Beruflich Dokumente
Kultur Dokumente
TABLE OF CONTENTS
1 Air-cooled selection procedure
2
2
3
3
39
40
42
44
1-1
Enter indoor unit capacity tables at given indoor and outdoor temperature.
Select the unit that the capacity is the nearest to and higher than the given load.
NOTE
Individual indoor unit capacity is subject to change by the combination. Actual capacity has to be calculated according to the combination by using
outdoor units capacity table.
1-2
Allowable combinations are indicated in indoor unit combination total capacity index table.
In general, oudoor units can be selected as follows though the location of the unit, zoning and usage of the rooms should be considered.
The indoor and outdoor unit combination is determined that the sum of indoor unit capacity index is nearest to and smaller than the capacity index at
100 % combination ratio of each outdoor unit. Up to 16 indoor units can be connected to one outdoor unit. It is recommended to choose a larger
outdoor unit if the installation space is large enough.
If the combination ratio is higher than 100 %, the indoor unit selection will have to be reviewed by using actual capacity of each indoor unit.
Indoor unit combination total capacity index table
Outdoor unit
RXYSQ4PV
RXYSQ5PV
RXYSQ6PV
Outdoor unit
RX(Y)Q5P
RX(Y)Q8P/REYQ8M
RX(Y)Q10P/REYQ10M
RX(Y)Q12P/REYQ12M
RX(Y)Q14P/REYQ14M
RX(Y)Q16P/REYQ16M
RX(Y)Q18P/REYQ18M
RXYQ20P/REYQ20M
RXYQ22P/REYQ22M
RXYQ24P/REYQ24M
RXYQ26P/REYQ26M
RXYQ28P/REYQ28M
RXYQ30P/REYQ30M
RXYQ32P/REYQ32M
RXYQ34P/REYQ34M
RXYQ36P/REYQ36M
RXYQ38P/REYQ38M
RXYQ40P/REYQ40M
RXYQ42P/REYQ42M
RXYQ44P/REYQ44M
RXYQ46P/REYQ46M
RXYQ48P/REYQ48M
RXYQ50P
RXYQ52P
RXYQ54P
130 %
130
162.5
182
120 %
120
150
168
110 %
110
137.5
154
100 %
100
125
140
80 %
80
100
112
70%
70
87.5
98
60 %
60
75
84
50 %
50
62.5
70
130 %
162.5
260
325
390
455
520
585
650
715
780
845
910
975
1,040
1,105
1,170
1,235
1,300
1,365
1,430
1,495
1,560
1,625
1,690
1,755
120 %
150
240
300
360
420
480
540
600
660
720
780
840
900
960
1,020
1,080
1,140
1,200
1,260
1,320
1,380
1,440
1,500
1,560
1,620
110 %
137.5
220
275
330
385
440
495
550
605
660
715
770
825
880
935
990
1,045
1,100
1,155
1,210
1,265
1,320
1,375
1,430
1,485
100 %
125
200
250
300
350
400
450
500
550
600
650
700
750
800
850
900
950
1,000
1,050
1,100
1,150
1,200
1,250
1,300
1,350
80 %
100
160
200
240
280
320
360
400
440
480
520
560
600
640
680
720
760
800
840
880
920
960
1,000
1,040
1,080
70%
87.5
140
175
210
245
280
315
350
385
420
455
490
525
560
595
630
665
700
735
770
805
840
875
910
945
60 %
75
120
150
180
210
240
270
300
330
360
390
420
450
480
510
540
570
600
630
660
690
720
750
780
810
50 %
62.5
100
125
150
175
200
225
250
275
300
325
350
375
400
425
450
475
500
525
550
575
600
625
650
675
20
20
25
25
32
31.25
40
40
50
50
63
62.5
71
71
80
80
100
100
125
125
200
200
250
250
1-3
1-4
Given
Design condition
Cooling: indoor 20CWB, outdoor 33CDB
Cooling load
Room
Load (kW)
A
2.9
B
2.7
C
2.5
D
4.3
E
4.0
F
4.0
G
3.9
H
4.2
B
2.7
25
3.0
C
2.5
25
3.0
D
4.3
40
4.8
E
4.0
40
4.8
F
4.0
40
4.8
G
3.9
40
4.8
H
4.2
40
4.8
A
2.9
25
3.0
1-4
Individual capacity
Capacity of FXCQ25M
= 30.5 x
Capacity of FXCQ40M
= 30.5 x
25
275
40
275
= 2.77kW
= 4.44kW
A
2.9
25
2.77
B
2.7
25
2.77
C
2.5
25
2.77
D
4.3
40
4.44
E
4.0
40
4.44
F
4.0
40
4.44
G
3.9
40
4.44
H
4.2
40
4.44
The unit size for room A has to be increased from 25 to 32 because the capacity is less than the load. For new combination, actual capacity is calculated
as follows.
Individual capacity
Capacity of FXCQ25M
Capacity of FXCQ32M
Capacity of FXCQ40M
25 = 2.7kW
281.25
= 30.0 x 32 = 3.4kW
281.25
= 30.0 x 40 = 4.3kW
281.25
= 30.0 x
A
2.9
32
3.4
B
2.7
25
2.7
C
2.5
25
2.7
D
4.3
40
4.3
E
4.0
40
4.3
F
4.0
40
4.3
G
3.9
40
4.3
H
4.2
40
4.3
Then, the capacities have to be corrected for actual piping length according to the location of indoor and outdoor units and the distance between them.
2-1
VRVIII-S
RXYSQ4,5PV
50
HP
(m)
30
20
40
50
60
70
80
90
10
20
30
40
50
60
70
80
90
100 110 120 130 140 150 160 170 180 L (m)
0.77
HM
20
(m)
30
40
1.0
1.0
0.80
40
0.85
30
0
10
0.90
20
(m)
20
0
0.95
HM
30
10
10
0
10
1.0
0.75
0.77
40
0.75
50
1.0
20
0
0.95
30
10
0.90
40
HP
(m)
0.80
0.85
3D045710B
NOTES
These figures illustrate the rate of change of a standard indoor unit system at maximum load (with the thermostat set to maximum) under standard
conditions.
Moreover, under partial load conditions, there is only a minor deviation from the rate of change in capacity, shown in the above figures.
With this outdoor unit, evaporating pressure constant control when cooling, and condensing pressure constant control when heating is carried out.
Method of calculating cooling/heating capacity (max. capacity for combination with standard indoor unit)
Cooling/heating capacity = cooling/heating capacity obtained from performance characteristics table x each capacity rate of change
In the case length of piping differs depending on the indoor unit, maximum capacity of eacht unit during simultaneous operation is:
Cooling/heating capacity = cooling/heating capacity obtained from performance characteristics table x each capacity rate of change
When overall equivalent pipe length is 90m or more, the diameter of the main gas pipes (outdoor unit-branch sections) must be increased..
[Diameter of above case]
Model
RXYSQ4,5P7V3B
gas pipe
19.1
liquid pipe
Not increased
When the main section of the interunit gas pipe diameters are increased the overall equivalent length should be calculated as follows.
Overall equivalent length = Equivalent length to main pipe x 0.5 + Equivalent length after branching
Equivalent lenght
Equivalent lenght
80 m
40 m
Indoor unit
Outdoor unit
Size increase
Branch
In the above case (Cooling)
Overall equivalent length = 80m x 0.5 + 40m = 80m
The correction factor in capacity when Hp=0m is thus approximately 0.78
EXPLANATION OF SYMBOLS
Hp : Level difference (m) between indoor and outdoor units where indoor unit in inferior position
HM : Level difference (m) between indoor and outdoor units where indoor unit in superior position
L
liquid pipe
9.5
2-1
VRVIII-S
RXYSQ6PV
1.0
20
30
50
40
60
70
80
90
0.85
0.87
0.90
40
0.92
30
10
20
30
40
50
60
70
80
90
100 110 120 130 140 150 160 170 180 L (m)
10
0.95
(m)
0.97
20
20
10
10
1.0
10
30
HM
20
(m)
30
40
1.0
0
HM
1.0
0.82
HP
(m)
0.82
50
40
0.97
30
20
10
0.95
40
HP
(m)
0.92
50
0.85
0.87
0.90
3D045961B
NOTES
These figures illustrate the rate of change of a standard indoor unit system at maximum load (with the thermostat set to maximum) under standard
conditions.
Moreover, under partial load conditions, there is only a minor deviation from the rate of change in capacity, shown in the above figures.
With this outdoor unit, evaporating pressure constant control when cooling, and condensing pressure constant control when heating is carried out.
Method of calculating cooling/heating capacity (max. capacity for combination with standard indoor unit)
Cooling/heating capacity = cooling/heating capacity obtained from performance characteristics table x each capacity rate of change
In the case length of piping differs depending on the indoor unit, maximum capacity of eacht unit during simultaneous operation is:
Cooling/heating capacity = cooling/heating capacity obtained from performance characteristics table x each capacity rate of change
When overall equivalent pipe length is 90m or more, the diameter of the main gas pipes (outdoor unit-branch sections) must be increased..
[Diameter of above case]
Model
RXYSQ6P7V3B
gas pipe
22.2
liquid pipe
Not increased
When the main section of the interunit gas pipe diameters are increased the overall equivalent length should be calculated as follows.
Overall equivalent length = Equivalent length to main pipe x 0.5 + Equivalent length after branching
Equivalent lenght
Equivalent lenght
80 m
40 m
Indoor unit
Outdoor unit
Size increase
Branch
In the above case (Cooling)
Overall equivalent length = 80m x 0.5 + 40m = 80m
The correction factor in capacity when Hp=0m is thus approximately 0.86
EXPLANATION OF SYMBOLS
Hp : Level difference (m) between indoor and outdoor units where indoor unit in inferior position
HM : Level difference (m) between indoor and outdoor units where indoor unit in superior position
liquid pipe
9.5
2-2
RXQ5P
Correction ratio for cooling capacity
Height difference between outdoor and farest indoor (m)
60
50
40
30
20
10
0
0
-10
-20
-30
-40
-50
1.00
0.98
10
1.00
0.96
0.94
0.90
0.92
20
0.98
0.96
30
0.94
0.88
0.86
40
0.84
0.82
0.80
0.78
0.76
0.74
2
50
60
70
80
90
100
110
0.92
0.90 0.88 0.86 0.84
0.82
0.80
0.78
0.76
3TW27302-6
NOTES
These figures illustrate the correction ratio for piping length in capacity for a standard indoor unit system at maximum load (with the thermostat set to
maximum) under standard conditions.
Moreover, under partial load conditions, there is only a minor deviation from the capacity correction ratio, shown in the above figures.
With this outdoor unit, constant evaporating pressure control when cooling.
When the overall equivalent pipe length is 90m or more, main gas and liquid pipe diameters must be increased..
For new diameters see below.
Model
gas pipe
19.1
RXQ5P
5
When the pipe length after the first refrigerant branch kit is more than 40m, pipe size between first and final branch kit must be increased (refer also
to installation manual).
Diameter of main pipes (standard size)
Model
gas pipe
15.9
RXQ5P
6
liquid pipe
9.5
Equivalent length used in the above figures is based upon the following equivalent length.
Equivalent piping length = Equivalent length of main pipe x Correction factor +
Equivalent length of branch pipes x Correction factor
Choose a correction factor from the following table.
When cooling capacity is calculated: gas pipe size.
Correction factor
Standard size
Size increase
1.0
0.5
liquid pipe
9.5
Example
Main gas pipe size increase
Main liquid pipe size increase
80 m
2-2
RXQ8P
60
50
0.92
40
0.90
0.84
0.86
0.88
0.82
0.94
30
0.96
20
0.98
1.00
10
0 0.75
0
10
1.00
20
-10
-20
30
40
50
60
0.94
0.92
0.90
70
80
90
100
110
0.98
-30
0.96
-40
-50
0.88
0.86
0.84
3TW27302-6
NOTES
These figures illustrate the correction ratio for piping length in capacity for a standard indoor unit system at maximum load (with the thermostat set to
maximum) under standard conditions.
Moreover, under partial load conditions, there is only a minor deviation from the capacity correction ratio, shown in the above figures.
With this outdoor unit, constant evaporating pressure control when cooling.
When the overall equivalent pipe length is 90m or more, main gas and liquid pipe diameters must be increased..
For new diameters see below.
Model
gas pipe
22.2
RXQ8P
5
When the pipe length after the first refrigerant branch kit is more than 40m, pipe size between first and final branch kit must be increased (refer also
to installation manual).
Diameter of main pipes (standard size)
Model
gas pipe
19.1
RXQ8P
6
liquid pipe
9.5
Equivalent length used in the above figures is based upon the following equivalent length.
Equivalent piping length = Equivalent length of main pipe x Correction factor +
Equivalent length of branch pipes x Correction factor
Choose a correction factor from the following table.
When cooling capacity is calculated: gas pipe size.
Correction factor
Standard size
Size increase
1.0
0.5
liquid pipe
12.7
Example
Main gas pipe size increase
Main liquid pipe size increase
80 m
2-2
RXQ10P
Correction ratio for cooling capacity
Height difference between outdoor and farest indoor (m)
60
0.90 0.88 0.86 0.84
0.82
0.80
50
0.92
40
0.94
30
0.96
20
0.98
10 1.00
0
0
40
60
80
100
120
140
160
20
-10
1.00
-20
0.98
-30
0.96
-40
0.82
0.80
0.94 0.92 0.90 0.88 0.86 0.84
-50
Equivalent piping length (m)
0.78
2
180
0.78
3TW27302-6
NOTES
These figures illustrate the correction ratio for piping length in capacity for a standard indoor unit system at maximum load (with the thermostat set to
maximum) under standard conditions.
Moreover, under partial load conditions, there is only a minor deviation from the capacity correction ratio, shown in the above figures.
With this outdoor unit, constant evaporating pressure control when cooling.
When the overall equivalent pipe length is 90m or more, main gas and liquid pipe diameters must be increased..
For new diameters see below.
Model
RXQ10P
gas pipe
25.4*
liquid pipe
12.7
* If not available on site, do not increase. If not increased, no correction factor should be applied to the equivalent length (see note 6).
5
When the pipe length after the first refrigerant branch kit is more than 40m, pipe size between first and final branch kit must be increased (refer also
to installation manual).
Diameter of main pipes (standard size)
Model
RXQ10P
gas pipe
22.2
Equivalent length used in the above figures is based upon the following equivalent length.
Equivalent piping length = Equivalent length of main pipe x Correction factor +
Equivalent length of branch pipes x Correction factor
Choose a correction factor from the following table.
When cooling capacity is calculated: gas pipe size.
Correction factor
Standard size
Size increase
1.0
0.5
liquid pipe
9.5
Example
Main gas pipe size increase
Main liquid pipe size increase
80 m
2-2
RXQ12,14P
Correction ratio for cooling capacity
Height difference between outdoor and farest indoor (m)
60
0.92
0.90
0.88
0.86
0.94
50
0.96
40
30
0.98
20
10 1.00
0
40
60
80
100
120
140
160
0
20
-10
1.00
-20
-30
0.98
-40
0.96 0.94
0.92
0.90
0.88
0.86
-50
Equivalent piping length (m)
0.84
180
0.84
3TW27302-6
NOTES
These figures illustrate the correction ratio for piping length in capacity for a standard indoor unit system at maximum load (with the thermostat set to
maximum) under standard conditions.
Moreover, under partial load conditions, there is only a minor deviation from the capacity correction ratio, shown in the above figures.
With this outdoor unit, constant evaporating pressure control when cooling.
When the overall equivalent pipe length is 90m or more, main gas and liquid pipe diameters must be increased..
For new diameters see below.
Model
RXQ12-14P
gas pipe
28.6
When the pipe length after the first refrigerant branch kit is more than 40m, pipe size between first and final branch kit must be increased (refer also
to installation manual).
Diameter of main pipes (standard size)
Model
RXQ12-14P
gas pipe
28.6
liquid pipe
12.7
Equivalent length used in the above figures is based upon the following equivalent length.
Equivalent piping length = Equivalent length of main pipe x Correction factor +
Equivalent length of branch pipes x Correction factor
Choose a correction factor from the following table.
When cooling capacity is calculated: gas pipe size.
Correction factor
Standard size
Size increase
1.0
0.5
liquid pipe
15.9
Example
Main gas pipe size increase
Main liquid pipe size increase
80 m
10
2-2
RXQ16P
60
50
0.86
0.94
40
0.96
30
0.98
20
10 1.00
00
20
40
60
80
-10
1.00
-20
0.98
-30
0.96
-40
0.94 0.92 0.90 0.88
-50
0.84
0.80
0.82
0.78
2
100
120
140
0.86 0.84
0.82
Equivalent piping length
160
0.80
180
0.78
3TW27302-6
NOTES
These figures illustrate the correction ratio for piping length in capacity for a standard indoor unit system at maximum load (with the thermostat set to
maximum) under standard conditions.
Moreover, under partial load conditions, there is only a minor deviation from the capacity correction ratio, shown in the above figures.
With this outdoor unit, constant evaporating pressure control when cooling.
When the overall equivalent pipe length is 90m or more, main gas and liquid pipe diameters must be increased..
For new diameters see below.
Model
gas pipe
31.8*
RXQ5P
5
When the pipe length after the first refrigerant branch kit is more than 40m, pipe size between first and final branch kit must be increased (refer also
to installation manual).
Diameter of main pipes (standard size)
Model
gas pipe
28.6
RXQ5P
6
liquid pipe
12.7
Equivalent length used in the above figures is based upon the following equivalent length.
Equivalent piping length = Equivalent length of main pipe x Correction factor +
Equivalent length of branch pipes x Correction factor
Choose a correction factor from the following table.
When cooling capacity is calculated: gas pipe size.
Correction factor
Standard size
Size increase
1.0
0.5
liquid pipe
15.9
Example
Main gas pipe size increase
Main liquid pipe size increase
80 m
11
2-2
RXQ18P
Correction ratio for cooling capacity
Height difference between outdoor and farest indoor (m)
60
0.84
0.82
0.92 0.90 0.88 0.86
50
0.94
40
0.96
30
0.98
20
10 1.00
0
20
100
0
120
140
80
40
60
-10
1.00
-20
0.98
-30
0.96
-40
0.94 0.92 0.90 0.88 0.86 0.84
0.82
-50
Equivalent piping length
0.80
160
0.80
0.78
180
0.78
3TW27302-6
NOTES
These figures illustrate the correction ratio for piping length in capacity for a standard indoor unit system at maximum load (with the thermostat set to
maximum) under standard conditions.
Moreover, under partial load conditions, there is only a minor deviation from the capacity correction ratio, shown in the above figures.
With this outdoor unit, constant evaporating pressure control when cooling.
When the overall equivalent pipe length is 90m or more, main gas and liquid pipe diameters must be increased..
For new diameters see below.
Model
RXQ18P
gas pipe
31.8*
liquid pipe
19.1
* If not available on site, do not increase. If not increased, no correction factor should be applied to the equivalent length (see note 6).
5
When the pipe length after the first refrigerant branch kit is more than 40m, pipe size between first and final branch kit must be increased (refer also
to installation manual).
Diameter of main pipes (standard size)
Model
RXQ18P
gas pipe
28.6
Equivalent length used in the above figures is based upon the following equivalent length.
Equivalent piping length = Equivalent length of main pipe x Correction factor +
Equivalent length of branch pipes x Correction factor
Choose a correction factor from the following table.
When cooling capacity is calculated: gas pipe size
.
Correction factor
Standard size
Size increase
1.0
0.5
liquid pipe
15.9
Example
Main gas pipe size increase
Main liquid pipe size increase
80 m
12
2-3
RXYQ5P
Correction ratio for cooling capacity
Height difference between outdoor and farest indoor (m)
60
50
40
30
20
1.00
10
0.98
0.96
0.94
0.92
0.90
0.88
0.86
0.84
0.82
0.80
0.78
0.76
60
0.74
0
-10 0
10
1.00
-20
20
0.98
-30
-40
0.96
30
0.94
40
50
60
70
80
90
100
110
0.92
0.90 0.88 0.86
-50
0.84
0.82
0.80
0.78
0.76
50
40
30
20
10
0
-10
-10
1.00
10
1.00
30
50
70
90
110
130
150
170
190
-20
-30
-40
-50
3TW27232-6
NOTES
These figures illustrate the correction ratio for piping length in capacity for a standard indoor unit system at maximum load (with the thermostat set to
maximum) under standard conditions.
Moreover, under partial load conditions, there is only a minor deviation from the capacity correction ratio, shown in the above figures.
With this outdoor unit, constant evaporating pressure control when cooling and constant condensing pressure control when heating is carried out.
When the overall equivalent pipe length is 90m or more, main gas and liquid pipe diameters must be increased..
For new diameters see below.
Model
RXYQ5P
gas pipe
19.1
When the pipe length after the first refrigerant branch kit is more than 40m, pipe size between first and final branch kit must be increased (refer also
to installation manual).
Diameter of main pipes (standard size)
Model
RXYQ5P
gas pipe
15.9
liquid pipe
9.5
Equivalent length used in the above figures is based upon the following equivalent length.
Equivalent piping length = Equivalent length of main pipe x Correction factor +
Equivalent length of branch pipes x Correction factor
Choose a correction factor from the following table.
When cooling capacity is calculated: gas pipe size
When heating capacity is calculated: liquid pipe size.
liquid pipe
9.5
Correction factor
Standard size
Size increase
1.0
0.5
1.0
0.5
Example
Main gas pipe size increase
Main liquid pipe size increase
80 m
13
2-3
RXYQ8P
Correction ratio for cooling capacity
Height difference between outdoor and farest indoor (m)
60
0.90
50
0.88
0.84
0.86
0.82
0.92
40
0.94
30
0.96
20
0.98
1.00
10
0 0.70
0
-10
-20
20
10
30
40
50
60
70
80
90
100
110
1.00
0.98
-30
0.96
-40
0.94
-50
0.92
0.90
0.88
Equivalent piping length
0.86
0.84
50
40
30
20
1.00
10
0
-10
-20
10
1.00
20
30
40
50
60
70
80
90
100
110
-30
-40
-50
3TW27232-6
NOTES
These figures illustrate the correction ratio for piping length in capacity for a standard indoor unit system at maximum load (with the thermostat set to
maximum) under standard conditions.
Moreover, under partial load conditions, there is only a minor deviation from the capacity correction ratio, shown in the above figures.
With this outdoor unit, constant evaporating pressure control when cooling and constant condensing pressure control when heating is carried out.
When the overall equivalent pipe length is 90m or more, main gas and liquid pipe diameters must be increased..
For new diameters see below.
Model
RXYQ8P
gas pipe
22.2
When the pipe length after the first refrigerant branch kit is more than 40m, pipe size between first and final branch kit must be increased (refer also
to installation manual).
Diameter of main pipes (standard size)
Model
RXYQ8P
gas pipe
19.1
liquid pipe
9.5
Equivalent length used in the above figures is based upon the following equivalent length.
Equivalent piping length = Equivalent length of main pipe x Correction factor +
Equivalent length of branch pipes x Correction factor
Choose a correction factor from the following table.
When cooling capacity is calculated: gas pipe size
When heating capacity is calculated: liquid pipe size.
liquid pipe
12.7
Correction factor
Standard size
Size increase
1.0
0.5
1.0
0.5
Example
Main gas pipe size increase
Main liquid pipe size increase
80 m
14
2-3
RXYQ10P
Correction ratio for cooling capacity
60
0.90 0.88 0.86 0.84
0.82
0.80
50
0.92
40
0.94
30
0.96
0.98
20
10 1.00
0
40
60
80
20
100
120
140
160
0
-10
1.00
-20
0.98
-30
0.96
-40
0.94 0.92 0.90 0.88 0.86 0.84
0.82
0.80
-50
Equivalent piping length
0.78
180
0.78
0.98 0.96 0.94 0.92 0.90 0.88 0.86 0.84 0.82 0.80
50
40
30
20
1.00
10
0
-10
-20
10
1.00
20
30
50
40
60
70
80
90
100
110
-30
-40
-50
0.98 0.96 0.94 0.92 0.90 0.88 0.86 0.84 0.82 0.80
Equivalent piping length (m)
3TW27232-6
NOTES
These figures illustrate the correction ratio for piping length in capacity for a standard indoor unit system at maximum load (with the thermostat set to
maximum) under standard conditions.
Moreover, under partial load conditions, there is only a minor deviation from the capacity correction ratio, shown in the above figures.
With this outdoor unit, constant evaporating pressure control when cooling and constant condensing pressure control when heating is carried out.
When the overall equivalent pipe length is 90m or more, main gas and liquid pipe diameters must be increased..
For new diameters see below.
Model
RXYQ10P
gas pipe
25.4*
liquid pipe
12.7
* If not available on site, do not increase. If not increased, no correction factor should be applied to the equivalent length (see note 6).
5
When the pipe length after the first refrigerant branch kit is more than 40m, pipe size between first and final branch kit must be increased (refer also
to installation manual).
Diameter of main pipes (standard size)
Model
RXYQ10P
gas pipe
22.2
Equivalent length used in the above figures is based upon the following equivalent length.
Equivalent piping length = Equivalent length of main pipe x Correction factor +
Equivalent length of branch pipes x Correction factor
Choose a correction factor from the following table.
When cooling capacity is calculated: gas pipe size
When heating capacity is calculated: liquid pipe size.
liquid pipe
9.5
Correction factor
Standard size
Size increase
1.0
0.5
1.0
0.5
Example
Main gas pipe size increase
Main liquid pipe size increase
80 m
15
2-3
RXYQ12,14,24,36P
Correction ratio for cooling capacity
60
0.94
0.92
0.90
0.88
0.86
50
0.96
40
30
0.98
20
10 1.00
0
40
60
80
20
100
120
140
160
0
-10
1.00
-20
-30
0.98
-40
0.96
0.94 0.92
0.90
0.88
0.86
-50
Equivalent piping length
0.84
180
0.84
50
40
30
20
1.00
10
0
-10
-20
10
1.00
20
30
40
50
60
70
80
90
100
110
-30
-40
-50
3TW27232-6
NOTES
These figures illustrate the correction ratio for piping length in capacity for a standard indoor unit system at maximum load (with the thermostat set to
maximum) under standard conditions.
Moreover, under partial load conditions, there is only a minor deviation from the capacity correction ratio, shown in the above figures.
With this outdoor unit, constant evaporating pressure control when cooling and constant condensing pressure control when heating is carried out.
When the overall equivalent pipe length is 90m or more, main gas and liquid pipe diameters must be increased..
For new diameters see below.
Model
RXYQ12-14P
RXYQ24P
RXYQ36P
gas pipe
28.6
34.9
41.3
When the pipe length after the first refrigerant branch kit is more than 40m, pipe size between first and final branch kit must be increased (refer also
to installation manual).
Diameter of main pipes (standard size)
Model
RXYQ12-14P
RXYQ24P
RXYQ36P
gas pipe
28.6
34.9
41.3
liquid pipe
12.7
15.9
19.1
Equivalent length used in the above figures is based upon the following equivalent length.
Equivalent piping length = Equivalent length of main pipe x Correction factor +
Equivalent length of branch pipes x Correction factor
Choose a correction factor from the following table.
When cooling capacity is calculated: gas pipe size
When heating capacity is calculated: liquid pipe size.
liquid pipe
15.9
19.1
22.2
Correction factor
Standard size
Size increase
1.0
0.5
1.0
0.5
Example
Main gas pipe size increase
Main liquid pipe size increase
80 m
16
2-3
RXYQ16P
60
0.80 0.79
0.92 0.90 0.88 0.86 0.84 0.82
50
0.94
40
0.96
30
0.98
20
10 1.00
0
40
60
80
20
100
120
140
160
180
0
-10
1.00
-20
0.98
-30
0.96
-40
0.94 0.92 0.90 0.88 0.86 0.84
0.82
0.80 0.79
-50
Equivalent piping length
50
40
30
20
1.00
10
0
-10
-20
10
1.00
20
30
40
50
60
70
80
90
100
110
-30
-40
-50
3TW27232-6
NOTES
These figures illustrate the correction ratio for piping length in capacity for a standard indoor unit system at maximum load (with the thermostat set to
maximum) under standard conditions.
Moreover, under partial load conditions, there is only a minor deviation from the capacity correction ratio, shown in the above figures.
With this outdoor unit, constant evaporating pressure control when cooling and constant condensing pressure control when heating is carried out.
When the overall equivalent pipe length is 90m or more, main gas and liquid pipe diameters must be increased..
For new diameters see below.
Model
RXYQ16P
gas pipe
31.8*
liquid pipe
15.9
* If not available on site, do not increase. If not increased, no correction factor should be applied to the equivalent length (see note 6).
5
When the pipe length after the first refrigerant branch kit is more than 40m, pipe size between first and final branch kit must be increased (refer also
to installation manual).
Diameter of main pipes (standard size)
Model
RXYQ16P
gas pipe
28.6
Equivalent length used in the above figures is based upon the following equivalent length.
Equivalent piping length = Equivalent length of main pipe x Correction factor +
Equivalent length of branch pipes x Correction factor
Choose a correction factor from the following table.
When cooling capacity is calculated: gas pipe size
When heating capacity is calculated: liquid pipe size.
liquid pipe
12.7
Correction factor
Standard size
Size increase
1.0
0.5
1.0
0.5
Example
Main gas pipe size increase
Main liquid pipe size increase
80 m
17
2-3
RXYQ18,26,30,38,44P
60
0.80 0.79
0.92 0.90 0.88 0.86 0.84 0.82
50
0.94
40
0.96
30
0.98
20
10 1.00
0
40
60
80
20
100
120
140
160
180
0
-10
1.00
-20
0.98
-30
0.96
-40
0.94 0.92 0.90 0.88 0.86 0.84
0.82
0.80 0.79
-50
Equivalent piping length
50
40
30
20
1.00
10
0
-10
-20
10
1.00
20
30
40
50
60
70
80
90
100
110
-30
-40
-50
3TW27232-6
NOTES
These figures illustrate the correction ratio for piping length in capacity for a standard indoor unit system at maximum load (with the thermostat set to
maximum) under standard conditions.
Moreover, under partial load conditions, there is only a minor deviation from the capacity correction ratio, shown in the above figures.
With this outdoor unit, constant evaporating pressure control when cooling and constant condensing pressure control when heating is carried out.
When the overall equivalent pipe length is 90m or more, main gas and liquid pipe diameters must be increased..
For new diameters see below.
Model
RXYQ18P
RXYQ26-30P
RXYQ38-44P
gas pipe
31.8*
38.1*
41.3
liquid pipe
19.1
22.2
22.2
* If not available on site, do not increase. If not increased, no correction factor should be applied to the equivalent length (see note 6).
5
When the pipe length after the first refrigerant branch kit is more than 40m, pipe size between first and final branch kit must be increased (refer also
to installation manual).
Diameter of main pipes (standard size)
Model
RXYQ18P
RXYQ26-30P
RXYQ38-44P
gas pipe
28.6
34.9
41.3
Equivalent length used in the above figures is based upon the following equivalent length.
Equivalent piping length = Equivalent length of main pipe x Correction factor +
Equivalent length of branch pipes x Correction factor
Choose a correction factor from the following table.
When cooling capacity is calculated: gas pipe size
When heating capacity is calculated: liquid pipe size.
liquid pipe
15.9
19.1
19.1
Correction factor
Standard size
Size increase
1.0
0.5
1.0
0.5
Example
Main gas pipe size increase
Main liquid pipe size increase
80 m
18
2-3
RXYQ20,32,34P
60
0.80
0.78
50
0.92 0.90 0.88 0.86 0.84 0.82
40
0.94
30
0.96
20
0.98
10 1.00
0
40 60
80
20
100
120 140 160 180
0
-10
1.00
-20
0.98
-30
0.96
-40
0.94 0.92 0.90 0.88 0.86 0.84 0.82
0.80
0.78
-50
Equivalent piping length
50
40
30
20
1.00
10
0
-10
-20
10
1.00
20
30
40
50
60
70
80
90
100
110
-30
-40
-50
3TW27232-6
NOTES
These figures illustrate the correction ratio for piping length in capacity for a standard indoor unit system at maximum load (with the thermostat set to
maximum) under standard conditions.
Moreover, under partial load conditions, there is only a minor deviation from the capacity correction ratio, shown in the above figures.
With this outdoor unit, constant evaporating pressure control when cooling and constant condensing pressure control when heating is carried out.
When the overall equivalent pipe length is 90m or more, main gas and liquid pipe diameters must be increased..
For new diameters see below.
Model
RXYQ20P
RXYQ32-34P
gas pipe
31.8*
38.1*
liquid pipe
19.1
22.2
* If not available on site, do not increase. If not increased, no correction factor should be applied to the equivalent length (see note 6).
5
When the pipe length after the first refrigerant branch kit is more than 40m, pipe size between first and final branch kit must be increased (refer also
to installation manual).
Diameter of main pipes (standard size)
Model
RXYQ20P
RXYQ32-34P
gas pipe
28.6
34.9
Equivalent length used in the above figures is based upon the following equivalent length.
Equivalent piping length = Equivalent length of main pipe x Correction factor +
Equivalent length of branch pipes x Correction factor
Choose a correction factor from the following table.
When cooling capacity is calculated: gas pipe size
When heating capacity is calculated: liquid pipe size.
liquid pipe
15.9
19.1
Correction factor
Standard size
Size increase
1.0
0.5
1.0
0.5
Example
Main gas pipe size increase
Main liquid pipe size increase
80 m
19
2-3
RXYQ22P
60
0.80
0.92 0.90 0.88 0.86 0.84 0.82
50
0.94
40
0.96
30
0.98
20 1.00
10
0 0.70
20
40
60
80 100
120 140
160
0
-10
-20
1.00
-30
0.98
-40
0.96 0.94 0.92 0.90 0.88 0.86 0.84 0.82
0.80
-50
Equivalent piping length
0.78
180
60
50
40
30
20
10
0
0
-10
-20
-30
-40
-50
1.00
10
1.00
20
30
40
50
60
70
80
90
100
110
3TW27232-6
NOTES
These figures illustrate the correction ratio for piping length in capacity for a standard indoor unit system at maximum load (with the thermostat set to
maximum) under standard conditions.
Moreover, under partial load conditions, there is only a minor deviation from the capacity correction ratio, shown in the above figures.
With this outdoor unit, constant evaporating pressure control when cooling and constant condensing pressure control when heating is carried out.
When the overall equivalent pipe length is 90m or more, main gas and liquid pipe diameters must be increased..
For new diameters see below.
Model
RXYQ22P
gas pipe
31.8*
liquid pipe
19.1
* If not available on site, do not increase. If not increased, no correction factor should be applied to the equivalent length (see note 6).
5
When the pipe length after the first refrigerant branch kit is more than 40m, pipe size between first and final branch kit must be increased (refer also
to installation manual).
Diameter of main pipes (standard size)
Model
RXYQ22P
gas pipe
28.6
Equivalent length used in the above figures is based upon the following equivalent length.
Equivalent piping length = Equivalent length of main pipe x Correction factor +
Equivalent length of branch pipes x Correction factor
Choose a correction factor from the following table.
When cooling capacity is calculated: gas pipe size
When heating capacity is calculated: liquid pipe size.
liquid pipe
15.9
Correction factor
Standard size
Size increase
1.0
0.5
1.0
0.5
Example
Main gas pipe size increase
Main liquid pipe size increase
80 m
20
2-3
RXYQ46P
60
0.90 0.88 0.86 0.84 0.82
0.80
0.78
50
0.92
40
0.94
30
0.96
0.98
20
10 1.00
0
40 60
80
100 120 140
160 180
0
20
-10
1.00
-20
0.98
-30
0.96
-40
0.78
0.94 0.92 0.90 0.88 0.86 0.84 0.82
0.80
-50
Equivalent piping length
60
50
40
30
20
10
0
0
-10
-20
-30
-40
-50
2
1.00
10
1.00
20
30
40
50
60
70
80
90
100
110
3TW27232-6
NOTES
These figures illustrate the correction ratio for piping length in capacity for a standard indoor unit system at maximum load (with the thermostat set to
maximum) under standard conditions.
Moreover, under partial load conditions, there is only a minor deviation from the capacity correction ratio, shown in the above figures.
With this outdoor unit, constant evaporating pressure control when cooling and constant condensing pressure control when heating is carried out.
When the overall equivalent pipe length is 90m or more, main gas and liquid pipe diameters must be increased..
For new diameters see below.
Model
RXYQ46P
gas pipe
41.3
When the pipe length after the first refrigerant branch kit is more than 40m, pipe size between first and final branch kit must be increased (refer also
to installation manual).
Diameter of main pipes (standard size)
Model
RXYQ46P
gas pipe
41.3
liquid pipe
19.1
Equivalent length used in the above figures is based upon the following equivalent length.
Equivalent piping length = Equivalent length of main pipe x Correction factor +
Equivalent length of branch pipes x Correction factor
Choose a correction factor from the following table.
When cooling capacity is calculated: gas pipe size
When heating capacity is calculated: liquid pipe size.
liquid pipe
22.2
Correction factor
Standard size
Size increase
1.0
0.5
1.0
0.5
Example
Main gas pipe size increase
Main liquid pipe size increase
80 m
21
2-3
RXYQ48P
60
0.90 0.88 0.86 0.84 0.82
0.80
0.78
50
0.92
40
0.94
30
0.96
0.98
20
10 1.00
0
40 60
80
100
120
140
160 180
0
20
-10
1.00
-20
0.98
-30
0.96
-40
0.78
0.94 0.92 0.90 0.88 0.86 0.84 0.82
0.80
-50
Equivalent piping length
60
50
40
30
20
10
0
0
-10
-20
-30
-40
-50
1.00
10
1.00
20
30
40
50
60
70
80
90
100
110
3TW27232-6
NOTES
These figures illustrate the correction ratio for piping length in capacity for a standard indoor unit system at maximum load (with the thermostat set to
maximum) under standard conditions.
Moreover, under partial load conditions, there is only a minor deviation from the capacity correction ratio, shown in the above figures.
With this outdoor unit, constant evaporating pressure control when cooling and constant condensing pressure control when heating is carried out.
When the overall equivalent pipe length is 90m or more, main gas and liquid pipe diameters must be increased..
For new diameters see below.
Model
RXYQ48P
gas pipe
41.3
When the pipe length after the first refrigerant branch kit is more than 40m, pipe size between first and final branch kit must be increased (refer also
to installation manual).
Diameter of main pipes (standard size)
Model
RXYQ48P
gas pipe
41.3
liquid pipe
19.1
Equivalent length used in the above figures is based upon the following equivalent length.
Equivalent piping length = Equivalent length of main pipe x Correction factor +
Equivalent length of branch pipes x Correction factor
Choose a correction factor from the following table.
When cooling capacity is calculated: gas pipe size
When heating capacity is calculated: liquid pipe size.
liquid pipe
22.2
Correction factor
Standard size
Size increase
1.0
0.5
1.0
0.5
Example
Main gas pipe size increase
Main liquid pipe size increase
80 m
22
2-3
RXYQ50P
60
0.90 0.88 0.86 0.84 0.82
0.80
0.78
50
0.92
40
0.94
30
0.96
0.98
20
10 1.00
0 0.70
40 60
80
100
120
140
160 180
0
20
-10
1.00
-20
0.98
-30
0.96
-40
0.78
0.94 0.92 0.90 0.88 0.86 0.84 0.82
0.80
-50
Equivalent piping length
60
50
40
30
20
10
0
0
-10
-20
-30
-40
-50
2
1.00
10
1.00
20
30
40
50
60
70
80
90
100
110
3TW27232-6
NOTES
These figures illustrate the correction ratio for piping length in capacity for a standard indoor unit system at maximum load (with the thermostat set to
maximum) under standard conditions.
Moreover, under partial load conditions, there is only a minor deviation from the capacity correction ratio, shown in the above figures.
With this outdoor unit, constant evaporating pressure control when cooling and constant condensing pressure control when heating is carried out.
When the overall equivalent pipe length is 90m or more, main gas and liquid pipe diameters must be increased..
For new diameters see below.
Model
RXYQ50P
gas pipe
41.3
When the pipe length after the first refrigerant branch kit is more than 40m, pipe size between first and final branch kit must be increased (refer also
to installation manual).
Diameter of main pipes (standard size)
Model
RXYQ50P
gas pipe
41.3
liquid pipe
19.1
Equivalent length used in the above figures is based upon the following equivalent length.
Equivalent piping length = Equivalent length of main pipe x Correction factor +
Equivalent length of branch pipes x Correction factor
Choose a correction factor from the following table.
When cooling capacity is calculated: gas pipe size
When heating capacity is calculated: liquid pipe size.
liquid pipe
22.2
Correction factor
Standard size
Size increase
1.0
0.5
1.0
0.5
Example
Main gas pipe size increase
Main liquid pipe size increase
80 m
23
2-3
RXYQ52P
60
0.90 0.88 0.86 0.84 0.82
0.80
0.78
0.92
50
40
0.94
0.96
30
20 0.98
1.00
10
0 0.70
40 60
80
100
120
140
160 180
0
20
-10
1.00
-20
0.98
-30
0.96
-40
0.78
0.94 0.92 0.90 0.88 0.86 0.84 0.82
0.80
-50
Equivalent piping length
60
50
40
30
20
10
0
0
-10
-20
-30
-40
-50
0.99
0.98 0.00 0.04 0.02 0.00 0.00 0.00 0.04 0.02 0.00
1.00
10
1.00
20
30
40
50
60
70
80
90
100 110
0.99 0.980.00 0.04 0.02 0.00 0.00 0.00 0.04 0.02 0.00
Equivalent piping length (m)
3TW27232-6
NOTES
These figures illustrate the correction ratio for piping length in capacity for a standard indoor unit system at maximum load (with the thermostat set to
maximum) under standard conditions.
Moreover, under partial load conditions, there is only a minor deviation from the capacity correction ratio, shown in the above figures.
With this outdoor unit, constant evaporating pressure control when cooling and constant condensing pressure control when heating is carried out.
When the overall equivalent pipe length is 90m or more, main gas and liquid pipe diameters must be increased..
For new diameters see below.
Model
RXYQ52P
gas pipe
41.3
When the pipe length after the first refrigerant branch kit is more than 40m, pipe size between first and final branch kit must be increased (refer also
to installation manual).
Diameter of main pipes (standard size)
Model
RXYQ52P
gas pipe
41.3
liquid pipe
19.1
Equivalent length used in the above figures is based upon the following equivalent length.
Equivalent piping length = Equivalent length of main pipe x Correction factor +
Equivalent length of branch pipes x Correction factor
Choose a correction factor from the following table.
When cooling capacity is calculated: gas pipe size
When heating capacity is calculated: liquid pipe size.
liquid pipe
22.2
Correction factor
Standard size
Size increase
1.0
0.5
1.0
0.5
Example
Main gas pipe size increase
Main liquid pipe size increase
80 m
24
2-3
RXYQ54P
60
0.92 0.90 0.88 0.86 0.84
50
0.94
40
0.96
30
0.98
20
10 1.00
0
40 60
80
100
20
-100
1.00
-20
0.98
-30
0.82
120
0.80
0.78
140
160
180
0.96
-40
-50
0.80
0.78
60
50
40
30
20
10
0
0
-10
-20
-30
-40
-50
1.00
10
20
0.99
0.95
40
30
1.00
0.97
0.93 0.91 0.89 0.89 0.85 0.83 0.81 0.79 0.77 0.75
2
50
60
70
80
90
100
110
0.99
0.97 0.95 0.93 0.91 0.89 0.89 0.85 0.83 0.81 0.79 0.77 0.75
Equivalent piping length (m)
3TW27232-6
NOTES
These figures illustrate the correction ratio for piping length in capacity for a standard indoor unit system at maximum load (with the thermostat set to
maximum) under standard conditions.
Moreover, under partial load conditions, there is only a minor deviation from the capacity correction ratio, shown in the above figures.
With this outdoor unit, constant evaporating pressure control when cooling and constant condensing pressure control when heating is carried out.
When the overall equivalent pipe length is 90m or more, main gas and liquid pipe diameters must be increased..
For new diameters see below.
Model
RXYQ54P
gas pipe
41.3
When the pipe length after the first refrigerant branch kit is more than 40m, pipe size between first and final branch kit must be increased (refer also
to installation manual).
Diameter of main pipes (standard size)
Model
RXYQ54P
gas pipe
41.3
liquid pipe
19.1
Equivalent length used in the above figures is based upon the following equivalent length.
Equivalent piping length = Equivalent length of main pipe x Correction factor +
Equivalent length of branch pipes x Correction factor
Choose a correction factor from the following table.
When cooling capacity is calculated: gas pipe size
When heating capacity is calculated: liquid pipe size.
liquid pipe
22.2
Correction factor
Standard size
Size increase
1.0
0.5
1.0
0.5
Example
Main gas pipe size increase
Main liquid pipe size increase
80 m
25
2-4
REYQ8,22M
3D042141
NOTES
These figures illustrate the rate of change in capacity of a standard indoor unit system at maximum load (with the thermostat set to
maximum) under standard conditions.
Moreover, under partial load conditions there is only a minor deviation from the rate of change in capacity shown in the above figures.
With this outdoor unit, evaporating pressure constant control when cooling, and condensing pressure constant control when heating is
carried out.
Method of calculating cooling / heating capacity (max. capacity for combination with standard indoor unit)
cooling / heating capacity = cooling / heating capacity obtained from performance characteristics table x each capacity rate of change
When piping length differs depending on the indoor unit, maximum capacity of each unit during simultaneous operation is:
cooling / heating capacity = cooling / heating capacity of each unit x capacity rate of change for each piping length
When overall equivalent pipe length is 90m or more, the diameter of the main gas pipes (outdoor unit-branch sections) must be increased.
Model
Liquid
REYQ8M
12.7
REYQ22M
19.1
When the main sections of the interunit gas pipe diameters are increased the overall equivalent length should be calculated as follows.
(Heating only)
Overall equivalent length = Equivalent length to main pipe x 0.5 + Equivalent length after branching
Example
Equivalent length
80 m
Equivalent length
40 m
Indoor unit
Size increase
Outdoor unit
Branch
In the combination which does not include cooling only indoor unit, calculate the equivalent length pipe by the following when you calculate
cooling capacity.
Overall equivalent length = Equivalent length to main pipe x 0.5 + Equivalent length after branching
Example
Equivalent length
80 m
Equivalent length
40 m
Indoor unit
Outdoor unit
Size increase
Branch BS unit
EXPLANATION OF SYMBOLS
Hp : Level difference (m) between indoor and outdoor units with indoor unit in inferior position
HM : Level difference (m) between indoor and outdoor units with indoor unit in superior position
L
26
liquid
REYQ8M
9.5
REYQ22M
15.9
2-4
REYQ10M
3D042142
NOTES
These figures illustrate the rate of change in capacity of a standard indoor unit system at maximum load (with the thermostat set to
maximum) under standard conditions.
Moreover, under partial load conditions there is only a minor deviation from the rate of change in capacity shown in the above figures.
With this outdoor unit, evaporating pressure constant control when cooling, and condensing pressure constant control when heating is
carried out.
Method of calculating cooling / heating capacity (max. capacity for combination with standard indoor unit)
cooling / heating capacity = cooling / heating capacity obtained from performance characteristics table x each capacity rate of change
When piping length differs depending on the indoor unit, maximum capacity of each unit during simultaneous operation is:
cooling / heating capacity = cooling / heating capacity of each unit x capacity rate of change for each piping length
When overall equivalent pipe length is 90m or more, the diameter of the main gas and liquid pipes (outdoor unit-branch sections) must be
increased.
Model
liquid
REYQ10M
5
12.7
When the main sections of the interunit gas pipe diameters are increased the overall equivalent length should be calculated as follows.
(Heating only)
Overall equivalent length = Equivalent length to main pipe x 0.5 + Equivalent length after branching
Example
Equivalent length
80 m
Equivalent length
40 m
Indoor unit
Size increase
Outdoor unit
Branch
In the combination which does not include cooling only indoor unit, calculate the equivalent length pipe by the following when you calculate
cooling capacity.
Overall equivalent length = Equivalent length to main pipe x 0.5 + Equivalent length after branching
Example
Equivalent length
80 m
Equivalent length
40 m
Indoor unit
Outdoor unit
Size increase
Branch BS unit
EXPLANATION OF SYMBOLS
Hp : Level difference (m) between indoor and outdoor units with indoor unit in inferior position
HM : Level difference (m) between indoor and outdoor units with indoor unit in superior position
L
liquid
9.5
27
2-4
REYQ12,14,24,36M
3D042143
NOTES
These figures illustrate the rate of change in capacity of a standard indoor unit system at maximum load (with the thermostat set to
maximum) under standard conditions.
Moreover, under partial load conditions there is only a minor deviation from the rate of change in capacity shown in the above figures.
With this outdoor unit, evaporating pressure constant control when cooling, and condensing pressure constant control when heating is
carried out.
Method of calculating cooling / heating capacity (max. capacity for combination with standard indoor unit)
cooling / heating capacity = cooling / heating capacity obtained from performance characteristics table x each capacity rate of change
When piping length differs depending on the indoor unit, maximum capacity of each unit during simultaneous operation is:
cooling / heating capacity = cooling / heating capacity of each unit x capacity rate of change for each piping length
When overall equivalent pipe length is 90m or more, the diameter of the main gas and liquid pipes (outdoor unit-branch sections) must be
increased.
Model
REYQ12,14M
REYQ24M
REYQ36M
liquid
15.9
19.1
22.2
When the main sections of the interunit gas pipe diameters are increased the overall equivalent length should be calculated as follows.
(Heating only)
Overall equivalent length = Equivalent length to main pipe x 0.5 + Equivalent length after branching
Example
Equivalent length
80 m
Equivalent length
40 m
Indoor unit
Size increase
Outdoor unit
Branch
In the combination which does not include cooling only indoor unit, calculate the equivalent length pipe by the following when you calculate cooling
capacity.
Overall equivalent length = Equivalent length to main pipe x 0.5 + Equivalent length after branching
Example
Equivalent length
80 m
Equivalent length
40 m
Indoor unit
Outdoor unit
Size increase
Branch BS unit
EXPLANATION OF SYMBOLS
Hp : Level difference (m) between indoor and outdoor units with indoor unit in inferior position
HM : Level difference (m) between indoor and outdoor units with indoor unit in superior position
L
28
liquid
12.7
15.9
19.1
2-4
REYQ16M
3D042144
NOTES
These figures illustrate the rate of change in capacity of a standard indoor unit system at maximum load (with the thermostat set to
maximum) under standard conditions.
Moreover, under partial load conditions there is only a minor deviation from the rate of change in capacity shown in the above figures.
With this outdoor unit, evaporating pressure constant control when cooling, and condensing pressure constant control when heating is
carried out.
Method of calculating cooling / heating capacity (max. capacity for combination with standard indoor unit)
cooling / heating capacity = cooling / heating capacity obtained from performance characteristics table x each capacity rate of change
When piping length differs depending on the indoor unit, maximum capacity of each unit during simultaneous operation is:
cooling / heating capacity = cooling / heating capacity of each unit x capacity rate of change for each piping length
When overall equivalent pipe length is 90m or more, the diameter of the main liquid pipes (outdoor unit-branch sections) must be increased.
Model
liquid
REYQ16M
5
15.9
When the main sections of the interunit gas pipe diameters are increased the overall equivalent length should be calculated as follows.
(Heating only)
Overall equivalent length = Equivalent length to main pipe x 0.5 + Equivalent length after branching
Example
Equivalent length
80 m
Equivalent length
40 m
Indoor unit
Size increase
Outdoor unit
Branch
In the combination which does not include cooling only indoor unit, calculate the equivalent length pipe by the following when you calculate
cooling capacity.
Overall equivalent length = Equivalent length to main pipe x 0.5 + Equivalent length after branching
Example
Equivalent length
80 m
Equivalent length
40 m
Indoor unit
Outdoor unit
Size increase
Branch BS unit
EXPLANATION OF SYMBOLS
Hp : Level difference (m) between indoor and outdoor units with indoor unit in inferior position
HM : Level difference (m) between indoor and outdoor units with indoor unit in superior position
L
liquid
12.7
29
2-4
REYQ18,26,28,30,38,40,42,44M
3D042145
NOTES
These figures illustrate the rate of change in capacity of a standard indoor unit system at maximum load (with the thermostat set to
maximum) under standard conditions.
Moreover, under partial load conditions there is only a minor deviation from the rate of change in capacity shown in the above figures.
With this outdoor unit, evaporating pressure constant control when cooling, and condensing pressure constant control when heating is
carried out.
Method of calculating cooling / heating capacity (max. capacity for combination with standard indoor unit)
cooling / heating capacity = cooling / heating capacity obtained from performance characteristics table x each capacity rate of change
When piping length differs depending on the indoor unit, maximum capacity of each unit during simultaneous operation is:
cooling / heating capacity = cooling / heating capacity of each unit x capacity rate of change for each piping length
When overall equivalent pipe length is 90m or more, the diameter of the main gas and liquid pipes (outdoor unit-branch sections) must be
increased.
Model
REYQ18M
REYQ26,28,30,38,40,42,44M
liquid
19.1
22.2
When the main sections of the interunit gas pipe diameters are increased the overall equivalent length should be calculated as follows.
(Heating only)
Overall equivalent length = Equivalent length to main pipe x 0.5 + Equivalent length after branching
Example
Equivalent length
80 m
Equivalent length
40 m
Indoor unit
Outdoor unit
Size increase
Branch
In the combination which does not include cooling only indoor unit, calculate the equivalent length pipe by the following when you calculate
cooling capacity.
Overall equivalent length = Equivalent length to main pipe x 0.5 + Equivalent length after branching
Example
Equivalent length
80 m
Equivalent length
40 m
Indoor unit
Outdoor unit
Size increase
Branch BS unit
EXPLANATION OF SYMBOLS
Hp : Level difference (m) between indoor and outdoor units with indoor unit in inferior position
HM : Level difference (m) between indoor and outdoor units with indoor unit in superior position
L
30
liquid
15.9
19.1
2-4
REYQ20,32,34,46M
3D042146
NOTES
These figures illustrate the rate of change in capacity of a standard indoor unit system at maximum load (with the thermostat set to
maximum) under standard conditions.
Moreover, under partial load conditions there is only a minor deviation from the rate of change in capacity shown in the above figures.
With this outdoor unit, evaporating pressure constant control when cooling, and condensing pressure constant control when heating is
carried out.
Method of calculating cooling / heating capacity (max. capacity for combination with standard indoor unit)
cooling / heating capacity = cooling / heating capacity obtained from performance characteristics table x each capacity rate of change
When piping length differs depending on the indoor unit, maximum capacity of each unit during simultaneous operation is:
cooling / heating capacity = cooling / heating capacity of each unit x capacity rate of change for each piping length
When overall equivalent pipe length is 90m or more, the diameter of the main gas and liquid pipes (outdoor unit-branch sections) must be
increased .
Model
liquid
REYQ20M
19.1
REYQ32,34,46M
22.2
When the main sections of the interunit gas pipe diameters are increased the overall equivalent length should be calculated as follows.
(Heating only)
Overall equivalent length = Equivalent length to main pipe x 0.5 + Equivalent length after branching
Example
Equivalent length
80 m
Equivalent length
40 m
Indoor unit
Size increase
Outdoor unit
Branch
In the combination which does not include cooling only indoor unit, calculate the equivalent length pipe by the following when you calculate
cooling capacity.
Overall equivalent length = Equivalent length to main pipe x 0.5 + Equivalent length after branching
Example
Equivalent length
80 m
Equivalent length
40 m
Indoor unit
Outdoor unit
Size increase
Branch BS unit
EXPLANATION OF SYMBOLS
Hp : Level difference (m) between indoor and outdoor units with indoor unit in inferior position
HM : Level difference (m) between indoor and outdoor units with indoor unit in superior position
L
liquid
REYQ20M
15.9
REYQ32,34,46M
19.1
31
2-4
REYQ48M
3D042147
NOTES
These figures illustrate the rate of change in capacity of a standard indoor unit system at maximum load (with the thermostat set to
maximum) under standard conditions.
Moreover, under partial load conditions there is only a minor deviation from the rate of change in capacity shown in the above figures.
With this outdoor unit, evaporating pressure constant control when cooling, and condensing pressure constant control when heating is
carried out.
Method of calculating cooling / heating capacity (max. capacity for combination with standard indoor unit)
cooling / heating capacity = cooling / heating capacity obtained from performance characteristics table x each capacity rate of change
When piping length differs depending on the indoor unit, maximum capacity of each unit during simultaneous operation is:
cooling / heating capacity = cooling / heating capacity of each unit x capacity rate of change for each piping length
When overall equivalent pipe length is 90m or more, the diameter of the main gas and liquid pipes (outdoor unit-branch sections) must be
increased except for the gas pipe of REYQ46M7W1B.
Model
liquid
REYQ48M
5
22.2
When the main sections of the interunit gas pipe diameters are increased the overall equivalent length should be calculated as follows.
(Heating only)
Overall equivalent length = Equivalent length to main pipe x 0.5 + Equivalent length after branching
Example
Equivalent length
80 m
Equivalent length
40 m
Indoor unit
Size increase
Outdoor unit
Branch
In the combination which does not include cooling only indoor unit, calculate the equivalent length pipe by the following when you calculate
cooling capacity.
Overall equivalent length = Equivalent length to main pipe x 0.5 + Equivalent length after branching
Example
Equivalent length
80 m
Equivalent length
40 m
Indoor unit
Outdoor unit
Size increase
Branch BS unit
EXPLANATION OF SYMBOLS
Hp : Level difference (m) between indoor and outdoor units with indoor unit in inferior position
HM : Level difference (m) between indoor and outdoor units with indoor unit in superior position
L
32
liquid
19.1
3
2
-7
-5
-3
0.96
0.93
0.87
0.81
0.83
0.89
1.0
Defrosting operation
Heating capacity
Defrosting operation
NOTE
Time
1 cycle
Please note that when there is an accumulation of snow against the outside surface of the outdoor unit heat exchanger, there will always be a
temporary reduction in capacity although this will, of course, vary in degree in accordance with a number of other factors such as the outdoor
temperature (CDB), relative humidity (RH) and the amount of frosting which occurs.
33
451.5
547.4
ID 19.10
ID 19.10
ID 38.10
ID 12.70
ID 19.10
90
ID 44.50
ID 12.70
ID 15.90
ID 12.70
ID 22.20
ID 19.10
ID 9.52
ID 6.35
ID 9.52
ID 6.35
ID 19.10
90
90
ID 15.90
ID 9.52
ID 25.40
ID 31.80
465.4
421.5
ID 6.35
ID 9.52
90
ID 38.10
ID 22.20
ID 15.90
ID 15.90
461.5
ID 9.52
ID 22.20
386.8
526.5
ID 9.52
ID 15.90
ID 19.10
ID 25.40
90
ID 15.90
ID 15.90
ID 25.40
ID 31.80
ID 28.60
ID 6.35
ID 9.52
ID 12.70
ID 9.52
ID 12.70
ID 15.90
ID 6.35
ID 12.70
90
ID 25.40
ID 19.10
90
ID 9.52
ID 12.70
ID 15.90
ID 19.10
90
381
ID 12.70
ID 25.40
ID 38.10
381
ID 12.70
ID 19.10
ID 31.80
ID 15.90
ID 19.10
ID 12.70
ID 15.90
ID 25.40
699.5
465.4
421.5
ID 15.90
ID 19.10
ID 31.80
ID 9.52
ID 12.70
ID 15.90
ID 25.40
ID 31.80
90
ID 12.70
ID 15.90
ID 28.60
ID 12.70
90
ID 15.90
ID 12.70
ID 15.90
ID 19.10
465.4
421.5
547.4
ID 15.90
ID 12.70
ID 19.10
90
ID 28.60
ID 19.10
ID 25.40
ID 38.10
ID 6.35
ID 9.52
ID 15.90
ID 19.10
526.5
90
ID 19.10
ID 25.40
ID 31.80
ID 19.10
ID 31.80
ID 19.10
ID 25.40
ID 31.80
ID 28.60
ID 12.70
ID 15.90
386.8
ID 6.35
ID 9.52
ID 12.70
ID 15.90
ID 19.10
381
ID 19.10
ID 38.10
ID 38.10
ID 44.50
ID 12.70
ID 9.52
ID 6.35
ID 9.52
ID 6.35
ID 15.90
ID 15.90
ID 12.70
ID 15.90
90
ID 12.70
ID 6.35
ID 9.52
ID 25.40
ID 19.10
ID 22.20
ID 15.90
465.4
421.5
ID 12.70
ID 31.80
ID 15.90
ID 19.10
ID 22.20
ID 15.90
ID 19.10
ID 31.80
ID 25.40
ID 19.10
ID 15.90
ID 28.60
ID 31.80
ID 28.60
ID 38.10
ID 19.10
ID 12.70
ID 9.52
ID 15.90
ID 12.70
ID 15.90
547.4
ID 25.40
ID 12.70
ID 25.40
ID 28.60
ID 9.52
526.5
ID 19.10
ID 19.10
ID 25.40
ID 12.70
90
ID 15.90
ID 12.70
ID 15.90
526.5
461.5
ID 19.10
ID 15.90
ID 19.10
ID 22.20
ID 9.52
ID 12.70
ID 15.90
ID 12.70
ID 15.90
ID 19.10
ID 25.40
90
ID 6.35
ID 9.52
ID 12.70
ID 12.70
90
ID 19.10
ID 19.10
ID 12.70
ID 15.90
ID 25.40
90
ID 12.70
ID 15.90
461.5
90
ID 15.90
90
ID 9.52
ID 9.52
ID 15.90
ID 19.10
ID 15.90
451.5
386.8
ID 12.70
ID 6.35
ID 9.52
ID 12.70
381
ID 12.70
ID 19.10
ID 19.10
ID 22.20
90
ID 15.90
ID 12.70
90
90
ID 9.52
ID 25.40
ID 31.80
465.4
421.5
ID 9.52
ID 15.90
ID 12.70
ID 25.40
ID 31.80
ID 15.90
ID 19.10
ID 25.40
90
ID 12.70
90
ID 22.20
ID 15.90
ID 15.90
ID 25.40
699.5
526.5
ID 19.10
ID 25.40
ID 31.80
ID 38.10
ID 12.70
ID 15.90
ID 19.10
465.4
421.5
ID 15.90
ID 19.10
ID 28.60
ID 28.60
ID 9.52
ID 12.70
ID 15.90
ID 12.70
ID 15.90
ID 19.10
547.4
ID 15.90
ID 19.10
ID 25.40
ID 12.70
ID 28.60
90
ID 15.90
ID 31.80
ID 12.70
ID 15.90
451.5
ID 12.70
ID 15.90
ID 19.10
ID 22.20
ID 25.40
90
90
ID 12.70
ID 15.90
ID 19.10
ID 25.40
ID 12.70
90
ID 15.90
ID 19.10
ID 15.90
ID 19.10
526.5
90
ID 9.52
ID 12.70
ID 15.90
ID 15.90
ID 25.40
465.4
421.5
386.8
ID 12.70
ID 31.80
ID 12.70
ID 15.90
90
ID 22.20
90
ID 31.80
ID 15.90
ID 19.10
90
KHRQ23M75T8 KHRQ23M64T8 KHRQ23M29T8 KHRQ23M20T8 KHRP23M75T8 KHRP23M64T8 KHRP23M33T8 KHRQ22M75T8 KHRQ22M64T8 KHRQ22M29T9 KHRQ22M20TA8 KHRP22M75T8 KHRP22M64T8
90
ID 31.80
ID 25.40
ID 15.90
ID 19.10
Closed pipes
OD 6.35
60
OD 9.52
OD 15.90
80
OD 12.70
60
80
OD 19.10
80
4TW25799-4A
34
ID 15.90
ID 22.20
ID 15.90
ID 31.80
500
165
ID 19.10
177
ID 19.10
520
ID 19.10
ID 12.70 (3x)
ID 15.90 (3x)
ID 25.40
ID 28.60
ID 31.80
175
7 x 80 = 560
ID 19.10 (6x)
ID 15.90 (6x)
165
ID 12.70 (2x)
775
ID 38.10
ID 12.70 (2x)
ID 15.90 (2x)
279
ID 6.32 (3x)
339
399
ID 19.10
ID 25.40
129
ID 9.52 (3x)
279
ID 6.32 (3x)
339
399
ID 12.70
177
ID 15.90
137
ID 15.90
2 x 80 = 160
370
150
ID 12.70 (2x)
ID 15.90 (2x)
ID 12.70
ID 19.10 (2x)
ID 28.60
ID 19.10
ID 25.40
150
ID 12.70
ID 15.90
2 x 80 = 160
370
ID 9.52 (3x)
279
ID 6.32 (3x)
339
399
ID 12.70 (3x)
ID 19.10
ID 15.90
ID 12.70
ID 9.52 (3x)
126
ID 15.90
137
ID 12.70
ID 19.10 (2x)
ID 28.60
129
ID 9.52 (3x)
177
ID 15.90
ID 15.90 (2x)
ID 31.80
ID 12.70
ID 9.52
2 x 60 = 120
5 x 80 = 400
720
150
2 x 60 = 120
5 x 80 = 400
720
150
ID 12.70 (2x)
86
128
177
ID 12.70 (3x)
ID 15.90 (3x)
86
128
7 x 60 = 420
ID 9.52 (8x)
50
ID 12.70 (3x)
ID 15.90 (3x)
ID 25.40
ID 28.60
ID 31.80
7 x 60 = 420
620
150
ID 19.10 (3x)
76
620
ID 12.70 (3x)
ID 15.90 (3x)
ID 9.52 (2x)
ID 12.70 (3x)
ID 15.90 (3x)
ID 25.40
ID 22.20
ID 19.10
500
ID 22.20
ID 19.10 (3x)
95
ID 15.90
60
93
ID 15.90
ID 15.90
ID 12.70 (3x)
138
179
7 x 60 = 420
ID 6.35 (6x)
ID 6.35 (2x)
ID 9.52 (6x)
85
127
40
ID 9.52 (3x)
ID 12.70 (5x)
ID 19.10
7 x 60 = 420
620
150
ID 12.70 (2x)
ID 15.90 (2x)
ID 15.90
ID 19.10
ID 9.52 (3x)
79
76
95
ID 9.52 (2x)
ID 12.70 (3x)
ID 15.90 (3x)
ID 25.40
ID 22.20
ID 19.10
500
ID 12.70
85
127
179
ID 15.90
60
93
ID 15.90
7 x 60 = 420
150
ID 12.70 (3x)
ID 9.52 (3x)
ID 15.90 (2x)
775
ID 38.10
ID 9.52 (3x)
7 x 60 = 420
ID 6.35 (6x)
ID 6.35 (2x)
ID 9.52 (6x)
40
79
76
7 x 80 = 560
ID 15.90 (6x)
ID 19.10 (6x)
ID 31.80
138
60
520
ID 19.10
2 x 60 = 120
5 x 80 = 400
720
150
7 x 60 = 420
ID 9.52 (8x)
50
76
ID 12.70 (2x)
85
127
60
93
ID 15.90
ID 12.70 (3x)
ID 15.90 (3x)
ID 25.40
ID 28.60
86
128
177
7 x 60 = 420
ID 6.35 (6x)
ID 6.35 (2x)
ID 9.52 (6x)
620
ID 12.70 (3x)
ID 15.90 (3x)
ID 19.10 (3x)
40
ID 12.70 (5x)
ID 19.10
500
79
76
ID 12.70 (2x)
ID 15.90 (2x)
85
127
60
93
ID 15.90
137
KHRQ250H8
7 x 60 = 420
ID 12.70
ID 15.90
ID 19.10
ID 15.90
ID 9.52
KHRP127HB8
7 x 60 = 420
ID 6.35 (6x)
ID 6.35 (2x)
ID 9.52 (6x)
175
40
ID 9.52
KHRQ127H8
79
76
60
150
2 x 80 = 160
370
OD 15.90
ID 12.70
ID 9.52
ID 22.20
OD 19.10
130
ID 28.60
130
ID 31.80
150
150
ID 6.35
50
ID 15.90
OD 19.10
80
ID 12.70
OD 25.4
ID 19.10
88
ID 19.10
OD 15.90
ID 6.35
95
60
ID 12.70
ID 9.52
OD 12.70
ID 9.52
OD 12.70
OD 15.90
ID 38.10
OD 31.80
ID 28.60
OD 25.40
100
OD 9.52
ID 25.40
ID 22.20
OD 19.10
90
OD 25.40
Reducers - Expanders
ID 15.90
ID 12.70
144
ID 41.28
ID 34.95
OD 31.80
ID 41.28
OD 38.10
80
OD 12.70
ID 12.70
OD 9.52
ID 15.90
60
100
ID 9.52
60
ID 28.60
OD 22.20
60
OD 6.35
120
150
ID 12.70
OD 9.52
60
ID 19.10
OD 12.70
100
4TW25799-4A
35
36
BHFQ22P1007
ID 28.6
ID 31.8
ID 28.6
ID 25.4
ID 22.2
ID 19.1
ID 25.4
ID 28.6
ID 31.8
ID 25.4
ID 28.6
ID 25.4
ID 22.2
ID 19.1
ID 15.9
ID 19.1
ID 19.1
ID 22.2
ID 15.9
ID 19.1
ID 22.2
ID 12.7
ID 9.5
ID 15.9
ID 15.9
ID 19.1
ID 15.9
ID 12.7
ID 9.5
ID 15.9
OD 25.4
ID 28.6
ID 25.4
ID 22.2
ID 19.1
OD 25.4
ID 28.6
ID 25.4
ID 22.2
ID 19.1
(2x)
OD 31.8
ID 38.1
OD 25.4
ID 28.6
ID 22.2
ID 25.4
ID 19.1
OD 31.8
ID 31.8
ID 28.6
OD 25.4
ID 28.6
ID 22.2
ID 25.4
ID 19.1
OD 19.1
OD 25.4
ID 28.6
OD 31.8
OD 38.1
ID 41.3
OD 31.8
OD 38.1
ID 41.3
(2x)
OD 28.6
ID 25.4
ID 22.2
OD 28.6
ID 31.8
Reducers
(2x)
OD 38.1
ID 41.3
OD 31.8
ID 34.9
OD 31.8
ID 34.9
OD 15.9
(2x)
ID 12.7
ID 9.5
OD 15.9
ID 12.7
ID 9.5
OD 15.9
ID 12.7
ID 9.5
OD 12.7
ID 15.9
ID 19.1
(2x)
OD 15.9
ID 12.7
ID 9.5
OD 19.1
ID 15.9
OD 12.7
ID 15.9
OD 12.7
ID 15.9
(2x)
(2x)
Insulation tube
for gas pipe for liquid pipe
ID 25.4
Liquid-side junction
ID 38.1
ID 31.8
ID 31.8
ID 28.6
Gas-side junction
BHFQ22P1517
4TW27239-1
BHFQ23M907
ID 28.60
ID 25.40
ID 19.10
ID 22.20
ID 31.80
ID 28.60
ID 25.40
ID 28.60
ID 25.40
ID 19.10
ID 22.20
ID 31.80
ID 31.80
ID 28.60
ID 25.40
ID 31.80
ID 31.80
ID 28.60
ID 25.40
ID 25.40
ID 22.20
ID 25.40
ID 28.60
ID 31.80
ID 28.60
ID 25.40
ID 9.52
ID 12.70
ID 19.10
ID 22.20
ID 22.20
ID 25.40
ID 28.60
ID 22.20
ID 19.10
ID 15.90
ID 9.52
ID 12.70
ID 19.10
ID 15.90
ID 15.90
ID 19.10
ID 15.90
ID 15.90
ID 38.10
ID 34.95
ID 19.10
ID 22.20
ID 9.52
ID 12.70
ID 9.52
ID 12.70
OD 31.80
OD 31.80
ID 25.40 OD 25.40
ID 28.60
OD 31.80
ID 25.40
ID 28.60
OD 25.40
ID 41.28
ID 34.95
OD 38.10
OD 31.80
ID 34.95
ID 19.10
ID 22.20
ID 22.20
ID 19.10
ID 15.90
ID 19.10
ID 22.20
ID 19.10
ID 15.90
ID 15.90
ID 19.10
ID 22.20
ID 22.20
ID 19.10
OD 25.40
ID 22.20
ID 19.10
ID 15.90
OD 25.40
Reducers / Expanders
OD 15.90
2TW25799-2A
OD 15.90
ID 9.52
ID 12.70
ID 9.52
ID 12.70
BHFQ23M1357
37
Type of fitting
Sample systems
Outdoor unit
Outdoor unit
REFNET joint
REFNET joint
Outdoor unit
Simultaneous
control of
cooling/heating
Outdoor unit
REFNET joint
REFNET joint
Indoor unit
Distribution by REFNET joints
Indoor unit
Cooling only
Indoor unit
Indoor unit
Cooling only
Cooling only
Simultaneous
control of
cooling/heating
Cooling only
Cooling only
Outdoor unit
Outdoor unit
Indoor unit
Simultaneous
control of
cooling/heating
Can be added
Cooling only
Can be added
Indoor unit
Can be added
Cooling
only
Indoor unit
Outdoor unit
Outdoor unit
REFNET joint
Indoor unit
38
Indoor unit
Can be added
Cooling only
a
A
refnet header
m
5
H1
p
k
3
e
D
c
B
k
7
c
1
e
2
H1
H2
c
1
e
3
f
4
Equivalent pipe length between outdoor and indoor units 175 m (Assume equivalent pipe length of refnet joint to be 0.5 m and of the refnet header to be 1.0 m. (for calculation purposes))
Total extension
length
Total piping length from outdoor unit to all indoor units between 10 m and 300 m
Difference in
height
Difference in height between outdoor and indoor units (H1)50 m (40 m if outdoor unit is located in a lower position).
h
7 H2
Equivalent length
Pipe size for direct connection to indoor unit must be the same as the
connection size of indoor unit.
Indoor capacity
index
20+25+32+40+50
63+80+100+125
Piping size
(outer diameter x minimum thickness)
Gas pipe
Liquid pipe
6.4x0.8
12.7x0.8
9.5x0.8
15.9x1.0
Indoor unit
R=
x0.054+
Example for refrigerant branch using refnet joint and refnet header
x0.022
a: 9.5x30 m
b: 9.5x10 m
c: 9.5x10 m
d: 9.5x13 m
e: 6.4x10 m
f: 6.4x10 m
g: 6.4x10 m
h: 6.4x20 m
i: 9.5x10 m
j: 6.4x10 m
k: 6.4x9 m
Allowable
height
b
H1
7 H2
Maximum
allowable
length
refnet joint
indoor unit
VRVIII-S
6-1
Example of connection
(Connection of 8 indoor units Heat pump system)
39
40
C
i
1
e
D
l
4
f
E
7
c
d
1
k
3
c
1
d
2
e
3
f
5
H3
a
H1
k
7
7 H2
c
8
d
1
e
2
f
3
H1
m
5
H1
G
l
4
h
7 H2
e
D
j
2
H1
H2
H2
c
1
d
2
e
3
f
4
h
7 H2
8
Equivalent pipe length between outdoor(*) and indoor units 190 m (Assume equivalent pipe length of refnet joint to be 0.5 m and of the refnet header to be 1.0 m. (for
calculation purposes))
Total extension
length
Total piping length from outdoor unit* to all indoor units 1000 m
Piping length from outdoor branch to outdoor unit 10 m. Approximate length: max. 13 m
Difference in
height
Difference in height between outdoor and indoor units (H1)50 m (40 m if outdoor unit is located in a lower
position).
Difference in
height
Difference in
height
Difference in height between outdoor unit (main) and outdoor unit (sub) (H3)5 m
Equivalent length
Allowable height
Pipe length from rst refrigerant branch kit (either refnet joint or refnet header) to indoor unit 40 m (See note 1 on next page)
Choose from the following table in accordance with the total capacity of all the indoor
units connected below the refnet header.
Note: 250 type cannot be connected below the refnet header.
[Example]
in case of refnet joint C; indoor units 3+4+5+6+7+8
[Example]
in case of refnet joint B; indoor units 7+8,
in case of refnet header; indoor units 1+2+3+4+5+6
[Example]
in case of refnet header;
indoor units 1+2+3+4+5+6+7+8
i
1
H3
d
C
refnet header
e
2
H3
p
7 H2
a
B
H1
n
H1
G
c
B
refnet joint
a
a
A
Outdoor units
installed in a
multiple outdoor
unit system
(RXYQ20~54)
indoor unit
VRVIII
Use the outdoor unit multi connection piping kit that is sold separately as an option
(BHFQ22P1007+1517) for the multi installation of outdoor units. Selection method is
as shown in the right table.
Do not use the outdoor unit multi connection piping kit (BHFQ22M909+1359) that
are sold separately as an option of the M-type series and do not use T-joints.
6-2
Example of connection
(Connection of 8 indoor units Heat pump system)
Choose from the following table in accordance with the total capacity of
all the indoor units connected below this.
Do not let the connection piping exceed the refrigerant piping size
chosen by general system model name.
Pipe size for direct connection to indoor unit must be the same as the
connection size of indoor unit.
When the equivalent pipe length between outdoor and indoor units is 90 m or more, the size of the main pipes (both gas side and liquid side) must be increased.
Depending on the length of the piping, the capacity lay drop, but even in such a case it is possible to increase the size of the main pipes.
Gas side
RX(Y)Q5
15.9
RX(Y)Q8
19.1
RX(Y)Q10
22.2
RX(Y)Q12+14
28.6
RX(Y)Q16+18 +
28.6
RXYQ20+22
RXYQ24
34.9
RXYQ26~34
34.9
RXYQ36~54
41.3
Increase is not allowed
19.1
22.2
25.4(a)
31.8(a)
38.1(a)
Liquid side
RX(Y)Q5
9.5
RX(Y)Q8+10
9.5 12.7
RX(Y)Q12~16
12.7 15.9
RX(Y)Q18 +
15.9 19.1
RXYQ20~24
RXYQ26~54
19.1 22.2
Increase is not allowed
1
2
3
4
5
Outdoor unit
Main pipes
Increase
First refrigerant branch kit
Indoor unit
Note 1
R=
x0.18+
(
(
)
)
x0.37+
x0.12+
(
(
)
)
x0.26+
x0.059+
(
(
)
)
x0.022
d: 9.5x10 m
e: 9.5x10 m
f: 9.5x10 m
g: 6.4x10 m
h: 6.4x20 m
i: 12.7x10 m
j: 6.4x10 m
k: 6.4x9 m
R = [30x0.26]+[10x0.18]+[10x0.12]+[40x0.059]+[49x0.022] = 14.238
R = 14.2 kg
Allowable length after the rst refrigerant branch kit to indoor units is 40 m or less, however it can be extended up to 90 m if all the following conditions are fullled.
Required conditions
Example drawings
It is necessary to increase the pipe size between the rst branch kit and the nal branch kit. (Reducers
must be procured on site.) However, if the pipes are of the same pipe size as the main pipe there is no
need to increase the pipe size.
indoor unit 8:
b+c+d+e+f+g+p90 m
increase the pipe size
of b, c, d, e, f, g
For calculation of total extension length, the actual length of above pipes must be doubled. (except main
pipe and the pipes that not increase the pipe size)
a+b*2+c*2+d*2+e*2+f*2+g*2
+h+i+j+k+l+m+n+p1000 m
h, i, j....... p40 m
The difference between the distance of the outdoor unit to the farthest indoor unit and the distance of the
outdoor unit to the nearest indoor unit 40 m
6.4 9.5
9.5 12.7
12.7 15.9
15.9 19.1
19.1 22.2
22.2 25.4*
28.6 31.8*
34.9 38.1*
Note 2
2
3
b
A
i
1
l
4
f
E
j
2
m
5
H1
7 H2
1 Outdoor unit
2 Refnet joints
(a~g)
3 Indoor units (1~8)
19.1
41.3
Outdoor unit
capacity type
RX(Y)Q5
RX(Y)Q8
RX(Y)Q10
RX(Y)Q12~16
RX(Y)Q18 +
RXYQ20+22
RXYQ24
RXYQ26~34
RXYQ36~54
Choose from the following table in accordance with the outdoor unit total
capacity type, connected downstream.
Outdoor unit connection piping size
VRVIII
A
D
6-2
41
42
A
refnet header
(3 pipes)
1
2
3
1
2
3
4
(2 pipes)
4
Maximum
allowable
length
Allowable
height
p
B3
1 ~ 4
7 + 8
Cooling only
5 + 6
a
A
f
i
B2
B2
f
B3
h
B4
k
j
H1
B1
c
B2
e
B3
g
B4
i
B5
k
B6
m
H2
7 H2
1 ~ 6
Cooling only
7 + 8
Cooling only
H3
H3
a
A
H1
H2
B5
n
H1
B4
p
B3
B1
d
7 + 8
e
D
l
B1 g
H1
H2
1 ~ 6
REFNET joint (
H3
When multiple
outdoor units
installed
(REYQ18~...)
s H1
B5
n
B4
B1
d
B2
f
B3
h
B1
c
B2
e
B3
g
B4
i
B5
k
B6
m
H1
p
B
B4
k
j
H2
7 H2
8
1 ~ 6
1 ~ 4 , 7 + 8
1 ~ 6
7 + 8
Cooling only
5 + 6
Cooling only
7 + 8
Cooling only
Actual pipe
length
Equivalent
length
Equivalent pipe length between outdoor and indoor units 175 m (Assume equivalent pipe length of refnet joint to be 0.5 m and of the refnet header to be 1.0 m, that of BSVQ100 and BSVQ160 to be 4 m
and that of BSVQ250 to be 6 m (for calculation purposes)).
Total extension
Total piping length from outdoor unit* to all indoor units 300 m
length
Between outdoor branch
and outdoor unit (Only for
REYQ18 or more)
Actual pipe
length
Piping length from outdoor branch to outdoor unit 10 m. Approximately length: max. 13 m
Difference in
height
Difference in height between outdoor and indoor units (H1)50 m (40 m if outdoor unit is located in a lower position).
Difference in height between outdoor unit (main) and outdoor unit (sub) (H3)5 m
Difference in
height
Actual pipe
length
s
t
Pipe length from first refrigerant branch kit (either refnet joint or refnet header) to indoor unit 40 m
For refnet joints other than the first branch, select the proper branch kit model based on the total capacity
index.
[Example]
in case of refnet joint C; indoor units 5+6+7+8
Choose from the following table in accordance with the total capacity of all the indoor units connected below
the refnet header.
Note: 250 type cannot be connected below the refnet header.
KHRQ22M29H7
KHRQ23M64H7
KHRQ23M75H7
KHRQ22M64H7
How to choose an outdoor branch kit (needed if the outdoor unit capacity type is REYQ18 or more.)
Choose from the following table in accordance with the number of outdoor units.
[Example]
in case of refnet joint B; indoor units 7+8,
in case of refnet header; indoor units 1+2+3+4+5+6
B2
e
D
l
B1 g
One outdoor
unit installed
(REYQ8~16)
d
C
refnet joint
BS box
B1
6-3
indoor unit
C
A
C
B
D
C
19.1
41.3
34.9
R=
{(
Indoor
capacity
index
<62.5(*)
62.5x200
200x<290
290x<420
420x<640
640x<920
920
6.4
Indoor
capacity index
20, 25, 32,40, 50(*)
63, 80, 100, 125
200
250
12.7
6.4
15.9
19.1
22.2
9.5
x0.35+
x0.25+
x0.054+
x0.17+
Model
x0.022
x 1.15
x0.11
Amount of refrigerant
REYQ8~16
0 kg
REYQ18~32
3 kg
REYQ34~48
6 kg
Example for refrigerant branch using refnet joint and refnet header for REYQ34
If the outdoor unit is REYQ34 and the piping lengths are as below
a: 19.1x30 m
b: 15.9x10 m
c: 9.5x10 m
d: 9.5x10 m
e: 9.5x10 m
f: 9.5x10 m
g: 6.4x10 m
h: 6.4x20 m
i: 12.7x10 m
j: 6.4x10 m
k: 6.4x9 m
28.6
34.9
Outdoor
capacity index
REYQ18
REYQ20+22
REYQ24
REYQ26
Outdoor unit
capacity type
REYQ8
REYQ10
REYQ12
REYQ14+16
Choose from the following table in accordance with the total capacity
of all the outdoor units connected above this.
Outdoor unit
capacity type
REYQ8
REYQ10
REYQ12
REYQ14+16
REYQ18
REYQ20+22
REYQ24
REYQ26~34
REYQ36
REYQ38~48
6-3
43
6-4
Piping thickness
Piping diameter
6.4
9.5
12.7
15.9
19.1
22.2
28.6
34.9
41.3
6
:O
: annealed
1/2H
: half-hard
Material
O
O
O
O
1/2H
1/2H
1/2H
1/2H
1/2H
For half hard pipes the maximum allowed tensile stress is 61 N/mm2. For this reason the 0.2% proof strength
of the half hard pipe shall be minimum 61 N/mm2.
The bending radius is more than or equal to 3 times the diameter of the pipe.
44
EEDE06-2 07/2006
Printed in Belgium by Lannoo
Zandvoordestraat 300
B-8400 Ostend - Belgium
www.daikineurope.com
EEDE06-2~