Beruflich Dokumente
Kultur Dokumente
Students Name
Registration Number
Lecture
:
:
Program
Information Technology
Course
: Bachelors of
: System Analysis and
Design
Year
: 2rd
Semester
: 2rd
Assignment 1
Due Date
31 /8 /2012
step in this phase is Architecture design, it describes hardware and software infrastructure to be
used (Mumba, 2012)
Last phase of SDLC is implementation, this is when the system is either developed or purchased,
this phase consists of three steps where the first step is when the system is developed then tested
to make sure it performs as developed. After the system has been developed the next step is
installation, preparing to support the installed system, and the final step in implementation phase
is support plan (Mumba, 2012) .The implementation phase involves training users, installation of
the system in production setting and hand over of ownership of the software or application from
the project team to the performing organization.
During system development, a system analyst play a vital role, he helps the organization to
understand the challenges before them to make to make this transition and to ensure that the
needs and expectations of the client are represented correctly in the final solution (Anon., 2012)
REFERENCE
Bibliography
Anon., 2012. slideshare. [Online]
Available at: http://www.slideshare.net/infinityrulz/roles-responsibilities-of-system-analyst
[Accessed 30 August 2012].
Mumba, T., 2012. Bachelor of Information Technology. In: System Analysis and Design. s.l.:s.n.
Stair, R. M., 2008. Principals of Information Systems. 8th ed. s.l.:s.n.