REAGENT PREPARATION
VERTICAL BALL MILL
Absorber Area
Dewatering
Area
Reagent Preparation
Area
Limestone Jetty
And Conveyor
Reagent Preparation
Vertical Ball Mill
Reagent Preparation
Vertical Ball Mill
Reagent Preparation
Vertical Ball Mill
Limestone
Silo
Bin Activator
Limestone
Feeder
Mill
Hydroclone
Limestone
Pre-Crusher
Limestone Slurry
Storage Tank
Mill
Recirculation
Sump
Seawater
Vertical
Ball Mill
Mill Recycle
Pump
Mill Outlet
Sump
Tanjung Jati B Training
Reagent Preparation
Vertical Ball Mill
The function of Reagent Preparation is to
process raw limestone stored in the Limestone
Silos into a limestone slurry which is ultimately
stored in the Limestone Slurry Storage Tank.
Limestone Slurry, produced by the Vertical Ball Mills
and classified by the Hydroclones, will have a solids
content of 30%.
95% of those solids will pass through a 325 mesh
screen.
Reagent Preparation
Vertical Ball Mill
Limestone
Silo
95% of solids
through a 325 mesh screen
Bin Activator
Limestone
Feeder
Mill
Hydroclone
Limestone
Pre-Crusher
Limestone Slurry
Storage Tank
Mill
Recirculation
Sump
Seawater
30%
SOLIDS
Vertical
Ball Mill
Mill Recycle
Pump
Mill Outlet
Sump
Tanjung Jati B Training
Reagent Preparation
Vertical Ball Mill
The Limestone Slurry produced by the Reagent
Preparation System, by design, will have a
solids content of 30%.
Control of the Reagent Preparation System
is from the main control room. The system is
operated most efficiently as a batch process
with a constant design feed rate of limestone
to the vertical ball mills.
Reagent Preparation
Vertical Ball Mill
The Hydroclone is an integral part of the Reagent
Preparation system as well as being integral to the
operation of the Vertical Ball Mill.
Lets first take a look at the Vertical Ball Mill
components.
Reagent Preparation
Vertical Ball Mill
DRIVE
MOTOR
GEAR
REDUCER
RAW
MATERIAL
INLET
BALL FILL
MILL
RECIRCULATION
SUMP
TO MILL
OUTLET SUMP
SCREW
TO MILL
RECIRCULATION
PUMP
Reagent Preparation
Vertical Ball Mill
LOW LEVEL
SWITCH
SLURRY FEED
WASH CONNECTION
BALL
DISCHARGE
DRAIN
Reagent Preparation
Vertical Ball Mill
AIR
VENT
CLAMP
ASSY
AGITATOR
MOTOR
SLURRY
OUTLET
AGITATOR
BLADES
AGITATOR
(300 RPM)
Reagent Preparation
Vertical Ball Mill
RAW
MATERIAL
INLET
SLURRY OUTLET
TO RECIRC SUMP
VERTICAL BALL
MILL FLOW PATH
RECYCLE SLURRY
FROM RECIRC PUMP
Reagent Preparation
Vertical Ball Mill
Reagent Preparation
Vertical Ball Mill
An Oil Lubrication Unit is required for the operation
Ball Mills Gear Reducer. This Lube Oil Unit requires
a cooling water source and has instrumentation for
measuring oil flow, temperature and differential
pressure.
The source of cooling water is Service Water. The
cooling water exiting the Lube Oil Unit goes to
the drain (trench).
Reagent Preparation
Vertical Ball Mill
DUPLEX
FILTER
OIL
INLET
OIL
OUTLET
OIL
PUMP
FLOW
METER
MOTOR
DIFFERENTIAL
SWITCH
OIL
COOLER
THERMOMETER
(WITH SWITCH)
Reagent Preparation
Vertical Ball Mill
Prior to discussing the start-up of the Vertical Ball
Mill, lets look at the Alarms
Mill Trip
Recycle Pump Trip
Recirculation Sump Agitator Trip
Mill Liquid Level Low
Mill & Mill Motor Bearing & Winding Temperatures High
Mill Motor Current (amps) High
Gear Reducer Lube Oil Pump Trip
Gear Reducer & Bearing Temperatures High
Gear Reducer Lube Oil Flow Low
Gear Reducer Lube Oil Temperature High
Reagent Preparation
Vertical Ball Mill
The Reagent Preparation System is started in the
following sequence. Note, the Limestone Slurry
Storage Tank must be ready to receive slurry
1. Mill Outlet Sump, Agitator & Pump
2. Tower Mill System
Reagent Preparation
Vertical Ball Mill
The Reagent Preparation System is started in the
following sequence
3. Limestone Slurry Storage System
Slurry Storage Tank (Level not Hi-Hi)
Tank Agitator
Limestone Slurry Feed Pumps
Reagent Preparation
Vertical Ball Mill
We have discussed system alarms and the start-up
sequence, now lets look at the basic steps for starting
the Vertical Mill and related equipment
Please consult the O&M Manuals for the details for
starting and stopping the Vertical Mill and related
equipment.
Reagent Preparation
Vertical Ball Mill
Starting the Ball Mill System (Mill Outlet Sump)
Open the Mill Outlet Sump Recycle Valve
Close Sump Pump Common Discharge Valve
Open manual Feed Valve to the Hydroclone
Verify that the manual Flushing Valve to the
Hydroclone Overflow is closed
Verify that the manual seawater Flushing Valve is
closed
Reagent Preparation
SUMP VALVE
ARRANGEMENT
DURING START-UP
FEED
To Vertical Mill
Recirculating Sump
Mill
Hydroclone
To Limestone
Slurry Tank
Seawater Fill
From Vertical Mill
Recirculating Sump
(Flush Water)
C
O
C
Seawater Flush
C
C*
Pumps A & B
Reagent Preparation
Vertical Ball Mill
Starting the Ball Mill System (Mill Outlet Sump)
Place the Mill Outlet Sump Pump in Automatic
Place the Mill Outlet Sump Agitator in Automatic
Once Sump level is achieved, the Pump & Agitator
will start.
The Sump Pump discharge flow will remain in the
Recycle Mode until the entire mill system is in operation.
Reagent Preparation
FEED
To Vertical Mill
Recirculating Sump
Mill
Hydroclone
To Limestone
Slurry Tank
Seawater Fill
From Vertical Mill
Recirculating Sump
(Flush Water)
C
O
C
Seawater Flush
C
C
C
O
Pumps A & B
Reagent Preparation
Vertical Ball Mill
Starting the Ball Mill System (Hydroclone)
Verify that 4 of 5 Cyclone Isolation Valves are open
Mill Hydroclone Recycle Valve to manual and open
Open Sump Pump Common Discharge Valve
Close Mill Outlet Sump Pump Recycle Valve
Mill Hydroclone Recycle Valve to automatic
Reagent Preparation
MILL HYDROCLONE
IN THE
RECYCLE MODE
FEED
To Vertical Mill
Recirculating Sump
Mill
Hydroclone
To Limestone
Slurry Tank
Seawater Fill
From Vertical Mill
Recirculating Sump
(Flush Water)
C
O
C
Seawater Flush
O
C
O
O
Pumps A & B
Reagent Preparation
Vertical Ball Mill
4 of 5 Cyclones open
for normal operation
CYCLONES
CYCLONE
MILL HYDROCLONE
(PLAN VIEW)
MILL HYDROCLONE
Reagent Preparation
Vertical Ball Mill
OVERFLOW
INLET
MILL HYDROCLONE
UNDERFLOW
Tanjung Jati B Training
Reagent Preparation
CYCLONES
MILL
HYDROCLONE
or
CLASSIFIER
UPPER
LAUNDER
LOWER
LAUNDER
KREBS U.S.A.
Tanjung Jati B Training
Reagent Preparation
Vertical Ball Mill
Starting the Ball Mill System (Lube Oil Unit)
Verify Lube Oil Shutoff Valves are Open
Verify Cooling Water Shutoff Valve is Open
(Observe cooling water discharging into trench)
Start the Lube Oil Pump
Verify Lube Oil Flow is above minimum, temperature
below maximum and differential pressure below
maximum
Tanjung Jati B Training
Reagent Preparation
Vertical Ball Mill
DUPLEX
FILTER
OIL
INLET
OIL
OUTLET
OIL
PUMP
FLOW
METER
MOTOR
DIFFERENTIAL
SWITCH
OIL
COOLER
THERMOMETER
(WITH SWITCH)
Reagent Preparation
Vertical Ball Mill
Starting the Ball Mill System (Vertical Mill)
Verify Mill Flush & Drain Valves are closed
Seawater Flow Control Valve to manual and open fully
Open Seawater Make-Up Isolation Valve
If Mill is empty, open seawater isolation valve.
Fill Mill until water is seen overflowing into the
Mill Outlet Sump
Verify Seawater Valve to Mill Hydroclone Underflow
is open
Tanjung Jati B Training
Reagent Preparation
Vertical Ball Mill
MILL HYDROCLONE
O
O
SEAWATER
MAKE-UP
O
VERTICAL MILL
Reagent Preparation
Vertical Ball Mill
Starting the Ball Mill System (Vertical Mill)
Once water from the Mill Recirculating Sump is seen
discharging into the Mill Outlet Sump, the Mill can be
started (manually).
If the Mill is in Automatic, the Mill will start when the
level in the Mill Recirculating Sump is above the low
level (switch).
Reagent Preparation
Vertical Ball Mill
MILL HYDROCLONE
O
O
SEAWATER
MAKE-UP
O
VERTICAL MILL
Reagent Preparation
Vertical Ball Mill
Starting the Ball Mill System (Recycle Pump & Sump
Agitator)
Verify Mill Flush and Drain Valves are closed.
Verify Mill Recycle Pump Isolation Valves are open
Verify Mill Recycle Feed Valve is open
Place Pump & Agitator in automatic. Both will start
if the level within the Recirculating Sump is above
the minimum (low level switch)
Reagent Preparation
Vertical Ball Mill
TO MILL
OUTLET SUMP
MILL
RECIRCULATING
SUMP
MILL
RECYCLE PUMP
Tanjung Jati B Training
Reagent Preparation
Vertical Ball Mill
Starting the Ball Mill System (System Dust Collector)
Verify Instrument Air Isolation Valve is open
Verify Isolation Valves at the Mill and Limestone
Feeder are open
Start the Dust Collector
Verify Differential Pressure is not excessive
Reagent Preparation
Vertical Ball Mill
REAGENT PREPARATION
AREA DUST COLLECTOR
Reagent Preparation
Vertical Ball Mill
INSTRUMENT
AIR
O
FROM TOWER MILL A
C
FROM TOWER MILL B
O
FROM LIMESTONE FEEDER A
C
FROM LIMESTONE FEEDER B
Reagent Preparation
Vertical Ball Mill
Starting the Ball Mill System (Crusher, Feeder and
Bin Activator)
Pre-Crusher will start after a short time delay after
the Mill is started (automatic)
Verify Silo Discharge Gate Valve is open
Limestone Feeder will start after a short time delay
after the Pre-Crusher is started (automatic)
Bin Activator will start (if in automatic) when Feeder
is running and Gate Valve is open.
Reagent Preparation
Vertical Ball Mill
Limestone
Silo
Bin Activator
Slide Gate
Limestone
Feeder
Mill
Hydroclone
Limestone
Pre-Crusher
Limestone Slurry
Storage Tank
Mill
Recirculation
Sump
Seawater
Vertical
Ball Mill
Mill Recycle
Pump
Mill Outlet
Sump
Tanjung Jati B Training
Reagent Preparation
Vertical Ball Mill
When the Limestone Slurry Storage Tank Level
reaches the high level set point, the Mill Outlet
Sump Pump will stop.
When the Sump Pump Stops, this will stop the
following equipment if in automatic mode
Pre-Crusher Limestone Feeder Bin Activator
The Vertical Mill will remain in service for flushing
and proper shutdown (approximately 60 minutes).
Reagent Preparation
Vertical Ball Mill
SHUTDOWN ORDER
Limestone
Silo
Limestone
Feeder
(3)
Limestone
Pre-Crusher
(2)
Seawater
Vertical
Ball Mill
(5)
Mill
Hydroclone
Limestone Slurry
Storage Tank
Mill
Recirculation
Sump
Mill Recycle
Pump
High Level
Set Point
Mill Outlet
Sump Pump (1)
Tanjung Jati B Training
Reagent Preparation
Vertical Ball Mill
The Vertical Mill is required to operate or run for
60 minutes after the Mill Outlet Sump Pump has
stopped.
This is required so that the slurry within the Mill
will become finer (smaller) and not settle rapidly
if the Mill were shutdown earlier.
The Mill will shutdown automatically after 60 minutes
if the Mill is in Automatic.
Reagent Preparation
Vertical Ball Mill
The Mill Recycle Pump and Mill Recirculating Sump
Agitator will continue to operate and slurry will be
recycled back to the Vertical Mill.
It is recommended that the Vertical Mill be run for a
5-minute period every 4 hours. This will prevent the
compacting of ground limestone within the Mill.
Reagent Preparation
Vertical Ball Mill
TO MILL
OUTLET SUMP
MILL
RECIRCULATING
SUMP
MILL
RECYCLE PUMP
Tanjung Jati B Training
Reagent Preparation
Vertical Ball Mill
Emergency Shutdown of the Vertical Ball Mill
In case of emergency stop due to electrical failure
or other cause, the Mill is to be drained and washed
of all slurry to prevent the cementation of the hard
particles.
For next start-up, the Vertical Mill must be filled with
water until the water is seen overflowing into the Mill
Outlet Sump.
REAGENT PREPARATION
VERTICAL BALL MILL
(END)