Beruflich Dokumente
Kultur Dokumente
1.0
-
2.0
3.0
GTG
Each GTG supplied is a Packaged Electric and Electronic Control compartment
with skid mounted local panel, local Operator station, Remote operator stations
and IRIG B interface for time synchronisation from Master clock.
Each Gas turbine controller shall have independent SOE monitoring function.
4.0
Master clock
Time synchronisation of GTG's and Electrical SER system shall be carried out by
a Master clock.
5.0
6.0
HVAC System
One(1) local control panel is envisaged in switchgear Room.
7.0
8.0
Air compressor
Air compressor shall be controlled by a local control panel.
10.0
Control cum Annunciation panel only. For all outgoing circuit breakers, only local
control from switchgear would be provided.
Remote Control cum Annunciation panel for 480V Unit Switchgear would be
located in the existing control building. This panel would be provided with
annunciation windows, mimic with discrepancy type selector switches , selector
switch for manual synchronisation of incomer feeders and selector switch for
remote control of incomer breakers.
Auto Transfer Scheme (ATS) to achieve Auto transfer of auxiliaries would be
provided on the Remote Control panel of 480V Unit Switchgear for incomers.
480V MCCs / Distribution Boards:
Only local control of incoming and outgoing feeders would be provided for all
other 480V Distribution boards / MCCs.
13.8kV/132kV Generator Transformers:
Relay panel for Generator Transformer would be located in existing Control
building. Separate Relay panels would be provided for Set-1 & Set-2 protections.
Remote Tap Changer Control Panels for Generator Transformers would be
located in existing control room.
33/4.16kV Station Transformers:
Relay panel for Station Transformer would be located in existing Control building.
One Relay panel with segregation between Set-1 & Set-2 protections would be
provided for each Station Transformer. The relay panel would be located in
existing control room.
4.16/0.480kV Station Auxiliary Transformers:
Protections for Station Auxiliary Transformers would be located in respective
Switchgears (HV side protections in 4.16kV Switchgear & LV side protections in
480V Station Switchgear).
Remote Tap Changer Control Panels for Station Auxiliary Transformers would be
located in New Switchgear building.
13.8kV/0.480kV Unit Auxiliary Transformers:
Protections for Unit Auxiliary Transformers would be located in respective
Switchgears (HV side protections in Relay panel of Generator Transformer & LV
side protections in 480V Unit Switchgear).
SOER Panel:
Description of Panel
Location
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
2 Nos. (1
no. for each
transformer)
10.0
SOER Panel
1
No.
(common
for Unit-7 &
New
Switchgear
building
Quantity
Unit 8)
11.0
New
Switchgear
building
1
No.
(common
for Unit-7 &
Unit 8)
(TIT may please note that as per SECs clarification, only incomer and bus
coupler panels shall be provided with remote Control and Annunciation panels.
Considering the importance of 4.16kV Outgoing breakers, the above writeup
proposes remote control of all breakers on 4.16kV Switchgear and remote control
of incomer & bus coupler panels of 480V Switchgears. Also, Mimic is envisaged
to be part of Remote Control Panels though it is not explicitly mentioned in SECs
specification)