Sie sind auf Seite 1von 16

www.antra.com.tr antra@antra.com.

tr

Lizbon Caddesi 29/8 06460 Asagi Ovecler/Ankara/TURKEY Phone : +90 312 472 50 90 Telefax: +90 312 472 50 89
www.antra.com.tr antra@antra.com.tr

CONTENTS
1

INTRODUCTION ................................................................................................. 3

FIELDS OF ACTIVITY ......................................................................................... 4

2.1

Energy Facilities

2.2

Dams and Weirs

2.3

Geotechnical Engineering & Ground Improvement

2.4

Infrastructure & Transportation Structures

2.5

Land & Water Resources

PROJECTS .......................................................................................................... 6
3.1

Final Design, Detailed Design and Consultancy Services

3.2

Consultancy, Feasibility Revision Studies and Others

6
12

Lizbon Caddesi 29/8 06460 Asagi Ovecler/Ankara/TURKEY Phone : +90 312 472 50 90 Telefax: +90 312 472 50 89
www.antra.com.tr antra@antra.com.tr

INTRODUCTION
ANTRA Engineering & Consultancy Limited, founded by five civil engineers, started its
journey in 4th quarter of year 2009, to reach the target of providing quality and reliable
engineering

solutions

by

means

of

blending the experience of its founders


with the enthusiasm of breathing a new
life into the engineering market.
Producing

tailor

made

solutions

for

engineering problems requires existence


of high concentration, sound engineering
background and up-to-date know how of
all related disciplines involved. ANTRA's
mission in the contracts undertaken is
to

search

for

state

of

the

art

Gemciler Weir, view from downstream


Gemciler Weir is designed by ANTRA for Serka Construction Company, which
is a subsidiary of Adal Holding

engineering practices for provision of technically reliable, sustainable and economical


engineering

solutions.

Sound

cooperation

established

with

the

Clients,

strong

communication abilities and devotion to corporate procedures are keys of ANTRA for
reaching to the targets set.
Since ANTRA founders have participated as
design

engineer,

project

manager

and

coordinator for more than 10 years in many


multi-national

and

large

scale

engineering

projects; ANTRA has high-level experience, on


contrary to the youtfulnness of the company, in
engineering
international

and

management

projects.

of

Rising

complex
on

this

experience, ANTRA contracted and compeleted

Kotanl Dam & HEPP Project, general view of Arch RCC dam
body and 50 MWe power plant from downstream

feasibilities, final and detailed designs for many

ANTRA is reponsible for final & detailed design works of the


power plant and detailed design works for all remaining structures

energy facilities. Among the completed/ongoing


projects

till

foundation

of

the

company,

following can be listed:


preparation of feasbility, final design (including electrical and mechnical installations
and hydromechanical design) and detailed design (including hydromechanical
design) for run-off river and storage type hydroelectric schemes, with both free
flow and pressurized conveyance lines,
design services for dams, small ponds and irrigation systems,
geotechnical consultancy services and designs for ground improvement,
various

consultancies

for

checking

structural/hydraulic

design

of

various

engineering structures and for electromechanical and hydro-mechanical equipment


for hydropower schemes

DEC / 2014

Lizbon Caddesi 29/8 06460 Asagi Ovecler/Ankara/TURKEY Phone : +90 312 472 50 90 Telefax: +90 312 472 50 89
www.antra.com.tr antra@antra.com.tr

FIELDS OF ACTIVITY
ANTRA, by basing on its background, is providing engineering and consultancy services
within the following fields:
Energy Facilities
Dams and Weirs
Infrastructure and Transportation Structures
Geotechnical Engineering and Ground Improvement
Planning and Development of Land and Water Reources
In addition to preparation of planning studies, feasibility reports, final design and detailed
(application)

design,

technical

specifications,

tender

documents

and

carrying

out

consultancy services during the tendering stage (selection of Contractors) in the above
fields; ANTRA is also providing services for preparation of loan application reports and duediligence reports especially for energy investments.
2.1 Energy Facilities
Although the services of ANTRA regarding energy facilities are mainly concentrated in
hydropower, its range is not limited to that and covers wind and thermal power plants as
well.
While serving in a wide spectrum in hydropower projects for determination of hydroelectric
potential of a site, dimensioning of structures and preparation of profitability analyses
(benefit/cost ratios, internal rate of return), preparation of feasibility and loan application
reports, final design and detailed design and provision of consultancy services for selection
of Contractors; ANTRA's scope for wind energy facilities are limited to detailed design
phase such as design of roads and auxiliary structures (culverts, bridges, etc.),
foundations for wind farms and structural designs of auxiliary structures. For thermal
power plants, ANTRA can provide detailed design engineering services for various
steel/reinforced concrete structures under the guidance of the final designer and full
designs for waste (ash or any other) storage dams, drainage and cooling water lines, etc.
2.2 Dams and Weirs
ANTRA has vast experience in the design of storage (dams) and diversion (weirs) facilities
which play an important role for use, control and management of water resources as per
requirements. In addition to dams and weirs constructed for the purpose of power
generation, there are various other dams and weirs constructed for domestic/industrial
water supply, irrigation, flood detention and waste storage in mining industry.
With a team of engineers specialized in computer aided analysis and design, ANTRA is
providing all engineering/consultancy services ranging from planning to commissioning for

DEC / 2014

Lizbon Caddesi 29/8 06460 Asagi Ovecler/Ankara/TURKEY Phone : +90 312 472 50 90 Telefax: +90 312 472 50 89
www.antra.com.tr antra@antra.com.tr

concrete and fill (clay-core, CFRD and concrete face gravel dams, RCC) type of dams; for
concrete, gated and Tyrolean type of weirs and for both's auxiliary structures (spillway,
diversion tunnel/channel, cofferdams, sluiceways, etc.).
In projects where special design is required, ANTRA is capable of modelling dam,
appurtenant hydraulic structures and even the fluid (water) in 3D.
2.3 Geotechnical Engineering & Ground Improvement
Proper geotechnical and foundation design considering the loadings of construction and
operational phases of a facility are being carried out by ANTRA. Design of appropriate and
economical

solutions

for

load

bearing,

settlement

and

seepage

problems

of

foundations/structures are designed by our experts.


Ground improvement techniques designed by ANTRA cover well-known and proven
supporting and reinforcing techniques such as piles, mini piles, ground anchors, stone
column and jet-grout.
2.4 Infrastructure & Transportation Structures
Increase of quality of life and sensitivity towards environmental issues raised expectations
and demands for urban infrastructure. Clean, healthy and abundant water supply &
distribution, and disposal of waste water, sewerage and solid wastes in an environmental
friendly manner are the most important of these demands. Transmission lines, city
reservoirs and distribution networks, waste water and storm water networks, pumping
stations, potable and waste water treatment plants constructed to meet modern urban
infrastructure requirements are among the facilities designed and supervised by ANTRA.
ANTRA is also performing designs for service roads, access roads and relocation roads,
bridges, tunnels and other appurtenant structures that may be required within the scope
of dam and weir projects carried out.
2.5 Land & Water Resources
Appropriate and sustainable management of land and water resources became more
important by global warming issue and increasing drought. Proper planning and
management of water and land resources can only be implemented by appropriate
planning of engineering facilities and taking into account the ecological demands.
With its staff specialized in the fields of water resources and hydraulic engineering, ANTRA
provides

all

engineering

and

consultancy

services

from

reconnaissance

study

to

commissioning for all sort of power generation, irrigation, drainage, flood protection and
sediment control and water supply (covering facilities like pumping stations, treatment
plants, flood protection structures) projects aiming to develop land and water resources.
5

DEC / 2014

Lizbon Caddesi 29/8 06460 Asagi Ovecler/Ankara/TURKEY Phone : +90 312 472 50 90 Telefax: +90 312 472 50 89
www.antra.com.tr antra@antra.com.tr

PROJECTS
ANTRA completed various final design, detailed design, due-diligence and feasibility
studies for more than 20 projects since its establishment and still continues to provide the
same for many other projects. Founders of ANTRA contributed as design engineer, deputy
project manager, project manager and coordinator for many internationally carried out
large scale engineering projects such as Ermenek Dam and HEPP Project (218 m high
double curvature thin arch dam, 300 MWe power plant, tunnel spillways, ~10 km long TBM
driven pressure tunnel) and Erik Weir and HEPP Scheme (as part of Ermenek Project),
Hakkari Dam and HEPP, Doanl Dam and HEPP and ukurca Dam and HEPP. In addition to
these projects, many national scale projects such as Kkaksu Dam and HEPP (CFGD
body), Kale Dam (CFRD body), Aslanck Dam and Arkun Dam (CFRD body) were
contributed as well. ANTRA founders are also experienced on Indian Projects as they acted
as design coordinator/manager within international consortiums during the biddin stages
of Kishanganga HEPP Proejct, Pakal Dul Project, Tehri HE Pumped Storage Project, Lata
Tapovan HEPP, Rammam Stage III HEPP and Khasiyabara-Rupsiabagar HEPP Projects.
Majority of ANTRA's current portfolio is composed of final and detailed design works
carried out for private energy companies. In addition to these relatively long term
projects, short-duration consultancies and engineering services such as development of
alternative schemes, feasibility revision and preparation of due-diligence reports are also
forming ANTRA's business scope.
Within the short duration since establishment, national and international scale companies
like SKEN (skenderun Enerji), alk Enerji, Adal Holding, Yksel naat, Bereket
Enerji, Ata naat, nal naat, Sargn naat and Energo-Pro tasted the service
quality of ANTRA.
Brief information about ANTRA's currently running and completed projects are provided in
the following pages.

3.1 Final Design, Detailed Design and Consultancy Services


Data for projects, in which ANTRA is providing final and detailed design (and in some cases
also feasibility revision) services, are listed below.

DEC / 2014

Lizbon Caddesi 29/8 06460 Asagi Ovecler/Ankara/TURKEY Phone : +90 312 472 50 90 Telefax: +90 312 472 50 89
www.antra.com.tr antra@antra.com.tr

Kotanl Dam & HEPP Project


Location

: Hanak, Ardahan

Installed Cap.

: 50 MWe

Dam Body

: Arch RCC

Type

: Storage facility

Conveyance

: Penstock

Status

: Almost completed (ANTRA's


scope is final and detailed design
works for power plant and only
detailed
design
for
other
structures. In addition, ANTRA
carried out the full hydro mechanical and electrical final design works for all
structures)

Client

: EBD retim ve Ticaret A..

(nal naat)

Pamukluk Dam and HEPP Project


(Only Energy Facilities)
Location

: Tarsus, Mersin

Installed Cap.

: 16 MWe

Dam Body

: CFRD

Type

: Storage facility

Conveyance

: Penstock of bottom outlet

Status
: Feasibility revision is
completed, Final Design is under progress
Client

: Nassan Elektrik retim Ltd. ti.

Yaylm Pond & Irrigation


Location

: Kse, Gmhane

Height of Dam

: ~35 m

Dam Body

: Rockfill

Irrigation Area : ~435 ha


Status

: All final and detailed design of


structures are completed

Client

: Serkan+Serbil naat
Ortakl
(Official bidding of DSI Trabzon
Regional Directorate)

Gksu Weir & HEPP Project


Location

: Mudurnu, Bolu

Installed Cap.

: 16,562 MWe

Dam Body

: Radial gated weir

Type

: Run-off river scheme

Conveyance
channel+tunnel

: Free flow open


(~12500 m)

Status

: Almost completed

Client

: TEK-EN Enerji r.A..

DEC / 2014

Lizbon Caddesi 29/8 06460 Asagi Ovecler/Ankara/TURKEY Phone : +90 312 472 50 90 Telefax: +90 312 472 50 89
www.antra.com.tr antra@antra.com.tr

Orhaneli Thermal Power Plant Ash Storage


Dam
Location

: Orhaneli, Bursa

Dam Body

: Zoned earthfill

Type

: Ash Storage Dam

Status

: Completed

Client

: Sistem Elektromekanik Tesisler A..


(official bidding of Turkish Electricity
Generation Company, EA)

Bekar Irrigation Project


ANTRA's scope is limited drainage channels within the
project.
Location

: Altnta, Ktahya

Channel Length

: 35 km

Channel Type

: Trapezoidal, b=60 m, h=5 m

Status

: Completed

Client

: Sistem Elektromekanik Tesisler A..


(Official bidding of DSI Eskiehir
Regional Directorate)

Readiye HEPP Project


Assessment of Energy Generation
Location

: Readiye, Tokat

Installed Cap.y : Cascade system of totally three plants


in operation
2 x 7,73 = 15,46 MWe
2 x 13,08 = 26,16 MWe
2 x 11,155 = 22,31 MWe
Type

: Run-off river, cascade of 3 projects

Conveyance

: Free flow open channel and tunnel

Scope

: Energy generation of Readiye HEPP Schemes, which are located downstream of


Klkaya and amlgze Dams, were assessed by simulating the upstream dams
using daily inflows. Addition of a reservoir to the most upstream scheme is also
simulated.

Status

: Completed.

Client

: Energo-Pro (originally from Czech Republic)

DEC / 2014

Lizbon Caddesi 29/8 06460 Asagi Ovecler/Ankara/TURKEY Phone : +90 312 472 50 90 Telefax: +90 312 472 50 89
www.antra.com.tr antra@antra.com.tr

Gemciler Weir & HEPP Project


Location

: Glba, Adyaman

Installed Cap.

: ~7,50 MW

Body

: Gated Weir

Type

: Run-off river

Conveyance

: Free flow conduit (2100 m)

Status

: Completed

Client

: Adal Holding (Laskar Enerji)

Deirmen Weir & HEPP Project


Location

: Maka, Trabzon

Installed Cap.

: 13 MW

Body

: Concrete Gravity (22 m high)

Type

: Storage facility

Conveyance

: Penstock (2700 m)

Status

: Completed

Client

: KAS Enerji

Zala Weir & HEPP Project


Location

: Ara, Kastamonu

Installed Cap.

: 5,27 MW

Body

: Radial gated weir

Type

: Run-off river

Conveyance

: Free flow
Trapezoidal Channel
(9846 m)

Status

: Completed

Client

: Ahmet Hakan
Elektrik retim A..

DEC / 2014

Lizbon Caddesi 29/8 06460 Asagi Ovecler/Ankara/TURKEY Phone : +90 312 472 50 90 Telefax: +90 312 472 50 89
www.antra.com.tr antra@antra.com.tr

Samatlar Weir & HEPP Project

Weir site

Location

: Ara, Kastamonu

Installed Cap.

: 5,57 MW

Body

: Radial gated weir

Type

: Run-off river

Conveyance

: Free flow Trapezoidal Channel (12783 m)

Status
in progress

: Final design completed, detailed design

Client

: RAK Enerji retim A..

Kuzkaya 1 Weir & HEPP Project


Location

: Ara, Kastamonu

Installed Cap.

: 3,36 MW

Body

: Gated weir

Type

: Run-off river

Conveyance

: Free flow Trapezoidal Channel (5970 m)

Status

: Feasibility revision completed

Client

: Murat Kaan Elektrik retim A..

Kuzkaya 1 weir site

Kuzkaya 2 Weir & HEPP Project

Powerhouse area and


penstock alignment

Location

: Ara, Kastamonu

Installed Cap.

: 2,70 MW

Body

: Gated weir

Type

: Run-off river

Conveyance

: Free flow Trapezoidal Channel (3460 m)

Status

: Feasibility revision completed

Client

: Murat Kaan Elektrik retim A..

Kadahor Weir & HEPP Project

Weir site and portal of


conveyance tunnel

Location

: Maka, Trabzon

Installed Cap.

: 9,36 MW

Body

: Gated weir

Type

: Run-off river

Conveyance

: Free flow tunnel (3150 m)

Status

: Completed

Client

: Arsin Enerji ve D Ticaret A..

Murat Weir & HEPP Project

Weir site

Location

: Ilca, Erzurum

Installed Cap.

: 3,648 MW

Body

: Radial gated weir

Type

: Run-off river

Conveyance

: Free flow conduit

Status

: Feasibility revision completed

Client

: Nur Enerji Elk. Taah. San. Tic. Ltd. ti.

10

DEC / 2014

Lizbon Caddesi 29/8 06460 Asagi Ovecler/Ankara/TURKEY Phone : +90 312 472 50 90 Telefax: +90 312 472 50 89
www.antra.com.tr antra@antra.com.tr

ay Weir & HEPP Project


Location

: Espiye, Giresun

Installed Cap.

: 10,05 MW

Body

: 2 Weirs, Radial Gated

Type

: Run-off river

Conveyance

: Pressurized Power Tunnel (5073 m)

Status

: Almost completed

Client

: Mart Enerji retim A..

Grgen Weir & HEPP Project


Location

: Aybast, Ordu

Installed Cap.

: 7,732 MW (total of 2 schemes)

Body

: 2 Weirs, Radial gated

Type

: Run-off river

Conveyance
~4210 m)

: Free flow tunnel (totally

Status

: Feasibility revision completed

Client

: Sargn naat (19 MAYIS ENERJ)

Mengel Weir & HEPP Project


Location

: Ptrge / Malatya

Installed Cap.

: 7,26 MW

Body

: 2 Weirs, Sluice Gated

Type

: Run-off river

Conveyance

: Pressurized penstock (4250 m)

Status
: Final design completed, detailed
design in progress
Client

: nka Enerji retim Ltd. ti.

Yakack Weir & HEPP Project


Location

: Payas, Hatay

Installed Cap.

: 11,41 MW

Body

: Sluice Gated Weir

Type

: Run-off river

Conveyance

: Free flow tunnel (totally ~4200 m)

Status

: Final design in progress

Client

: Beyda Enerji ret. ve Ticaret A..

11

DEC / 2014

Lizbon Caddesi 29/8 06460 Asagi Ovecler/Ankara/TURKEY Phone : +90 312 472 50 90 Telefax: +90 312 472 50 89
www.antra.com.tr antra@antra.com.tr

3.2 Consultancy, Feasibility Revision Studies and Others


Ongoing and completed consultancy, feasibility study and other short duration tasks are
summarized below.
Tekkale Weir & HEPP Project
Weir site on tributary
branch

Location

: Yusufeli, Artvin

Scope

: Various alternative schemes


covering 1 Weir/2 Weir solutions and
different conveyance lines were
examined.

Installed Cap.

: ~10 MW

Body

: Gated Weir (2 weirs)

Type

: Run-off river

Conveyance

: Free flow tunnel (~5000 m)

Status

: Completed (Due-Diligence)

Client

: Yksel naat A..

Ground Improvement for Dzce Aksu HEPP


Location

: Aksu, Dzce

Scope

: Pile design for the power plant foundation to be constructed on clayey soil

Status

: Completed

Client

: Bereket Enerji retim A..

Ayas Thermal Power Plant Assessment of Surface Excavations


Location

: Yumurtalk, Adana

Scope

: Assessment of excavation classes (totally 4,5 hm3 surface excavation) and


evaluation of the dispute between the Client and the Contractor as per contractual
items

Status

: Completed

Client

: SKEN

Relocation Roads of Deriner Dam - Walls of D22 Zone


Location

: Artvin

Scope

: Detailed design of D22 zone walls for the relocation roads constructed within the
scope of Deriner Dam project

Status

: Completed

Client

: Sistem naat

Filiz Weir & HEPP Project


Location

: kizdere, Rize

Scope

: Preparation of revised feasibility report

Installed Cap.

: 12,93 MW

Body

: Gated weir with daily storage

Type

: Run-off river

Conveyance

: Free flow box and tunnel (1125 m)

Status

: Completed

Client

: Ay-Yldz Enerji retim ve Tic. Ltd. ti.

12

DEC / 2014

Lizbon Caddesi 29/8 06460 Asagi Ovecler/Ankara/TURKEY Phone : +90 312 472 50 90 Telefax: +90 312 472 50 89
www.antra.com.tr antra@antra.com.tr

Akasya Weir & HEPP Project


Location

: Grele, Giresun

Scope

: Preparation of revised feasibility report

Installed Cap.

: 3,740 MW

Body

: Gated weir with daily storage

Type

: Run-off river

Conveyance

: Free flow tunnel (2000 m)

Status

: Completed

Client

: Ay-Yldz Enerji retim ve Tic. Ltd. ti.

Aksu Dam & HEPP Project


Location

: spir, Erzurum

Installed Cap.

: 160 MW

Body

: CFRD

Type

: Dam (storage facility)

Conveyance

: Pressure Tunnel

Status

: Completed

Scope

: Control and assessment of hydro mechanical and electromechanical design and


electrical-mechanical installations design

Client

: alk Enerji Elektrik retim A..

Kzkayas Dam and HEPP Project


Location

: Mustafakemalpaa, Bursa

Installed Cap.

: 112 MW

Body

: CFRD (h=165,0 m, from foundation)

Type

: Dam (storage facility)

Conveyance

: Pressure Tunnel

Status

: Completed

Scope

: Control and assessment of hydro mechanical and electromechanical design and


electrical-mechanical installations design

Client

: alk Enerji Elektrik retim A..

Karlyayla Weir & Readiye 3 HEPP, Conveyance Tunnel Rehabilitation Project


Location

: Readiye, Tokat

Scope

: Assessment structural damages occurred in the lining of conveyance tunnel and


rehabilitation suggestions

Status

: Completed

Client

: Hitit Sanayi naat ve Tic. Ltd. ti. (Owner: EnergoPro)

Uak Wind Farm Power Plant, Design of Foundations


Location

: Banaz, Uak

Scope

: Design of wind farm towers foundations, which are 80 m high

Status

: Completed

Client

: Bereket Enerji retim A..

13

DEC / 2014

Lizbon Caddesi 29/8 06460 Asagi Ovecler/Ankara/TURKEY Phone : +90 312 472 50 90 Telefax: +90 312 472 50 89
www.antra.com.tr antra@antra.com.tr

obanl Weir & HEPP Project


Location

: Glova, Sivas

Scope

: Preparation of revised feasibility report

Installed Cap.

: 19,03 MW

Body

: Gated Weir

Type

: Run-off river

Conveyance

: Free flow tunnel (2331 m) and conduit (505 m)

Status

: Completed

Client

: HDRO-D Hidroelektrik Enerji retim A.. (Yksel naat A..)

Uurlu Weir & HEPP Project


Location

: Glky, Ordu

Scope

: Preparation of revised feasibility report

Installed Cap.

: 8,78 MW

Body

: Gated Weir

Type

: Run-off river

Conveyance

: HDPE free flow pipe (3605 m) and tunnel (1806 m)

Status

: Completed

Client

: TEK SU Mavirlik Enerji Mhendislik San. ve Tic. A.. (Ata naat)

Meryemana Weir & HEPP Project


Location

: Maka, Trabzon

Scope

: Preparation of revised feasibility report

Installed Cap.

: 3,81 MW

Body

: Gated Weir

Type

: Run-off river

Conveyance

: Pressurized GRP Pipe (2105 m)

Status

: Completed

Client

: Ay-Yldz Enerji retim ve Tic. Ltd. ti.

Melet Energy Group Projects


Location

: Mesudiye, Ordu

Scope

: Preparation of revised feasibility report

Installed Cap.

: 8,893 MW (Stage 1), 9,246 MW (Stage 2), 4,728 MW (Stage 3)

Body

: RCC Dam (Stage 1), Gated Weir (Stages 2 and 3)

Type

: Storage facility (Stage 1) and Run-off river (Stages 2 and 3)

Conveyance

: Pressure Tunnel (2845 m), Stage 1


Free flow tunnel (5183 m) and conduit (1470 m), Stage 2
Free flow open channel (2710m), Stage 3

Status

: Completed

Client

: Akyurt Enerji retim A..

14

DEC / 2014

Lizbon Caddesi 29/8 06460 Asagi Ovecler/Ankara/TURKEY Phone : +90 312 472 50 90 Telefax: +90 312 472 50 89
www.antra.com.tr antra@antra.com.tr

Karaku Weir & HEPP Project


Location

: Niksar, Tokat

Scope

: Preparation of revised feasibility report

Installed Cap.

: 4,72 MW

Body

: Concrete gravity

Type

: Run-off river

Conveyance

: Free flow box section (5707 m)

Status

: Completed

Client

: Nisan Elektromekanik Enerji San. ve Ticaret A.. (Ata naat)

zdil Weir & HEPP Project


Location

: Yomra, Trabzon

Scope

: Preparation of revised feasibility report

Installed Cap.

: 1,410 MW (Stage 1), 2,478 MW (Stage 2) and 4,728 MW (Stage 3)

Body

: Gated Weir (All Stages)

Type

: Run-off river (All Stages)

Conveyance

: Free flow tunnel (1535 m-Stage 1, 1876 m-Stage 2, 3438 m-Stage 3)

Status

: Completed

Client

: Ay-Yldz Enerji retim and Tic. Ltd. ti.

Gkta Dam and HEPP


Location

: Seyhan River, Adana

Scope

: Preparation of updated inflows to the reservoir and flood hydrology review

Status

: Completed

Client

: Bereket Enerji retim A..

Uzunburun Weir and HEPP Project


Location

: Yenice, Karabk

Scope

: Preparation of revised feasibility report and preparation of Due-Diligence Report

Installed Cap.

: 18,017 MW

Body

: Gated Weir

Type

: Run-off river

Conveyance

: Free flow tunnel and open channel (total 9650 m)

Status

: Completed

Client

: S.H. Enerji Elektrik retim ve Ticaret A.. (Yksel naat A..)

ncirli Weir and HEPP Rehabilitation of Surge Tank


Location

: kizdere, Rize

Scope

: Hydraulic and structural re-design of 18 m diameter reinforced concrete surge


tank, which cracked and overflowed during commissioning tests

Type

: Run-off river

Conveyance

: Pressure tunnel (~6000 m)

Status

: Completed

Client

: Adal Holding (Laskar Enerji)

15

DEC / 2014

Lizbon Caddesi 29/8 06460 Asagi Ovecler/Ankara/TURKEY Phone : +90 312 472 50 90 Telefax: +90 312 472 50 89
www.antra.com.tr antra@antra.com.tr

Aksu Dam and HEPP


Location

: spir, Erzurum

Scope

: ANTRA was asked to develop an alternative spillway design of the project, which
is being designed originally by another designer. Design discharge of spillway is
more than 4000 m3/s and it is radial gated. ANTRA developed alternative energy
dissipating solutions as well.

Type

: Storage facility

Status

: Completed

Client

: alk Enerji

Karakaya Weir & HEPP Project


Location

: Maka, Trabzon

Installed Cap.

: 8,51 MW

Body

: Concrete gravity 3 weirs

Type

: Run-off river

Conveyance

: Free flow tunnel (3126 m)

Status

: Feasibility revision is completed

Client

: KAS Enerji

Readiye HEPP-3 Project


Location

: Readiye, Tokat

Scope

: Hydraulic and structural design of a side spillway and chute structure on the
existing conveyance line (trapezoidal channel) located between Karlyayla Weir
and HEPP-3

Type

: Run-off river

Status

: Completed

Client

: Energo-Pro Gney Elektrik retim ti.

Saray HEPP Project


Location

: kizdere, Rize

Scope

: Hydraulic and structural review of surge tank

Type

: Run-off river, pressure tunnel

Status

: Completed

Client

: Adal Holding

Powerhouse Access Bridge (Aksu HEPP Project)


Location

: Ptrge, Malatya

Scope

: Hydraulic and structural design

Type

: 2x12,5 m Span and 2 Lanes Access Bridge

Status

: Completed

Client

: Asr Enerji

16

DEC / 2014