Sie sind auf Seite 1von 53

Mobilink 2G

3G Site SWAP
Solution
www.huawei.com

HUAWEI TECHNOLOGIES CO., LTD.

Agenda:
1.
2.
3.

4.
5.

Project Background
SWAP Solution and Scenarios Overview
Indoor SWAP
A. Indoor HOT SWAP
B. Indoor COLD SWAP
Outdoor SWAP
A. Outdoor HOT SWAP
Appendix

HUAWEI TECHNOLOGIES CO., LTD.

Page 2

2G3G Swap Background


2G3GProgram Delivery Map( 28 Cluster )

Footprint Regions
Swap Regions
Before Swap:

After
Swap:

Swap

HUAWEI TECHNOLOGIES CO., LTD.

Page 3

BTS Swap Solution : Scenarios


Place:
Method:

Indoor & Out Door


HOT SWAP & COLD SWAP

Existed Cabinets(All -48V DC):


1) RBS6201 (600x400)Indoor Feeder
2) RBS6101 (700x680)Outdoor Feeder
3) RBS6301 (450x500)Mini RRU Outdoor
4) RBS6102 (1300x700)Feeder Outdoor

Existed Technologies:
1) GSM
(G900)

(2G),

2)

(2G + 3G),

GSM

(G900 +G1800)
3) 2GSM+UMTS
(G900+G1800+U2100)

Proposed Cabinets:
1) Huawei APM 30 (DBS 3900 BBU, 2G)
2) Huawei APM 30 (DBS 3900 BBU, 2G & 3G)
Dimensions of the cabinet (W x H x D)
600 mm x 700 mm x 480 mm

Locations/Regions:
Karachi & Hyderabad
HUAWEI TECHNOLOGIES CO., LTD.

Page 4

(2*2G + 3G),

BTS Swap Solution : Huawei Configurations


Solution

Band
G900

G1800

Configuration Product
S444_000

S000_444

Wireless Macro
Solution
(DBS Combined) G900+D180
S444_444
RAN16.0
0
U2100

S222

G900+D180 S444_444+S22
0+U2100
2

HUAWEI TECHNOLOGIES CO., LTD.

RRU 3936

RRU 3936

Power
Output
20W with 4 TRX

20W with 4 TRX

MultiMode
GO

GO

Control
Board

Backup

GTMU

UBRI(if more
then 6
Carrier)

GTMU

GTMU

UBRI(if more
then 6
Carrier

UBRI(if more
then 6
Carrier

RRU 3936

20W

GO

RRU 3826

20W

UO

UMPT

RRU3936+RR
20W
U 3826

GU

GTMU+UMP UBBPd2+UB
T
RI

Page 5

UBBPd2

BTS Swap Solution : Huawei Cabinet

3U
HUAWEI TECHNOLOGIES CO., LTD.

Page 6

Main equipment BBU3900


Specifications of BBU3900

2U Height, 8 slots

Standard 19 inch cabinet

Board

Description

442 mm x 310 mmx86 mm

WBBP

WCDMA BaseBand Processing


unit(3G)

7~12 kg

UBRI

Universal BaseBand Radio


Interface board(2G )

A single BBU: Max 24 cells Max CE


UL: 3072 DL: 4608

UMPT

Typical Power consumption: 200W


Maximal Power consumption: 325W

Universal Main Processing &


Transmission unit(2G/3G/4G coProcessing unit)

UPEU

2 FE/GE + 4 E1; Max 12 E1 (able to


share transmission with 2G)

Universal Power and


Environment interface Unit

UEIU

Universal Environment Interface


Unit

86.1 mm

UEIU

HUAWEI TECHNOLOGIES CO., LTD.

Page 7

Main equipment RRU


BBU3900

GSM/UMTS
Multi-mode BBU

RRU3936 900M

RRU3826 2100M

RRU3936 1800M

CPRI (Optical Fiber)

GU

Weight: 15Kg
Power: -48V DC
400mm 300mm
120mm (H*W*D)
Power consumption:
270W
IT2R
Scenario:G444

HUAWEI TECHNOLOGIES CO., LTD.

GUL

UMTS only

Weight: 15Kg
Power: -48V DC
400mm 300mm
120mm (H*W*D)
Power
consumption: 270W
IT2R
Scenario:D444

Page 8

Weight: 15 kg
Power: 48 V DC
400mm x 300mm
x 120mm (H*W*D)
Power
consumption: 260W
IT2R
UMTS only

BTS Swap IT/Mobile Tools

Team Viewer
Get your Smartphone

WeChat
WhatsApp
Line

Add your contact in advance.

Take and send pictures to show


others.

Huawei APP
HUAWEI TECHNOLOGIES CO., LTD.

Page 9

BTS Swap IT/Mobile Tools

HUAWEI TECHNOLOGIES CO., LTD.

Team Viewer
http://www.teamviewer.com/

Page 10

BTS Swap IT/Mobile Tools


WeChat Application:
http://www.wechat.com/en/

HUAWEI TECHNOLOGIES CO., LTD.

Page 11

BTS Swap Solution


A.
B.
C.
D.

Feeder Site Solution.


CRPI Site Solution.
Feeder + CPRI site Solution.
Micro Site Solution

HUAWEI TECHNOLOGIES CO., LTD.

Page 12

Karachi and Hyderabad Swap Scenarios

For All
Scenario

New APM30 will be installed at all site


BBU will be installed in Huawei APM30 cabinet
IDU shifting to APM30 is required in case E/// IDU is in same cabinet with E/// BTS
Reuse Jumper and DBC
Install RRU Pole before SWAP in case there is no space for new RRU.(CIVIL Part monopole MUST )

Specific
Scenario

Feeder (macro)

Hot SWAP
Dismantle E/// BTS,
Loop test
Ping test,
Install Huawei
BTS,Integration
Install Huawei RRU\RRU
( 2G + 3G ) power cable and CPRI fiber
SWAP,
Reuse exiting RCU.
Reuse exiting DBC.

HUAWEI TECHNOLOGIES CO., LTD.

CPRI(macro)

MIX (Feeder + CPRI) (macro) Micro

Hot SWAP
Dismantle E/// RRU first ,then
install Huawei RRU during
SWAP.
Loop test
Ping test,
Reuse exiting RCU.
Reuse exiting CPRI(if possible)
Reuse exiting RRU power
Cable(If possible ).

Hot SWAP
Dismantle E/// RRU first ,then
install Huawei RRU during
SWAP.
Loop test
Ping test,
Reuse exiting Feeder if no
space available for RRU.
Reuse exiting RCU.
Reuse exiting CPRI(if
possible)
Reuse exiting RRU power
Cable(If possible ).Install
Jumper with feeder to RRU
Page 13

Cold Swap / Hot Swap


DAS part remain same .
Dismantle E/// RRU first ,then install
Huawei RRU during SWAP.
Loop test
Ping test
Reuse exiting CPRI(if possible)
Reuse exiting RRU power Cable(If
possible ).

Overview of E/// Existing SiteIndoor Site

HUAWEI TECHNOLOGIES CO., LTD.

Page 14

E// BTS Swap solution : Indoor Site


Key Points:

Before Swap

Remove E// cabinet;


Remove Dual band Combiner ;
Remove E// IDU if installed in
BTS Cabinet if its in E// BTS cab;
Install HW APM 30 then
DBS3900;
Reuse:
existing DC power ;
existing jumpers, antenna
and DBC;
New:
Power & GND cable
Transmission FE cable
(New port if E1 2G IP 3G )
External Alarm cable

HUAWEI TECHNOLOGIES CO., LTD.

Page 15

15

E// BTS Swap solution : Indoor Site & Outdoor


Swap Key Points

1. Remove RBS Cab

1. Reuse Antenna

2. Remove Lighting protection

3. Remove Feeder

2. Reuse existing breaker

3. Reuse DBC and RCU

HUAWEI TECHNOLOGIES CO., LTD.

Page 16

16

Huawei DBS 3900


RCU ESN for RET

ESN needed
BBU ESN for commissioning

BBU
ESN

HUAWEI TECHNOLOGIES CO., LTD.

Page 17

Scenario 1A: Feeder site solution

E// BTS +MW in Separate Cab APM30 + DBS3900

Before

After
Overall view of site after swapping

Overall view of site before swapping


Equipment be swapped
E1 cable
AC power cable
DC power cable
Grounding cable
1/2 jumper
7/8 feeder
MW IF cable
Alarm Report Cable

MW ODU &
Antenna

Antenna

ROOM

MW ODU &
Antenna

New AC power cable


New CPRI cable

Antenna+ RCU

RRU

ROOM

ACDB
Grounding Bar

AC

ATS

Transmission Cable IP
AC power cable
DC power cable
Grounding cable
1/2 jumper
7/8 feeder
MW IF cable
Alarm Report Cable
RRU power Cable

Grounding
Bar

Grounding Bar

Alarm Box

AC

ACDB

Alarm Box

Grounding
Bar

Grounding Bar
ATS
DG

APM 30

DG
GSM
900

GSM
1800

BT
Existing
MW
Grounding Bar

Grounding Bar

Scenario description :

HUAWEI TECHNOLOGIES CO., LTD.

Page 18

2G&3G
share
BBU

19 inch rack

HW-MW

Scenario 1B: Feeder site solution

E// BTS +MW in single Cab APM30 + DBS3900

Before

After
Overall view of site after swapping

Overall view of site before swapping


Equipment be swapped
E1 cable
AC power cable
DC power cable
Grounding cable
1/2 jumper
7/8 feeder
MW IF cable
Alarm Report Cable

MW ODU &
Antenna

Antenna

ROOM

MW ODU &
Antenna

New AC power cable


New CPRI cable

Antenna+ RCU

RRU

ROOM

ACDB
Grounding Bar

AC

ATS

Transmission Cable IP
AC power cable
DC power cable
Grounding cable
1/2 jumper
7/8 feeder
MW IF cable
Alarm Report Cable
RRU power Cable

Grounding
Bar

Grounding Bar

Alarm Box

AC

ACDB

Alarm Box

Grounding
Bar

Grounding Bar
ATS
DG

APM 30

DG
GSM
900

GSM
1800

BT
IDU HW-MW

Existing
MW
Grounding Bar

Grounding Bar

Scenario description : In door to Indoor with IDU will be installed in DBS 3900 cab.

HUAWEI TECHNOLOGIES CO., LTD.

Page 19

Scenario 1C: Feeder site Outdoor solution

E// BTS +MW in Same Cab APM30 + DBS3900

Before

After
Overall view of site after 2G & 3G

Overall view of site 2G


Equipment be swapped
E1 cable
AC power cable
DC power cable
Grounding cable
1/2 jumper
7/8 feeder
MW IF cable
Alarm Report Cable

E1 cable
AC power cable
DC power cable
Grounding cable
CPRI Cable
7/8 feeder
MW IF cable
Alarm Report Cable

MW ODU &
Antenna

Antenna

Existing Equipment
AC power cable
CPRI cable

MW ODU &
Antenna
Antenna + RCU

RRU

ACDB
Grounding Bar

AC

ATS

Grounding
Bar

Grounding Bar

AC

Grounding Bar

ATS

ACDB
Grounding Bar

DG

Grounding Bar

DG
Existing

MW

Existing
MW

BBU
APM 30

Grounding Bar

Grounding Bar

Scenario description : Feeder is installed in existing scenario, we will remove the feeder , install RRU on Tower.

HUAWEI TECHNOLOGIES CO., LTD.

Page 20

Page
Page20
20

CPRI
Cable

Scenario 2: CPRI Site solution

E// BTS +MW in Same Cab APM30 + DBS3900

Before

After
Overall view of site after 2G & 3G

Overall view of site 2G/ 3G / 2G+3G


Equipment be swapped
E1 cable
AC power cable
CPRI cable
DC power cable
Grounding cable
1/2 jumper
7/8 feeder
MW IF cable
Alarm Report Cable

E1 cable
AC power cable
DC power cable
Grounding cable
CPRI Cable

MW ODU &
Antenna

Existing Equipment
AC power cable
CPRI cable

MW ODU &
Antenna
Antenna + RCU

Antenna
MW IF cable
Alarm Report Cable
RRU

ACDB
Grounding Bar

AC

ATS

Grounding
Bar

Grounding Bar

AC

Grounding Bar

ATS

ACDB
Grounding Bar

DG

CPRI
Cable

Grounding Bar

DG
Existing

MW

Existing
MW

BBU
APM 30

Grounding Bar

Grounding Bar

Scenario description : Reuse of existing CPRI & RRU Power cable, Reuse of RCU.
HUAWEI TECHNOLOGIES CO., LTD.

Page 21

CPRI
Cable

Scenario 3: MIX Feeder + CPRI Site solution

E// BTS +MW in Same Cab APM30 + DBS3900

Before

After
Overall view of site after 2G & 3G

Overall view of site 2G/ 3G / 2G+3G


Equipment be swapped
E1 cable
AC power cable
CPRI cable
DC power cable
Grounding cable
1/2 jumper
7/8 feeder
MW IF cable
Alarm Report Cable
BTS Shed

E1 cable
AC power cable
DC power cable
Grounding cable
CPRI Cable

MW ODU &
Antenna

Existing Equipment
AC power cable
CPRI cable

MW ODU &
Antenna
Antenna + RCU

Antenna
MW IF cable
Alarm Report Cable
BTS Shed

ACDB
Grounding Bar

AC

ATS

RRU
Grounding
Bar

Grounding Bar

AC

Grounding Bar

ATS

ACDB
Grounding Bar

DG

Grounding Bar

DG
CPRI
Cable

Existing

MW

Existing
MW

BBU
APM 30

Grounding Bar

CPRI
Cable

Grounding Bar

RRU ion tower leg if


no space on tower

Scenario description : Reuse of existing CPRI & RRU Power cable, Reuse of RCU Install RRU on shed Leg in cross for load balance.
HUAWEI TECHNOLOGIES CO., LTD.

Page 22

Per SWAP if possible : Indoor Site


Pre Installation Before Swap

Steps:
1. Install HW Temporary
APM30 & DBS3900;
2. Connect grounding and
Power cables
3. Power on HW DBS3900
cabinet;
4. Lay FE cables
5. Install RRU if space
available
6. Lay RF jumpers
7. Lay External Alarm
connection

5
2
4

7
6

RBS E// Cab

3
IDU

1
HUAWEI TECHNOLOGIES CO., LTD.

Page 23

23

Pre swap if possible: Indoor Site


Remove Key Steps:
0. SWAP preparation &
Transmission check(ping)

Swap

1. Dismantle & Swap


Transmission (E1/FE)
cables
2. Power off E// cabinet;
3. Disconnect RF
jumpers, Dismantle &
Lightening cable,
3. connect HW Jumpers;
4. Connect external
alarm cable
5. Disconnect Power &
grounding cables
6. Remove Cabinet

CPRI

3
4
1
5

2
6

HUAWEI TECHNOLOGIES CO., LTD.

Dismantle

APM30

Page 24

24

RRU Connectivity for 2G


A

*NOTE : Connect FE cable from BBU FE0 to IDU for Future use
HUAWEI TECHNOLOGIES CO., LTD.

Page 25

RRU Connectivity for 2G Dual Band (6+ RRU)


A

HUAWEI TECHNOLOGIES CO., LTD.

Page 26

RRU Connectivity for 2G Dual Band +3 G

HUAWEI TECHNOLOGIES CO., LTD.

Page 27

RRU Connectivity for Configuration more 1 RRU in 1 Sec in same Freq

IF more then 1 RRU required in 1


Frequency band then short CPRI
will be used to cascade them.

HUAWEI TECHNOLOGIES CO., LTD.

Page 28

RRU Installation with minimum Space


2

5
4
Note : To install 3 Blade RRU with using only 1 Bracket.
HUAWEI TECHNOLOGIES CO., LTD.

6
Page 29

RRU Installation with minimum Space


Existing RRU Power cables will be reused for Newly
installed RRUs. Existing RRU CPRI Optical cable will
be reused for Newly installed RRUs

RRU Mounting Options:


Priority1:
Install RRUs on back of Antenna using same Antenna
Mounts,

Priority2:
a.Install RRUs on tower Platform in case of
railing tower or on Ring poles
incase of monopole tower,
Priority3:
Install RRU on Tower leg,

HUAWEI TECHNOLOGIES CO., LTD.

Page 30

2. Macro RT Site RRU and Antenna install on Wall


Scenarios

New solution

New solution sketch

RRUs cant be installed behind the antenna on


For rooftop Macro existing pole due to loading issue.
sites
First option solution: install RRU on the wall,
recommended distance between RRUs is
500mm, minimum distance between RRUs is
300mm.

HUAWEI TECHNOLOGIES CO., LTD.

Page 31

3 Micro / IBS RRU and Antenna install on Wall (installation location)


First option:

HUAWEI TECHNOLOGIES CO., LTD.

Special case second option:

Page 32

DBS Swap solution:


RCU Connectivity
RRU 1

RRU 0

Sector A
HUAWEI TECHNOLOGIES CO., LTD.

RRU 2

Sector B

Sector C
Page 33

Overview Antenna System


3G Antenna
3G RCU

2G Antenna

HUAWEI TECHNOLOGIES CO., LTD.

Page 34

Overview SBT Site solution


Huawei Purposed SBT solution
Existing SBT solution

HUAWEI TECHNOLOGIES CO., LTD.

Page 35

HW - Antenna Installation Color Rings

Need confirm and


mark color ring for
existed system and
Huawei jumpers
BEFORE SWAP

Make feeder or jumper color rings for 2G &


HUAWEI TECHNOLOGIES CO., LTD.

Page 36

3G

BTS Swap solution : Abis OverE1 & IUb IP Transmission


E/// E1 Color Code
1st E1

White blue White orange

2nd E1

White green White brown

3rd E1

Red Blue

4th E1

RedGreen

IDU Board Layout

Red Orange

FE Port

Red Brown
3G

HUAWEI TECHNOLOGIES CO., LTD.

Page 37

37

BTS Swap solution : Transmission

20P 10 U space
HUAWEI TECHNOLOGIES CO., LTD.

6P 3 U Space
Page 38

2P / CN 1 U Space

BTS Swap solution : MW Transmission

20P 10 U space

6P 3 U Space
HUAWEI TECHNOLOGIES CO., LTD.

Page 39

BTS Swap solution : CN 210

HUAWEI TECHNOLOGIES CO., LTD.

Page 40

BTS Swap solution : CN 210


E/// Node-B
is connected.

This Port will be


used for pretesting.

PMCL Will configure


the Free Port as mirror of
working port for testing.
And Media will be tested
Before swap on New Port.

HUAWEI TECHNOLOGIES CO., LTD.

Page 41

BTS Swap solution : TN

HUAWEI TECHNOLOGIES CO., LTD.

Page 42

BTS Swap solution : TN 2PB and TN 6PC

E/// Node-B
is connected.

PMCL Will configure


the Free Port as
mirror of
working port for
testing.
And Media will be
tested
Before swap on New
Port.
HUAWEI TECHNOLOGIES CO., LTD.

Page 43

This Port will


be used for pretesting.

BTS Swap solution : TN 20PB

E/// Node-B
is connected.
This Port will
be used for
pre-testing.
PMCL Will
configure
the Free Port as
mirror of
working port for
testing.
And Media will
be tested
Before swap on
New Port.
HUAWEI TECHNOLOGIES CO., LTD.

Page 44

BTS Swap solution : MW IDU Detail

HUAWEI TECHNOLOGIES CO., LTD.

MW IDU Type

Qty of sites

AMM 20PB

154

AMM 2PB

943

AMM 6PC

271

MINI-LINK CN210

101

SPO1410

13

SPO1460

38

Grand Total

1520

Page 45

DBC Reuse solution:

Description
Clamp set

HUAWEI TECHNOLOGIES CO., LTD.

Page 46

Spec
Quantity
30~127 mm
2PCS

External Alarm Swap solution :


Extend Alarm Solution

BBU Box

UEIU+UPEU Board

HUAWEI TECHNOLOGIES CO., LTD.

Sensor DDF

Page 47

47

External Alarm Swap solution :


Extend Alarm Solution

BBU Box

UEIU+UPEU Board

HUAWEI TECHNOLOGIES CO., LTD.

Sensor DDF
DATB
Page 48

48

External Alarm Swap solution : Indoor Site


Extend Alarm Solution
Indoor Scenario
PIN NO
P0

P1

P2

SA

P3

P4

P5

P6

Cable
Color

Cable Color

White

14

Blue

White

15

Orange

White

16

Green

White

17

Brown

White

18

Gray

Red

19

Blue

Red

20

Orange

Red

Outdoor Scenario
Mobilink Alarm
Definition

always
on/off

Seve
rity

GENSET ON

off

PIN NO
P0

P1
AC MAIN FAILURE

off

P2
INTRUDER

on

SA
FIRE ALARM

on

HIGH TEMP

on

P3

P4

LOW VOLTAGE

RECTIFIER MAJOR

on

on

P5

P6

P7
P7

21

RECTIFIER MINOR

on

Cable
Color

Cable Color

White

14

Blue

White

15

Orange

White

16

Green

White

17

Brown

White

18

Gray

Red

19

Blue

Red

20

Orange

Red

P8

Green

HUAWEI TECHNOLOGIES CO., LTD.

Page 49

49

Mobilink Alarm
Definition

always
on/off

Severi
ty

GENSET ON

off

AC MAIN FAILURE

off

RECTIFIER DOOR

on

DC LOAD FUSE

on

BATTERIES HIGH TEMP

on

LOW VOLTAGE

on

RECTIFIER MAJOR

on

SYSTEM ON BATTERIES

on

Rectifier Door

on

Ping Test for 3G site solution:

HUAWEI TECHNOLOGIES CO., LTD.

Page 50

Pre Swap Testing , Swap Activity and Swap Troubleshooting


RM
Key Point

Mobilink

Huawei

Site access arrangement

Media Provisioning MW+ MSTP+ Datacom

Third party

Core and PS Core CGI ,LAC,RAC definitions

Neighbor addition

Acknowledgement on swap activity closure

Spares provision

Media verification MW+ MSTP+Datacom

Configuration and Troubleshooting of other vendor equipment

Conclusion of activity failure due to Other Vendor equipment

Decision of roll back

Perform Rollback

HUAWEI TECHNOLOGIES CO., LTD.

Configuration and Troubleshooting of Huawei equipment

"" indicates the Owner, while "O" indicates the support.

Page 51

Page 51

Support Required from Mobilink


1. For 3G Sites additional port configuration to perform ping test before
swap2. Involve other vendor support for joint troubleshooting with SLA of 30min
3. 2 hour and 50min troubleshooting window before decision of rollback
4. Extension ECRF if needed will apply before 5:30AM and need PMCL
support to approve it before 5:45AM
5. One Swap TL from PMCL for each activity to coordinate with all internal
teams and Huawei Swap TL to assure activity successful
6. Spares availability for swap include RAN , Power, MW
7. Enough NOC and planning engineer of MSTP+ MW+Datacom during
activity consider work for cross connects , media verification of 50 sites
per night
HUAWEI TECHNOLOGIES CO., LTD.
8. MW,MSTP LLD await detailed topology +capacity+utilization from PMCL
Page 52

Thank you
www.huawei.com
Copyright2014 Huawei Technologies Co., Ltd. All Rights Reserved.
The information in this document may contain predictive statements including, without limitation, statements regarding the future financial and
operating results, future product portfolio, new technology, etc. There are a number of factors that could cause actual results and developments to
differ materially from those expressed or implied in the predictive statements. Therefore, such information is provided for reference purpose only and
constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.

Das könnte Ihnen auch gefallen