A 001 Demolition of brick work in cement motar, bricks stacked and debris cleared away

from second floor level to roof level


PER Cu.m
L 001

Unskilled labour

hour

0.00

ALLOW FOR SCAFFOLDING - STEEL


0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

A 002 Demolition of brick work in cement motar, bricks stacked and debris cleared away

from first floor level to second floor level


PER Cu.m
L 001

Unskilled labour

hour

5.7

0.00

ALLOW FOR SCAFFOLDING - STEEL


0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

A 003 Demolition of brick work in cement motar, bricks stacked and debris cleared away

from ground floor level to first floor level


PER Cu.m
L 001

Unskilled labour

hour

0.00

ALLOW FOR SCAFFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

A -

DEMOLISHER

A004 Demolition of cadjan roof or wall, timber stacked and debris cleared away, for
single storey building
PER Sq.m.
L001 Unskilled labour

hour

0.2

0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
A005 Demolition of ceiling,materials stacked and debris cleared away, for
single storey building
PER Sq.m.
L002 Unskilled labour

hour

0.5

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
A006

0.00

Demolition of unreiforced concrete in ground floor slab (150mm)


and debris cleared away
PER Sq.m.

L001 Unskilled labour

hour

0
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
A007

0.00

Demolition and removing of reinforced concrete (100mm) in roof or floor slabs


and debris cleared away (first floor level) scaffolding paid seperately
PER Sq.m.

L001 Unskilled labour

hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

5.6

0.00
0.00
0.00
0.00

DEMOLISHER

A008 Removal of Galvanised iron or asbestos or aluminium corrugated sheets from roofs or
wall from a single storey building and stacked. Removal of frame work paid seperately
PRE Sq.m.
L001 Unskilled labour

hour

0.6

0.00

ALLOW FOR SCAFFOLDING - STEEL


0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

A009 Removal of corrugated Galvanised iron or asbestos or aluminium sheets from roof
or walls of two storeyed buildings and stacked. Removal of frame work paid seperately
PER Sq.m.
L001 Unskilled labour

hour

0.8

0.00

ALLOW FOR SCAFFOLDING - STEE


0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

A010 Removal of corrugated Galvanised iron or aluminium or asbestos sheets from roof or
walls of 3 storeyed buildings. Removal of frame work paid seperately.
PER Sq.m.
L001 Unskilled labour

hour

1.0

0.00

ALLOW FOR SCAFFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0
0.00
0.00

Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.

DESCRIPTION

UNIT

Basket

day

Concrete Mixer

hour

Lorry 3 Tonnes

hour

Lorry 5 Tonnes

hour

Tractor 75 Cubes

hour

Vibrator

hour

PRICE
Rs.
Cts.

Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.

DESCRIPTION

UNIT

Black Smith

Hour

Carpenter

Hour

Glazier

Hour

Mason

Hour

Painter

Hour

Plumber

Hour

Skilled labour

Hour

Skilled Labour *

Day

Terrazzo Mason

Hour

Tinker

Hour

Unskilled Labour

Hour

Unskilled Labour
Sanitary labour

Day
Day

PRICE
Rs. Cts.

Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.

DESCRIPTION

UNIT

1/2" M/s/ rods

Kg.

100mm x 100mm Aluminium grating


150mmx150mm Aluminium grating
100mm x100mm Class I timber beams(4" x 4")

No.
No.
m

10mm chip board (8'x4')


10mm chip board (8'x4') *
1125 L, 16 BWG G.I. Tank
1150 X 2060 X 32MM

m2
No.
No.

12mm Brass Screws Gauge 6

Nos.

12mm chip board (8'x4')


12mm chip board (8'x4') *
12mm chromium plated stop cock.

m2
No.
No.

12mm heavy quality brass push tap

No.

12mm light brass push tap

No.

12mm thick class I timber planks

m2

12mm x 12mm class I timber beadings

12mm x 12mm imported class I timber fillets


12mm x 12mm local class I timber fillets

Lm.
m

12mm x 12mm local Class II timber fillets.

L.M.

150mm x 150mm Grating Aluminium

No.

16mm Brass Screws Gauge 8

Nos.

16mm x 16mm Class 1 timber

1800 L, 16 BWG G.I. Tank

No.

2" x 4" H iron

Kg.

200mm x 200mm ceramic floor tile.

No.

PRICE
Rs. Cts.

Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.

DESCRIPTION

UNIT

20mm G.I. Clout nails

Kg

20mm thick class A imported timber planks - Burma

m2

20mm thick planks of class I local timber

m2

20mm x 20mm Class 1 timber battens

25mm brass screws - 8

Nos.

25mm thick class I imported timber planks

m2

25mm thick planks of Class I local timber

m2

25mm thick planks of Class II local timber

m2

25mm thick Teak timber planks

m2

25mm x 20mm imported timber fillets

25mm x 25mm class I local timber fillets

Lm.

25mm x 25mm Teak Timber

28mm thick Class I timber planks.

m2

28mm x 15mm Class I timber

28mm x 28mm Class A timber.

28mm x 28mm Class I timber

31mm thick imported class I timber planks

m2

32mm to 38mm thick (Burma Teak) imported Class

32mm x 12mm local class 1 timber fillets

32mm x 32mm Class I timber

32mm x 32mm Teak timber

38mm x 200mm timber coping in Class 1

m3

PRICE
Rs. Cts.

Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.

DESCRIPTION

UNIT

400 gal round plastic shell Tank

No.

400 L , 16 BWG G.I. Tank

No.

40mm to 50mm x 12mm class I timber fillets

40mm to 50mm x 12mm local class I timber fillets

40mm x 40mm class I timber sash bars

L.M.

40mm x 40mm class II timber sash bars

L.M.

50mm brass screws Gauge 8

No.

50mm iron screws Gauge 10

Nos.

50mm x 12mm Class A timber.

50mm x 12mm Class I timber

50mm x 12mm Class II local timber.

50mm x 15mm Class A timber.

50mm x 15mm Class I timber

50mm x 25mm Class A timber

50mm x 25mm class I local timber fillets

50mm x 25mm class I timber

50mm x 25mm Class II local timber.

50mm x 25mm class II timber

50mm x 50mm thick class 1 timber

5mm iron nails

Kg

600mm x 125mm glass shelf with chromium plated

No.

Alkali resisting primer

Lit.

Aluminium paint

Lit.

PRICE
Rs. Cts.

Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.

DESCRIPTION
Aluminium Wood Primer

UNIT
*

Lit.

Angle iron 40 x 40 x 6mm

Angle iron 50 x 50 x 7mm

Kg.

Anti - Corrosive Paint

Lit.

Asbestos cement riding(pair)

Nos.

Asbestos plain ceiling sheet 1220 x 1220mm

No.

Assistgate valve, heavy quality brass 20mm

No.

Ball only (Plastic) 1" valve

No.

Ball only (Plastic) 1/2" valve

No.

Ball only (Plastic) 3/4" valve

No.

Ball Valve, 12mm (Plastic)

No.

Ball Valve, 20mm

No.

Ball Valve, 25mm

No.

Ball Valve, 32mm

No.

Barbed wire

Kg.

Basin 360 x 560 with tap waste plug but excluding

No.

Bend G.I. 12mm

No.

Bend G.I. 20mm

No.

Bend G.I. 25mm

No.

Bend G.I. 32mm

No.

Bend G.I. 38mm

No.

Bend G.I. 50mm

No.

Bend G.I. 63mm

No.

Bend G.I. 75mm

No.

Bend PVC 20mm

No.

PRICE
Rs. Cts.

Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.

DESCRIPTION

UNIT

Bend PVC 25mm

No.

Bend PVC 32mm

No.

Bend PVC 40mm

No.

Bend PVC 50mm

No.

Bend PVC 63mm

No.

Bend PVC 75mm

No.

Bend PVC 90mm

No.

Bib Cock Brass, 12mm - English

No.

Bidets - White

No.

Binding wire
Bitumen

Kg.

Kg.

Bitumen washers

No.

Boiled Lime

Kg

Bolt and nut iron 125 x 10mm

No.

Bolt and nut iron 125 x 12mm

No.

Bolt and nut iron 150 x 12mm

No.

Bolt and nut iron 225 x 10mm

Kg.

Bolt and nut iron 225 x 10mm

No.

Bolt and nut iron 45 x 6mm

No.

Bolt and nut iron 63 x 10mm

No.

Bolt Barrel Brass 100mm

Bolt Barrel Brass 125mm


Bolt Barrel Brass 150mm

No.
*

No.
No.

Bolt Barrel Brass 63mm

No.

Bolt Barrel Brass 75mm

No.

PRICE
Rs. Cts.

Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.

DESCRIPTION

UNIT

Bolt Skeleton Brass 200mm

No.

Bolt Skeleton Brass 250mm

No.

Bolt Skeleton Brass 300mm

No.

Bolt Skeleton Brass 450mm

No.

Bolt Tower iron 100mm

No.

Bolt Tower iron 125mm

No.

Bolt Tower iron 150mm

No.

Bolt Tower iron 75mm

No.

Brass door knob

No.

Brick

1000nos

Cabin Hook & Eye Iron 150mm

No.

Cabin Hook & Eye Iron 200mm

No.

Cabin Hook & Eye Iron 50mm

No.

Cabin Hook & Eye Iron 75mm

No.

Cabin Hook Brass 150mm

No.

Cabin Hook Brass 200mm

No.

Cabin Hook Brass 225mm

Nos.

Cabin Hook Brass 250mm

No.

Cabin Hook Brass 300mm

No.

Cabin Hook Brass 50mm


Cabin Hook Brass 75mm

No.
*

No.

Calicut pattern flat tiles

No.

Calicut pattern ventilator tiles

No.

Cap PVC 20mm

No.

PRICE
Rs. Cts.

Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.

DESCRIPTION

UNIT

Cap PVC 25mm

No.

Cap PVC 32mm

No.

Cap PVC 40mm

No.

Cap PVC 50mm

No.

Cap PVC 63mm

No.

Cap PVC 75mm

No.

Casement Fastner Brass

No.

Casement Stay Brass 250mm

No.

Casement Stay Brass 300mm

No.

Cement

50kg

Cement block 100 x 200 x 400mm

1 No.

Cement block 150 x 200 x 400mm

1 No.

Cement block 200 x 200 x 400mm

1 No.

Chromium plated chain for flushing cistern

No.

Cistern Bracket

Pair

Cistern High level C.I. - including 1/2" dia Ball Valv

No.

Clay

m3

Close fitting asbestos ridging

Pair

Closet pedestal type

No.

Coal Tar

Lit.

Coconut rafters

Colour pigment for cement

Kg.

Coloured cement

Kg.

Conduit Pipe 18mm

Conduit Pipe 20mm

PRICE
Rs. Cts.

Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.

DESCRIPTION

UNIT

Conduit Pipe 25mm

Conduit Pipe 30mm

Conduit Pipe 40mm

Conduit Pipe 50mm

Connector G.I. 12mm

No.

Connector G.I. 20mm

No.

Connector G.I. 25mm

No.

Connector G.I. 32mm

No.

Connector G.I. 38mm

No.

Connector G.I. 50mm

No.

Connector G.I. 63mm

No.

Connector G.I. 75mm

No.

Corrugated asbestos sheet

Sq.m.

Corrugated G.I. Sheet 24 BWG

Sq.m.

Cove moulding(63mmx40mm)imported classI

Cove moulding(63mmx40mm)local class I

Door handle

Nos.

Down pipe Clip PVC 89mm

No.

Down pipe Elbow PVC 89mm

No.

Down pipe joiner PVC 89mm

No.

Down pipe PVC 89mm

Down spout square PVC 114mm - Large

Down spout square PVC 114mm - Small

DPC Tar

Lit.

PRICE
Rs. Cts.

Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.

DESCRIPTION

UNIT

Drainage Bend PVC 110mm 880

No.

Drainage Tee PVC 110mm 880

No.

Drainage 'Y' Junction PVC 110mm Inspection -45 0

No.

Drive Screws and washers

Nos.

Elbow G.I. 12mm

No.

Elbow G.I. 20mm

No.

Elbow G.I. 25mm

No.

Elbow G.I. 32mm

No.

Elbow G.I. 38mm

No.

Elbow G.I. 50mm

No.

Elbow G.I. 63mm

No.

Elbow G.I. 75mm

No.

Elbow PVC 20mm

No.

Elbow PVC 25mm

No.

Elbow PVC 32mm

No.

Elbow PVC 40mm

No.

Elbow PVC 50mm

No.

Elbow PVC 63mm

No.

Elbow PVC 75mm

No.

Elbow PVC 90mm

No.

Emulsion

Lit.

Enamel

Lit.

Equal Tee PVC 20mm

No.

Equal Tee PVC 25mm

No.

Equal Tee PVC 32mm

No.

PRICE
Rs. Cts.

Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.

DESCRIPTION

UNIT

Equal Tee PVC 40mm

No.

Equal Tee PVC 50mm

No.

Equal Tee PVC 63mm


Equal Tee PVC 75mm
Fanlight Catch Brass

No.
No.
No.

Faucet Socket PVC 110mm

No.

Faucet Socket PVC 20mm

No.

Faucet Socket PVC 25mm

No.

Faucet Socket PVC 32mm

No.

Faucet Socket PVC 40mm

No.

Faucet Socket PVC 50mm

No.

Faucet Socket PVC 63mm to smaller size

No.

Faucet Socket PVC 75mm

No.

Faucet Socket PVC 90mm

No.

Fibre glass storage tank 400 gals.

No.

Fittings for Bidet - Indian

No.

Fittings for Cistern

No.

Floor Paint - Quick drying

Lit.

Floor Paint (Epoxy)

Lit.

Flush pipe PVC (32mm)

No.

G.I. 18 BWG sheets(plain)

m2

G.I. 22 BWG sheets(plain)

m2

G.I. 24 BWG sheets(plain)

m2

G.I. Bolts and nuts

No.

G.I. Hook bolts

No.

PRICE
Rs. Cts.

Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.

DESCRIPTION

UNIT

G.I. Hook bolts 8mm x 115mm

Nos.

G.I. Joint nut 12mm

No.

G.I. Joint nut 20mm

No.

G.I. Joint nut 25mm

No.

G.I. Joint nut 32mm

No.

G.I. Joint nut 38mm

No.

G.I. Joint nut 50mm

No.

G.I. Reducing socket 25mm to smaller

No.

G.I. Ridging 2m x 1m - 24 B.W.G.

Nos.

G.I. sheet 18 B.W.G.

Sq.m.

G.I. Sheet 24 B.W.G.


Gate valve, heavy quality brass 12mm
Gate valve, heavy quality brass 20mm

Sq.m.
No.
No.

Gate valve, heavy quality brass 25mm

No.

Gate valve, heavy quality brass 32mm

No.

Gate valve, heavy quality brass 38mm

No.

Glass pane clear 3mm

Sq.m.

Glass pane clear 4mm

Sq.m.

Glass pane Figured 3mm

Sq.m.

Glass pane Figured 5mm

Sq.m.

Glass Tray Holder 100 x 100mm - White

Pair

Glue

Kg.

Grating 100mm x 100mm Aluminium

No.

Gravel

m3

Gutter Bracket half round (Short Arm Aluminium)

No.

Gutter Bracket Square PVC 114mm

No.

PRICE
Rs. Cts.

Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.

DESCRIPTION

UNIT

Gutter End Cap square PVC 114mm

No.

Gutter End Cap half round PVC 150mm

No.

Gutter Half round PVC 150mm x 4m

Gutter Joiner square PVC 114mm

No.

Gutter Joiner half round PVC 150mm

No.

Gutter square PVC 114mm

Hasp and staple Iron 100mm

No.

Hasp and staple iron 150mm

No.

Hasp and staple safety type Brass 100mm

No.

Hasp and staple safety type Brass 150mm

No.

Hat Hook Brass

No.

High level plastic - plastic

No.

Hinge butt brass 100mm

No.

Hinge Butt Brass 100mm x 63mm

No.

Hinge Butt Brass 125mm x 100mm

No.

Hinge Butt Brass 38mm x 25mm

No.

Hinge Butt Brass 50mm x 38mm

No.

Hinge Butt Brass 75mm x 38mm

No.

Hinge Butt Brass 89mm x 63mm

No.

Hinge Butt iron 100mmx63mm

No.

Hinge Butt iron 125mmx100mm

No.

Hinge Butt Iron 50mmx38mm

No.

Hinge Butt iron 75mmx38mm

No.

Hinge Centre Pivot Brass

Set

PRICE
Rs. Cts.

Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.

DESCRIPTION

UNIT

Hinge Gravity Brass

No.

Hinge Parliamentary Brass 100mm

No.

Hinge Parliamentary Brass 125mm

No.

Hinge Parliamentary Brass 150mm

No.

Hinge Spring Double Acting Brass 100mm

No.

Hinge T iron 150mm

No.

Hinge T iron 200mm

No.

Hinge T iron 250mm

No.

Hinge T iron 300mm

No.

Holdfasts

Nos.

Holdfasts - 250 x 25 x 6

Nos.

Holdfasts - 400 x 25 x 6

Nos.

Hooks 38mm G.I. Pipes

No.

Hooks for 12mm G.I. Pipes

No.

Hooks for 20mm G.I. Pipes

No.

Hooks for 25mm G.I. Pipes

No.

Hooks for 32mm G.I. Pipes


Hooks for 38mm G.I. Pipes
Imported Timber

No.
No.
Cu.m.

Kitchen sink 600 x 375 x 175mm - White

No.

Leather washer

No.

Limpet washers

Nos.

Lock Cupboard Four Levers Brass 63mm

No.

Lock mortice single local made

No.

Lock Mortice Union Double Sash

No.

PRICE
Rs. Cts.

Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.

DESCRIPTION

UNIT

Lock Mortice Union Single Sash

No.

Lock Rim Double Lever Brass 150mm

No.

Lock Rim single Lever Brass 150mm

No.

Low level cistern - white

No.

Low level cistern - white - plastic

No.

Low level closet unit

No.

Low level commode with Trap - White

No.

Lunumidella 150 x 12mm

Sq.m.

Lunumidella 150 x 20mm

Sq.m.

Manhole Cover 600mm x 600mm with frame

No.

Metal 20mm

m3

Metal 25mm

m3

Metal 40mm

m3

Metal 50mm

m3

Mild steel

Kg.

Mild steel flat

Kg.

Mirror Frame Oval - White (380 x 330) mm

No.

Mirror Frame Square - white (320 x 280) mm

No.

Mirror only, oval (380 x 330) mm

No.

Mirror only, square

No.

Mitre Joint half round PVC 150mm

No.

Mitre Joint square PVC 114mm

No.

Mould oil

Lit.

Night Latch - China

No.

Nipple G.I. 12mm

No.

PRICE
Rs. Cts.

Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.

DESCRIPTION

UNIT

Nipple G.I. 20mm

No.

Nipple G.I. 25mm

No.

Nipple G.I. 32mm

No.

Nipple G.I. 38mm

No.

Nipple G.I. 50mm

No.

Nipple G.I. 63mm

No.

Nipple G.I. 75mm

No.

Oil paint (Gloss)

Lit.

Pillar Cock Chromium Plated 12mm

No.

Pillar Cock Chromium plated 20mm

No.

Pintels and stay hinges 50mm x 6mm x 1m

Nos.

Pipe G.I. 12mm

Pipe G.I. 20mm

Pipe G.I. 25mm

Pipe G.I. 32mm

Pipe G.I. 38mm

Pipe G.I. 50mm

Pipe G.I. 63mm

Pipe G.I. 75mm

Pipe PVC 110mm type 1000

Pipe PVC 110mm type 400

Pipe PVC 110mm type 600

Pipe PVC 20mm type 1000 (Anton)

PRICE
Rs. Cts.

Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.

DESCRIPTION

UNIT

Pipe PVC 25mm type 1000

Pipe PVC 32mm type 1000

Pipe PVC 32mm type 600

Pipe PVC 40mm type 1000

Pipe PVC 40mm type 600

Pipe PVC 50mm type 1000

Pipe PVC 50mm type 400

Pipe PVC 50mm type 600

Pipe PVC 63mm type 1000

Pipe PVC 63mm type 400

Pipe PVC 63mm type 600

Pipe PVC 75mm type 1000

Pipe PVC 75mm type 400

Pipe PVC 75mm type 600

Pipe PVC 90mm type 1000

Pipe PVC 90mm type 400

Pipe PVC 90mm type 600

Plaster of paris

Kg.

Plug G.I. 12mm

No.

Plug G.I. 20mm

No.

Plug G.I. 25mm

No.

Plug G.I. 32mm

No.

Plug G.I. 38mm

No.

Plug G.I. 50mm

No.

Plug G.I. 63mm

No.

PRICE
Rs. Cts.

Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.

DESCRIPTION

UNIT

Plug G.I. 75mm

No.

Plugs

No.

Plugs PVC 20mm

No.

Plugs PVC 25mm

No.

Plugs PVC 32mm

No.

Plugs PVC 40mm

No.

Plugs PVC 50mm

No.

Plugs PVC 75mm

No.

Plywood board, 12mm M.R.

Sq.m.

Plywood board, ordinary 25mm

Sq.m.

Plywood board, ordinary M.R. 1150x2060x32mm

No.

Plywood board, ordinary M.R. 3mm

Sq.m.

Plywood board, ordinary M.R. 6mm

Sq.m.

Plywood board, ordinary M.R. 9mm

Sq.m.

Plywood door ordinary M.R. 838 x 2060 x 32mm

No.

Plywood door, ordinary B.R. 686x2060x32mm

No.

Plywood door, ordinary M.R. 686x2060x32mm

No.

Polythane Varnish

Lit.

Props (bamboo) 3 - 4 m

No.

Pudlo Cement

Kg.

PVC 75mm socket

No.

PVC 90mm socket

No.

PVC Elbow 110mm

No.

PVC Elbow 75mm

No.

PVC Elbow 90mm

No.

PRICE
Rs. Cts.

Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.

DESCRIPTION

UNIT

Rag bolts

No.

Rawl plugs.

No.

Red lead

Kg.

Red Lead Paint

Lit.

Reducing Socket G.I. 20mm to smaller


Reducing Socket G.I. 25mm
Reducing Socket G.I. 32mm

No.
No.
No.

Reducing Socket G.I. 38mm

No.

Reducing Socket G.I. 50mm

No.

Reducing Socket G.I. 75mm

No.

Reducing Socket PVC 25mm to smaller size

No.

Reducing Socket PVC 32mm to smaller size

No.

Reducing Socket PVC 40mm to smaller size

No.

Reducing Socket PVC 50mm to smaller size

No.

Reducing Socket PVC 63mm to smaller size

No.

Reducing Tee PVC 25mm to smaller size.

No.

Reducing Tee PVC 32mm to smaller size.

No.

Reducing Tee PVC 40mm to smaller size.

No.

Reducing Tee PVC 50mm to smaller size.

No.

Reducing Tee PVC 63 mm to smaller size.

No.

Ridge tile calicut pattern Gr. I

No.

Ring Brass 45mm to 38mm

No.

Rivets (6.3mm x 10mm)

No.

Robe Hook 100 x 100mm - White

No.

Roofing nails

Kg.

Rubber plug 25mm to 32mm

No.

PRICE
Rs. Cts.

Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.

DESCRIPTION

UNIT

Rubber plug 32mm to 50mm

No.

Rubble 150mm to 225mm

m3

Running head PVC 150mm

No.

Running Head Square PVC 114mm

No.

Sand

m3

Screws Brass 12mm x Gauge 4

Doz.

Screws Brass 12mm x Gauge 5

Doz.

Screws Brass 20mm x Gauge 6

Doz.

Screws Brass 25mm x Gauge 7

Doz.

Screws Brass 30mm x Gauge 7

Doz.

Screws Brass 40mm x Gauge 8

Nos.

Screws Brass 45mm x Gauge 9

Doz.

Screws Brass 50mm x Gauge 8

No.

Screws Brass 16mm x Gauge 7

Nos.

Screws Brass 20mm x Gauge 8

Doz.

Screws Brass 25mm x Gauge 8

Doz.

Screws Brass 30mm x Gauge 8

Doz.

Screws brass 30mm x guage 8

Doz.

Screws Brass 40mm x Gauge 8

Doz.

Screws brass 50mm x Guage 10

Nos.

Screws Iron 12mm x Gauge 6

Doz.

Screws Iron 12mm x Gauge 8

Doz.

Screws Iron 16mm x Gauge 6

Doz.

Screws Iron 16mm x Gauge 8

Doz.

Screws Iron 20mm x Gauge 6

Doz.

PRICE
Rs. Cts.

Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.

DESCRIPTION

UNIT

Screws Iron 25mm x Gauge 8

Doz.

Screws Iron 30mm x Gauge 8

Doz.

Screws Iron 40mm x Gauge 8

Doz.

Screws Iron 45mm x Gauge 8

Doz.

Screws Iron 50mm x Gauge 8

No.

Seat cover plastic - Indian

No.

Shower Rose Copper 150mm x 12mm


Shower Rose PVC 150mm x 12mm

*
*

No.
No.

Slaked lime

Kg.

Slaked lime

Bushels

Snowcem

Kg.

Soap Holder - White

No.

Socket G.I. 12mm

No.

Socket G.I. 20mm

No.

Socket G.I. 25mm

No.

Socket G.I. 32mm

No.

Socket G.I. 38mm

No.

Socket G.I. 50mm

No.

Socket G.I. 63mm

No.

Socket G.I. 75mm

No.

Socket PVC 20mm

No.

Socket PVC 25mm

No.

Socket PVC 32mm

No.

Socket PVC 40mm

No.

PRICE
Rs. Cts.

Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.

DESCRIPTION

UNIT

Socket PVC 50mm

No.

Socket PVC 63mm

No.

Socket PVC 75mm

No.

Socket PVC 90mm

No.

Solvent cement

50Grams

Spur Stones

No.

Squatting Pan (M) with 'P' Trap

No.

Stop cock Brass, 12mm - Italy

No.

Stop cock Brass, 20mm

No.

Stop cock Brass, 25mm

No.

Stop cock Brass, 32mm

No.

Stop cock Brass, 38mm

No.

Stop cock Brass, 50mm

No.

Straining bolts 16mm dia.

No.

Tap for wash Basin (M) - Malasiyan

No.

Tee equal PVC 75mm

No.

Tee equal PVC 90mm

No.

Thinner

Lit.

Tile calicut pattern Gr. I

No.

Tile cement pressed 200 x 200mm


Tile glazed 108 x 108mm

No.
No.

Tile half round (asbestos covering) Gr. I

No.

Tile half round Gr.I

No.

Tile Terrazzo 300 x 300mm


Timber beams Class I

No.
Cu.m.

PRICE
Rs. Cts.

Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.

DESCRIPTION

UNIT

Timber beams Class ii

Cu.m.

Timber beams Class iii

Cu.m.

Timber plank 25mm class i

Sq.m.

Timber plank 25mm class ii

Sq.m.

Timber plank 25mm class iii

Sq.m.

Timber plank 31mm Class i

Sq.m.

Timber plank 31mm Class ii

Sq.m.

Timber plank 31mm Class iii

Sq.m.

Timber plank 38mm class i

Sq.m.

Timber plank 38mm class ii

Sq.m.

Timber plank 38mm class iii

Sq.m.

Timber planks 25mm class B

Sqm.

Toilet Paper Holder 150 x 150 mm - White

No.

Tooth Brush Holder 200 x 100mm -White

No.

Tor steel

Kg.

Towel Rack Bar 750 mm

No.

Towel Rack Holder 100 x 100mm - White

Pair

Tower bolts, iron 250mm

No.

Two way tap for wash Basin (L) - Italy

No.

Urinal - White

No.

Valve Socket PVC 20mm

No.

Valve Socket PVC 25mm

No.

Valve Socket PVC 32mm

No.

Valve Socket PVC 40mm

No.

Valve Socket PVC 50mm

No.

PRICE
Rs. Cts.

Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.

DESCRIPTION

UNIT

Valve Socket PVC 63mm

No.

Valve socket PVC 75mm

No.

Valve socket PVC 90mm

No.

Wash Basin (L) Bracket

Pair

Wash Basin (L) Waste

No.

Wash Basin (L) with Pedestal - White

No.

Wash Basin (L) without Pedestal - White

No.

Wash Basin (M) Bracket

Pair

Wash Basin (M) Round - White

No.

Wash Basin (M) Waste


Weathershield

No.
*

Lit.

Weld mesh(galvanised) 50 x 50mm, Gauge 10

m2

Wire Dome, 100mm

No.

Wire Dome, 50mm

No.

Wire nail S.W.G. 12 to 14

Kg.

Wire nail S.W.G. 4 to 10

Kg.

Wire nail S.W.G. 4 to 14

Kg.

Wire nail S.W.G. 4 to 18

Kg.

Wire nail S.W.G. 4 to 8

Kg.

Wood plugs.

Wood Preservative (Black / coloured)


Wood Preservative (clear)
Yellow ochre

Lit.
Lit.
Kg.

PRICE
Rs. Cts.

Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.

DESCRIPTION

UNIT

Fluorescent lamp, batten type 40W with


enamelled reflector(English make)

No.

Fluorescent lamp, batten type 40W with


diffuser(Chinese make)

No.

Fluorescent lamp, batten type 40W with


diffuser(English make)

No.

Incandecent bulb, 25W to 100W

No.

DESCRIPTION

UNIT

Incandecent bulb holder

No.

Incandecent bulb shade

No.

Main switch single phase 15 Amps 250v, MEM

No.

Main switch single 30 Amp 250v, MEM

No.

Distribution Board, 4 way

No.

Distribution Board, 6 way

No.

Distribution Board, 10 way

No.

Distribution Board, 12 way

No.

Helegen lamp 1000w

No.

Fluorescent bulb 20 w or 40 w

No.

Starter for Fluorescent bulb

No.

Choke for fluorescent bulb

No.

R.C.C.B. 40Amp (Crabtree)

No.

Round block(PVC)

No.

Ceiling Rose (PVC)

No.

Cable PVC 1mm2

Earth wire PVC 2.5mm2

PRICE
Rs. Cts.

PRICE
Rs. Cts.

Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.

DESCRIPTION

UNIT

Socket outlet, surface type, 5 Amps


(Indian or Chinese make)

No.

Socket outlet, surface type, 15 Amps


(Indian or Chinese make)

No.

Socket outlet flush type, 5 Amps


(Clipsal , Tenby or Carbtree)

No.

DESCRIPTION

UNIT

Socket outlet flush type, 15 Amps


(Clipsal , Tenby or Carbtree)

No.

Ceiling Fan, sweep 1425 mm(National or KDK)

No.

Fluorescent lamp, batten type 40w with


enemelled reflector(Chinese make)

No.

PRICE
Rs. Cts.

PRICE
Rs. Cts.

A011

DEMOLISHER

Removal of a door or a window frame including sashes (size up to 4 sq.m.)


from existing walls and stacked
PER No.

L001

Unskilled labour

Hour

8.00

0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

A012

0.00
0.00
0.00
0.00

Removal of a door or a window frame including sashes (size over 4 sq.m.) from
existing wall and stacked
PER No.

L001

Unskilled labour

Hour

12.00

0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

A013

Removal of door or window sash(size upto 4sq.m.)from existing wall and


stacked.
PER No.

L001
L002

Unskilled labour
Skilled labour

Hour
Hour

0.5
0.5

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

A014

0.00

0.00
0.00
0.00
0.00
0.00

Removal of door or window sash from existing wall(over 4sq.m.)and stacked.


PER No.

L001
L002

Unskilled labour
Skilled labour

Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.75
0.75

0.00
0.00

0.00
0.00
0.00
0.00
0.00

- DEMOLISHER

A015

Removal of old or decayed, 100mm to 150mm dia. GI down pipes,


from existing buildings and stacked.
PER L.m.

L001

Unskilled labour

Hour

0.30

0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

A016

Demolition of brick drains and clearing debries as directed. Rate included to


backfill the drain with the available earth and compacted.
PER L.m.

L001

Unskilled labour

Hour

0.90

0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

A017

0.00

0.00
0.00
0.00
0.00

Removal of expanded metal or mesh from existing frames and stacking as


directed.
PER m2

L001

Unskilled labour

Hour

1.2

0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

A018

0.00

0.00
0.00
0.00

Uprooting of fence post, rolling up barbed wire and stacking all material as
directed. (length of the fencing to be measured).
PER L.m.

L001

Unskilled labour

Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.25

0.00

0.00
0.00
0.00
0.00

A-

DEMOLISHER

A019

Demolition of brick paved cement rendered floors and cleaning debris as directed
(75mm to 100mm thick floor)
PER M2

L001

Unskilled labour

Hour

0.70

0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
A020

0.00
0.00
0.00
0.00

Removing and stacking of gate sash (02 Nos.) after demolishing two cement concrete
columns or removing two posts and seperating pintles.
PER No.

L001

Unskilled labour

Hour

8.00

0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

A021

Removing glass panes in doors, windows and fanlights and stacking as


directed
PER M2

L002

Skilled labour

Hour

2.00

0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

A022

0.00

0.00
0.00
0.00
0.00

Removing eaves gutter from roof of single storeyed buildings and stacking
as directed.
PER L.m.

L001

Unskilled labour

Hour

0.20

0.00

0.00

ALLOW FOR SCAFFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

A-

DEMOLISHER

A023

Removing eaves gutter from roof of two storeyed buildings and stacking
as directed.
PER L.m.

L001

Unskilled labour

Hour

0.30

0.00

0.00

ALLOW FOR SCAFFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

A024

0.00
0.00
0.00

Removing eaves gutter from roofs of 3 or more stroyed buildings and


stacking as directed.
PER L.m.

L001 nskilled labour

Hour

0.35

0.00

0.00

LLOW FOR SCAFFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

A025

L001
L002

0.00
0.00
0.00

Removing partition and stacking at site including making good to walls and floors.
Rate to include painting new plaster patches to match existing colour.
Note :- Material cost will cover from the labour cost.
PER M2
Unskilled labour
Skilled labour

Hour
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.60
1.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00

A-

DEMOLISHER

A026

Chipping and removing of lime plaster on Brick walls, cement concrete walls
and clearing debris as directed.
PER M2

L001

Unskilled labour

Hour

0.30

0.00

0.00

ALLOW FOR TOOLS


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

A027

Chipping and removing of cement rendering on brick walls and floors and
clearing away debries.
PER M2

L001

Unskilled labour

Hour

1.0

0.00

0.00

ALLOW FOR TOOLS


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

A028

0.00
0.00
0.00

Chipping and removing of cement rendering on cement concrete walls and


floors and clearing away debris
PER M2

L001

Unskilled labour

Hour

1.35

0.00

0.00

ALLOW FOR TOOLS


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

A-

DEMOLISHER

A029

Removing roof tiles and timber and stacking serviceable material at ground and
clearing debris in single storeyed buildings.
PER M2

L001
L002

Unskilled labour
Skilled labour
ALLOW FOR SCAFFOLDING

Hour
Hour

0.90
0.20

0.00
0.00

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

A030

0.00
0.00

Removing roof tiles and timber and stacking serviceable material and
clearing debris in 2 storeyed buildings
PER M2

L001
L002

Unskilled labour
Skilled labour

Hour
Hour

1.30
0.20

0.00
0.00

0.00
0.00

ALLOW FOR SCAFFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

A031

0.00
0.00
0.00

Removing roof tiles and timber and staking serviceable material at ground and
clearing debries in 3 storeyed buildings.
PER M2

L001 nskilled labour


L002 Skilled labour

Hour
Hour

1.70
0.20

0.00
0.00

0.00
0.00

ALLOW FOR SCAFFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

A-

DEMOLISHER

A032

Demolition of rubble masonary in cement sand motar and stacking rubble and
clearing debris as directed.
PER M3

L001

A033

Unskilled labour
Hour
9.00
ALLOW FOR SCAFFOLDING/TOOLS
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00

0.00
0.00
0.00
0.00

Demolition of rubble masonary in lime cement sand motar stacking rubble and
clearing debris.
PER M3

L001

Unskilled labour
Hour
6.00
ALLOW FOR SCAFFOLDING/TOOLS
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

A034

Demolition of glazed/wall/floor tiles and clearing debris as directed


Rate to include removing cement sand bedding
PER M2

L001

Unskilled labour

Hour

1.75

0.00

0.00
0.00
0.00

0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

A035

0.00

0.00
0.00
0.00
0.00

Removing half round tiles or calicut tiles from roof of single storeyed buildings
and stacking as directed at ground.
PER M2

L001

Unskilled labour

Hour

0.40

0.00

0.00

ALLOW FOR SCAFFOLDING.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

A
A036

DEMOLISHER
Removing of half round tiles or calicut tiles from roof of two storeyed buildings and
stacking as directed at ground.
PER M2

L001

Unskilled labour

Hour

0.60

0.00

0.00

ALLOW FOR SCAFFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

A037

0.00
0.00
0.00

Removing half round tiles or calicut tiles from roof of three storeyed building and
stacking as directed at ground
PER M2

L001

Unskilled labour

Hour

0.90

0.00

0.00

ALLOW FOR SCAFFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

A038

0.00
0.00
0.00

Removing water proof treatment of bitumen from flat roof and clearing
debris as directed
PER M2

L001

Unskilled labour

Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.70

0.00

0.00
0.00
0.00
0.00

DEMOLISHER

A039

Removing asbestos ceiling including timber frame work, stacking serviceable materials
at ground and clearing debris as directed in single storeyed building.
PER M2

L001
L002

Unskilled labour
Skilled labour

Hour
Hour

0.90
0.90

0.00
0.00

0.00
0.00

ALLOW FOR SCAFFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

A040

0.00
0.00
0.00

Removing asbestos ceiling including timber frame work, stacking


serciceable material at ground and clearing debris as directed in two storeyed
buildings
PER M2

L001
L002

A041

Unskilled labour
Hour
1.30
Skilled labour
Hour
0.90
ALLOW FOR SCAFFOLDING
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00

0.00
0.00
0.00
0.00
0.00

Removing valance barge boarding, stacking materials and clearing away


the debris in single storeyed buildings.
PER L.M.

L001

Unskilled labour

Hour

0.20

0.00

0.00

ALLOW FOR SCAFFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

DEMOLISHER

A042

Removing valance barge boarding, stacking materials and clearing debris


as directed in two storeyed buildings.
PER L.M.

L001

Unskilled labour

Hour

0.30

0.00

0.00

ALLOW FOR SCAFFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

A043

0.00
0.00
0.00

Chipping of cement lime sand plastering in soffit and cleaning debris as directed
PER m2

L001

Unskilled labour

Hour

1.50

0.00

0.00

ALLOW FOR SCAFFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

A044

0.00
0.00
0.00

Cutting down trees girth not exceeding 600mm, grubing uprooting, logging and
stacking and fill in excavation with earth.
PER Nos.

L001

Unskilled labour

Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

16.00

0.00

0.00
0.00
0.00
0.00

DEMOLISHER

A045

Cutting down trees, uprooting and grubbing girth exceeding 600mm but
less than 900mm excavation filled in earth logging and stacking.
PER No.

L001

Unskilled labour

Hour

20.00

0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

A046

0.00
0.00
0.00
0.00

Cutting down trees, uprooting and grubbing girth exceeding 900mm but
less than 1200mm excavation filled in earth logging and stacking.
PER No.

L010

Unskilled labour

day

5.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

A047

0.00
0.00
0.00
0.00

Cutting down trees, uprooting and grubbing girth exceeding 1200mm but less than
1600mm excavation filled in earth, rate to include logging and stacking
Per No.

L010

Unskilled labour

day
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

7.00

0.00
0.00
0.00
0.00

B-

EXCAVATOR

B001

Excavation of drains in any soil except rock requiring blasting as directed


by the engineer and soil deposited within site.
PER M3

L001
E001

B002

Unskilled labour
Hour
Basket
day
(Cost of tool include in Basket rate)
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

4.5
0.2

0.00
0.00

0.00
0.00
0.00
0.00
0.00

Excavation for foundation to a depth not exceeding 1.5 m in any material except rock
requrin blasting part return fill in and ram and surplus disposed within the site as directed
PER M3

L001
E001

B003

Unskilled labour
Hour
Basket
day
(Cost of tool include in Basket rate)
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

5.0
0.2

0.00
0.00

0.00
0.00
0.00
0.00
0.00

Excavation and levelling site in any material except rock requiring


blasting surplus disposed including transport upto 0.4Km depositing and
levelling
PER M3

L001
E001
E002

Unskilled labour
Basket
Tractor 75 Cubes

Hour
day
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

3.0
0.2
0.4

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

B-

EXCAVATOR

B004

Filling under floors with gravel or other approved quality of filling spread,
watered and well rammed in 75mm layers (material avialable at site)
PER M3

L001
E001

Unskilled labour
Basket

Hour
day

5.0
0.2

0.00
0.00

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

B005

0.00
0.00

Filling under floors with gravel or other approved quality filling spread
and well rammed in75mm layers with imported earth (1.6Km transport)
PER m3

L001 Unskilled labour


M001 Gravel
P001 Basket

Hour
Cu.m.
No.

5.6
1.1
0.1

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

B006

0.00
0.00
0.00
0.00
0.00
0.00

Filling under floors with gravel or other approved quality of filling spread
watered and rammed in 75mm layers(6Km transport).
PER M3

L001 Unskilled labour


M001 Gravel
P001 Basket

Hour
Cu.m.
No.

5.6
1.1
0.1

0.00
0.00
0.00

0.00
0.00
0.00

ALLOW FOR EXTRA TRANSPORT


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

C-

CONCRETOR

C001 1:3:6 (40mm) cement concrete for volumes exceedings 3 cu.m.

PER M3
L001
L002
M014
M007
M004
E0010

Unskilled labour
Skilled labour
Cement
Sand
Metal 40mm
Basket

Hour
Hour
50 Kg.
Cum
Cu.m.
day

22.60
2.80
4.70
0.23
1.00
0.30

0.00
0.00
0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

C002 1:3:6(40mm) cement concrete for volumes upto 3 cu.m.

PER M3
L001
L002
M014
M007
M004
E001

Unskilled labour
Skilled labour
Cement
Sand
Metal 40mm
Basket

Hour
Hour
50 Kg.
Cum
Cu.m.
day

28.50
3.50
4.70
0.23
1.00
0.30

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

C003 1:2 1/2:5 (25mm) cement concrete for volumes exceeding 3 cu.m.

PER M3
L001
L002
M014
M007
M005
E001

Unskilled labour
Skilled labour
Cement
Sand
Metal 25mm
Basket

Hour
Hour
50 Kg.
Cum
Cu.m.
day
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

22.60
2.80
5.50
0.23
1.00
0.30

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

C-

CONCRETOR

C004 1:2 1/2:5 (25mm) cement concrete for volumes upto 3 cu.m

PER M3
L001
L002
M014
M007
M005
E001

Unskilled labour
Skilled labour
Cement
Sand
Metal 25mm
Basket

Hour
Hour
50 Kg.
Cum
Cu.m.
day

28.25
3.50
5.50
0.23
1.00
0.30

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

C005 1:2:4 (20mm) cement concrete for volumes exceeding 3 cu.m.

PER M3
L001
L002
M014
M007
M006
E001

Unskilled labour
Skilled labour
Cement
Sand
Metal 20mm
Basket

Hour
Hour
50 Kg.
Cum
Cu.m.
day

22.60
2.80
7.00
0.23
1.00
0.30

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

C006 1:2:4 (20mm) cement concrete for volumes upto 3 cu.m.

PER M3
L001
L002
M014
M007
M006
E001

Unskilled labour
Skilled labour
Cement
Sand
Metal 20mm
Basket

Hour
Hour
50 Kg.
Cum
Cu.m.
day
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

28.25
3.50
7.00
0.23
1.00
0.30

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

C-

CONCRETOR

C007 Formation of 50mm semicircular channels in cement concrete floors

and 12mm thick 1:2 cement sand rendering (extra over concrete floors)
PER L.M
L001
L002

Unskilled labour
Skilled labour

Hour
Hour

0.3
0.7

0.00
0.00

0.00
0.00

ALLOW FOR CEMENT AND SAND


0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

C008 Formation of 100mm semicircular channels in cement concrete floors

and

12mm thick 1:2 cement sand rendering (extra over concrete floors)
PER L.M
L001
L002

Unskilled labour
Skilled labour

Hour
Hour

0.7
1.3

0.00
0.00

0.00
0.00

ALLOW FOR CEMENT AND SAND


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

C009 Corbel stone 150mmx225mmx375mm in cement concrete 1:2:4 (20mm)

reinforced with 4 nos. 10mm rods upto 0.3cu.m


PER No.
L001
L002
M014
M007
M006
M031

Unskilled labour
Skilled labour
Cement
Sand
Metal 20mm
Mild Steel
*

10 mm dia

Hour
Hour
50 Kg.
Cum
Cu.m.
Kg.

0.750
0.750
0.080
0.008
0.014
0.870

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

ALLOW FOR MOULDS AND CURING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

C-

CONCRETOR

C010 225mm high 75mm thick curb in cement concrete including and 15mm

thick 1:2 cement rendering Rate to include excavation.


PER L.M.
L001
L002
M014
M007
M006

Unskilled labour
Skilled labour
Cement
Sand
Metal 20mm

Hour
Hour
50 Kg.
Cum
Cu.m.

2.60
2.60
0.14
0.01
0.02

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

ALLOW FOR SHUTTERING EXCAVATION CURING ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

C011 Semicircular drains without ramps in cement concrete 1:3:6(25mm)

225mm wide and 225mm avarage depth, with 75mm thick sides and
base rate to include for excavation & return fill of earth.
PER L.M
L001
L002
M014
M007
M005

Unskilled labour
Skilled labour
Cement
Sand
Metal 25mm

Hour
Hour
50 Kg.
Cum
Cu.m.

4.00
2.60
0.50
0.06
0.07

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

ALLOW FOR SHUTTERING, BRACKETS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

C
C012

CONCRETOR
112mmx150mm size lintol of 1:2:4 (20mm) cement concrete including
form work.(reinforcement paid separately.)
PER L.m

L001
L002
M014
M007
M006
M048

Unskilled labour
Hour
Skilled labour
Hour
Cement
50 Kg.
Sand
Cum
Metal 20mm
Cu.m.
Timber plank 25mm Class iii
Sq.m.
ALLOW FOR TIMBER PROPS AND NAILS

2.00
1.30
0.10
0.01
0.02
0.10

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
C013 225mmx150mm size lintol of 1:2:4(20mm) cement concrete including

form work (reinforcement paid separately)


PER L.M.
L001
L002
M014
M007
M006
M048

Unskilled labour
Skilled labour
Cement
Sand
Metal 20mm
Timber plank 25mm class iii

Hour
Hour
50 Kg.
Cum
Cu.m.
Sq.m.

2.00
1.30
0.20
0.01
0.03
0.30

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

ALLOW FOR TIMBER PROPS AND NAILS


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

CONCRETOR

C014 225mmX225mm size lintol of 1:2:4(20mm) cement concrete

including shuttering (Reinforcement paid separately)


PER L.m.
L001
L002
M014
M007
M006
M048

Unskilled labour
Skilled labour
Cement
Sand
Metal 20mm
Timber plank 25mm Class iii

Hour
Hour
50 Kg.
Cum
Cu.m.
Sq.m.

2.40
1.50
0.30
0.02
0.05
0.45

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

ALLOW FOR NAILS AND PROPS


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

C015 300mm x 225mm size beam in 1:2:4 (20mm)cement concrete including

shuttering (reinforcement paid separately.)


PER L.M.
L001
L002
M014
M007
M006
M048

Unskilled labour
Skilled labour
Cement
Sand
Metal 20mm
Timber plank 25mm class iii

Hour
Hour
50 Kg.
Cum
Cu.m.
Sq.m.

2.60
1.70
0.40
0.03
0.07
0.60

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

ALLOW FOR NAILS AND PROPS


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

C-

CONCRETOR

C016 340mm x 150mm size beam in 1:2:4(20mm) cement concrete including

shuttering (reinforcement paid separately)


PER L.M.
L001
L002
M014
M007
M006
M048

Unskilled labour
Hour
Skilled labour
Hour
Cement
50 Kg.
Sand
Cum
Metal 20mm
Cu.m.
Timber plank 25mm Class iii
Sq.m.
ALLOW FOR PROPS AND NAILS
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

2.60
1.75
0.30
0.02
0.05
0.10

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

C017 340mm x 225mm size beam in 1:2:4(20mm) cement concrete including

shuttering (reinforcement paid for separately.)


PER L.M
L001
L002
L003
L004
L005
L006
L007

Unskilled labour
Skilled labour
Cement
Sand
Metal 20mm
Timber plank 25mm Class iii

Hour
Hour
50 Kg.
Cum
Cu.m.
Sq.m.

3.10
2.00
0.50
0.03
0.08
0.45

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

ALLOW FOR PROPS AND NAILS


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

CONCRETOR

C018 340mm x 300mm size beam in 1:2:4 (20mm) cement concrete including

shuttering (reinforcement paid for separately.)


PER L.m
L001
L002
M014
M007
M006
M048

Unskilled labour
Skilled labour
Cement
Sand
Metal 20mm
Timber plank 25mm class iii

Hour
Hour
50 Kg.
Cum
Cu.m.
Sq.m.

4.00
3.00
0.70
0.03
0.10
0.60

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

ALLOW FOR NAILS AND PROPS


0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

C019 450mm x 340mm x 150mm padstones in 1:2:4(20mm) cement concrete

precast or insitu
PER No.
L001
L002
M014
M007
M006
M048

Unskilled labour
Skilled labour
Cement
Sand
Metal 20mm
Timber plank 25mm class iii

Hour
Hour
50 Kg.
Cum
Cu.m.
Sq.m.

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.000
0.500
0.145
0.014
0.025
0.240

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

CONCRETOR

C020 100mm thick flat roof in 1:2:4 (20mm) cement concrete and reinforced

with expanded metal, 12mm thick 1:2 cement rendering with 5% pudllo
cement and lime puttying soffit complete (reinforced paid seperately)
PER M2
L001
L002
M014
M007
M006
M008
M012

Unskilled labour
Skilled labour
Cement
Sand
Metal 20mm
Boiled lime
Pudlo Cement

Hour
Hour
50 Kg.
Cum
Cum
Kg.
Kg.

8.75
3.50
0.70
0.08
0.10
0.65
0.40

0.00
0.00
0.00
0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

C021 75mm thick slabs over drains in 1:2:4(20mm) cement concrete reinforced

12mm 1:2 cement sand rendered (reinforcement paid seperately)

PER m2
L001
L002
L014
L007
L006
L048

Unskilled labour
Skilled labour
Cement
Sand
Metal 20mm
Timber plank 25mm class iii

Hour
Hour
50 Kg.
Cum
Cu.m.
Sq.m.

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

3.60
2.20
0.60
0.05
0.08
0.50

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

C-

CONCRETOR

C022 200mm x 200mm x 150mm spur stones in 1:2:4 (20mm) cement

concrete for verandah posts supplied and fixed.


PER No.
L001
L002
M014
M007
M006

Unskilled labour
Skilled labour
Cement
Sand
Metal 20mm

Hour
Hour
50 Kg.
Cum
Cu.m.

0.600
0.600
0.040
0.002
0.010

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

ALLOW FOR MOULDS


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

C-

CONCRETOR

C023 100mm x75mm x 50mm spur stones in 1:2:4 (20mm) cement concrete

for door posts supplied and fixed


PER No.
L001
L002
M014
M007
M006

Unskilled labour
Skilled labour
Cement
Sand
Metal 20mm

Hour
Hour
50 Kg.
Cum
Cu.m.

0.2000
0.2000
0.0024
0.0002
0.0004

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

ALLOW FOR MOULDS


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

C024 Squatting plates for latrines in 1:2:4(20mm) cement concrete with mild steel

reinforcements 225mm centres both ways.


PER No. say - 1.25 x 1.25 x 0.10 m
L001
L002
L003
M014
M007
M006
M031

Unskilled labour
Skilled labour
Black smith
Cement
Sand
Metal 20mm
Mild Steel *

10 mm dia

Hour
Hour
Hour
50 Kg.
Cum
Cu.m.
Kg.

4.000
2.000
0.500
0.104
0.004
0.005
9.065

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

ALLOW FOR BINDING AND MOULDS


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

CCONCRETOR
C025 1:2:4 (20mm) cement concrete using concrete mixer and vibrator

(shuttering, reinforcement finishes paid separately)


PER m3
L001
L002
M014
M007
M005
E001

Unskilled labour
Skilled labour
Cement
Sand
Metal 25mm
Basket

Hour
Hour
50 Kg.
Cum
Cu.m.
day

17.00
2.80
6.50
0.21
1.00
0.30

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

ALLOW FOR WATER AND CONCRETE MIXER VIBRATOR ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

C026 1:2:4(20mm)cement concrete in column shafts (reinforcements shuttering

and finishes paid for separately) in ground floor using mixer and vibrator
PER m3
L001
L002
M014
M007
M006
E001

Unskilled labour
Skilled labour
Cement
Sand
Metal 20mm
Basket

Hour
Hour
50 Kg.
Cum
Cu.m.
day

17.00
2.80
6.40
0.21
1.00
0.30

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

ALLOW FOR WATER & MIXER VIB. OPERATORS FUEL ECT.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

CONCRETOR

C027 1:2:4(20mm) cement concrete in column shafts in 1st floor (reinforcement,

shuttering and finishes paid for seperately)


PER m3
L001
L002
M014
M007
M006
E001

Unskilled labour
Hour
22.60
Skilled labour
Hour
2.80
Cement
50 Kg.
6.40
Sand
Cum
0.21
Metal 20mm
Cu.m.
1.00
Basket
day
0.30
ALLOW FOR WATER & MIXER VIB. OPERATORS FUEL ECT.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

CONCRETOR

C028 1:2:4(20mm) cement concrete in column shafts in 2nd floor (reinforcement,

L001
L002
M014
M007
M006
E001

shuttering and finishes paid for separately).


PER m3
Unskilled labour
Hour
31.10
Skilled labour
Hour
2.80
Cement
50 Kg.
6.40
Sand
Cum
0.21
Metal 20mm
Cum
1.00
Basket
day
0.30
ALLOW FOR WATER & MIXER VIB. OPERATORS FUEL ECT.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

C029 1:2:4(20mm) cement concrete in beams in ground floor (reinforcement,

shuttering and finishes paid for separately) using mixer and vibrator.
PER m3
L001
L002
M014
M007
M006
E001

Unskilled labour
Skilled labour
Cement
Sand
Metal 20mm
Basket

Hour
Hour
50 Kg.
Cum
Cu.m.
day

22.60
3.50
6.40
0.21
1.00
0.24

0.00
0.00
0.00
0.00
0.00
0.00

ALLOW FOR CURING, WATER, MIXER, VIBRATOR, FUEL,


OPERATORS
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

C030 1:2:4(20mm) cement concrete in beams in 1st floor (reinforcement,

shuttering and finishes paid for separately)


PER M3
L001
L002
M014
M007
M006
E001

Unskilled labour
Hour
28.20
Skilled labour
Hour
3.50
Cement
50 Kg.
6.40
Sand
Cum
0.21
Metal 20mm
Cu.m.
1.00
Basket
day
0.24
ALLOW FOR WATER & MIXER VIB. OPERATORS FUEL ECT.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

C-

CONCRETOR

C031 1:2:4 (20mm) cement concrete in beams in 2nd floor (reinforcement,

shuttering and finishes paid for separately.)


PER m3
L001
L002
M014
M007
M006
E001

Unskilled labour
Hour
36.70
skilled labour
Hour
3.50
Cement
50 Kg.
6.40
Sand
Cum
0.21
Metal 20mm
Cu.m.
1.00
Basket
day
0.24
ALLOW FOR WATER & MIXER VIB. OPERATORS FUEL ECT.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

C032 Shuttering for floor slab concrete including 100mm x 50mm class ii

joints and necessary props( rate to include for removal)


PER m2
L001
L002
M048
M041
M363
M037
M364

Unskilled labour
Skilled labour
Timber plank 25mm class iii
G.I. sheet 18 B.W.G.
Props (bamboo) 3 - 4 m
Wire nail S.W.G. 4 to 8
*
Mould oil

Hour
Hour
Sq.m.
Sq.m.
No.
Kg.
Lit.

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

2.600
0.900
0.110
0.002
7.500
0.200
1.200

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

CONCRETOR

C033 Shuttering for 225mm x 225mm column shafts including class ii timber

joists and necessary props. ( rate to include for removal).


PER m2
L001
L002
M048
M044
M065
M363

Unskilled labour
Skilled labour
Timber plank 25mm class iii
Timber beams Class ii
Bolt and nut iron 225 x 10mm
Props (bamboo) 3 - 4 m

Hour
Hour
Sq.m.
Cu.m.
No.
No.

2.700
2.700
0.350
0.003
0.600
1.700

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

ALLOW FOR SCREWS AND NAILS


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

C034 Shuttering for beams sides, soffit including class ii timber joists and

necessary props (rate include for removal)


PER m2
L001
L002
M048
M041
M363
M037
M364

Unskilled labour
Skilled labour
Timber plank 25mm class iii
G.I. Sheet 18 B.W.G.
Props (bamboo) 3 - 4 m
Wire nail S.W.G. 4 to 18 *
Mould oil

Hour
Hour
Sq.m.
Sq.m.
No.
Kg.
Lit.

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.100
1.100
1.100
0.005
0.500
0.400
0.300

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

CONCRETOR

C035 1:2:4 (20mm) cement concrete in lintol and beams in ground floor using

mixer and vibrator (reinforcement and shuttering paid for separately)


PER m3
L001
L002
M014
M007
E001
M006

Unskilled labour
Skilled labour
Cement
Sand
Basket
Metal 20mm

Hour
Hour
50 Kg.
Cum
day
Cu.m.

45.20
5.60
6.40
0.22
0.20
1.00

0.00
0.00
0.00
0.00
0.00
0.00

ALLOW FOR WATER, CURY, MIXER, VIBRATOR, FUEL,


OPERATORS
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

C036 1:2:4(20mm) cement concrete in lintol and beams as per item co35 in 1st floor

PER m3
L001
L002
M014
M007
M006
E001

Unskilled labour
Hour
50.80
Skilled labour
Hour
5.60
Cement
50 Kg.
6.40
Sand
Cum
0.22
Metal 20mm
Cu.m.
1.00
Basket
day
0.20
ALLOW FOR WATER, MIXER & VIBRATOR
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

C037 100mm thick 1:2:4(20mm) cement concrete in 1st floor slab using mixer

and vibrator (reinforcement and shuttering paid for separately)


PER m2
L001
L002
M014
M006
M007

Unskilled labour
Skilled labour
Cement
Metal 20mm
Sand

Hour
Hour
50 Kg.
Cu.m.
Cum

2.600
0.430
0.650
0.031
0.025

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

ALLOW FOR WATER ANY MIXER, OPERATOR FUEL ECT.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

C038 125mm thick 1:2:4(20mm) cement concrete in 1st floor slab

reinforcemnet and shuttering paid for separately) using mixer and vibrator.
PER m2
L001 Unskilled labour
Hour
2.70
0.00
L002 Skilled labour
Hour
0.43
0.00
M014 Cement
50 Kg.
0.80
0.00
M006 Metal 20mm
Cu.m.
0.04
0.00
M007 Sand
Cum
0.03
0.00
ALLOW FOR WATER, CURING, MIXER, VIBRATOR, FUEL,
OPERATOR ETC.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

D-

BRICKLAYER

D001 Segmental brick arch in 1:3 cement sand mortar including centering

PER m3
L001
L002
M010
M014
M007

Unskilled labour
Skilled labour
Brick
Cement
Sand

Hour
22.60
Hour
17.00
1000 Nos 0.51
50 Kg.
2.20
Cu.m.
0.15

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

ALLOW FOR WATER AND SCAFFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

D002 225mm Brick work in 1:5 cement sand mortar (above 3 cu.m) upto 1st floor level

PER m3
M010
M007
M014
L001
L002

Brick
Sand
Cement
Unskilled labour
Skilled labour

1000 Nos
Cum
50 kg.
Hour
Hour

0.512
0.100
1.300
14.100
8.500

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

ALLOW FOR WATER AND SCAFFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

D003 225mm brick work in 1:5 cement sand mortar upto 1st floor level (upto 3cu.m)

PER m3
L001
L002
M010
M007
M014

Unskilled labour
Skilled labour
Brick
Sand
Cement

Hour
Hour
1000 Nos
Cum
50 kg.

16.200
10.600
0.512
0.100
1.300

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

ALLOW FOR WATER AND SCAFFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

D-

BRICKLAYERS

D004 225 brick work in 1:5 cement sand mortar in piers upto 1st floor level

PER m3
L001
L002
M010
M007
M014

Unskilled labour
Skilled labour
Brick
Sand
Cement

Hour
Hour
1000 Nos
Cum
50 kg.

18.330
12.730
0.517
0.090
1.300

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

ALLOW FOR WATER AND SCAFFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

D005 225mm brick work in 1:5 cement sand mortar with bricks available at site

including sorting and clearing bricks


PER m3
L001
L002
M014
M007

Unskilled labour
Skilled labour
Cement
Sand

Hour
Hour
50Kg.
Cum

17.00
8.50
1.30
0.09

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

ALLOW FOR WATER AND SCAFFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

D006 112mm brick work in 1:5 cement sand mortar upto 1st floor level

above 10 s.q.m.)
PER m2
M010
M007
M014
L001
L002

Brick
Sand
Cement
Unskilled labour
Skilled labour

1000 Nos
Cum
50 Kg.
Hour
Hour

0.060
0.015
0.140
1.720
1.290

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

ALLOW FOR SCAFFOLDING AND WATER


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

D-

BRICKLAYER

D007 112mm brick work in 1:5 cement sand mortar upto 1st floor level(upto 10 sq.m.)

PER m2
M010
M007
M014
L001
L002

Brick
Sand
Cement
Unskilled labour
Skilled labour

1000 Nos
Cum
50Kg.
Hour
Hour

0.060
0.015
0.140
2.150
1.610

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

ALLOW FOR SCAFFOLDING AND WATER


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

D008 112mm brick work in 1:5 cement sand mortar using available bricks including

sorting and cleaning upto 1st floor level.


PER m2
M007
M014
L001
L002

Sand
Cement
Unskilled labour
Skilled labour

Cum
50 Kg.
Hour
Hour

0.015
0.140
2.250
1.610

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

ALLOW FOR WATER AND SCAFFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

D009 225mm brick work in 2.5 lime sand mortar upto first floor level (above 3cu.m)

PER m3
M010
M007
M009
L001
L002

Brick
Sand
Boiled lime
Unskilled labour
Skilled labour

1000 Nos
Cum
Kg.
Hour
Hour

0.512
0.100
66.250
14.100
8.500

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

ALLOW FOR WATER AND SCAFFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

D-

BRICKLAYER

D010 225mm brick work in 2:5 lime sand mortar upto 1st floor level (upto 3Cu.m.)

PER m3
M010
M007
M009
L001
L002

Brick
Sand
Boiled lime
Unskilled labour
Skilled labour

1000 Nos
Cum
Kg.
Hour
Hour

0.512
0.100
66.250
16.200
10.600

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

ALLOW FOR WATER AND SCAFFOLDING


0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

D011 225mm brick work in 2:5 lime sand mortar with bricks available at site,

including sorting out and cleaning bricks.


PER m3
M007
M009
L001
L002

Sand
Boiled lime
Unskilled labour
Skilled labour

Cum
Kg.
Hour
Hour

0.10
66.25
19.70
8.50

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

ALLOW FOR WATER AND SCAFFOLDING


0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
D012 Extra over item D002 to D005 and D009 to D011 for brick work from

first floor level to seconed floor level


PER m3
L001

Unskilled labour

Hour

4.2

0.00

0.00

ALLOW FOR SCAFFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

D-

BRICKLAYER

D013 Extra over item D002 to D005 and D009 to D011 for brick work above second

floor level
PER m3
L001

Unskilled labour

Hour

12.7

0.00

0.00

ALLOW FOR SCAFFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

D014 Extra over item D006 to D008 for brick work from first floor level to

seconed floor level


PER m2
L001

Unskilled labour

Hour

1.4

0.00

0.00

ALLOW FOR SCAFFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

D015 Extra over item D006 to D008 for brick work above 2nd floor level

PER m2
L001

Unskilled labour

Hour

4.2

0.00

0.00

ALLOW FOR SCAFFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

D-

BRICKLAYER

D019 Weathered and throated brick coping in 1:5 cement sand mortar on 112mm thick

walls complete with 12mm thick 1:3 sand cement rendering and cement floating
coat.
PER L.m.
M010
M007
M014
L001
L002

Brick
Sand
Cement
Unskilled labour
Skilled labour

1000 Nos
Cum
50 Kg.
Hour
Hour

0.013
0.020
0.330
1.600
1.600

0.00
0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

D020 Weathered and throated brick coping in 1:5 cement sand mortar on 340mm

thick walls complete with 12mm thick 1:3 cement sand rendering and cement
floating coat.
PER L.m
M010
M007
M014
L001
L002

Brick
Sand
Cement
Unskilled labour
Skilled labour

1000 Nos
Cum
50 Kg.
Hour
Hour

0.04
0.06
1.00
2.00
2.00

0.00
0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

D021 Wheathered and throated brick coping in 1:5 cement sand mortar on 225mm

thick walls complete with 12mm thick 1:3 cement sand rendering and cement
floating coat.
PER L.m
M010
M007
M014
L001
L002

Brick
Sand
Cement
Unskilled labour
Skilled labour

1000 Nos
Cum
50 Kg.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.03
0.04
0.70
2.60
2.60

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

BRICKLAYER

D022 Weathered and throated brick coping in 1:5 cement sand mortar on 225mm

thick walls using available bricks complete with 12mm thick 1:3 cement sand
rendering and cement floating coat.
PER L.m
M007
M014
L001
L002

Sand
Cement
Unskilled labour
Skilled labour

Cum
50 Kg.
Hour
Hour

0.04
0.70
2.60
2.60

0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00
0.00
0.00

D023 Brick cornices in 1:5 cement mortar complete with 12mm thick 1:3

cement rendering up to 225mm projection and 225mm depth


PER L.m
M010
M007
M014
L001
L002

Brick
Sand
Cement
Unskilled labour
Skilled labour

1000 Nos
Cum
50 Kg.
Hour
Hour

0.102
0.020
0.300
5.200
5.200

0.00
0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

D024 Inserting of door or window in existing walls including making opening

and making good to floor and wall (lintol,arch.door & window paid for
separately). up to 3m2
PER No.
L001
L002
M010
M007
M014
M009

Unskilled labour
Skilled labour
Brick
Sand
Cement
Boiled lime

Hour
16.00
Hour
12.00
1000 Nos 0.10
Cum
0.03
50 Kg.
0.52
Kg.
8.70
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

D-

BRICKLAYER

D025 300mm wide 225mm to 300mm deep, brick drains in with 112mm thick side walls

in 1:5 cement motar complete with 12mm thick 1:2 cement sand rendering with
smooth finish and necessary expansion joints(rate to included for excavation)
& backfilling.
PER L.m
L001
L002
M010
M014
M007

Unskilled labour
Skilled labour
Brick
Cement
Sand

Hour
Hour
1000 Nos
50 Kg.
Cum

4.000
3.280
0.065
0.160
0.020

0.00
0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

D026 225mm wide 150mm to 225mm deep brick drains in 1:5 cement sand mortar

complete with 12mm thick 1:2 cement sand rendering with smooth finish and
necessary expansion joints (rate to included for necessary excavation and
backfilling) side walls should be 112mm thick.
PER L.m
L001
L002
M010
M014
M007

Unskilled labour
Skilled labour
Brick
Cement
Sand

Hour
Hour
1000 Nos
50 Kg.
Cum

3.050
2.440
0.055
0.100
0.010

0.00
0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

D027 Scott's pattern drains including apron of overall width 750mm brick

masonary in 1:5 cement mortar and 12mm thick 1:2 cement sand rendering
and necessary expansion joints ( rate to include necessary excavation)
PER L.m
M010
M014
M007
L001
L002

Brick
Cement
Sand
Unskilled labour
Skilled labour

1000 Nos
50 Kg.
Cum
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.05
0.36
0.02
3.66
3.66

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

D-

BRICKLALYER

D028 300mm wide and 150mm to 225 high brick work in 1:5 cement sand motar

steps complete with 12mm thick 1:3 cement sand rendering with smooth
finish with 300mm deep foundation. Rate to include excavation.
PER L.m
M010
M014
M007
L001
L002

Brick
Cement
Sand
Unskilled labour
Skilled labour

1000 Nos
50 Kg.
Cum
Hour
Hour

0.060
0.250
0.010
1.220
1.220

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

D029 Formation of vent openings upto 300mm height and 150mm width on

existing walls and making good to walls. Rate to include painting to match
the existing colours.
PER No.
M009
M007
L001
L002

Boiled lime
Sand
Unskilled labour
Skilled labour
ALLOW FOR PAINTS ETC.

Kg.
Cum
Hour
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

3.140
0.005
1.000
1.000

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

E-

MASON

E001

Random rubble masonry in 1:5 cement sand mortar (above 3 cu.m.)


PER m3

M002
M007
M014
L001
L002

Rubble 150mm to 225mm


Sand
Cement
Unskilled labour
Skilled labour

Cu.m.
Cum
50 Kg.
Hour
Hour

1.00
0.16
2.56
16.94
8.46

0.00
0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

E002

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Random rubble masonry in 1:5 cement sand mortar (upto 3cu.m)


PER m3

M002
M007
M014
L001
L002

Rubble 150mm to 225mm


Sand
Cement
Unskilled labour
Skilled labour

Cu.m.
Cum
50 Kg.
Hour
Hour

1.00
0.16
2.56
16.63
9.31

0.00
0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

E003

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Random rubble masonary in 1:5 cement sand mortar using rubble available at
site including sorting out and cleaning rubble
PER m3

M007
M014
L001
L002

Sand
Cement
Unskilled labour
Skilled labour

Cum
50 Kg.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.16
2.56
22.60
8.50

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

FF001

PAVIOR
Expansion joints in brick floors filled with bitumen and sand
PER L.m

L001
L002

Unskilled labour
Skilled labour

Hour
Hour

0.08
0.08

0.00
0.00

0.00
0.00

ALLOW FOR SAND AND BITUMEN


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

F002

0.00
0.00
0.00

Expansion joints in concrete floors filled with bitumen and sand (to
full depth of concrete and rendering)
PER L.m

L001
L002
M007
M018

Unskilled labour
Skilled labour
Sand
Bitumen *

Hour
Hour
Cum
Kg.

0.170
0.170
0.001
0.125

0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

F003

0.00
0.00
0.00
0.00
0.00
0.00
0.00

75mm thick brick paved floor set in 1:5 cement sand mortar and including
12mm thick 1:3 cement rendering with smooth finish.
PER m2

M010
M007
M014
L001
L002

Brick
Sand
Cement
Unskilled labour
Skilled labour

1000 Nos
Cum
50 Kg.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.034
0.030
0.490
2.970
1.490

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

F-

PAVIOR

F004

75mm thick brick paved floors set in 1:5 cement motar and 12mm thick
1:3 cement rendering with smooth finish with available brick including sorting out
and cleaning bricks.
PER m2

M007
M014
L001
L002

Sand
Cement
Unskilled labour
Skilled labour

Cum
50 Kg.
Hour
Hour

0.03
0.49
2.97
1.49

0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00
0.00
0.00

F005

75mm thick 1:2 1/2:5 (25mm) cement concrete floors including 12mm
thick 1:2 cement rendered with smooth finish with expansion joints filled with cement
and sand
PER m2

M005
M007
M014
L001
L002

Metal 25mm
Sand
Cement
Unskilled labour
Skilled labour

Cu.m.
Cum
50 Kg.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.03
0.02
0.46
1.00
2.60

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

PAVIOR

F006

100mm thick, 1:2:4 (20mm) cement concrete in upper floors including form
work, with 12mm thick 1:3 cement sand rendering with smooth finish and lime
putty rendering to soffit and expansion joints filled with cement and sand
(reinforcement paid for separately).
PER m2

M007
M006
M014
M009
M048
M045
M363
M038
M364
L001

Sand
Metal 20mm
Cement
Boiled lime
Timber plank 25mm class iii
Timber beams Class ii
Props (bamboo) 3 - 4 m
Wire nail S.W.G. 12 to 14 *
Mould oil
Unskilled labour

L002

Skilled labour

Cum
Cu.m.
50 Kg.
Kg.
Sq.m.
Cu.m.
No.
Kg.
Lit.
Hour

0.030
0.033
0.650
1.750
0.110
0.013
1.000
0.910
0.330
7.430

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Hour

2.600

0.00

0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
F007

0.00
0.00
0.00

Spreading watering & ramming gravel in floors for 100mm thickness


PER m2

M001 Gravel
L001 Unskilled labour

Cu.m.
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.30
0.43

0.00
0.00

0.00
0.00
0.00
0.00
0.00

F008

Terrazzo tile flooring supplied and laid.rate to include for 12mm thick
1:3 cement motar levelling screed etc.
PER m2

M020
M014
M007
M001
M002
M004

Tile Terrazzo 300 x 300mm *


Cement
Sand
Unskilled labour
Skilled labour
Terrazzo Mason

No.
50 Kg.
Cum
Hour
Hour
Hour

12.00
0.13
0.01
2.25
1.50
0.75

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

ALLOW FOR STEEL PIN COLOURED CEMENT AND POLISHING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

F011

0.00
0.00
0.00

Supplying and fixing ceramic floor tiles to floors including 20mm


thick 1:3 cement sand bedding.
PER m2

M380
M014
M007
M010
L020

200mm x 200mm ceramic floor tile.


No.
25.00
Cement
50 Kg.
0.27
Sand
Cum
0.02
Unskilled labour
Hour
4.00
Skilled labour
Hour
5.60
ALLOW FOR WASTAGE
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00

Supplying and fixing of glazed tiles with all specials to walls including raking
plaster and bedding in 12mm thick 1:3 cement motar joints shall be filled with
tile grout.
PER m2
M021 Tile glazed 108 x 108mm *
No. 86.000
0.00
M014 Cement
50 Kg. 0.270
0.00
M007 Sand
Cum
0.021
0.00
L010 Unskilled labour
Hour
4.000
0.00
L020 Skilled labour
Hour
8.000
0.00
ADD 10% SPECIALS AND WASTAGES ETC.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

F012

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

PAVIOR

F013

Supplying and fixing of glazed tiles to walls including raking plaster


and bedding in 12mm thick 1:2 cement motar (Tiles supplied by the
client
PER m2

M014
M007
L010
L020

Cement
Sand
Unskilled labour
Skilled labour

50 Kg.
Cum
Hour
Hour

0.270
0.021
4.000
8.000

0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

F014

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Supplying and fixing of pressed cement tiles of approved pattern and


colour to floors including 20mm thick 1:3 cement sand bedding
PER m2

M022
M014
M007
L010
L020

Tile cement pressed 200 x 200mm *


No. 25.000
Cement
50 Kg. 0.270
Sand
Cum
0.021
Unskilled labour
Hour
4.000
Skilled labour
Hour
5.600
ALLOW FOR WASTAGE
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

G-

ROOFER

G001 Fixing of corrugated asbestos or GI (24 BWG) sheets with hooks

bolts and nuts to roofing or walling(sheets available at site)


PER m2
L001
L003
M367
M368

Unskilled labour
Black smith
G.I. Hook bolts 8mm x 115mm
Limpet washers

Hour
Hour
Nos.
Nos.

0.38
0.30
4.00
4.00

0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00
0.00
0.00

G002 Supplying and fixing of corrugated GI (24 BWG) sheets roofing on class I timber

purlins complete including treating timber with wood preservatives


ridging measured seperately)
PER m2
M040
M043
M369
L001
L002
M141

G.I. Sheet 24 B.W.G.


Timber beams Class I
Drive screws and washers
Unskilled labour
Skilled labour
Wood Preservative (Black/ Coloured) *

Sq.m.
Cu.m.
Nos.
Hour
Hour
Lit.

1.20
0.01
3.00
1.72
0.65
0.05

0.00
0.00
0.00
0.00
0.00
54.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

G003 Supplying and fixing of corrugated GI (24 BWG) sheet on 100mm x 50mm

class I timber frame work for cladding


PER m2
M043
M026
M369
L001
L002

Timber beams Class I


Corrugated G.I. Sheet 24 BWG *
Drive screws and washers
Unskilled labour
Skilled labour

Cu.m.
Sq.m.
Nos.
Hour
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.01
1.20
3.00
1.10
1.72

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

G-

ROOFER

G004 Supplying and fixing of corrugated GI (24 BWG) sheets on existing roof frame

or wall.
PER m2
M026
M369
L001
L002

Corrugated G.I. Sheet 24 BWG *


Drive screws and washers
Unskilled labour
Skilled labour

Sq.m.
Nos.
Hour
Hour

1.20
3.00
0.43
0.43

0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00
0.00
0.00

G005 Supplying and fixing of corrgated asbestos sheet roofing on class I timber

purlins complete including treating timber with wood preservative


PER m2
M023
M043
M369
L001
L002
M141

Corrugated asbestos sheet


Timber beams Class I
Drive Screws and washers
Unskilled labour
Skilled labour
Wood Preservative (Black / coloured) *

Sq.m.
Cu.m
Nos.
Hour
Hour
Lit.

1.167
0.010
3.000
1.140
1.720
0.050

0.00
0.00
0.00
0.00
0.00
54.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

G006 Supplying and fixing of corrugated asbestos sheet cladding on class I

timber frame work complete.


PER m2
M043
M023
M369
L001
L002

Timber beams Class I


Corrugated asbestos sheet
Drive Screws and washers
Unskilled labour
Skilled labour

Cu.m.
Sq.m.
Nos.
Hour
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.011
1.167
4.000
1.100
1.720

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

G-

ROOFER

G007 Supplying and fixing of corrugated asbestos sheets to roof or wall on

existing frame work with necessary coach screws and linpet washers or
hook bolts
PER m2
M023
M369
L001
L002

Corrugated asbestos sheet


Drive screws and washers
Unskilled labour
Skilled labour

Sq.m.
Nos.
Hour
Hour

1.2
2.0
0.7
0.5

0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00
0.00
0.00

G008 Supplying and fixing of 24 BWG corrugated GI roofing on class I timber

purlins complete with GI ridging washers hook bolts or clips including


treating timber with wood preservative.
PER m2
M369
M141
M043
M040
L001
L002

Drive screws and washers


Wood preservative (black / coloured)*
Timber beams Class I
G.I. Sheet 24 B.W.G.
Unskilled labour
Skilled labour

Nos.
Lit
Cu.m.
Sq.m.
Hour
Hour

3.000
0.050
0.019
1.200
1.110
1.000

0.00
0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

G009 supplying and fixing corrugated GI cladding on class I timber frame work

fixed complete.
PER m2
M043
M040
M370
L001
L002

Timber beams Class I


G.I. Sheet 24 B.W.G.
Drive screws and washers
Unskilled labour
Skilled labour

Cu.m.
Sq.m.
Nos.
Hour
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.01
1.20
3.00
1.10
1.72

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

G-

ROOFER

G010 24BWG Corrugated GI sheets fixid to roof wall or fence with necessary

cup washers hool bolts or screws (timber framing paid for seperately)
PER m2
M040
M369
L001
L002

G.I. Sheet 24 B.W.G.


Drive Screws and washers
Unskilled labour
Skilled labour

Sq.m.
Nos.
Hour
Hour

1.2
3.0
0.43
0.43

0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00
0.00
0.00

G011 Rectification of leaks (upto 5 in number) in roofs of single storeyed

building
PER No.
L001

Unskilled labour

Hour

1.3

0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00

G012 Rectification of leaks (above 5 in number) in roofs of single storeyed

building
PER No.
L001

Unskilled labour

Hour

0.5

0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00

G013 Rectification of leaks (upto 5 in number) of roof of buildings above one

storeyed building
PER No.
L001

Unskilled labour

Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.7

0.00

0.00
0.00
0.00
0.00

G-

ROOFER

G014 Rectification of leaks (above 5 in number) in roofs of building above one

storeyed
PER No.
L001

Unskilled labour

Hour

0.67

0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00

G015 Rectification of leaks in corrugated sheet roofs with bitumen washers

and G.I. Bolts and nuts.


PER No.
M371 Bitumen washers
M372 G.I. Bolts and nuts
L001 Unskilled labour

Nos.
Nos.
Hour

1.0
1.0
1.2

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00
0.00

G016 Rectification of leaks in corrugated sheet roof patched with jute hesseian

dipped in asphalt and laid over with a cement and sand layer.
PER No.
L001

Unskilled labour

Hour

1.2

0.00

0.00

ALLOW FOR JUTE HESSIAN, BITUMEN AND CEMENT


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

G-

ROOFER

G017 Fixing of asbestos cement, Aluminium alloy or G.I. Ridging available at

site with hook bolts or screws.


PER L.M.
M369 Drive Screws and washers
L001 Unskilled labour
L003 Black smith

Nos
Hour
Hour

7.0
0.5
0.5

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00
0.00

G018 Calicut pattern ridging bedded in cement sand and lime mortar 1:1:4 coloured

to match tiles
PER L.m.
M028 Ridge tile calicut pattern Gr. I
M007 Sand
M008 Slaked lime
M0143 Cement
L001 Unskilled labour
L002 Skilled labour

Nos.
Cum
Kg.
50 Kg.
Hour
Hour

3.000
0.010
2.280
0.050
0.550
0.550

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

ALLOW FOR COLOURING POWDER


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

G019 Calicut pattern ridging bedded in cement sand and lime mortar 1:1:4 coloured

to match tiles (Tiles available at site).


PER m
M007
M008
M014
L001
L002

Sand
Slaked lime
Cement
Unskilled labour
Skilled labour

Cum
Kg.
50 Kg.
Hour
Hour

0.01
2.28
0.05
0.55
0.55

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

ALLOW FOR COLOURING POWDER


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

G-

ROOFER

G020 24 BWG GI ridging 450mm wide overall fixed complete

PER L.M.
M373
M369
L001
L003

G.I. Ridging 2m x 1m - 24 B.W.G.


Drive Screws and washers
Unskilled labour
Black smith

Nos.
Nos.
Hour
Hour

0.6
7.0
0.6
0.6

0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00
0.00
0.00

G021 Asbestos ridging complete with roofing screws or hooks.

PER L.M
M025
M369
L001
L002

Close fitting asbestos ridging


Drive Screws and washers
Unskilled labour
Skilled labour

Pair
Nos.
Hour
Hour

1.0
4.0
0.5
0.5

0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00
0.00
0.00

G022 Half round tile ridging bedded in lime cement mortar 1:1:4 and coloured to

match tiles.
PER L.M
M029
M007
M008
L001
L002
M014

Tile half round Gr.I


Sand
Slaked lime
Unskilled labour
Skilled labour
Cement

Nos.
Cum
Kg.
Hour
Hour
50 Kg.

4.00
0.01
2.73
0.70
0.70
0.06

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

ALLOW FOR COLOURING POWDER


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

G-

ROOFER

G023 Ridging with half round bedded in lime cement mortar 1:1:4 coloured to

match tiles. Tiles available at site


PER L.M
M007
M008
L001
L002
M014

Sand
Slaked lime
Unskilled labour
skilled labour
Cement

Cum
Kg.
Hour
Hour
50 Kg.

0.01
2.73
0.70
0.70
0.06

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

ALLOW FOR COLOURING POWDER


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

G024 Ridging with half round or calicut pattern tiles removed and relaid in lime

mortar 1:1:4 and coloured to match the tile


PER L.M
M007
M008
M014
L001
L002

Sand
Slaked lime
Cement
Unskilled labour
Skilled labour

Cum
Kg.
50 Kg.
Hour
Hour

0.01
2.73
0.06
0.90
0.90

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

ALLOW FOR COLOURING POWDER


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

G025 0.6m X 0.6m x 5mm thick ribbed skylight glass supplied and fixed to

roof including necessary lime cement filleting


PER No.
M200 Glass pane figured 5mm
L001 Unskilled labour
L002 Skilled labour

Sq.m.
Hour
Hour

0.36
2.00
2.00

0.00
0.00
0.00

0.00
0.00
0.00

ALLOW FOR LIME SAND ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

G-

ROOFER

G026 Supplying and laying calicut pattern flat tiles (up to 5 tiles) in single

storeyed building on existing frame.


PER per tile
M375 Calicut pattern flat tiles
L001 Unskilled labour

No.
Hour

1.00
0.17

0.00
0.00

ALLOW FOR SCAFFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00

G027 Supplying and laying calicut pattern flat tiles(above 5 tiles) in single

storeyed building
PER Per tile
M375 Calicut pattern flat tiles
L001 Unskilled labour

No.
Hour

1.00
0.07

0.00
0.00

ALLOW FOR SCAFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00

G028 Supplying and laying calicut pattern flat tiles (upto 5 tiles) in buildings of

more than one storey


PER Per tile
M375 Calicut pattern flat tiles
L001 Unskilled labour

No.
Hour

ALOW FOR SCAFFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.00
0.33

0.00
0.00

0.00
0.00
0.00
0.00
0.00

G-

ROOFER

G029 Supplying and laying calicut pattern flat tiles (above 5 upto 25 tiles)

in building of more than one storey


PER per tile
M375 Calicut pattern flat tiles
L001 Unskilled labour

No.
Hour

1.00
0.13

0.00
0.00

ALLOW FOR SCAFFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00

G030 Supplying and laying of calicut pattern tiles in any buildings

PER m2
M027 Tile calicut pattern Gr. I
L001 Unskilled labour

No.
Hour

14.00
0.43

0.00
0.00

ALLOW FOR SCAFFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00

G031 Laying calicut pattern tiles in any building (Tiles available at site)

PER m2
L001

Unskilled labour

Hour

0.43

0.00

0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

G034 Glass tiles laid in small quantities including fixing with G.I. Wire where

necessary (tiles supplied by the client)


PER No.
L001

Unskilled labour

Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.5

0.00

0.00
0.00
0.00
0.00

G-

ROOFER

G036 Supplying and laying half round tiles upto 50 Nos. in single storeyed building

PER per tile


M029 Tile half round Gr.I
L001 Unskilled labour

No.
Hour

1.00
0.03

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00

G037 Supplying and laying half round tiles above 50 and upto 100 in single

storeyed buildings.
PER Per tile
M029 Tile half round Gr.I
L001 Unskilled labour

No.
Hour

1.00
0.02

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00

G038 Supplying and laying half round tiles upto 50 on buildings of more than

one storeyed
PER per tile
M029 Tile half round Gr.I
L001 Unskilled labour

No.
Hour

1.00
0.07

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00

G039 Supplying and laying half round tiles above 50 and upto 100 in number

on roof of buildings of more than one storeyed


PER per tile
M029 Tile half round Gr.I
L001 Unskilled labour

No.
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.00
0.05

0.00
0.00

0.00
0.00
0.00
0.00
0.00

G-

ROOFER

G040 Supplying and alying half round tiles in any building

PER m2
M029 Tile half round Gr.I
L001 Unskilled labour

No.
Hour

56.00
0.86

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00

G041 Half round tiles laid in any building (Tiles available at site)

PER m2
L001

Unskilled labour

Hour

0.86

0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00

G042 Shifting and relaying half round tiles

PER m2
L001

Unskilled labour

Hour

0.65

0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00

G043 Shifting and relaying calicut pattern tiles

PER m2
L001

Unskilled labour

Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.29

0.00

0.00
0.00
0.00
0.00

G-

ROOFER

G044 Supplying and laying one layer half round tiles over the existing asbestos roof

PER m2
M030 Tile half round (asbestos covering) Gr. I
L001 Unskilled labour

No.
Hour

38.00
0.08

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00

G045 Supply and fixing of calicut pattern tiled roof on class I sawn timber frame work

including ridges, hips etc.


PER M2
M043
M055
M029
M030
M037
M041
M076
M010
M084
M007
L002
L001

Timber beams class I


50mm x 25mm timber class I
Tile calicut pattern Gr. I
Ridge tile calicut pattern Gr. I
Binding wire *
Wire nail S.W.G. 12 to 14 *
Wood preservative (Black / coloured)*
Cement
Slaked Lime
Sand
Skilled labour
Unskilled Labour

Cum
m
No
No
Kg
Kg
Lit
Kg
Kg
Cum
Hour
Hour

0.02
3.61
13.00
1.33
0.07
0.07
0.18
0.03
0.03
0.00
2.96
1.86

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Allow for colouring powder


SUB TOTAL
OVER HEADS & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

CARPENTER & JOINER

I001

40mm to 50mm x 12mm plain chamfered class I timber beading fixed


complete with brass screw.
PER L.m.

M381
M382
L001
L002

40mm to 50mm x 12mm local class I timber m


Screws Brass 40mm x Gauge 8
Nos.
Unskilled labour
Hour
Skilled labour
Hour

1.05
1.57
0.13
0.13

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I002

0.00
0.00
0.00
0.00
0.00
0.00
0.00

25mm x20mm plain chamfered Imported timber beadings fixed complete


with brass screws
PER L.m

M383
M382
L001
L002

25mm x 20mm Imported timber fillets


Screws Brass 40mm x Gauge 8
Unskilled labour
Skilled labour

m
Nos.
Hour
Hour

1.05
1.57
0.13
0.13

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I003

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Beading or filleting in Class I timber for glass panes fixed complete


with brass springs of brass panel pins.
PER L.m

M384 12mm x 12mm local class I timber fillets


L002 Skilled labour

m
Hour

1.100
0.200

0.00
0.00

0.00
0.00

ALLOW FOR PANEL PIN AND PUTTY


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Beading or filleting on under side of ceiling removed and re fixed with


brass screws complete.
PER L.m
M382 Screws Brass 40mm x Gauge 8
Nos.
2.0
L001 Unskilled labour
Hour
0.2
0.00
L002 Skilled labour
Hour
0.2
0.00

0.00
0.00
0.00

I004

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS
TOTAL

0.00
0.00
0.00

I005

Beading filleting in class I local timber for glass panes fixed complete
with brass springs or brass panel pins
PER L.m

M386 12mm x12mm local class I timber fillets


L002 Skilled labour

Lm.
Hour

1.1
0.2

0.00

0.00
0.00

ALLOW FOR BRASS PANEL PINS AND PUTTY


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

I004

Beading or filleting on under side of ceiling removed and re fixed with


brass screws complete.
PER L.m

M382 Screws Brass 40mm x Gauge 8


L001 Unskilled labour
L002 Skilled labour

Nos.
Hour
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

2.0
0.2
0.2

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

CARPENTER & JOINER

I005

Barge valance facia boards 20mm thick in class I timber fixed complete
with necessary iron screws (above 0.03 m3)
PER m2

M046
M387
L001
L002

Timber plank 25mm class I


Sq.m.
50mm iron screws Gauge 10
Nos.
Unskilled labour
Hour
Skilled labour
Hour
ALLOW FOR MACHINE PLANING
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.97
8.21
0.69
2.74

0.00
0.00
0.00
0.00
0.00
0.00
0.00

I006

Barge valance facia boards 20mm thick in class I local timber fixed
complete with necessary iron screws (upto 0.03 m3)

M046
M387
L001
L002

Timber plank 25mm class I


Sq.m.
50mm iron screws Gauge 10
Nos.
Unskilled labour
Hour
Skilled labour
Hour
ALLOW FOR MACHINE PLANING
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I007

0.00
0.00
0.00
0.00

0.97
8.21
0.86
3.43

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Barge valance facia boards 20mm thick in class II timber fixed complete
with necessary iron screws (above 0.03 m3)
PER m2

M047
M387
L001
L002

Timber plank 25mm class II


Sq.m.
50mm iron screws Gauge 10
Nos.
Unskilled labour
Hour
Skilled labour
Hour
ALLOW FOR MACHINE PLANING
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.97
8.21
0.69
2.74

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

CARPENTER & JOINER

I008

Barge valance facia boards 20mm thick in class II local timber fixed
complete with necessary screws (upto 0.03 m3)
PER m2

M047
M387
L001
L002

I009

Timber plank 25mm class ii


Sq.m.
50mm iron screws Gauge 10
Nos.
Unskilled labour
Hour
Skilled labour
Hour
ALLOW FOR MACHINE PLANING
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.97
8.21
0.86
3.43

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Barge valance facia boards available fixed including cutting and minor
repairs
PER m2

L001 Unskilled labour


L002 Skilled labour
M387 50mm iron screws Gauge 10

Hour
Hour
Nos.

0.43
0.86
5.17

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I010

0.00
0.00
0.00
0.00
0.00
0.00

Flat asbestos ceiling fixed to 100mm x 50mm joists and 50x50mm bearers
of class I timber including 40mm x 12mm cover fillets and 40 x 40mm coves
of class I timber. 2coats of alkali resisting primer and 2 coats of emulision paint.
PER m2

L001
L002
L005
M043
M037
M141
M024
M391
M384
M382
M469
M084
M073

Unskilled labour
Hour
Skilled labour
Hour
Painter
Hour
Timber Beams Class I
Cu.m.
Wire nail S.W.G. 12 to 14 *
Hour
Wood preservative (black / coloured) *
Hour
Asbestos plain ceiling sheet 1220 x 1220mm No.
20mm G.I. Clout nails
Kg.
40mm to 50mm x 12mm local class I timber m
Screws Brass 40mm x Gauge 8
No.
Cove moulding(63mmx40mm)local class I
m
Alkali resisting primer *
Lit.
Emulsion *
Lit.

3.313
1.767
1.767
0.013
1.767
1.767
0.75
0.025
0.084
1.078
1.00
0.020
0.040

ALLOW FOR CEMENT SAND SCAFFOLDING AND BRUSHES


SUB TOTAL
OVER HEAD & PROFITS 22 %
TOTAL

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

CARPENTER & JOINER

I011

Asbestos, plywood, cainte or colotex ceiling supplied by client cut


and fixed on existing bearers rafter or frames (Beading or cover fillets
paid separately).
PER m2

M391 20mm G.I. Clout nails


L001 Unskilled labour
L002 Skilled labour

Kg.
Hour
Hour

0.006
0.650
0.430

0.00
0.00
0.00

0.00
0.00
0.00

ALLOW FOR SCAFFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I012

0.00
0.00
0.00

Asbestos ceiling or partition fixed with clout heading nails to existing


bearers or frames (beadings or cover fillets paid seperately)
PER m2

M024
L001
L002
M391

Asbestos plain ceiling sheet 1220 x 1220mm


Unskilled labour
Skilled labour
20mm G.I. clout nails
ALLOW FOR SCAFFOLDING

No.
Hour
Hour
Kg.

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.75
0.65
0.43
0.006

0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00

CARPERNTER & JOINER

I013

Canito treotex or colotex ceiling or partition fixed to exixting bearers,


rafters or frames (beadings or cover fillets paid for separately)
PER m2

M024
L001
L002
M391

Asbestos plain ceiling sheet 1220 x 1220mm


Unskilled labour
Skilled labour
20mm G.I. clout nails
ALLOW FOR SCAFFOLDING

No.
Hour
Hour
Kg.

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.75
0.650
0.430
0.006

0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00

CARPENTER & JOINER

I013

Lunumidella ceiling boards of 150mm x 20mm renewed in small


quantites.
PER L.m

M054 Lunumidella 150 x 20mm


L001 Unskilled labour
L002 Skilled labour

Sq.m.
Hour
Hour

0.18
0.22
0.22

0.00
0.00
0.00

0.00
0.00
0.00

ALLOW FOR NAILS


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I014

0.00
0.00
0.00

Lunumidella ceiling fixed with wire nails (boards available at site)


PER m2

M037 Wire nail S.W.G. 4 to 14


L001 Unskilled labour
L002 Skilled labour

Kg.
Hour
Hour

0.04
0.90
0.90

0.00
0.00
0.00

0.00
0.00
0.00

ALLOW FOR SCAFFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

CARPENTER & JOINER

I015

20mm Lunumidella ceiling or partition beaded and rebated nailed to


under side of existing joists rafters or frames above 10m2 (fillets or
beading paid for separately).
PER m2

M054
M037
L001
L002

Lunumidella 150 x 20mm


Wire nail S.W.G. 4 to 14 *
Unskilled labour
Skilled labour

Sq.m.
Kg.
Hour
Hour

1.100
0.040
1.000
1.000

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

ALLOW FOR SCAFFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I016

0.00
0.00
0.00

20mm Lunumidella ceiling or partition beaded and rebated nailed to


nder side of existing joists, rafters or frames upto 10m2 (fillets and
beading paid for separately.)
PER m2

M054
M037
L001
L002

Lunumidella 150 x 20mm


Wire nail S.W.G. 4 to 18 *
Unskilled labour
Skilled labour

Sq.m.
Kg.
Hour
Hour

1.100
0.040
1.100
1.100

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

ALLOW FOR SCAFFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I017

0.00
0.00
0.00

Ceiling openings 600mm x 450mm approx formed complete with


50mm x 50mm bearers (glass tiles or sheets paid for seperately)
PER No.

M053
M043
L001
L002

Lunumidella 150 x 12mm


Timber beams Class I
Unskilled labour
Skilled labour

Sq.m.
Kg.
Hour
Hour

0.330
0.003
4.000
4.000

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

ALLOW FOR NAILS


SUB TOTAL
OVER HEADS & PROFITS 22 %
TOTAL

0.00
0.00
0.00

I
I018

CARPENTER & JOINER


Cleaning of ceiling upper side and clearing away the debris
PER m2

L001

Unskilled labour

Hour

0.22

0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I019

0.00
0.00
0.00
0.00

Cove moulding with 63mm x 40mm imported class I timber fixed with
brass screws and plugs new or renewed
PER L.m

M392
M393
M389
L001
L002

Cove moulding(63mm x 40mm)imported cla m


Wood plugs.
m
Screws Brass 50mm x Gauge 8
No.
Unskilled labour
Hour
skilled labour
Hour

1.100
1.312
1.180
0.394
0.919

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

ALLOW FOR CEMENT AND SAND


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

CARPENTER & JOINER

I020

Supplying and fixing of Doors and Windows ledged, braced and battened with
grooved and tongued joints 100mm x 75mm frames and 20mm thick sashes in
class I local timber complete with brass furniture with local mortice lock for doors
heavy gauge stays fastners and barrel bolts for windows.
PER m2

M043
M046
M382
M389
M117
M127
L001
L002

Timber beams Class I


Timber plank 25mm class I
Brass screws (40mm) Guage 8
Screws brass 50mm x Gauge 8
Hinge Butt Brass 100mm x 63mm *
Lock mortice single local made
Unskilled labour
Skilled labour

Cu.m.
Sq.m.
Nos.
No.
No.
No.
Hour
Hour

0.03
1.30
40.00
4.00
1.00
0.70
6.60
16.00

0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

ALLOW FOR SPUR STONES ROWL PLUGS, DOWELS,


SAND PAPER ETC.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I021

M044
M047
M382
M389
M117
M127
L001
L002

Supplying and fixing of 20mm thick ledged, braced and battened sashes and
100mm x75mm frames in class II timber for doors and windows with local
mortice lock for doors or heavy gauge casement stays, fastners and barrael
bolts for windows.
PER m2
Timber beams Class ii
Cu.m.
0.03
0.00
Timber plank 25mm class II
Sq.m
1.30
0.00
Brass screws (40mm) Guage 8
Nos.
40.00
Screws Brass 50mm x Guage 10
Nos.
4.00
Hinge Butt Brass 100mm x 63mm *
Nos.
1.00
0.00
Lock mortice single local made
Nos.
0.70
0.00
Unskilled Labour
Hour
6.00
0.00
Skilled Labour
Hour
16.00
0.00
ALLOW FOR SPUR STONES RAWL, DOWELS SAND PAPER ETC.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

CARPENTER & JOINER

I022

Supplying and fixing of 20mm thick ledged, braced and battened sash
only for doors and windows in class I timber fixed with available furniture
PER m2

M046
M135
M133
L001
L002

Timber plank 25mm class I


Screws Brass 40mm x Gauge 8
Screws Brass 25mm x Gauge 7
Unskilled labour
Skilled labour

Sq.m
Doz.
Doz.
Hour
Hour

1.500
3.740
0.374
6.000
13.500

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

ALLOW FOR SAND PAPER ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I 023

0.00
0.00
0.00

Supplying and fixing of 20mm thick ledged, braced and battened sash
for door and windows in class II timber fixed with available furniture.
PER m2

M047
M382
M389
L001
L002

Timber plank 25mm class ii


Screws Brass 40mm x Gauge 8
Screws Brass 50mm x Gauge 10
Unskilled labour
Skilled labour

Sq.m.
Nos.
No.
Hour
Hour

1.5
45.0
5.0
6.0
13.5

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

ALLOW FOR SAND PAPER ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

CARPENTER & JOINER

I024

Supplying and fixing of 25mm thick framed and 15mm thick battened sashes
and 100mm x 75mm frame class I local timber complete with brass
furniture, for doors and windows (locks paid seperately)
PER m2

M043
M049
M425
M117
M135
M133
L001
L002

Timber beams Class I


Cu.m. 0.032
Timber plank 31mm class I
Sq.m.
0.500
25mm thick planks of class I local timber
m2
0.816
Hinge Butt Brass 100mm x 63mm *
No.
2.000
Screws Brass 40mm x Gauge 8
Doz.
1.330
Screws Brass 25mm x Gauge 7
Doz.
0.330
Unskilled labour
Hour 10.600
Skilled labour
Hour 22.500
ALLOW FOR BARREL BOLTS ETC.
ALLOW FOR SPUR STONES DOWELS,RAWL PLUGS AND
SCREWS SAND PAPER ETC.

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I025

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Supplying and fixing of 25mm thick framed and 15mm thick battened sashes
with 100mm x 75mm frames in class II local timber complete with brass
furniture for doors and windows (locks paid seperately)
PER m2

M044
M050
M426
M117
M135
M133
L001
L002

Timber beams Class ii


Cu.m. 0.032
Timber plank 31mm Class ii
Sq.m.
0.500
25mm thick planks of class II local timber
m2
0.816
Hinge Butt Brass 100mm x 63mm *
No.
2.000
Screws Brass 40mm x Gauge 8
Doz.
1.330
Screws Brass 25mm x Gauge 7
Doz.
0.330
Unskilled labour
Hour 10.600
Skilled labour
Hour 22.500
ALLOW FOR BARREL BOLTS ETC
ALLOW FOR SUPER STONES DOWLS, RAWLS PLUGS,
SCREWS AND SAND PAPER ETC.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

CARPENTER & JOINER

I026

Supplying and fixing of 32mm thick framed and 15mm thick battened sashes
with 100mm x 75mm frames in class I local timber complete with brass
furniture for doors and windows (locks paid seperately)
PER m2

M043
M051
M425
M117
M135
M133
L001
L002

Timber beams Class I


Cu.m. 0.032
Timber plank 38mm class I
Sq.m.
0.500
25mm thick planks of class I local timber
m2
0.816
Hinge Butt Brass 100mm x 63mm *
No.
2.000
Screws Brass 40mm x Gauge 8
Doz.
1.330
Screws Brass 25mm x Gauge 7
Doz.
0.330
Unskilled labour
Hour 10.600
Skilled labour
Hour 22.500
ALLOW FOR BARREL BOLTS, SKELTON BOLTS
ALLOW FOR SPURSTONES, DOWELS,RAWL PLUGS SAND
PAPER AND SCREWS ETC.

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I027

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Supplying and fixing of 32mm thick framed and 15mm thick battened sashes
with 100mm x 75mm frames in class II local timber complete with brass
furniture for doors and windows (locks opaid seperately)
PER m2

M044
M052
M426
M117
M135
M133
L001
L002

Timber beams Class II


Cu.m. 0.032
Timber plank 38mm class II
Sq.m.
0.500
25mm thick planks of class II local timber
m2
0.816
Hinge Butt Brass 100mm x 63mm *
No.
2.000
Screws Brass 40mm x Gauge 8
Doz.
1.330
Screws Brass 25mm x Gauge 7
Doz.
0.330
Unskilled labour
Hour 10.600
Skilled labour
Hour 22.500
ALLOW FOR BARREL BOLTS, SKELTON BOLTS
ALLOW FOR SPURSTONES, DOWELS, SANDPAPER RAWL
PLUGS AND SCREWS
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

CARPENTER & JOINER

I028

Supplying and fixing of 25mm thick, ledged, braced and battened sash in class I
timber for doors and windows (Barrel Bolts, Skeleton Bolts paid seperately)
PER m2

M049
M134
M133
L002
L001

Timber plank 31mm class I


Screws brass 30mm x Guage 8
Screws brass 25mm x Guage 7
Unskilled labour
Skilled labour

Sq.m.
Doz.
Doz.
Hour
Hour

1.500
3.740
0.374
6.000
14.000

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00

ALLOW FOR SAND PAPER ETC


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I029

0.00
0.00
0.00

Supplying and fixing of 25mm thick, ledged , braced and battened sash in class II
local timber for doors and windows( Barrel Bolts & Skeleton Bolts paid seperately)
PER m2

M050
M134
M133
L001
L002

Timber plank 31mm class II


Screws brass 30mm x Guage 8
Screws brass 25mm x Guage 7
Skilled labour
Unskilled labour

Sq.m.
Doz.
Doz.
Hour
Hour

1.500
3.740
0.374
14.000
6.000

0.00

0.00
0.00

ALLOW FOR SAND PAPER ETC


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I030

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

Supplying and fixing of 32mm thick, ledged, braced and battened sash in class I
timber for doors and windows. (Barrel Bolts & Skeleton Bolts paid seperately)
PER m2

M051
M134
M133
L002
L001

Timber plank 38mm class I


Screws brass 30mm x Guage 8
Screws brass 25mm x Guage 7
Skilled labour
Unskilled labour

Sq.m.
Doz.
Doz.
Hour
Hour

1.500
3.740
0.374
15.000
6.000

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00

ALLOW FOR SAND PAPER ETC


SUB TOTAL
OVER HEAD & PROFITS
TOTAL

0.00
0.00
0.00

I031

CARPENTER & JOINER

Supplying and fixing of 32 thick, ledged, braced and battened sash in class II local
timber for doors and windows (Barrel Bolts & Slkeleton Bolts paid seperately)
PER m2

M052
M134
M133
L002
L001

Timber plank 38mm class II


Screws brass 30mm x Guage 8
Screws brass 25mm x Guage 8
Skilled labour
Unskilled labour

sq.m
Doz
Doz
hour
hour

1.500
3.740
0.374
15.000
6.000

0.00

0.00
0.00

ALLOW FOR SCREWS AND SAND PAPER


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I032

Supplying and fixing of 25mm thick sash in imported timber for doors and
windows (Iron Mongery glazing paid seperately)
PER m2

M427 32mm thick imported timber planks


L002 Skilled labour
L001 Unskilled labour

m2
hour
hour

ALLOW FOR SCREWS AND SAND PAPER


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.400
15.000
6.000

0.00
0.00

I033

M381
M382
M043
M051
M425
M429
M430
M062
M068
L001
L002

Supplying and fixing of battened, door for gurge 32mm framed 15mm thick battened w
125mm x 100mm frames in class I timber with iron pintels and strap hinges Iron towe
for Hasp & Staple.
PER m2
Hasp and staple Iron 100mm *
No.
0.200
0.00
Screws Brass 40mm x Gauge 8
Nos.
3.400
0.00
Timber beams class I
Cu.m
0.02
0.00
Timber plank 38mm class I
sq.m
0.60
0.00
25mm thick planks of class I local timber
M2
0.64
0.00
Holdfasts - 250 x 25 x 6
Nos.
1.00
Pintels and stay hinges 50mm x 6mm x 1m
Nos.
1.00
0.00
Bolt & nut iron 45 x 6mm
Nos.
5.00
Bolt Tower iron 75mm *
Nos.
0.20
0.00
Unskilled labour
Hour
4.000
0.00
Skilled labour
Hour
6.000
0.00
ALLOW FOR SPUR STONES SAND PAPER DOWELS
ALLOW FOR MACHINE PLANING
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I034

Supplying and fixing of glazed and panelled, 32mm thick sash and with 100mm x 75m
in class I local timber for doors and windows including all Brass furniture. (Door lock
seperately)
PER m2

M043
M049
M425
M432
M386
M197
M122
M099
M096
M398
L001
L002

Timber beams class I


Timber plank 38mm class I
25mm thick planks of class I local timber
40mm x 40mm class I timber sash bars
12mm x 12mm local class I timber fillets
Glass Pane clear 3mm
Hinge butt brass 125mm x 100mm *
Bolt skeleton brass 300mm *
Bolt barrel brass 150mm *
25mm brass screws - 8
Unskilled labour
Skilled labour

Cu.m
sq.m
M2
L.m
L.m
sq.m
No.
No.
Nos.
Nos.
hour
hour

0.02
0.64
0.25
1.64
5.30
0.36
1.50
0.40
0.80
12.00
6.00
12.00

ALLOW FOR SPUR STONES, RAWL PLUGS, SCREWS, DOWELS,


SAND PAPER ETC.
ALLOW FOR MACHINE PLANING & JOINT
SUB TOTAL
OVER HEAD & PROFITS 22 %
TOTAL

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

I035

Supplying and fixing of glazed or pannelled 32mm thick sashes with


100mm x 75mm frames in class II local timber complete with brass
furniture for doors and windows. ( door lock paid seperately)
PER m2

M044
M050
M426
M433
M434
M197
M122
M099
M096
M398
L001
L002

Timber beams class II


Timber plank 38mm class II
25mm thick planks of class II local timber
40mm x 40mm Class II timber sash bars
12mm x 12mm local class II timber fillets.
Glass pane clear 3mm
Hinge Butt Brass 125mm x 100mm *
Bolt Skeleton Brass 300mm *
Bolt Barrel Brass 150mm *
Screws brass 25mm x Gauge 8
Unskilled labour
Skilled labour

Cum
m2
m2
L.m
L.m
sqm
No.
No.
No.
No.
hour
hour

0.02
0.64
0.25
1.64
5.30
0.36
2.00
0.40
0.33
9.00
6.00
12.00

ALLOW FOR MACHINE PLANING


ALLOW FOR SPUR STONES RAWL PLUGS, SCREWS, DOWELS,
SAND PAPER ETC.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

I
I036

CARPENTER & JOINER


Supplying and fixing of doors or windows glazed and or panelled sashes
32mm thick in class I timber with brass furniture.
PER m2

M049
M425
M432
M386
M197
M122
M099
M096
M398
L002
L001

Timber plank 31mm class I


25mm thick planks of class I local timber
40mm x 40mm class I timber sash bars
12mm x 12mm local class I timber fillets
Glass Pane clear 3mm
Hinge Parliamentary Brass 125mm
Bolt Skeleton Brass 300mm *
Bolt barrel Brass 150mm *
25mm brass screws - 8
Skilled labour
Unskilled labour

sq.m
m2
L.m
L.m
sq.m
No.
No.
No.
No.
hour
hour

0.72
0.28
1.86
6.00
0.41
1.00
0.50
0.90
10.00
12.00
6.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

ALLOW FOR SAND PAPER AND SCREWS


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I037

Supplying and fixing of glazed or panelled, 32mm thick sashes in class


II timber with brass furniture for doors and windows.
PER m2

M050
M426
M433
M434
M197
M122
M099
M096
M398
L001
L002

Timber plank 31mm class II


25mm thick planks of class II local timber
40mm x 40mm class II timber sash bars
12mm x 12mm local class II timber fillets.
Glass pane clear 3mm
Hinge parliamentary Brass 125mm
Bolt Barrel Brass 150mm *
Bolt Skeleton Brass 300mm *
25mm brass screws - 8
Unskilled labour
Skilled labour

sq.m
m2
L.m
L.m
sq.m
No.
No.
No.
No.
Hour
Hour

ALLOW FOR SAND PAPER AND SCREWS


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.73
0.28
1.86
6.00
0.40
1.00
0.50
0.90
10.00
6.00
12.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

I038

Supplying and fixingbof panelled 31mm thick sash and 100mm x 75mm
frames in class I timber and trelised with weld mesh no.32 and complete
with brass furniture
PER m2

M043
M049
M425
M035
M386
M117
M127
M382
M389
L001
L002

Timber beams class I


Timber plank 31mm class I
25mm thick planks of class I local timber
Weld mesh(galvanised) 50 x 50mm, Gauge 10
12mm x12mm local class I timber fillets
Hinge butt brass 100mm
Lock mortice single local made
Screws Brass 40mm x Gauge 8
Screws Brass 50mm x Gauge 8
Unskilled labour
Skilled labour

Cu.m
sq.m
m2
m2
Lm
No.
No.
No.
No.
hour
hour

0.03
0.52
0.29
0.36
1.87
1.00
0.70
16.00
4.00
10.60
22.50

0.00
0.00
0.00

0.00
0.00
0.00

ALLOW FOR SPUR STONE DOWELS, RAWL PLUGS AND SCREWS


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I039

Supplying and fixing of 31mm door sash panelled and terllis with Gal
weld mesh with 31 class I timber and available furniture.
PER m2

M049
M425
M035
M386
L002
L001
M384
M398

Timber plank 31mm class I


25mm thick planks of class I local timber
Weld mesh(galvanised) 50 x 50mm, Gauge 10
12mm x 12mm local class I timber fillets
Skilled labour
Unskilled labour
40mm to 50mm x 12mm local class I timber filet
25mm brass screws - 8

sq.m
m2
m2
Lm
hour
hour
m
Nos.

ALLOW FOR SAND PAPER ETC.


SUB TOTAL
OVER HEADS & PROFITS 22 %
TOTAL

0.62
0.34
0.42
2.22
17.00
6.06
15.00
4.00

0.00
0.00

0.00
0.00
0.00

I040

Supplying and fixing of 32mm panneled doors sash and with BRC No. 32
weld mesh in class I timber with available furniture.
PER m2

M435
M425
M035
M386
L002
L001
M384
M398

28mm thick class I timber planks.


25mm thick planks of class I local timber
Weld mesh (galvanised) 50x50mm, gauge 10
12mm x12mm local class I timber fillets
Skilled labour
Unskilled labour
40mm to 50mm x 12mm local class I timber fille
25mm brass screws - 8

m2
m2
m2
Lm
hour
hour
m
Nos.

0.62
0.34
0.42
2.22
17.00
6.06
15.00
4.00

0.00
0.00

0.00
0.00
0.00
0.00

ALLOW FOR SAND PAPER ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I041

Supplying and fixing of 32mm panelled door sashes and 100mm x 75mm
frames in class I timber fixed complete with brass furniture. (door lock paid seperately
PER m2

M043
M049
M425
L002
L001
M117
M382
M389

Timber beams class I


Timber plank 38mm class I
25mm thick planks of class I local timber
Skilled labour
Unskilled labour
Hinge Butt Brass 125mm x 100mm *
Screws Brass 40mm x Gauge 8
Screws Brass 50mm x Gauge 8

Cu.m
sq.m
m2
hour
hour
No.
No.
No.

ALLOW FOR MACHINE PLANING AND JOINTS


ALLOW FOR SPUR STONES RAWL PLUGS AND SCREWS
SUB TOTAL
OVER HEAD & PROFITS 22%
TOTAL

0.03
0.67
0.52
10.00
6.00
1.50
12.30
3.00

0.00
0.00
0.00
0.00
0.00
0.00

CARPENTER & JOINER

I042

Removing , easing and refixing of doors or windows.


PER No

L001 Unskilled labour


L002 Skilled labour

Hour
Hour

1.50
1.50

0.00
0.00

1.00

0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I043

Easing of doors and windows


PER No

L002 Skilled labour

Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I044

Renewing in short lenghs with Class I timber in Doors and Windows frames.
PER L.m.

M043 Timber beams class I


L002 Skilled labour

Cu.m.
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.013
4.400

0.00
0.00

I
I045

CARPENTER & JOINER


Altering door or window frame by filleting existing rebate using Class I
timber and rehanging screws and sashes on opposite side.
PER No.

M517
M134
M133
L002
L001

32mm x 12mm local class 1 timber fillets


Screws Brass 30mm x Gauge 8
Screws Brass 25mm x Gauge 8
Skilled labour
Unskilled labour

m2
Doz.
Doz.
Hour
Hour

6.41
1.50
1.00
12.00
4.00

0.00

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I046

Renewing of glazing bars in door or windows in Class I timber, (per 2.0m,


32mm x 32mm)

PER m
M432 40mm x 40mm class I timber sash bars
L002 Skilled labour
L001 Unskilled labour

L.m.
Hour
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.17
2.80
0.94

0.00
0.00
0.00

I047

Fixing of louvered Door or Window sash 25mm to 32mm in Imported Timber with
available furniture.
PER m2

M427 31mm to 38mm thick (Burma Teak) imported


Class Timber planks
M518 12mm thick class I timber planks
M133 Screws brass 25mm x Gauge 8
L002 Skilled labour
L001 Unskilled labour
ALLOW FOR SAND PAPER
SUB TOTAL
OVER HEAD & PROFITS 22%
TOTAL

Lm

0.720

m2
Doz.
Hour
Hour

1.330
3.074
33.000
9.000

0.00
0.00
0.00
0.00

CARPENTER & JOINER

I048

Supplying and fixing 38mm x 38mm x 125mm tapered doors tops in Class I
timber
PER Nos.

M520 50mm x 50mm thick class 1 timber


L002 Skilled labour
L001 Unskilled labour

Lm
Hour
Hour

0.150
1.000
0.500

0.00
0.00
0.00

ALLOW FOR CEMENT ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I049

Fixing of door or window sashes to position (sash and fittings supplied by client)

PER NO.
L002 Skilled labour
L001 Unskilled labour

Hour
Hour

ALLOW FOR TOOLS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

3.00
3.00

0.00
0.00

I
I050

CARPENTER & JOINER


Removing and refixing of door sashes in new position

PER NO.
L002 Skilled labour
L001 Unskilled labour

Hour
Hour

2.00
2.00

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I051

Supplying and fixing of 25mm thick swing doors (900mm x 450mm each) with
12mm panel or glazed and panelled in Class I timber including brass gravity hinges.

PER PAIR
M435
M518
M120
M135
L002
L001
M133

28mm thick Class I timber planks.


12mm thick class I timber planks
Hinge Gravity Brass
Screws Brass 40mm x Gauge 8
Skilled labour
Unskilled labour
Screws Brass 25mm x Gauge 8

m2
m2
No.
Doz.
Hour
Hour
Doz.

ALLOW FOR SAND PAPER

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.51
0.79
4.00
1.00
20.00
6.00
3.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

I
I052

CARPENTER & JOINER


Supplying and fixing 25mm thick swing doors (900mm x 450mm each) panels in
Class I timber complete with gravity hinges.
PER pair

M435
M120
M135
M061
L002
L001

28mm thick Class I timber planks.


Hinge Gravity Brass
Screws brass 40mm x Gauge 8
Plywood board, 12mm M.R.
Skilled labour
Unskilled labour

m2
No.
Doz.
Sq.m.
Hour
Hour

0.51
4.00
1.00
0.56
20.00
6.00

0.00
0.00
0.00
0.00
0.00
0.00

ALLOW FOR SAND PAPER ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I053

Supplying and fixing quadrant fillets 20mm x 20mm with spring or nails
in Class I timber.
PER m

M388 25mm x 25mm class I local timber fillets


L002 Skilled labour

Lm.
Hour

1.10
0.33

0.00
0.00

ALLOW FOR NAILS OR SPRINGS


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I054

Supplying and fixing quadrant fillets 25mm x 25mm with springs or nails in Class I
timber.
PER m

M524 32mm x 32mm Class I timber


L002 Skilled labour

Lm
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00 %
TOTAL

1.10
0.33

0.00
0.00

I
I055

CARPENTER & JOINER


Supplying and fixing of gate sash with available posts at site including fixing post
(Gate and posts supplied by Client)
PER sash

L001 Unskilled labour


L002 Skilled labour

Hour
Hour

8.00
2.00

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I056

Supplying and fixing of louver blades with 10mm minimum thickness in


Class I timber up to 100mm width.
PER m

M518 12mm thick class i timber planks


L002 Skilled labour

m2
Hour

0.120
1.312

0.00
0.00

ALLOW FOR NAILS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I057

Supplying and fixing of louvers blades with 10mm minimum thickness and
100mm to 150mm wide in class I timber.
PER m

M518 12mm thick class i timber planks


L002 Skilled labour

m2
Hour

ALLOW FOR NAILS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00 %
TOTAL

0.160
1.400

0.00
0.00

I
I058

CARPENTER & JOINER


Supplying and fixing of louver blades with a 10mm minimum thickness and
150mm to 225mm wide in Class I timber.
PER m

M518 12mm thick class i timber planks


L002 Skilled labour

m2
Hour

0.230
1.640

0.00
0.00

ALLOW FOR NAILS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I059

Fixing of available partitions including making good to walls and floors.


PER m2

L002 Skilled labour


L001 Unskilled labour

Hour
Hour

ALLOW FOR PLUGS, SCREWS, CEMENT & PAINT


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.92
2.46

0.00
0.00

I
I060

CARPENTER & JOINER


Fixing of full panelled or panelled and glazed 38mm thick partitions with
100mm x 50mm frames and 25mm x 25mm quadrant fillets, complete with
brass screws in Class I local timber.
PER m2

M041 Timber beams Class I


M046
M425
M524
M526
L002
L001
M197
M137
M038

Timber plank 25mm class I


32mm thick planks of Class I local timber
32mm x 32mm Class I timber
20mm x 20mm Class 1 timber battens
Skilled labour
Unskilled labour
Glass Pane clear 3mm
Screws Brass 50mm x Gauge 8
Wire nail S.W.G. 12 to 14 *

Cu.m
Sq.m.
m2
m
m
Hour
Hour
Sq.m.
Doz.
Kg.

0.02
0.36
0.36
7.52
3.38
26.73
9.83
0.43
0.93
0.04

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

ALLOW FOR SAND PAPER ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I061

Fixing of glazed and plywood panelled partitions in Class I timber with


100mm x 100mm x 300mm intermediate posts 100mm x 50mm x 2150mm and
40mm x 200mm capping complete.
PER m2

M043
M046
M061
M524
M526
L002
L001
M197
M137
M038

Timber beams Class I


Timber plank 25mm class I
Plywood board, 12mm M.R.
32mm x 32mm Class I timber
20mm x 20mm Class 1 timber battens
Skilled labour
Unskilled labour
Glass Pane clear 3mm
Screws Brass 50mm x Gauge 8
Wire nail S.W.G. 12 to 14 *
ALLOW FOR SAND PAPER ETC.
SUB TOTAL

Cu.m.
Sq.m.
Sq.m.
m
m
Hour
Hour
Sq.m.
Doz.
Kg.

0.003
0.360
0.360
7.520
3.380
26.730
9.830
0.430
0.930
0.040

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

OVER HEAD & PROFITS 22.00%


TOTAL

I
I062

CARPENTER & JOINER


Supplying and fixing 100mm long tapered 75mm x 50mm plugs in Class I
timber on walls with 1:3 cement mortar finish neately.
PER No.

M043 Timber beams Class I


L002 Skilled labour
L001 Unskilled labour

Cu.m.
Hour
Hour

0.001
0.400
0.200

0.00
0.00
0.00

ALLOW FOR CEMENT & PAINT


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I063

Supplying of 3 ply plywood panels 6mm thick and fixing to existing frames (beading p
separately).
PER m2

M059 Plywood board, ordinary M.R. 6mm


L002 Skilled labour

Sq.m.
Hour

1.005
1.802

0.00
0.00

ALLOW FOR NAILS SCREWS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I064

Fixing of 2135mm long, 125mm x 125mm verandah post tapering to 100mm x 100mm
on spur stone in Class I timber(Spur stone paid for separately).
PER No.

M043 Timber beams Class I


L002 Skilled labour
L001 Unskilled labour

Cu.m.
Hour
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00 %
TOTAL

0.037
5.000
1.000

0.00
0.00
0.00

I
I065

CARPENTER & JOINER


Fixing of 2135mm long, 150mm x 150mm verandah post tapering to 125mm x 125mm
on spur stone in Class I local timber(Spur stone paid for separately).
PER No.

M043 Timber beams Class I


L002 Skilled labour
L001 Unskilled labour

Cu.m.
Hour
Hour

0.053
6.000
1.000

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I066

Fixing of round jungle timber available wooden posts 150m to 200mm(posts


supplied by Client).
PER m

L001 Unskilled labour

Hour

1.300

0.00

1.100
0.153
0.077

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I067

Supplying and fixing of coconut rafters


PER m

M529 Coconut rafters


L002 Skilled labour
L001 Unskilled labour

m
Hour
Hour

ALLOW FOR NAILS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00 %
TOTAL

I
I068

CARPENTER & JOINER


Supplying and fixing of 50mm x 25mm reepers in Class I timber new or renewed with
nails up to 30m (Shifting of tiles paid for separately) Rate include applying wood prese
PER m

M530
L002
L001
M038

50mm x 25mm Class I timber


m
Skilled labour
Hour
Unskilled labour
Hour
Wire nail S.W.G. 12 to 14 *
Kg.
ALLOW FOR WOOD PRESERVATIVE
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.100
0.066
0.066
0.004

I069

Supplying and fixing of 50mm x 25mm reepers in Class I timber new or renewed with
nails over 30m (Shifting of tiles paid for separately) Rate include applying wood prese

0.00
0.00
0.00

PER m
M530
L002
L001
M038

50mm x 25mm Class I timber


m
Skilled labour
Hour
Unskilled labour
Hour
Wire nail S.W.G. 12 to 14 *
Kg.
ALLOW FOR WOOD PRESERVATIVE
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.100
0.044
0.044
0.004

I070

Supplying and fixing of 50mmx25mm reepers in ClassII local timber new or renewed
nails up to 30m (Shifting of tiles paid for separately) Rate include applying wood prese

0.00
0.00
0.00

PER m
M530
L002
L001
M038

50mm x 25mm Class II timber


m
Skilled labour
Hour
Unskilled labour
Hour
Wire nail S.W.G. 12 to 14 *
Kg.
ALLOW FOR WOOD PRESERVATIVE
SUB TOTAL
OVER HEAD & PROFITS 22%
TOTAL

1.100
0.066
0.066
0.004

0.00
0.00
0.00
0.00

I071

Supplying and fixing of 50mmx25mm reepers in ClassII local timber new or renewed
nails over 30m (Shifting of tiles paid for separately) Rate include for apply wood prese
PER m

M530
L002
L001
M038

50mm x 25mm Class II timber


m
Skilled labour
Hour
Unskilled labour
Hour
Wire nail S.W.G. 12 to 14 *
Kg.
ALLOW FOR WOOD PRESERVATIVE
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.100
0.044
0.044
0.004

0.00
0.00
0.00
0.00

I072

Supplying and fixing of 50mm x 12mm reepers in Class I local timber new or renewed
with Iron nails up to 30m.
PER m

M485 50mm x 12mm Class I timber


L002 Skilled labour
L001 Unskilled labour

m
Hour
Hour

ALLOW FOR NAILS WOOD PRESERVATIVE


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.100
0.066
0.066

0.00
0.00
0.00

I
I073

CARPENTER & JOINER


Supplying and fixing of 50mm x 12mm reepers in Class I local timber new or renewed
with Iron nails over 30m and apply wood preservative.
PER m

M485
L002
L001
M038

50mm x 12mm Class I timber


m
Skilled labour
Hour
Unskilled labour
Hour
Wire nail S.W.G. 12 to 14 *
Kg.
ALLOW FOR WOOD PRESERVATIVE
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.100
0.044
0.044
0.003

I074

Fixing of available reepers with wir nails and apply wood preservative.

0.00
0.00
0.00
0.00

PER m
L002 Skilled labour
Hour
L001 Unskilled labour
Hour
M038 Wire nail S.W.G. 12 to 14 *
Kg.
ALLOW FOR WOOD PRESERVATIVE
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.066
0.066
0.004

0.00
0.00
0.00

I075

Supplying and fixing calicut pattern tiles roof on Class I sawn timber frame work
including ridges, hips etc.
PER m2

M043
M530
M027
M028
M037
M038
M141
M014
M416
M007
L002
L001

Timber beams Class I


50mm x 25mm class I timber
Tile calicut pattern Gr. I
Ridge tile calicut pattern Gr. I
Wire nail S.W.G. 4 to 10 *
Wire nail S.W.G. 12 to 14 *
Wood Preservative (black / coloured) *
Cement
Slaked lime
Sand
Skilled labour
Unskilled labour

Cu.m.
m
No.
No.
Kg.
Kg.
Lit.
50 Kg.
25Kg.
Cum
Hour
Hour

0.018
3.609
12.550
0.810
0.065
0.016
0.204
0.027
0.675
0.004
1.650
1.650

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

ALLOW FOR COLOURING POWDER ETC.


SUB TOTAL
OVER HEAD & PROFITS
TOTAL

I076

Supplying and fixing calicut pattern tiled roof on Class II sawn timber frame work
including ridges, hips etc.
PER m2

M044
M484
M027
M028
M037
M038
M141
M416
M007
M014
L002
L001

Timber beams class II


50mm x 25mm Class II timber
Tile calicut pattern Gr. I
Ridge tile calicut pattern Gr. I
Wire nail S.W.G. 4 to 10 *
Wire nail S.W.G. 12 to 14 *
Wood Preservative (black / coloured) *
Slaked lime
Sand
Cement
Skilled labour
Unskilled labour
ALLOW FOR COLOURING POWDER ETC.
SUB TOTAL

Cu.m.
m
No.
No.
Kg.
Kg.
Lit.
25Kg.
Cum
50 Kg.
Hour
Hour

0.018
3.609
12.550
0.810
0.065
0.016
0.204
0.675
0.004
0.027
1.650
1.650

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

OVER HEAD & PROFITS 22.00%


TOTAL

I077

M043
M485
M028
M029
M037
M038
M141
M014
M416
M007
L002
L001

I078

M044
M485
M028
M029
M037
M038
M141
M014
M416
M007
L002
L001

Supplying material and fixing half round tiled roof on Class I sawn timber
frame work including fidges, hips etc.
PER m2
Timber beams class I
Cu.m.
0.017
50mm x 25mm Class I timber
m
7.218
Ridge tile calicut patten Gr. I
No.
0.810
Tile half round Gr.I
No.
61.340
Wire nail S.W.G. 4 to 10 *
Kg.
0.065
Wire nail S.W.G. 12 to 14 *
Kg.
0.016
Wood Preservative (black / coloured) *
Lit.
0.245
Cement
50 Kg.
0.027
Slaked lime
Bushels
0.027
Sand
Cum
0.004
Skilled labour
Hour
1.794
Unskilled labour
Hour
1.794
ALLOW FOR COLOURING POWDER ETC.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Supplying material and fixing half round tiles roof on Class II sawn timber
frame work including fidges, hips etc.
PER m2
Timber beams class II
Cu.m.
50mm x 25mm Class II timber
m
Ridge tile calicut pattern Gr. I
m
Tile half round Gr. I
No.
Wire nail S.W.G. 4 to 10 *
Kg.
Wire nail S.W.G. 12 to 14 *
Kg.
Wood Preservative (black / coloured) *
Lit.
Cement
50 Kg.
Slaked lime
Bushels
Sand
Cum
Skilled labour
Hour
Unskilled labour
Hour
ALLOW FOR COLOURING POWDER ETC.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.017
7.218
0.810
61.340
0.065
0.016
0.245
0.027
0.027
0.004
1.794
1.794

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

I079

Sorting out of available timber cut to required sizes and fixed in partitions and frames.
PER m3

L002 Skilled labour


L001 Unskilled labour

Hour
Hour

12.80
4.30

0.00
0.00

ALLOW FOR SCREWS , SAND PAPER ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I080

Sorting out of available timber cut to required sizes and fixed in roof and other
carpentry work.
PER m3

L002 Skilled labour


L001 Unskilled labour

Hour
Hour

ALLOW FOR NAILS, SPIKES ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

21.300
4.300

0.00
0.00

I081

Fixing or renewing partitions and frames with Class I timber (excluding Milla)
including panels and boards.
PER m3

M043 Timber beams class I


L002 Skilled labour
L001 Unskilled labour

Cu.m.
Hour
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.00
25.60
12.80

0.00
0.00
0.00

I082

Fixing or renewing partitions and frames with Class II timber


including panels and boards
PER M3

M044 Timber beams class II


L002 Skilled labour
L001 Unskilled labour
ALLOW FOR TOOLS ETC.

Cu.m.
Hour
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.00
256.00
128.00

0.00
0.00
0.00

I083

Fixing or renewing Class I timber in roof and other carpentry work.


PER m3

M043 Timber beams class I


L002 Skilled labour
L001 Unskilled labour
ALLOW FOR TOOLS ETC.

Cu.m.
Hour
Hour

1.00
256.00
128.00

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I084

Fixing or renewing Class II timber in roof and other carpentry work.


PER m3

M044 Timber beams class II


L002 Skilled labour
L001 Unskilled labour
ALLOW FOR TOOLS ETC.

Cu.m.
Hour
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.00
256.00
128.00

0.00
0.00
0.00

I085

Renewing of trellis laths 16mm x 16mm in Class I local timber in quantities over 30m.
PERm

M511 16mm x 16mm Class 1 timber


M038 Wire nail S.W.G. 12 to 14 *
L002 Skilled labour

m
Kg.
Hour

1.100
0.004
0.140

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I086

Renewing of trellis laths 16mm x 16mm in Class I local timber in quantities


up to 30m.
PERm

M511 16mm x 16mm Class 1 timber


M038 Wire nail S.W.G. 12 to 14 *
L002 Skilled labour

m
Kg.
Hour

1.100
0.004
0.175

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I087

Renewing of trellis laths 25mm x 12mm in Class I local timber in quantities over 30m.
PERm

M527 28mm x 15mm Class I timber


L002 Skilled labour
M038 Wire nail S.W.G. 12 to 14 *

m
Hour
Kg.

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.100
0.170
0.004

0.00
0.00
0.00

I088

Renewing of trellis laths 25mm x 12mm in Class I local timber in small


quantities upto 30m.
PER m

M527 28mm x 15mm Class I timber


L002 Skilled labour
M038 Wire nail S.W.G. 12 to 14 *

m
Hour
Kg.

1.100
0.220
0.004

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00 %
TOTAL

I089

Supplying and fixing of trellis laths 25mm x 25mm in Class I local timber.
PER m

M483 28mm x 28mm Class I timber


L002 Skilled labour
M038 Wire nail S.W.G. 12 to 14 *

m
Hour
Kg.

1.100
0.170
0.008

0.00
0.00
0.00

1.100
0.170
0.008

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I090

Renewing of trellis laths 50mm x 12mm in Class I timber.


PER m

M486 50mm x 15mm Class I timber


L002 Skilled labour
M038 Wire nail S.W.G. 12 to 14 *

m
Hour
Kg.

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I091

Supplying and fixing in position 100mm x 75mm door frame in Class I


timber
PER m2

M043
L002
L001
M533
M488

Timber beams class I


Skilled labour
Unskilled labour
Spur stones
Holdfasts - 400 x 25 x 6

Cu.m.
Hour
Hour
No.
No.

0.020
5.960
5.960
1.325
2.650

0.00
0.00
0.00
0.00
0.00

ALLOW FOR CEMENT, SAND, DOVEL PINS ETC.


SUB TOTAL
OVER HEAD & PROFITS
TOTAL

I092

Supplying and fixing in position of 100mm x 50mm Class I timber door frames.
PER m2

M043
L002
L001
M512
M429

Timber beams class I


Skilled labour
Unskilled labour
Spur Stones
Holdfasts - 400 x 25 x 6

Cu.m.
Hour
Hour
No.
Nos.

ALLOW FOR CEMENT , SAND & DOUBLE PINS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.014
5.960
5.960
1.325
2.650

0.00
0.00
0.00
0.00
0.00

I093

Supplying and fixing of 32mm thick ordinary sash single (ordinary finish)
plywood door hung on 100mm x 75mm frame in Class I timber complete
with brass furniture(lock paid for separately).
PER m2

M043
M512
M429
L002
L001
M056
M117
M099
M096
M135
M133
M132

Timber beams class I


Spur Stones
Holdfasts - 400 x 25 x 6
Skilled labour
Unskilled labour
Plywood door ordinary M.R. 838 x 2060 x 32mm
Hinge Butt Brass 100mm x 63mm *
Bolt Skeleton Brass 300mm *
Bolt Barrel Brass 150mm *
Screws brass 40mm x Gauge 8
Screws brass 25mm x Gauge 8
Screws brass 20mm x Gauge 8
ALLOW FOR MACHINE PLANING
ALLOW FOR DOWELS, CEMENT ETC.

Cu.m.
No.
Nos.
Hour
Hour
No.
No.
No.
No.
Doz.
Doz.
Doz.

0.022
0.950
2.830
4.000
2.000
0.472
1.416
0.472
0.472
0.480
0.943
0.480

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00 %
TOTAL

I094

Supplying and fixing of 32mm thick ordinary sash single (ordinary finish)
plywood door hung on 100mm x 50mm frame in Class I timber complete
with brass furniture(lock paid for separately).

M043
M512
M429
L002
L001
M056
M117
M099
M096
M135
M133
M132

Timber beams class I


Spur Stones
Holdfasts - 250 x 25 x 6
Skilled labour
Unskilled labour
Plywood door ordinary M.R. 838 x 2060 x 32mm
Hinge Butt Brass 100mm x 63mm *
Bolt Skeleton Brass 300mm *
Bolt Barrel Brass 150mm *
Screws brass 40mm x Gauge 8
Screws brass 25mm x Gauge 8
Screws brass 20mm x Gauge 8
ALLOW FOR MACHINE PLANING
ALLOW FOR DOWELS, CEMENT ETC.
SUB TOTAL

Cu.m.
No.
Nos.
Hour
Hour
No.
No.
No.
No.
Doz.
Doz.
Doz.

0.014
0.943
2.830
4.000
2.000
0.472
1.416
0.472
0.472
0.480
0.943
0.480

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

OVER HEAD & PROFITS 22.00%


TOTAL

I095

Supplying and fixing of 32mm thick ordinary sash single (ordinary finish)
plywood door on existing frame(lock paid for separately).
PER m2

L002
L001
M056
M117
M099
M096
M135
M133

Skilled labour
Unskilled labour
Plywood door ordinary M.R. 838 x 2060 x 32mm
Hinge Butt Brass 100mm x 63mm *
Bolt Skeleton Brass 300mm *
Bolt Barrel Brass 150mm *
Screws brass 20mm x Gauge 8
Screws brass 25mm x Gauge 8

Hour
Hour
No.
No.
No.
No.
Doz.
Doz.

2.320
2.320
0.472
1.416
0.472
0.472
0.480
0.943

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I096

Supplying and fixing of 32mm thick marine type plywood door (ordinary water
proof) on existing frame.(lock paid for separately).
PER m2

M056
L002
L001
M096
M135
M125
M133
M117

Plywood door ordinary M.R. 636x2060x32mm


No.
Skilled labour
Hour
Unskilled labour
Hour
Bolt Barrel Brass 150mm *
No.
Screws brass 20mm x Gauge 8
Doz.
Ring Brass 45mm to 38mm
No.
Screws brass 25mm x Gauge 8
No.
Hinge butt brass 100mm x 63mm *
No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.710
2.837
2.837
1.420
0.710
0.710
0.750
1.416

0.00
0.00
0.00
0.00
0.00
0.00
0.00

I097

Supplying & fixing 2100 to 3000mm high, 4mm thick glazed partition with
12mm thick chipboard panels on 100 x 75 and 100 x 100mm uprights
at 900mm intervals & 100 x 50mm as horizontal members in CI I timber
with 50 x 12mm timber beadings around glasspane.
PER m2

M514
M043
M198
M384
L002
L001
M038
M133

12mm chip board (8'x4') *


Timber beams class I
Glass pane Clear 4mm
40mm to 50mm x 12mm local class I timber fille
ets.
Skilled labour
Unskilled labour
Wire nail S.W.G. 12 to 14 *
Screws brass 25mm x Gauge 8

No.
Cu.m.
Sq.m.
m

0.400
0.017
0.544
2.220

0.00
0.00
0.00
0.00

Hour
Hour
Kg.
Doz.

8.833
1.890
0.144
0.473

0.00
0.00
0.00
0.00

ALLOW FOR CEMENT, SAND ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00 %
TOTAL

I098

M515
M043
M198
M384
M038
M133
L002
L001

Supplying & fixing 2100 to 3000mm high, 4mm thick glazed partition with
10mm thick chipboad panels on 100 x 75mm & 100x100mm uprights at 900mm interv
& horizontal members in Cl I timber and 50 x 12mm timber beading around glass pane
PER m2
10mm chip board (8'x4') *
No.
0.400
0.00
Timber beams class I
Cu.m.
0.017
0.00
Glass pane Clear 4mm
Sq.m.
0.544
0.00
40mm to 50mm x 12mm local class I timber fille
m
2.220
0.00
Wire nail S.W.G. 12 to 14
*
Kg.
0.144
0.00
Screws Brass 25mm x Gauge 8
Doz
0.473
0.00
Skilled labour
Hour
8.833
0.00
Unskilled labour
Hour
1.890
0.00
ALLOW FOR CEMENT, SANS ETC.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I099

Supplying & fixing 2100 to 3000mm high panelled partition with 12mm thick
chipboard on both sides with 100 x 50mm & 100 x 100mm upright fixed at
900mm intervals & 100 x 50mm as horizontal members in Cl I timber.
PER m2

M043
M514
M516
M038
L002
L001

Timber beams class I


12mm chip board (8'x4')
50mm x 25mm Class I local timber fillets
Wire nail S.W.G. 12 to 14 *
Skilled labour
Unskilled labour

Cu.m.
m2
m2
Kg.
Hour
Hour

0.016
2.200
2.885
0.215
6.310
6.940

0.00
0.00
0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I100

Supplying & fixing 2100 to 3000mm high panelled partition with 10mm thick
chipboard on both sides with 100 x 50mm & 100 x 100mm upright fixed at
900mm intervals & 100 x 50mm as horizontal members in Class I timber.
PER m2

M515
M043
L002
L001
M038
M516

10mm chip board (8'x4')


Timber beams class I
Skilled labour
Unskilled labour
Wire nail S.W.G. 12 to 14 *
50mm x 25mm Class I local timber fillets

m2
Cu.m.
Hour
Hour
Kg.
m2

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

2.200
0.016
6.310
6.940
0.215
2.885

0.00
0.00
0.00
0.00
0.00
0.00

I101

Supplying & fixing 12mm thick lunumidella planks inceiling to frame work
consisting of 100 x 50mm joists and 50 x50mm bearers in Class I timber.
Rate to include for 2 coats of tarnap to joists and bearers.
PER m2

M043
M038
L002
L001
M141
M053

Timber beams class I


Wire nail S.W.G. 12 to 14 *
Skilled labour
Unskilled labour
Wood Preservative (black / coloured) *
Lunumidella 150 x 12mm

Cu.m.
Kg.
Hour
Hour
Lit.
Sq.m.

0.012
0.074
1.830
2.260
0.163
1.300

0.00
0.00
0.00
0.00
0.00

ALLOW FOR CEMENT AND SAND


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

I102

Supplying & fixing 20mm thick lunumidella planks in ceiling to frame work
consisting of 100 x 50mm joists and 50 x50mm bearers in Class I timber.
Rate to include for 2 coats of tarnap to joists and bearers.
PER m2

M043
M038
L002
L001
M141
M053

Timber beams class I


Wire nail S.W.G. 12 to 14 *
Skilled labour
Unskilled labour
Wood Preservative (black / coloured) *
Lunumidella 150 x 20mm

Cu.m.
Kg.
Hour
Hour
Lit.
Sq.m.

ALLOW FOR CEMENT AND SAND


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.012
0.074
1.830
2.260
0.163
1.300

0.00
0.00
0.00
0.00
0.00

J
J001

IRON MONGER
Supplying and fixing of 45mm x 6mm bolts and nuts with washers.
PER No.

M062 Bolt and nut iron 45 x 6mm *


L002 Skilled labour

No.
Hour

1.000
0.500

0.00
0.00

ALLOW FOR WASHERS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

J002

Supplying and fixing of 65mm x 10mm bolts and nuts with washers.
PER No.

M063 Bolt and nut iron 63 x 10mm *


L002 Skilled labour

No.
Hour

1.000
0.500

0.00
0.00

ALLOW FOR WASHERS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

J003

Supplying and fixing of 125mm x 10mm bolts and nuts with washers.
PER No.

M064 Bolt and nut iron 125 x 10mm


L002 Skilled labour

No.
Hour

ALLOW FOR WASHERS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.000
0.500

0.00
0.00

J
J004

IRON MONGER
Supplying and fixing of 225mm x 10mm iron bolts and nuts washers.
PER No.

M065 Bolt and nut iron 225 x 10mm


L002 Skilled labour

No.
Hour

1.000
0.500

0.00

ALLOW FOR WASHERS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

J005

Supplying and fixing 125mm x 12mm iron bolts and nuts with washers.
PER No.

M066 Bolt and nut iron 125 x 12mm


L002 Skilled labour

No.
Hour

1.000
0.500

0.00
0.00

ALLOW FOR WASHERS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

J006

Suupplying and fixing of 150mm x 12mm iron bolts and nuts with washers.
PER No.

M067 Bolt and nut iron 150 x 12mm *


L002 Skilled labour

No.
Hour

ALLOW FOR WASHERS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.000
0.500

0.00
0.00

J
J007

IRON MONGER
Supplying of 75mm iron heavy quality tower bolts and fixing with iron screws.
PER No.

M068 Bolt Tower iron 75mm *


M085 Screws Iron 16mm x Gauge 8 *
L002 Skilled labour

No.
Doz.
Hour

1.000
0.500
0.500

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

J008

Supplying of 100mm iron heavy quality tower bolts and fixing iron screws.
PER No.

M069 Bolt Tower iron 100mm *


M085 Screws Iron 16mm x Gauge 8 *
L002 Skilled labour

No.
Doz.
Hour

1.000
0.500
0.500

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

J009

Supplying of 125mm iron heavy quality tower bolts and fixing iron screws.
PER No.

M070 Bolt Tower iron 125mm *


M085 Screws Iron 16mm x Gauge 8 *
L002 Skilled labour

No.
Doz.
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.000
0.750
0.500

0.00
0.00
0.00

J
J010

IRON MONGER
Supplying of 150mm iron heavy quality tower bolts and fixing them with
iron screws.
PER No.

M071 Bolt Tower iron 150mm *


M085 Screws Iron 16mm x Gauge 8 *
L002 Skilled labour

No.
Doz.
Hour

1.000
0.750
0.500

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

J011

Making 1000mm (approx) iron brackets out of 40mm x 6mm flat iron with fish
tail at end and fixing to walls and making good to walls.
PER No.

M033 Mild steel flat *


L020 Skilled labour (Carpenter & Mason)

Kg.
day

2.000
0.400

0.00

ALLOW FOR CEMENT SAND ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

J012

Supplying 50mm x 50mm G.I. Weldmesh (gauge 10) and fixing to existing frame
with staples (Fillets and beading paid separately).
PER m2

M035 Weld mesh(galvanised) 50 x 50mm, Gauge 10 *


L002 Skilled labour
L001 Unskilled labour
ALLOW FOR STAPLES ETC.

m2
Hour
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.170
2.500
2.000

0.00
0.00
0.00

J
J013

IRON MONGER
Supplying 50mm x 50mm G.I. Weldmesh (gauge 10) and fixing to window frame
with 50 x 12mm Class II timber beading including painting mesh with red lead and
2 coats of enamel paint, beading with primer and 2 coats of enamel.
PER m2

M035
M484
L002
L001
M048
L005

Weld mesh(galvanised) 50 x 50mm, Gauge 10 *


50mm x 12mm Class II local timber.
Skilled labour
Unskilled labour
Timber plank 25mm Class III
Painter

m2
m
Hour
Hour
Sq.m.
Hour

1.150
4.100
2.000
2.000
1.500
3.000

0.00
0.00
0.00
0.00
0.00
0.00

1.000
0.330

0.00
0.00

1.100
0.330

0.00
0.00

ALLOW FOR PAINT ETC. & SCREWS


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

J014

Supplying and fixing of 50mm iron cabin hooks and eyes.


PER No.

M072 Cabin Hook & Eye Iron 50mm *


L002 Skilled labour

No.
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

J015

Supplying and fixing of 75mm iron cabin hooks and eyes.


PER No.

M072 Cabin Hook & Eye Iron 75mm *


L002 Skilled labour

No.
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

J
J016

IRON MONGER
Supplying and fixing of 150mm iron cabin hooks and eyes.
PER No.

M073 Cabin Hook & Eye Iron 150mm *


L002 Skilled labour

No.
Hour

1.000
0.330

0.00
0.00

1.000
0.330

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

J017

Supplying and fixing of 200mm iron cabin hooks and eyes.


PER No.

M074 Cabin Hook & Eye Iron 200mm *


L002 Skilled labour

No.
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

J018

Making iron gate with 40 x 40 x 6mm angle iron frame work including bracing and
horizontal centre member with 16mm M.S. bar at 150mm centres and fixing in
position.
PER m2

M039
M031
M033
L070
L010

Angle iron 40 x 40 x 6mm *


Mild steel *
Mild steel flat *
Black smith
Unskilled labour

m
M/ton
M/ton
day
day

ALLOW FOR COAL ETC.


ALLOW FOR WELDING
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

4.000
0.012
0.005
1.000
1.000

0.00

J
J019

IRON MONGER
Supplying of 20mm x 3mm gutter hook brackets and fixing in position with iron screw
PER No.

M531
M087
L002
L001

Mild steel Flat *


Screws iron 25mm x Gauge 8 *
Skilled labour
Unskilled labour

Kg.
Doz.
Hour
Hour

0.228
0.170
0.750
0.750

0.00
0.00
0.00
0.00

ALLOW FOR COAL ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

J020

Supplying of approved heavy quality safety type 100mm iron hasp and staples
and fixing in position with iron screws.
PER No.

M075 Hasp and staple Iron 100mm *


M087 Screws iron 25mm x Gauge 8 *
L002 Skilled labour

No.
Doz.
Hour

1.000
0.250
0.600

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

J021

Supplying of approved heavy quality safety type 150mm iron hasp and staples
and fixing in position with iron screws.
PER No.

M076 Hasp and staple Iron 150mm *


M087 Screws iron 25mm x Gauge 8 *
L002 Skilled labour

No.
Doz.
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.000
0.250
0.600

0.00
0.00
0.00

J
J022

IRON MONGER
Making 300 x 50mm hasp and staple out of 6mm iron plate and fixing in position
with 6 x 50mm bolts and nuts.
PER No.

M531
M062
L020
L010

Mild steel (Flat)


Bolt and nut iron 45 x 6mm *
Skilled labour (Carpenter & Mason)
Unskilled labour *

Kg.
No.
day
day

1.150
8.000
1.000
1.000

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

J023

Supplying and fixing of approved heavy quality 50mmx38mm iron butt hinges.
PER No.

M077
M087
L002
L001

Hinge Butt Iron 50mmx38mm


Screws iron 25mm x Gauge 8 *
Skilled labour
Unskilled labour

No.
Doz.
Hour
Hour

1.000
0.500
0.400
0.400

0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

J024

Supplying and fixing of approved heavy quality 75mmx38mm iron butt hinges.
PER No.

M078
M087
L002
L001

Hinge Butt Iron 75mmx38mm


Screws iron 25mm x Gauge 8 *
Skilled labour
Unskilled labour

No.
Doz.
Hour
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.000
0.500
0.400
0.400

0.00
0.00
0.00
0.00

J
J025

IRON MONGER
Supplying and fixing of approved heavy quality 100mmx63mm iron butt hinges.
PER No.

M079
M087
L002
L001

Hinge Butt Iron 100mmx63mm


Screws iron 25mm x Gauge 8 *
Skilled labour
Unskilled labour

No.
Doz.
Hour
Hour

1.000
0.500
0.400
0.400

0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

J026

Supplying and fixing of approved heavy quality 125mmx100mm iron butt hinges.
PER No.

M080
M087
L002
L001

Hinge Butt Iron 125mmx100mm


Screws iron 25mm x Gauge 8 *
Skilled labour
Unskilled labour

No.
Doz.
Hour
Hour

1.000
0.500
0.500
0.500

0.00
0.00
0.00
0.00

0.500
0.500
0.500

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

J027

Fixing hinges supplied by Client with iron screws.


PER No.

M087 Screws iron 25mm x Gauge 8 *


L002 Skilled labour
L001 Unskilled labour

Doz.
Hour
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

J
J028

IRON MONGER
Supplying and fixing of 40 x 6mm, 300mm long iron strap hinge with necessary
bolts and nuts excluding pintle.
PER No.

M531
M067
L002
L001

Mild steel Flat *


Kg.
Bolt and nut iron 150 x 12mm *
No.
Skilled labour
Hour
Unskilled labour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.800
4.000
3.000
2.000

0.00
0.00
0.00
0.00

J029

Supplying and fixing of 50 x 6mm , 900mm long iron strap hinges with necessary
bolts and nuts including pintles.
PER No.

M531
M067
L002
L001

Mild steel Flat *


Bolt and nut iron 150 x 12mm *
Skilled labour
Unskilled labour

Kg.
No.
Hour
Hour

2.500
6.000
5.000
3.000

0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

J030

Supplying of 60 x 10 x 1050mm iron double strap hinges, flat iron bend to shape
and fixing with bolts and nuts.
PER No.

M531
M067
L020
L001

Mild steel Flat *


Bolt and nut iron 150 x 12mm *
Skilled labour (Carpenter & Mason)
Unskilled labour *

Kg.
No.
day
day

ALLOW FOR COAL ETC.

SUB TOTAL
OVER HEAD & PROFITS 22.00%

2.200
6.000
0.750
0.500

0.00
0.00
0.00

TOTAL

J031

Supplying of 65 x 10 x 1650mm iron double strap hinges, flat iron bend to shape
and fixing with bolts and nuts.
PER No.

M531
M067
L020
L001

Mild steel Flat *


Bolt and nut iron 150 x 12mm *
Skilled labour (Carpenter & Mason)
Unskilled labour *

Kg.
No.
day
day

17.270
8.000
1.000
0.630

0.00
0.00
0.00

ALLOW FOR COAL ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

J032

Supplying and fixing of heavy quality 150mm iron T hinges with iron screws.
PER No.

M081
M084
L001
L002

Hinge T iron 150mm


Screws Iron 12mm x Gauge 8 *
Unskilled labour
Skilled labour

No.
Doz.
Hour
Hour

1.000
1.500
1.000
1.000

0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

J033

Supplying and fixing of heavy quality, 200mm iron T hinges with screws.
PER N0.

M081 Hinge T iron 200mm


M084 Screws Iron 12mm x Gauge 8 *
L001 Unskilled labour

No.
Doz.
Hour

1.000
1.500
1.000

0.00
0.00
0.00

L002 Skilled labour

Hour

1.000

0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

J034

Supplying and fixing of heavy quality 250mm iron T hinges with iron screws.
PER No.

M082
M084
L001
L002

Hinge T iron 250mm


Screws Iron 12mm x Gauge 8 *
Unskilled labour
Skilled labour

No.
Doz.
Hour
Hour

1.150
1.500
1.500
1.500

0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

J035

Supplying and fixing of heavy quality 300mm iron T hinges with iron screws.
PER No.

M083
M084
L001
L002

Hinge T iron 300mm


Screws Iron 12mm x Gauge 8 *
Unskilled labour
Skilled labour

No.
Doz.
Hour
Hour

1.000
1.500
1.500
1.500

0.00
0.00
0.00
0.00

0.410
0.200
1.000
0.500

0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

J036

Supplying and fixing of 3mm x 50mm x 225mm iron hold fasts.


PER No.

M531
M089
L002
L001

Mild steel Flat *


Screws Iron 40mm x Gauge 8 *
Skilled labour
Unskilled labour

Kg.
Doz.
Hour
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

J037

Cutting iron rods supplied by Client to correct length inserting in window frames
including painting with red lead and 2 coats of anti - corrosive paint.
PER No.

L002 Skilled labour


L001 Unskilled labour
L008 Plumber

Hour
Hour
Hour

0.250
0.250
0.250

0.00
0.00
0.00

ALLOW FOR PAINT ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

J038

Supplying mild steel rods in reinforcing lintols, beams, columns and laid in position w
binding wire.
PER Kg.

M031
M034
L002
L001

Mild Steel *
Binding wire *
Skilled labour
Unskilled labour

M/ton
Kg.
Hour
Hour

ALLOW FOR WASTAGE


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.001
0.010
0.150
0.150

0.00
0.00
0.00

J
J039

IRON MONGER
Supplying mild steel rods in reinforcing foundation and laid in position with
G.I. binding wire.
PER Kg.

M031
M034
L002
L001

Mild Steel *
Binding wire *
Skilled labour
Unskilled labour

M/ton
Kg.
Hour
Hour

0.001
0.010
0.100
0.100

0.00
0.00
0.00

ALLOW FOR WASTAGE


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

J040

Bending and tying reinforcement and laid in position in beams lintols, floors, etc.
with G.I. Wire, Steel rod supplied by Client, (mild steel or tor steel)
PER Kg.

M034 Binding wire *


L002 Skilled labour
L001 Unskilled labour

Kg.
Hour
Hour

0.010
0.150
0.150

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J041

Bending and tying reinforcement and laid in position in foundation with


G.I. Binding wire, (mild steel or tor steel supplied by Client, )
PER Kg.

M034 Binding wire *


L002 Skilled labour
L001 Unskilled labour

Kg.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.010
0.100
0.100

0.00
0.00
0.00

J
J042

IRON MONGER
Supplying 16mm dia. Mild steel bars and fixing in window frames at 100mm
centres including painting with red lead and 2 coats anti - corrosive paint.
PER m

M031 Mild steel *


Kg
L002 Skilled labour
Hour
L001 Unskilled labour
Hour
ALLOW FOR PAINTING ETC.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

J043

1.579
0.250
0.250

0.00
0.00

Supplying 20mm dia. Mild steel bars and fixing in window frames at 100mm
centres including painting with red lead and 2 coats anti - corrosive paint.
PER m

M031 Mild steel *


Kg.
L002 Skilled labour
Hour
L001 Unskilled labour
Hour
ALLOW FOR PAINTING ETC.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

J044

2.466
0.250
0.250

0.00
0.00

Supplying pintels for gates and garage doors and fixing in position in cement
concrete (Concrete paid separately.)
PER No.

M531 Mild steel Flat *


L002 Skilled labour
L001 Unskilled labour

Kg.
Hour
Hour

ALLOW FOR COAL ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

2.280
3.250
3.250

0.00
0.00
0.00

IRON MONGER

J045

Supplying and fixing 100mm x 16mm rag bolts with nuts, washers.
PER No.

M531 Mild steel Flat *


Kg.
L002 Skilled labour
Hour
L001 Unskilled labour
Hour
ALLOW FOR WASHERS & WASTE
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

J046

0.682
0.500
0.500

0.00
0.00
0.00

Supplying and fixing of 24 B.W.G. plain G.I. Sheets to existing frame with wire
nails.
PER m2

M040 G.I. Sheet 24 B.W.G.


L002 Skilled labour
L001 Unskilled labour

Sq.m.
Hour
Hour

1.000
1.435
1.435

0.00
0.00
0.00

ALLOW FOR NAILS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

J047

Supplying and BS 4449 high Yeild steel bars and laid in positing as reinforcement
in beams, columns, slabs etc. with binding wire.
PER Kg.

M032
M034
L002
L001

Tor steel *
Binding wire *
Skilled labour
Unskilled labour

M/ton
Kg.
Hour
Hour

ALLOW FOR WASTAGE


SUB TOTAL
OVER HEAD & PROFITS 22.00 %
TOTAL

0.001
0.010
0.150
0.150

0.00
0.00
0.00

J048

Supplying and BS 4449 high Yeild steel bars and laid in positing as reinforcement
in foundation with binding wire.
PER Kg.

M032
M034
L002
L001

Tor steel *
Binding wire *
Skilled labour
Unskilled labour

M/ton
Kg.
Hour
Hour

ALLOW FOR WASTAGE


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.001
0.010
0.100
0.100

0.00
0.00
0.00

BRASS FOUNDER

K001 Removing and refixing of Bolts, casement fastners or stays, including making good
to holes in frames and sashes.
PER No.
L002 Skilled labour

Hour

0.500

0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

K002 Supplying fixing and polishing of 63mm heavy quality brass barrel bolts with
brass screws.
PER No.
M092 Bolt Barrel Brass 63mm *
M389 Screws Brass 20mm x Gauge 8
L002 Skilled labour

No.
No.
Hour

1.000
6.000
0.330

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

K003 Supplying fixing and polishing of 75mm heavy quality brass barrel bolts with
brass screws.
PER No.
M093 Bolt Barrel Brass 75mm *
M389 Screws brass 20mm x gauge 8
L002 Skilled labour

No.
No.
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.000
6.000
0.330

0.00
0.00

BRASS FOUNDER

K004 Supplying fixing and polishing of 100mm heavy quality brass barrel bolts with
brass screws.
PER No.
M094 Bolt Barrel Brass 100mm *
M389 Screws Brass 20mm x Gauge 8
L002 Skilled labour

No.
No.
Hour

1.000
6.000
0.330

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

K005 Supplying fixing and polishing of 125mm heavy quality brass barrel bolts with
brass screws.
PER No.
M094 Bolt Barrel Brass 125mm *
M389 Screws brass 20mm x Gauge 8
L002 Skilled labour

No.
No.
Hour

1.000
6.000
0.330

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

K006 Supplying fixing and polishing of 150mm heavy quality brass barrel bolts with
brass screws.
PER No.
M094 Bolt Barrel Brass 150mm *
M389 Screws Brass 20mm x Gauge 8
L002 Skilled labour

No.
No.
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.000
6.000
0.330

0.00
0.00

BRASS FOUNDER

K007 Supplying and fixing of 200mm brass skeleten bolts with brass screws.
PER No.
M097 Bolt Skeleton Brass 200mm *
L002 Skilled labour
M394 Screws Brass 20mm x Gauge 8

No.
Hour
No.

1.000
0.500
9.000

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

K008 Supplying and fixing of 250mm brass skeleten bolts with brass screws.
PER No.
M098 Bolt Skeleton Brass 250mm *
L002 Skilled labour
M394 Screws Brass 20mm x Gauge 8

No.
Hour
No.

1.000
0.500
9.000

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

K009 Supplying and fixing of 300mm brass skeleten bolts with brass screws.
PER No.
M099 Bolt Skeleton Brass 300mm *
M394 Screws Brass 20mm x Gauge 8
L002 Skilled labour

No.
No.
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.000
9.000
0.500

0.00
0.00

BRASS FOUNDER

K010 Supplying and fixing of 450mm brass skeleten bolts with brass screws.
PER No.
M100 Bolt Skeleton Brass 450mm *
M394 Screws Brass 20mm x Gauge 8
L002 Skilled labour

No.
No.
Hour

1.000
12.000
0.500

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

K011 Supplying , fixing and polishing of 50mm heavy quality brass cabin hooks
with brass screws.
PER No.
M101 Cabin Hook Brass 50mm *
L002 Skilled labour
M395 Screws Brass 16mm x Gauge 7

No.
Hour
No.

1.000
0.500
9.000

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

K012 Supplying , fixing and polishing of 75mm heavy quality brass cabin hooks
with brass screws.
PER No.
M102 Cabin Hook Brass 75mm *
L002 Skilled labour
M395 Screws Brass 16mm x Gauge 7

No.
Hour
No.

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.000
0.500
9.000

0.00
0.00
0.00

BRASS FOUNDER

K013 Supplying , fixing and polishing of 150mm heavy quality brass cabin hooks
with brass screws.
PER No.
M103 Cabin Hook Brass 150mm *
L002 Skilled labour
M395 Screws Brass 16mm x Gauge 7

No.
Hour
No.

1.000
0.500
9.000

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

K014 Supplying , fixing and polishing of 200mm heavy quality brass cabin hooks
with brass screws.
PER No.
M104 Cabin Hook Brass 200mm
*
L002 Skilled labour
M395 Screws Brass 16mm x Gauge 7

No.
Hour
No.

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.000
0.500
9.000

0.00
0.00
0.00

BRASS FOUNDER

K015 Supplying , fixing and polishing of 225mm heavy quality brass cabin hooks
with brass screws.
PER No.
M396 Cabin Hook Brass 225mm *
L002 Skilled labour
M395 Screws Brass 16mm x Gauge 7

No.
Hour
No.

1.000
0.500
9.000

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

K016 Supplying , fixing and polishing of 250mm heavy quality brass cabin hooks
with brass screws.
PER No.
M105 Cabin Hook Brass 250mm
*
L002 Skilled labour
M395 Screws Brass 16mm x Gauge 7

No.
Hour
No.

1.000
0.500
9.000

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

K017 Supplying , fixing and polishing of 300mm heavy quality brass cabin hooks
with brass screws.
PER No.
M106 Cabin Hook Brass 300mm
*
L002 Skilled labour
M395 Screws Brass 16mm x Gauge 7

No.
Hour
No.

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.000
0.500
9.000

0.00
0.00
0.00

BRASS FOUNDER

K018 Supplying and fixing of Brass heavy quality casement fastners with mortice plate
polished, with brass screws.
PER No.
M107 Casement Fastner Brass *
M394 Screws Brass 16mm x gauge 7
L002 Skilled labour

No.
No.
Hour

1.000
4.000
0.750

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

K019 Supplying , fixing and polishing of 250mm heavy quality casement stays.
PER No.
M108 Casement Stay Brass 250mm *
M394 Screws Brass 16mm x Gauge 7
L002 Skilled labour

No.
No.
Hour

1.000
4.000
0.500

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

K020 Supplying , fixing and polishing of 300mm heavy quality casement stays.
PER No.
M109 Casement Stay Brass 300mm *
M394 Screws Brass 16mm x Gauge 7
L002 Skilled labour

No.
No.
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.000
4.000
0.500

0.00
0.00
0.00

BRASS FOUNDER

K021 Supplying and fixing of Heavy quality brass fanlight catches complete with brass
screws.
PER No.
M110 Fanlight Catch Brass *
M394 Screws Brass 16mm x Gauge 7
L002 Skilled labour

No.
No.
Hour

1.000
4.000
0.750

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

K022 Supplying, fixing and polishing of Heavy quality brass door handles with
brass screws.
PER No.
M397 Door handle
M389 Screws Brass 20mm x gauge 8
L002 Skilled labour

No.
No.
Hour

1.000
4.000
0.250

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

K023 Supplying, fixing and polishing of 150mm brass safety type heavy quality
hasp and staple with brass screws complete.
PER No.
M112 Hasp and staple safety type Brass 150mm *
M394 Screws Brass 20mm x gauge 8
L002 Skilled labour

No.
No.
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.000
7.000
0.500

0.00
0.00

BRASS FOUNDER

K024 Supplying, fixing and polishing of 100mm brass safety type heavy quality
hasp and staple with brass screws complete.
PER No.
M111 Hasp and staple safety type Brass 100mm *
M394 Screws brass 20mm x Gauge 8
L002 Skilled labour

No.
No.
Hour

1.000
7.000
0.500

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K025 Supplying and fixing of brass hat hooks with brass screws
K025 Hat Hook Brass *
M389 Screws Brass 25mm x Gauge 8
L002 Skilled labour

No.
No.
Hour

1.000
4.000
0.500

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

K026 Supplying, fixing and polishing of 50mmx 38mm heavy quality brass butt hinges with
brass screws.
PER No.
M114
M382
L002
L001

Hinge Butt Brass 50mm x 38mm


Screws Brass 20mm x Gauge 8
Skilled labour
Unskilled labour

No.
No.
Hour
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.000
6.000
0.250
0.350

0.00
0.00

BRASS FOUNDER

K027 Supplying, fixing and polishing of 75mmx38mm heavy quality brass butt hinges with
brass screws.
PER No.
M115
M382
L002
L001

Hinge Butt Brass 75mm x 38mm *


Screws Brass 40mm x Gauge 8
Skilled labour
Unskilled labour

No.
No.
Hour
Hour

1.000
6.000
0.380
0.330

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

K028 Supplying, fixing and polishing of 89mm x63mm heavy quality brass butt hinges with
brass screws.
PER No.
M116
M382
L002
L001

Hinge Butt Brass 89mm x 63mm


Screws Brass 40mm x Gauge 8
Skilled labour
Unskilled labour

No.
No.
Hour
Hour

1.000
8.000
0.380
0.380

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

K029 Supplying, fixing and polishing of 100mm x 63mm heavy quality brass butt hinges wi
PER No.
M117
M382
L002
L001

Hinge Butt Brass 100mm x 63mm


Screws Brass 40mm x Gauge 8
Skilled labour
Unskilled labour

No.
No.
Hour
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.000
8.000
0.380
0.380

0.00
0.00
0.00

BRASS FOUNDER

K030 Supplying, fixing and polishing of 125mm x 100mm heavy quality brass butt hinges w
PER No.
M118
M382
L002
L001

Hinge Butt Brass 125mm x 100mm *


Screws Brass 40mm x Gauge 8
Skilled labour
Unskilled labour

No.
No.
Hour
Hour

1.000
8.000
0.380
0.380

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

K031 Supplying, fixing and polishing of Brass center pivot hinges(Consisting of 2 pieces)
heavy quality with brass screws..
PER No.
M119
M133
L001
L002

Hinge Centre Pivot Brass *


Screws brass 20mm x Gauge 8
Unskilled labour
Skilled labour

Set
Doz.
Hour
Hour

1.000
0.500
0.500
0.500

0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

K032 Supplying and fixing of Brass gravity hinges with brass screws complete.
PER No.
M120
M382
L002
L001

Hinge Gravity Brass


Screws Brass 20mm x Gauge 8
Skilled labour
Unskilled labour

No.
No
Hour
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.000
8.000
0.500
0.500

0.00
0.00
0.00

BRASS FOUNDER

K033 Supplying, fixing and polishing of 100mm x 90mm brass parliamentary heavy quality
hinges with brass screws complete.
PER No.
M121
M387
L001
L002

Hinge Parliamentary Brass 100mm


Screws Brass 25mm x Gauge 8
Unskilled labour
Skilled labour

No.
No.
Hour
Hour

1.000
8.000
0.380
0.380

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

K034 Supplying, fixing and polishing of 125mm x 150mm brass parliamentary heavy qualit
hinges with brass screws complete.
PER No.
M122
M382
L001
L002

Hinge Parliamentary Brass 125mm


Screws Brass 25mm x gauge 8
Unskilled labour
Skilled labour

No.
No.
Hour
Hour

1.000
8.000
0.380
0.380

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K035 Supplying, fixing and polishing of 150mm x 180mm brass parliamentary heavy quality
hinges with brass screws.
PER No.
M122
M382
L001
L002

Hinge Parliamentary Brass 150mm


Screws Brass 25mm x Gauge 8
Unskilled labour
Skilled labour

No.
No.
Hour
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.000
10.000
0.380
0.380

0.00
0.00
0.00

BRASS FOUNDER

K036 Repairing and re - fixing available spring hinges.


PER No.
L002 Skilled labour
L003 Black smith

Hour
Hour

1.000
2.000

0.00
0.00

1.000
8.000
2.000
2.000

0.00

ALLOW FOR SCREWS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

K037 Supplying and fixing 100mm brass, double acting springs hinges.
PER No.
M532
M135
L002
L001

Hinge Spring Double Acting Brass 100mm


Screws brass 30mm x Gauge 8
Skilled labour
Unskilled labour

No.
No.
Hour
Hour

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

K038 Fixing of hinges in position with brass screws, the hinges supplied by Client.
PER No.
M135 Screws brass 30mm x Gauge 8
L002 Skilled labour
L001 Unskilled labour

Nos.
Hour
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

8.000
0.500
0.500

0.00
0.00

BRASS FOUNDER

K039 Making and supplying brass keys for door locks.


PER No.
L003 Black smith

Hour

2.500

0.00

1.000
0.250

0.00
0.00

0.500
1.500

0.00
0.00

ALLOW FOR BLANK KEY


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

K040 Supplying, fixing and polishing good quality brass door knobs.
PER No.
M533 Brass door knob
L002 Skilled labour

No.
Hour

ALLOW FOR SCREWS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

K041 Fixing available door locks.


PER No.
M133 Screws brass 25mm x Gauge 8
L002 Skilled labour

Doz.
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

BRASS FOUNDER

K042 Repairing and re - fixing door locks.


PER No.
L003 Black smith
M133 Screws brass 25mm x Gauge 8
L002 Skilled labour

Hour
Doz.
Hour

2.000
0.500
1.500

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

K043 Supplying 65mm brass, 4 lever approved quality locks for cupboards and fiixing
in position with brass screws.
PER No.
M124 Lock Cupboard Four Levers Brass 63mm
M132 Screws brass 20mm x Gauge 8
L002 Skilled labour

No.
Doz.
Hour

1.000
0.333
1.000

0.00
0.00

0.150
0.500

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

K044 Repairing and refixing cupboard locks.


PER No.
L002 Skilled labour
L003 Black smith

Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

BRASS FOUNDER

K045 Supplying, fixing and polishing 150mm brass, 2 lever , approved qualiry rim
lock.
PER No.
M126 Lock Rim Double lever Brass 150mm
M133 Screws brass 25mm x Gauge 8
L002 Skilled labour

No.
Doz.
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.000
0.500
1.500

0.00
0.00
0.00

K046 Supplying, fixing and polishing 150mm brass, single lever , approved qualiry rim
lock.
PER No.
M127 Lock Rim single lever Brass 150mm
M133 Screws brass 25mm x Gauge 8
L002 Skilled labour

No.
Doz.
Hour

1.000
0.500
1.500

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

K047 Supplying, fixing and polishing 150mm brass, double lever , approved qualiry rim
lock.
PER No.
M126 Lock Rim Double lever Brass 150mm
M133 Screws brass 25mm x Gauge 8
L002 Skilled labour

No.
Doz.
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.000
0.500
1.500

0.00
0.00
0.00

BRASS FOUNDER

K048 Supplying and fixing of 125mm good quality single lever rim lock.
PER No.
M127 Lock Rim single lever Brass 150mm
M133 Screws brass 25mm x Gauge 8
L002 Skilled labour

No.
Doz.
Hour

1.000
0.500
1.500

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

K047 Supplying and fixing of night latch Yale or Union lock with duplicate keys.
PER No.
M128 Night Latch - China
M133 Screws brass 25mm x Gauge 8
L002 Skilled labour

No.
Doz.
Hour

1.000
0.500
2.000

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

K048 Supplying and fixing of 32mm to 40mm brass rings to doors and windows with
brass screws.
PER No.
M125 Ring Brass 45mm to 38mm
M132 Screws brass 20mm x Gauge 8
L002 Skilled labour

No.
Doz.
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.000
0.250
0.250

0.00
0.00
0.00

BRASS FOUNDER

K049 Supplying and fixing of Union mortice lock (imported) for single sash.
PER No.
M128 Lock Mortice Union single Sash
L002 Skilled labour

No.
Hour

1.000
4.000

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

K050 Supplying and fixing of Union Mortice (Imported) lock for double sash.
PER No.
M129 Lock Mortice Union Double Sash
L002 Skilled labour

No.
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.000
6.000

0.00
0.00

PLASTERER

L001 15mm thick , 1:1:5 cement lime plastering.


PER m2
M010
M550
M007
L004
L001

cement
Boiled lime
sand
Mason
Unskilled labour
SCAFFOLDING 3 %

50Kg.
Kg.
Cu.m.
Hour
Hour

0.086
2.400
0.021
0.646
1.292

0.00
0.00
0.00
0.00
0.00

1.200
0.646
0.215

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

L002 Clay plastering and lime puttying smooth


PER m2

M550 Boiled lime


Kg.
L004 Mason
Hour
L001 Unskilled labour
Hour
ALLOW FOR SCAFFOLDING
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

L003 65mm x 65mm Cove moulding build in existing walls in 1:2 cement mortar.

PER m
M010
M007
L004
L001

cement
50Kg.
sand
Cu.m.
Mason
Hour
Unskilled labour
Hour
ALLOW SCAFFOLDING, WATER & LIME
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.036
0.003
0.656
0.656

0.00
0.00
0.00
0.00

PLASTERER

L004 Plastering of 50mm to 100mm wide cracks in wall with 1:3 cement plaster after
chipping.
PER m
M010
L004
L001
M007

cement
50Kg.
Mason
Hour
Unskilled labour
Hour
sand
Cu.m.
ALLOW SCAFFOLDIN, WATER & LIME PUTTY
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.013
0.164
0.328
0.002

0.00
0.00
0.00
0.00

L005 Cresting with broken glass in 1:4 cement mortar on coping of boundary wall.
PER m
M010
M007
L004
L001

cement
sand
Mason
Unskilled labour

50Kg.
Cu.m.
Hour
Hour

0.082
0.009
0.500
0.500

0.00
0.00
0.00
0.00

ALLOW FOR GLASS BOTTLING, SCAFFOLDING & WATER


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

L006 75mm x 12mm Ddo moulding in walls in 1:1:4 lime and cement mortar for
replacement to match existing, or to be extra over rate for plastering.
PER m
M010
M007
L004
L001
M550

cement
sand
Mason
Unskilled labour
Boiled lime
ALLOW FOR SCAFFOLDING & WATER

50Kg.
Cu.m.
Hour
Hour
Kg.

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.008
0.002
0.800
0.800
0.230

0.00
0.00
0.00
0.00
0.00

L
PLASTERER
L007 150mm x 25mm Dado moulding in walls in 1:1:4 lime and cement mortar only for
replacement to match existing or to be extra over rate for plastering.
PER m
M010
M007
L004
L001
M550

cement
50Kg.
sand
Cu.m.
Mason
Hour
Unskilled labour
Hour
Boiled lime
Kg.
ALLOW FOR SCAFFOLDING & WATER
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.033
0.008
1.000
1.000
0.900

0.00
0.00
0.00
0.00
0.00

L008 100mm x 50mm Dado moulding in cement and sand 1:2 built in existing wall or to be
over rate for plstering
PER m
M010
M007
L004
L001

cement
50Kg.
sand
Cu.m.
Mason
Hour
Unskilled labour
Hour
ALLOW FOR SCAFFOLDING
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.082
0.006
1.200
1.200

0.00
0.00
0.00
0.00

L009 Laying of Flashing or plaster bands over tiles 100mm to 150mm wide on roof
in 1:1:4 cement and lime mortar rate including scaffolding and colour figment to match
tile colour
PER m
M010
M007
L004
L001
M550

cement
sand
Mason
Unskilled labour
Boiled lime

50Kg.
Cu.m.
Hour
Hour
Kg.

ALLOW FOR SCAFFOLDING & COLOUR FIGMENTS


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.026
0.005
0.250
0.500
0.720

0.00
0.00
0.00
0.00
0.00

PLASTERER

L010 Letters embosed in plaster 20mm thick 150mm high in cement and sand
1:2 cement floated and painted.
PER No.
L004 Mason
L001 Unskilled labour
L015 Painter

Hour
Hour
Hour

0.500
0.250
0.125

0.00
0.00
0.00

ALLOW FOR CEMENT, PAINT ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

L011 15mm thick 1:1:5 Lime plastering and finished smooth with lime putty.
PER m2
M007
M550
L004
L001
M010

sand
Cu.m.
Boiled lime
Kg.
Mason
Hour
Unskilled labour
Hour
cement
50Kg.
ALLOW FOR SCAFFOLDING & WATER
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.021
3.000
1.300
1.300
0.086

0.00
0.00
0.00
0.00
0.00

L012 1:2 cement plastering flush in surface cracks including raking out joints and lime putty
floating and painting to matchthe existing surface
PER m
L004 Mason
L001 Unskilled labour

Hour
Hour

ALLOW FOR CEMENT, SAND & LIME PUTTY


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.164
0.250

0.00
0.00

PLASTERER

L013 15mm 1:3 cement sand plastering in brick masonary etc. including cement floating
PER m2
M010
M007
L004
L001

cement
sand
Mason
Unskilled labour

50Kg.
Cu.m.
Hour
Hour

0.108
0.009
2.500
2.500

0.00
0.00
0.00
0.00

0.161
0.015
0.650
1.300

0.00
0.00
0.00
0.00

0.161
0.015
0.800
1.600

0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

L014 12mm thick 1:2 cement rendering , above 10m2


PER m2
M010
M007
L004
L001

cement
sand
Mason
Unskilled labour

50Kg.
Cu.m.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

L015 12mm thick 1:2 cement rendering upto 10m2.


PER m2
M010
M007
L004
L001

cement
sand
Mason
Unskilled labour

50Kg.
Cu.m.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLASTERER

L016 12mm thick 1:3 cement rendering , above 10m2.


PER m2
M010
M007
L004
L001

cement
sand
Mason
Unskilled labour

50Kg.
Cu.m.
Hour
Hour

0.115
0.015
0.650
1.300

0.00
0.00
0.00
0.00

0.115
0.015
0.800
1.600

0.00
0.00
0.00
0.00

0.242
0.022
0.865
1.730

0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

L017 12mm thick 1:3 cement rendering , upto 10m2.


PER m2
M010
M007
L004
L001

cement
sand
Mason
Unskilled labour

50Kg.
Cu.m.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

L018 20mm thick 1:2 cement rendering , above 10m2.


PER m2
M010
M007
L004
L001

cement
sand
Mason
Unskilled labour

50Kg.
Cu.m.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLASTERER

L019 20mm thick 1:2 cement rendering , upto10m2.


PER m2
M010
M007
L004
L001

cement
sand
Mason
Unskilled labour

50Kg.
Cu.m.
Hour
Hour

0.242
0.022
1.000
2.160

0.00
0.00
0.00
0.00

0.188
0.022
0.865
1.730

0.00
0.00
0.00
0.00

0.188
0.022
1.000
2.160

0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

L020 20mm thick 1:3 cement rendering , above 10m2.


PER m2
M010
M007
L004
L001

cement
sand
Mason
Unskilled labour

50Kg.
Cu.m.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

L021 20mm thick 1:3 cement rendering , up to 10m2.


PER m2
M010
M007
L004
L001

cement
sand
Mason
Unskilled labour

50Kg.
Cu.m.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLASTERER

L022 Normal cement floating coat in rendering , using normal cement


and finish smooth.
PER m2
M010 cement
L004 Mason
L001 Unskilled labour

50Kg.
Hour
Hour

0.029
0.100
0.050

0.00
0.00
0.00

ALLOW FOR CURING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

L023 Brown or Green cement floating in rendering with black cement and finish
smooth.
PER m2
M010
M011
L004
L001

cement
Colour pigment for cement
Mason
Unskilled labour
ALLOW FOR CURING

50Kg.
Kg.
Hour
Hour

0.029
0.004
0.100
0.050

0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

L024 Black cement floating in rendering with black cement and finish smooth.
PER m2
M010
M011
L004
L001

cement
Colour pigment for cement
Mason
Unskilled labour
ALLOW FOR CURING

50Kg.
Kg.
Hour
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.029
0.004
0.100
0.050

0.00
0.00
0.00
0.00

PLASTERER

L025 20mm thick , 1:2 cement rendering with 5% pudlo cement.


PER m2
M010
M007
M012
L004
L001

cement
50Kg.
sand
Cu.m.
Pudlo cement
Kg.
Mason
Hour
Unskilled labour
Hour
ALLOW FOR CURING & FLOATING CEMENT
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.242
0.022
0.549
0.865
1.730

0.00
0.00
0.00
0.00
0.00

L026 12mm x 150mm Skirting in 1:3, projected on flush with wall and including
forming groove with smooth finish
PER m
M010
M007
L004
L001

cement
sand
Mason
Unskilled labour
ALLOW FOR WATER

50Kg.
Cu.m.
Hour
Hour

0.033
0.003
0.800
0.800

0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

L027 12mm x 150mm Skirting in 1:3 cement mortar projected in flush with wall
and finished with red cement floating including forming groove.
PER m
M010
M007
M011
L004
L001

cement
sand
Colour pigment for cement
Mason
Unskilled labour
ALLOW FOR WATER

50Kg.
Cu.m.
Kg.
Hour
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.032
0.003
0.001
1.000
0.800

0.00
0.00
0.00
0.00
0.00

PLASTERER

L028 15mm thick plastering , 1:1:3 cement lime and sand to R.C. beams and slab
sooffit including floating with lime putty.
PER m2
M010
M007
M550
L004
L001

cement
sand
Boiled lime
Mason
Unskilled labour

50Kg.
Cu.m.
Kg.
Hour
Hour

0.086
0.015
2.400
1.750
1.750

0.00
0.00
0.00
0.00
0.00

ALLOW FOR SCAFFOLDING WATER ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

L029 20mm thick, 1:2 cement sand D.P.C. and finished smooth with 2 coats of hot
tar blinded with coarse sand.
PER m2
M010
M007
M013
L004
L001

cement
sand
DPC Tar *
Mason
Unskilled labour

50Kg.
Cu.m.
Lit.
Hour
Hour

ALLOW FOR FIRE WOOD AND WATER ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.242
0.003
0.500
1.000
2.000

0.00
0.00
0.00
0.00
0.00

PLASTERER

L030 12mm x 100mm skirting in 1:3 cement sand mortar in flush with wall and finished wit
smooth cement floating. Rate include for forming groove.
PER m2
M010 cement
50Kg.
0.022
0.00
M007 Sand
Cu.m.
0.002
0.00
L004 Mason
Hour
0.700
0.00
L001 Unskilled labour
Hour
0.700
0.00
ALLOW FOR WATER
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
L031 12mm x 100mm skirting in 1:3 cement sand mortar projected in flush with wall and
finished with colour cement floating. Rate include for forming groove.
PER m
M010
M007
M011
L004
L001

Cement
Sand
Colour pigment for cement
Mason
Unskilled labour
ALLOW FOR WATER

50Kg.
Cu. m.
Kg.
Hour
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.021
0.002
0.001
0.900
0.700

0.00
0.00
0.00
0.00
0.00

M TINKER
M001 Supplying and fixing of 100mm dia. G.I. 24 BWG down pipes fixed to walls
with holdfast or plugs in 1:3 cement.
PER m
M022
L004
L007
L001

G.I. 24 BWG sheets(Plain)


Mason
Tinker
Unskilled labour

m2
Hour
Hour
Hour

0.400
0.250
2.250
1.000

0.00
0.00
0.00

ALLOW FOR PLUGS, BRACKETS, IRON SCREWS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

M002 Supplying and fixing of 150mm dia. G.I. 24 BWG down pipes fixed to walls
with holdfast or plugs in 1:3 cement.
PER m
M022
L004
L007
L001

G.I. Sheet 24 B.W.G.


Mason
Tinker
Unskilled labour

m2
Hour
Hour
Hour

0.600
0.250
3.000
1.000

ALLOW FOR PLUGS, BRACKETS, SCREWS , SOLDER AND CEMENT


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

TINKER

M003 Supplying and fixing of 100 x 75mm rectangular G.I. 24 BWG down pipes
fixed with holdfast or plugs in 1:3 cement.
PER m
M022
L004
L007
L001

G.I. 24 BWG sheets(Plain)


Mason
Tinker
Unskilled labour

m2
Hour
Hour
Hour

0.450
0.250
2.750
1.000

0.00
0.00
0.00

ALLOW FOR PLUGS, BRACKETS, IRON SCREWS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

M004 Fixing of 100 to 150mm circular or rectangular down pipes fixed with holdfast
or plugs in 1:3 cement mortar (G.I. Sheets supplied by Client.)
PER m
L004 Mason
L007 Tinker
L001 Unskilled labour

Hour
Hour
Hour

0.029
0.293
0.234

0.00
0.00
0.00

0.125
0.500

0.00
0.00

ALLOW FOR PLUGS, IRON SCREWS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M005 Extra over item M001 to M004 in two storeyed buildings.
PER m
L004 Mason
L001 Unskilled labour

Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

TINKER

M006 Extra over item M001 to M004 in buildings of three or more storeyed.
PER m
L004 Mason
L001 Unskilled labour

Hour
Hour

0.250
1.000

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

M007 Fixing of down pipes loose or new fixed with holdfast or plugs including making
good to walls (down pipes supplied by Client, plugs or holdfast paid for separately).
PER m
L007 Tinker
L001 Unskilled labour

Hour
Hour

0.350
0.350

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

M008 450mm wide G.I. Flashing (G.I. 24 BWG) fixed with 150mm turned up along
and top edge tucked well into wall in cement lime mortar including removal of
old flashing.
PER m
M022
L007
L004
L001

G.I. 24 BWG sheets(Plain)


Tinker
Mason
Unskilled labour

m2
Hour
Hour
Hour

ALLOW FOR CEMENT, SAND


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.600
1.000
0.250
1.250

0.00
0.00
0.00

TINKER

M009 Refixing of G.I. Flashing including making good to walls in cement and lime
mortar.
PER m
L007 Tinker
L004 Mason
L001 Unskilled labour

Hour
Hour
Hour

0.750
0.250
1.000

0.00
0.00
0.00

ALLOW FOR CEMENT, SAND, LIME ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

M010 150mm G.I. Gutters eaves semi circular made with G.I. 24 B.W.G. and fixed with
hooks or brackets and bolts and joints soldered complete.
PER m
M022
L007
L001
M546
M124
M123

G.I. 24 BWG sheets(Plain)


Tinker
Unskilled labour
Mild steel Flat *
Bolt and nut iron 63 x 10mm *
Bolt and nut iron 45 x 6mm *

m2
Hour
Hour
Kg.
No.
No.

ALLOW FOR MAKING BRACKETS, ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.350
2.500
1.500
0.228
2.500
1.667

0.00
0.00
0.00

TINKER

M011 150mm G.I. Gutters eaves semi circular made with G.I. 24 B.W.G. and fixed with
hooks or brackets and screws and joints soldered complete (G.I. Sheets supplied
by Client.)
PER m
L007 Tinker
L001 Unskilled labour

day
day

0.285
0.178

0.00
0.00

ALLOW FOR GUTTERS HOOKS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

M012 150mm Gutters, eaves moulded in G.I. 24 BWG and fixed complete including
brackets.
PER m
M022 G.I. 24 BWG sheets(Plain)
L007 Tinker
L001 Unskilled labour

m2
Hour
Hour

0.400
4.000
2.000

0.00

ALLOW FOR GUTTERS HOOKS ETC. AS IN ITEM NO M010


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

M013 Extra over items M010 to M012 and M026 in two storeyed Buildings.
PER m
L007 Tinker
L001 Unskilled labour

Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.000
1.000

0.00
0.00

TINKER

M014 Extra over items M010 to M012 and M026 in three storeyed Buildings.
PER m
M445 Props (bamboo) 3 - 4 m
L001 Unskilled labour
L007 Tinker

No.
Hour
Hour

0.950
1.750
1.500

ALLOW FOR COIR, STRING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

M015 Cleaning of Gutters, eaves and down pipes in single storeyed buildings.
PER m
L001 Unskilled labour

Hour

0.150

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

M016 Cleaning of Gutters, eaves and down pipes in two storeyed buildings.
PER m
L001 Unskilled labour

Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.200

0.00
0.00

TINKER

M017 Re - grading Gutters eaves , in single storeyed Buildings.


PER m
L007 Tinker
L001 Unskilled labour

day
Hour

0.064
0.064

0.00
0.00

0.100
0.100

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

M018 Re - grading Gutters eaves , in two storeyed Buildings.


PER m
L007 Tinker
L001 Unskilled labour

Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

M019 Making openings to existing gutters to receive 100mm to 150mm down pipe
attaching spigot piece joints soldered including making good.
PER No.
M022 G.I. 24 BWG sheets(Plain)
L007 Tinker
L001 Unskilled labour

m2
Hour
Hour

ALLOW FOR PLUGS, BRACKETS IRON SCREWS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.100
2.000
2.000

0.00

TINKER

M020 Making of 250 x 300 x 500mm deep gutter head with G.I. Sheets 24 B.W.G. down
pipe and fixed complete.
PER No.
M022 G.I. 24 BWG sheets(Plain)
L007 Tinker
L001 Unskilled labour

m2
Hour
Hour

0.900
7.000
2.000

0.00

ALLOW FOR PLUGS, SCREWS FOR SOLDER AND CEMENT


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

M021 Making of 250 x 300 x 500mm deep gutter head with G.I. Sheets 24 B.W.G. down
pipe and fixed complete.(Sheets supplied by Client).
PER No.
L007 Tinker
L001 Unskilled labour

Hour
Hour

ALLOW FOR LEAD, SOLDERING, FLUID ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

7.000
2.000

0.00
0.00

TINKER

M022 Making of 250 x 300 x 300mm deep gutter head with G.I. Sheets 24 B.W.G. down
pipe and fixed complete.
PER No.
M022 G.I. 24 BWG sheets(Plain)
L007 Tinker

m2
Hour

0.500
5.000

0.00

ALLOW FOR LEADS, ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

M023 Making of 250 x 300 x 300mm deep gutter head with G.I. Sheets 22 B.W.G. down
pipe and fixed complete.(Sheets supplied by Client).
PER No.
L007 Tinker
L001 Unskilled labour

Hour
Hour

5.000
2.000

0.00
0.00

ALLOW FOR LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

M024 Supplying of 20mm x 3mm Gutter hooks or brackets and fixing with
iron screws.
PER No.
M546
M147
L005
L011
L012

Mild steel Flat *


Screws Iron 16mm x Guage 6
Black Smith
Unskilled labour
Skilled labour

Kg.
Doz.
Hour
day
day

ALLOW FOR COAL ETC.

SUB TOTAL
OVER HEAD & PROFITS 22.00%

0.227
0.167
0.042
0.073
0.032

0.00
0.00

TOTAL

M025 Gutters, leaks, replaced or joints soldered.


PER No.
L007 Tinker
L001 Unskilled labour

Hour
Hour

0.500
0.500

0.00
0.00

ALLOW FOR LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

M026 G.I. 900mm wide overall, 22 B.W.G. Parapet gutters renewed on existing boards joints
soldered and laid complete.
PER m
M023
L007
L002
L001

G.I. 22 BWG sheets(Plain)


Tinker
Skilled labour
Unskilled labour

m2
Hour
Hour
Hour

0.920
1.250
0.250
1.250

0.00
0.00
0.00
0.00

ALLOW FOR LEAD, SOLERING, FLUID CEMENT ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M027 18 BWG 900mm wide valley gutters renewed on existing boards, sheets tarred,
joints soldered and cement lime filletting complete.
PER m
M024
M476
M010
M481
M007
L001
L002
L007

G.I. 18 BWG sheets(Plain)


Coal Tar
Cement
Slaked lime
Sand
Unskilled labour
Skilled labour
Tinker

m2
Lit.
50 Kg.
Kg.
Cu.m.
Hour
Hour
Hour

ALLOW FOR NAILS, SOLDERING, MATERIALS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%

0.998
0.224
0.027
0.800
0.004
1.500
0.300
0.600

0.00
0.00
0.00
0.00
0.00
0.00

TOTAL

TINKER

M032 18 BWG 900mm wide valley gutters renewed including timber 25mm thick
boarding sheet tarred joints soldered and cement lime filleting complete.
PER m
M024
M047
M476
M010
M550
M007
M041
M076
L001
L002

G.I. 18 BWG sheets(Plain)


Timber planks 25mm class B
Coal Tar
Cement
Boiled lime
Sand
Wire nail S.W.G. 12 to 14 *
Wood Preservative (black / coloured) *
Unskilled labour
Skilled labour

m2
Sq.m.
Lit.
50 Kg.
Kg.
Cu.m.
Kg.
Lit.
Hour
Hour

0.998
1.000
0.224
0.027
0.800
0.004
0.067
0.335
3.500
2.000

0.00
0.00
0.00
0.00
0.00
0.00

ALLOW FOR NAILS, SLODERING MATERIAL ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

M033 Fixing of Half round, 150mm pvc Eaves gutters with aluminium brackets and brass scr
at 450mm intervals including necessary moulded fittings.
PER m
M478
M401
M400
M404
M402
M405
M406
M197
L008
L001

Gutter half round PVC 150mm x 4m


No.
Gutter end cap half round PVC 150mm
No.
Mitre Joint half round PVC 150mm
No.
Gutter Bracket half round (Short Arm Aluminium
No.
Gutter Joiner half round PVC 150mm
No.
Running head PVC 150mm
No.
Solvent cement
50 Grams
Screws Brass 20mm x Gauge 6
Doz.
Plumber
Hour
Unskilled labour
Hour
ALLOW FOR LADDER

SUB TOTAL
OVER HEAD & PROFITS 22.00%

0.273
0.137
0.068
3.100
0.205
0.137
0.137
0.580
0.273
0.273

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

TOTAL

M034 Fixing of 114mm PVC square Eave gutters with P.V.C. brackets and brass screws
at 450mm intervals including all necessary moulded fittings.
PER m
M388 Gutter Square PVC 114mm
M390 Gutter End Cap Square PVC 114mm
M3989 Mitre Joint Square PVC 114mm
M391 Gutter Joiner Square PVC 114mm
M393 Gutter Bracket Square PVC 114mm
M392 Running Head Square PVC 114mm
M406 Solvent cement
M197 Screws brass 20mm x Gauge 6
L008 Plumber
L001 Unskilled labour

m
No.
No.
No.
No.
No.
50 Grams
Doz.
Hour
Hour

1.000
0.137
0.068
0.205
3.100
0.137
0.137
0.580
0.273
0.273

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

ALLOW FOR LADDER


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M035 Fixing of 87mm dia. PVC Down pipes with wooden plug including all necessary
moulded fittings.
PER m
M395
M398
M396
M470
M397
M197
M406
L008
L002
L001

Down pipe PVC 89mm


Down pipe Elbow PVC 89mm
Down pipe joiner PVC 89mm
Wood plugs.
Down pipe Clip PVC 89mm
Screws Brass 20mm x Guage 6
Solvent cement
Plumber
Skilled labour
Unskilled labour

m
No.
No.
m
No.
Doz.
50 Grams
Hour
Hour
Hour

ALLOW FOR LADDER & RAWL PLUG


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.093
0.547
0.137
0.547
0.547
0.091
0.205
0.273
0.273
0.546

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

GLAZIER

N001 Fixing of Glass panes with class I timber boarding (Glass Supplied by Client)
PER m2
M479 12mm x 12mm Class I timber beadings
L009 Glazier

m
Hour

19.650
5.000

0.00
0.00

ALLOW FOR PUTTY, NAILS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

N002 Supplying of 3mm thick clear Glass panes and fixing with class I timber
beading.
PER m2
M228 Glass Pane clear 3mm
M479 12mm x 12mm Class I timber beadings
L009 Glazier

Sq.m.
m
Hour

1.100
15.000
5.000

0.00
0.00
0.00

ALLOW FOR NAILS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
N003 Supplying of 4mm clear Glass panes and fixing with class I timber beading.
PER m2
M229 Glass Pane clear 4mm
M479 12mm x 12mm Class I timber beadings
L009 Glazier

Sq.m.
m
Hour

ALLOW FOR NAILS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.100
8.000
4.000

0.00
0.00
0.00

GLAZIER

N004 Supplying of 3mm figured Glass panes and fixing with Class I timber beading.
PER m2
M230 Glass pane Figured 3mm
M479 12mm x 12mm Class I timber beadings
L009 Glazier

Sq.m.
m
Hour

1.10
15.00
5.00

0.00
0.00
0.00

ALLOW FOR NAILS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

N005 Supplying of 5mm figured Glass panes and fixing with Class I timber beading.
PER m2
M231 Glass pane Figured 5mm
M479 12mm x 12mm Class I timber beadings
L009 Glazier

Sq.m.
m
Hour

ALLOW FOR NAILS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.10
8.00
4.00

0.00
0.00
0.00

PAINTER & DECORATOR

P001 One coat of cement washing to walls of single storeyed buildings, patching
and preparing surface.
PER m2
M010 Cement
L006 Painter
L001 Unskilled labour

50 Kg.
Hour
Hour

0.004
0.088
0.088

0.00
0.00

ALLOW FOR BRUSHES ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

P002 Two coat of cement washing to walls of single storeyed buildings, patching
and preparing surface.
PER m2
M010 Cement
L006 Painter
L001 Unskilled labour

50 Kg.
Hour
Hour

ALLOW FOR BRUSHES ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.007
0.150
0.150

0.00
0.00

PAINTER & DECORATOR

P003 One coat of cement washing externally to walls of buildings upper floor

PER m2
M010 Cement
L006 Painter
L001 Unskilled labour

50 Kg.
Hour
Hour

0.004
0.104
0.104

0.00
0.00

ALLOW FOR BRUSHES ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

P004 Flags average size 1800mm x 900mm hung upon buildings as directed and removed
when required (Flags supplied by Client. Any poles used are to be paid separately).
PER No.
L001 Unskilled labour

Hour

0.500

0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

P005 Flags small (burges) up to 100 hungs upon buildings as directed and removed when
required (Flags supplied by Client. Any poles used are to be paid separately).
PER No.
L001 Unskilled labour

day
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.007

0.00

PAINTER & DECORATOR

P006 Flags small (burges) up to 100 hungs upon buildings as directed and removed when
required (Flags supplied by Client. Any poles used are to be paid separately).
PER No.
L001 Unskilled labour

day

0.006

0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

P007 Flag poles (Supplied by Client) planted as directed removed when required
and ground made good.
PER post
L001 Unskilled labour

day

0.150

0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

P008 Lettering 25mm to 50mm painted in Sinhala, English or Tamil including painting
ground.
PER p/letter
L006 Painter

Hour

ALLOW FOR BRUSHERS PAINT ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.184

0.00

PAINTER & DECORATOR

P009 Lettering 50mm to 75mm painted in Sinhala, English or Tamil including painting
ground.
PER p/letter
L006 Painter

Hour

0.200

0.00

ALLOW FOR BRUSHERS PAINT ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

P010 Lettering 100mm to 125mm painted in Sinhala, English or Tamil including painting
ground.
PER p/letter
L006 Painter

Hour

0.250

0.00

0.070
0.054

0.00
0.00

ALLOW FOR BRUSHERS PAINT ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

P011 Painting the metal surface with one coat of aluminium paint.
PER m2
M480 Aluminium paint
L015 Painter

Lit.
day

ALLOW FOR BRUSHERS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PAINTER & DECORATOR

P012 Painting one coat of enamel paint including washing (using washing soda) , cleaning a
smoothing down with sand paper.
PER m2
M075 Enamel *
L006 Painter

Lit.
Hour

0.081
0.430

0.00
0.00

ALLOW FOR BRUSHES , SAND PAPER, WASHING SODA ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

P013 Painting two coats of enamel paint including washing( using washing soda) cleaning a
down with sand paper.
PER m2
M075 Enamel *
L006 Painter

Lit.
Hour

0.161
1.000

0.00
0.00

ALLOW FOR BRUSHES , SAND PAPER WASHING SODA ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P014 Painting new wood work with primer and 2 coats of oil paint.
PER m2
M077 Aluminium wood primer *
M083 Oil paint (Gloss) *
L006 Painter

Lit.
Lit.
Hour

ALLOW FOR BRUSHES , SAND PAPER ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.081
0.161
1.300

0.00
0.00
0.00

PAINTER & DECORATOR

P015 Painting new wood work with one coat of approved wood primer
PER m2
M077 Aluminium wood primer *
L006 Painter

Lit.
Hour

0.081
0.500

0.00
0.00

ALLOW FOR BRUSHES ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

P016 Painting steel work, with 1 coat of red lead including removing scale and wire brushing
PER m2
M082 Red Lead Paint *
L006 Painter

Lit.
Hour

0.081
0.500

0.00
0.00

ALLOW FOR BRUSHES ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

P017 Painting steel work, with 2 coat of red lead including removing scale and wire brushing
PER m2
M082 Red Lead Paint *
L006 Painter

Lit.
Hour

ALLOW FOR BRUSHES ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.162
1.000

0.00
0.00

PAINTER & DECORATOR

P018 Painting walls with Alkali resisting primer where necessary.


PER m2
M084 Alkali resisting primer *
L006 Painter

Lit.
Hour

0.097
0.300

0.00
0.00

ALLOW FOR BRUSHES ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

P019 Painting walls with one coat of emulsion paint including preparing surface
of new work.
PER m2
M073 Emulsion *
L006 Painter

Lit.
Hour

0.081
0.300

0.00
0.00

ALLOW FOR BRUSHES PLASTER OF PARIS & WITING ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

P020 Painting walls with two coats of emulsion paint including preparing surface
of new work.
PER m2
M073 Emulsion *
L006 Painter

Lit.
Hour

0.150
0.600

ALLOW FOR BRUSHES PLASTER OF PARIS & WITING ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00

PAINTER & DECORATOR

P021 Painting walls with one coat of emulsion paint including preparing surface
of old work.
PER m2
M073 Emulsion *
L006 Painter

Lit.
Hour

0.081
0.376

0.00
0.00

ALLOW FOR BRUSHES & WITING ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

P022 Painting walls with two coats of emulsion paint including preparing surface of old wor
PER m2
M073 Emulsion *
L006 Painter

Lit.
Hour

0.150
0.650

0.00
0.00

ALLOW FOR BRUSHES & WITING ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

P023 Painting walls with two coats of snowcem or equivalent cemet paint to new work.
PER m2
M080 Snowcem
L006 Painter
L001 Unskilled labour

Kg.
Hour
Hour

ALLOW FOR BRUSHES ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.345
0.700
0.400

0.00
0.00
0.00

PAINTER & DECORATOR

P024 Painting old walls with two coats of snowcem or equivalent cement paint after scraping
existing colourwash, sand papering and wiping down.
PER m2
M080 Snowcem
L006 Painter
L001 Unskilled labour

Kg.
Hour
Hour

0.345
0.700
0.700

0.00
0.00
0.00

ALLOW FOR BRUSHES ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

P025 Painting old walls with one coat of snowcem or equivalent cement paint after scraping
existing colour wash, sand papering and wiping
PER m2
M080 Snowcem
L006 Painter
L001 Unskilled labour

Kg.
Hour
Hour

ALLOW FOR BRUSHES ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.197
0.400
0.600

0.00
0.00
0.00

PAINTER & DECORATOR

P026 Removing paint entirely with blow lamp to bare timber.


PER m2
L001 Unskilled labour

Hour

1.300

0.00

2.000

0.00

ALLOW FOR BLOW LAMP OIL ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

P027 Removing paint on panelled and moulded surfaces.


PER m2
L001 Unskilled labour

Hour

ALLOW FOR BLOW LAMP OIL SAND PAPER ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

P028 Painting G.I. Pipes 20mm to 40mm diameter with 2 coats of enamel paint.
PER m
M075 Enamel *
L006 Painter

Lit.
Hour

ALLOW FOR BRUSHES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.022
0.200

0.00
0.00

PAINTER & DECORATOR

P029 Applying of 1 coat Tarnap or other wood preservative to old wood work.
PER m2
M076 Wood Preservative (black / coloured) *
L006 Painter

Lit.
Hour

0.122
0.200

0.00

ALLOW FOR BRUSHES ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

P030 Applying of 2 coats Tarnap or other wood preservative to new wood work.
PER m2
M076 Wood Preservative (Black / Coloured) *
L006 Painter

Lit.
Hour

0.218
0.400

0.00

ALLOW FOR BRUSHES ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

P031 Varnishing with 1 coat of polyurethene best Copal varnish after washing down and san
PER m2
M079 Polythane Varnish *
L001 Unskilled labour
L006 Painter

Lit.
Hour
Hour

ALLOW FOR SAND PAPER BRUSHES ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.097
0.300
0.400

0.00
0.00
0.00

PAINTER & DECORATOR

P032 Varnishing with 2 coats of Polyurathene varnish after washing down and sand paperin
PER m2
M079 Polythane Varnish *
L001 Unskilled labour
L006 Painter

Lit.
Hour
Hour

0.178
0.300
0.800

0.00
0.00
0.00

ALLOW FOR SAND PAPER , BRUSHES ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

P033 Removing existing varnishing to bare timber and preparing surface.


PER m2
L001 Unskilled labour

Hour

1.750

0.00

ALLOW FOR SAND PAPER ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

P034 Scraping and removing soot on walls and levelling internally(extra over colour
washing).
PER m2
L001 Unskilled labour

Hour

ALLOW FOR TOOLS


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.200

0.00

PAINTER & DECORATOR

P035 Scraping of walls to original plaster, sand papering and lime putting cracks and
defects, preparing surface for new application of distermper, snowcem paint or similar
application.
PER m2
L001 Unskilled labour
L004 Mason

Hour
Hour

0.200
0.050

0.00
0.00

ALLOW FOR SAND PAPER LIME PUTTY & SCAFFOLDING ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

P036 White washing or colour washing wall with 1 coat in single storeyed building
including patching and preparing surface.
PER m2
M550
M482
M483
L006
L001

Boiled Lime
Glue
Yellow ochre
Painter
Unskilled labour

Kg.
Kg.
Kg.
Hour
Hour

ALLOW FOR SCAFFOLDING, BRUSHES CEMENT ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.182
0.001
0.001
0.088
0.088

0.00
0.00
0.00
0.00

PAINTER & DECORATOR

P039 White washing or colour washing external walls with one coat in buildings of more
than two storeys.
PER m2
M484
M482
M483
L006
L001

Slaked lime
Glue
Yellow ochre
Painter
Unskilled labour

Bushels
Kg.
Kg.
Hour
Hour

0.182
0.001
0.001
0.088
0.144

0.00
0.00
0.00

ALLOW FOR CEMENT SAND AND SCAFFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

P040 White washing or colour washing external walls with two coats in 2 storeyed building

PER m2
M484
M482
M483
L006
L001

Slaked lime
Glue
Yellow ochre
Painter
Unskilled labour

Bushels
Kg.
Kg.
Hour
Hour

0.296
0.002
0.002
0.150
0.184

ALLOW FOR CEMENT SAND BRUSHES SCAFFOLDING ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

PAINTER & DECORATOR

P041 White washing or colour washing external walls with 2coat in buildings with more
than two storeys.
PER m2
M484
M482
M483
L006
L001

Slaked lime
Glue
Yellow ochre
Painter
Unskilled labour

Bushels
Kg.
Kg.
Hour
Hour

0.296
0.002
0.002
0.150
0.208

0.00
0.00
0.00

ALLOW FOR CEMENT SAND SCAFFOLDING BRUSHES ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

P042 Walls internal faces scraped to original plaster patching up cracks and defects
lime putty sand papering applying plaster of paris and preparing surfaces for
application of emulsion paint or enamel paint.
PER m2
L001 Unskilled labour
L004 Mason
L006 Painter

Hour
Hour
Hour

1.000
0.200
0.100

ALLOW FOR SAND PAPER , CEMENT SAND PLASTER OF PARIS AND


SCAFFOLDING ETC.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00
0.00

PAINTER & DECORATOR

P043 Walls external faces scraped to original plaster patching up cracks and defects and
preparing surface including sand papering for application of snowcem / white washing
in single storeyed buildings.
PER m2
L001 Unskilled labour
L004 Mason

Hour
Hour

1.000
0.200

0.00
0.00

ALLOW FOR CEMENT SAND LIME PUTTY AND SCAFFOLDING ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

P044 Walls external faces scraped to original plaster patching up cracks and defects and
preparing surface including sand papering for application of snowcem or white washin
in two storeyed buildings.
PER m2
L001 Unskilled labour
L004 Mason

Hour
Hour

ALLOW FOR CEMENT SAND AND SCAFFOLDING ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.300
0.200

0.00
0.00

PAINTER & DECORATOR

P045 Walls external faces scraped to original plaster patching up cracks and defects and
preparing surface including sand papering for application of snowcem or white washin
in more than two storeyed buildings.
PER m2
L001 Unskilled labour
L004 Mason

Hour
Hour

1.700
0.200

0.00
0.00

ALLOW FOR CEMENT SAND AND LIME PUTTY.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

P046 Painting walls with 1 coat weathershield paint including preparing surface of new work
PER m2
M074 Weathershield
L006 Painter

Lit.
Hour

0.117
0.320

0.00
0.00

ALLOW FOR SCAFFOLDING, BRUSHES SAND PAPER ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

P047 Painting walls with 2 coats weathershield paint including preparing surface of new wor
PER m2
M074 Weathershield *
L006 Painter

Lit.
Hour

0.223
0.600

ALLOW FOR SCAFFOLDING, BRUSHES SAND PAPER ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00

PAINTER & DECORATOR

P048 Painting walls with 1 coat weathershield paint including preparing surface of old work
PER m2
M074 Weathershield *
L006 Painter

Lit.
Hour

0.117
0.376

0.00
0.00

ALLOW FOR SCAFFOLDING, BRUSHES SAND PAPER ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

P049 Painting walls with 2 coats weathershield paint including preparing surface of old work
PER m2
M074 Weathershield *
L006 Painter

Lit.
Hour

0.223
0.700

0.00
0.00

ALLOW FOR SCAFFOLDING, BRUSHES SAND PAPER ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

P050 Painting floors with 1 coat floor paint including preparing surface.
PER m2
M081 Floor Paint - Quick drying
M085 Thinner *
L006 Painter

Lit.
Lit.
Hour

ALLOW FOR BRUSHES ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.082
0.008
0.250

0.00
0.00
0.00

PAINTER & DECORATOR

P051 Painting floors with 2 coats floor paint including preparing surface.
PER m2
M081 Floor Paint - Quick drying
M085 Thinner *
L006 Painter

Lit.
Lit.
Hour

ALLOW FOR BRUSHES ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.164
0.016
0.400

0.00
0.00
0.00

PLUMBER

Q001 Supplying and fixing of 12mm Ball float valve.


PER No.
M216 Ball Valve, 12mm (plastic)
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.500
0.500

0.00
0.00
0.00

1.000
0.500
0.500

0.00
0.00
0.00

1.000
0.750
0.750

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q002 Supplying and fixing of 20mm Ball valve.


PER No.
M217 Ball Valve, 20mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q003 Supplying and fixing of 25mm Ball valve.


PER No.
M218 Ball Valve, 25mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q004 Supplying and fixing of 32mm Ball valve.


PER No.
M219 Ball Valve, 32mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
1.000
1.000

0.00
0.00
0.00

0.500
0.500

0.00
0.00

0.500
0.500
1.000

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q005 Fixing of 12mm to 25mm Ball valve (Valve supplied by Client.)


PER No.
L008 Plumber
L001 Unskilled labour

Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q006 Removing , repairing , testing and fixing of Ball valve.


PER No.
L008 Plumber
L001 Unskilled labour
L007 Tinker

Hour
Hour
Hour

ALLOW FOR LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q007 Supplying and fixing of Ball only plastic, for 12mm valve.
PER No.
M220
L008
L001
L007

Ball only (plastic) 1/2" valve


Plumber
Unskilled labour
Tinker

No.
Hour
Hour
Hour

1.000
0.500
0.500
0.250

0.00
0.00
0.00
0.00

1.000
0.500
0.500
0.250

0.00
0.00
0.00
0.00

ALLOW FOR LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q008 Supplying and fixing of Ball only plastic, for 20mm valve.
PER No.
M221
L008
L001
L007

Ball only (plastic) 3/4" valve


Plumber
Unskilled labour
Tinker

No.
Hour
Hour
Hour

ALLOW FOR LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q009 Supplying and fixing of Ball only plastic, for 25mm valve.
PER No.
M222
L008
L001
L007

Ball only (Plastic) 1" valve


Plumber
Unskilled labour
Tinker

No.
Hour
Hour
Hour

1.000
0.750
0.750
0.250

0.00
0.00
0.00
0.00

0.500
0.500
0.250

0.00
0.00
0.00

ALLOW FOR LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q010 Ball soldered and fixed to lever operating valve.


PER No.
L008 Plumber
L001 Unskilled labour
L007 Tinker

Hour
Hour
Hour

ALLOW FOR LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q011 Fixing of lavatory Basin to wall and connected to existing water service and making
good (Basin brackets and fittings supplied by Client).
PER No.
M485 Plugs

No.

4.000

0.00

L001 Unskilled labour


L008 Plumber

Hour
Hour

8.000
6.000

0.00
0.00

ALLOW FOR SCREWS , CEMENT , RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q012 Fixing of lavatory Basin on existing brackets(Tap , waste trap and basin supplied
by Client.).
PER No.
L008 Plumber
L001 Unskilled labour

Hour
Hour

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

4.000
4.000

0.00
0.00

PLUMBER

Q013 Supplying and fixing of lavatory Basin 560mm x 360mm with one taps, waste
plug, with new brackets (additional tap , trap and outlet pipe paid separately).
PER No.
M122 Basin 360 x 560 with tap waste plug but
excluding bracket.
M485 Plugs

No.

1.000

No.

4.000

0.00

L001 Unskilled labour


L008 Plumber
M113 Wash Basin (L) Bracket

Hour
Hour
Pair

8.000
6.000
1.000

0.00
0.00
0.00

ALLOW FOR SCREWS, CEMENT RED LEAD


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q014 Supplying and fixing of lavatory Basin 560mm x 360mm with one tap on existing
brackets complete (additional tap, trap and outlet pipe paid separately).
PER No.
M122 Basin 360 x 560 with tap waste plug but
excluding bracket.
M485 Plugs

No.

1.000

No.

4.000

0.00

L001 Unskilled labour


L008 Plumber

Hour
Hour

8.000
6.000

0.00
0.00

ALLOW FOR SCREWS, CEMENT RED LEAD


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q015 Removing Basin, Urinal or sink including all fittings and walls made good.
PER No.
L008 Plumber
L001 Unskilled labour
L002 Skilled labour

Hour
Hour
Hour

3.000
4.000
1.000

0.00
0.00
0.00

ALLOW FOR CEMENT , LIME ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q016 C.I. Enamelled baths removing and re - fixing in new position and making good to
walls and floors (extra pipes required paid separately).
PER N0.
L008 Plumber
L001 Unskilled labour
L002 Skilled labour

Hour
Hour
Hour

ALLOW FOR CEMENT , RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

10.000
14.000
4.000

0.00
0.00
0.00

PLUMBER

Q017 C.I. Enamelled baths any size including trap, tap, outlet pipes etc. fixed complete
(Bath and fittings supplied by Client).
PER N0.
L008 Plumber
L001 Unskilled labour
L002 Skilled labour

Hour
Hour
Hour

8.000
10.000
2.000

0.00
0.00
0.00

ALLOW FOR CEMENT , RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q018 Fixing of C.I. Bends,elbows, tees, cresses any size upto 50mm(fittings supplied by Clie
PER N0.
L008 Plumber
L001 Unskilled labour

Hour
Hour

0.250
0.250

0.00
0.00

1.000
0.250
0.250

0.00
0.00
0.00

ALLOW FOR RED LEAD HEMP ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q019 Supplying and fixing of 12mm G.I. Bends.
PER N0.
M240 Bend G.I. 12mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q020 Supplying and fixing of 20mm G.I. Bends.


PER N0.
M241 Bend G.I. 20mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.250
0.250

0.00
0.00
0.00

1.000
0.250
0.250

0.00
0.00
0.00

1.000
0.250
0.250

0.00
0.00
0.00

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q021 Supplying and fixing of 25mm G.I. Bends.


PER N0.
M242 Bend G.I. 25mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q022 Supplying and fixing of 32mm G.I. Bends.
PER N0.
M243 Bend G.I. 32mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q023 Supplying and fixing of 38mm G.I. Bends.


PER N0.
M244 Bend G.I. 38mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.250
0.250

0.00
0.00
0.00

1.000
0.250
0.250

0.00
0.00
0.00

1.000
0.333
0.333

0.00
0.00
0.00

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q024 Supplying and fixing of 50mm G.I. Bends.


PER N0.
M245 Bend G.I. 50mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q025 Supplying and fixing of 75mm G.I. Bends.
PER N0.
M247 Bend G.I. 75mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q

PLUMBER

Q026 Supplying and fixing of chain, chromium plated for flushing cistern.

PER No.
M121 Chromium plated chain for flushing cistern
L008 Plumber

No.
Hour

1.000
0.500

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q027 Supplying and fixing of PVC reducing Sockets from 20mm to smaller sizes.
PER No.
L008 Plumber
L001 Unskilled labour

Hour
Hour

0.100
0.100

0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q028 Supplying and fixing of PVC reducing Sockets from 25mm to smaller sizes.
PER No.
M356 Reducing Socket PVC 25mm to smaller size.
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.100
0.100

0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q029 Supplying and fixing of PVC reducing Sockets from 32mm to smaller sizes.
PER No.
M357 Reducing Socket PVC 32mm to smaller size.
L008 Plumber

No.
Hour

1.000
0.100

0.00

L001 Unskilled labour

Hour

0.100

0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q030 Supplying and fixing of PVC reducing Sockets from 38mm to smaller sizes.
PER No.
M358 Reducing Socket PVC 40mm to smaller size.
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.100
0.100

0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q031 Supplying and fixing of PVC reducing Sockets from 50mm to smaller sizes.
PER No.
M359 Reducing Socket PVC 50mm to smaller size.
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.100
0.100

0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q

PLUMBER

Q032 Supplying and fixing of PVC reducing Tees from 20mm to smaller sizes.
PER No.
M361 Reducing Socket PVC 20mm to smaller size.
L008 Plumber
L001 Unskilled labour
ALLOW FOR OTHER EXPENSES

No.
Hour
Hour

1.000
0.100
0.100

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q033 Supplying and fixing of PVC reducing Tees from 25mm to smaller sizes.
PER No.
M361 Reducing Socket PVC 20mm to smaller size.
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.100
0.100

0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q034 Supplying and fixing of PVC reducing Tees from 32mm to smaller sizes.
PER No.
M362 Reducing Socket PVC 32mm to smaller size.
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.100
0.100

0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q

PLUMBER

Q035 Supplying and fixing of PVC reducing Tees from 40mm to smaller sizes.
PER No.
M363 Reducing Socket PVC 40mm to smaller size.
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.000
0.100
0.100

0.00
0.00

Q036 Supplying and fixing of PVC reducing Tees from 50mm to smaller sizes.
PER No.
M364 Reducing Socket PVC 50mm to smaller size.
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.100
0.100

0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q037 Supplying and fixing of 560mm x 510mm pedestal type wash basin(L)
with two way tapand waste plug.
PER No.
M088
L002
L001
L008

Wash Basin(L) with pedestal - white


Skilled labour
Unskilled labour
Plumber

No.
Hour
Hour
Hour

1.000
2.000
8.000
8.000

0.00
0.00
0.00

1.000
0.100

0.00
0.00

ALLOW FOR CEMENT ETC.


Q

PLUMBER
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q038 Supplying and fixing of 20mm p.v.c. Valve socket.


PER No.
M378 Valve Socket PVC 20mm
L008 Plumber

No.
Hour

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q039 Supplying and fixing of 25mm p.v.c. Valve socket.


PER No.
M379 Valve Socket PVC 25mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.100
0.100

0.00
0.00
0.00

1.000
0.100
0.100

0.00
0.00
0.00

1.000
0.100
0.100

0.00
0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q040 Supplying and fixing of 32mm PVC Valve socket.


PER No.
M379 Valve Socket PVC 25mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q041 Supplying and fixing of 40mm PVC Valve socket.


PER No.
M381 Valve Socket PVC 40mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q042 Supplying and fixing of 50mm PVC Valve socket.
PER No.
M382 Valve Socket PVC 50mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.100
0.100

0.00
0.00
0.00

1.000
0.150
0.150

0.00
0.00
0.00

1.000
0.200
0.200

0.00
0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q

PLUMBER

Q043 Supplying and fixing of 75mm PVC Valve socket.


PER No.
M346 Valve Socket PVC 75mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q044 Supplying and fixing of 90mm PVC Valve socket.


PER No.
M347 Valve Socket PVC 75mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR OTHER EXPENSES


SUB TOTAL

OVER HEAD & PROFITS 22.00%


TOTAL

PLUMBER

Q045 Supplying and fixing of 20mm p.v.c. Faucet socket.


PER No.
M336 Faucet Socket PVC 20mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.100
0.100

0.00
0.00

1.000
0.100
0.100

0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q046 Supplying and fixing of 25mm p.v.c. Faucet socket.


PER No.
M337 Faucet Socket PVC 25mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q047 Supplying and fixing of 32mm p.v.c. Faucet socket.

PER No.
M338 Faucet Socket PVC 32mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.100
0.100

0.00
0.00

1.000
0.100
0.100

0.00
0.00

1.000
0.100
0.100

0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q

PLUMBER

Q048 Supplying and fixing of 40mm p.v.c. Faucet socket.


PER No.
M339 Faucet Socket PVC 40mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q049 Supplying and fixing of 50mm p.v.c. Faucet socket.


PER No.
M340 Faucet Socket PVC 50mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q050 Supplying and fixing of 75mm p.v.c. Faucet socket.
PER No.
M342 Faucet Socket PVC 75mm

No.

1.000

L008 Plumber
L001 Unskilled labour

Hour
Hour

0.100
0.100

0.00
0.00

1.000
0.100
0.100

0.00
0.00

1.000
0.100
0.100

0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q

PLUMBER

Q051 Supplying and fixing of 90mm p.v.c. Faucet socket.


PER No.
M343 Faucet Socket PVC 90mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q052 Supplying and fixing of 20mm p.v.c. equal Tee.


PER No.
M372 Faucet Socket PVC 20mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q053 Supplying and fixing of 25mm p.v.c. Equal Tee.


PER No.
M373 Equal Tee PVC 25mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.100
0.100

0.00
0.00

1.000
0.100
0.100

0.00
0.00

1.000
0.100
0.100

0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q054 Supplying and fixing of 32mm p.v.c. Equal Tee.


PER No.
M374 Equal Tee PVC 25mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q055 Supplying and fixing of 40mm p.v.c. Equal Tee.
PER No.
M375 Equal Tee PVC 40mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q056 Supplying and fixing of 50mm p.v.c. Equal Tee.


PER No.
M376 Equal Tee PVC 50mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.100
0.100

0.00
0.00

1.000
0.100
0.100

0.00
0.00

1.000
0.100
0.100

0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q057 Supplying and fixing of 75mm p.v.c. Equal Tee.
PER No.
M348 Equal Tee PVC 75mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q058 Supplying and fixing of 40mm p.v.c. Equal Tee.
PER No.
M349 Equal Tee PVC 40mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q

PLUMBER

Q059 Supplying and fixing of 20mm p.v.c. Plugs.

PER No.
M495 Plugs PVC 20mm(see M350)
L008 Plumber

No.
Hour

1.000
0.100

0.00

1.000
0.100

0.00

1.000
0.100

0.00

1.000
0.100

0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q060 Supplying and fixing of 20mm p.v.c. Plugs.


PER No.
M496 Plugs PVC 25mm (see M351)
L008 Plumber

No.
Hour

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q061 Supplying and fixing of 32mm p.v.c. Plugs.


PER No.
M497 Plugs PVC 32mm (see M352)
L008 Plumber

No.
Hour

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q062 Supplying and fixing of 40mm p.v.c. Plugs.


PER No.
M498 Plugs PVC 40mm (see M353)
L008 Plumber

No.
Hour

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q063 Supplying and fixing of 50mm p.v.c. Plugs.


PER No.
M499 Plugs PVC 50mm (see M354)
L008 Plumber

No.
Hour

1.000
0.100

0.00

1.000
0.100

0.00

1.000
0.100
0.100

0.00
0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q064 Supplying and fixing of 75mm p.v.c. Plugs.


PER No.
M500 Plugs PVC 75mm
L008 Plumber

No.
Hour

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q065 Supplying and fixing of 20mm P.V.C. Sockets plain.


PER No.
M320 Socket PVC 20mm
L008 Plumber
L001 Unskilled labour
ALLOW FOR OTHER EXPENSES

No.
Hour
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q066 Supplying and fixing of 25mm P.V.C. Sockets plain.


PER No.
M321 Socket PVC 25mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.100
0.100

0.00
0.00
0.00

1.000
0.100
0.100

0.00
0.00
0.00

1.000
0.100
0.100

0.00
0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q067 Supplying and fixing of 32mm P.V.C. Sockets plain.
PER No.
M322 Socket PVC 32mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q

PLUMBER

Q068 Supplying and fixing of 40mm P.V.C. Sockets plain.


PER No.
M323 Socket PVC 40mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q069 Supplying and fixing of 50mm P.V.C. Sockets plain.


PER No.
M324 Socket PVC 50mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.100
0.100

0.00
0.00
0.00

1.000
0.100
0.100

0.00
0.00
0.00

1.000
0.200
0.200

0.00
0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q070 Supplying and fixing of 75mm P.V.C. Sockets plain.
PER No.
M326 Socket PVC 75mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q

PLUMBER

Q071 Supplying and fixing of 90mm P.V.C. Sockets plain.


PER No.
M327 Socket PVC 75mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q072 Supplying and fixing of 20mm p.v.c. pipes.(fittings paid separately.)


PER m

M293 Pipe PVC 20mm type 1000


L008 Plumber
L001 Unskilled labour

m
Hour
Hour

1.000
0.050
0.050

0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q073 Supplying and fixing of 25mm (type 1000) p.v.c. pipes.(Fittings paid separately.)
PER m
M293 Pipe PVC 20mm type 1000
L008 Plumber
L001 Unskilled labour

m
Hour
Hour

1.000
0.067
0.067

0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q

PLUMBER

Q074 Supplying and fixing of 32mm (type 1000) p.v.c. pipes.(Fittings paid separately.)
PER m
M293 Pipe PVC 32mm type 1000
L008 Plumber
L001 Unskilled labour

m
Hour
Hour

1.000
0.100
0.100

0.00
0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q075 Supplying and fixing of 40mm (type 1000) p.v.c. pipes.(Fittings paid separately.)
PER m
M296 Pipe PVC 32mm type 1000
L008 Plumber
L001 Unskilled labour

m
Hour
Hour

1.000
0.100
0.100

0.00
0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q076 Supplying and fixing of 50mm (type 1000) p.v.c. pipes.(Fittings paid separately.)
PER m
M297 Pipe PVC 50mm type 1000
L008 Plumber
L001 Unskilled labour

m
Hour
Hour

1.000
0.333
0.333

0.00
0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q

PLUMBER

Q077 Supplying and fixing of 63mm (type 1000) p.v.c. pipes.(Fittings paid separately.)
PER m
M298 Pipe PVC 63mm type 1000
L008 Plumber
L001 Unskilled labour

m
Hour
Hour

1.000
0.333
0.333

0.00
0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q078 Supplying and fixing of 75mm (type 1000) p.v.c. pipes.(Fittings paid separately.)
PER m
M299 Pipe PVC 75mm type 1000
L008 Plumber
L001 Unskilled labour

m
Hour
Hour

ALLOW FOR OTHER EXPENSES


SUB TOTAL

1.000
0.333
0.333

0.00
0.00
0.00

OVER HEAD & PROFITS 22.00%


TOTAL

PLUMBER

Q079 Fixing of Closet pedestal type available at site with cement concrete after
breaking concrete floor and making good and making connections to soil and
flush pipe.
PER No.
M010 Cement
L008 Plumber
L001 Unskilled labour

50 Kg.
Hour
Hour

0.250
6.000
6.000

0.00
0.00
0.00

ALLOW FOR METAL , SAND RED LEAD, HEMP ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q080 Fixing of 20mm to 50mm p.v.c. Pipes with specials (pipes and specials supplied
by Client.)
PER m
L008 Plumber
L001 Unskilled labour

Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.100
0.100

0.00
0.00

PLUMBER

Q081 Supplying and fixing of 20mm (type 1000) p.v.c. Pipes including specials and
fittings.
PER m
M293 Pipe PVC 20mm type 1000
L008 Plumber
L001 Unskilled labour

m
Hour
Hour

1.000
0.100
0.100

0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q082 Supplying and fixing of 25mm (type 1000) p.v.c. Pipes including specials and
fittings.
PER m
M294 Pipe PVC 25mm type 1000
L008 Plumber
L001 Unskilled labour

m
Hour
Hour

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.000
0.100
0.100

0.00
0.00
0.00

PLUMBER

Q083 Supplying and fixing of 32mm (type 1000) p.v.c. Pipes including specials and
fittings.
PER m
M295 Pipe PVC 25mm type 1000
L008 Plumber
L001 Unskilled labour

m
Hour
Hour

1.100
0.125
0.125

0.00
0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q084 Supplying and fixing of 40mm (type 1000) p.v.c. Pipes including specials and
fittings.
PER m
M296 Pipe PVC 40mm type 1000
L008 Plumber
L001 Unskilled labour

m
Hour
Hour

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.100
0.125
0.125

0.00
0.00
0.00

PLUMBER

Q085 Supplying and fixing of 50mm (type 1000) p.v.c. Pipes including specials and
fittings.
PER m
M297 Pipe PVC 50mm type 1000
L008 Plumber
L001 Unskilled labour

m
Hour
Hour

1.100
0.200
0.200

0.00
0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q086 Supplying and fixing of 63mm (type 1000) p.v.c. Pipes including specials and
fittings.
PER m
M298 Pipe PVC 63mm type 1000
L008 Plumber
L001 Unskilled labour

m
Hour
Hour

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.100
0.200
0.200

0.00
0.00
0.00

PLUMBER

Q087 Supplying and fixing of 150mm x 12mm p.v.c. shower rose with specials.
PER No.
M117 Shower Rose PVC 150mm x 12mm
L008 Plumber

No.
Hour

1.000
0.500

0.00

1.000
1.000

0.00

1.000
0.500
0.500

0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q088 Supplying and fixing of plastic seat cover.


PER No.
M116 Seat cover plastic
L008 Plumber

No.
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q089 Supplying and fixing of 12mm brass Gate valve.


PER No.
M501 Gate valve, brass 12mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q090 Supplying and fixing of 20mm brass Gate valve.

PER No.
M502 Gate valve, brass 20mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.500
0.500

0.00
0.00

1.000
0.750
0.750

0.00
0.00

1.000
1.000
1.000

0.00
0.00

1.000
1.000

0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q091 Supplying and fixing of 25mm brass Gate valve.


PER No.
M503 Gate valve, brass 25mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q092 Supplying and fixing of 32mm brass Gate valve.


PER No.
M504 Gate valve, brass 32mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q093 Supplying and fixing of 38mm brass Gate valve.


PER No.
M505 Gate valve, brass 38mm
L008 Plumber

No.
Hour

L001 Unskilled labour

Hour

1.000

0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q094 Supplying and installing of 400 gal capacity round plastic shell tank(with 2 Nos.
of 01 oz.mat.) including scaffolding & transport.
PER P/tank
M547 400 gal round plastic shell Tank
L011 Unskilled labour
L018 Plumber

No.
day
day

1.000
4.000
1.000

0.00

ALLOW FOR SCAFFOLDING


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q095 Disconneting pedestal type closet and plugging sewer connction and making good
to all affected walls and floors.
PER No.
M010 Cement
L008 Plumber
L001 Unskilled labour

50 Kg.
Hour
Hour

0.167
4.000
4.000

0.00
0.00
0.00

ALLOW FOR SAND METAL ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q

PLUMBER

Q096 Supplying and fixing pedestal type Closet (seat and cover available).
PER No.
M102
M010
L008
L001

Closet pedestal type


Cement
Plumber
Unskilled labour
ALLOW FOR SAND ETC.

No.
50 Kg.
Hour
Hour

1.000
0.250
6.000
6.000

0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q097 Supplying and fixing of Closet pedestal type with low level glazed earthenware
flushing cistern, flush pipe, double plastic seat cover 12mm stop cock trap etc.
PER No.
M506
M204
L008
L001
M109
M110
M094

Low level closet unit


Stop Cock Brass, 12mm
Plumber
Unskilled labour
Fittings for Cistern
Cistern Bracket
Low level cistern - white

No.
No.
Hour
Hour
No.
Pair
No.

1.000
1.000
8.000
8.000
1.000
1.000
1.000

0.00
0.00
0.00
0.00
0.00
0.00

ALLOW FOR METAL SAND ETC.


ALLOW FOR TRANSPORT
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q098 Supplying and fixing of Closet squatting type with trap excluding cistern.
PER No.
M091
M010
L018
L011

Squatting Pan (M) with 'P' Trap


Cement
Plumber
Unskilled labour

No.
50 Kg.
day
day

ALLOW FOR METAL ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.000
0.333
1.000
1.000

0.00
0.00
0.00
0.00

Q099 Supplying and fixing of Closet, squatting type with trap with cistern flush
pipe including 12mm stop cock and specials.
PER No.
M091
M010
L018
L011
M204
M109
M110
M094

Squatting Pan (M) with 'P' Trap


Cement
Plumber
Unskilled labour
Stop Cock Brass, 12mm
Fittings for Cistern
Cistern Bracket
Low level cistern - White

No.
50 Kg.
day
day
No.
No.
Pair
No.

ALLOW FOR METAL ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.000
0.333
1.000
1.000
1.000
1.000
1.000
1.000

0.00
0.00
0.00
0.00
0.00
0.00
0.00

PLUMBER

Q100 Removing Closet , squatting type and plugging sewer connections and making
good to floors.
PER No.
M010 Cement
L018 Plumber
L011 Unskilled labour

50 Kg.
hour
hour

0.500
6.000
6.000

0.00
0.00
0.00

ALLOW FOR METAL SAND ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q101 Installing Closet, squatting type including breaking floor and fixed in cement
concrete (Closet supplied by Client.)
PER No.
M010 Cement
L018 Plumber
L011 Unskilled labour

50 Kg.
hour
hour

ALLOW FOR METAL SAND ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.340
6.000
6.000

0.00
0.00
0.00

PLUMBER

Q102 Installing Closet, squatting type including trap, breaking floor and fixed in cement
concrete (Closet and trap supplied by Client.)
PER No.
M010 Cement
L018 Plumber
L011 Unskilled labour

50 Kg.
hour
hour

0.333
8.000
8.000

0.00
0.00
0.00

ALLOW FOR METAL ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q103 Installing Closet, squatting type including flushing cistern and pipes complete
(Closet and all fittings supplied .)
PER No.
M485
L002
L001
L008
M010

Plugs
Skilled labour
Unskilled labour
Plumber
Cement

No.
Hour
Hour
Hour
50 Kg.

ALLOW FOR METAL ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

6.000
1.000
13.000
12.000
0.333

0.00
0.00
0.00
0.00
0.00

PLUMBER

Q104 Supplying and fixing of 12mm brass bib cocks of approved quality.
PER No.
M204 Stop Cock Brass, 12mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.334
0.334

0.00
0.00

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q105 Supplying and fixing of 12mm chromium plated bib cocks of approved quality.
PER No.
M211 Pillar Cock chromium plated 12mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.334
0.334

0.00
0.00
0.00

0.334
0.334

0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q106 Fixing of Cocks, brass any size or push (cock supplied by Client.)
PER No.
L008 Plumber
L001 Unskilled labour

Hour
Hour

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q107 Removing of Cocks, brass bib push or stop cock of size 12mm to 40mm.
PER No.
L008 Plumber

Hour

0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q108 Repairing of Cocks bib or stop by fixing leather washers.


PER No.
M507 Leather washer
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.500
0.500

0.00
0.00
0.00

1.000
1.000
1.000

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q109 Repairing of Cocks self closing by fixing leather washer.


PER No.
M507 Leather washer
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q110 Supplying and fixing of 12mm G.I. Connector.

PER No.
M272 Connector G.I. 12mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.500
0.500

0.00
0.00
0.00

1.000
0.500
0.500

0.00
0.00
0.00

1.000
0.500
0.500

0.00
0.00
0.00

1.000
0.500

0.00
0.00

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q111 Supplying and fixing of 20mm G.I. Connector.


PER No.
M273 Connector G.I. 20mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q112 Supplying and fixing of 25mm G.I. Connector.
PER No.
M274 Connector G.I. 25mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q

PLUMBER

Q113 Supplying and fixing of 32mm G.I. Connector.


PER No.
M275 Connector G.I. 32mm
L008 Plumber

No.
Hour

L001 Unskilled labour

Hour

0.500

0.00

1.000
0.500
0.500

0.00
0.00
0.00

1.000
0.667
0.667

0.00
0.00
0.00

1.000
0.667
0.667

0.00
0.00
0.00

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q114 Supplying and fixing of 38mm G.I. Connector.


PER No.
M276 Connector G.I. 38mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q115 Supplying and fixing of 50mm G.I. Connector.
PER No.
M277 Connector G.I. 50mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q

PLUMBER

Q116 Supplying and fixing of 75mm G.I. Connector.


PER No.
M278 Connector G.I. 75mm
L008 Plumber
L001 Unskilled labour
ALLOW FOR RED LEAD ETC.

No.
Hour
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q117 Fixing of connector any size upto 38mm (connector supplied by Client.)
PER No.
L008 Plumber
L001 Unskilled labour

Hour
Hour

0.500
0.500

0.00
0.00

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q118 Fixing of connector above 38mm and upto 75mm (connector supplied by Client.)
PER No.
L008 Plumber
L001 Unskilled labour

Hour
Hour

0.667
0.667

0.00
0.00

1.000
2.000
2.000

0.00
0.00

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q

PLUMBER

Q119 Supplying and fixing of Plastic cover for commode.


PER No.
M116 Seat cover plastic
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q120 Supplying and fixing of 12mm G.I. Elbows.


PER No.
M248 Elbow G.I. 12mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.250
0.250

0.00
0.00
0.00

1.000
0.250
0.250

0.00
0.00
0.00

1.000
0.250
0.250

0.00
0.00
0.00

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q121 Supplying and fixing of 20mm G.I. Elbows.
PER No.
M249 Elbow G.I. 20mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q

PLUMBER

Q122 Supplying and fixing of 25mm G.I. Elbows.


PER No.
M250 Elbow G.I. 25mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q123 Supplying and fixing of 32mm G.I. Elbows.


PER No.

M251 Elbow G.I. 32mm


L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.250
0.250

0.00
0.00
0.00

1.000
0.250
0.250

0.00
0.00
0.00

1.000
0.250
0.250

0.00
0.00
0.00

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q124 Supplying and fixing of 38mm G.I. Elbows.
PER No.
M252 Elbow G.I. 38mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q

PLUMBER

Q125 Supplying and fixing of 50mm G.I. Elbows.


PER No.
M253 Elbow G.I. 50mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q126 Cleaning of cost iron Flushing cistern and painting with one coat Anti - corrosive
paint internally.
PER No.
L008 Plumber

Hour

2.500

0.00

ALLOW FOR PAINT AND BRUSHES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q127 Supplying and fixing of Flushing cistern, cistern, C.I. 9 litres, excluding flush pipe
and brackets but including ball valve.
PER No.
M119 Cistern High level C.I.
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
4.000
4.000

0.00
0.00

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q128 Supplying and fixing of Flushing cistern, cistern, C.I. 9 litres, excluding flush pipe
and brackets but ball valve.
PER No.
M120 Cistern High level C.I.
L008 Plumber
L001 Unskilled labour
ALLOW FOR RED LEAD ETC.

No.
Hour
Hour

1.000
4.000
4.000

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q128 Supplying and fixing of Flushing cistern plastic 9 litres excluding flush pipe and
brackets but ball valve.
PER No.
M120 Cistern high level plastic
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
4.000
4.000

0.00
0.00

4.000
1.000
4.000
4.000

0.00
0.00
0.00
0.00

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q129 Fixing of Flushing cistern (cistern brackets supplied).


PER No.
M485
L002
L001
L008

Plugs
Skilled labour
Unskilled labour
Plumber

No.
Hour
Hour
Hour

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q130 Supplying and fixing of low level porcelain Flushing cistern.


PER No.
M094
L008
L001
M110

Low level cistern - White


Plumber
Unskilled labour
Cistern Brackets

No.
Hour
Hour
Hour

1.100
4.000
4.000
1.000

0.00
0.00
0.00

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q131 Fixing of Flushing cistern lever forged out of wrought iron 25mm x 5m, bent to shape
PER No.
L005 Black Smith
L001 Unskilled labour
L008 Plumber

Hour
Hour
Hour

ALLOW FOR STEEL ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

4.000
5.000
1.000

0.00
0.00
0.00

PLUMBER

Q132 Disconnecting C.I. Flushing cistern and plugging water connection including making
good to all damage walls, floors etc.
PER No.
M256 Plug G.I. 12mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
4.000
4.000

0.00
0.00
0.00

ALLOW FOR RED LEAD CEMENT ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q133 Removing of Flushing cistern and re- fixing in new position including necessary
plugs, and making good to walls.
PER No.
M485
L002
L001
L008
M256

Plugs
Skilled labour
Unskilled labour
Plumber
Plug G.I. 12mm

No.
Hour
Hour
Hour
No.

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

4.000
1.000
8.000
8.000
1.000

0.00
0.00
0.00
0.00
0.00

PLUMBER

Q134 Refixing of Flush pipe of pedestal closets after removing old putty etc.
PER No.
L008 Plumber
L001 Unskilled labour

Hour
Hour

1.000
1.000

0.00
0.00

ALLOW FOR PUTTY ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q135 Fixing G.I. Flush pipe including solders, joints (Flush pipe supplied by Client).
PER No.
L008 Plumber
L001 Unskilled labour

Hour
Hour

2.000
2.000

0.00
0.00

1.000
0.500
0.500

0.00
0.00
0.00

ALLOW FOR RED LEAD, CEMENT ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q136 Supplying and fixing 32mm p.v.c. flush pipe p.v.c.


PER No.
M295 Pipe PVC 32mm type 1000
L008 Plumber
L001 Unskilled labour

m
Hour
Hour

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q137 Supplying and fixing of Hooks for G.I. 12mm pipes.


PER No.
M509 Hooks for 12mm G.I. Pipes
L008 Plumber

No.
Hour

1.000
0.100

0.00
0.00

1.000
0.100

0.00
0.00

1.000
0.100

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q138 Supplying and fixing of Hooks for G.I. 20mm pipes.


PER No.
M510 Hooks for 20mm G.I. Pipes
L008 Plumber

No.
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q139 Supplying and fixing of Hooks for G.I. 25mm pipes.


PER No.
M511 Hooks for 25mm G.I. Pipes
L008 Plumber

No.
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q140 Supplying and fixing of Hooks for G.I. 32mm pipes.

PER No.
M512 Hooks for 32mm G.I. Pipes
L008 Plumber

No.
Hour

1.000
0.100

0.00
0.00

1.000
0.100

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q141 Supplying and fixing of Hooks for G.I. 38mm pipes.


PER No.
M513 Hooks for 38mm G.I. Pipes
L008 Plumber

No.
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q142 Fixing of Hooks for G.I. Pipes,(Hooks available).


PER No.
L008 Plumber

Hour

0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q143 Supplying and fixing of 12mm G.I. Jam nuts.


PER No.
M514 G.I. Joint nut 12mm
L008 Plumber

No.
Hour

1.000
0.100

0.00
0.00

L001 Unskilled labour

Hour

0.100

0.00

1.000
0.100
0.100

0.00
0.00
0.00

1.000
0.100
0.100

0.00
0.00
0.00

1.000
0.100
0.100

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q144 Supplying and fixing of 20mm G.I. Jam nuts.


PER No.
M515 G.I. Joint nut 20mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q145 Supplying and fixing of 25mm G.I. Jam nuts.


PER No.
M516 G.I. Joint nut 25mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q146 Supplying and fixing of 32mm G.I. Jam nuts.


PER No.
M517 G.I. Joint nut 32mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%

TOTAL

Q147 Supplying and fixing of 38mm G.I. Jam nuts.


PER No.
M518 G.I. Joint nut 38mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.100
0.100

0.00
0.00
0.00

1.000
0.100
0.100

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q148 Supplying and fixing of 50mm G.I. Jam nuts.


PER No.
M519 G.I. Joint nut 50mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q149 Fixing of Jam nuts any size upto 50mm (Jam nuts supplied by Client).
PER No.
L008 Plumber
L001 Unskilled labour

Hour
Hour

0.100
0.100

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q150 Supplying and fixing of Bath room type oval shape bevelled mirror, 380mm x 330mm
with rawl plugs and chromium plated fittings.

PER No.
M104 Mirror Frame Oval - White
L008 Plumber
M103 Mirror only, oval

No.
Hour
No.

1.000
2.000
1.000

0.00

ALLOW FOR PLUGS SCREWS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q151 Supplying and fixing 320mm x 280mm Rectangular bevelled mirror to wall with rawl
plugs and chromium plated fittings.
PER No.
M105 Mirror Frame Square - White
L008 Plumber
M101 Mirror only, square

No.
Hour
No.

1.000
2.000
1.000

0.00
0.00

ALLOW FOR PLUGS SCREWS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q

PLUMBER

Q152 Supplying and fixing of 12mm G.I. Pipe. Rate to include trenching backfilling and
making good to wall (fittings and pipe hooks paid separately).
PER m
M232
M520
L008
L001

Pipe G.I. 12mm


Red lead
Plumber
Unskilled labour

m
Kg.
Hour
Hour

1.000
0.333
0.500
0.500

0.00
0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q153 Supplying and fixing of 20mm G.I. Pipe. Rate to include trenching backfilling and

making good to walls(fittings and pipe hooks paid separately).


PER m
M233
M520
L008
L001

Pipe G.I. 20mm


Red lead
Plumber
Unskilled labour

m
Kg.
Hour
Hour

1.000
0.038
0.500
0.500

0.00
0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q154 Supplying and fixing of 25mm G.I. Pipe. Rate to include trenching backfilling and
making good to walls(fittings and pipe hooks paid separately).
PER m
M234
M520
L008
L001

Pipe G.I. 25mm


Red lead
Plumber
Unskilled labour

m
Kg.
Hour
Hour

1.000
0.042
0.500
1.000

0.00
0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q155 Supplying and fixing of 32mm G.I. Pipe. Rate to include trenching backfilling and
making good to walls(fittings and pipe hooks paid separately).
PER m

M235
M520
L008
L001

Pipe G.I. 32mm


Red lead
Plumber
Unskilled labour

m
Kg.
Hour
Hour

1.000
0.033
0.500
1.000

0.00
0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q156 Supplying and fixing of 38mm G.I. Pipe. Rate to include trenching backfilling and
making good to walls(fittings and pipe hooks paid separately).
PER m
M236
M520
L008
L001

Pipe G.I. 38mm


Red lead
Plumber
Unskilled labour

m
Kg.
Hour
Hour

1.000
0.033
0.500
1.000

0.00
0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q157 Supplying and fixing of 50mm G.I. Pipe. Rate to include trenching backfilling and
making good to walls(fittings and pipe hooks paid separately).
PER m
M237 Pipe G.I. 50mm
M520 Red lead
L008 Plumber

m
Kg.
Hour

1.000
0.033
0.600

0.00
0.00

L001 Unskilled labour

Hour

1.200

0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q158 Supplying and fixing of 75mm G.I. Pipe. Rate to include trenching backfilling and
making good to walls(fittings and pipe hooks paid separately).
PER m
M239
M520
L008
L001

Pipe G.I. 75mm


Red lead
Plumber
Unskilled labour

m
Kg.
Hour
Hour

1.000
0.033
0.600
1.200

0.00
0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q159 Fixing of 12mm to 50mm G.I. Pipes with specials bends, elbows etc.(Pipes and
specials supplied by Client). Rate to include trenching and making good to walls.
PER m
M520 Red lead
L001 Unskilled labour
L008 Plumber

Kg.
Hour
Hour

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%

0.033
1.200
0.600

0.00
0.00

TOTAL

PLUMBER

Q160 Fixing of 63mm to 75mm G.I. Pipes Rate to include trenching and making good to wal
(Fittings and pipe hooks paid separately,)
PER m
M520 Red lead
L001 Unskilled labour
L008 Plumber

Kg.
Hour
Hour

0.030
1.200
0.600

0.00
0.00

1.000
0.132

0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q161 Removing of G.I. Pipes any size upto 50mm and trench filled in.
PER m
L001 Unskilled labour
L008 Plumber

Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q162 Removing of G.I. Pipes 50mm to 100mm and making good to walls and floors.
PER m
L001 Unskilled labour
L008 Plumber

Hour
Hour

0.550
0.850

0.00
0.00

M010 Cement

50 Kg.

ALLOW FOR BRICKS SAND ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.035

0.00

PLUMBER

Q163 Existing G.I. Pipes upto 50mm takeout cleaned and relaid. Rate to include backfilling.
PER m
L001 Unskilled labour
L008 Plumber
M520 Red lead

Hour
Hour
Kg.

0.500
0.270
0.019

0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q164 Existing G.I. Pipes 63mm to 75mm takeout cleaned and relaid. Rate to include backfill
PER m
L001 Unskilled labour
L008 Plumber
M520 Red lead

Hour
Hour
Kg.

1.000
0.400
0.030

0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q165 Existing G.I. Pipes upto 50mm takeout cleaned and relaid in new position.
Rate to include backfilling.
PER m
L001 Unskilled labour
L008 Plumber
Red lead
ALLOW FOR EXPENSES

Hour
Hour
Kg.

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.200
0.300
0.019

0.00
0.00

PLUMBER

Q166 Cleaning of pipe outlets, upto 2400mm length, (Excluding removing and
replacing.
PER m
L001 Unskilled labour

Hour

1.000

0.00

0.083
0.083

0.00
0.00

1.000
0.083
0.083

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q167 G.I. Plugs of any size fixed in position (plugs supplied by Client).
PER No.
L008 Plumber
L001 Unskilled labour

Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q168 Supplying and fixing of 12mm G.I. Plugs.


PER No.
M256 Plug G.I. 12mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q169 Supplying and fixing of 20mm G.I. Plugs.

PER No.
M257 Plug G.I. 20mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.083
0.083

0.00
0.00
0.00

1.000
0.083
0.083

0.00
0.00
0.00

1.000
0.083
0.083

0.00
0.00
0.00

1.000
0.083

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q170 Supplying and fixing of 25mm G.I. Plugs.


PER No.
M258 Plug G.I. 25mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q171 Supplying and fixing of 32mm G.I. Plugs.


PER No.
M259 Plug G.I. 32mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q172 Supplying and fixing of 38mm G.I. Plugs.


PER No.
M260 Plug G.I. 38mm
L008 Plumber

No.
Hour

L001 Unskilled labour

Hour

0.083

0.00

1.000
0.083
0.083

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q173 Supplying and fixing of 50mm G.I. Plugs.


PER No.
M261 Plug G.I. 50mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q174 Supplying and fixing of 25mm to 32mm rubber plugs for wash basins and sinks.
PER No.
M521 Rubber plug 25mm to 32mm
L008 Plumber

No.
Hour

1.000
0.250

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q175 Supplying and fixing of 38mm to 50mm rubber plugs for wash basins and sinks
PER No.
M522 Rubber plug 32mm to 50mm
L008 Plumber

No.
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.000
0.250

0.00
0.00

Q176 Supplying and fixing of Wooden plugs in Class I timber , 100mm long, tapered 75mm
to 50mm square section bedded in 1:2 cement mortar.
PER No.
M523 100mm x 100mm Class I timber beams(4" x 4")
L002 Skilled labour
L001 Unskilled labour
ALLOW FOR CEMENT ETC.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q177 Supplying and fixing of 12mm heavy quality brass push taps.
PER No.
M212 12mm heavy quality brass push tap
L008 Plumber

No.
Hour

1.000
0.334

0.00
0.00

1.000
0.334

0.00
0.00

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

A178 Supplying and fixing of 12mm light pattern brass push taps.
PER No.
M214 12mm light brass push tap
L008 Plumber

No.
Hour

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q179 Making a platform, with bamboo and planks for lifting or lowering of storage tank to
a height 4575mm to 9145mm and removing same.
PER No.
M445 Props(bamboo) 3 - 4 m
M047 Timber planks 25mm class B
L011 Unskilled labour

No.
Sq.m.
day

3.500
0.070
2.000

0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q180 Making a platform, with bamboo and planks for lifting or lowering of storage tank to
a height 9145mm to 15240mm and removing same.
PER No.
M445 Props(bamboo) 3 - 4 m
M047 Timber planks 25mm class B
L011 Unskilled labour

No.
Sq.m.
day

7.000
0.070
2.500

0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q181 Supplying and fixing of 600mm x 125mm glass shelves with chromium plated bracket
to wall with rawl plugs.

PER No.
M524 600mm x 125mm glass shelf with chromium
plated brackets.
M525 Rawl Plugs
L008 Plumber

No.

1.000

No.
Hour

4.000
1.250

0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q182 Fixing any size of shower rose in position (Shower rose supplied by client).
PER N.
L008 Plumber

Hour

0.250

0.00

1.000
0.250

0.00

1.000
0.250

0.00

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q

PLUMBER

Q183 Supplying and fixing of 150mm copper shower rose.


PER No.
M118 Shower Rose Copper 150mm x 12mm
L008 Plumber

No.
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q184 Supplying and fixing of 150mm p.v.c. shower rose.


PER No.
M117 Shower Rose 150mm x 12mm
L008 Plumber

No.
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q185 Shower rose soldered and re - fixed.


PER No.
L008 Plumber

Hour

1.000

0.00

1.000
0.125

0.00
0.00

1.000
0.125

0.00
0.00

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q186 Supplying and fixing of 12mm G.I. Nipples.


PER No.
M264 Nipple G.I. 12mm
L008 Plumber

No.
Hour

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q187 Supplying and fixing of 20mm G.I. Nipples.


PER No.
M265 Nipple G.I. 20mm
L008 Plumber

No.
Hour

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q188 Supplying and fixing of 25mm G.I. Nipples.


PER No.
M266 Nipple G.I. 25mm
L008 Plumber

No.
Hour

1.000
0.125

0.00
0.00

1.000
0.125

0.00
0.00

1.000
0.125

0.00
0.00

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q189 Supplying and fixing of 32mm G.I. Nipples.


PER No.
M267 Nipple G.I. 32mm
L008 Plumber

No.
Hour

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q190 Supplying and fixing of 38mm G.I. Nipples.


PER No.
M268 Nipple G.I. 38mm
L008 Plumber

No.
Hour

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q191 Supplying and fixing of 50mm G.I. Nipples.

PER No.
M269 Nipple G.I. 50mm
L008 Plumber

No.
Hour

1.000
0.125

0.00
0.00

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q192 Fixing in position of G.I. Nipples upto 50mm (nipple supplied by Client)
PER No.
L008 Plumber

Hour

0.125

0.00

ALLOW FOR RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q193 Repairing Piller cock and fixing to basin without damaging the basin.
PER No.
L008 Plumber

Hour

1.500

0.00

ALLOW FOR WASHERS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q194 Supplying and fixing 12mm chromium plated pillar cocks to basin.
PER No.
M211 Pillar cock chromium Plated 12mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.750
0.750

0.00
0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q195 Supplying and fixing 20mm chromium plated pillar cocks to basin.
PER No.
M213 Pillar cock chromium Plated 20mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.750
0.750

0.00
0.00
0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q196 Fixing of Sink in any size with all fittings (Sink and fittings supplied by Client.)
PER No.
M485
L002
L008
L001

Plugs
Skilled labour
Plumber
Unskilled labour

No.
Hour
Hour
Hour

ALLOW CEMENT ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

4.000
2.000
6.000
8.000

0.00
0.00
0.00
0.00

PLUMBER

Q197 Supplying and fixing of 610mm x 380mm x 180mm glazed earthenware sink with all
fitting on existing brackets.
PER No.
M089 Kitchen Sink 600 x 375 x 175mm White
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
5.500
5.500

0.00
0.00

ALLOW CEMENT ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q198 Supplying and fixing of 610mm x 380mm x 180mm glazed earthenware sink with all
fittings. Rate to include for provision of brackets.
PER No.
M089
M112
L008
L001

Kitchen Sink 600 x 375 x 175mm White


Wash Basin(M) Bracket
Plumber
Unskilled labour

No.
Hour
Hour
Hour

ALLOW CEMENT ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.000
5.500
5.500
5.500

0.00
0.00

PLUMBER

Q199 Removing Sink or basin and refixing in new position.


PER No.
M485
L008
L004
L001

Plugs
Plumber
Mason
Unskilled labour

No.
Hour
Hour
Hour

4.000
8.000
3.000
12.000

0.00
0.00
0.00
0.00

ALLOW CEMENT, RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q200 Making 600mm x 600mm x 150mm sink in 112mm brick masonary in cement 1:5 incl
12mm thick 1:2 cement rendering. Rate to include making holes in the wall and supply
and fixing of 50mm outlet pipes.
PER No.
M009
M010
M007
M297
L004
L001

Brick
Cement
sand
Pipe PVC 50mm type 1000
Mason
Unskilled labour

1000 Nos.
50 Kg.
Cu.m.
m
Hour
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q201 Supplying and fixing of 12mm plain G.I. Sockets.

0.032
0.500
0.115
0.310
6.000
6.000

0.00
0.00
0.00
0.00
0.00
0.00

PER No.
M280 Socket G.I. 12mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.125
0.125

0.00
0.00
0.00

1.000
0.125
0.125

0.00
0.00
0.00

1.000
0.125
0.125

0.00
0.00
0.00

1.000
0.125

0.00
0.00

ALLOW RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q202 Supplying and fixing of 20mm plain G.I. Sockets.


PER No.
M281 Socket G.I. 20mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q203 Supplying and fixing of 25mm plain G.I. Sockets.
PER No.
M282 Socket G.I. 25mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q

PLUMBER

Q204 Supplying and fixing of 32mm plain G.I. Sockets.


PER No.
M283 Socket G.I. 32mm
L008 Plumber

No.
Hour

L001 Unskilled labour

Hour

0.125

0.00

1.000
0.125
0.125

0.00
0.00
0.00

1.000
0.125
0.125

0.00
0.00
0.00

1.000
0.167
0.167

0.00
0.00
0.00

ALLOW RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q205 Supplying and fixing of 38mm plain G.I. Sockets.


PER No.
M284 Socket G.I. 38mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q206 Supplying and fixing of 50mm plain G.I. Sockets.
PER No.
M285 Socket G.I. 50mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW RED LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q

PLUMBER

Q207 Supplying and fixing of 75mm plain G.I. Sockets.


PER No.
M287 Socket G.I. 75mm
L008 Plumber
L001 Unskilled labour
ALLOW RED LEAD ETC.

No.
Hour
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q208 Supplying and fixing of 20mm to smaller size G.I. Reducing sockets.
PER No.
M288 Reducing Socket G.I. 20mm to smaller
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.125
0.125

0.00
0.00
0.00

ALLOW OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q209 Supplying and fixing of 25mm to smaller size G.I. Reducing sockets.
PER No.
M526 G.I. reducing Socket 25mm to smaller
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.125
0.125

0.00
0.00
0.00

ALLOW OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q

PLUMBER

Q210 Supplying and fixing of 32mm to smaller size G.I. Reducing sockets.
PER No.
M289 Reducing Socket G.I. 32mm to smaller
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.000
0.125
0.125

0.00
0.00

Q211 Supplying and fixing of 38mm to smaller size G.I. Reducing sockets.
PER No.
M290 Reducing Socket G.I. 38mm to smaller
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.125
0.125

0.00
0.00

ALLOW OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q212 Supplying and fixing of 50mm to smaller size G.I. Reducing sockets.
PER No.
M291 Reducing Socket G.I. 50mm to smaller
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.125
0.125

0.00
0.00

ALLOW OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q

PLUMBER

Q213 Supplying and fixing of 75mm to 50mm size G.I. Reducing sockets.
PER No.
M292 Reducing Socket G.I. 75mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.167
0.167

ALLOW OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q214 Fixing in position of G.I. Socket in any size (Socket supplied by Client.)
PER No.

0.00
0.00
0.00

L008 Plumber
L001 Unskilled labour

Hour
Hour

0.125
0.125

0.00
0.00

ALLOW OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q215 Supplying of white porcelain soap tray and fixing to wall by rawl plugs.
PER No.
M095 Soap Holder - White
M525 Rawl plugs
L008 Plumber

No.
No.
Hour

1.000
2.000
1.000

0.00
0.00

ALLOW FOR SCREWS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q

PLUMBER

Q216 Steel work in RSJ's as supports for tanks. Fixed in position upto 6000mm in height
and painted 2 coats red and 2 coats anti corrosive paint.
PER No.
M494
M082
M078
L008
L001
L015

2" x 4" H iron


Red lead paint
Anti - Corrosive Paint
Plumber
Unskilled labour
Painter

Kg.
Lit.
Lit.
Hour
Hour
day

ALLOW FOR CEMENT ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q217 Supplying and fixing of 12mm brass stop cocks.


PER No.

1.000
0.008
0.008
0.023
0.046
0.006

0.00

0.00
0.00
0.00

M204 Stop Cock Brass , 12mm


L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.500
0.500

0.00
0.00

1.000
0.500
0.500

0.00
0.00

1.000
0.500
0.500

0.00
0.00

ALLOW FOR LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q218 Supplying and fixing of 20mm brass stop cocks.


PER No.
M205 Stop Cock Brass , 20mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q219 Supplying and fixing of 25mm brass stop cocks.


PER No.
M206 Stop Cock Brass , 25mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR LEAD ETC.


SUB TOTAL

OVER HEAD & PROFITS 22.00%


TOTAL
Q220 Supplying and fixing of 32mm brass stop cocks.
PER No.
M207 Stop Cock Brass , 32mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.500
0.500

0.00
0.00

1.000
0.500
0.500

0.00
0.00

1.000
0.500
0.500

0.00
0.00

ALLOW FOR LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q

PLUMBER

Q221 Supplying and fixing of 38mm brass stop cocks.


PER No.
M208 Stop Cock Brass , 38mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q222 Supplying and fixing of 50mm brass stop cocks.


PER No.
M209 Stop Cock Brass , 50mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR LEAD ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q223 Supplying and fixing of 12mm chromium plated stop cocks.

PER No.
M215 12mm chromium plated stop cock.
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

1.000
0.500
0.500

0.00
0.00
0.00

PLUMBER

Q224 Hoist & place in position of 1125 - 1800 litre GI tank upto a height of 6000mm
& remove old tank include disconnect & connect all pipes & paint the new tank with
red lead paint & 2 coats of anti corrosive paint.(Tank supplied by client & scaffolding
paid.
PER No.
L008
L001
L006
M082
M078

Plumber
Unskilled labour
Painter
Red Lead Paint *
Anti - Corrosive paint *

Hour
Hour
Hour
Lit.
Lit.

4.500
17.000
14.000
0.700
1.400

0.00
0.00
0.00
0.00
0.00

ALLOW FOR BRUSHES ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q225 Hoisting and placing in position of 110 to 910 litre G.I. Tank upto a height of 6000mm
& removing the old tank including connecting & disconnecting all pipes & painting the
tank with red lead paint & 2 coats of anti corrosive paint.(Tank supplied by client &
scaffolding paid.
PER No.
L008
L001
L006
M082
M078

Plumber
Unskilled labour
Painter
Red Lead Paint *
Anti - Corrosive paint *

Hour
Hour
Hour
Lit.
Lit.

ALLOW FOR BRUSHES ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

4.500
12.000
5.000
0.225
0.450

0.00
0.00
0.00
0.00
0.00

PLUMBER

Q226 Placeing in position of 110 - 910 litre GI tank upto a height of 6000mm & fix erction o
support, include fixing of all pipes & paint the tank & support with red lead paint & 2 c
anti corrosive paint.(Tank , pipes, fittings, RSJ's , supplied by the client.)
PER No.
M082
M078
L008
L001
L006

Red Lead Paint


Anti - Corrosive paint
Plumber
Unskilled labour
Painter

Lit.
Lit.
Hour
Hour
Hour

0.225
0.450
3.500
8.000
5.000

0.00
0.00
0.00

ALLOW FOR BRUSHES ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q227 Placeing in position of 1125 - 1800 litre GI tank at a height of 6000mm & remove &
supports, remove old tank include disconnect all pipes and paint new tank & supports w
lead paint & 2 coats of anticorrosive paint(Tank , pipes , fittings RSJs.)
PER No.
M082
M078
L008
L001
L006

Red Lead Paint


Anti - Corrosive paint
Plumber
Unskilled labour
Painter

Lit.
Lit.
Hour
Hour
Hour

ALLOW FOR BRUSHES ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.700
1.400
3.500
11.000
14.000

0.00
0.00
0.00

PLUMBER

Q228 Cleaning of tanks upto the storage capacity of 1800 litres.


PER No.
L001 Unskilled labour

Hour

4.000

0.00

8.000

0.00

ALLOW FOR BRUSHES ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q229 Cleaning of tanks of storage capacity over 1800 litres.


PER No.
L001 Unskilled labour

Hour

ALLOW FOR BRUSHES ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q230 Removing of G.I. Storage tank and making good to walls and floor (scaffolding
paid separately where necessary.)
PER No.
L008 Plumber
L001 Unskilled labour

Hour
Hour

3.000
8.000

0.00
0.00

ALLOW FOR CEMENT ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q231 Supplying and installing of 400 litre. 16 BWG G.I. Tank including painting the tank
with one coat of primer and 2 coats of anti - corrosive paint.

PER No.
M412
M082
M078
L008
L001
L006

400 L, 16 BWG G.I. Tank


Red Lead Paint
Anti - Corrosive paint
Plumber
Unskilled labour
Painter

No.
Lit.
Lit.
Hour
Hour
Hour

1.000
0.280
0.550
3.500
8.000
3.000

0.00
0.00
0.00

ALLOW FOR BRUSHES , WASHERS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q232 Supplying and installing of 1125 litre. 16 BWG G.I. Tank including painting the tank
with primer and 2 coats of anti - corrosive paint.
PER No.
M413
M082
M078
L008
L001
L006

1125 L, 16 BWG G.I. Tank


Red Lead Paint
Anti - Corrosive paint
Plumber
Unskilled labour
Painter

No.
Lit.
Lit.
Hour
Hour
Hour

1.000
0.620
1.240
3.500
4.000
6.000

0.00

0.00
0.00
0.00

ALLOW FOR BRUSHES , WASHERS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q233 Supplying and installing of 1800 litre. 16 BWG G.I. Tank including painting the tank
with one coat primer and 2 coats of anti - corrosive paint.
PER No.
M414 1800 L, 16 BWG G.I. Tank

No.

1.000

0.00

M082
M078
L008
L001
L006

Red Lead Paint


Anti - Corrosive paint
Plumber
Unskilled labour
Painter

Lit.
Lit.
Hour
Hour
Hour

0.900
1.800
3.500
11.000
12.000

0.00
0.00
0.00

ALLOW FOR BRUSHES , WASHERS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q234 Supplying and fixing of wall type Urinals.


PER No.
M093
M470
L002
L008
L001

Urinal - White
Wood plugs
Skilled labour
Plumber
Unskilled labour

No.
m
Hour
Hour
Hour

1.000
0.200
0.500
0.500
1.000

0.00
0.00
0.00
0.00

0.200
0.500
0.500
1.000

0.00
0.00
0.00

ALLOW FOR CEMENT , SCREWS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q235 Supplying and fixing of wall type Urinals.(Urinals available)


PER No.
M470
L002
L008
L001

Wood plugs
Skilled labour
Plumber
Unskilled labour
ALLOW FOR CEMENT , SCREWS ETC.

m
Hour
Hour
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q236 Fixing of P.V.C. bends elbows. Tees and other specials upto 75mm (Fittings
supplied by Client.)
PER No.
L008 Plumber
L001 Unskilled labour

Hour
Hour

0.100
0.100

0.00
0.00

1.000
0.100
0.100

0.00
0.00
0.00

ALLOW FOR SOLVENT , CEMENT , ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q237 Supplying and fixing of 20mm p.v.c. bends.


PER No.
M328 Bend PVC 20mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR SOLVENT , CEMENT , ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q238 Supplying and fixing of 25mm p.v.c. bends.


PER No.
M329 Bend PVC 25mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.100
0.100

0.00
0.00
0.00

1.000
0.100
0.100

0.00
0.00
0.00

1.000
0.100
0.100

0.00
0.00
0.00

ALLOW FOR SOLVENT , CEMENT , ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q239 Supplying and fixing of 32mm p.v.c. bends.
PER No.
M330 Bend PVC 32mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR SOLVENT , CEMENT , ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q

PLUMBER

Q240 Supplying and fixing of 32mm p.v.c. bends.


PER No.
M331 Bend PVC 40mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR SOLVENT , CEMENT , ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q241 Supplying and fixing of 50mm p.v.c. bends.


PER No.

M332 Bend PVC 50mm


L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.100
0.100

0.00
0.00
0.00

1.000
0.100
0.100

0.00
0.00
0.00

1.000
0.180
0.180

0.00
0.00
0.00

1.000
0.100
0.100

0.00
0.00
0.00

ALLOW FOR SOLVENT , CEMENT , ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q242 Supplying and fixing of 75mm p.v.c. bends.
PER No.
M334 Bend PVC 75mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR SOLVENT , CEMENT , ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q

PLUMBER

Q243 Supplying and fixing of 90mm p.v.c. bends.


PER No.
M335 Bend PVC 90mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR SOLVENT , CEMENT , ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q244 Supplying and fixing of 20mm p.v.c. elbows.


PER No.
M368 Elbow PVC 20mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR SOLVENT , CEMENT , ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q245 Supplying and fixing of 25mm p.v.c. elbows.
PER No.
M367 Elbow PVC 25mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.100
0.100

0.00
0.00
0.00

1.000
0.100
0.100

0.00
0.00
0.00

1.000
0.100
0.100

0.00
0.00
0.00

ALLOW FOR SOLVENT , CEMENT , ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q

PLUMBER

Q246 Supplying and fixing of 32mm p.v.c. elbows.


PER No.
M368 Elbow PVC 32mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR SOLVENT , CEMENT , ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q247 Supplying and fixing of 40mm p.v.c. elbows.


PER No.
M369 Elbow PVC 40mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR SOLVENT , CEMENT , ETC.


SUB TOTAL

OVER HEAD & PROFITS 22.00%


TOTAL
Q248 Supplying and fixing of 50mm p.v.c. elbows.
PER No.
M370 Elbow PVC 50mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

1.000
0.100
0.100

0.00
0.00
0.00

1.000
0.100
0.100

0.00
0.00
0.00

1.000
0.180
0.180

0.00
0.00
0.00

ALLOW FOR SOLVENT , CEMENT , ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q

PLUMBER

Q249 Supplying and fixing of 75mm p.v.c. elbows.


PER No.
M344 Elbow PVC 75mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR SOLVENT , CEMENT , ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q250 Supplying and fixing of 90mm p.v.c. elbows.


PER No.
M345 Elbow PVC 90mm
L008 Plumber
L001 Unskilled labour

No.
Hour
Hour

ALLOW FOR SOLVENT , CEMENT , ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

PLUMBER

Q251 Supplying and fixing of p.v.c. reducing sockets 20mm to smaller sizes.
PER No.
M356 Reducing Socket PVC 25mm to
smaller size
L008 Plumber
L001 Unskilled labour

No.

1.000

Hour
Hour

0.100
0.100

0.00
0.00

ALLOW FOR SOLVENT , CEMENT , ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q252 Supplying of 200mm x 400mm half rounded , tooth brush holders and fixing with
rawl plugs.
PER No.
M096 Toothe Brush Holder 200 x 100mm
white
M525 Rawl plugs
L008 Plumber
L001 Unskilled labour

No.

1.000

No.
Hour
Hour

2.000
0.750
0.750

ALLOW FOR OTHER EXPENSES


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00
0.00

DRAINLAYER

R001 Supplying and fixing of 150mm x 150mm C.I. Grating.


PER No.
M226 150mm x 150mm C.I. Grating
L001 Unskilled labour

No.
Hour

1.000
0.125

0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

R002 600mm x 600mm manhole upto 600mm deep, constructed with 225mm brick
in 1:3 cement mortar and 12mm cement rendered walls and 150mm thick 1:3:6(25mm)
concrete foundation. Rate to include forming of channels.
PER No.
M009
M007
M005
M010
L001
L004

Brick
Sand
Metal 25mm
Cement
Unskilled labour
Mason

1000 Nos
Cu.m.
Cu.m.
50 Kg.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.260
0.285
0.170
2.040
20.000
8.000

0.00
0.00
0.00
0.00
0.00

DRAINLAYER

R003 1000mm x 700mm manhole 600mm to 1200mm deep, constructed with 225mm brick
in 1:3 cement mortar and 12mm cement rendered walls and 150mm thick 1:3:6(25mm)
concrete foundation. Rate to include forming of channels.
PER No.
M009
M007
M005
M010
L001
L004

Brick
Sand
Metal 25mm
Cement
Unskilled labour
Mason

1000 Nos
Cu.m.
Cu.m.
50 Kg.
Hour
Hour

0.500
0.485
0.285
3.300
32.000
12.000

0.00
0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

R004 1000mm x 700mm manhole 1200mm to 1800mm deep, constructed with 225mm bric
in 1:3 cement mortar and 12mm cement rendered walls and 150mm thick 1:3:6(25mm)
concrete foundation. Rate to include forming of channels.
PER No.
M009
M007
M005
M010
L001
L004

Brick
Sand
Metal 25mm
Cement
Unskilled labour
Mason

1000 Nos
Cu.m.
Cu.m.
50 Kg.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.875
0.736
0.250
4.580
7.000
2.500

0.00
0.00
0.00
0.00
0.00

DRAINLAYER

R005 Supplying and fixing of 550mm x 500mm rectangular C.I. Manhole cover.
PER No.
M227
M528
M010
L002
L001

Manhole Cover 550mm x 500mm


Rag bolts
Cement
Skilled labour
Unskilled labour

No.
No.
50 Kg.
Hour
Hour

1.000
4.000
0.200
2.000
2.000

0.00
0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

R006 Constructing and placing in position of 75mm thick 600mm x 600mm reinforced concr
manhole cover, reinforced with 6mm dia. M.S. rods at 75mm centres both ways.
PER No.
M004
M007
M010
M549
L005
L002
L001

Metal 40mm
Sand
Cement
Tor Steel
Black Smith
Skilled labour
Unskilled labour

Cu.m.
Cu.m.
50 Kg.
Kg.
Hour
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

DRAINLAYER

R007 Supplying and fixing of wire domes 100mm pipes.

0.028
0.015
0.210
2.500
0.500
2.000
2.000

0.00
0.00
0.00
0.00
0.00
0.00

PER No.
M224 Wire Dome, 100mm
L008 Plumber

No.
Hour

1.000
0.500

0.00
0.00

1.000
0.500

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

R008 Supplying and fixing of wire domes for 50mm pipes.


PER No.
M223 Wire Dome, 50mm
L008 Plumber

No.
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

R009 110 dia. Pvc(type 600) laid in 350 x 150mm thick 1:3:6(25mm) concrete upto
600mm depth of trench. Rate to include excavation.
PER m
M308
M010
M007
M005
L004
L011
L018

Pipe PVC 110mm type 600


Cement
Sand
Metal 25mm
Mason
Unskilled labour
Plumber

m
50 Kg.
Cu.m.
Cu.m.
Hour
day
day

1.000
0.420
0.045
0.080
0.030
0.400
0.030

0.00
0.00
0.00
0.00
0.00
0.00
0.00

ALLOW FOR ERASE PART ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
R

DRAINLAYER

R010 110 dia. Pvc(type 600) laid in 150mm thick 1:3:6(25mm) concrete upto
600mm to 1200mm depth of trench. Rate to include excavation.
PER m
M308 Pipe PVC 110mm type 600

1.000

0.00

M010
M007
M005
L004
L011
L018

Cement
Sand
Metal 25mm
Mason
Unskilled labour
Plumber

50 Kg.
Cu.m.
Cu.m.
Hour
day
day

0.420
0.045
0.080
0.030
0.530
0.030

0.00
0.00
0.00
0.00
0.00
0.00

ALLOW FOR TRANSPORT ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

R011 110 dia. Pvc(type 600) embedded in 150mm thick 1:3:6(25mm) over 1200mm to
1800mm depth of trench. Rate to include excavation.
PER m
M308
M010
M007
M005
L004
L011
L018

Pipe PVC 110mm type 600


Cement
Sand
Metal 25mm
Mason
Unskilled labour
Plumber

m
50 Kg.
Cu.m.
Cu.m.
Hour
day
day

1.000
0.420
0.045
0.080
0.030
0.700
0.030

0.00
0.00
0.00
0.00
0.00
0.00
0.00

1.000
0.250

0.00
0.00

ALLOW FOR TRANSPORT ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

DRAINLAYER

R012 Supplying and fixing of 100m x 100mm aluminium grating.


PER No.
M527 100mm x 100mm Aluminium grating
L001 Unskilled labour

No.
Hour

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

MISCELLANEOUS

S001 Supplying of Bamboos


PER m
M445 Props (bamboo) 3 - 4m

No.

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

S002 Supplying of Bamboos and fixing in position.


PER m

0.350

M445 Props (bamboo) 3 - 4m


L001 Unskilled labour

No.
Hour

0.350
0.132

0.00

0.180

0.00

ALLOW FOR COIR, STRING ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

S003 Removing of Bamboos and re-fixing with coir string.


PER m
L001 Unskilled labour

Hour

ALLOW FOR COIR, STRING ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

MISCELLANEOUS

S004 Supplying and fixing of light duty galvernized mild steel barbed wire (conforming to
SLS 31 of 1988) an exsisting timber post with GI staples.
PER m
M039 Barbed wire
L002 Skilled labour
L001 Unskilled labour

Kg.
Hour
Hour

0.093
0.030
0.030

0.00
0.00

ALLOW FOR STAPLES ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

S005 Supplying and fixing of light duty galvernized mild steel barbed wire (conforming to
SLS 31 of 1988) an exsisting concrete post .

PER m
M039 Barbed wire
L002 Skilled labour
L001 Unskilled labour

Kg.
Hour
Hour

0.093
0.050
0.050

0.00
0.00

ALLOW FOR HOOK BOLTS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

MISCELLANEOUS

S006 Supplying and fixing of light duty galvernized mild steel barbed wire (conforming to
SLS 31 of 1988) in short lengths and timber posts with G.I. Staples.
PER m
M039 Barbed wire
L002 Skilled labour
L001 Unskilled labour

Kg.
Hour
Hour

0.093
0.040
0.040

0.00
0.00

ALLOW FOR STAPLES ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

S007 Supplying and fixing of light duty galvernized mild steel barbed wire (conforming to
SLS 31 of 1988) in short lengths an concrete or steel posts with available hook bolts..
PER m
M039 Barbed wire

Kg.

0.093

L002 Skilled labour


L001 Unskilled labour

Hour
Hour

0.060
0.060

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
S008 Fixing of Barbed wire with G.I. Staples in existing timber posts(Barbed wire supplied
by Client.)
PER m
L002 Skilled labour
L001 Unskilled labour

Hour
Hour

0.030
0.030

0.00
0.00

ALLOW FOR STAPLES ETC.

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
MISCELLANEOUS

S009 Fixing of barbed wire fence with hook bolts on concrete or steel posts (Barbed wire
supplied by Client.)
PER m
L002 Skilled labour
L001 Unskilled labour

Hour
Hour

0.050
0.050

0.00
0.00

0.040
0.040

0.00
0.00

ALLOW FOR HOOK BOLTS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

S010 Straining and refixing of barbed wire on the fence with staples.
PER m
L002 Skilled labour
L001 Unskilled labour

Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

S011 Straining and refixing only the barbed wire on concrete or steel posts with available ho
PER m
L002 Skilled labour
L001 Unskilled labour

Hour
Hour

0.050
0.050

0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

MISCELLANEOUS

S012 Construction and fixing of 100mm x 150mm and 1700mm high in 1:1
1/2:3 (20mm) cement concrete intermediate fence posts reinforced with 4 Nos. 6mm d
MS rods.
PER No.
M006
M007
M010
M549
M037
L001
L002

Metal 20mm
Sand
Cement
Tor Steel
Binding wire
Unskilled labour
Skilled labour

Cu.m.
Cu.m.
50 Kg.
Kg.
Hour
Hour
Hour

0.030
0.015
0.255
1.800
0.228
3.000
2.000

0.00
0.00
0.00

0.00
0.00

ALLOW FOR MOULDS


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

S013 Construction and fixing of 100mm x 150mm and 2285mm high in 1:1
1/2:3 (20mm) cement concrete intermediate fence posts reinforced with 4 Nos. 6mm d
MS rods.
PER No.
M006 Metal 20mm
M007 Sand
M010 Cement

Cu.m.
Cu.m.
50 Kg.

0.036
0.018
0.350

0.00
0.00
0.00

M549
M037
L005
L001
L002

Tor Steel
Binding wire
Black Smith
Unskilled labour
Skilled labour

Kg.
Kg.
Hour
Hour
Hour

2.270
0.340
1.000
3.000
1.000

0.00
0.00
0.00

ALLOW FOR MOULDS


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
S

MISCELLANEOUS

Q014 Construction and fixing of end posts and struts as per drawing. Rate to include excavat
and base concrete.
PER No.
M004
M006
M007
M010
M033
M037
L005
L002
L001

Metal 40mm
Metal 20mm
Sand
Cement
Mild Steel
Binding wire
Black Smith
Skilled labour
Unskilled labour

Cu.m.
Cu.m.
Cu.m.
50 Kg.
M/ton
Kg.
Hour
Hour
day

0.200
0.092
0.170
1.790
0.017
0.455
3.250
5.500
1.500

0.00
0.00
0.00
0.00

0.00
0.00
0.00

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

S015 Construction of barbed wire fence 5 strands with 4 points at 75mm centre. Including
corner posts, struts, intermediate post binding concrete as per drawing.
PER m
M004
M006
M007
M010
M033
M037
M039
M529
M530

Metal 40mm
Metal 20mm
Sand
Cement
Mild Steel
Binding wire
Barbed wire
G.I. Hook bolts
Straining bolts 16mm dia.

Cu.m.
Cu.m.
Cu.m.
50 Kg.
M/ton
Kg.
Kg.
No.
No.

0.009
0.017
0.014
0.175
0.003
0.112
1.400
0.550
0.165

0.00
0.00
0.00
0.00

0.00
0.00

L005 Black Smith

Hour

1.100

ALLOW FOR MOULDS ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
S

MISCELLANEOUS

S016 Supplying and fixing of 12mm dia. 450mm long straining bolts.
PER No.
M531 1/2" M/S rods
L005 Black Smith
L001 Unskilled labour

Kg.
Hour
day

ALLOW FOR NUTS, ETC.


SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

S017 Cleaning of lavatory or sewage block (without clearing rods).


PER P/Block
L020 Sanitary Labourer

day

1.000

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

S018 Cleaning of lavatory or sewage block (with contractor and clearing rods).
PER P/Block
L020 Sanitary Labourer

day
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

0.00