Civil engineering department
Surveying (1)
Report )3(
Group names :
120091883
120092395
120091718
/
/
/
120093007
/
120092732
To Eng:
Ahmed F. Elhalaq
Day :Tuseday
Date:25/10/2010
Fig )
1( Rangin
g rod
Fig(2)
Fig(3)
Arrows
The tape
Fig(4) The
prisma
Methodology:
* we have four ways for ' setting out right angle
( Erecting & dropping prependicular lines ) :-
1)
2)
3)
4)
1)
2)
1-For dropping :
* As shown in Fig6
-We determine (A, B and C) as before and show (AB)
by the tape.
- We calculate two equal length from (CK)
and (CL) to AB.
2-For erecting :
* As shown in Fig(7)
3)
* As shown in Fig(8)
8m
Fig(8) Pythagoras
to theory
up.
comment:
-In this experiment we work in a large group so that the work
finish quickly but the work was interesting.
- The prisma was too small so it was hard to show features.
-The measuring by the tape was difficult in some parts.
- We did not use the prisma in the experiment so we didnt deal
with it in our report.