Project Background
SWAP Solution and Scenarios Overview
Indoor SWAP
A. Indoor HOT SWAP
B. Indoor COLD SWAP
Outdoor SWAP
A. Outdoor HOT SWAP
Appendix
Page 2
Footprint Regions
Swap Regions
Before Swap:
After
Swap:
Swap
Page 3
Existed Technologies:
1) GSM
(G900)
(2G),
2)
(2G + 3G),
GSM
(G900 +G1800)
3) 2GSM+UMTS
(G900+G1800+U2100)
Proposed Cabinets:
1) Huawei APM 30 (DBS 3900 BBU, 2G)
2) Huawei APM 30 (DBS 3900 BBU, 2G & 3G)
Dimensions of the cabinet (W x H x D)
600 mm x 700 mm x 480 mm
Locations/Regions:
Karachi & Hyderabad
HUAWEI TECHNOLOGIES CO., LTD.
Page 4
(2*2G + 3G),
Band
G900
G1800
Configuration Product
S444_000
S000_444
Wireless Macro
Solution
(DBS Combined) G900+D180
S444_444
RAN16.0
0
U2100
S222
G900+D180 S444_444+S22
0+U2100
2
RRU 3936
RRU 3936
Power
Output
20W with 4 TRX
MultiMode
GO
GO
Control
Board
Backup
GTMU
UBRI(if more
then 6
Carrier)
GTMU
GTMU
UBRI(if more
then 6
Carrier
UBRI(if more
then 6
Carrier
RRU 3936
20W
GO
RRU 3826
20W
UO
UMPT
RRU3936+RR
20W
U 3826
GU
GTMU+UMP UBBPd2+UB
T
RI
Page 5
UBBPd2
3U
HUAWEI TECHNOLOGIES CO., LTD.
Page 6
2U Height, 8 slots
Board
Description
WBBP
7~12 kg
UBRI
UMPT
UPEU
UEIU
86.1 mm
UEIU
Page 7
GSM/UMTS
Multi-mode BBU
RRU3936 900M
RRU3826 2100M
RRU3936 1800M
GU
Weight: 15Kg
Power: -48V DC
400mm 300mm
120mm (H*W*D)
Power consumption:
270W
IT2R
Scenario:G444
GUL
UMTS only
Weight: 15Kg
Power: -48V DC
400mm 300mm
120mm (H*W*D)
Power
consumption: 270W
IT2R
Scenario:D444
Page 8
Weight: 15 kg
Power: 48 V DC
400mm x 300mm
x 120mm (H*W*D)
Power
consumption: 260W
IT2R
UMTS only
Team Viewer
Get your Smartphone
WeChat
WhatsApp
Line
Huawei APP
HUAWEI TECHNOLOGIES CO., LTD.
Page 9
Team Viewer
http://www.teamviewer.com/
Page 10
Page 11
Page 12
For All
Scenario
Specific
Scenario
Feeder (macro)
Hot SWAP
Dismantle E/// BTS,
Loop test
Ping test,
Install Huawei
BTS,Integration
Install Huawei RRU\RRU
( 2G + 3G ) power cable and CPRI fiber
SWAP,
Reuse exiting RCU.
Reuse exiting DBC.
CPRI(macro)
Hot SWAP
Dismantle E/// RRU first ,then
install Huawei RRU during
SWAP.
Loop test
Ping test,
Reuse exiting RCU.
Reuse exiting CPRI(if possible)
Reuse exiting RRU power
Cable(If possible ).
Hot SWAP
Dismantle E/// RRU first ,then
install Huawei RRU during
SWAP.
Loop test
Ping test,
Reuse exiting Feeder if no
space available for RRU.
Reuse exiting RCU.
Reuse exiting CPRI(if
possible)
Reuse exiting RRU power
Cable(If possible ).Install
Jumper with feeder to RRU
Page 13
Page 14
Before Swap
Page 15
15
1. Reuse Antenna
3. Remove Feeder
Page 16
16
ESN needed
BBU ESN for commissioning
BBU
ESN
Page 17
Before
After
Overall view of site after swapping
MW ODU &
Antenna
Antenna
ROOM
MW ODU &
Antenna
Antenna+ RCU
RRU
ROOM
ACDB
Grounding Bar
AC
ATS
Transmission Cable IP
AC power cable
DC power cable
Grounding cable
1/2 jumper
7/8 feeder
MW IF cable
Alarm Report Cable
RRU power Cable
Grounding
Bar
Grounding Bar
Alarm Box
AC
ACDB
Alarm Box
Grounding
Bar
Grounding Bar
ATS
DG
APM 30
DG
GSM
900
GSM
1800
BT
Existing
MW
Grounding Bar
Grounding Bar
Scenario description :
Page 18
2G&3G
share
BBU
19 inch rack
HW-MW
Before
After
Overall view of site after swapping
MW ODU &
Antenna
Antenna
ROOM
MW ODU &
Antenna
Antenna+ RCU
RRU
ROOM
ACDB
Grounding Bar
AC
ATS
Transmission Cable IP
AC power cable
DC power cable
Grounding cable
1/2 jumper
7/8 feeder
MW IF cable
Alarm Report Cable
RRU power Cable
Grounding
Bar
Grounding Bar
Alarm Box
AC
ACDB
Alarm Box
Grounding
Bar
Grounding Bar
ATS
DG
APM 30
DG
GSM
900
GSM
1800
BT
IDU HW-MW
Existing
MW
Grounding Bar
Grounding Bar
Scenario description : In door to Indoor with IDU will be installed in DBS 3900 cab.
Page 19
Before
After
Overall view of site after 2G & 3G
E1 cable
AC power cable
DC power cable
Grounding cable
CPRI Cable
7/8 feeder
MW IF cable
Alarm Report Cable
MW ODU &
Antenna
Antenna
Existing Equipment
AC power cable
CPRI cable
MW ODU &
Antenna
Antenna + RCU
RRU
ACDB
Grounding Bar
AC
ATS
Grounding
Bar
Grounding Bar
AC
Grounding Bar
ATS
ACDB
Grounding Bar
DG
Grounding Bar
DG
Existing
MW
Existing
MW
BBU
APM 30
Grounding Bar
Grounding Bar
Scenario description : Feeder is installed in existing scenario, we will remove the feeder , install RRU on Tower.
Page 20
Page
Page20
20
CPRI
Cable
Before
After
Overall view of site after 2G & 3G
E1 cable
AC power cable
DC power cable
Grounding cable
CPRI Cable
MW ODU &
Antenna
Existing Equipment
AC power cable
CPRI cable
MW ODU &
Antenna
Antenna + RCU
Antenna
MW IF cable
Alarm Report Cable
RRU
ACDB
Grounding Bar
AC
ATS
Grounding
Bar
Grounding Bar
AC
Grounding Bar
ATS
ACDB
Grounding Bar
DG
CPRI
Cable
Grounding Bar
DG
Existing
MW
Existing
MW
BBU
APM 30
Grounding Bar
Grounding Bar
Scenario description : Reuse of existing CPRI & RRU Power cable, Reuse of RCU.
HUAWEI TECHNOLOGIES CO., LTD.
Page 21
CPRI
Cable
Before
After
Overall view of site after 2G & 3G
E1 cable
AC power cable
DC power cable
Grounding cable
CPRI Cable
MW ODU &
Antenna
Existing Equipment
AC power cable
CPRI cable
MW ODU &
Antenna
Antenna + RCU
Antenna
MW IF cable
Alarm Report Cable
BTS Shed
ACDB
Grounding Bar
AC
ATS
RRU
Grounding
Bar
Grounding Bar
AC
Grounding Bar
ATS
ACDB
Grounding Bar
DG
Grounding Bar
DG
CPRI
Cable
Existing
MW
Existing
MW
BBU
APM 30
Grounding Bar
CPRI
Cable
Grounding Bar
Scenario description : Reuse of existing CPRI & RRU Power cable, Reuse of RCU Install RRU on shed Leg in cross for load balance.
HUAWEI TECHNOLOGIES CO., LTD.
Page 22
Steps:
1. Install HW Temporary
APM30 & DBS3900;
2. Connect grounding and
Power cables
3. Power on HW DBS3900
cabinet;
4. Lay FE cables
5. Install RRU if space
available
6. Lay RF jumpers
7. Lay External Alarm
connection
5
2
4
7
6
3
IDU
1
HUAWEI TECHNOLOGIES CO., LTD.
Page 23
23
Swap
CPRI
3
4
1
5
2
6
Dismantle
APM30
Page 24
24
*NOTE : Connect FE cable from BBU FE0 to IDU for Future use
HUAWEI TECHNOLOGIES CO., LTD.
Page 25
Page 26
Page 27
Page 28
5
4
Note : To install 3 Blade RRU with using only 1 Bracket.
HUAWEI TECHNOLOGIES CO., LTD.
6
Page 29
Priority2:
a.Install RRUs on tower Platform in case of
railing tower or on Ring poles
incase of monopole tower,
Priority3:
Install RRU on Tower leg,
Page 30
New solution
Page 31
Page 32
RRU 0
Sector A
HUAWEI TECHNOLOGIES CO., LTD.
RRU 2
Sector B
Sector C
Page 33
2G Antenna
Page 34
Page 35
Page 36
3G
2nd E1
3rd E1
Red Blue
4th E1
RedGreen
Red Orange
FE Port
Red Brown
3G
Page 37
37
20P 10 U space
HUAWEI TECHNOLOGIES CO., LTD.
6P 3 U Space
Page 38
2P / CN 1 U Space
20P 10 U space
6P 3 U Space
HUAWEI TECHNOLOGIES CO., LTD.
Page 39
Page 40
Page 41
Page 42
E/// Node-B
is connected.
Page 43
E/// Node-B
is connected.
This Port will
be used for
pre-testing.
PMCL Will
configure
the Free Port as
mirror of
working port for
testing.
And Media will
be tested
Before swap on
New Port.
HUAWEI TECHNOLOGIES CO., LTD.
Page 44
MW IDU Type
Qty of sites
AMM 20PB
154
AMM 2PB
943
AMM 6PC
271
MINI-LINK CN210
101
SPO1410
13
SPO1460
38
Grand Total
1520
Page 45
Description
Clamp set
Page 46
Spec
Quantity
30~127 mm
2PCS
BBU Box
UEIU+UPEU Board
Sensor DDF
Page 47
47
BBU Box
UEIU+UPEU Board
Sensor DDF
DATB
Page 48
48
P1
P2
SA
P3
P4
P5
P6
Cable
Color
Cable Color
White
14
Blue
White
15
Orange
White
16
Green
White
17
Brown
White
18
Gray
Red
19
Blue
Red
20
Orange
Red
Outdoor Scenario
Mobilink Alarm
Definition
always
on/off
Seve
rity
GENSET ON
off
PIN NO
P0
P1
AC MAIN FAILURE
off
P2
INTRUDER
on
SA
FIRE ALARM
on
HIGH TEMP
on
P3
P4
LOW VOLTAGE
RECTIFIER MAJOR
on
on
P5
P6
P7
P7
21
RECTIFIER MINOR
on
Cable
Color
Cable Color
White
14
Blue
White
15
Orange
White
16
Green
White
17
Brown
White
18
Gray
Red
19
Blue
Red
20
Orange
Red
P8
Green
Page 49
49
Mobilink Alarm
Definition
always
on/off
Severi
ty
GENSET ON
off
AC MAIN FAILURE
off
RECTIFIER DOOR
on
DC LOAD FUSE
on
on
LOW VOLTAGE
on
RECTIFIER MAJOR
on
SYSTEM ON BATTERIES
on
Rectifier Door
on
Page 50
Mobilink
Huawei
Third party
Neighbor addition
Spares provision
Perform Rollback
Page 51
Page 51
Thank you
www.huawei.com
Copyright2014 Huawei Technologies Co., Ltd. All Rights Reserved.
The information in this document may contain predictive statements including, without limitation, statements regarding the future financial and
operating results, future product portfolio, new technology, etc. There are a number of factors that could cause actual results and developments to
differ materially from those expressed or implied in the predictive statements. Therefore, such information is provided for reference purpose only and
constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.