A 001 Demolition of brick work in cement motar, bricks stacked and debris cleared away
Unskilled labour
hour
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
A 002 Demolition of brick work in cement motar, bricks stacked and debris cleared away
Unskilled labour
hour
5.7
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
A 003 Demolition of brick work in cement motar, bricks stacked and debris cleared away
Unskilled labour
hour
0.00
0.00
0.00
0.00
A -
DEMOLISHER
A004 Demolition of cadjan roof or wall, timber stacked and debris cleared away, for
single storey building
PER Sq.m.
L001 Unskilled labour
hour
0.2
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
A005 Demolition of ceiling,materials stacked and debris cleared away, for
single storey building
PER Sq.m.
L002 Unskilled labour
hour
0.5
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
A006
0.00
hour
0
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
A007
0.00
hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
5.6
0.00
0.00
0.00
0.00
DEMOLISHER
A008 Removal of Galvanised iron or asbestos or aluminium corrugated sheets from roofs or
wall from a single storey building and stacked. Removal of frame work paid seperately
PRE Sq.m.
L001 Unskilled labour
hour
0.6
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
A009 Removal of corrugated Galvanised iron or asbestos or aluminium sheets from roof
or walls of two storeyed buildings and stacked. Removal of frame work paid seperately
PER Sq.m.
L001 Unskilled labour
hour
0.8
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
A010 Removal of corrugated Galvanised iron or aluminium or asbestos sheets from roof or
walls of 3 storeyed buildings. Removal of frame work paid seperately.
PER Sq.m.
L001 Unskilled labour
hour
1.0
0.00
0
0.00
0.00
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION
UNIT
Basket
day
Concrete Mixer
hour
Lorry 3 Tonnes
hour
Lorry 5 Tonnes
hour
Tractor 75 Cubes
hour
Vibrator
hour
PRICE
Rs.
Cts.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION
UNIT
Black Smith
Hour
Carpenter
Hour
Glazier
Hour
Mason
Hour
Painter
Hour
Plumber
Hour
Skilled labour
Hour
Skilled Labour *
Day
Terrazzo Mason
Hour
Tinker
Hour
Unskilled Labour
Hour
Unskilled Labour
Sanitary labour
Day
Day
PRICE
Rs. Cts.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION
UNIT
Kg.
No.
No.
m
m2
No.
No.
Nos.
m2
No.
No.
No.
No.
m2
Lm.
m
L.M.
No.
Nos.
No.
Kg.
No.
PRICE
Rs. Cts.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION
UNIT
Kg
m2
m2
Nos.
m2
m2
m2
m2
Lm.
m2
m2
m3
PRICE
Rs. Cts.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION
UNIT
No.
No.
L.M.
L.M.
No.
Nos.
Kg
No.
Lit.
Aluminium paint
Lit.
PRICE
Rs. Cts.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION
Aluminium Wood Primer
UNIT
*
Lit.
Kg.
Lit.
Nos.
No.
No.
No.
No.
No.
No.
No.
No.
No.
Barbed wire
Kg.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
PRICE
Rs. Cts.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION
UNIT
No.
No.
No.
No.
No.
No.
No.
No.
Bidets - White
No.
Binding wire
Bitumen
Kg.
Kg.
Bitumen washers
No.
Boiled Lime
Kg
No.
No.
No.
Kg.
No.
No.
No.
No.
*
No.
No.
No.
No.
PRICE
Rs. Cts.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION
UNIT
No.
No.
No.
No.
No.
No.
No.
No.
No.
Brick
1000nos
No.
No.
No.
No.
No.
No.
Nos.
No.
No.
No.
*
No.
No.
No.
No.
PRICE
Rs. Cts.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION
UNIT
No.
No.
No.
No.
No.
No.
No.
No.
No.
Cement
50kg
1 No.
1 No.
1 No.
No.
Cistern Bracket
Pair
No.
Clay
m3
Pair
No.
Coal Tar
Lit.
Coconut rafters
Kg.
Coloured cement
Kg.
PRICE
Rs. Cts.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION
UNIT
No.
No.
No.
No.
No.
No.
No.
No.
Sq.m.
Sq.m.
Door handle
Nos.
No.
No.
No.
DPC Tar
Lit.
PRICE
Rs. Cts.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION
UNIT
No.
No.
No.
Nos.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
Emulsion
Lit.
Enamel
Lit.
No.
No.
No.
PRICE
Rs. Cts.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION
UNIT
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
Lit.
Lit.
No.
m2
m2
m2
No.
No.
PRICE
Rs. Cts.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION
UNIT
Nos.
No.
No.
No.
No.
No.
No.
No.
Nos.
Sq.m.
Sq.m.
No.
No.
No.
No.
No.
Sq.m.
Sq.m.
Sq.m.
Sq.m.
Pair
Glue
Kg.
No.
Gravel
m3
No.
No.
PRICE
Rs. Cts.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION
UNIT
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
Set
PRICE
Rs. Cts.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION
UNIT
No.
No.
No.
No.
No.
No.
No.
No.
No.
Holdfasts
Nos.
Holdfasts - 250 x 25 x 6
Nos.
Holdfasts - 400 x 25 x 6
Nos.
No.
No.
No.
No.
No.
No.
Cu.m.
No.
Leather washer
No.
Limpet washers
Nos.
No.
No.
No.
PRICE
Rs. Cts.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION
UNIT
No.
No.
No.
No.
No.
No.
No.
Sq.m.
Sq.m.
No.
Metal 20mm
m3
Metal 25mm
m3
Metal 40mm
m3
Metal 50mm
m3
Mild steel
Kg.
Kg.
No.
No.
No.
No.
No.
No.
Mould oil
Lit.
No.
No.
PRICE
Rs. Cts.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION
UNIT
No.
No.
No.
No.
No.
No.
No.
Lit.
No.
No.
Nos.
PRICE
Rs. Cts.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION
UNIT
Plaster of paris
Kg.
No.
No.
No.
No.
No.
No.
No.
PRICE
Rs. Cts.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION
UNIT
No.
Plugs
No.
No.
No.
No.
No.
No.
No.
Sq.m.
Sq.m.
No.
Sq.m.
Sq.m.
Sq.m.
No.
No.
No.
Polythane Varnish
Lit.
Props (bamboo) 3 - 4 m
No.
Pudlo Cement
Kg.
No.
No.
No.
No.
No.
PRICE
Rs. Cts.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION
UNIT
Rag bolts
No.
Rawl plugs.
No.
Red lead
Kg.
Lit.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
Roofing nails
Kg.
No.
PRICE
Rs. Cts.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION
UNIT
No.
m3
No.
No.
Sand
m3
Doz.
Doz.
Doz.
Doz.
Doz.
Nos.
Doz.
No.
Nos.
Doz.
Doz.
Doz.
Doz.
Doz.
Nos.
Doz.
Doz.
Doz.
Doz.
Doz.
PRICE
Rs. Cts.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION
UNIT
Doz.
Doz.
Doz.
Doz.
No.
No.
*
*
No.
No.
Slaked lime
Kg.
Slaked lime
Bushels
Snowcem
Kg.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
PRICE
Rs. Cts.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION
UNIT
No.
No.
No.
No.
Solvent cement
50Grams
Spur Stones
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
Thinner
Lit.
No.
No.
No.
No.
No.
No.
Cu.m.
PRICE
Rs. Cts.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION
UNIT
Cu.m.
Cu.m.
Sq.m.
Sq.m.
Sq.m.
Sq.m.
Sq.m.
Sq.m.
Sq.m.
Sq.m.
Sq.m.
Sqm.
No.
No.
Tor steel
Kg.
No.
Pair
No.
No.
Urinal - White
No.
No.
No.
No.
No.
No.
PRICE
Rs. Cts.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION
UNIT
No.
No.
No.
Pair
No.
No.
No.
Pair
No.
No.
*
Lit.
m2
No.
No.
Kg.
Kg.
Kg.
Kg.
Kg.
Wood plugs.
Lit.
Lit.
Kg.
PRICE
Rs. Cts.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION
UNIT
No.
No.
No.
No.
DESCRIPTION
UNIT
No.
No.
No.
No.
No.
No.
No.
No.
No.
Fluorescent bulb 20 w or 40 w
No.
No.
No.
No.
Round block(PVC)
No.
No.
PRICE
Rs. Cts.
PRICE
Rs. Cts.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
DESCRIPTION
UNIT
No.
No.
No.
DESCRIPTION
UNIT
No.
No.
No.
PRICE
Rs. Cts.
PRICE
Rs. Cts.
A011
DEMOLISHER
L001
Unskilled labour
Hour
8.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
A012
0.00
0.00
0.00
0.00
Removal of a door or a window frame including sashes (size over 4 sq.m.) from
existing wall and stacked
PER No.
L001
Unskilled labour
Hour
12.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
A013
L001
L002
Unskilled labour
Skilled labour
Hour
Hour
0.5
0.5
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
A014
0.00
0.00
0.00
0.00
0.00
0.00
L001
L002
Unskilled labour
Skilled labour
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.75
0.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
- DEMOLISHER
A015
L001
Unskilled labour
Hour
0.30
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
A016
L001
Unskilled labour
Hour
0.90
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
A017
0.00
0.00
0.00
0.00
0.00
L001
Unskilled labour
Hour
1.2
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
A018
0.00
0.00
0.00
0.00
Uprooting of fence post, rolling up barbed wire and stacking all material as
directed. (length of the fencing to be measured).
PER L.m.
L001
Unskilled labour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.25
0.00
0.00
0.00
0.00
0.00
A-
DEMOLISHER
A019
Demolition of brick paved cement rendered floors and cleaning debris as directed
(75mm to 100mm thick floor)
PER M2
L001
Unskilled labour
Hour
0.70
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
A020
0.00
0.00
0.00
0.00
Removing and stacking of gate sash (02 Nos.) after demolishing two cement concrete
columns or removing two posts and seperating pintles.
PER No.
L001
Unskilled labour
Hour
8.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
A021
L002
Skilled labour
Hour
2.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
A022
0.00
0.00
0.00
0.00
0.00
Removing eaves gutter from roof of single storeyed buildings and stacking
as directed.
PER L.m.
L001
Unskilled labour
Hour
0.20
0.00
0.00
0.00
0.00
0.00
A-
DEMOLISHER
A023
Removing eaves gutter from roof of two storeyed buildings and stacking
as directed.
PER L.m.
L001
Unskilled labour
Hour
0.30
0.00
0.00
A024
0.00
0.00
0.00
Hour
0.35
0.00
0.00
A025
L001
L002
0.00
0.00
0.00
Removing partition and stacking at site including making good to walls and floors.
Rate to include painting new plaster patches to match existing colour.
Note :- Material cost will cover from the labour cost.
PER M2
Unskilled labour
Skilled labour
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.60
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
A-
DEMOLISHER
A026
Chipping and removing of lime plaster on Brick walls, cement concrete walls
and clearing debris as directed.
PER M2
L001
Unskilled labour
Hour
0.30
0.00
0.00
0.00
0.00
0.00
A027
Chipping and removing of cement rendering on brick walls and floors and
clearing away debries.
PER M2
L001
Unskilled labour
Hour
1.0
0.00
0.00
A028
0.00
0.00
0.00
L001
Unskilled labour
Hour
1.35
0.00
0.00
0.00
0.00
0.00
A-
DEMOLISHER
A029
Removing roof tiles and timber and stacking serviceable material at ground and
clearing debris in single storeyed buildings.
PER M2
L001
L002
Unskilled labour
Skilled labour
ALLOW FOR SCAFFOLDING
Hour
Hour
0.90
0.20
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
A030
0.00
0.00
Removing roof tiles and timber and stacking serviceable material and
clearing debris in 2 storeyed buildings
PER M2
L001
L002
Unskilled labour
Skilled labour
Hour
Hour
1.30
0.20
0.00
0.00
0.00
0.00
A031
0.00
0.00
0.00
Removing roof tiles and timber and staking serviceable material at ground and
clearing debries in 3 storeyed buildings.
PER M2
Hour
Hour
1.70
0.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
A-
DEMOLISHER
A032
Demolition of rubble masonary in cement sand motar and stacking rubble and
clearing debris as directed.
PER M3
L001
A033
Unskilled labour
Hour
9.00
ALLOW FOR SCAFFOLDING/TOOLS
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
Demolition of rubble masonary in lime cement sand motar stacking rubble and
clearing debris.
PER M3
L001
Unskilled labour
Hour
6.00
ALLOW FOR SCAFFOLDING/TOOLS
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
A034
L001
Unskilled labour
Hour
1.75
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
A035
0.00
0.00
0.00
0.00
0.00
Removing half round tiles or calicut tiles from roof of single storeyed buildings
and stacking as directed at ground.
PER M2
L001
Unskilled labour
Hour
0.40
0.00
0.00
0.00
0.00
0.00
A
A036
DEMOLISHER
Removing of half round tiles or calicut tiles from roof of two storeyed buildings and
stacking as directed at ground.
PER M2
L001
Unskilled labour
Hour
0.60
0.00
0.00
A037
0.00
0.00
0.00
Removing half round tiles or calicut tiles from roof of three storeyed building and
stacking as directed at ground
PER M2
L001
Unskilled labour
Hour
0.90
0.00
0.00
A038
0.00
0.00
0.00
Removing water proof treatment of bitumen from flat roof and clearing
debris as directed
PER M2
L001
Unskilled labour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.70
0.00
0.00
0.00
0.00
0.00
DEMOLISHER
A039
Removing asbestos ceiling including timber frame work, stacking serviceable materials
at ground and clearing debris as directed in single storeyed building.
PER M2
L001
L002
Unskilled labour
Skilled labour
Hour
Hour
0.90
0.90
0.00
0.00
0.00
0.00
A040
0.00
0.00
0.00
L001
L002
A041
Unskilled labour
Hour
1.30
Skilled labour
Hour
0.90
ALLOW FOR SCAFFOLDING
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
L001
Unskilled labour
Hour
0.20
0.00
0.00
0.00
0.00
0.00
DEMOLISHER
A042
L001
Unskilled labour
Hour
0.30
0.00
0.00
A043
0.00
0.00
0.00
Chipping of cement lime sand plastering in soffit and cleaning debris as directed
PER m2
L001
Unskilled labour
Hour
1.50
0.00
0.00
A044
0.00
0.00
0.00
Cutting down trees girth not exceeding 600mm, grubing uprooting, logging and
stacking and fill in excavation with earth.
PER Nos.
L001
Unskilled labour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
16.00
0.00
0.00
0.00
0.00
0.00
DEMOLISHER
A045
Cutting down trees, uprooting and grubbing girth exceeding 600mm but
less than 900mm excavation filled in earth logging and stacking.
PER No.
L001
Unskilled labour
Hour
20.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
A046
0.00
0.00
0.00
0.00
Cutting down trees, uprooting and grubbing girth exceeding 900mm but
less than 1200mm excavation filled in earth logging and stacking.
PER No.
L010
Unskilled labour
day
5.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
A047
0.00
0.00
0.00
0.00
Cutting down trees, uprooting and grubbing girth exceeding 1200mm but less than
1600mm excavation filled in earth, rate to include logging and stacking
Per No.
L010
Unskilled labour
day
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
7.00
0.00
0.00
0.00
0.00
B-
EXCAVATOR
B001
L001
E001
B002
Unskilled labour
Hour
Basket
day
(Cost of tool include in Basket rate)
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
4.5
0.2
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Excavation for foundation to a depth not exceeding 1.5 m in any material except rock
requrin blasting part return fill in and ram and surplus disposed within the site as directed
PER M3
L001
E001
B003
Unskilled labour
Hour
Basket
day
(Cost of tool include in Basket rate)
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
5.0
0.2
0.00
0.00
0.00
0.00
0.00
0.00
0.00
L001
E001
E002
Unskilled labour
Basket
Tractor 75 Cubes
Hour
day
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
3.0
0.2
0.4
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
B-
EXCAVATOR
B004
Filling under floors with gravel or other approved quality of filling spread,
watered and well rammed in 75mm layers (material avialable at site)
PER M3
L001
E001
Unskilled labour
Basket
Hour
day
5.0
0.2
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
B005
0.00
0.00
Filling under floors with gravel or other approved quality filling spread
and well rammed in75mm layers with imported earth (1.6Km transport)
PER m3
Hour
Cu.m.
No.
5.6
1.1
0.1
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
B006
0.00
0.00
0.00
0.00
0.00
0.00
Filling under floors with gravel or other approved quality of filling spread
watered and rammed in 75mm layers(6Km transport).
PER M3
Hour
Cu.m.
No.
5.6
1.1
0.1
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
C-
CONCRETOR
PER M3
L001
L002
M014
M007
M004
E0010
Unskilled labour
Skilled labour
Cement
Sand
Metal 40mm
Basket
Hour
Hour
50 Kg.
Cum
Cu.m.
day
22.60
2.80
4.70
0.23
1.00
0.30
0.00
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PER M3
L001
L002
M014
M007
M004
E001
Unskilled labour
Skilled labour
Cement
Sand
Metal 40mm
Basket
Hour
Hour
50 Kg.
Cum
Cu.m.
day
28.50
3.50
4.70
0.23
1.00
0.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
C003 1:2 1/2:5 (25mm) cement concrete for volumes exceeding 3 cu.m.
PER M3
L001
L002
M014
M007
M005
E001
Unskilled labour
Skilled labour
Cement
Sand
Metal 25mm
Basket
Hour
Hour
50 Kg.
Cum
Cu.m.
day
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
22.60
2.80
5.50
0.23
1.00
0.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
C-
CONCRETOR
C004 1:2 1/2:5 (25mm) cement concrete for volumes upto 3 cu.m
PER M3
L001
L002
M014
M007
M005
E001
Unskilled labour
Skilled labour
Cement
Sand
Metal 25mm
Basket
Hour
Hour
50 Kg.
Cum
Cu.m.
day
28.25
3.50
5.50
0.23
1.00
0.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER M3
L001
L002
M014
M007
M006
E001
Unskilled labour
Skilled labour
Cement
Sand
Metal 20mm
Basket
Hour
Hour
50 Kg.
Cum
Cu.m.
day
22.60
2.80
7.00
0.23
1.00
0.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER M3
L001
L002
M014
M007
M006
E001
Unskilled labour
Skilled labour
Cement
Sand
Metal 20mm
Basket
Hour
Hour
50 Kg.
Cum
Cu.m.
day
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
28.25
3.50
7.00
0.23
1.00
0.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
C-
CONCRETOR
and 12mm thick 1:2 cement sand rendering (extra over concrete floors)
PER L.M
L001
L002
Unskilled labour
Skilled labour
Hour
Hour
0.3
0.7
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
and
12mm thick 1:2 cement sand rendering (extra over concrete floors)
PER L.M
L001
L002
Unskilled labour
Skilled labour
Hour
Hour
0.7
1.3
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Unskilled labour
Skilled labour
Cement
Sand
Metal 20mm
Mild Steel
*
10 mm dia
Hour
Hour
50 Kg.
Cum
Cu.m.
Kg.
0.750
0.750
0.080
0.008
0.014
0.870
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
C-
CONCRETOR
C010 225mm high 75mm thick curb in cement concrete including and 15mm
Unskilled labour
Skilled labour
Cement
Sand
Metal 20mm
Hour
Hour
50 Kg.
Cum
Cu.m.
2.60
2.60
0.14
0.01
0.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
225mm wide and 225mm avarage depth, with 75mm thick sides and
base rate to include for excavation & return fill of earth.
PER L.M
L001
L002
M014
M007
M005
Unskilled labour
Skilled labour
Cement
Sand
Metal 25mm
Hour
Hour
50 Kg.
Cum
Cu.m.
4.00
2.60
0.50
0.06
0.07
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
C
C012
CONCRETOR
112mmx150mm size lintol of 1:2:4 (20mm) cement concrete including
form work.(reinforcement paid separately.)
PER L.m
L001
L002
M014
M007
M006
M048
Unskilled labour
Hour
Skilled labour
Hour
Cement
50 Kg.
Sand
Cum
Metal 20mm
Cu.m.
Timber plank 25mm Class iii
Sq.m.
ALLOW FOR TIMBER PROPS AND NAILS
2.00
1.30
0.10
0.01
0.02
0.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
C013 225mmx150mm size lintol of 1:2:4(20mm) cement concrete including
Unskilled labour
Skilled labour
Cement
Sand
Metal 20mm
Timber plank 25mm class iii
Hour
Hour
50 Kg.
Cum
Cu.m.
Sq.m.
2.00
1.30
0.20
0.01
0.03
0.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
CONCRETOR
Unskilled labour
Skilled labour
Cement
Sand
Metal 20mm
Timber plank 25mm Class iii
Hour
Hour
50 Kg.
Cum
Cu.m.
Sq.m.
2.40
1.50
0.30
0.02
0.05
0.45
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Unskilled labour
Skilled labour
Cement
Sand
Metal 20mm
Timber plank 25mm class iii
Hour
Hour
50 Kg.
Cum
Cu.m.
Sq.m.
2.60
1.70
0.40
0.03
0.07
0.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
C-
CONCRETOR
Unskilled labour
Hour
Skilled labour
Hour
Cement
50 Kg.
Sand
Cum
Metal 20mm
Cu.m.
Timber plank 25mm Class iii
Sq.m.
ALLOW FOR PROPS AND NAILS
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
2.60
1.75
0.30
0.02
0.05
0.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Unskilled labour
Skilled labour
Cement
Sand
Metal 20mm
Timber plank 25mm Class iii
Hour
Hour
50 Kg.
Cum
Cu.m.
Sq.m.
3.10
2.00
0.50
0.03
0.08
0.45
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
CONCRETOR
C018 340mm x 300mm size beam in 1:2:4 (20mm) cement concrete including
Unskilled labour
Skilled labour
Cement
Sand
Metal 20mm
Timber plank 25mm class iii
Hour
Hour
50 Kg.
Cum
Cu.m.
Sq.m.
4.00
3.00
0.70
0.03
0.10
0.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
precast or insitu
PER No.
L001
L002
M014
M007
M006
M048
Unskilled labour
Skilled labour
Cement
Sand
Metal 20mm
Timber plank 25mm class iii
Hour
Hour
50 Kg.
Cum
Cu.m.
Sq.m.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.000
0.500
0.145
0.014
0.025
0.240
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
CONCRETOR
C020 100mm thick flat roof in 1:2:4 (20mm) cement concrete and reinforced
with expanded metal, 12mm thick 1:2 cement rendering with 5% pudllo
cement and lime puttying soffit complete (reinforced paid seperately)
PER M2
L001
L002
M014
M007
M006
M008
M012
Unskilled labour
Skilled labour
Cement
Sand
Metal 20mm
Boiled lime
Pudlo Cement
Hour
Hour
50 Kg.
Cum
Cum
Kg.
Kg.
8.75
3.50
0.70
0.08
0.10
0.65
0.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
C021 75mm thick slabs over drains in 1:2:4(20mm) cement concrete reinforced
PER m2
L001
L002
L014
L007
L006
L048
Unskilled labour
Skilled labour
Cement
Sand
Metal 20mm
Timber plank 25mm class iii
Hour
Hour
50 Kg.
Cum
Cu.m.
Sq.m.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
3.60
2.20
0.60
0.05
0.08
0.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
C-
CONCRETOR
Unskilled labour
Skilled labour
Cement
Sand
Metal 20mm
Hour
Hour
50 Kg.
Cum
Cu.m.
0.600
0.600
0.040
0.002
0.010
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
C-
CONCRETOR
C023 100mm x75mm x 50mm spur stones in 1:2:4 (20mm) cement concrete
Unskilled labour
Skilled labour
Cement
Sand
Metal 20mm
Hour
Hour
50 Kg.
Cum
Cu.m.
0.2000
0.2000
0.0024
0.0002
0.0004
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
C024 Squatting plates for latrines in 1:2:4(20mm) cement concrete with mild steel
Unskilled labour
Skilled labour
Black smith
Cement
Sand
Metal 20mm
Mild Steel *
10 mm dia
Hour
Hour
Hour
50 Kg.
Cum
Cu.m.
Kg.
4.000
2.000
0.500
0.104
0.004
0.005
9.065
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
CCONCRETOR
C025 1:2:4 (20mm) cement concrete using concrete mixer and vibrator
Unskilled labour
Skilled labour
Cement
Sand
Metal 25mm
Basket
Hour
Hour
50 Kg.
Cum
Cu.m.
day
17.00
2.80
6.50
0.21
1.00
0.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
and finishes paid for separately) in ground floor using mixer and vibrator
PER m3
L001
L002
M014
M007
M006
E001
Unskilled labour
Skilled labour
Cement
Sand
Metal 20mm
Basket
Hour
Hour
50 Kg.
Cum
Cu.m.
day
17.00
2.80
6.40
0.21
1.00
0.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
CONCRETOR
Unskilled labour
Hour
22.60
Skilled labour
Hour
2.80
Cement
50 Kg.
6.40
Sand
Cum
0.21
Metal 20mm
Cu.m.
1.00
Basket
day
0.30
ALLOW FOR WATER & MIXER VIB. OPERATORS FUEL ECT.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
CONCRETOR
L001
L002
M014
M007
M006
E001
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
shuttering and finishes paid for separately) using mixer and vibrator.
PER m3
L001
L002
M014
M007
M006
E001
Unskilled labour
Skilled labour
Cement
Sand
Metal 20mm
Basket
Hour
Hour
50 Kg.
Cum
Cu.m.
day
22.60
3.50
6.40
0.21
1.00
0.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Unskilled labour
Hour
28.20
Skilled labour
Hour
3.50
Cement
50 Kg.
6.40
Sand
Cum
0.21
Metal 20mm
Cu.m.
1.00
Basket
day
0.24
ALLOW FOR WATER & MIXER VIB. OPERATORS FUEL ECT.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
C-
CONCRETOR
Unskilled labour
Hour
36.70
skilled labour
Hour
3.50
Cement
50 Kg.
6.40
Sand
Cum
0.21
Metal 20mm
Cu.m.
1.00
Basket
day
0.24
ALLOW FOR WATER & MIXER VIB. OPERATORS FUEL ECT.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
C032 Shuttering for floor slab concrete including 100mm x 50mm class ii
Unskilled labour
Skilled labour
Timber plank 25mm class iii
G.I. sheet 18 B.W.G.
Props (bamboo) 3 - 4 m
Wire nail S.W.G. 4 to 8
*
Mould oil
Hour
Hour
Sq.m.
Sq.m.
No.
Kg.
Lit.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
2.600
0.900
0.110
0.002
7.500
0.200
1.200
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
CONCRETOR
C033 Shuttering for 225mm x 225mm column shafts including class ii timber
Unskilled labour
Skilled labour
Timber plank 25mm class iii
Timber beams Class ii
Bolt and nut iron 225 x 10mm
Props (bamboo) 3 - 4 m
Hour
Hour
Sq.m.
Cu.m.
No.
No.
2.700
2.700
0.350
0.003
0.600
1.700
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
C034 Shuttering for beams sides, soffit including class ii timber joists and
Unskilled labour
Skilled labour
Timber plank 25mm class iii
G.I. Sheet 18 B.W.G.
Props (bamboo) 3 - 4 m
Wire nail S.W.G. 4 to 18 *
Mould oil
Hour
Hour
Sq.m.
Sq.m.
No.
Kg.
Lit.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.100
1.100
1.100
0.005
0.500
0.400
0.300
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
CONCRETOR
C035 1:2:4 (20mm) cement concrete in lintol and beams in ground floor using
Unskilled labour
Skilled labour
Cement
Sand
Basket
Metal 20mm
Hour
Hour
50 Kg.
Cum
day
Cu.m.
45.20
5.60
6.40
0.22
0.20
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
C036 1:2:4(20mm) cement concrete in lintol and beams as per item co35 in 1st floor
PER m3
L001
L002
M014
M007
M006
E001
Unskilled labour
Hour
50.80
Skilled labour
Hour
5.60
Cement
50 Kg.
6.40
Sand
Cum
0.22
Metal 20mm
Cu.m.
1.00
Basket
day
0.20
ALLOW FOR WATER, MIXER & VIBRATOR
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
C037 100mm thick 1:2:4(20mm) cement concrete in 1st floor slab using mixer
Unskilled labour
Skilled labour
Cement
Metal 20mm
Sand
Hour
Hour
50 Kg.
Cu.m.
Cum
2.600
0.430
0.650
0.031
0.025
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
reinforcemnet and shuttering paid for separately) using mixer and vibrator.
PER m2
L001 Unskilled labour
Hour
2.70
0.00
L002 Skilled labour
Hour
0.43
0.00
M014 Cement
50 Kg.
0.80
0.00
M006 Metal 20mm
Cu.m.
0.04
0.00
M007 Sand
Cum
0.03
0.00
ALLOW FOR WATER, CURING, MIXER, VIBRATOR, FUEL,
OPERATOR ETC.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
D-
BRICKLAYER
D001 Segmental brick arch in 1:3 cement sand mortar including centering
PER m3
L001
L002
M010
M014
M007
Unskilled labour
Skilled labour
Brick
Cement
Sand
Hour
22.60
Hour
17.00
1000 Nos 0.51
50 Kg.
2.20
Cu.m.
0.15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
D002 225mm Brick work in 1:5 cement sand mortar (above 3 cu.m) upto 1st floor level
PER m3
M010
M007
M014
L001
L002
Brick
Sand
Cement
Unskilled labour
Skilled labour
1000 Nos
Cum
50 kg.
Hour
Hour
0.512
0.100
1.300
14.100
8.500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
D003 225mm brick work in 1:5 cement sand mortar upto 1st floor level (upto 3cu.m)
PER m3
L001
L002
M010
M007
M014
Unskilled labour
Skilled labour
Brick
Sand
Cement
Hour
Hour
1000 Nos
Cum
50 kg.
16.200
10.600
0.512
0.100
1.300
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
D-
BRICKLAYERS
D004 225 brick work in 1:5 cement sand mortar in piers upto 1st floor level
PER m3
L001
L002
M010
M007
M014
Unskilled labour
Skilled labour
Brick
Sand
Cement
Hour
Hour
1000 Nos
Cum
50 kg.
18.330
12.730
0.517
0.090
1.300
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
D005 225mm brick work in 1:5 cement sand mortar with bricks available at site
Unskilled labour
Skilled labour
Cement
Sand
Hour
Hour
50Kg.
Cum
17.00
8.50
1.30
0.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
D006 112mm brick work in 1:5 cement sand mortar upto 1st floor level
above 10 s.q.m.)
PER m2
M010
M007
M014
L001
L002
Brick
Sand
Cement
Unskilled labour
Skilled labour
1000 Nos
Cum
50 Kg.
Hour
Hour
0.060
0.015
0.140
1.720
1.290
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
D-
BRICKLAYER
D007 112mm brick work in 1:5 cement sand mortar upto 1st floor level(upto 10 sq.m.)
PER m2
M010
M007
M014
L001
L002
Brick
Sand
Cement
Unskilled labour
Skilled labour
1000 Nos
Cum
50Kg.
Hour
Hour
0.060
0.015
0.140
2.150
1.610
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
D008 112mm brick work in 1:5 cement sand mortar using available bricks including
Sand
Cement
Unskilled labour
Skilled labour
Cum
50 Kg.
Hour
Hour
0.015
0.140
2.250
1.610
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
D009 225mm brick work in 2.5 lime sand mortar upto first floor level (above 3cu.m)
PER m3
M010
M007
M009
L001
L002
Brick
Sand
Boiled lime
Unskilled labour
Skilled labour
1000 Nos
Cum
Kg.
Hour
Hour
0.512
0.100
66.250
14.100
8.500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
D-
BRICKLAYER
D010 225mm brick work in 2:5 lime sand mortar upto 1st floor level (upto 3Cu.m.)
PER m3
M010
M007
M009
L001
L002
Brick
Sand
Boiled lime
Unskilled labour
Skilled labour
1000 Nos
Cum
Kg.
Hour
Hour
0.512
0.100
66.250
16.200
10.600
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
D011 225mm brick work in 2:5 lime sand mortar with bricks available at site,
Sand
Boiled lime
Unskilled labour
Skilled labour
Cum
Kg.
Hour
Hour
0.10
66.25
19.70
8.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
D012 Extra over item D002 to D005 and D009 to D011 for brick work from
Unskilled labour
Hour
4.2
0.00
0.00
0.00
0.00
0.00
D-
BRICKLAYER
D013 Extra over item D002 to D005 and D009 to D011 for brick work above second
floor level
PER m3
L001
Unskilled labour
Hour
12.7
0.00
0.00
0.00
0.00
0.00
D014 Extra over item D006 to D008 for brick work from first floor level to
Unskilled labour
Hour
1.4
0.00
0.00
0.00
0.00
0.00
D015 Extra over item D006 to D008 for brick work above 2nd floor level
PER m2
L001
Unskilled labour
Hour
4.2
0.00
0.00
0.00
0.00
0.00
D-
BRICKLAYER
D019 Weathered and throated brick coping in 1:5 cement sand mortar on 112mm thick
walls complete with 12mm thick 1:3 sand cement rendering and cement floating
coat.
PER L.m.
M010
M007
M014
L001
L002
Brick
Sand
Cement
Unskilled labour
Skilled labour
1000 Nos
Cum
50 Kg.
Hour
Hour
0.013
0.020
0.330
1.600
1.600
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
D020 Weathered and throated brick coping in 1:5 cement sand mortar on 340mm
thick walls complete with 12mm thick 1:3 cement sand rendering and cement
floating coat.
PER L.m
M010
M007
M014
L001
L002
Brick
Sand
Cement
Unskilled labour
Skilled labour
1000 Nos
Cum
50 Kg.
Hour
Hour
0.04
0.06
1.00
2.00
2.00
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
D021 Wheathered and throated brick coping in 1:5 cement sand mortar on 225mm
thick walls complete with 12mm thick 1:3 cement sand rendering and cement
floating coat.
PER L.m
M010
M007
M014
L001
L002
Brick
Sand
Cement
Unskilled labour
Skilled labour
1000 Nos
Cum
50 Kg.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.03
0.04
0.70
2.60
2.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
BRICKLAYER
D022 Weathered and throated brick coping in 1:5 cement sand mortar on 225mm
thick walls using available bricks complete with 12mm thick 1:3 cement sand
rendering and cement floating coat.
PER L.m
M007
M014
L001
L002
Sand
Cement
Unskilled labour
Skilled labour
Cum
50 Kg.
Hour
Hour
0.04
0.70
2.60
2.60
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
D023 Brick cornices in 1:5 cement mortar complete with 12mm thick 1:3
Brick
Sand
Cement
Unskilled labour
Skilled labour
1000 Nos
Cum
50 Kg.
Hour
Hour
0.102
0.020
0.300
5.200
5.200
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
and making good to floor and wall (lintol,arch.door & window paid for
separately). up to 3m2
PER No.
L001
L002
M010
M007
M014
M009
Unskilled labour
Skilled labour
Brick
Sand
Cement
Boiled lime
Hour
16.00
Hour
12.00
1000 Nos 0.10
Cum
0.03
50 Kg.
0.52
Kg.
8.70
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
D-
BRICKLAYER
D025 300mm wide 225mm to 300mm deep, brick drains in with 112mm thick side walls
in 1:5 cement motar complete with 12mm thick 1:2 cement sand rendering with
smooth finish and necessary expansion joints(rate to included for excavation)
& backfilling.
PER L.m
L001
L002
M010
M014
M007
Unskilled labour
Skilled labour
Brick
Cement
Sand
Hour
Hour
1000 Nos
50 Kg.
Cum
4.000
3.280
0.065
0.160
0.020
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
D026 225mm wide 150mm to 225mm deep brick drains in 1:5 cement sand mortar
complete with 12mm thick 1:2 cement sand rendering with smooth finish and
necessary expansion joints (rate to included for necessary excavation and
backfilling) side walls should be 112mm thick.
PER L.m
L001
L002
M010
M014
M007
Unskilled labour
Skilled labour
Brick
Cement
Sand
Hour
Hour
1000 Nos
50 Kg.
Cum
3.050
2.440
0.055
0.100
0.010
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
D027 Scott's pattern drains including apron of overall width 750mm brick
masonary in 1:5 cement mortar and 12mm thick 1:2 cement sand rendering
and necessary expansion joints ( rate to include necessary excavation)
PER L.m
M010
M014
M007
L001
L002
Brick
Cement
Sand
Unskilled labour
Skilled labour
1000 Nos
50 Kg.
Cum
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.05
0.36
0.02
3.66
3.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
D-
BRICKLALYER
D028 300mm wide and 150mm to 225 high brick work in 1:5 cement sand motar
steps complete with 12mm thick 1:3 cement sand rendering with smooth
finish with 300mm deep foundation. Rate to include excavation.
PER L.m
M010
M014
M007
L001
L002
Brick
Cement
Sand
Unskilled labour
Skilled labour
1000 Nos
50 Kg.
Cum
Hour
Hour
0.060
0.250
0.010
1.220
1.220
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
D029 Formation of vent openings upto 300mm height and 150mm width on
existing walls and making good to walls. Rate to include painting to match
the existing colours.
PER No.
M009
M007
L001
L002
Boiled lime
Sand
Unskilled labour
Skilled labour
ALLOW FOR PAINTS ETC.
Kg.
Cum
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
3.140
0.005
1.000
1.000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
E-
MASON
E001
M002
M007
M014
L001
L002
Cu.m.
Cum
50 Kg.
Hour
Hour
1.00
0.16
2.56
16.94
8.46
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
E002
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
M002
M007
M014
L001
L002
Cu.m.
Cum
50 Kg.
Hour
Hour
1.00
0.16
2.56
16.63
9.31
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
E003
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Random rubble masonary in 1:5 cement sand mortar using rubble available at
site including sorting out and cleaning rubble
PER m3
M007
M014
L001
L002
Sand
Cement
Unskilled labour
Skilled labour
Cum
50 Kg.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.16
2.56
22.60
8.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
FF001
PAVIOR
Expansion joints in brick floors filled with bitumen and sand
PER L.m
L001
L002
Unskilled labour
Skilled labour
Hour
Hour
0.08
0.08
0.00
0.00
0.00
0.00
F002
0.00
0.00
0.00
Expansion joints in concrete floors filled with bitumen and sand (to
full depth of concrete and rendering)
PER L.m
L001
L002
M007
M018
Unskilled labour
Skilled labour
Sand
Bitumen *
Hour
Hour
Cum
Kg.
0.170
0.170
0.001
0.125
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
F003
0.00
0.00
0.00
0.00
0.00
0.00
0.00
75mm thick brick paved floor set in 1:5 cement sand mortar and including
12mm thick 1:3 cement rendering with smooth finish.
PER m2
M010
M007
M014
L001
L002
Brick
Sand
Cement
Unskilled labour
Skilled labour
1000 Nos
Cum
50 Kg.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.034
0.030
0.490
2.970
1.490
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
F-
PAVIOR
F004
75mm thick brick paved floors set in 1:5 cement motar and 12mm thick
1:3 cement rendering with smooth finish with available brick including sorting out
and cleaning bricks.
PER m2
M007
M014
L001
L002
Sand
Cement
Unskilled labour
Skilled labour
Cum
50 Kg.
Hour
Hour
0.03
0.49
2.97
1.49
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
F005
75mm thick 1:2 1/2:5 (25mm) cement concrete floors including 12mm
thick 1:2 cement rendered with smooth finish with expansion joints filled with cement
and sand
PER m2
M005
M007
M014
L001
L002
Metal 25mm
Sand
Cement
Unskilled labour
Skilled labour
Cu.m.
Cum
50 Kg.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.03
0.02
0.46
1.00
2.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAVIOR
F006
100mm thick, 1:2:4 (20mm) cement concrete in upper floors including form
work, with 12mm thick 1:3 cement sand rendering with smooth finish and lime
putty rendering to soffit and expansion joints filled with cement and sand
(reinforcement paid for separately).
PER m2
M007
M006
M014
M009
M048
M045
M363
M038
M364
L001
Sand
Metal 20mm
Cement
Boiled lime
Timber plank 25mm class iii
Timber beams Class ii
Props (bamboo) 3 - 4 m
Wire nail S.W.G. 12 to 14 *
Mould oil
Unskilled labour
L002
Skilled labour
Cum
Cu.m.
50 Kg.
Kg.
Sq.m.
Cu.m.
No.
Kg.
Lit.
Hour
0.030
0.033
0.650
1.750
0.110
0.013
1.000
0.910
0.330
7.430
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Hour
2.600
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
F007
0.00
0.00
0.00
M001 Gravel
L001 Unskilled labour
Cu.m.
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.30
0.43
0.00
0.00
0.00
0.00
0.00
0.00
0.00
F008
Terrazzo tile flooring supplied and laid.rate to include for 12mm thick
1:3 cement motar levelling screed etc.
PER m2
M020
M014
M007
M001
M002
M004
No.
50 Kg.
Cum
Hour
Hour
Hour
12.00
0.13
0.01
2.25
1.50
0.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
F011
0.00
0.00
0.00
M380
M014
M007
M010
L020
0.00
0.00
0.00
0.00
0.00
Supplying and fixing of glazed tiles with all specials to walls including raking
plaster and bedding in 12mm thick 1:3 cement motar joints shall be filled with
tile grout.
PER m2
M021 Tile glazed 108 x 108mm *
No. 86.000
0.00
M014 Cement
50 Kg. 0.270
0.00
M007 Sand
Cum
0.021
0.00
L010 Unskilled labour
Hour
4.000
0.00
L020 Skilled labour
Hour
8.000
0.00
ADD 10% SPECIALS AND WASTAGES ETC.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
F012
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAVIOR
F013
M014
M007
L010
L020
Cement
Sand
Unskilled labour
Skilled labour
50 Kg.
Cum
Hour
Hour
0.270
0.021
4.000
8.000
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
F014
0.00
0.00
0.00
0.00
0.00
0.00
0.00
M022
M014
M007
L010
L020
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
G-
ROOFER
Unskilled labour
Black smith
G.I. Hook bolts 8mm x 115mm
Limpet washers
Hour
Hour
Nos.
Nos.
0.38
0.30
4.00
4.00
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
G002 Supplying and fixing of corrugated GI (24 BWG) sheets roofing on class I timber
Sq.m.
Cu.m.
Nos.
Hour
Hour
Lit.
1.20
0.01
3.00
1.72
0.65
0.05
0.00
0.00
0.00
0.00
0.00
54.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
G003 Supplying and fixing of corrugated GI (24 BWG) sheet on 100mm x 50mm
Cu.m.
Sq.m.
Nos.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.01
1.20
3.00
1.10
1.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
G-
ROOFER
G004 Supplying and fixing of corrugated GI (24 BWG) sheets on existing roof frame
or wall.
PER m2
M026
M369
L001
L002
Sq.m.
Nos.
Hour
Hour
1.20
3.00
0.43
0.43
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
G005 Supplying and fixing of corrgated asbestos sheet roofing on class I timber
Sq.m.
Cu.m
Nos.
Hour
Hour
Lit.
1.167
0.010
3.000
1.140
1.720
0.050
0.00
0.00
0.00
0.00
0.00
54.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Cu.m.
Sq.m.
Nos.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.011
1.167
4.000
1.100
1.720
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
G-
ROOFER
existing frame work with necessary coach screws and linpet washers or
hook bolts
PER m2
M023
M369
L001
L002
Sq.m.
Nos.
Hour
Hour
1.2
2.0
0.7
0.5
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Nos.
Lit
Cu.m.
Sq.m.
Hour
Hour
3.000
0.050
0.019
1.200
1.110
1.000
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
G009 supplying and fixing corrugated GI cladding on class I timber frame work
fixed complete.
PER m2
M043
M040
M370
L001
L002
Cu.m.
Sq.m.
Nos.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.01
1.20
3.00
1.10
1.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
G-
ROOFER
G010 24BWG Corrugated GI sheets fixid to roof wall or fence with necessary
cup washers hool bolts or screws (timber framing paid for seperately)
PER m2
M040
M369
L001
L002
Sq.m.
Nos.
Hour
Hour
1.2
3.0
0.43
0.43
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
building
PER No.
L001
Unskilled labour
Hour
1.3
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
building
PER No.
L001
Unskilled labour
Hour
0.5
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
storeyed building
PER No.
L001
Unskilled labour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.7
0.00
0.00
0.00
0.00
0.00
G-
ROOFER
storeyed
PER No.
L001
Unskilled labour
Hour
0.67
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
Nos.
Nos.
Hour
1.0
1.0
1.2
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
G016 Rectification of leaks in corrugated sheet roof patched with jute hesseian
dipped in asphalt and laid over with a cement and sand layer.
PER No.
L001
Unskilled labour
Hour
1.2
0.00
0.00
0.00
0.00
0.00
G-
ROOFER
Nos
Hour
Hour
7.0
0.5
0.5
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
G018 Calicut pattern ridging bedded in cement sand and lime mortar 1:1:4 coloured
to match tiles
PER L.m.
M028 Ridge tile calicut pattern Gr. I
M007 Sand
M008 Slaked lime
M0143 Cement
L001 Unskilled labour
L002 Skilled labour
Nos.
Cum
Kg.
50 Kg.
Hour
Hour
3.000
0.010
2.280
0.050
0.550
0.550
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
G019 Calicut pattern ridging bedded in cement sand and lime mortar 1:1:4 coloured
Sand
Slaked lime
Cement
Unskilled labour
Skilled labour
Cum
Kg.
50 Kg.
Hour
Hour
0.01
2.28
0.05
0.55
0.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
G-
ROOFER
PER L.M.
M373
M369
L001
L003
Nos.
Nos.
Hour
Hour
0.6
7.0
0.6
0.6
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PER L.M
M025
M369
L001
L002
Pair
Nos.
Hour
Hour
1.0
4.0
0.5
0.5
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
G022 Half round tile ridging bedded in lime cement mortar 1:1:4 and coloured to
match tiles.
PER L.M
M029
M007
M008
L001
L002
M014
Nos.
Cum
Kg.
Hour
Hour
50 Kg.
4.00
0.01
2.73
0.70
0.70
0.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
G-
ROOFER
G023 Ridging with half round bedded in lime cement mortar 1:1:4 coloured to
Sand
Slaked lime
Unskilled labour
skilled labour
Cement
Cum
Kg.
Hour
Hour
50 Kg.
0.01
2.73
0.70
0.70
0.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
G024 Ridging with half round or calicut pattern tiles removed and relaid in lime
Sand
Slaked lime
Cement
Unskilled labour
Skilled labour
Cum
Kg.
50 Kg.
Hour
Hour
0.01
2.73
0.06
0.90
0.90
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
G025 0.6m X 0.6m x 5mm thick ribbed skylight glass supplied and fixed to
Sq.m.
Hour
Hour
0.36
2.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
G-
ROOFER
G026 Supplying and laying calicut pattern flat tiles (up to 5 tiles) in single
No.
Hour
1.00
0.17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
G027 Supplying and laying calicut pattern flat tiles(above 5 tiles) in single
storeyed building
PER Per tile
M375 Calicut pattern flat tiles
L001 Unskilled labour
No.
Hour
1.00
0.07
0.00
0.00
0.00
0.00
0.00
0.00
0.00
G028 Supplying and laying calicut pattern flat tiles (upto 5 tiles) in buildings of
No.
Hour
1.00
0.33
0.00
0.00
0.00
0.00
0.00
0.00
0.00
G-
ROOFER
G029 Supplying and laying calicut pattern flat tiles (above 5 upto 25 tiles)
No.
Hour
1.00
0.13
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PER m2
M027 Tile calicut pattern Gr. I
L001 Unskilled labour
No.
Hour
14.00
0.43
0.00
0.00
0.00
0.00
0.00
0.00
0.00
G031 Laying calicut pattern tiles in any building (Tiles available at site)
PER m2
L001
Unskilled labour
Hour
0.43
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
G034 Glass tiles laid in small quantities including fixing with G.I. Wire where
Unskilled labour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.5
0.00
0.00
0.00
0.00
0.00
G-
ROOFER
G036 Supplying and laying half round tiles upto 50 Nos. in single storeyed building
No.
Hour
1.00
0.03
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
G037 Supplying and laying half round tiles above 50 and upto 100 in single
storeyed buildings.
PER Per tile
M029 Tile half round Gr.I
L001 Unskilled labour
No.
Hour
1.00
0.02
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
G038 Supplying and laying half round tiles upto 50 on buildings of more than
one storeyed
PER per tile
M029 Tile half round Gr.I
L001 Unskilled labour
No.
Hour
1.00
0.07
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
G039 Supplying and laying half round tiles above 50 and upto 100 in number
No.
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.00
0.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
G-
ROOFER
PER m2
M029 Tile half round Gr.I
L001 Unskilled labour
No.
Hour
56.00
0.86
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
G041 Half round tiles laid in any building (Tiles available at site)
PER m2
L001
Unskilled labour
Hour
0.86
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
PER m2
L001
Unskilled labour
Hour
0.65
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
PER m2
L001
Unskilled labour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.29
0.00
0.00
0.00
0.00
0.00
G-
ROOFER
G044 Supplying and laying one layer half round tiles over the existing asbestos roof
PER m2
M030 Tile half round (asbestos covering) Gr. I
L001 Unskilled labour
No.
Hour
38.00
0.08
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
G045 Supply and fixing of calicut pattern tiled roof on class I sawn timber frame work
Cum
m
No
No
Kg
Kg
Lit
Kg
Kg
Cum
Hour
Hour
0.02
3.61
13.00
1.33
0.07
0.07
0.18
0.03
0.03
0.00
2.96
1.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
I001
M381
M382
L001
L002
1.05
1.57
0.13
0.13
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I002
0.00
0.00
0.00
0.00
0.00
0.00
0.00
M383
M382
L001
L002
m
Nos.
Hour
Hour
1.05
1.57
0.13
0.13
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I003
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m
Hour
1.100
0.200
0.00
0.00
0.00
0.00
0.00
0.00
0.00
I004
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS
TOTAL
0.00
0.00
0.00
I005
Beading filleting in class I local timber for glass panes fixed complete
with brass springs or brass panel pins
PER L.m
Lm.
Hour
1.1
0.2
0.00
0.00
0.00
0.00
0.00
0.00
I004
Nos.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
2.0
0.2
0.2
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
I005
Barge valance facia boards 20mm thick in class I timber fixed complete
with necessary iron screws (above 0.03 m3)
PER m2
M046
M387
L001
L002
0.97
8.21
0.69
2.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00
I006
Barge valance facia boards 20mm thick in class I local timber fixed
complete with necessary iron screws (upto 0.03 m3)
M046
M387
L001
L002
I007
0.00
0.00
0.00
0.00
0.97
8.21
0.86
3.43
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Barge valance facia boards 20mm thick in class II timber fixed complete
with necessary iron screws (above 0.03 m3)
PER m2
M047
M387
L001
L002
0.97
8.21
0.69
2.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
I008
Barge valance facia boards 20mm thick in class II local timber fixed
complete with necessary screws (upto 0.03 m3)
PER m2
M047
M387
L001
L002
I009
0.97
8.21
0.86
3.43
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Barge valance facia boards available fixed including cutting and minor
repairs
PER m2
Hour
Hour
Nos.
0.43
0.86
5.17
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I010
0.00
0.00
0.00
0.00
0.00
0.00
Flat asbestos ceiling fixed to 100mm x 50mm joists and 50x50mm bearers
of class I timber including 40mm x 12mm cover fillets and 40 x 40mm coves
of class I timber. 2coats of alkali resisting primer and 2 coats of emulision paint.
PER m2
L001
L002
L005
M043
M037
M141
M024
M391
M384
M382
M469
M084
M073
Unskilled labour
Hour
Skilled labour
Hour
Painter
Hour
Timber Beams Class I
Cu.m.
Wire nail S.W.G. 12 to 14 *
Hour
Wood preservative (black / coloured) *
Hour
Asbestos plain ceiling sheet 1220 x 1220mm No.
20mm G.I. Clout nails
Kg.
40mm to 50mm x 12mm local class I timber m
Screws Brass 40mm x Gauge 8
No.
Cove moulding(63mmx40mm)local class I
m
Alkali resisting primer *
Lit.
Emulsion *
Lit.
3.313
1.767
1.767
0.013
1.767
1.767
0.75
0.025
0.084
1.078
1.00
0.020
0.040
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
I011
Kg.
Hour
Hour
0.006
0.650
0.430
0.00
0.00
0.00
0.00
0.00
0.00
I012
0.00
0.00
0.00
M024
L001
L002
M391
No.
Hour
Hour
Kg.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.75
0.65
0.43
0.006
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
I013
M024
L001
L002
M391
No.
Hour
Hour
Kg.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.75
0.650
0.430
0.006
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
I013
Sq.m.
Hour
Hour
0.18
0.22
0.22
0.00
0.00
0.00
0.00
0.00
0.00
I014
0.00
0.00
0.00
Kg.
Hour
Hour
0.04
0.90
0.90
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
I015
M054
M037
L001
L002
Sq.m.
Kg.
Hour
Hour
1.100
0.040
1.000
1.000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
I016
0.00
0.00
0.00
M054
M037
L001
L002
Sq.m.
Kg.
Hour
Hour
1.100
0.040
1.100
1.100
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
I017
0.00
0.00
0.00
M053
M043
L001
L002
Sq.m.
Kg.
Hour
Hour
0.330
0.003
4.000
4.000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
I
I018
L001
Unskilled labour
Hour
0.22
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I019
0.00
0.00
0.00
0.00
Cove moulding with 63mm x 40mm imported class I timber fixed with
brass screws and plugs new or renewed
PER L.m
M392
M393
M389
L001
L002
1.100
1.312
1.180
0.394
0.919
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
I020
Supplying and fixing of Doors and Windows ledged, braced and battened with
grooved and tongued joints 100mm x 75mm frames and 20mm thick sashes in
class I local timber complete with brass furniture with local mortice lock for doors
heavy gauge stays fastners and barrel bolts for windows.
PER m2
M043
M046
M382
M389
M117
M127
L001
L002
Cu.m.
Sq.m.
Nos.
No.
No.
No.
Hour
Hour
0.03
1.30
40.00
4.00
1.00
0.70
6.60
16.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
I021
M044
M047
M382
M389
M117
M127
L001
L002
Supplying and fixing of 20mm thick ledged, braced and battened sashes and
100mm x75mm frames in class II timber for doors and windows with local
mortice lock for doors or heavy gauge casement stays, fastners and barrael
bolts for windows.
PER m2
Timber beams Class ii
Cu.m.
0.03
0.00
Timber plank 25mm class II
Sq.m
1.30
0.00
Brass screws (40mm) Guage 8
Nos.
40.00
Screws Brass 50mm x Guage 10
Nos.
4.00
Hinge Butt Brass 100mm x 63mm *
Nos.
1.00
0.00
Lock mortice single local made
Nos.
0.70
0.00
Unskilled Labour
Hour
6.00
0.00
Skilled Labour
Hour
16.00
0.00
ALLOW FOR SPUR STONES RAWL, DOWELS SAND PAPER ETC.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
I022
Supplying and fixing of 20mm thick ledged, braced and battened sash
only for doors and windows in class I timber fixed with available furniture
PER m2
M046
M135
M133
L001
L002
Sq.m
Doz.
Doz.
Hour
Hour
1.500
3.740
0.374
6.000
13.500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
I 023
0.00
0.00
0.00
Supplying and fixing of 20mm thick ledged, braced and battened sash
for door and windows in class II timber fixed with available furniture.
PER m2
M047
M382
M389
L001
L002
Sq.m.
Nos.
No.
Hour
Hour
1.5
45.0
5.0
6.0
13.5
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
I024
Supplying and fixing of 25mm thick framed and 15mm thick battened sashes
and 100mm x 75mm frame class I local timber complete with brass
furniture, for doors and windows (locks paid seperately)
PER m2
M043
M049
M425
M117
M135
M133
L001
L002
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I025
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Supplying and fixing of 25mm thick framed and 15mm thick battened sashes
with 100mm x 75mm frames in class II local timber complete with brass
furniture for doors and windows (locks paid seperately)
PER m2
M044
M050
M426
M117
M135
M133
L001
L002
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
I026
Supplying and fixing of 32mm thick framed and 15mm thick battened sashes
with 100mm x 75mm frames in class I local timber complete with brass
furniture for doors and windows (locks paid seperately)
PER m2
M043
M051
M425
M117
M135
M133
L001
L002
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I027
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Supplying and fixing of 32mm thick framed and 15mm thick battened sashes
with 100mm x 75mm frames in class II local timber complete with brass
furniture for doors and windows (locks opaid seperately)
PER m2
M044
M052
M426
M117
M135
M133
L001
L002
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
I028
Supplying and fixing of 25mm thick, ledged, braced and battened sash in class I
timber for doors and windows (Barrel Bolts, Skeleton Bolts paid seperately)
PER m2
M049
M134
M133
L002
L001
Sq.m.
Doz.
Doz.
Hour
Hour
1.500
3.740
0.374
6.000
14.000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
I029
0.00
0.00
0.00
Supplying and fixing of 25mm thick, ledged , braced and battened sash in class II
local timber for doors and windows( Barrel Bolts & Skeleton Bolts paid seperately)
PER m2
M050
M134
M133
L001
L002
Sq.m.
Doz.
Doz.
Hour
Hour
1.500
3.740
0.374
14.000
6.000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Supplying and fixing of 32mm thick, ledged, braced and battened sash in class I
timber for doors and windows. (Barrel Bolts & Skeleton Bolts paid seperately)
PER m2
M051
M134
M133
L002
L001
Sq.m.
Doz.
Doz.
Hour
Hour
1.500
3.740
0.374
15.000
6.000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
I031
Supplying and fixing of 32 thick, ledged, braced and battened sash in class II local
timber for doors and windows (Barrel Bolts & Slkeleton Bolts paid seperately)
PER m2
M052
M134
M133
L002
L001
sq.m
Doz
Doz
hour
hour
1.500
3.740
0.374
15.000
6.000
0.00
0.00
0.00
I032
Supplying and fixing of 25mm thick sash in imported timber for doors and
windows (Iron Mongery glazing paid seperately)
PER m2
m2
hour
hour
1.400
15.000
6.000
0.00
0.00
I033
M381
M382
M043
M051
M425
M429
M430
M062
M068
L001
L002
Supplying and fixing of battened, door for gurge 32mm framed 15mm thick battened w
125mm x 100mm frames in class I timber with iron pintels and strap hinges Iron towe
for Hasp & Staple.
PER m2
Hasp and staple Iron 100mm *
No.
0.200
0.00
Screws Brass 40mm x Gauge 8
Nos.
3.400
0.00
Timber beams class I
Cu.m
0.02
0.00
Timber plank 38mm class I
sq.m
0.60
0.00
25mm thick planks of class I local timber
M2
0.64
0.00
Holdfasts - 250 x 25 x 6
Nos.
1.00
Pintels and stay hinges 50mm x 6mm x 1m
Nos.
1.00
0.00
Bolt & nut iron 45 x 6mm
Nos.
5.00
Bolt Tower iron 75mm *
Nos.
0.20
0.00
Unskilled labour
Hour
4.000
0.00
Skilled labour
Hour
6.000
0.00
ALLOW FOR SPUR STONES SAND PAPER DOWELS
ALLOW FOR MACHINE PLANING
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I034
Supplying and fixing of glazed and panelled, 32mm thick sash and with 100mm x 75m
in class I local timber for doors and windows including all Brass furniture. (Door lock
seperately)
PER m2
M043
M049
M425
M432
M386
M197
M122
M099
M096
M398
L001
L002
Cu.m
sq.m
M2
L.m
L.m
sq.m
No.
No.
Nos.
Nos.
hour
hour
0.02
0.64
0.25
1.64
5.30
0.36
1.50
0.40
0.80
12.00
6.00
12.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
I035
M044
M050
M426
M433
M434
M197
M122
M099
M096
M398
L001
L002
Cum
m2
m2
L.m
L.m
sqm
No.
No.
No.
No.
hour
hour
0.02
0.64
0.25
1.64
5.30
0.36
2.00
0.40
0.33
9.00
6.00
12.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
I
I036
M049
M425
M432
M386
M197
M122
M099
M096
M398
L002
L001
sq.m
m2
L.m
L.m
sq.m
No.
No.
No.
No.
hour
hour
0.72
0.28
1.86
6.00
0.41
1.00
0.50
0.90
10.00
12.00
6.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
M050
M426
M433
M434
M197
M122
M099
M096
M398
L001
L002
sq.m
m2
L.m
L.m
sq.m
No.
No.
No.
No.
Hour
Hour
0.73
0.28
1.86
6.00
0.40
1.00
0.50
0.90
10.00
6.00
12.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
I038
Supplying and fixingbof panelled 31mm thick sash and 100mm x 75mm
frames in class I timber and trelised with weld mesh no.32 and complete
with brass furniture
PER m2
M043
M049
M425
M035
M386
M117
M127
M382
M389
L001
L002
Cu.m
sq.m
m2
m2
Lm
No.
No.
No.
No.
hour
hour
0.03
0.52
0.29
0.36
1.87
1.00
0.70
16.00
4.00
10.60
22.50
0.00
0.00
0.00
0.00
0.00
0.00
I039
Supplying and fixing of 31mm door sash panelled and terllis with Gal
weld mesh with 31 class I timber and available furniture.
PER m2
M049
M425
M035
M386
L002
L001
M384
M398
sq.m
m2
m2
Lm
hour
hour
m
Nos.
0.62
0.34
0.42
2.22
17.00
6.06
15.00
4.00
0.00
0.00
0.00
0.00
0.00
I040
Supplying and fixing of 32mm panneled doors sash and with BRC No. 32
weld mesh in class I timber with available furniture.
PER m2
M435
M425
M035
M386
L002
L001
M384
M398
m2
m2
m2
Lm
hour
hour
m
Nos.
0.62
0.34
0.42
2.22
17.00
6.06
15.00
4.00
0.00
0.00
0.00
0.00
0.00
0.00
Supplying and fixing of 32mm panelled door sashes and 100mm x 75mm
frames in class I timber fixed complete with brass furniture. (door lock paid seperately
PER m2
M043
M049
M425
L002
L001
M117
M382
M389
Cu.m
sq.m
m2
hour
hour
No.
No.
No.
0.03
0.67
0.52
10.00
6.00
1.50
12.30
3.00
0.00
0.00
0.00
0.00
0.00
0.00
I042
Hour
Hour
1.50
1.50
0.00
0.00
1.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I043
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I044
Renewing in short lenghs with Class I timber in Doors and Windows frames.
PER L.m.
Cu.m.
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.013
4.400
0.00
0.00
I
I045
M517
M134
M133
L002
L001
m2
Doz.
Doz.
Hour
Hour
6.41
1.50
1.00
12.00
4.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I046
PER m
M432 40mm x 40mm class I timber sash bars
L002 Skilled labour
L001 Unskilled labour
L.m.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.17
2.80
0.94
0.00
0.00
0.00
I047
Fixing of louvered Door or Window sash 25mm to 32mm in Imported Timber with
available furniture.
PER m2
Lm
0.720
m2
Doz.
Hour
Hour
1.330
3.074
33.000
9.000
0.00
0.00
0.00
0.00
I048
Supplying and fixing 38mm x 38mm x 125mm tapered doors tops in Class I
timber
PER Nos.
Lm
Hour
Hour
0.150
1.000
0.500
0.00
0.00
0.00
I049
Fixing of door or window sashes to position (sash and fittings supplied by client)
PER NO.
L002 Skilled labour
L001 Unskilled labour
Hour
Hour
3.00
3.00
0.00
0.00
I
I050
PER NO.
L002 Skilled labour
L001 Unskilled labour
Hour
Hour
2.00
2.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I051
Supplying and fixing of 25mm thick swing doors (900mm x 450mm each) with
12mm panel or glazed and panelled in Class I timber including brass gravity hinges.
PER PAIR
M435
M518
M120
M135
L002
L001
M133
m2
m2
No.
Doz.
Hour
Hour
Doz.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.51
0.79
4.00
1.00
20.00
6.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
I
I052
M435
M120
M135
M061
L002
L001
m2
No.
Doz.
Sq.m.
Hour
Hour
0.51
4.00
1.00
0.56
20.00
6.00
0.00
0.00
0.00
0.00
0.00
0.00
I053
Supplying and fixing quadrant fillets 20mm x 20mm with spring or nails
in Class I timber.
PER m
Lm.
Hour
1.10
0.33
0.00
0.00
I054
Supplying and fixing quadrant fillets 25mm x 25mm with springs or nails in Class I
timber.
PER m
Lm
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00 %
TOTAL
1.10
0.33
0.00
0.00
I
I055
Hour
Hour
8.00
2.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I056
m2
Hour
0.120
1.312
0.00
0.00
I057
Supplying and fixing of louvers blades with 10mm minimum thickness and
100mm to 150mm wide in class I timber.
PER m
m2
Hour
0.160
1.400
0.00
0.00
I
I058
m2
Hour
0.230
1.640
0.00
0.00
I059
Hour
Hour
0.92
2.46
0.00
0.00
I
I060
Cu.m
Sq.m.
m2
m
m
Hour
Hour
Sq.m.
Doz.
Kg.
0.02
0.36
0.36
7.52
3.38
26.73
9.83
0.43
0.93
0.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
I061
M043
M046
M061
M524
M526
L002
L001
M197
M137
M038
Cu.m.
Sq.m.
Sq.m.
m
m
Hour
Hour
Sq.m.
Doz.
Kg.
0.003
0.360
0.360
7.520
3.380
26.730
9.830
0.430
0.930
0.040
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
I
I062
Cu.m.
Hour
Hour
0.001
0.400
0.200
0.00
0.00
0.00
I063
Supplying of 3 ply plywood panels 6mm thick and fixing to existing frames (beading p
separately).
PER m2
Sq.m.
Hour
1.005
1.802
0.00
0.00
I064
Fixing of 2135mm long, 125mm x 125mm verandah post tapering to 100mm x 100mm
on spur stone in Class I timber(Spur stone paid for separately).
PER No.
Cu.m.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00 %
TOTAL
0.037
5.000
1.000
0.00
0.00
0.00
I
I065
Cu.m.
Hour
Hour
0.053
6.000
1.000
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I066
Hour
1.300
0.00
1.100
0.153
0.077
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I067
m
Hour
Hour
I
I068
M530
L002
L001
M038
1.100
0.066
0.066
0.004
I069
Supplying and fixing of 50mm x 25mm reepers in Class I timber new or renewed with
nails over 30m (Shifting of tiles paid for separately) Rate include applying wood prese
0.00
0.00
0.00
PER m
M530
L002
L001
M038
1.100
0.044
0.044
0.004
I070
Supplying and fixing of 50mmx25mm reepers in ClassII local timber new or renewed
nails up to 30m (Shifting of tiles paid for separately) Rate include applying wood prese
0.00
0.00
0.00
PER m
M530
L002
L001
M038
1.100
0.066
0.066
0.004
0.00
0.00
0.00
0.00
I071
Supplying and fixing of 50mmx25mm reepers in ClassII local timber new or renewed
nails over 30m (Shifting of tiles paid for separately) Rate include for apply wood prese
PER m
M530
L002
L001
M038
1.100
0.044
0.044
0.004
0.00
0.00
0.00
0.00
I072
Supplying and fixing of 50mm x 12mm reepers in Class I local timber new or renewed
with Iron nails up to 30m.
PER m
m
Hour
Hour
1.100
0.066
0.066
0.00
0.00
0.00
I
I073
M485
L002
L001
M038
1.100
0.044
0.044
0.003
I074
Fixing of available reepers with wir nails and apply wood preservative.
0.00
0.00
0.00
0.00
PER m
L002 Skilled labour
Hour
L001 Unskilled labour
Hour
M038 Wire nail S.W.G. 12 to 14 *
Kg.
ALLOW FOR WOOD PRESERVATIVE
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.066
0.066
0.004
0.00
0.00
0.00
I075
Supplying and fixing calicut pattern tiles roof on Class I sawn timber frame work
including ridges, hips etc.
PER m2
M043
M530
M027
M028
M037
M038
M141
M014
M416
M007
L002
L001
Cu.m.
m
No.
No.
Kg.
Kg.
Lit.
50 Kg.
25Kg.
Cum
Hour
Hour
0.018
3.609
12.550
0.810
0.065
0.016
0.204
0.027
0.675
0.004
1.650
1.650
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
I076
Supplying and fixing calicut pattern tiled roof on Class II sawn timber frame work
including ridges, hips etc.
PER m2
M044
M484
M027
M028
M037
M038
M141
M416
M007
M014
L002
L001
Cu.m.
m
No.
No.
Kg.
Kg.
Lit.
25Kg.
Cum
50 Kg.
Hour
Hour
0.018
3.609
12.550
0.810
0.065
0.016
0.204
0.675
0.004
0.027
1.650
1.650
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
I077
M043
M485
M028
M029
M037
M038
M141
M014
M416
M007
L002
L001
I078
M044
M485
M028
M029
M037
M038
M141
M014
M416
M007
L002
L001
Supplying material and fixing half round tiled roof on Class I sawn timber
frame work including fidges, hips etc.
PER m2
Timber beams class I
Cu.m.
0.017
50mm x 25mm Class I timber
m
7.218
Ridge tile calicut patten Gr. I
No.
0.810
Tile half round Gr.I
No.
61.340
Wire nail S.W.G. 4 to 10 *
Kg.
0.065
Wire nail S.W.G. 12 to 14 *
Kg.
0.016
Wood Preservative (black / coloured) *
Lit.
0.245
Cement
50 Kg.
0.027
Slaked lime
Bushels
0.027
Sand
Cum
0.004
Skilled labour
Hour
1.794
Unskilled labour
Hour
1.794
ALLOW FOR COLOURING POWDER ETC.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Supplying material and fixing half round tiles roof on Class II sawn timber
frame work including fidges, hips etc.
PER m2
Timber beams class II
Cu.m.
50mm x 25mm Class II timber
m
Ridge tile calicut pattern Gr. I
m
Tile half round Gr. I
No.
Wire nail S.W.G. 4 to 10 *
Kg.
Wire nail S.W.G. 12 to 14 *
Kg.
Wood Preservative (black / coloured) *
Lit.
Cement
50 Kg.
Slaked lime
Bushels
Sand
Cum
Skilled labour
Hour
Unskilled labour
Hour
ALLOW FOR COLOURING POWDER ETC.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.017
7.218
0.810
61.340
0.065
0.016
0.245
0.027
0.027
0.004
1.794
1.794
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
I079
Sorting out of available timber cut to required sizes and fixed in partitions and frames.
PER m3
Hour
Hour
12.80
4.30
0.00
0.00
I080
Sorting out of available timber cut to required sizes and fixed in roof and other
carpentry work.
PER m3
Hour
Hour
21.300
4.300
0.00
0.00
I081
Fixing or renewing partitions and frames with Class I timber (excluding Milla)
including panels and boards.
PER m3
Cu.m.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.00
25.60
12.80
0.00
0.00
0.00
I082
Cu.m.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.00
256.00
128.00
0.00
0.00
0.00
I083
Cu.m.
Hour
Hour
1.00
256.00
128.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I084
Cu.m.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.00
256.00
128.00
0.00
0.00
0.00
I085
Renewing of trellis laths 16mm x 16mm in Class I local timber in quantities over 30m.
PERm
m
Kg.
Hour
1.100
0.004
0.140
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I086
m
Kg.
Hour
1.100
0.004
0.175
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I087
Renewing of trellis laths 25mm x 12mm in Class I local timber in quantities over 30m.
PERm
m
Hour
Kg.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.100
0.170
0.004
0.00
0.00
0.00
I088
m
Hour
Kg.
1.100
0.220
0.004
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00 %
TOTAL
I089
Supplying and fixing of trellis laths 25mm x 25mm in Class I local timber.
PER m
m
Hour
Kg.
1.100
0.170
0.008
0.00
0.00
0.00
1.100
0.170
0.008
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I090
m
Hour
Kg.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I091
M043
L002
L001
M533
M488
Cu.m.
Hour
Hour
No.
No.
0.020
5.960
5.960
1.325
2.650
0.00
0.00
0.00
0.00
0.00
I092
Supplying and fixing in position of 100mm x 50mm Class I timber door frames.
PER m2
M043
L002
L001
M512
M429
Cu.m.
Hour
Hour
No.
Nos.
0.014
5.960
5.960
1.325
2.650
0.00
0.00
0.00
0.00
0.00
I093
Supplying and fixing of 32mm thick ordinary sash single (ordinary finish)
plywood door hung on 100mm x 75mm frame in Class I timber complete
with brass furniture(lock paid for separately).
PER m2
M043
M512
M429
L002
L001
M056
M117
M099
M096
M135
M133
M132
Cu.m.
No.
Nos.
Hour
Hour
No.
No.
No.
No.
Doz.
Doz.
Doz.
0.022
0.950
2.830
4.000
2.000
0.472
1.416
0.472
0.472
0.480
0.943
0.480
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00 %
TOTAL
I094
Supplying and fixing of 32mm thick ordinary sash single (ordinary finish)
plywood door hung on 100mm x 50mm frame in Class I timber complete
with brass furniture(lock paid for separately).
M043
M512
M429
L002
L001
M056
M117
M099
M096
M135
M133
M132
Cu.m.
No.
Nos.
Hour
Hour
No.
No.
No.
No.
Doz.
Doz.
Doz.
0.014
0.943
2.830
4.000
2.000
0.472
1.416
0.472
0.472
0.480
0.943
0.480
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
I095
Supplying and fixing of 32mm thick ordinary sash single (ordinary finish)
plywood door on existing frame(lock paid for separately).
PER m2
L002
L001
M056
M117
M099
M096
M135
M133
Skilled labour
Unskilled labour
Plywood door ordinary M.R. 838 x 2060 x 32mm
Hinge Butt Brass 100mm x 63mm *
Bolt Skeleton Brass 300mm *
Bolt Barrel Brass 150mm *
Screws brass 20mm x Gauge 8
Screws brass 25mm x Gauge 8
Hour
Hour
No.
No.
No.
No.
Doz.
Doz.
2.320
2.320
0.472
1.416
0.472
0.472
0.480
0.943
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I096
Supplying and fixing of 32mm thick marine type plywood door (ordinary water
proof) on existing frame.(lock paid for separately).
PER m2
M056
L002
L001
M096
M135
M125
M133
M117
0.710
2.837
2.837
1.420
0.710
0.710
0.750
1.416
0.00
0.00
0.00
0.00
0.00
0.00
0.00
I097
Supplying & fixing 2100 to 3000mm high, 4mm thick glazed partition with
12mm thick chipboard panels on 100 x 75 and 100 x 100mm uprights
at 900mm intervals & 100 x 50mm as horizontal members in CI I timber
with 50 x 12mm timber beadings around glasspane.
PER m2
M514
M043
M198
M384
L002
L001
M038
M133
No.
Cu.m.
Sq.m.
m
0.400
0.017
0.544
2.220
0.00
0.00
0.00
0.00
Hour
Hour
Kg.
Doz.
8.833
1.890
0.144
0.473
0.00
0.00
0.00
0.00
I098
M515
M043
M198
M384
M038
M133
L002
L001
Supplying & fixing 2100 to 3000mm high, 4mm thick glazed partition with
10mm thick chipboad panels on 100 x 75mm & 100x100mm uprights at 900mm interv
& horizontal members in Cl I timber and 50 x 12mm timber beading around glass pane
PER m2
10mm chip board (8'x4') *
No.
0.400
0.00
Timber beams class I
Cu.m.
0.017
0.00
Glass pane Clear 4mm
Sq.m.
0.544
0.00
40mm to 50mm x 12mm local class I timber fille
m
2.220
0.00
Wire nail S.W.G. 12 to 14
*
Kg.
0.144
0.00
Screws Brass 25mm x Gauge 8
Doz
0.473
0.00
Skilled labour
Hour
8.833
0.00
Unskilled labour
Hour
1.890
0.00
ALLOW FOR CEMENT, SANS ETC.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I099
Supplying & fixing 2100 to 3000mm high panelled partition with 12mm thick
chipboard on both sides with 100 x 50mm & 100 x 100mm upright fixed at
900mm intervals & 100 x 50mm as horizontal members in Cl I timber.
PER m2
M043
M514
M516
M038
L002
L001
Cu.m.
m2
m2
Kg.
Hour
Hour
0.016
2.200
2.885
0.215
6.310
6.940
0.00
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I100
Supplying & fixing 2100 to 3000mm high panelled partition with 10mm thick
chipboard on both sides with 100 x 50mm & 100 x 100mm upright fixed at
900mm intervals & 100 x 50mm as horizontal members in Class I timber.
PER m2
M515
M043
L002
L001
M038
M516
m2
Cu.m.
Hour
Hour
Kg.
m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
2.200
0.016
6.310
6.940
0.215
2.885
0.00
0.00
0.00
0.00
0.00
0.00
I101
Supplying & fixing 12mm thick lunumidella planks inceiling to frame work
consisting of 100 x 50mm joists and 50 x50mm bearers in Class I timber.
Rate to include for 2 coats of tarnap to joists and bearers.
PER m2
M043
M038
L002
L001
M141
M053
Cu.m.
Kg.
Hour
Hour
Lit.
Sq.m.
0.012
0.074
1.830
2.260
0.163
1.300
0.00
0.00
0.00
0.00
0.00
I102
Supplying & fixing 20mm thick lunumidella planks in ceiling to frame work
consisting of 100 x 50mm joists and 50 x50mm bearers in Class I timber.
Rate to include for 2 coats of tarnap to joists and bearers.
PER m2
M043
M038
L002
L001
M141
M053
Cu.m.
Kg.
Hour
Hour
Lit.
Sq.m.
0.012
0.074
1.830
2.260
0.163
1.300
0.00
0.00
0.00
0.00
0.00
J
J001
IRON MONGER
Supplying and fixing of 45mm x 6mm bolts and nuts with washers.
PER No.
No.
Hour
1.000
0.500
0.00
0.00
J002
Supplying and fixing of 65mm x 10mm bolts and nuts with washers.
PER No.
No.
Hour
1.000
0.500
0.00
0.00
J003
Supplying and fixing of 125mm x 10mm bolts and nuts with washers.
PER No.
No.
Hour
1.000
0.500
0.00
0.00
J
J004
IRON MONGER
Supplying and fixing of 225mm x 10mm iron bolts and nuts washers.
PER No.
No.
Hour
1.000
0.500
0.00
J005
Supplying and fixing 125mm x 12mm iron bolts and nuts with washers.
PER No.
No.
Hour
1.000
0.500
0.00
0.00
J006
Suupplying and fixing of 150mm x 12mm iron bolts and nuts with washers.
PER No.
No.
Hour
1.000
0.500
0.00
0.00
J
J007
IRON MONGER
Supplying of 75mm iron heavy quality tower bolts and fixing with iron screws.
PER No.
No.
Doz.
Hour
1.000
0.500
0.500
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J008
Supplying of 100mm iron heavy quality tower bolts and fixing iron screws.
PER No.
No.
Doz.
Hour
1.000
0.500
0.500
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J009
Supplying of 125mm iron heavy quality tower bolts and fixing iron screws.
PER No.
No.
Doz.
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.000
0.750
0.500
0.00
0.00
0.00
J
J010
IRON MONGER
Supplying of 150mm iron heavy quality tower bolts and fixing them with
iron screws.
PER No.
No.
Doz.
Hour
1.000
0.750
0.500
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J011
Making 1000mm (approx) iron brackets out of 40mm x 6mm flat iron with fish
tail at end and fixing to walls and making good to walls.
PER No.
Kg.
day
2.000
0.400
0.00
J012
Supplying 50mm x 50mm G.I. Weldmesh (gauge 10) and fixing to existing frame
with staples (Fillets and beading paid separately).
PER m2
m2
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.170
2.500
2.000
0.00
0.00
0.00
J
J013
IRON MONGER
Supplying 50mm x 50mm G.I. Weldmesh (gauge 10) and fixing to window frame
with 50 x 12mm Class II timber beading including painting mesh with red lead and
2 coats of enamel paint, beading with primer and 2 coats of enamel.
PER m2
M035
M484
L002
L001
M048
L005
m2
m
Hour
Hour
Sq.m.
Hour
1.150
4.100
2.000
2.000
1.500
3.000
0.00
0.00
0.00
0.00
0.00
0.00
1.000
0.330
0.00
0.00
1.100
0.330
0.00
0.00
J014
No.
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J015
No.
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J
J016
IRON MONGER
Supplying and fixing of 150mm iron cabin hooks and eyes.
PER No.
No.
Hour
1.000
0.330
0.00
0.00
1.000
0.330
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J017
No.
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J018
Making iron gate with 40 x 40 x 6mm angle iron frame work including bracing and
horizontal centre member with 16mm M.S. bar at 150mm centres and fixing in
position.
PER m2
M039
M031
M033
L070
L010
m
M/ton
M/ton
day
day
4.000
0.012
0.005
1.000
1.000
0.00
J
J019
IRON MONGER
Supplying of 20mm x 3mm gutter hook brackets and fixing in position with iron screw
PER No.
M531
M087
L002
L001
Kg.
Doz.
Hour
Hour
0.228
0.170
0.750
0.750
0.00
0.00
0.00
0.00
J020
Supplying of approved heavy quality safety type 100mm iron hasp and staples
and fixing in position with iron screws.
PER No.
No.
Doz.
Hour
1.000
0.250
0.600
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J021
Supplying of approved heavy quality safety type 150mm iron hasp and staples
and fixing in position with iron screws.
PER No.
No.
Doz.
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.000
0.250
0.600
0.00
0.00
0.00
J
J022
IRON MONGER
Making 300 x 50mm hasp and staple out of 6mm iron plate and fixing in position
with 6 x 50mm bolts and nuts.
PER No.
M531
M062
L020
L010
Kg.
No.
day
day
1.150
8.000
1.000
1.000
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J023
Supplying and fixing of approved heavy quality 50mmx38mm iron butt hinges.
PER No.
M077
M087
L002
L001
No.
Doz.
Hour
Hour
1.000
0.500
0.400
0.400
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J024
Supplying and fixing of approved heavy quality 75mmx38mm iron butt hinges.
PER No.
M078
M087
L002
L001
No.
Doz.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.000
0.500
0.400
0.400
0.00
0.00
0.00
0.00
J
J025
IRON MONGER
Supplying and fixing of approved heavy quality 100mmx63mm iron butt hinges.
PER No.
M079
M087
L002
L001
No.
Doz.
Hour
Hour
1.000
0.500
0.400
0.400
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J026
Supplying and fixing of approved heavy quality 125mmx100mm iron butt hinges.
PER No.
M080
M087
L002
L001
No.
Doz.
Hour
Hour
1.000
0.500
0.500
0.500
0.00
0.00
0.00
0.00
0.500
0.500
0.500
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J027
Doz.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J
J028
IRON MONGER
Supplying and fixing of 40 x 6mm, 300mm long iron strap hinge with necessary
bolts and nuts excluding pintle.
PER No.
M531
M067
L002
L001
0.800
4.000
3.000
2.000
0.00
0.00
0.00
0.00
J029
Supplying and fixing of 50 x 6mm , 900mm long iron strap hinges with necessary
bolts and nuts including pintles.
PER No.
M531
M067
L002
L001
Kg.
No.
Hour
Hour
2.500
6.000
5.000
3.000
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J030
Supplying of 60 x 10 x 1050mm iron double strap hinges, flat iron bend to shape
and fixing with bolts and nuts.
PER No.
M531
M067
L020
L001
Kg.
No.
day
day
SUB TOTAL
OVER HEAD & PROFITS 22.00%
2.200
6.000
0.750
0.500
0.00
0.00
0.00
TOTAL
J031
Supplying of 65 x 10 x 1650mm iron double strap hinges, flat iron bend to shape
and fixing with bolts and nuts.
PER No.
M531
M067
L020
L001
Kg.
No.
day
day
17.270
8.000
1.000
0.630
0.00
0.00
0.00
J032
Supplying and fixing of heavy quality 150mm iron T hinges with iron screws.
PER No.
M081
M084
L001
L002
No.
Doz.
Hour
Hour
1.000
1.500
1.000
1.000
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J033
Supplying and fixing of heavy quality, 200mm iron T hinges with screws.
PER N0.
No.
Doz.
Hour
1.000
1.500
1.000
0.00
0.00
0.00
Hour
1.000
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J034
Supplying and fixing of heavy quality 250mm iron T hinges with iron screws.
PER No.
M082
M084
L001
L002
No.
Doz.
Hour
Hour
1.150
1.500
1.500
1.500
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J035
Supplying and fixing of heavy quality 300mm iron T hinges with iron screws.
PER No.
M083
M084
L001
L002
No.
Doz.
Hour
Hour
1.000
1.500
1.500
1.500
0.00
0.00
0.00
0.00
0.410
0.200
1.000
0.500
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J036
M531
M089
L002
L001
Kg.
Doz.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J037
Cutting iron rods supplied by Client to correct length inserting in window frames
including painting with red lead and 2 coats of anti - corrosive paint.
PER No.
Hour
Hour
Hour
0.250
0.250
0.250
0.00
0.00
0.00
J038
Supplying mild steel rods in reinforcing lintols, beams, columns and laid in position w
binding wire.
PER Kg.
M031
M034
L002
L001
Mild Steel *
Binding wire *
Skilled labour
Unskilled labour
M/ton
Kg.
Hour
Hour
0.001
0.010
0.150
0.150
0.00
0.00
0.00
J
J039
IRON MONGER
Supplying mild steel rods in reinforcing foundation and laid in position with
G.I. binding wire.
PER Kg.
M031
M034
L002
L001
Mild Steel *
Binding wire *
Skilled labour
Unskilled labour
M/ton
Kg.
Hour
Hour
0.001
0.010
0.100
0.100
0.00
0.00
0.00
J040
Bending and tying reinforcement and laid in position in beams lintols, floors, etc.
with G.I. Wire, Steel rod supplied by Client, (mild steel or tor steel)
PER Kg.
Kg.
Hour
Hour
0.010
0.150
0.150
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J041
Kg.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.010
0.100
0.100
0.00
0.00
0.00
J
J042
IRON MONGER
Supplying 16mm dia. Mild steel bars and fixing in window frames at 100mm
centres including painting with red lead and 2 coats anti - corrosive paint.
PER m
J043
1.579
0.250
0.250
0.00
0.00
Supplying 20mm dia. Mild steel bars and fixing in window frames at 100mm
centres including painting with red lead and 2 coats anti - corrosive paint.
PER m
J044
2.466
0.250
0.250
0.00
0.00
Supplying pintels for gates and garage doors and fixing in position in cement
concrete (Concrete paid separately.)
PER No.
Kg.
Hour
Hour
2.280
3.250
3.250
0.00
0.00
0.00
IRON MONGER
J045
Supplying and fixing 100mm x 16mm rag bolts with nuts, washers.
PER No.
J046
0.682
0.500
0.500
0.00
0.00
0.00
Supplying and fixing of 24 B.W.G. plain G.I. Sheets to existing frame with wire
nails.
PER m2
Sq.m.
Hour
Hour
1.000
1.435
1.435
0.00
0.00
0.00
J047
Supplying and BS 4449 high Yeild steel bars and laid in positing as reinforcement
in beams, columns, slabs etc. with binding wire.
PER Kg.
M032
M034
L002
L001
Tor steel *
Binding wire *
Skilled labour
Unskilled labour
M/ton
Kg.
Hour
Hour
0.001
0.010
0.150
0.150
0.00
0.00
0.00
J048
Supplying and BS 4449 high Yeild steel bars and laid in positing as reinforcement
in foundation with binding wire.
PER Kg.
M032
M034
L002
L001
Tor steel *
Binding wire *
Skilled labour
Unskilled labour
M/ton
Kg.
Hour
Hour
0.001
0.010
0.100
0.100
0.00
0.00
0.00
BRASS FOUNDER
K001 Removing and refixing of Bolts, casement fastners or stays, including making good
to holes in frames and sashes.
PER No.
L002 Skilled labour
Hour
0.500
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K002 Supplying fixing and polishing of 63mm heavy quality brass barrel bolts with
brass screws.
PER No.
M092 Bolt Barrel Brass 63mm *
M389 Screws Brass 20mm x Gauge 8
L002 Skilled labour
No.
No.
Hour
1.000
6.000
0.330
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K003 Supplying fixing and polishing of 75mm heavy quality brass barrel bolts with
brass screws.
PER No.
M093 Bolt Barrel Brass 75mm *
M389 Screws brass 20mm x gauge 8
L002 Skilled labour
No.
No.
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.000
6.000
0.330
0.00
0.00
BRASS FOUNDER
K004 Supplying fixing and polishing of 100mm heavy quality brass barrel bolts with
brass screws.
PER No.
M094 Bolt Barrel Brass 100mm *
M389 Screws Brass 20mm x Gauge 8
L002 Skilled labour
No.
No.
Hour
1.000
6.000
0.330
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K005 Supplying fixing and polishing of 125mm heavy quality brass barrel bolts with
brass screws.
PER No.
M094 Bolt Barrel Brass 125mm *
M389 Screws brass 20mm x Gauge 8
L002 Skilled labour
No.
No.
Hour
1.000
6.000
0.330
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K006 Supplying fixing and polishing of 150mm heavy quality brass barrel bolts with
brass screws.
PER No.
M094 Bolt Barrel Brass 150mm *
M389 Screws Brass 20mm x Gauge 8
L002 Skilled labour
No.
No.
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.000
6.000
0.330
0.00
0.00
BRASS FOUNDER
K007 Supplying and fixing of 200mm brass skeleten bolts with brass screws.
PER No.
M097 Bolt Skeleton Brass 200mm *
L002 Skilled labour
M394 Screws Brass 20mm x Gauge 8
No.
Hour
No.
1.000
0.500
9.000
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K008 Supplying and fixing of 250mm brass skeleten bolts with brass screws.
PER No.
M098 Bolt Skeleton Brass 250mm *
L002 Skilled labour
M394 Screws Brass 20mm x Gauge 8
No.
Hour
No.
1.000
0.500
9.000
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K009 Supplying and fixing of 300mm brass skeleten bolts with brass screws.
PER No.
M099 Bolt Skeleton Brass 300mm *
M394 Screws Brass 20mm x Gauge 8
L002 Skilled labour
No.
No.
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.000
9.000
0.500
0.00
0.00
BRASS FOUNDER
K010 Supplying and fixing of 450mm brass skeleten bolts with brass screws.
PER No.
M100 Bolt Skeleton Brass 450mm *
M394 Screws Brass 20mm x Gauge 8
L002 Skilled labour
No.
No.
Hour
1.000
12.000
0.500
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K011 Supplying , fixing and polishing of 50mm heavy quality brass cabin hooks
with brass screws.
PER No.
M101 Cabin Hook Brass 50mm *
L002 Skilled labour
M395 Screws Brass 16mm x Gauge 7
No.
Hour
No.
1.000
0.500
9.000
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K012 Supplying , fixing and polishing of 75mm heavy quality brass cabin hooks
with brass screws.
PER No.
M102 Cabin Hook Brass 75mm *
L002 Skilled labour
M395 Screws Brass 16mm x Gauge 7
No.
Hour
No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.000
0.500
9.000
0.00
0.00
0.00
BRASS FOUNDER
K013 Supplying , fixing and polishing of 150mm heavy quality brass cabin hooks
with brass screws.
PER No.
M103 Cabin Hook Brass 150mm *
L002 Skilled labour
M395 Screws Brass 16mm x Gauge 7
No.
Hour
No.
1.000
0.500
9.000
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K014 Supplying , fixing and polishing of 200mm heavy quality brass cabin hooks
with brass screws.
PER No.
M104 Cabin Hook Brass 200mm
*
L002 Skilled labour
M395 Screws Brass 16mm x Gauge 7
No.
Hour
No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.000
0.500
9.000
0.00
0.00
0.00
BRASS FOUNDER
K015 Supplying , fixing and polishing of 225mm heavy quality brass cabin hooks
with brass screws.
PER No.
M396 Cabin Hook Brass 225mm *
L002 Skilled labour
M395 Screws Brass 16mm x Gauge 7
No.
Hour
No.
1.000
0.500
9.000
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K016 Supplying , fixing and polishing of 250mm heavy quality brass cabin hooks
with brass screws.
PER No.
M105 Cabin Hook Brass 250mm
*
L002 Skilled labour
M395 Screws Brass 16mm x Gauge 7
No.
Hour
No.
1.000
0.500
9.000
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K017 Supplying , fixing and polishing of 300mm heavy quality brass cabin hooks
with brass screws.
PER No.
M106 Cabin Hook Brass 300mm
*
L002 Skilled labour
M395 Screws Brass 16mm x Gauge 7
No.
Hour
No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.000
0.500
9.000
0.00
0.00
0.00
BRASS FOUNDER
K018 Supplying and fixing of Brass heavy quality casement fastners with mortice plate
polished, with brass screws.
PER No.
M107 Casement Fastner Brass *
M394 Screws Brass 16mm x gauge 7
L002 Skilled labour
No.
No.
Hour
1.000
4.000
0.750
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K019 Supplying , fixing and polishing of 250mm heavy quality casement stays.
PER No.
M108 Casement Stay Brass 250mm *
M394 Screws Brass 16mm x Gauge 7
L002 Skilled labour
No.
No.
Hour
1.000
4.000
0.500
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K020 Supplying , fixing and polishing of 300mm heavy quality casement stays.
PER No.
M109 Casement Stay Brass 300mm *
M394 Screws Brass 16mm x Gauge 7
L002 Skilled labour
No.
No.
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.000
4.000
0.500
0.00
0.00
0.00
BRASS FOUNDER
K021 Supplying and fixing of Heavy quality brass fanlight catches complete with brass
screws.
PER No.
M110 Fanlight Catch Brass *
M394 Screws Brass 16mm x Gauge 7
L002 Skilled labour
No.
No.
Hour
1.000
4.000
0.750
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K022 Supplying, fixing and polishing of Heavy quality brass door handles with
brass screws.
PER No.
M397 Door handle
M389 Screws Brass 20mm x gauge 8
L002 Skilled labour
No.
No.
Hour
1.000
4.000
0.250
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K023 Supplying, fixing and polishing of 150mm brass safety type heavy quality
hasp and staple with brass screws complete.
PER No.
M112 Hasp and staple safety type Brass 150mm *
M394 Screws Brass 20mm x gauge 8
L002 Skilled labour
No.
No.
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.000
7.000
0.500
0.00
0.00
BRASS FOUNDER
K024 Supplying, fixing and polishing of 100mm brass safety type heavy quality
hasp and staple with brass screws complete.
PER No.
M111 Hasp and staple safety type Brass 100mm *
M394 Screws brass 20mm x Gauge 8
L002 Skilled labour
No.
No.
Hour
1.000
7.000
0.500
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K025 Supplying and fixing of brass hat hooks with brass screws
K025 Hat Hook Brass *
M389 Screws Brass 25mm x Gauge 8
L002 Skilled labour
No.
No.
Hour
1.000
4.000
0.500
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K026 Supplying, fixing and polishing of 50mmx 38mm heavy quality brass butt hinges with
brass screws.
PER No.
M114
M382
L002
L001
No.
No.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.000
6.000
0.250
0.350
0.00
0.00
BRASS FOUNDER
K027 Supplying, fixing and polishing of 75mmx38mm heavy quality brass butt hinges with
brass screws.
PER No.
M115
M382
L002
L001
No.
No.
Hour
Hour
1.000
6.000
0.380
0.330
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K028 Supplying, fixing and polishing of 89mm x63mm heavy quality brass butt hinges with
brass screws.
PER No.
M116
M382
L002
L001
No.
No.
Hour
Hour
1.000
8.000
0.380
0.380
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K029 Supplying, fixing and polishing of 100mm x 63mm heavy quality brass butt hinges wi
PER No.
M117
M382
L002
L001
No.
No.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.000
8.000
0.380
0.380
0.00
0.00
0.00
BRASS FOUNDER
K030 Supplying, fixing and polishing of 125mm x 100mm heavy quality brass butt hinges w
PER No.
M118
M382
L002
L001
No.
No.
Hour
Hour
1.000
8.000
0.380
0.380
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K031 Supplying, fixing and polishing of Brass center pivot hinges(Consisting of 2 pieces)
heavy quality with brass screws..
PER No.
M119
M133
L001
L002
Set
Doz.
Hour
Hour
1.000
0.500
0.500
0.500
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K032 Supplying and fixing of Brass gravity hinges with brass screws complete.
PER No.
M120
M382
L002
L001
No.
No
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.000
8.000
0.500
0.500
0.00
0.00
0.00
BRASS FOUNDER
K033 Supplying, fixing and polishing of 100mm x 90mm brass parliamentary heavy quality
hinges with brass screws complete.
PER No.
M121
M387
L001
L002
No.
No.
Hour
Hour
1.000
8.000
0.380
0.380
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K034 Supplying, fixing and polishing of 125mm x 150mm brass parliamentary heavy qualit
hinges with brass screws complete.
PER No.
M122
M382
L001
L002
No.
No.
Hour
Hour
1.000
8.000
0.380
0.380
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K035 Supplying, fixing and polishing of 150mm x 180mm brass parliamentary heavy quality
hinges with brass screws.
PER No.
M122
M382
L001
L002
No.
No.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.000
10.000
0.380
0.380
0.00
0.00
0.00
BRASS FOUNDER
Hour
Hour
1.000
2.000
0.00
0.00
1.000
8.000
2.000
2.000
0.00
K037 Supplying and fixing 100mm brass, double acting springs hinges.
PER No.
M532
M135
L002
L001
No.
No.
Hour
Hour
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K038 Fixing of hinges in position with brass screws, the hinges supplied by Client.
PER No.
M135 Screws brass 30mm x Gauge 8
L002 Skilled labour
L001 Unskilled labour
Nos.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
8.000
0.500
0.500
0.00
0.00
BRASS FOUNDER
Hour
2.500
0.00
1.000
0.250
0.00
0.00
0.500
1.500
0.00
0.00
K040 Supplying, fixing and polishing good quality brass door knobs.
PER No.
M533 Brass door knob
L002 Skilled labour
No.
Hour
Doz.
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
BRASS FOUNDER
Hour
Doz.
Hour
2.000
0.500
1.500
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K043 Supplying 65mm brass, 4 lever approved quality locks for cupboards and fiixing
in position with brass screws.
PER No.
M124 Lock Cupboard Four Levers Brass 63mm
M132 Screws brass 20mm x Gauge 8
L002 Skilled labour
No.
Doz.
Hour
1.000
0.333
1.000
0.00
0.00
0.150
0.500
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
BRASS FOUNDER
K045 Supplying, fixing and polishing 150mm brass, 2 lever , approved qualiry rim
lock.
PER No.
M126 Lock Rim Double lever Brass 150mm
M133 Screws brass 25mm x Gauge 8
L002 Skilled labour
No.
Doz.
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.000
0.500
1.500
0.00
0.00
0.00
K046 Supplying, fixing and polishing 150mm brass, single lever , approved qualiry rim
lock.
PER No.
M127 Lock Rim single lever Brass 150mm
M133 Screws brass 25mm x Gauge 8
L002 Skilled labour
No.
Doz.
Hour
1.000
0.500
1.500
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K047 Supplying, fixing and polishing 150mm brass, double lever , approved qualiry rim
lock.
PER No.
M126 Lock Rim Double lever Brass 150mm
M133 Screws brass 25mm x Gauge 8
L002 Skilled labour
No.
Doz.
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.000
0.500
1.500
0.00
0.00
0.00
BRASS FOUNDER
K048 Supplying and fixing of 125mm good quality single lever rim lock.
PER No.
M127 Lock Rim single lever Brass 150mm
M133 Screws brass 25mm x Gauge 8
L002 Skilled labour
No.
Doz.
Hour
1.000
0.500
1.500
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K047 Supplying and fixing of night latch Yale or Union lock with duplicate keys.
PER No.
M128 Night Latch - China
M133 Screws brass 25mm x Gauge 8
L002 Skilled labour
No.
Doz.
Hour
1.000
0.500
2.000
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K048 Supplying and fixing of 32mm to 40mm brass rings to doors and windows with
brass screws.
PER No.
M125 Ring Brass 45mm to 38mm
M132 Screws brass 20mm x Gauge 8
L002 Skilled labour
No.
Doz.
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.000
0.250
0.250
0.00
0.00
0.00
BRASS FOUNDER
K049 Supplying and fixing of Union mortice lock (imported) for single sash.
PER No.
M128 Lock Mortice Union single Sash
L002 Skilled labour
No.
Hour
1.000
4.000
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K050 Supplying and fixing of Union Mortice (Imported) lock for double sash.
PER No.
M129 Lock Mortice Union Double Sash
L002 Skilled labour
No.
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.000
6.000
0.00
0.00
PLASTERER
cement
Boiled lime
sand
Mason
Unskilled labour
SCAFFOLDING 3 %
50Kg.
Kg.
Cu.m.
Hour
Hour
0.086
2.400
0.021
0.646
1.292
0.00
0.00
0.00
0.00
0.00
1.200
0.646
0.215
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
L003 65mm x 65mm Cove moulding build in existing walls in 1:2 cement mortar.
PER m
M010
M007
L004
L001
cement
50Kg.
sand
Cu.m.
Mason
Hour
Unskilled labour
Hour
ALLOW SCAFFOLDING, WATER & LIME
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.036
0.003
0.656
0.656
0.00
0.00
0.00
0.00
PLASTERER
L004 Plastering of 50mm to 100mm wide cracks in wall with 1:3 cement plaster after
chipping.
PER m
M010
L004
L001
M007
cement
50Kg.
Mason
Hour
Unskilled labour
Hour
sand
Cu.m.
ALLOW SCAFFOLDIN, WATER & LIME PUTTY
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.013
0.164
0.328
0.002
0.00
0.00
0.00
0.00
L005 Cresting with broken glass in 1:4 cement mortar on coping of boundary wall.
PER m
M010
M007
L004
L001
cement
sand
Mason
Unskilled labour
50Kg.
Cu.m.
Hour
Hour
0.082
0.009
0.500
0.500
0.00
0.00
0.00
0.00
L006 75mm x 12mm Ddo moulding in walls in 1:1:4 lime and cement mortar for
replacement to match existing, or to be extra over rate for plastering.
PER m
M010
M007
L004
L001
M550
cement
sand
Mason
Unskilled labour
Boiled lime
ALLOW FOR SCAFFOLDING & WATER
50Kg.
Cu.m.
Hour
Hour
Kg.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.008
0.002
0.800
0.800
0.230
0.00
0.00
0.00
0.00
0.00
L
PLASTERER
L007 150mm x 25mm Dado moulding in walls in 1:1:4 lime and cement mortar only for
replacement to match existing or to be extra over rate for plastering.
PER m
M010
M007
L004
L001
M550
cement
50Kg.
sand
Cu.m.
Mason
Hour
Unskilled labour
Hour
Boiled lime
Kg.
ALLOW FOR SCAFFOLDING & WATER
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.033
0.008
1.000
1.000
0.900
0.00
0.00
0.00
0.00
0.00
L008 100mm x 50mm Dado moulding in cement and sand 1:2 built in existing wall or to be
over rate for plstering
PER m
M010
M007
L004
L001
cement
50Kg.
sand
Cu.m.
Mason
Hour
Unskilled labour
Hour
ALLOW FOR SCAFFOLDING
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.082
0.006
1.200
1.200
0.00
0.00
0.00
0.00
L009 Laying of Flashing or plaster bands over tiles 100mm to 150mm wide on roof
in 1:1:4 cement and lime mortar rate including scaffolding and colour figment to match
tile colour
PER m
M010
M007
L004
L001
M550
cement
sand
Mason
Unskilled labour
Boiled lime
50Kg.
Cu.m.
Hour
Hour
Kg.
0.026
0.005
0.250
0.500
0.720
0.00
0.00
0.00
0.00
0.00
PLASTERER
L010 Letters embosed in plaster 20mm thick 150mm high in cement and sand
1:2 cement floated and painted.
PER No.
L004 Mason
L001 Unskilled labour
L015 Painter
Hour
Hour
Hour
0.500
0.250
0.125
0.00
0.00
0.00
L011 15mm thick 1:1:5 Lime plastering and finished smooth with lime putty.
PER m2
M007
M550
L004
L001
M010
sand
Cu.m.
Boiled lime
Kg.
Mason
Hour
Unskilled labour
Hour
cement
50Kg.
ALLOW FOR SCAFFOLDING & WATER
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.021
3.000
1.300
1.300
0.086
0.00
0.00
0.00
0.00
0.00
L012 1:2 cement plastering flush in surface cracks including raking out joints and lime putty
floating and painting to matchthe existing surface
PER m
L004 Mason
L001 Unskilled labour
Hour
Hour
0.164
0.250
0.00
0.00
PLASTERER
L013 15mm 1:3 cement sand plastering in brick masonary etc. including cement floating
PER m2
M010
M007
L004
L001
cement
sand
Mason
Unskilled labour
50Kg.
Cu.m.
Hour
Hour
0.108
0.009
2.500
2.500
0.00
0.00
0.00
0.00
0.161
0.015
0.650
1.300
0.00
0.00
0.00
0.00
0.161
0.015
0.800
1.600
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
cement
sand
Mason
Unskilled labour
50Kg.
Cu.m.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
cement
sand
Mason
Unskilled labour
50Kg.
Cu.m.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PLASTERER
cement
sand
Mason
Unskilled labour
50Kg.
Cu.m.
Hour
Hour
0.115
0.015
0.650
1.300
0.00
0.00
0.00
0.00
0.115
0.015
0.800
1.600
0.00
0.00
0.00
0.00
0.242
0.022
0.865
1.730
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
cement
sand
Mason
Unskilled labour
50Kg.
Cu.m.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
cement
sand
Mason
Unskilled labour
50Kg.
Cu.m.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PLASTERER
cement
sand
Mason
Unskilled labour
50Kg.
Cu.m.
Hour
Hour
0.242
0.022
1.000
2.160
0.00
0.00
0.00
0.00
0.188
0.022
0.865
1.730
0.00
0.00
0.00
0.00
0.188
0.022
1.000
2.160
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
cement
sand
Mason
Unskilled labour
50Kg.
Cu.m.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
cement
sand
Mason
Unskilled labour
50Kg.
Cu.m.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PLASTERER
50Kg.
Hour
Hour
0.029
0.100
0.050
0.00
0.00
0.00
L023 Brown or Green cement floating in rendering with black cement and finish
smooth.
PER m2
M010
M011
L004
L001
cement
Colour pigment for cement
Mason
Unskilled labour
ALLOW FOR CURING
50Kg.
Kg.
Hour
Hour
0.029
0.004
0.100
0.050
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
L024 Black cement floating in rendering with black cement and finish smooth.
PER m2
M010
M011
L004
L001
cement
Colour pigment for cement
Mason
Unskilled labour
ALLOW FOR CURING
50Kg.
Kg.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.029
0.004
0.100
0.050
0.00
0.00
0.00
0.00
PLASTERER
cement
50Kg.
sand
Cu.m.
Pudlo cement
Kg.
Mason
Hour
Unskilled labour
Hour
ALLOW FOR CURING & FLOATING CEMENT
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.242
0.022
0.549
0.865
1.730
0.00
0.00
0.00
0.00
0.00
L026 12mm x 150mm Skirting in 1:3, projected on flush with wall and including
forming groove with smooth finish
PER m
M010
M007
L004
L001
cement
sand
Mason
Unskilled labour
ALLOW FOR WATER
50Kg.
Cu.m.
Hour
Hour
0.033
0.003
0.800
0.800
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
L027 12mm x 150mm Skirting in 1:3 cement mortar projected in flush with wall
and finished with red cement floating including forming groove.
PER m
M010
M007
M011
L004
L001
cement
sand
Colour pigment for cement
Mason
Unskilled labour
ALLOW FOR WATER
50Kg.
Cu.m.
Kg.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.032
0.003
0.001
1.000
0.800
0.00
0.00
0.00
0.00
0.00
PLASTERER
L028 15mm thick plastering , 1:1:3 cement lime and sand to R.C. beams and slab
sooffit including floating with lime putty.
PER m2
M010
M007
M550
L004
L001
cement
sand
Boiled lime
Mason
Unskilled labour
50Kg.
Cu.m.
Kg.
Hour
Hour
0.086
0.015
2.400
1.750
1.750
0.00
0.00
0.00
0.00
0.00
L029 20mm thick, 1:2 cement sand D.P.C. and finished smooth with 2 coats of hot
tar blinded with coarse sand.
PER m2
M010
M007
M013
L004
L001
cement
sand
DPC Tar *
Mason
Unskilled labour
50Kg.
Cu.m.
Lit.
Hour
Hour
0.242
0.003
0.500
1.000
2.000
0.00
0.00
0.00
0.00
0.00
PLASTERER
L030 12mm x 100mm skirting in 1:3 cement sand mortar in flush with wall and finished wit
smooth cement floating. Rate include for forming groove.
PER m2
M010 cement
50Kg.
0.022
0.00
M007 Sand
Cu.m.
0.002
0.00
L004 Mason
Hour
0.700
0.00
L001 Unskilled labour
Hour
0.700
0.00
ALLOW FOR WATER
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
L031 12mm x 100mm skirting in 1:3 cement sand mortar projected in flush with wall and
finished with colour cement floating. Rate include for forming groove.
PER m
M010
M007
M011
L004
L001
Cement
Sand
Colour pigment for cement
Mason
Unskilled labour
ALLOW FOR WATER
50Kg.
Cu. m.
Kg.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.021
0.002
0.001
0.900
0.700
0.00
0.00
0.00
0.00
0.00
M TINKER
M001 Supplying and fixing of 100mm dia. G.I. 24 BWG down pipes fixed to walls
with holdfast or plugs in 1:3 cement.
PER m
M022
L004
L007
L001
m2
Hour
Hour
Hour
0.400
0.250
2.250
1.000
0.00
0.00
0.00
M002 Supplying and fixing of 150mm dia. G.I. 24 BWG down pipes fixed to walls
with holdfast or plugs in 1:3 cement.
PER m
M022
L004
L007
L001
m2
Hour
Hour
Hour
0.600
0.250
3.000
1.000
0.00
0.00
0.00
TINKER
M003 Supplying and fixing of 100 x 75mm rectangular G.I. 24 BWG down pipes
fixed with holdfast or plugs in 1:3 cement.
PER m
M022
L004
L007
L001
m2
Hour
Hour
Hour
0.450
0.250
2.750
1.000
0.00
0.00
0.00
M004 Fixing of 100 to 150mm circular or rectangular down pipes fixed with holdfast
or plugs in 1:3 cement mortar (G.I. Sheets supplied by Client.)
PER m
L004 Mason
L007 Tinker
L001 Unskilled labour
Hour
Hour
Hour
0.029
0.293
0.234
0.00
0.00
0.00
0.125
0.500
0.00
0.00
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
TINKER
M006 Extra over item M001 to M004 in buildings of three or more storeyed.
PER m
L004 Mason
L001 Unskilled labour
Hour
Hour
0.250
1.000
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M007 Fixing of down pipes loose or new fixed with holdfast or plugs including making
good to walls (down pipes supplied by Client, plugs or holdfast paid for separately).
PER m
L007 Tinker
L001 Unskilled labour
Hour
Hour
0.350
0.350
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M008 450mm wide G.I. Flashing (G.I. 24 BWG) fixed with 150mm turned up along
and top edge tucked well into wall in cement lime mortar including removal of
old flashing.
PER m
M022
L007
L004
L001
m2
Hour
Hour
Hour
0.600
1.000
0.250
1.250
0.00
0.00
0.00
TINKER
M009 Refixing of G.I. Flashing including making good to walls in cement and lime
mortar.
PER m
L007 Tinker
L004 Mason
L001 Unskilled labour
Hour
Hour
Hour
0.750
0.250
1.000
0.00
0.00
0.00
M010 150mm G.I. Gutters eaves semi circular made with G.I. 24 B.W.G. and fixed with
hooks or brackets and bolts and joints soldered complete.
PER m
M022
L007
L001
M546
M124
M123
m2
Hour
Hour
Kg.
No.
No.
0.350
2.500
1.500
0.228
2.500
1.667
0.00
0.00
0.00
TINKER
M011 150mm G.I. Gutters eaves semi circular made with G.I. 24 B.W.G. and fixed with
hooks or brackets and screws and joints soldered complete (G.I. Sheets supplied
by Client.)
PER m
L007 Tinker
L001 Unskilled labour
day
day
0.285
0.178
0.00
0.00
M012 150mm Gutters, eaves moulded in G.I. 24 BWG and fixed complete including
brackets.
PER m
M022 G.I. 24 BWG sheets(Plain)
L007 Tinker
L001 Unskilled labour
m2
Hour
Hour
0.400
4.000
2.000
0.00
M013 Extra over items M010 to M012 and M026 in two storeyed Buildings.
PER m
L007 Tinker
L001 Unskilled labour
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.000
1.000
0.00
0.00
TINKER
M014 Extra over items M010 to M012 and M026 in three storeyed Buildings.
PER m
M445 Props (bamboo) 3 - 4 m
L001 Unskilled labour
L007 Tinker
No.
Hour
Hour
0.950
1.750
1.500
M015 Cleaning of Gutters, eaves and down pipes in single storeyed buildings.
PER m
L001 Unskilled labour
Hour
0.150
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M016 Cleaning of Gutters, eaves and down pipes in two storeyed buildings.
PER m
L001 Unskilled labour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.200
0.00
0.00
TINKER
day
Hour
0.064
0.064
0.00
0.00
0.100
0.100
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M019 Making openings to existing gutters to receive 100mm to 150mm down pipe
attaching spigot piece joints soldered including making good.
PER No.
M022 G.I. 24 BWG sheets(Plain)
L007 Tinker
L001 Unskilled labour
m2
Hour
Hour
0.100
2.000
2.000
0.00
TINKER
M020 Making of 250 x 300 x 500mm deep gutter head with G.I. Sheets 24 B.W.G. down
pipe and fixed complete.
PER No.
M022 G.I. 24 BWG sheets(Plain)
L007 Tinker
L001 Unskilled labour
m2
Hour
Hour
0.900
7.000
2.000
0.00
M021 Making of 250 x 300 x 500mm deep gutter head with G.I. Sheets 24 B.W.G. down
pipe and fixed complete.(Sheets supplied by Client).
PER No.
L007 Tinker
L001 Unskilled labour
Hour
Hour
7.000
2.000
0.00
0.00
TINKER
M022 Making of 250 x 300 x 300mm deep gutter head with G.I. Sheets 24 B.W.G. down
pipe and fixed complete.
PER No.
M022 G.I. 24 BWG sheets(Plain)
L007 Tinker
m2
Hour
0.500
5.000
0.00
M023 Making of 250 x 300 x 300mm deep gutter head with G.I. Sheets 22 B.W.G. down
pipe and fixed complete.(Sheets supplied by Client).
PER No.
L007 Tinker
L001 Unskilled labour
Hour
Hour
5.000
2.000
0.00
0.00
M024 Supplying of 20mm x 3mm Gutter hooks or brackets and fixing with
iron screws.
PER No.
M546
M147
L005
L011
L012
Kg.
Doz.
Hour
day
day
SUB TOTAL
OVER HEAD & PROFITS 22.00%
0.227
0.167
0.042
0.073
0.032
0.00
0.00
TOTAL
Hour
Hour
0.500
0.500
0.00
0.00
M026 G.I. 900mm wide overall, 22 B.W.G. Parapet gutters renewed on existing boards joints
soldered and laid complete.
PER m
M023
L007
L002
L001
m2
Hour
Hour
Hour
0.920
1.250
0.250
1.250
0.00
0.00
0.00
0.00
m2
Lit.
50 Kg.
Kg.
Cu.m.
Hour
Hour
Hour
0.998
0.224
0.027
0.800
0.004
1.500
0.300
0.600
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
TINKER
M032 18 BWG 900mm wide valley gutters renewed including timber 25mm thick
boarding sheet tarred joints soldered and cement lime filleting complete.
PER m
M024
M047
M476
M010
M550
M007
M041
M076
L001
L002
m2
Sq.m.
Lit.
50 Kg.
Kg.
Cu.m.
Kg.
Lit.
Hour
Hour
0.998
1.000
0.224
0.027
0.800
0.004
0.067
0.335
3.500
2.000
0.00
0.00
0.00
0.00
0.00
0.00
M033 Fixing of Half round, 150mm pvc Eaves gutters with aluminium brackets and brass scr
at 450mm intervals including necessary moulded fittings.
PER m
M478
M401
M400
M404
M402
M405
M406
M197
L008
L001
SUB TOTAL
OVER HEAD & PROFITS 22.00%
0.273
0.137
0.068
3.100
0.205
0.137
0.137
0.580
0.273
0.273
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
M034 Fixing of 114mm PVC square Eave gutters with P.V.C. brackets and brass screws
at 450mm intervals including all necessary moulded fittings.
PER m
M388 Gutter Square PVC 114mm
M390 Gutter End Cap Square PVC 114mm
M3989 Mitre Joint Square PVC 114mm
M391 Gutter Joiner Square PVC 114mm
M393 Gutter Bracket Square PVC 114mm
M392 Running Head Square PVC 114mm
M406 Solvent cement
M197 Screws brass 20mm x Gauge 6
L008 Plumber
L001 Unskilled labour
m
No.
No.
No.
No.
No.
50 Grams
Doz.
Hour
Hour
1.000
0.137
0.068
0.205
3.100
0.137
0.137
0.580
0.273
0.273
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m
No.
No.
m
No.
Doz.
50 Grams
Hour
Hour
Hour
1.093
0.547
0.137
0.547
0.547
0.091
0.205
0.273
0.273
0.546
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
GLAZIER
N001 Fixing of Glass panes with class I timber boarding (Glass Supplied by Client)
PER m2
M479 12mm x 12mm Class I timber beadings
L009 Glazier
m
Hour
19.650
5.000
0.00
0.00
N002 Supplying of 3mm thick clear Glass panes and fixing with class I timber
beading.
PER m2
M228 Glass Pane clear 3mm
M479 12mm x 12mm Class I timber beadings
L009 Glazier
Sq.m.
m
Hour
1.100
15.000
5.000
0.00
0.00
0.00
Sq.m.
m
Hour
1.100
8.000
4.000
0.00
0.00
0.00
GLAZIER
N004 Supplying of 3mm figured Glass panes and fixing with Class I timber beading.
PER m2
M230 Glass pane Figured 3mm
M479 12mm x 12mm Class I timber beadings
L009 Glazier
Sq.m.
m
Hour
1.10
15.00
5.00
0.00
0.00
0.00
N005 Supplying of 5mm figured Glass panes and fixing with Class I timber beading.
PER m2
M231 Glass pane Figured 5mm
M479 12mm x 12mm Class I timber beadings
L009 Glazier
Sq.m.
m
Hour
1.10
8.00
4.00
0.00
0.00
0.00
P001 One coat of cement washing to walls of single storeyed buildings, patching
and preparing surface.
PER m2
M010 Cement
L006 Painter
L001 Unskilled labour
50 Kg.
Hour
Hour
0.004
0.088
0.088
0.00
0.00
P002 Two coat of cement washing to walls of single storeyed buildings, patching
and preparing surface.
PER m2
M010 Cement
L006 Painter
L001 Unskilled labour
50 Kg.
Hour
Hour
0.007
0.150
0.150
0.00
0.00
P003 One coat of cement washing externally to walls of buildings upper floor
PER m2
M010 Cement
L006 Painter
L001 Unskilled labour
50 Kg.
Hour
Hour
0.004
0.104
0.104
0.00
0.00
P004 Flags average size 1800mm x 900mm hung upon buildings as directed and removed
when required (Flags supplied by Client. Any poles used are to be paid separately).
PER No.
L001 Unskilled labour
Hour
0.500
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P005 Flags small (burges) up to 100 hungs upon buildings as directed and removed when
required (Flags supplied by Client. Any poles used are to be paid separately).
PER No.
L001 Unskilled labour
day
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.007
0.00
P006 Flags small (burges) up to 100 hungs upon buildings as directed and removed when
required (Flags supplied by Client. Any poles used are to be paid separately).
PER No.
L001 Unskilled labour
day
0.006
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P007 Flag poles (Supplied by Client) planted as directed removed when required
and ground made good.
PER post
L001 Unskilled labour
day
0.150
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P008 Lettering 25mm to 50mm painted in Sinhala, English or Tamil including painting
ground.
PER p/letter
L006 Painter
Hour
0.184
0.00
P009 Lettering 50mm to 75mm painted in Sinhala, English or Tamil including painting
ground.
PER p/letter
L006 Painter
Hour
0.200
0.00
P010 Lettering 100mm to 125mm painted in Sinhala, English or Tamil including painting
ground.
PER p/letter
L006 Painter
Hour
0.250
0.00
0.070
0.054
0.00
0.00
P011 Painting the metal surface with one coat of aluminium paint.
PER m2
M480 Aluminium paint
L015 Painter
Lit.
day
P012 Painting one coat of enamel paint including washing (using washing soda) , cleaning a
smoothing down with sand paper.
PER m2
M075 Enamel *
L006 Painter
Lit.
Hour
0.081
0.430
0.00
0.00
P013 Painting two coats of enamel paint including washing( using washing soda) cleaning a
down with sand paper.
PER m2
M075 Enamel *
L006 Painter
Lit.
Hour
0.161
1.000
0.00
0.00
Lit.
Lit.
Hour
0.081
0.161
1.300
0.00
0.00
0.00
P015 Painting new wood work with one coat of approved wood primer
PER m2
M077 Aluminium wood primer *
L006 Painter
Lit.
Hour
0.081
0.500
0.00
0.00
P016 Painting steel work, with 1 coat of red lead including removing scale and wire brushing
PER m2
M082 Red Lead Paint *
L006 Painter
Lit.
Hour
0.081
0.500
0.00
0.00
P017 Painting steel work, with 2 coat of red lead including removing scale and wire brushing
PER m2
M082 Red Lead Paint *
L006 Painter
Lit.
Hour
0.162
1.000
0.00
0.00
Lit.
Hour
0.097
0.300
0.00
0.00
P019 Painting walls with one coat of emulsion paint including preparing surface
of new work.
PER m2
M073 Emulsion *
L006 Painter
Lit.
Hour
0.081
0.300
0.00
0.00
P020 Painting walls with two coats of emulsion paint including preparing surface
of new work.
PER m2
M073 Emulsion *
L006 Painter
Lit.
Hour
0.150
0.600
0.00
0.00
P021 Painting walls with one coat of emulsion paint including preparing surface
of old work.
PER m2
M073 Emulsion *
L006 Painter
Lit.
Hour
0.081
0.376
0.00
0.00
P022 Painting walls with two coats of emulsion paint including preparing surface of old wor
PER m2
M073 Emulsion *
L006 Painter
Lit.
Hour
0.150
0.650
0.00
0.00
P023 Painting walls with two coats of snowcem or equivalent cemet paint to new work.
PER m2
M080 Snowcem
L006 Painter
L001 Unskilled labour
Kg.
Hour
Hour
0.345
0.700
0.400
0.00
0.00
0.00
P024 Painting old walls with two coats of snowcem or equivalent cement paint after scraping
existing colourwash, sand papering and wiping down.
PER m2
M080 Snowcem
L006 Painter
L001 Unskilled labour
Kg.
Hour
Hour
0.345
0.700
0.700
0.00
0.00
0.00
P025 Painting old walls with one coat of snowcem or equivalent cement paint after scraping
existing colour wash, sand papering and wiping
PER m2
M080 Snowcem
L006 Painter
L001 Unskilled labour
Kg.
Hour
Hour
0.197
0.400
0.600
0.00
0.00
0.00
Hour
1.300
0.00
2.000
0.00
Hour
P028 Painting G.I. Pipes 20mm to 40mm diameter with 2 coats of enamel paint.
PER m
M075 Enamel *
L006 Painter
Lit.
Hour
0.022
0.200
0.00
0.00
P029 Applying of 1 coat Tarnap or other wood preservative to old wood work.
PER m2
M076 Wood Preservative (black / coloured) *
L006 Painter
Lit.
Hour
0.122
0.200
0.00
P030 Applying of 2 coats Tarnap or other wood preservative to new wood work.
PER m2
M076 Wood Preservative (Black / Coloured) *
L006 Painter
Lit.
Hour
0.218
0.400
0.00
P031 Varnishing with 1 coat of polyurethene best Copal varnish after washing down and san
PER m2
M079 Polythane Varnish *
L001 Unskilled labour
L006 Painter
Lit.
Hour
Hour
0.097
0.300
0.400
0.00
0.00
0.00
P032 Varnishing with 2 coats of Polyurathene varnish after washing down and sand paperin
PER m2
M079 Polythane Varnish *
L001 Unskilled labour
L006 Painter
Lit.
Hour
Hour
0.178
0.300
0.800
0.00
0.00
0.00
Hour
1.750
0.00
P034 Scraping and removing soot on walls and levelling internally(extra over colour
washing).
PER m2
L001 Unskilled labour
Hour
0.200
0.00
P035 Scraping of walls to original plaster, sand papering and lime putting cracks and
defects, preparing surface for new application of distermper, snowcem paint or similar
application.
PER m2
L001 Unskilled labour
L004 Mason
Hour
Hour
0.200
0.050
0.00
0.00
P036 White washing or colour washing wall with 1 coat in single storeyed building
including patching and preparing surface.
PER m2
M550
M482
M483
L006
L001
Boiled Lime
Glue
Yellow ochre
Painter
Unskilled labour
Kg.
Kg.
Kg.
Hour
Hour
0.182
0.001
0.001
0.088
0.088
0.00
0.00
0.00
0.00
P039 White washing or colour washing external walls with one coat in buildings of more
than two storeys.
PER m2
M484
M482
M483
L006
L001
Slaked lime
Glue
Yellow ochre
Painter
Unskilled labour
Bushels
Kg.
Kg.
Hour
Hour
0.182
0.001
0.001
0.088
0.144
0.00
0.00
0.00
P040 White washing or colour washing external walls with two coats in 2 storeyed building
PER m2
M484
M482
M483
L006
L001
Slaked lime
Glue
Yellow ochre
Painter
Unskilled labour
Bushels
Kg.
Kg.
Hour
Hour
0.296
0.002
0.002
0.150
0.184
0.00
0.00
0.00
P041 White washing or colour washing external walls with 2coat in buildings with more
than two storeys.
PER m2
M484
M482
M483
L006
L001
Slaked lime
Glue
Yellow ochre
Painter
Unskilled labour
Bushels
Kg.
Kg.
Hour
Hour
0.296
0.002
0.002
0.150
0.208
0.00
0.00
0.00
P042 Walls internal faces scraped to original plaster patching up cracks and defects
lime putty sand papering applying plaster of paris and preparing surfaces for
application of emulsion paint or enamel paint.
PER m2
L001 Unskilled labour
L004 Mason
L006 Painter
Hour
Hour
Hour
1.000
0.200
0.100
0.00
0.00
0.00
P043 Walls external faces scraped to original plaster patching up cracks and defects and
preparing surface including sand papering for application of snowcem / white washing
in single storeyed buildings.
PER m2
L001 Unskilled labour
L004 Mason
Hour
Hour
1.000
0.200
0.00
0.00
P044 Walls external faces scraped to original plaster patching up cracks and defects and
preparing surface including sand papering for application of snowcem or white washin
in two storeyed buildings.
PER m2
L001 Unskilled labour
L004 Mason
Hour
Hour
1.300
0.200
0.00
0.00
P045 Walls external faces scraped to original plaster patching up cracks and defects and
preparing surface including sand papering for application of snowcem or white washin
in more than two storeyed buildings.
PER m2
L001 Unskilled labour
L004 Mason
Hour
Hour
1.700
0.200
0.00
0.00
P046 Painting walls with 1 coat weathershield paint including preparing surface of new work
PER m2
M074 Weathershield
L006 Painter
Lit.
Hour
0.117
0.320
0.00
0.00
P047 Painting walls with 2 coats weathershield paint including preparing surface of new wor
PER m2
M074 Weathershield *
L006 Painter
Lit.
Hour
0.223
0.600
0.00
0.00
P048 Painting walls with 1 coat weathershield paint including preparing surface of old work
PER m2
M074 Weathershield *
L006 Painter
Lit.
Hour
0.117
0.376
0.00
0.00
P049 Painting walls with 2 coats weathershield paint including preparing surface of old work
PER m2
M074 Weathershield *
L006 Painter
Lit.
Hour
0.223
0.700
0.00
0.00
P050 Painting floors with 1 coat floor paint including preparing surface.
PER m2
M081 Floor Paint - Quick drying
M085 Thinner *
L006 Painter
Lit.
Lit.
Hour
0.082
0.008
0.250
0.00
0.00
0.00
P051 Painting floors with 2 coats floor paint including preparing surface.
PER m2
M081 Floor Paint - Quick drying
M085 Thinner *
L006 Painter
Lit.
Lit.
Hour
0.164
0.016
0.400
0.00
0.00
0.00
PLUMBER
No.
Hour
Hour
1.000
0.500
0.500
0.00
0.00
0.00
1.000
0.500
0.500
0.00
0.00
0.00
1.000
0.750
0.750
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
No.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
No.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PLUMBER
No.
Hour
Hour
1.000
1.000
1.000
0.00
0.00
0.00
0.500
0.500
0.00
0.00
0.500
0.500
1.000
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Hour
Hour
Hour
PLUMBER
Q007 Supplying and fixing of Ball only plastic, for 12mm valve.
PER No.
M220
L008
L001
L007
No.
Hour
Hour
Hour
1.000
0.500
0.500
0.250
0.00
0.00
0.00
0.00
1.000
0.500
0.500
0.250
0.00
0.00
0.00
0.00
Q008 Supplying and fixing of Ball only plastic, for 20mm valve.
PER No.
M221
L008
L001
L007
No.
Hour
Hour
Hour
PLUMBER
Q009 Supplying and fixing of Ball only plastic, for 25mm valve.
PER No.
M222
L008
L001
L007
No.
Hour
Hour
Hour
1.000
0.750
0.750
0.250
0.00
0.00
0.00
0.00
0.500
0.500
0.250
0.00
0.00
0.00
Hour
Hour
Hour
PLUMBER
Q011 Fixing of lavatory Basin to wall and connected to existing water service and making
good (Basin brackets and fittings supplied by Client).
PER No.
M485 Plugs
No.
4.000
0.00
Hour
Hour
8.000
6.000
0.00
0.00
Q012 Fixing of lavatory Basin on existing brackets(Tap , waste trap and basin supplied
by Client.).
PER No.
L008 Plumber
L001 Unskilled labour
Hour
Hour
4.000
4.000
0.00
0.00
PLUMBER
Q013 Supplying and fixing of lavatory Basin 560mm x 360mm with one taps, waste
plug, with new brackets (additional tap , trap and outlet pipe paid separately).
PER No.
M122 Basin 360 x 560 with tap waste plug but
excluding bracket.
M485 Plugs
No.
1.000
No.
4.000
0.00
Hour
Hour
Pair
8.000
6.000
1.000
0.00
0.00
0.00
Q014 Supplying and fixing of lavatory Basin 560mm x 360mm with one tap on existing
brackets complete (additional tap, trap and outlet pipe paid separately).
PER No.
M122 Basin 360 x 560 with tap waste plug but
excluding bracket.
M485 Plugs
No.
1.000
No.
4.000
0.00
Hour
Hour
8.000
6.000
0.00
0.00
PLUMBER
Q015 Removing Basin, Urinal or sink including all fittings and walls made good.
PER No.
L008 Plumber
L001 Unskilled labour
L002 Skilled labour
Hour
Hour
Hour
3.000
4.000
1.000
0.00
0.00
0.00
Q016 C.I. Enamelled baths removing and re - fixing in new position and making good to
walls and floors (extra pipes required paid separately).
PER N0.
L008 Plumber
L001 Unskilled labour
L002 Skilled labour
Hour
Hour
Hour
10.000
14.000
4.000
0.00
0.00
0.00
PLUMBER
Q017 C.I. Enamelled baths any size including trap, tap, outlet pipes etc. fixed complete
(Bath and fittings supplied by Client).
PER N0.
L008 Plumber
L001 Unskilled labour
L002 Skilled labour
Hour
Hour
Hour
8.000
10.000
2.000
0.00
0.00
0.00
Q018 Fixing of C.I. Bends,elbows, tees, cresses any size upto 50mm(fittings supplied by Clie
PER N0.
L008 Plumber
L001 Unskilled labour
Hour
Hour
0.250
0.250
0.00
0.00
1.000
0.250
0.250
0.00
0.00
0.00
No.
Hour
Hour
PLUMBER
No.
Hour
Hour
1.000
0.250
0.250
0.00
0.00
0.00
1.000
0.250
0.250
0.00
0.00
0.00
1.000
0.250
0.250
0.00
0.00
0.00
No.
Hour
Hour
No.
Hour
Hour
PLUMBER
No.
Hour
Hour
1.000
0.250
0.250
0.00
0.00
0.00
1.000
0.250
0.250
0.00
0.00
0.00
1.000
0.333
0.333
0.00
0.00
0.00
No.
Hour
Hour
No.
Hour
Hour
PLUMBER
Q026 Supplying and fixing of chain, chromium plated for flushing cistern.
PER No.
M121 Chromium plated chain for flushing cistern
L008 Plumber
No.
Hour
1.000
0.500
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q027 Supplying and fixing of PVC reducing Sockets from 20mm to smaller sizes.
PER No.
L008 Plumber
L001 Unskilled labour
Hour
Hour
0.100
0.100
0.00
0.00
Q028 Supplying and fixing of PVC reducing Sockets from 25mm to smaller sizes.
PER No.
M356 Reducing Socket PVC 25mm to smaller size.
L008 Plumber
L001 Unskilled labour
No.
Hour
Hour
1.000
0.100
0.100
0.00
0.00
PLUMBER
Q029 Supplying and fixing of PVC reducing Sockets from 32mm to smaller sizes.
PER No.
M357 Reducing Socket PVC 32mm to smaller size.
L008 Plumber
No.
Hour
1.000
0.100
0.00
Hour
0.100
0.00
Q030 Supplying and fixing of PVC reducing Sockets from 38mm to smaller sizes.
PER No.
M358 Reducing Socket PVC 40mm to smaller size.
L008 Plumber
L001 Unskilled labour
No.
Hour
Hour
1.000
0.100
0.100
0.00
0.00
No.
Hour
Hour
1.000
0.100
0.100
0.00
0.00
PLUMBER
Q032 Supplying and fixing of PVC reducing Tees from 20mm to smaller sizes.
PER No.
M361 Reducing Socket PVC 20mm to smaller size.
L008 Plumber
L001 Unskilled labour
ALLOW FOR OTHER EXPENSES
No.
Hour
Hour
1.000
0.100
0.100
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q033 Supplying and fixing of PVC reducing Tees from 25mm to smaller sizes.
PER No.
M361 Reducing Socket PVC 20mm to smaller size.
L008 Plumber
L001 Unskilled labour
No.
Hour
Hour
1.000
0.100
0.100
0.00
0.00
No.
Hour
Hour
1.000
0.100
0.100
0.00
0.00
PLUMBER
Q035 Supplying and fixing of PVC reducing Tees from 40mm to smaller sizes.
PER No.
M363 Reducing Socket PVC 40mm to smaller size.
L008 Plumber
L001 Unskilled labour
No.
Hour
Hour
1.000
0.100
0.100
0.00
0.00
Q036 Supplying and fixing of PVC reducing Tees from 50mm to smaller sizes.
PER No.
M364 Reducing Socket PVC 50mm to smaller size.
L008 Plumber
L001 Unskilled labour
No.
Hour
Hour
1.000
0.100
0.100
0.00
0.00
Q037 Supplying and fixing of 560mm x 510mm pedestal type wash basin(L)
with two way tapand waste plug.
PER No.
M088
L002
L001
L008
No.
Hour
Hour
Hour
1.000
2.000
8.000
8.000
0.00
0.00
0.00
1.000
0.100
0.00
0.00
PLUMBER
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
No.
Hour
No.
Hour
Hour
1.000
0.100
0.100
0.00
0.00
0.00
1.000
0.100
0.100
0.00
0.00
0.00
1.000
0.100
0.100
0.00
0.00
0.00
PLUMBER
No.
Hour
Hour
No.
Hour
Hour
No.
Hour
Hour
1.000
0.100
0.100
0.00
0.00
0.00
1.000
0.150
0.150
0.00
0.00
0.00
1.000
0.200
0.200
0.00
0.00
0.00
PLUMBER
No.
Hour
Hour
No.
Hour
Hour
PLUMBER
No.
Hour
Hour
1.000
0.100
0.100
0.00
0.00
1.000
0.100
0.100
0.00
0.00
No.
Hour
Hour
PER No.
M338 Faucet Socket PVC 32mm
L008 Plumber
L001 Unskilled labour
No.
Hour
Hour
1.000
0.100
0.100
0.00
0.00
1.000
0.100
0.100
0.00
0.00
1.000
0.100
0.100
0.00
0.00
PLUMBER
No.
Hour
Hour
No.
Hour
Hour
No.
1.000
L008 Plumber
L001 Unskilled labour
Hour
Hour
0.100
0.100
0.00
0.00
1.000
0.100
0.100
0.00
0.00
1.000
0.100
0.100
0.00
0.00
PLUMBER
No.
Hour
Hour
No.
Hour
Hour
PLUMBER
No.
Hour
Hour
1.000
0.100
0.100
0.00
0.00
1.000
0.100
0.100
0.00
0.00
1.000
0.100
0.100
0.00
0.00
No.
Hour
Hour
No.
Hour
Hour
PLUMBER
No.
Hour
Hour
1.000
0.100
0.100
0.00
0.00
1.000
0.100
0.100
0.00
0.00
1.000
0.100
0.100
0.00
0.00
No.
Hour
Hour
No.
Hour
Hour
PLUMBER
PER No.
M495 Plugs PVC 20mm(see M350)
L008 Plumber
No.
Hour
1.000
0.100
0.00
1.000
0.100
0.00
1.000
0.100
0.00
1.000
0.100
0.00
No.
Hour
No.
Hour
PLUMBER
No.
Hour
No.
Hour
1.000
0.100
0.00
1.000
0.100
0.00
1.000
0.100
0.100
0.00
0.00
0.00
No.
Hour
PLUMBER
No.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
No.
Hour
Hour
1.000
0.100
0.100
0.00
0.00
0.00
1.000
0.100
0.100
0.00
0.00
0.00
1.000
0.100
0.100
0.00
0.00
0.00
No.
Hour
Hour
PLUMBER
No.
Hour
Hour
No.
Hour
Hour
1.000
0.100
0.100
0.00
0.00
0.00
1.000
0.100
0.100
0.00
0.00
0.00
1.000
0.200
0.200
0.00
0.00
0.00
No.
Hour
Hour
PLUMBER
No.
Hour
Hour
m
Hour
Hour
1.000
0.050
0.050
0.00
0.00
m
Hour
Hour
1.000
0.067
0.067
0.00
0.00
PLUMBER
Q074 Supplying and fixing of 32mm (type 1000) p.v.c. pipes.(Fittings paid separately.)
PER m
M293 Pipe PVC 32mm type 1000
L008 Plumber
L001 Unskilled labour
m
Hour
Hour
1.000
0.100
0.100
0.00
0.00
0.00
Q075 Supplying and fixing of 40mm (type 1000) p.v.c. pipes.(Fittings paid separately.)
PER m
M296 Pipe PVC 32mm type 1000
L008 Plumber
L001 Unskilled labour
m
Hour
Hour
1.000
0.100
0.100
0.00
0.00
0.00
m
Hour
Hour
1.000
0.333
0.333
0.00
0.00
0.00
PLUMBER
Q077 Supplying and fixing of 63mm (type 1000) p.v.c. pipes.(Fittings paid separately.)
PER m
M298 Pipe PVC 63mm type 1000
L008 Plumber
L001 Unskilled labour
m
Hour
Hour
1.000
0.333
0.333
0.00
0.00
0.00
Q078 Supplying and fixing of 75mm (type 1000) p.v.c. pipes.(Fittings paid separately.)
PER m
M299 Pipe PVC 75mm type 1000
L008 Plumber
L001 Unskilled labour
m
Hour
Hour
1.000
0.333
0.333
0.00
0.00
0.00
PLUMBER
Q079 Fixing of Closet pedestal type available at site with cement concrete after
breaking concrete floor and making good and making connections to soil and
flush pipe.
PER No.
M010 Cement
L008 Plumber
L001 Unskilled labour
50 Kg.
Hour
Hour
0.250
6.000
6.000
0.00
0.00
0.00
Q080 Fixing of 20mm to 50mm p.v.c. Pipes with specials (pipes and specials supplied
by Client.)
PER m
L008 Plumber
L001 Unskilled labour
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.100
0.100
0.00
0.00
PLUMBER
Q081 Supplying and fixing of 20mm (type 1000) p.v.c. Pipes including specials and
fittings.
PER m
M293 Pipe PVC 20mm type 1000
L008 Plumber
L001 Unskilled labour
m
Hour
Hour
1.000
0.100
0.100
0.00
0.00
Q082 Supplying and fixing of 25mm (type 1000) p.v.c. Pipes including specials and
fittings.
PER m
M294 Pipe PVC 25mm type 1000
L008 Plumber
L001 Unskilled labour
m
Hour
Hour
1.000
0.100
0.100
0.00
0.00
0.00
PLUMBER
Q083 Supplying and fixing of 32mm (type 1000) p.v.c. Pipes including specials and
fittings.
PER m
M295 Pipe PVC 25mm type 1000
L008 Plumber
L001 Unskilled labour
m
Hour
Hour
1.100
0.125
0.125
0.00
0.00
0.00
Q084 Supplying and fixing of 40mm (type 1000) p.v.c. Pipes including specials and
fittings.
PER m
M296 Pipe PVC 40mm type 1000
L008 Plumber
L001 Unskilled labour
m
Hour
Hour
1.100
0.125
0.125
0.00
0.00
0.00
PLUMBER
Q085 Supplying and fixing of 50mm (type 1000) p.v.c. Pipes including specials and
fittings.
PER m
M297 Pipe PVC 50mm type 1000
L008 Plumber
L001 Unskilled labour
m
Hour
Hour
1.100
0.200
0.200
0.00
0.00
0.00
Q086 Supplying and fixing of 63mm (type 1000) p.v.c. Pipes including specials and
fittings.
PER m
M298 Pipe PVC 63mm type 1000
L008 Plumber
L001 Unskilled labour
m
Hour
Hour
1.100
0.200
0.200
0.00
0.00
0.00
PLUMBER
Q087 Supplying and fixing of 150mm x 12mm p.v.c. shower rose with specials.
PER No.
M117 Shower Rose PVC 150mm x 12mm
L008 Plumber
No.
Hour
1.000
0.500
0.00
1.000
1.000
0.00
1.000
0.500
0.500
0.00
0.00
No.
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
No.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PLUMBER
PER No.
M502 Gate valve, brass 20mm
L008 Plumber
L001 Unskilled labour
No.
Hour
Hour
1.000
0.500
0.500
0.00
0.00
1.000
0.750
0.750
0.00
0.00
1.000
1.000
1.000
0.00
0.00
1.000
1.000
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
No.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
No.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PLUMBER
No.
Hour
Hour
1.000
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q094 Supplying and installing of 400 gal capacity round plastic shell tank(with 2 Nos.
of 01 oz.mat.) including scaffolding & transport.
PER P/tank
M547 400 gal round plastic shell Tank
L011 Unskilled labour
L018 Plumber
No.
day
day
1.000
4.000
1.000
0.00
50 Kg.
Hour
Hour
0.167
4.000
4.000
0.00
0.00
0.00
PLUMBER
Q096 Supplying and fixing pedestal type Closet (seat and cover available).
PER No.
M102
M010
L008
L001
No.
50 Kg.
Hour
Hour
1.000
0.250
6.000
6.000
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q097 Supplying and fixing of Closet pedestal type with low level glazed earthenware
flushing cistern, flush pipe, double plastic seat cover 12mm stop cock trap etc.
PER No.
M506
M204
L008
L001
M109
M110
M094
No.
No.
Hour
Hour
No.
Pair
No.
1.000
1.000
8.000
8.000
1.000
1.000
1.000
0.00
0.00
0.00
0.00
0.00
0.00
PLUMBER
Q098 Supplying and fixing of Closet squatting type with trap excluding cistern.
PER No.
M091
M010
L018
L011
No.
50 Kg.
day
day
1.000
0.333
1.000
1.000
0.00
0.00
0.00
0.00
Q099 Supplying and fixing of Closet, squatting type with trap with cistern flush
pipe including 12mm stop cock and specials.
PER No.
M091
M010
L018
L011
M204
M109
M110
M094
No.
50 Kg.
day
day
No.
No.
Pair
No.
1.000
0.333
1.000
1.000
1.000
1.000
1.000
1.000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PLUMBER
Q100 Removing Closet , squatting type and plugging sewer connections and making
good to floors.
PER No.
M010 Cement
L018 Plumber
L011 Unskilled labour
50 Kg.
hour
hour
0.500
6.000
6.000
0.00
0.00
0.00
Q101 Installing Closet, squatting type including breaking floor and fixed in cement
concrete (Closet supplied by Client.)
PER No.
M010 Cement
L018 Plumber
L011 Unskilled labour
50 Kg.
hour
hour
0.340
6.000
6.000
0.00
0.00
0.00
PLUMBER
Q102 Installing Closet, squatting type including trap, breaking floor and fixed in cement
concrete (Closet and trap supplied by Client.)
PER No.
M010 Cement
L018 Plumber
L011 Unskilled labour
50 Kg.
hour
hour
0.333
8.000
8.000
0.00
0.00
0.00
Q103 Installing Closet, squatting type including flushing cistern and pipes complete
(Closet and all fittings supplied .)
PER No.
M485
L002
L001
L008
M010
Plugs
Skilled labour
Unskilled labour
Plumber
Cement
No.
Hour
Hour
Hour
50 Kg.
6.000
1.000
13.000
12.000
0.333
0.00
0.00
0.00
0.00
0.00
PLUMBER
Q104 Supplying and fixing of 12mm brass bib cocks of approved quality.
PER No.
M204 Stop Cock Brass, 12mm
L008 Plumber
L001 Unskilled labour
No.
Hour
Hour
1.000
0.334
0.334
0.00
0.00
Q105 Supplying and fixing of 12mm chromium plated bib cocks of approved quality.
PER No.
M211 Pillar Cock chromium plated 12mm
L008 Plumber
L001 Unskilled labour
No.
Hour
Hour
1.000
0.334
0.334
0.00
0.00
0.00
0.334
0.334
0.00
0.00
Q106 Fixing of Cocks, brass any size or push (cock supplied by Client.)
PER No.
L008 Plumber
L001 Unskilled labour
Hour
Hour
PLUMBER
Q107 Removing of Cocks, brass bib push or stop cock of size 12mm to 40mm.
PER No.
L008 Plumber
Hour
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
No.
Hour
Hour
1.000
0.500
0.500
0.00
0.00
0.00
1.000
1.000
1.000
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
No.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PLUMBER
PER No.
M272 Connector G.I. 12mm
L008 Plumber
L001 Unskilled labour
No.
Hour
Hour
1.000
0.500
0.500
0.00
0.00
0.00
1.000
0.500
0.500
0.00
0.00
0.00
1.000
0.500
0.500
0.00
0.00
0.00
1.000
0.500
0.00
0.00
No.
Hour
Hour
No.
Hour
Hour
PLUMBER
No.
Hour
Hour
0.500
0.00
1.000
0.500
0.500
0.00
0.00
0.00
1.000
0.667
0.667
0.00
0.00
0.00
1.000
0.667
0.667
0.00
0.00
0.00
No.
Hour
Hour
No.
Hour
Hour
PLUMBER
No.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q117 Fixing of connector any size upto 38mm (connector supplied by Client.)
PER No.
L008 Plumber
L001 Unskilled labour
Hour
Hour
0.500
0.500
0.00
0.00
Q118 Fixing of connector above 38mm and upto 75mm (connector supplied by Client.)
PER No.
L008 Plumber
L001 Unskilled labour
Hour
Hour
0.667
0.667
0.00
0.00
1.000
2.000
2.000
0.00
0.00
PLUMBER
No.
Hour
Hour
No.
Hour
Hour
1.000
0.250
0.250
0.00
0.00
0.00
1.000
0.250
0.250
0.00
0.00
0.00
1.000
0.250
0.250
0.00
0.00
0.00
No.
Hour
Hour
PLUMBER
No.
Hour
Hour
No.
Hour
Hour
1.000
0.250
0.250
0.00
0.00
0.00
1.000
0.250
0.250
0.00
0.00
0.00
1.000
0.250
0.250
0.00
0.00
0.00
No.
Hour
Hour
PLUMBER
No.
Hour
Hour
Q126 Cleaning of cost iron Flushing cistern and painting with one coat Anti - corrosive
paint internally.
PER No.
L008 Plumber
Hour
2.500
0.00
PLUMBER
Q127 Supplying and fixing of Flushing cistern, cistern, C.I. 9 litres, excluding flush pipe
and brackets but including ball valve.
PER No.
M119 Cistern High level C.I.
L008 Plumber
L001 Unskilled labour
No.
Hour
Hour
1.000
4.000
4.000
0.00
0.00
Q128 Supplying and fixing of Flushing cistern, cistern, C.I. 9 litres, excluding flush pipe
and brackets but ball valve.
PER No.
M120 Cistern High level C.I.
L008 Plumber
L001 Unskilled labour
ALLOW FOR RED LEAD ETC.
No.
Hour
Hour
1.000
4.000
4.000
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PLUMBER
Q128 Supplying and fixing of Flushing cistern plastic 9 litres excluding flush pipe and
brackets but ball valve.
PER No.
M120 Cistern high level plastic
L008 Plumber
L001 Unskilled labour
No.
Hour
Hour
1.000
4.000
4.000
0.00
0.00
4.000
1.000
4.000
4.000
0.00
0.00
0.00
0.00
Plugs
Skilled labour
Unskilled labour
Plumber
No.
Hour
Hour
Hour
PLUMBER
No.
Hour
Hour
Hour
1.100
4.000
4.000
1.000
0.00
0.00
0.00
Q131 Fixing of Flushing cistern lever forged out of wrought iron 25mm x 5m, bent to shape
PER No.
L005 Black Smith
L001 Unskilled labour
L008 Plumber
Hour
Hour
Hour
4.000
5.000
1.000
0.00
0.00
0.00
PLUMBER
Q132 Disconnecting C.I. Flushing cistern and plugging water connection including making
good to all damage walls, floors etc.
PER No.
M256 Plug G.I. 12mm
L008 Plumber
L001 Unskilled labour
No.
Hour
Hour
1.000
4.000
4.000
0.00
0.00
0.00
Q133 Removing of Flushing cistern and re- fixing in new position including necessary
plugs, and making good to walls.
PER No.
M485
L002
L001
L008
M256
Plugs
Skilled labour
Unskilled labour
Plumber
Plug G.I. 12mm
No.
Hour
Hour
Hour
No.
4.000
1.000
8.000
8.000
1.000
0.00
0.00
0.00
0.00
0.00
PLUMBER
Q134 Refixing of Flush pipe of pedestal closets after removing old putty etc.
PER No.
L008 Plumber
L001 Unskilled labour
Hour
Hour
1.000
1.000
0.00
0.00
Q135 Fixing G.I. Flush pipe including solders, joints (Flush pipe supplied by Client).
PER No.
L008 Plumber
L001 Unskilled labour
Hour
Hour
2.000
2.000
0.00
0.00
1.000
0.500
0.500
0.00
0.00
0.00
m
Hour
Hour
PLUMBER
No.
Hour
1.000
0.100
0.00
0.00
1.000
0.100
0.00
0.00
1.000
0.100
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
No.
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
No.
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PLUMBER
PER No.
M512 Hooks for 32mm G.I. Pipes
L008 Plumber
No.
Hour
1.000
0.100
0.00
0.00
1.000
0.100
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
No.
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Hour
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PLUMBER
No.
Hour
1.000
0.100
0.00
0.00
Hour
0.100
0.00
1.000
0.100
0.100
0.00
0.00
0.00
1.000
0.100
0.100
0.00
0.00
0.00
1.000
0.100
0.100
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
No.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
No.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PLUMBER
No.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
No.
Hour
Hour
1.000
0.100
0.100
0.00
0.00
0.00
1.000
0.100
0.100
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
No.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PLUMBER
Q149 Fixing of Jam nuts any size upto 50mm (Jam nuts supplied by Client).
PER No.
L008 Plumber
L001 Unskilled labour
Hour
Hour
0.100
0.100
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q150 Supplying and fixing of Bath room type oval shape bevelled mirror, 380mm x 330mm
with rawl plugs and chromium plated fittings.
PER No.
M104 Mirror Frame Oval - White
L008 Plumber
M103 Mirror only, oval
No.
Hour
No.
1.000
2.000
1.000
0.00
Q151 Supplying and fixing 320mm x 280mm Rectangular bevelled mirror to wall with rawl
plugs and chromium plated fittings.
PER No.
M105 Mirror Frame Square - White
L008 Plumber
M101 Mirror only, square
No.
Hour
No.
1.000
2.000
1.000
0.00
0.00
PLUMBER
Q152 Supplying and fixing of 12mm G.I. Pipe. Rate to include trenching backfilling and
making good to wall (fittings and pipe hooks paid separately).
PER m
M232
M520
L008
L001
m
Kg.
Hour
Hour
1.000
0.333
0.500
0.500
0.00
0.00
0.00
Q153 Supplying and fixing of 20mm G.I. Pipe. Rate to include trenching backfilling and
m
Kg.
Hour
Hour
1.000
0.038
0.500
0.500
0.00
0.00
0.00
PLUMBER
Q154 Supplying and fixing of 25mm G.I. Pipe. Rate to include trenching backfilling and
making good to walls(fittings and pipe hooks paid separately).
PER m
M234
M520
L008
L001
m
Kg.
Hour
Hour
1.000
0.042
0.500
1.000
0.00
0.00
0.00
Q155 Supplying and fixing of 32mm G.I. Pipe. Rate to include trenching backfilling and
making good to walls(fittings and pipe hooks paid separately).
PER m
M235
M520
L008
L001
m
Kg.
Hour
Hour
1.000
0.033
0.500
1.000
0.00
0.00
0.00
PLUMBER
Q156 Supplying and fixing of 38mm G.I. Pipe. Rate to include trenching backfilling and
making good to walls(fittings and pipe hooks paid separately).
PER m
M236
M520
L008
L001
m
Kg.
Hour
Hour
1.000
0.033
0.500
1.000
0.00
0.00
0.00
Q157 Supplying and fixing of 50mm G.I. Pipe. Rate to include trenching backfilling and
making good to walls(fittings and pipe hooks paid separately).
PER m
M237 Pipe G.I. 50mm
M520 Red lead
L008 Plumber
m
Kg.
Hour
1.000
0.033
0.600
0.00
0.00
Hour
1.200
0.00
PLUMBER
Q158 Supplying and fixing of 75mm G.I. Pipe. Rate to include trenching backfilling and
making good to walls(fittings and pipe hooks paid separately).
PER m
M239
M520
L008
L001
m
Kg.
Hour
Hour
1.000
0.033
0.600
1.200
0.00
0.00
0.00
Q159 Fixing of 12mm to 50mm G.I. Pipes with specials bends, elbows etc.(Pipes and
specials supplied by Client). Rate to include trenching and making good to walls.
PER m
M520 Red lead
L001 Unskilled labour
L008 Plumber
Kg.
Hour
Hour
0.033
1.200
0.600
0.00
0.00
TOTAL
PLUMBER
Q160 Fixing of 63mm to 75mm G.I. Pipes Rate to include trenching and making good to wal
(Fittings and pipe hooks paid separately,)
PER m
M520 Red lead
L001 Unskilled labour
L008 Plumber
Kg.
Hour
Hour
0.030
1.200
0.600
0.00
0.00
1.000
0.132
0.00
0.00
Q161 Removing of G.I. Pipes any size upto 50mm and trench filled in.
PER m
L001 Unskilled labour
L008 Plumber
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q162 Removing of G.I. Pipes 50mm to 100mm and making good to walls and floors.
PER m
L001 Unskilled labour
L008 Plumber
Hour
Hour
0.550
0.850
0.00
0.00
M010 Cement
50 Kg.
0.035
0.00
PLUMBER
Q163 Existing G.I. Pipes upto 50mm takeout cleaned and relaid. Rate to include backfilling.
PER m
L001 Unskilled labour
L008 Plumber
M520 Red lead
Hour
Hour
Kg.
0.500
0.270
0.019
0.00
0.00
Q164 Existing G.I. Pipes 63mm to 75mm takeout cleaned and relaid. Rate to include backfill
PER m
L001 Unskilled labour
L008 Plumber
M520 Red lead
Hour
Hour
Kg.
1.000
0.400
0.030
0.00
0.00
Q165 Existing G.I. Pipes upto 50mm takeout cleaned and relaid in new position.
Rate to include backfilling.
PER m
L001 Unskilled labour
L008 Plumber
Red lead
ALLOW FOR EXPENSES
Hour
Hour
Kg.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.200
0.300
0.019
0.00
0.00
PLUMBER
Q166 Cleaning of pipe outlets, upto 2400mm length, (Excluding removing and
replacing.
PER m
L001 Unskilled labour
Hour
1.000
0.00
0.083
0.083
0.00
0.00
1.000
0.083
0.083
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q167 G.I. Plugs of any size fixed in position (plugs supplied by Client).
PER No.
L008 Plumber
L001 Unskilled labour
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
No.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PLUMBER
PER No.
M257 Plug G.I. 20mm
L008 Plumber
L001 Unskilled labour
No.
Hour
Hour
1.000
0.083
0.083
0.00
0.00
0.00
1.000
0.083
0.083
0.00
0.00
0.00
1.000
0.083
0.083
0.00
0.00
0.00
1.000
0.083
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
No.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
No.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PLUMBER
No.
Hour
Hour
0.083
0.00
1.000
0.083
0.083
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
No.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q174 Supplying and fixing of 25mm to 32mm rubber plugs for wash basins and sinks.
PER No.
M521 Rubber plug 25mm to 32mm
L008 Plumber
No.
Hour
1.000
0.250
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PLUMBER
Q175 Supplying and fixing of 38mm to 50mm rubber plugs for wash basins and sinks
PER No.
M522 Rubber plug 32mm to 50mm
L008 Plumber
No.
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
1.000
0.250
0.00
0.00
Q176 Supplying and fixing of Wooden plugs in Class I timber , 100mm long, tapered 75mm
to 50mm square section bedded in 1:2 cement mortar.
PER No.
M523 100mm x 100mm Class I timber beams(4" x 4")
L002 Skilled labour
L001 Unskilled labour
ALLOW FOR CEMENT ETC.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q177 Supplying and fixing of 12mm heavy quality brass push taps.
PER No.
M212 12mm heavy quality brass push tap
L008 Plumber
No.
Hour
1.000
0.334
0.00
0.00
1.000
0.334
0.00
0.00
PLUMBER
A178 Supplying and fixing of 12mm light pattern brass push taps.
PER No.
M214 12mm light brass push tap
L008 Plumber
No.
Hour
Q179 Making a platform, with bamboo and planks for lifting or lowering of storage tank to
a height 4575mm to 9145mm and removing same.
PER No.
M445 Props(bamboo) 3 - 4 m
M047 Timber planks 25mm class B
L011 Unskilled labour
No.
Sq.m.
day
3.500
0.070
2.000
0.00
0.00
PLUMBER
Q180 Making a platform, with bamboo and planks for lifting or lowering of storage tank to
a height 9145mm to 15240mm and removing same.
PER No.
M445 Props(bamboo) 3 - 4 m
M047 Timber planks 25mm class B
L011 Unskilled labour
No.
Sq.m.
day
7.000
0.070
2.500
0.00
0.00
Q181 Supplying and fixing of 600mm x 125mm glass shelves with chromium plated bracket
to wall with rawl plugs.
PER No.
M524 600mm x 125mm glass shelf with chromium
plated brackets.
M525 Rawl Plugs
L008 Plumber
No.
1.000
No.
Hour
4.000
1.250
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q182 Fixing any size of shower rose in position (Shower rose supplied by client).
PER N.
L008 Plumber
Hour
0.250
0.00
1.000
0.250
0.00
1.000
0.250
0.00
PLUMBER
No.
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
No.
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Hour
1.000
0.00
1.000
0.125
0.00
0.00
1.000
0.125
0.00
0.00
PLUMBER
No.
Hour
No.
Hour
No.
Hour
1.000
0.125
0.00
0.00
1.000
0.125
0.00
0.00
1.000
0.125
0.00
0.00
PLUMBER
No.
Hour
No.
Hour
PER No.
M269 Nipple G.I. 50mm
L008 Plumber
No.
Hour
1.000
0.125
0.00
0.00
PLUMBER
Q192 Fixing in position of G.I. Nipples upto 50mm (nipple supplied by Client)
PER No.
L008 Plumber
Hour
0.125
0.00
Q193 Repairing Piller cock and fixing to basin without damaging the basin.
PER No.
L008 Plumber
Hour
1.500
0.00
Q194 Supplying and fixing 12mm chromium plated pillar cocks to basin.
PER No.
M211 Pillar cock chromium Plated 12mm
L008 Plumber
L001 Unskilled labour
No.
Hour
Hour
1.000
0.750
0.750
0.00
0.00
0.00
PLUMBER
Q195 Supplying and fixing 20mm chromium plated pillar cocks to basin.
PER No.
M213 Pillar cock chromium Plated 20mm
L008 Plumber
L001 Unskilled labour
No.
Hour
Hour
1.000
0.750
0.750
0.00
0.00
0.00
Q196 Fixing of Sink in any size with all fittings (Sink and fittings supplied by Client.)
PER No.
M485
L002
L008
L001
Plugs
Skilled labour
Plumber
Unskilled labour
No.
Hour
Hour
Hour
4.000
2.000
6.000
8.000
0.00
0.00
0.00
0.00
PLUMBER
Q197 Supplying and fixing of 610mm x 380mm x 180mm glazed earthenware sink with all
fitting on existing brackets.
PER No.
M089 Kitchen Sink 600 x 375 x 175mm White
L008 Plumber
L001 Unskilled labour
No.
Hour
Hour
1.000
5.500
5.500
0.00
0.00
Q198 Supplying and fixing of 610mm x 380mm x 180mm glazed earthenware sink with all
fittings. Rate to include for provision of brackets.
PER No.
M089
M112
L008
L001
No.
Hour
Hour
Hour
1.000
5.500
5.500
5.500
0.00
0.00
PLUMBER
Plugs
Plumber
Mason
Unskilled labour
No.
Hour
Hour
Hour
4.000
8.000
3.000
12.000
0.00
0.00
0.00
0.00
Q200 Making 600mm x 600mm x 150mm sink in 112mm brick masonary in cement 1:5 incl
12mm thick 1:2 cement rendering. Rate to include making holes in the wall and supply
and fixing of 50mm outlet pipes.
PER No.
M009
M010
M007
M297
L004
L001
Brick
Cement
sand
Pipe PVC 50mm type 1000
Mason
Unskilled labour
1000 Nos.
50 Kg.
Cu.m.
m
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PLUMBER
0.032
0.500
0.115
0.310
6.000
6.000
0.00
0.00
0.00
0.00
0.00
0.00
PER No.
M280 Socket G.I. 12mm
L008 Plumber
L001 Unskilled labour
No.
Hour
Hour
1.000
0.125
0.125
0.00
0.00
0.00
1.000
0.125
0.125
0.00
0.00
0.00
1.000
0.125
0.125
0.00
0.00
0.00
1.000
0.125
0.00
0.00
No.
Hour
Hour
No.
Hour
Hour
PLUMBER
No.
Hour
Hour
0.125
0.00
1.000
0.125
0.125
0.00
0.00
0.00
1.000
0.125
0.125
0.00
0.00
0.00
1.000
0.167
0.167
0.00
0.00
0.00
No.
Hour
Hour
No.
Hour
Hour
PLUMBER
No.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q208 Supplying and fixing of 20mm to smaller size G.I. Reducing sockets.
PER No.
M288 Reducing Socket G.I. 20mm to smaller
L008 Plumber
L001 Unskilled labour
No.
Hour
Hour
1.000
0.125
0.125
0.00
0.00
0.00
No.
Hour
Hour
1.000
0.125
0.125
0.00
0.00
0.00
PLUMBER
Q210 Supplying and fixing of 32mm to smaller size G.I. Reducing sockets.
PER No.
M289 Reducing Socket G.I. 32mm to smaller
L008 Plumber
L001 Unskilled labour
No.
Hour
Hour
1.000
0.125
0.125
0.00
0.00
Q211 Supplying and fixing of 38mm to smaller size G.I. Reducing sockets.
PER No.
M290 Reducing Socket G.I. 38mm to smaller
L008 Plumber
L001 Unskilled labour
No.
Hour
Hour
1.000
0.125
0.125
0.00
0.00
No.
Hour
Hour
1.000
0.125
0.125
0.00
0.00
PLUMBER
Q213 Supplying and fixing of 75mm to 50mm size G.I. Reducing sockets.
PER No.
M292 Reducing Socket G.I. 75mm
L008 Plumber
L001 Unskilled labour
No.
Hour
Hour
1.000
0.167
0.167
Q214 Fixing in position of G.I. Socket in any size (Socket supplied by Client.)
PER No.
0.00
0.00
0.00
L008 Plumber
L001 Unskilled labour
Hour
Hour
0.125
0.125
0.00
0.00
Q215 Supplying of white porcelain soap tray and fixing to wall by rawl plugs.
PER No.
M095 Soap Holder - White
M525 Rawl plugs
L008 Plumber
No.
No.
Hour
1.000
2.000
1.000
0.00
0.00
PLUMBER
Q216 Steel work in RSJ's as supports for tanks. Fixed in position upto 6000mm in height
and painted 2 coats red and 2 coats anti corrosive paint.
PER No.
M494
M082
M078
L008
L001
L015
Kg.
Lit.
Lit.
Hour
Hour
day
1.000
0.008
0.008
0.023
0.046
0.006
0.00
0.00
0.00
0.00
No.
Hour
Hour
1.000
0.500
0.500
0.00
0.00
1.000
0.500
0.500
0.00
0.00
1.000
0.500
0.500
0.00
0.00
PLUMBER
No.
Hour
Hour
No.
Hour
Hour
No.
Hour
Hour
1.000
0.500
0.500
0.00
0.00
1.000
0.500
0.500
0.00
0.00
1.000
0.500
0.500
0.00
0.00
PLUMBER
No.
Hour
Hour
No.
Hour
Hour
PER No.
M215 12mm chromium plated stop cock.
L008 Plumber
L001 Unskilled labour
No.
Hour
Hour
1.000
0.500
0.500
0.00
0.00
0.00
PLUMBER
Q224 Hoist & place in position of 1125 - 1800 litre GI tank upto a height of 6000mm
& remove old tank include disconnect & connect all pipes & paint the new tank with
red lead paint & 2 coats of anti corrosive paint.(Tank supplied by client & scaffolding
paid.
PER No.
L008
L001
L006
M082
M078
Plumber
Unskilled labour
Painter
Red Lead Paint *
Anti - Corrosive paint *
Hour
Hour
Hour
Lit.
Lit.
4.500
17.000
14.000
0.700
1.400
0.00
0.00
0.00
0.00
0.00
Q225 Hoisting and placing in position of 110 to 910 litre G.I. Tank upto a height of 6000mm
& removing the old tank including connecting & disconnecting all pipes & painting the
tank with red lead paint & 2 coats of anti corrosive paint.(Tank supplied by client &
scaffolding paid.
PER No.
L008
L001
L006
M082
M078
Plumber
Unskilled labour
Painter
Red Lead Paint *
Anti - Corrosive paint *
Hour
Hour
Hour
Lit.
Lit.
4.500
12.000
5.000
0.225
0.450
0.00
0.00
0.00
0.00
0.00
PLUMBER
Q226 Placeing in position of 110 - 910 litre GI tank upto a height of 6000mm & fix erction o
support, include fixing of all pipes & paint the tank & support with red lead paint & 2 c
anti corrosive paint.(Tank , pipes, fittings, RSJ's , supplied by the client.)
PER No.
M082
M078
L008
L001
L006
Lit.
Lit.
Hour
Hour
Hour
0.225
0.450
3.500
8.000
5.000
0.00
0.00
0.00
Q227 Placeing in position of 1125 - 1800 litre GI tank at a height of 6000mm & remove &
supports, remove old tank include disconnect all pipes and paint new tank & supports w
lead paint & 2 coats of anticorrosive paint(Tank , pipes , fittings RSJs.)
PER No.
M082
M078
L008
L001
L006
Lit.
Lit.
Hour
Hour
Hour
0.700
1.400
3.500
11.000
14.000
0.00
0.00
0.00
PLUMBER
Hour
4.000
0.00
8.000
0.00
Hour
Q230 Removing of G.I. Storage tank and making good to walls and floor (scaffolding
paid separately where necessary.)
PER No.
L008 Plumber
L001 Unskilled labour
Hour
Hour
3.000
8.000
0.00
0.00
PLUMBER
Q231 Supplying and installing of 400 litre. 16 BWG G.I. Tank including painting the tank
with one coat of primer and 2 coats of anti - corrosive paint.
PER No.
M412
M082
M078
L008
L001
L006
No.
Lit.
Lit.
Hour
Hour
Hour
1.000
0.280
0.550
3.500
8.000
3.000
0.00
0.00
0.00
Q232 Supplying and installing of 1125 litre. 16 BWG G.I. Tank including painting the tank
with primer and 2 coats of anti - corrosive paint.
PER No.
M413
M082
M078
L008
L001
L006
No.
Lit.
Lit.
Hour
Hour
Hour
1.000
0.620
1.240
3.500
4.000
6.000
0.00
0.00
0.00
0.00
PLUMBER
Q233 Supplying and installing of 1800 litre. 16 BWG G.I. Tank including painting the tank
with one coat primer and 2 coats of anti - corrosive paint.
PER No.
M414 1800 L, 16 BWG G.I. Tank
No.
1.000
0.00
M082
M078
L008
L001
L006
Lit.
Lit.
Hour
Hour
Hour
0.900
1.800
3.500
11.000
12.000
0.00
0.00
0.00
Urinal - White
Wood plugs
Skilled labour
Plumber
Unskilled labour
No.
m
Hour
Hour
Hour
1.000
0.200
0.500
0.500
1.000
0.00
0.00
0.00
0.00
0.200
0.500
0.500
1.000
0.00
0.00
0.00
PLUMBER
Wood plugs
Skilled labour
Plumber
Unskilled labour
ALLOW FOR CEMENT , SCREWS ETC.
m
Hour
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q236 Fixing of P.V.C. bends elbows. Tees and other specials upto 75mm (Fittings
supplied by Client.)
PER No.
L008 Plumber
L001 Unskilled labour
Hour
Hour
0.100
0.100
0.00
0.00
1.000
0.100
0.100
0.00
0.00
0.00
PLUMBER
No.
Hour
Hour
No.
Hour
Hour
1.000
0.100
0.100
0.00
0.00
0.00
1.000
0.100
0.100
0.00
0.00
0.00
1.000
0.100
0.100
0.00
0.00
0.00
No.
Hour
Hour
PLUMBER
No.
Hour
Hour
No.
Hour
Hour
1.000
0.100
0.100
0.00
0.00
0.00
1.000
0.100
0.100
0.00
0.00
0.00
1.000
0.180
0.180
0.00
0.00
0.00
1.000
0.100
0.100
0.00
0.00
0.00
No.
Hour
Hour
PLUMBER
No.
Hour
Hour
No.
Hour
Hour
No.
Hour
Hour
1.000
0.100
0.100
0.00
0.00
0.00
1.000
0.100
0.100
0.00
0.00
0.00
1.000
0.100
0.100
0.00
0.00
0.00
PLUMBER
No.
Hour
Hour
No.
Hour
Hour
No.
Hour
Hour
1.000
0.100
0.100
0.00
0.00
0.00
1.000
0.100
0.100
0.00
0.00
0.00
1.000
0.180
0.180
0.00
0.00
0.00
PLUMBER
No.
Hour
Hour
No.
Hour
Hour
PLUMBER
Q251 Supplying and fixing of p.v.c. reducing sockets 20mm to smaller sizes.
PER No.
M356 Reducing Socket PVC 25mm to
smaller size
L008 Plumber
L001 Unskilled labour
No.
1.000
Hour
Hour
0.100
0.100
0.00
0.00
Q252 Supplying of 200mm x 400mm half rounded , tooth brush holders and fixing with
rawl plugs.
PER No.
M096 Toothe Brush Holder 200 x 100mm
white
M525 Rawl plugs
L008 Plumber
L001 Unskilled labour
No.
1.000
No.
Hour
Hour
2.000
0.750
0.750
0.00
0.00
DRAINLAYER
No.
Hour
1.000
0.125
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
R002 600mm x 600mm manhole upto 600mm deep, constructed with 225mm brick
in 1:3 cement mortar and 12mm cement rendered walls and 150mm thick 1:3:6(25mm)
concrete foundation. Rate to include forming of channels.
PER No.
M009
M007
M005
M010
L001
L004
Brick
Sand
Metal 25mm
Cement
Unskilled labour
Mason
1000 Nos
Cu.m.
Cu.m.
50 Kg.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.260
0.285
0.170
2.040
20.000
8.000
0.00
0.00
0.00
0.00
0.00
DRAINLAYER
R003 1000mm x 700mm manhole 600mm to 1200mm deep, constructed with 225mm brick
in 1:3 cement mortar and 12mm cement rendered walls and 150mm thick 1:3:6(25mm)
concrete foundation. Rate to include forming of channels.
PER No.
M009
M007
M005
M010
L001
L004
Brick
Sand
Metal 25mm
Cement
Unskilled labour
Mason
1000 Nos
Cu.m.
Cu.m.
50 Kg.
Hour
Hour
0.500
0.485
0.285
3.300
32.000
12.000
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
R004 1000mm x 700mm manhole 1200mm to 1800mm deep, constructed with 225mm bric
in 1:3 cement mortar and 12mm cement rendered walls and 150mm thick 1:3:6(25mm)
concrete foundation. Rate to include forming of channels.
PER No.
M009
M007
M005
M010
L001
L004
Brick
Sand
Metal 25mm
Cement
Unskilled labour
Mason
1000 Nos
Cu.m.
Cu.m.
50 Kg.
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.875
0.736
0.250
4.580
7.000
2.500
0.00
0.00
0.00
0.00
0.00
DRAINLAYER
R005 Supplying and fixing of 550mm x 500mm rectangular C.I. Manhole cover.
PER No.
M227
M528
M010
L002
L001
No.
No.
50 Kg.
Hour
Hour
1.000
4.000
0.200
2.000
2.000
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
R006 Constructing and placing in position of 75mm thick 600mm x 600mm reinforced concr
manhole cover, reinforced with 6mm dia. M.S. rods at 75mm centres both ways.
PER No.
M004
M007
M010
M549
L005
L002
L001
Metal 40mm
Sand
Cement
Tor Steel
Black Smith
Skilled labour
Unskilled labour
Cu.m.
Cu.m.
50 Kg.
Kg.
Hour
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
DRAINLAYER
0.028
0.015
0.210
2.500
0.500
2.000
2.000
0.00
0.00
0.00
0.00
0.00
0.00
PER No.
M224 Wire Dome, 100mm
L008 Plumber
No.
Hour
1.000
0.500
0.00
0.00
1.000
0.500
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
No.
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
R009 110 dia. Pvc(type 600) laid in 350 x 150mm thick 1:3:6(25mm) concrete upto
600mm depth of trench. Rate to include excavation.
PER m
M308
M010
M007
M005
L004
L011
L018
m
50 Kg.
Cu.m.
Cu.m.
Hour
day
day
1.000
0.420
0.045
0.080
0.030
0.400
0.030
0.00
0.00
0.00
0.00
0.00
0.00
0.00
DRAINLAYER
R010 110 dia. Pvc(type 600) laid in 150mm thick 1:3:6(25mm) concrete upto
600mm to 1200mm depth of trench. Rate to include excavation.
PER m
M308 Pipe PVC 110mm type 600
1.000
0.00
M010
M007
M005
L004
L011
L018
Cement
Sand
Metal 25mm
Mason
Unskilled labour
Plumber
50 Kg.
Cu.m.
Cu.m.
Hour
day
day
0.420
0.045
0.080
0.030
0.530
0.030
0.00
0.00
0.00
0.00
0.00
0.00
R011 110 dia. Pvc(type 600) embedded in 150mm thick 1:3:6(25mm) over 1200mm to
1800mm depth of trench. Rate to include excavation.
PER m
M308
M010
M007
M005
L004
L011
L018
m
50 Kg.
Cu.m.
Cu.m.
Hour
day
day
1.000
0.420
0.045
0.080
0.030
0.700
0.030
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.000
0.250
0.00
0.00
DRAINLAYER
No.
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
MISCELLANEOUS
No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.350
No.
Hour
0.350
0.132
0.00
0.180
0.00
Hour
MISCELLANEOUS
S004 Supplying and fixing of light duty galvernized mild steel barbed wire (conforming to
SLS 31 of 1988) an exsisting timber post with GI staples.
PER m
M039 Barbed wire
L002 Skilled labour
L001 Unskilled labour
Kg.
Hour
Hour
0.093
0.030
0.030
0.00
0.00
S005 Supplying and fixing of light duty galvernized mild steel barbed wire (conforming to
SLS 31 of 1988) an exsisting concrete post .
PER m
M039 Barbed wire
L002 Skilled labour
L001 Unskilled labour
Kg.
Hour
Hour
0.093
0.050
0.050
0.00
0.00
MISCELLANEOUS
S006 Supplying and fixing of light duty galvernized mild steel barbed wire (conforming to
SLS 31 of 1988) in short lengths and timber posts with G.I. Staples.
PER m
M039 Barbed wire
L002 Skilled labour
L001 Unskilled labour
Kg.
Hour
Hour
0.093
0.040
0.040
0.00
0.00
S007 Supplying and fixing of light duty galvernized mild steel barbed wire (conforming to
SLS 31 of 1988) in short lengths an concrete or steel posts with available hook bolts..
PER m
M039 Barbed wire
Kg.
0.093
Hour
Hour
0.060
0.060
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
S008 Fixing of Barbed wire with G.I. Staples in existing timber posts(Barbed wire supplied
by Client.)
PER m
L002 Skilled labour
L001 Unskilled labour
Hour
Hour
0.030
0.030
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
MISCELLANEOUS
S009 Fixing of barbed wire fence with hook bolts on concrete or steel posts (Barbed wire
supplied by Client.)
PER m
L002 Skilled labour
L001 Unskilled labour
Hour
Hour
0.050
0.050
0.00
0.00
0.040
0.040
0.00
0.00
S010 Straining and refixing of barbed wire on the fence with staples.
PER m
L002 Skilled labour
L001 Unskilled labour
Hour
Hour
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
S011 Straining and refixing only the barbed wire on concrete or steel posts with available ho
PER m
L002 Skilled labour
L001 Unskilled labour
Hour
Hour
0.050
0.050
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
MISCELLANEOUS
S012 Construction and fixing of 100mm x 150mm and 1700mm high in 1:1
1/2:3 (20mm) cement concrete intermediate fence posts reinforced with 4 Nos. 6mm d
MS rods.
PER No.
M006
M007
M010
M549
M037
L001
L002
Metal 20mm
Sand
Cement
Tor Steel
Binding wire
Unskilled labour
Skilled labour
Cu.m.
Cu.m.
50 Kg.
Kg.
Hour
Hour
Hour
0.030
0.015
0.255
1.800
0.228
3.000
2.000
0.00
0.00
0.00
0.00
0.00
S013 Construction and fixing of 100mm x 150mm and 2285mm high in 1:1
1/2:3 (20mm) cement concrete intermediate fence posts reinforced with 4 Nos. 6mm d
MS rods.
PER No.
M006 Metal 20mm
M007 Sand
M010 Cement
Cu.m.
Cu.m.
50 Kg.
0.036
0.018
0.350
0.00
0.00
0.00
M549
M037
L005
L001
L002
Tor Steel
Binding wire
Black Smith
Unskilled labour
Skilled labour
Kg.
Kg.
Hour
Hour
Hour
2.270
0.340
1.000
3.000
1.000
0.00
0.00
0.00
MISCELLANEOUS
Q014 Construction and fixing of end posts and struts as per drawing. Rate to include excavat
and base concrete.
PER No.
M004
M006
M007
M010
M033
M037
L005
L002
L001
Metal 40mm
Metal 20mm
Sand
Cement
Mild Steel
Binding wire
Black Smith
Skilled labour
Unskilled labour
Cu.m.
Cu.m.
Cu.m.
50 Kg.
M/ton
Kg.
Hour
Hour
day
0.200
0.092
0.170
1.790
0.017
0.455
3.250
5.500
1.500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
S015 Construction of barbed wire fence 5 strands with 4 points at 75mm centre. Including
corner posts, struts, intermediate post binding concrete as per drawing.
PER m
M004
M006
M007
M010
M033
M037
M039
M529
M530
Metal 40mm
Metal 20mm
Sand
Cement
Mild Steel
Binding wire
Barbed wire
G.I. Hook bolts
Straining bolts 16mm dia.
Cu.m.
Cu.m.
Cu.m.
50 Kg.
M/ton
Kg.
Kg.
No.
No.
0.009
0.017
0.014
0.175
0.003
0.112
1.400
0.550
0.165
0.00
0.00
0.00
0.00
0.00
0.00
Hour
1.100
MISCELLANEOUS
S016 Supplying and fixing of 12mm dia. 450mm long straining bolts.
PER No.
M531 1/2" M/S rods
L005 Black Smith
L001 Unskilled labour
Kg.
Hour
day
day
1.000
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
S018 Cleaning of lavatory or sewage block (with contractor and clearing rods).
PER P/Block
L020 Sanitary Labourer
day
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
0.00