size copper. control cable through underground/cable
trench/trenching SGR interlinking through proper connections.transformer control
panel/protection board /Battery and Battery Charger/Bunch jolts Relay 33/11 KV Transformer
junction box/ 33KV VCB ,CTs etc as per site conditions.
a) 2x2.5mm2
b) 4x2.5mm

c) 6x2.5mm

27

Supply and installation of fire fighting extinguisher of sub station as per ISI Specification
including mounting on wall with the help of clamp

28

Supply and fixings of CT junction box

No.

29

Painting of all structures & equipments

job

Materials to be supplied by Department


1
2
3
4
5
6
7
8
9

33/11 KV Transformer 5 MVA


33 KV VCB 800 Amp.
33 KV Control PannelSingle Transformer
33 KV Control pannel single Circuit Feeder
33 KV Lightening Arrester 400 Amp.
33 KV Line Isolator
33 KV Bus Isolator
33KV Current Transformer 200/100/1
11 KV Incoming VCB 400/200/5A

10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

11 KV Out going VCB 200/100/5A


ACSR Panther Conductor for Bus Bar
Disc Insulator B/S 7000 KN
11 KV 3x300mm2 XLPE Cable
11 KV 3x185mm2 XLPE Cable
Cost of 63 KVA Transformer
11 KV 3x70mm2 XLPE cable
LT cable 3.5x70/35 mm2
Rail 90 Ibs/13mtr.
Ms Channel 125X65 mm
MS Channel 100X50 mm
M.S. Angle 75X75X6 mm
M.S. Angle 65X65X6 mm
MS Round Bar 32mm
ST Pole 11 Mt Long
ST Pole 9 Mt Long
ACSR weasul conductor
11 kv pin insulator

27
Any other material for switch yard structure fitting, accessories, equipments, apparatus which might not
have been mentioned in the bid document but which are used and necessary for completion of the work as
per RESSPO Norms/relevant ISS shall be arranged by the contractor.

( S.C. Bharati )
Superintending Engineer (V)

ANNEXURE-V
Price Schedule for execution of works required for Construction of new 33/11 kV 1x5 MVA Sub
station for MalihabadTehsilagainst Tender Specifications No. 104/EUCC (V)/ LESA/ 2013-14 due
for opening on 17.11.2013 at 15:00 hrs.
S.
No
1
1
2
3
4
5
6
7
8
9
10
11

Description of Work

Unit

Carriage of all the concerning material from store center to JE's dump store&
from dump store to the site work including loading,unloading and proper
stacking at the site etc.
Material of 33/11 KV S/S

33/11 KV Transformer 5 MVA


33 KV VCB 800 Amp.
33 KV Control PannelSingle Transformer
33 KV Control pannel single Circuit Feeder
33 KV Lightening Arrester 400 Amp.
33 KV Line Isolator
33KV Current Transformer 200/100/1
11 KV Incoming VCB 400/200/5A
11 KV Out going VCB 200/100/5A
ACSR Panther Conductor for Bus Bar
Disc Insulator B/S 7000 KN

No.
No.
No.
No.
No.
No.
No.
No.
No.
M.
No.

Unit Rate (Rs)


In figures In words

12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

11 KV 3x300mm2 XLPE Cable


11 KV 3x185mm2 XLPE Cable
Cost of 63 KVA Transformer
11 KV 3x70mm2 XLPE cable
LT cable 3.5x70/35 mm2
Rail 90 Ibs/13mtr.
Ms Channel 125X65 mm FOR CT POST INSULATOR
MS Channel 100X50 mm FOR CABLE STAND
M.S. Angle 75X75X6 mm FOR CT POST INSULATOR
M.S. Angle 65X65X6 mm FOR TERMINAL GANTRY/BUSBAR
GANTRY
MS Round Bar 32mm
ST Pole 11 Mt Long
ST Pole 9 Mt Long
ACSR weasul conductor
33 kv pin insulator

Construction of Toe wall around the outdoor Switchyard of the S/s of


size 0.75 Mt.At Base and 0.23 Mt. At top as per RESSPO Norms by lst class
bricks in the ratio 1:6, Base concreting of the wall to be done in ratio 1:6:12
2 and plaster 12 mm thick in ratio 1:4.
Fabrication of switchyard fencing with wire mesh 10SWG(37mmx50mm)
as per drawing along with Fabrication of one number gate made of MS Angle,
MS Channel, MS Flat together with locking arrangement, its Installation
3 including the cost of civil material, angle 50x50x6mm.
EARTH MAT Laying of earth mat in the switchyard by laying of M.S. Round of
32 mm dia in 500 mm deep trenches with M.S. Round 32mm dia,3 Mtr. Long
earth electrodes as per drawing. The work includes welding of the M.S. Round
,connecting all steel structures in the switchyard with the earth mat by means
of G.I. strips of size 50x6mm as per item below.( M.S. Round bar 32mm
4 provided by Department )
a) Excavation of earth for laying mat
b) Driving of earth electrode.
c)

Laying of earthmat (M.S.) Bar including cutting, shaping and binding etc)
d) Preparation of joints, proper making and welding; of main earthmat bar joints
and applying, bitumen, bitumen impregnated on joints I.e. End Joints. Cross
Joints, Lap Joints.
e) Welding of riser strip with earthmat and department structure body (One set
means one riser strip welding to main equipments).
PLINTH OF 5 MVA.33/11 KV T/Fs Construction of plinth of size 3.46x3.46
Mtr. For 5 MVA T/F HAVING 0.4 Mtr. Above ground level . The work including
excavation of foundation .base concreting in CC 1:6:12 ratio (cement ,fine
sand & brick ballast)first class brick work in cement morter of ratio 1:4
foundation CC in 1:4:8 ratio (cement ,fine sand & brick blast) and RCC
working ratio 1:2:4 (cement ,coarse sand and store grit of 20mm gauge using
MS Bars of 10mm dia( tor ) in reinforcement including its cutting ,bending
&binding in required shape .The work also includes laying of 2 Nos . 3.46
Mts.Long each rail places complete with cutting welding & proper fitting etc.
The plinth will be made as per drawing and shall be plastered/ finished on top
5 and sides of the plinth .
FABRICATION ,ERECTION & GROUTING OF S/S STRUCTURE. (A) BUS
BAR GANTRY Fabrication, erection, & grouting of Bus bar gantry using rail
pole and channel as per RESPO Drg. No. RES- 38. (All steel section supplied
6 by contractor )
B) ISOLATOR STRUCTURE
Fabrication of isolator structures 3.5 Mtr. In
height as per drawing No. RES 39.Digging of two Nos .pits of size
1.075x0.9x0.3 Mtr. providing stone pad at the bottom of the pit and grouting
pad at the bottom of the pit and grouting of two legs of the isolator structure
in CC (cement coarse sand and stone grit of 20m.m gauge)of the ratio 1:4:8 in
block of 1.075Mtrx0.3 mm including supply of all T&P complete in all respect.
The work includes dragging, shifting upto 40 mtrs.Raising and erecting the two
legs with runner in proper allignment, and level and plumb .Both plinths of the
isolator structure shall be properly finished with smoothening of edges. (All

M.
M.
No.
M.
M.
Kg.
Kg.
Kg.
Kg.
Kg.
Kgs.
No.
No.
Mtr.
No.

RMT

RMT

RMtr.
No.
RMtr.
No.

RMT

NO.

NO.

No.

7-

8-

9-

10-

11-

1213-

steel section supplied by contractor )


D) LIGHTENING ARRESTOR & C.T.STRUCTURE Fabrication of lightening
arrestor/CT structure/.as per drawing No. Res-39 Digging of two Nos. pits of
size 1.075x0.3x0.3Mtr providing stone pad at the bottom of the pit and
grouting of two legs of the above structures in CC (Cement, coarse sand and
stone grit of 20mm gauge) of ratio 1:4:8 in block of 1.075Mtr X0.3Mtr including
supply of all civil material complete in all respect. The work includes dragging,
shifting up to 40Mtrs. raising and erecting the two legs with runner of isolator
in proper alignment, level and plumb. Both plinths of the structures shall be
properly finished with chambering of edges etc. (All steel section supplied by
contractor )
PLINTH FOR VCB Construction of plinth of size 2.0 mtr x 1.5 mtr x 0.9 mtr
suitable for erection of upper structure for 33KV VCB including grouting of
anchor bolts in proper alignment and level. Scope of work includes excavation
of foundation base concreting in CC 1:6:12(cement, fine sand & brick ballast
),1st class brick work in cement mortor of ratio 1:4 CC in ratio 1:4:8 and RCC
work in ratio 1:2:4(cement coarse sand and stone grit of 20mm gauge )as per
drawing.
ERECTION & INSTALLATION OF 33/11KV,5MVA TRANSFORMERS
A)Erection and installation of 33/11kV,5MVA transformer in a leveled position
on the plinth. The work include shifting of transformer to the site of installation
within the substation premises, assembling fixing and fitting of all accessories
and filling of transformer oil to the desired level and insuring that there is no
leakage. All the jump ring & connection are included in the scope of work.
B) Earthing by way of boring and lowering of "B" class GI pipe 50mm dia from
ground upto the water level (minimum 40 meter deep) as per standard
practice
C) Fabrication and grouting of M.S Channel 100x50x6mm in L shape & in
proper size and alignment to provide support for the two separate earthing
strips for power transformer neutral including supply and fixing of two nos.
Flexible copper bonds for neutral ear thing.
D) Fabrication and erection of cable support made of two pieces of M.S
channel 100x50mm,3.0 Mtr. long joined to each other by means of 5 Nos.M.S
Flat 50x6mm places of size 150mm long each by welding at equal intervals as
per drawing and grouting in a block of size300x300x700mm complete with one
coat of ready mixed primer and two coats of alluminum paint. This includes
provinding of four nos M.S clamp made of M.S flat holding the cable including
nuts and bolts and fixing of XLPE Cable.
INSTALLATION OF ISOLATORS Assembling and installation of line /bus
isolator on the isolator structure adjusting of opening mechanism in proper
alignment so as to ensure smooth operation of the same in case of line
isolator proper operation of earth links shall also be insured. The work
includes fabrication for proper flexing if required.
INSTALLATION OF LIGHTENING ARRESTORS
Assembling and installation Mounting of 3Nos (1 set) lightening arrestors on
the L.A.Structure/ complete with making earth connections(separate)and line
connections the work includes fabrication for proper fixing if required.
INSTALLATION OF CT
Installation of 3 Nos.(1 set) CTs on the /CTs structure . Along with C.T. J/B.
The work includes fabrication for proper fixing if required.
INSTALLATION OF VCB Installation of 33KV VCB complete work including
commissioning.
INSTALLATION OF SWITCHGEARS IN CONTROLROOM
A) Shifting carefully & safely 11KV I/C & O/G switchgear from outside of the
switchgear room, including grouting the two No.100x50x6mm channels pieces
(each 800mm long including cutting to size) and foundation bolts in 1;2:4 CC
(including cutting of CC of the floor and finishing of floor)as per direction of
Engineer in charge, placing and fixing of switchgear on foundation providing
G.I. Nuts & Bolts of proper size in proper position and alignment and checking,
complete work with Mounting of P.T on incoming S/G.
B) Fixing and making bus bar connections in between all switchgearsafter
cleaning and tapping with H.T. Tape, empire tape and PVC tape properly,
providing and fixing of 6 mm thick Bakelite separators and plugging of all
opening & holes with plastic compound complete work including cost of all
material (except copper Bus Bars)strictly to the satisfaction of site in- charge.
C) Shifting carefully & installation of 33KV single circuit transformer control

NO.

NO.

NO.

NO.

NO.

NO.

NO.
NO.

NO.
NO.

No.

job
NO.

14

15
16
17

18

19

panel in control room including grouting of above.


D) Shifting carefully & installation of 33KV single circuit line control feeder
panel in control room including grouting of above.
EARTHING OF 11KV & 33KV SWITCHGEARS
A) Laying of Earth mate for earthing of indoor equipments by means of M.S
strip 50x6mm connecting to Pipe type earthing as per RESSPO norms. Joints
will be welded with high quality are welding.
supply and Installation of 24 Volt 15 AH sine wave Battery and batter y
Charger Complete and Charger including its commisioning.
Supply & FIXING OF Rubber matt 2x1.5mtr
Fabrication and erection of exposer type D/P for 11 KV line, on 11 m long
S.T. pole with fixing of necessary clamp & other accessories like one no. Top
channel 100x50.-1.3m long ,Angle 65x65x6mm , its grouting 300mm above
ground Level ,painting of pole .
H.T.CABLE LAYING
A) Laying & dressing of 11KV,3X300sq.mm under ground cable from 5MVA T/F
to 11KV incoming switchgear in the trench 450 mm wide,900mm deep
providing 150mm fine sand, cushion beneath and 150mm fine sand cushion
above the cable. The cable shall be duly protected by bricks, sand & stone
slab .The work includes supplying of fine sand , bricks and stone slab are
refilling and ramming of the left out soil ,closing the trench and leveling. Spare
cable shall be left and burried in the trench in the shape of rings at both ends
cable laying work includes unrolling cutting mage ring and sealing both ends of
the cable.
B) Laying & dressing of 11KV,3X185sq.mm under ground cable in the trench
450 mm wide,900mm deep providing 150mm fine sand,cushion beneath and
150mm fine sand cushion above the cable. The cable shall be duly protected
by Ist class bricks/stone slab. The work includes supplying of fine sand &
bricks & stone slab and refilling and ramming of the left out soil and leveling.
Spare cable shall be left and buried in the trench in the shape of rings at both
ends.
C) Laying & dressing of 11KV,3X70sq.mm under ground cable from 63KVA T/F
to 11KV outgoing switchgear in the trench 450 mm wide,900mm deep
providing 150mm fine sand, cushion beneath and 150mm fine sand cushion
above the cable. The cable shall be duly protected by bricks, sand & stone slab
.The work includes supplying of fine sand , bricks and stone slab are refilling
and ramming of the left out soil ,closing the trench and leveling. Spare cable
shall be left and burried in the trench in the shape of rings at both ends cable
laying work includes unrolling cutting mage ring and sealing both ends of the
cable.
SUPPLY & FIXING OF 11KV CABLE ENDS
A)Supply & fixing of 11KV,3x300sq.mm XLPE Cable out door jointing kits after
carefully removing the insulation of the cable duly plumbing and taping of
cable providing, fixing and crimpling of proper size good quality lugs and
complete work including cost of material such as insulating tapes, cotton tape,
plumbing material and lugs etc.
B)Supply & fixing of 11KV,3x300sq.mm XLPE Cable In door jointing kits on
switchgears after carefully removing the insulation of the cable,duly plumbing
and taping of cable providing,fixing and crimpling of proper size good quality
lugs,duly plumbing and taping of cable with good Quality of cotton tape
,empire tape, HT Tape and PVC Tape, properly fixing of lugs on switchgears
and boxes complete in all respect including cost of material such as insulating
Tapes ,cotton Tape,Plumbing material and lugs etc.
C)Supply & fixing of 11KV,3x185sq.mm XLPE Cable out door jointing kits after
carefully removing the insulation of the cable duly plumbing and taping of
cable providing, fixing and crimpling of proper size good quality lugs and
complete work including cost of material such as insulating tapes, cotton tape,
plumbing material and lugs etc.
D)Supply & fixing of 11KV,3x185 sq.mm XLPE Cable In door jointing kits on
switchgears after carefully removing the insulation of the cable, duly plumbing
and taping of cable providing, fixing and crimpling of proper size good quality
lugs, duly plumbing and taping of cable with good Quality of cotton tape
,empire tape, HT Tape and PVC Tape, properly fixing of lugs on switchgears
and boxes complete in all respect including cost of material such as insulating
Tapes ,cotton Tape, Plumbing material and lugs etc.
E)Supply & fixing of 11KV,3x70sq.mm XLPE Cable out door jointing kits after
carefully removing the insulation of the cable duly plumbing and taping of

NO.
job

NO.
NO.

NO.

Mtr

Mtr

Mtr

NO.

NO.

NO.

NO.
NO.

cable providing, fixing and crimpling of proper size good quality lugs and
complete work including cost of material such as insulating tapes, cotton tape,
plumbing material and lugs etc.
F)Supply & fixing of 11KV,3x70sq.mm XLPE Cable In door jointingkits on
switchgears after carefully removing the insulation of the cable, duly plumbing
and taping of cable providing, fixing and crimpling of proper size good quality
lugs, duly plumbing and taping of cable with good Quality of cotton tape
,empire tape, HT Tape and PVC Tape, properly fixing of lugs on switchgears
and boxes complete in all respect including cost of material such as insulating
Tapes ,cotton Tape, Plumbing material and lugs etc.
G) Hosting of 11kv cable with 100 mm Dia ,3.5 mtr. Long MS Pipe on the
feeder cable before mounting the cable on the double pole,lifting,mounting and
clamping of 11KV feeder cable boxes on the feeder double pole structure and
making connection including supply of cable mounting clamps The work
includes the sealing of GI Pipes lower end of the Pipe is to be buried into the
earth by about one foot.
H) Hosting of 11 KV cable to 11 switchgear & 33/11 KV T/F & 11/0.4 KV
Cable Stand
20 33kv SECTIONAL BUS BAR AND STRINGING
Stringing of 33KV bus bar using of ACSR Panther Conductor including fixing of
Disc insulators. Strings and tension fitting complete with sagging of bus bar
etc. and making vertical/Horizontal jumper connection through PG Clamps and
connecting all the equipments with each other through connecting
clamps.Work includes all the jump ring from terminal gantry to bus bar and
from bus bar to transformer (2no. T/f bay's)
Construction of S/S T/F plinth of size 1.5x1.5x1 m with 1ST class Bricks, cores
Sand , Cement & stone Ballets in Ratio 1:2:4 with RCC Top duly plasterd
fixing of two No. channel of size 125x65 mm on the top of the plinth for
21 placement of T/F (All the material will be arranged by the contractor .)
Shifting of 63 KVA T/F on T/F Plinth and commissioning including jumping
with the system ( All the required matrial for above job shall be provided by
22 contractor)
23 STATION/SWITCYARD LIGHTING
A) Erection of 9 Mt. STP after excavation of earth in any type of soil and
grouting of CC in ratio 1:4:8 (cement coarse sand & brick ballast) as per
RESSPO Drg. With plinth.
B)Fixing & supply of 250 watt. sodium vapor lamp complete fitting and of
standard quality ISI mark with water light fittings, elbow etc.complete in all
respect and suitable for above supports.
C) Laying and spreading of 3.5 x 70/35 Sq.mm PVC LT cable from 11/.04
kv,63KVA T/F to LT Distribution Board in switchgear room after digging the
trench, laying cable and refilling of trench including connection at both ends
after providing and crimpling of lugs of proper size,complete work.
D)Providing and laying of 2 x 6 sq. mm. aluminum cable from S.G. room to
street light supports after digging of trench, laying of cable,providing a brick on
top of cable , refilling of trench, making connections at poles with street light
fittings, complete in all respect.
Construction of cable trench of size 300x300 mm including brick work 1:4 in
wall of the trench brick ballst work in 1:5:10 on foundation plaster 12 mm thick
with coarse sand 1:4 and surface finishing with cement : providing MS strip at
24 an interval of 0.5 M & MS angle running on both the edges of trench.
Construction of welded frame type control cable trench cover 0.5 M long
25 suitable for trench (SI. No. 14)including cost of MS/Torr Bar.
Supply and Laying of following size copper. control cable through
underground/cable trench/trenching SGR interlinking through proper
connections.transformer control panel/protection board /Battery and Battery
Charger/Bunch jolts Relay 33/11 KV Transformer junction box/ 33KV VCB ,CTs
26 etc as per site conditions.
a) 2x2.5mm2

NO.

NO.
NO.
job

No.

No.
NO.

NO.

job

job

RMT
NO.

RMT

b) 4x2.5mm2

RMT

RMT

c) 6x2.5mm
Supply and installation of fire fighting extinguisher of sub station as per ISI
27 Specification including mounting on wall with the help of clamp
28 Supply and fixings of CT junction box
29 Painting of all structures & equipments

job
No.
job

Date
Place:
Address

Signature of contractor with seal