Beruflich Dokumente
Kultur Dokumente
KARIMNAGAR
KARIMNAGAR
KARIMNAGAR
KORUTLA
MALLAPUR
Estimate cost
Rs.
114.33 Lakhs
SSR 2010-11
PANCHAYAT RAJ ENGINEERING DEPARTMENT
GENERAL ABSTRACT
Model bridge estimate 6 vent 6.00 m span , 8 vent 6.00 m span
114.33 Lakhs
Desription
Amount
PART - A
1
4639833
6013423
Add 4% VAT
10653256
180897
11260283
DY.EXECUTIVE ENGINEER
PIU SD KORUTLA
112603
60114
PART - A TOTAL
ASST.ENGINEER
PIU SD KORUTLA
426130
11433000
EXECUTIVE ENGINEER
PIU DIVN. KARIMNAGAR
SUPERINTENDING ENGINEER
PR KARIMNAGAR
*****
I have inspected the bridge site along with above mentioned officers
Recommandations:
The Field staff is hereby directed to prepare the Detailed Estimate as per the above provisions immediately.
Minor Bridge
Individual Foundation
7.50 mts
5) Coefficient of Rugosity
0.033
SUPERINTENDING ENGINEER
PR CIRCLE KARIMNAGAR
TO,
1). The Executive Engineer, PIU P.R.Division, Karimnagar
2). Copy to The Dy.Executive Engineer, PIU P.R.S.D., Korutla
3). Copy to The Dy.Executive Engineer, PR QC & Vig., SD Karimnagar.
4). Copy Submitted to the Chief Engineer (P.R.),, Hyderabad.
3 / 32
Sl.
No.
Description
(1)
(2)
1 60-63 mm IRC HBG Metal
Quarry
Lead in
KM
Initial
Cost
Conveyance
Charges
Blasting
charges
(3)
Kondagattu
(4)
75.00
(5)
360.00
(6)
596.40
(7)
70.00
Add 25%
extra for
machine
crushing
(8)
Total
Deduct
amount Convea
for
excluding
ynce
Remarks
stockin
conveyan chargs
g
ce
(9)
(10)
430.00
(11)
596.40
(12)
Kondagattu
75.00
390.00
596.40
70.00
460.00
596.40
Kondagattu
75.00
500.00
596.40
70.00
570.00
596.40
Kondagattu
75.00
830.00
596.40
70.00
900.00
596.40
Kondagattu
75.00
950.00
596.40
70.00
1020.00
596.40
Kondagattu
75.00
500.00
596.40
70.00
125.00
695.00
596.40
Kondagattu
75.00
830.00
596.40
70.00
207.50
1107.50
596.40
Kondagattu
75.00
950.00
596.40
70.00
237.50
1257.50
596.40
792.50 WBMM
Kondagattu
75.00
690.00
596.40
70.00
172.50
932.50
596.40
851.25 WMM
10
Kondagattu
75.00
560.00
596.40
70.00
140.00
770.00
596.40
688.75 WMM
11
Kondagattu
75.00
430.00
596.40
70.00
107.50
607.50
596.40
12
Kondagattu
75.00
260.00
596.40
70.00
65.00
395.00
596.40
13
Kondagattu
75.00
500.00
596.40
70.00
125.00
695.00
596.40
14
Kondagattu
75.00
844.00
596.40
70.00
211.00
1125.00
596.40
15
Kondagattu
75.00
688.00
596.40
70.00
172.00
930.00
596.40
16
Kondagattu
75.00
560.00
596.40
70.00
140.00
770.00
596.40
17
Kondagattu
75.00
236.00
596.40
236.00
596.40
18
Gravel
Local
6.00
50.50
66.00
50.50
66.00
1020.00
501.25 Gr.II
19
20
21
22
23
24
25
ASST.ENGINEER
PIU SD
PIU SD
DY.EXECUTIVE ENGINEER
PIU DIVN.
PR
EXECUTIVE ENGINEER
SUPERINTENDING ENGINEER
220.00
70.00
35568.92
25989.68
26584.66
2900.00
33000.00
117.60
117.60
Data Sheet
RATE ANALYSIS
0
Model bridge estimate 6 vent 6.00 m span , 8 vent 6.00 m span
S. No.
Index
Code
RBREECD4
Description of item
Unit
Qty
Rate
Amount
a)
Labour
Mazdoor (Unskilled)
b)
day
1.04
196.00
203.84
hour
1.67
1,808.50
3020.20
hour
4.50
629.80
2834.10
hour
0.50
1,081.19
540.60
hour
4.00
345.00
1380.00
hour
2.00
345.00
690.00
1.00
1704.60
1704.60
Machinery
hour
10373.34
1867.20
12240.54
-414.93
11825.61
RBRSBBS2
118.26
Page 3 of 32
Data Sheet
S. No.
Index
Code
Description of item
Unit
Qty
Rate
Amount
b)
c)
Labour
Mazdoor (Skilled)
day
2.40
196.00
470.40
Mazdoor (Un-Skilled)
day
8.00
196.00
1568.00
hour
6.00
1704.60
10227.60
hour
5.00
345.00
1725.00
hour
12.00
345.00
4140.00
hour
12.00
345.00
4140.00
cum
237.60
50.50
11998.80
cum
122.40
70.00
8568.00
Machinery
Material
Well graded granular sub-base material as per
table 400.2
Cost of materials
42837.80
a)
142.79
c)
25.70
142.79
162.78
cum
0.79
66.00
52.27
cum
0.41
117.60
47.98
RBRCCPV5
-5.71
263.03
Page 4 of 32
Data Sheet
S. No.
Index
Code
Description of item
Unit
Qty
Rate
Amount
Unit = cum
Taking output = 75cum (172.50 t)
(100x3.75 x 0.200)
a)
b)
Labour
Mason (1st class)
Mason (2nd class)
Mazdoor (unskilled)
Mazdoor(skilled)
Surveyor
Mazdoor (semi-skilled)
Black smith for cutting of dowel bars including
removal of burrs, fabrications & fixing of dowel
bars
Machinery
c)
(I)
day
day
day
day
day
day
day
5.00
5.00
150.00
6.00
2.00
6.00
1.00
258.00
237.00
196.00
196.00
237.00
196.00
237.00
1290.00
1185.00
29400.00
1176.00
474.00
1176.00
237.00
Hour
36.00
345.00
12420.00
Hour
Hour
Hour
Hour
Hour
9.00
9.00
9.00
5.00
2.00
0.00
40.00
40.00
345.00
370.00
0.00
360.00
360.00
1725.00
740.00
Cum
Cum
44.55
22.95
1125.00
770.00
50118.75
17671.50
Page 5 of 32
Data Sheet
S. No.
Index
Code
Description of item
Unit
Qty
Rate
Amount
(ii)
cum
33.75
220.00
7425.00
(iii)
(iv)
(v)
t
sqm
24.375
412.5
2900.00
15.00
70687.50
6187.50
Kg
117.6
33.00
3880.80
0.005
35568.92
177.84
Litre
19.00
36.00
684.00
90.00
5.00
450.00
90.00
9.00
810.00
No
483.00
0.50
241.50
Litre
122.00
58.00
7076.00
Litre
sqm
131.25
3.00
58.00
732.00
7612.50
2196.00
(d)
225761.89
6772.86
232534.75
3100.46
558.08
3100.46
-124.02
Cum
0.90
596.40
536.76
Cum
0.45
117.60
52.92
ASST.ENGINEER
PIU SD
PIU SD
DY.EXECUTIVE ENGINEER
PIU DIVN.
PR
4124.20
EXECUTIVE ENGINEER
Page 6 of 32
SUPERINTENDING ENGINEER
(CD WORKS)
Index
Code
RBRFNDN-1
Description of item
Unit
Qty
Rate
Amount
Ordinary soil
Mechanical Means
Upto 3 m depth
Unit = cum
Taking output = 240 cum
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic Excavator 1 cum bucket capacity
Add seignorage charges
5% For dewatering
day
day
0.00
8.32
hour
cum
6.00
240.00
12481.72
237.00
196.00
0.00
1630.72
1808.50 10851.00
0.00
0.00
0.05
624.09
13105.81
2359.05
15464.86
-524.23
14940.62
62.25
NOTE:
3 m to 6 m depth
Mechanical Means
(CD WORKS)
S.
No.
Index
Code
Description of item
Unit = cum
Taking output = 210 cum
a) Labour
Mate
Mazdoor (Unskilled)
b)
Machinery
Hydraulic excavator 1.0 cum bucket capacity
Add seignorage charges
5% For dewatering
Unit
Qty
day
day
0.00
8.32
hour
cum
6.00
210.00
12481.72
Rate
237.00
196.00
Amount
0.00
1630.72
1808.50 10851.00
0.00
0.00
0.05
624.09
13105.81
2359.05
13105.81
-524.23
14940.62
71.15
6m above Depth
Mechanical Means
Unit = cum
Taking output = 180 cum
a)
Labour
Mate
day
0.00
237.00
0.00
Mazdoor (Unskilled)
day
10.40
196.00
2038.40
hour
6.00
cum
180.00
0.00
0.00
12889.40
0.05
644.47
b)
Machinery
5% For dewatering
1808.50 10851.00
13533.87
Overheads & Contractors Profit @18%
Deduct 4% VAT
Cost for 210 cum = a+b+c+d
Rate per cum = (a+b+c+d)/210
2436.10
13533.87
-541.35
15428.61
85.71
Note : Cost of dewatering upto 5 per cent of (a+b) may be added, where
required. Assessment for dewatering shall be made as per site conditions.
(CD WORKS)
S.
No.
Index
Code
Description of item
Unit
Qty
Rate
Amount
RBRFNDN-2
day
day
0.00
0.31
237.00
196.00
0.00
60.76
cum
1.00
70.00
cum
1.00
130.76
117.60
70.00
130.76
23.54
-5.23
117.60
266.67
cum
12.000
50.50
606.00
day
day
7.280
196.00
1426.88
hour
hour
2.500
0.050
40.00
345.00
cum
12.000
66.00
100.00
17.25
2150.13
387.02
-86.01
792.00
3243.14
23
324.31
(CD WORKS)
S.
No.
15
Index
Code
RBRFNDN-4
Description of item
Unit
Qty
Rate
Amount
P.C.C grade M 10
Nominal mix 1:3:6
Unit = cum
(a) Material
Cement
Coarse sand
40 mm aggregate
Water
(b) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)
(c) Machinery
Mechanical concrete mixer 0.4/0.28 cum capacity
fitted with water measuring device and preferably
also with load cell.
Water tanker 6 kl capacity
t
cum
cum
kl
0.22
0.45
0.9
1.2
2900.00
220.00
695.00
0.00
638.00
99.00
625.50
0.00
day
day
day
0
0.10
1.39
237.00
258.00
196.00
0.00
25.80
272.44
hour
0.40
345.00
138.00
hour
0.13
345.00
44.85
4.00%
1843.59
73.74
1917.33
Overheads & Contractors Profit @18%
345.12
Deduct 4% VAT
1917.33
-76.69
cum
0.45
117.60
52.92
cum
0.90
596.40
536.76
RBRFNDN-7
2775.44
t
kg
52.00
312.00
10
(CD WORKS)
S.
No.
Index
Code
Description of item
Unit
Qty
Rate
Amount
day
0.00
237.00
0.00
Blacksmith
day
2.00
237.00
474.00
Mazdoor (Unskilled)
day
6.40
196.00
1254.40
36690.40
6604.27
Deduct 4% VAT
36690.40
RBRFNDN-4
-1467.62
41827.05
t
cum
cum
cum
0.347
0.45
0.54
0.36
2900.00
220.00
1125.00
770.00
1006.30
99.00
607.50
277.20
day
day
day
0
0.1
1.39
237.00
258.00
196.00
0.00
25.80
272.44
hr / cum
0.4
345.00
138.00
hour
0.4
620.00
248.00
4.00%
2674.24
106.97
2781.21
Overheads & Contractors Profit @ 18%
500.62
Deduct 4% VAT
2781.21
-111.25
cum
0.45
117.60
52.92
cum
0.90
596.40
536.76
3760.26
11
(CD WORKS)
S.
No.
19
Index
Code
RBRSBST-5
Description of item
Unit
Qty
Rate
Amount
0.275
2900.00
797.50
Coarse sand
cum
0.480
220.00
105.60
40 mm aggregate
cum
0.480
695.00
333.60
20 mm aggregate
cum
0.240
1125.00
270.00
10 mm aggregate
cum
0.080
770.00
61.60
Mate
day
0.000
237.00
0.00
day
0.100
258.00
25.80
Mazdoor (Unskilled)
day
1.390
196.00
272.44
hour
0.400
345.00
138.00
10.00%
2004.54
200.45
(b) Labour
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
(d) Formwork @ 10% on cost of material, labour
and machinery (a+b+c)
Overheads & Contractors Profit @ 18%
Deduct 4% VAT
Add for conveyance of sand
Add for conveyance of metal
Rate per cum = a+b+c+d+e+f
cum
cum
0.48
0.80
2204.99
117.60
596.40
2204.99
396.90
-88.20
56.45
477.12
3047.26
12
(CD WORKS)
S.
No.
20
Index
Code
RBRSBST-6
Description of item
Unit
Qty
Rate
Amount
kg
6.000
52.00
312.00
day
0.000
237.00
0.00
Blacksmith
day
2.000
237.00
474.00
Mazdoor (Unskilled)
day
6.840
196.00
1340.64
36776.64
6619.80
Deduct 4% VAT
36776.64
RBRSBST-5
-1471.07
41925.37
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm
metal mechanically mixed in substructure complete as per drawings
and technical specification Clauses 802, 804, 805, 806, 807, 1202 and
1204 MORD and 1500, 1700 & 2200 MORTH ,including overhead charges
& Contractors profit but excluding VAT upto 5m height.
R.C.C. grade M 25 (Design Mix)
Unit = cum
Height upto 5m
Case I : Using concrete Mixer
(a) Material
Cement
0.403
2900.00
1168.70
Coarse sand
cum
0.450
220.00
99.00
20 mm aggregate
cum
0.540
1125.00
607.50
10 mm aggregate
cum
0.360
770.00
277.20
Mate
day
0.00
237.00
0.00
day
0.10
258.00
25.80
Mazdoor (Unskilled)
day
1.39
196.00
272.44
(b) Labour
13
(CD WORKS)
S.
No.
Index
Code
Description of item
Unit
Qty
Rate
Amount
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
hour
0.40
345.00
138.00
Generator 33 KVA
hour
0.40
620.00
248.00
Vibrator
hour
10.00%
2836.64
283.66
3120.30
Overheads & Contractors Profit @18%
561.65
Deduct 4% VAT
3120.30
-124.81
cum
0.45
117.60
52.92
cum
0.90
596.40
536.76
RBRSBST-5
4146.83
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm
metal mechanically mixed in substructure complete as per drawings
and technical specification Clauses 802, 804, 805, 806, 807, 1202 and
1204 MORD and 1500, 1700 & 2200 MORTH ,including overhead charges
& Contractors profit but excluding VAT 5 to 10m height.
R.C.C. grade M 25 (Design Mix)
Height 5m to 10m
Case I : Using concrete Mixer
Per Cum Basic Cost of Labour, Material &
Machinery (a+b+c) of Item VI (i) Case I excluding
of Formwork
cum
2836.64
2836.64
11.80%
2836.64
334.72
1.80%
2836.64
51.06
d) formwork
Add on cost of material, labour and machinery
(a+b+c) for Formwork
Add on cost of material, Labour and machinery
excluding formwork to cater for extra lift
3222.42
Overheads & Contractors Profit @18%
Deduct 4% VAT
Rate perm (a+b+c+d+e+f)
23
RBRSPST-2
580.04
3222.42
-128.90
3673.56
14
(CD WORKS)
S.
No.
Index
Code
Description of item
Unit
Qty
Rate
Amount
Unit = t
(a) Material
1.05 33000.00 34650.00
Binding wire
kg
8.00
52.00
416.00
day
0.00
237.00
0.00
day
3.00
237.00
711.00
Mazdoor (Unskilled)
day
8.44
196.00
1654.24
37431.24
6737.62
Deduct 4% VAT
37431.24
RBRSPST-1
-1497.25
42671.61
Providing and laying reinforced cement concrete M25 grade (Design Mix)
using 20 & 10mm metal mechanically mixed in superstructure as per
drawing and technical specifications Clauses 800, 1205.4 and 1205.5
MORD / Sections 1500, 1600 & 1700 MORTH ,including overhead charges
& Contractors profit but excluding VAT upto 5m height.
R.C.C M 25 Grade (Design Mix)
Unit =cum
(i) Height upto 5m
Case I : Using Concrete Mixer.
(a) Material
Cement
Coarse sand
20 mm aggregate
10 mm aggregate
(b) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA
d) For formwork and staging refer to sub-item I
(B) case I above
d)
Formwork and staging of (a+b+c)
t
cum
cum
cum
0.40
0.45
0.54
0.36
2900.00
220.00
1125.00
770.00
1160.00
99.00
607.50
277.20
day
day
day
0.00
0.10
1.39
237.00
258.00
196.00
0.00
25.80
272.44
hour/cu
m
hour
0.40
345.00
138.00
0.40
620.00
248.00
20.00%
2827.94
565.59
15
(CD WORKS)
S.
No.
Index
Code
Description of item
Unit
Qty
Rate
Amount
3393.53
610.84
Deduct 4% VAT
3393.53
-135.74
cum
0.45
117.60
52.92
cum
0.90
596.40
536.76
RBRSPST-1
4458.30
Providing and laying reinforced cement concrete M25 grade (Design Mix)
using 20 & 10mm metal mechanically mixed in superstructure as per
drawing and technical specifications Clauses 800, 1205.4 and 1205.5
MORD / Sections 1500, 1600 & 1700 MORTH ,including overhead charges
& Contractors profit but excluding VAT 5 to 10m height.
R.C.C M 25 Grade (Design Mix)
Unit =cum
Height 5m to 10m
Case I : Using Concrete Mixer.
(a) Material
Cement
0.40
2900.00
1160.00
Coarse sand
cum
0.45
220.00
99.00
20 mm aggregate
cum
0.54
1125.00
607.50
10 mm aggregate
cum
0.36
770.00
277.20
Mate
day
0.00
237.00
0.00
day
0.10
258.00
25.80
Mazdoor (Unskilled)
day
1.39
196.00
272.44
hour/cu
m
hour
0.40
345.00
138.00
0.40
620.00
248.00
25.00%
2827.94
706.99
(b) Labour
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA
d) For formwork and staging refer to sub-item I
(B) case I above
d)
Formwork and staging of (a+b+c)
3534.93
Overheads & Contractors Profit @18%
636.29
Deduct 4% VAT
3534.93
-141.40
cum
0.45
117.60
52.92
cum
0.90
596.40
536.76
16
(CD WORKS)
S.
No.
Index
Code
Description of item
Unit
Qty
Rate
RBRSPST-5
Amount
4619.50
t
cum
cum
cum
t
Mate
day
0.00
237.00
0.00
day
0.10
258.00
25.80
Mazdoor (Unskilled)
day
1.39
196.00
272.44
day
0.15
196.00
29.40
hour
0.40
345.00
138.00
Generator 33 KVA.
hour
0.40
620.00
248.00
3.00%
5436.98
0.45
0.90
5848.09
117.60
596.40
163.11
5848.09
1052.66
-233.92
52.92
536.76
cum
cum
0.407 2900.00
0.45
220.00
0.54 1125.00
0.36
770.00
0.075 37431.24
ASST.ENGINEER
PIU SD
PIU SD
DY.EXECUTIVE ENGINEER
PIU DIVN.
PR
EXECUTIVE ENGINEER
1180.30
99.00
607.50
277.20
2807.34
7256.50
SUPERINTENDING ENGINEER
17
SPECIFICATION REPORT
Model bridge estimate 6 vent 6.00 m span , 8 vent 6.00 m span
114.33
Lakhs
The above work has been administratively sanctioned vide G.O.Ms.No.330, dated 17.09.2010 by the
Govt.of Andhra Pradesh under PMGSY Phase IX grant.
PROVISIONS MADE IN THE ESTIMATE
The above work estimate is prepared with the following provisions with AP REVISED STANDARD DATAS as
per PMGSY guidelines.
1
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 as per
Technical Specification 305 MORD / 304 MORTH.
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size Graded
hard stone aggregate, mechanically mixed, as per drawings and technical specifications Clause 802, 803,
1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
Plain cement concrete M 15 grade using 40,20 & 10mm metal mechanically mixed in substructure complete
as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500,
1700 & 2200 MORTH.
Providing concrete for reinforced concrete M 20 grade (Design Mix) in open foundations using 20 & 10 mm
nominal size Graded hard stone aggregate as per drawings and technical specifications Clause 802, 803,
1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal
mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and
1205.5 MORD / Sections 1500, 1600 & 1700 MORTH.
Providing and laying cement concrete wearing course M 30 (Design Mix) grade using 20 & 10mm metal
mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses
800 and 1206.3 MORD and 2702 MORTH.
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and
technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH.
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification
Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH.
Construction of embankment with approved material obtained from borrow pits with all lifts, transporting
to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and
300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 MORD/ 305 MORTH
Construction of granular sub-base by providing well graded material, spreading in uniform layers with
motor grader on prepared surface, and compacting with three wheel 80-100 kN static roller / Vibratory
Roller 80-100 kN as per Technical Specification Clause 402 MORD
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement
concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other
type as per Clause 1501.2.2 M30 (Grade), as per drawing and Technical Specification Clause 1501 MORD.
10
The estimate is prepared with the SSR for the year 2010-2011.
ASST.ENGINEER
PIU SD
PIU SD
DY.EXECUTIVE ENGINEER
PIU DIVN.
EXECUTIVE ENGINEER
PR
SUPERINTENDING ENGINEER
Description of item
Nos
Qty in
cum
Rate
Per
Amount
62.25
1 cum
30582
2775.44 1Cum
476581
1 x
2.70
8.70
1.65
77.52
For piers
1 x
3.30
9.60
1.65
261.36
2 x
1 x
2
1
5.00
40.00
2.35
0.60
1.20
1.50
56.40
36.00
1 x
40.00
0.60
2.50
60.00
491.28
Cum
1 x
2.70
8.70
0.30
14.09
2 x
5.00
2.35
0.30
14.10
For piers
1 x
3.30
9.60
0.30
47.52
1 x
40.00
0.60
1.50
36.00
1 x
40.00
0.60
2.50
60.00
171.71
Cum
Page 20 of 32
Sl.
Description of item
Nos
L
No
3 Plain cement concrete M 15 grade using 40,20 & 10mm
metal mechanically mixed in substructure complete as per
drawings and technical specification Clauses 802, 804,
805, 806, 807, 1202 and 1204 MORD and 1500, 1700 &
2200 MORTH ,including overhead charges & Contractors
profit but excluding VAT.
Qty in
cum
1
1
2
1
1
2
x
x
x
x
x
x
2
5
2
2
5
2
2.50
3.00
5.00
2.30
2.70
5.00
8.70
9.60
2.35
8.30
9.20
1.95
0.45
0.45
0.45
0.45
0.45
0.45
19.58
64.80
21.15
17.18
55.89
17.55
1
1
2
1
x
x
x
x
2
5
2
2
2.10
2.40
5.00
7.50
7.90
8.80
1.55
0.45
0.45
0.45
2.10
14.93
47.52
13.95
42.53
Above GL piers
8.40
2.4+1.2
2
2.10
158.76
5.00
1.4+0.7
2
3.00
63.00
1.8+0.9
2
536.83
Cum
4
Per
Amount
3047.26 1Cum
1635868
4.05
15.12
19.17 3760.26 1Cum
72084
Rate
1 x
1 x
2
5
7.50
8.40
Page 21 of 32
0.90
1.20
0.30
0.30
Sl.
No
Description of item
For Deckslab 1st and last
Centre slabs
1 x
1 x
2
4
7.50
7.50
7.90
7.90
0.45
0.45
Qty in
Rate
Per
cum
53.33
106.65
159.98 4458.30 1Cum
1
1
x
x
713217
2
4
7.50
7.50
7.90
7.90
0.075
0.075
8.89
17.78
26.66
7256.50 1Cum
30.00
42671.61 MT
193477
1280148
5.00
6.60
3.75+0.6
2
143.55
143.55
Amount
Nos
324.31
1Cum
46555
118.26
1Cum
42572
120.00
Page 22 of 32
6.00
0.500
360.00
360.00
Cum
Sl.
Description of item
Nos
L
B
No
10 Construction of granular sub-base by providing well graded
material, spreading in uniform layers with motor grader on prepared
surface, mixing by mix in place method with rotavator at OMC, and
compacting with three wheel 80-100 kN static roller / Vibratory
Roller 80-100 kN capacity to achieve the desired density, complete
as per Technical Specification Clause 402 MORD, including
overhead charges & Contractor profit, But excluding VAT
For approaches
5.00
6.60
0.150
Qty in
cum
Rate
Per
263.03
1Cum
2604
11.25
11.25 3047.26 1Cum
Cum
34282
15.00
15.00 4124.20 1Cum
Cum
61863
9.90
9.90
Cum
Amount
5.00
7.50
0.150
5.00
7.50
0.200
50000
Total:
ASST.ENGINEER
PIU SD
PIU SD
DY.EXECUTIVE ENGINEER
PIU DIVN.
PR
EXECUTIVE ENGINEER
Page 23 of 32
SUPERINTENDING ENGINEER
4639833
Item
Quantity
(finished item)
Unit
Material
Qty
(collected)
Rate
Seignorage
Amount
491.28
Cum
Earth
491.28
22.00
10808
171.71
Cum
536.83
Cum
Metal
Sand
Metal
154.54
77.27
429.47
50.00
40.00
50.00
7727
3091
21474
Sand
257.68
40.00
10307
Metal
17.25
50.00
863
Sand
8.63
40.00
345
Metal
143.98
50.00
7199
Sand
71.99
40.00
2880
159.98
Rough stone
10
11
12
19.17
For CC pavement
Cum
Cum
0.00
Cum
Metal
0.00
50.00
143.55
Cum
Gravel
157.91
22.00
3474
26.66
Cum
Metal
24.00
50.00
1200
Sand
12.00
40.00
480
360.00
Cum
Gravel
396.00
22.00
8712
9.90
Cum
Gravel
8.42
22.00
185
Sand
4.26
40.00
170
Metal
10.13
50.00
507
Sand
5.06
40.00
202
Metal
13.50
50.00
675
Sand
6.75
40.00
270
11.25
15.00
Cum
Cum
ASST.ENGINEER
PIU SD
PIU SD
DY.EXECUTIVE ENGINEER
PIU DIVN.
80569
EXECUTIVE ENGINEER
PR
SUPERINTENDING ENGINEER
Description of item
Nos
Qty in
cum
Rate
Per
Amount
62.25
1 cum
38584
2775.44 1Cum
595947
1 x
2.70
8.70
1.65
77.52
For piers
1 x
3.30
9.60
1.65
365.90
2 x
1 x
2
1
5.00
50.00
2.35
0.60
1.20
1.50
56.40
45.00
1 x
50.00
0.60
2.50
75.00
619.82
Cum
1 x
2.70
8.70
0.30
14.09
2 x
5.00
2.35
0.30
14.10
For piers
1 x
3.30
9.60
0.30
66.53
1 x
50.00
0.60
1.50
45.00
1 x
50.00
0.60
2.50
75.00
214.72
Cum
Page 25 of 32
Sl.
Description of item
Nos
L
No
3 Plain cement concrete M 15 grade using 40,20 & 10mm
metal mechanically mixed in substructure complete as per
drawings and technical specification Clauses 802, 804,
805, 806, 807, 1202 and 1204 MORD and 1500, 1700 &
2200 MORTH ,including overhead charges & Contractors
profit but excluding VAT.
Qty in
cum
1
1
2
1
1
2
x
x
x
x
x
x
2
7
2
2
7
2
2.50
3.00
5.00
2.30
2.70
5.00
8.70
9.60
2.35
8.30
9.20
1.95
0.45
0.45
0.45
0.45
0.45
0.45
19.58
90.72
21.15
17.18
78.25
17.55
1
1
2
1
x
x
x
x
2
7
2
2
2.10
2.40
5.00
7.50
7.90
8.80
1.55
0.45
0.45
0.45
2.10
14.93
66.53
13.95
42.53
Above GL piers
8.40
2.4+1.2
2
2.10
222.26
5.00
1.4+0.7
2
3.00
63.00
1.8+0.9
2
667.62
Cum
4
Per
Amount
3047.26 1Cum
2034414
4.05
21.17
25.22 3760.26 1Cum
94826
Rate
1 x
1 x
2
7
7.50
8.40
Page 26 of 32
0.90
1.20
0.30
0.30
Sl.
No
Description of item
For Deckslab 1st and last
Centre slabs
1 x
1 x
2
6
7.50
7.50
7.90
7.90
0.45
0.45
Qty in
Rate
Per
cum
53.33
159.98
213.30 4458.30 1Cum
1
1
x
x
950956
2
6
7.50
7.50
7.90
7.90
0.075
0.075
8.89
26.66
35.55
7256.50 1Cum
42.00
42671.61 MT
257969
1792208
5.00
6.60
3.75+0.6
2
143.55
143.55
Amount
Nos
324.31
1Cum
46555
118.26
1Cum
53215
150.00
Page 27 of 32
6.00
0.500
450.00
450.00
Cum
Sl.
Description of item
Nos
L
B
No
10 Construction of granular sub-base by providing well graded
material, spreading in uniform layers with motor grader on prepared
surface, mixing by mix in place method with rotavator at OMC, and
compacting with three wheel 80-100 kN static roller / Vibratory
Roller 80-100 kN capacity to achieve the desired density, complete
as per Technical Specification Clause 402 MORD, including
overhead charges & Contractor profit, But excluding VAT
For approaches
5.00
6.60
0.150
Qty in
cum
Rate
Per
263.03
1Cum
2604
11.25
11.25 3047.26 1Cum
Cum
34282
15.00
15.00 4124.20 1Cum
Cum
61863
9.90
9.90
Cum
Amount
5.00
7.50
0.150
5.00
7.50
0.200
50000
Total:
ASST.ENGINEER
PIU SD
PIU SD
DY.EXECUTIVE ENGINEER
PIU DIVN.
PR
EXECUTIVE ENGINEER
Page 28 of 32
SUPERINTENDING ENGINEER
6013423
Item
Quantity
(finished item)
Unit
Material
Qty
(collected)
Rate
Seignorage
Amount
619.82
Cum
Earth
619.82
22.00
13636
214.72
Cum
Metal
193.25
50.00
9663
Sand
96.62
40.00
3865
Metal
534.10
50.00
26705
Sand
320.46
40.00
12818
Metal
22.70
50.00
1135
Sand
11.35
40.00
454
Metal
191.97
50.00
9599
Sand
95.99
40.00
3840
Rough stone
10
12
25.22
213.30
11
667.62
For CC pavement
Cum
Cum
Cum
0.00
Cum
Metal
0.00
50.00
143.55
Cum
Gravel
157.91
22.00
3474
35.55
Cum
Metal
32.00
50.00
1600
Sand
16.00
40.00
640
450.00
Cum
Gravel
495.00
22.00
10890
9.90
Cum
Gravel
8.42
22.00
185
Sand
4.26
40.00
170
Metal
10.13
50.00
507
Sand
5.06
40.00
202
Metal
13.50
50.00
675
Sand
6.75
40.00
270
11.25
15.00
Cum
Cum
ASST.ENGINEER
PIU SD
PIU SD
DY.EXECUTIVE ENGINEER
PIU DIVN.
100328
EXECUTIVE ENGINEER
PR
SUPERINTENDING ENGINEER