STANDARD METHOD STATEMENT FOR CONCRETE REPAIR
D.
E.
Page 2 of 4
Project: xxx
STANDARD METHOD STATEMENT FOR CONCRETE REPAIR
SURFACE CRACK
42. Cut V-groove of minimum depth of 10mm to 20mm along the crack line.
43. Clean the groove with brush and ensure it is free from dust.
44. The final surface should be damp to ensure good bonding with the new concrete.
45. Patch the repair area with the approved non-shrink material.
REPAIR MATERIALS
Page 3 of 4
Project: xxx
STANDARD METHOD STATEMENT FOR CONCRETE REPAIR
2.
3.
Quickseal 510
2.
Davco Polycrete
2.
3.
Quickseal 516