Name of the work

Model bridge estimate 6 vent 6.00 m


span , 8 vent 6.00 m span

Estimate cost

Rs.

114.33 Lakhs

SSR 2010-11
PANCHAYAT RAJ ENGINEERING DEPARTMENT

GENERAL ABSTRACT
Model bridge estimate 6 vent 6.00 m span , 8 vent 6.00 m span

Estimate amount Rs:


S.
No.

114.33 Lakhs

Desription

Amount

PART - A
1

Constuction of 6 V of 6m Span High level


bridge

4639833

Constuction of 8 V of 6m Span High level


bridge

6013423

Add 4% VAT

Add Seignorage charges

Preparation of DPR 1% on Project Cost

Add L.S. for Blasting in foundations,


flaxuation of rates and other unforseen
items

10653256

180897
11260283

DY.EXECUTIVE ENGINEER
PIU SD KORUTLA

112603
60114

PART - A TOTAL

ASST.ENGINEER
PIU SD KORUTLA

426130

11433000

EXECUTIVE ENGINEER
PIU DIVN. KARIMNAGAR

SUPERINTENDING ENGINEER
PR KARIMNAGAR

INSPECTION REPORT OF SUPERINTENDING ENGINEER, P RAJ CIRCLE, KARIMNAGAR


Present: - Sri M.Bichya Naik, B.Tech.,
DATE OF INSPECTION

Name of the work

Model bridge estimate 6 vent 6.00 m span , 8


vent 6.00 m span

Name of the Grant

PMGSY (Missing Bridges)

Name of the Officers present

Sri 1) E.Dasharatham, M.Tech.,


Executive Engineer,
PIR Divn Karimnagar

Sri 2) R.Chandra Shekar, B.Tech.,


DyEE PIU SD Korutla

Sri 3) B.Rajeshwar Rao


A.E. PIU Korutla

*****
I have inspected the bridge site along with above mentioned officers

Recommandations:
The Field staff is hereby directed to prepare the Detailed Estimate as per the above provisions immediately.

1) Type of Bridge Proposde

Minor Bridge

2) Type of foundtions proposed

Individual Foundation

3) Carriage way width proposed

7.50 mts

4) Linear Water way proposed

40 & 50 mts respectively

5) Coefficient of Rugosity

0.033

SUPERINTENDING ENGINEER
PR CIRCLE KARIMNAGAR
TO,
1). The Executive Engineer, PIU P.R.Division, Karimnagar
2). Copy to The Dy.Executive Engineer, PIU P.R.S.D., Korutla
3). Copy to The Dy.Executive Engineer, PR QC & Vig., SD Karimnagar.
4). Copy Submitted to the Chief Engineer (P.R.),, Hyderabad.

3 / 32

LEAD CHARGES (2010-11)

Model bridge estimate 6 vent 6.00 m span , 8 vent 6.00 m span

Sl.
No.

Description

(1)
(2)
1 60-63 mm IRC HBG Metal

Quarry

Lead in
KM

Initial
Cost

Conveyance
Charges

Blasting
charges

(3)
Kondagattu

(4)
75.00

(5)
360.00

(6)
596.40

(7)
70.00

Add 25%
extra for
machine
crushing

(8)

Total
Deduct
amount Convea
for
excluding
ynce
Remarks
stockin
conveyan chargs
g
ce

(9)

(10)
430.00

(11)
596.40

(12)

50-55 mm IRC HBG Metal

Kondagattu

75.00

390.00

596.40

70.00

460.00

596.40

40-45 mm IRC HBG Metal

Kondagattu

75.00

500.00

596.40

70.00

570.00

596.40

25-27 mm IRC HBG Metal

Kondagattu

75.00

830.00

596.40

70.00

900.00

596.40

19-22 mm IRC HBG Metal

Kondagattu

75.00

950.00

596.40

70.00

1020.00

596.40

40-45 mm IRC HBG Metal

Kondagattu

75.00

500.00

596.40

70.00

125.00

695.00

596.40

25-27 mm IRC HBG Metal

Kondagattu

75.00

830.00

596.40

70.00

207.50

1107.50

596.40

19-22 mm IRC HBG Metal

Kondagattu

75.00

950.00

596.40

70.00

237.50

1257.50

596.40

792.50 WBMM

12-14 mm IRC HBG Metal

Kondagattu

75.00

690.00

596.40

70.00

172.50

932.50

596.40

851.25 WMM

10

9.5-11.2 mm for Grading 2

Kondagattu

75.00

560.00

596.40

70.00

140.00

770.00

596.40

688.75 WMM

11

5-7 mm IRC HBG Metal

Kondagattu

75.00

430.00

596.40

70.00

107.50

607.50

596.40

12

2.36 mm HBG metal

Kondagattu

75.00

260.00

596.40

70.00

65.00

395.00

596.40

13

40mm HBG chips-SS5

Kondagattu

75.00

500.00

596.40

70.00

125.00

695.00

596.40

14

20mm HBG chips-SS5

Kondagattu

75.00

844.00

596.40

70.00

211.00

1125.00

596.40

15

12mm HBG chips-SS5

Kondagattu

75.00

688.00

596.40

70.00

172.00

930.00

596.40

16

10mm HBG chips-SS5

Kondagattu

75.00

560.00

596.40

70.00

140.00

770.00

596.40

17

2.36mm Below metal

Kondagattu

75.00

236.00

596.40

236.00

596.40

18

Gravel

Local

6.00

50.50

66.00

50.50

66.00

1020.00

501.25 Gr.II

19
20
21
22
23
24
25

Sand for mortar


Godavari
12.00
220.00
117.60
Sand for Filling
Godavari
12.00
70.00
117.60
Bitumen 60/70
Chennai
980.00 31373.96 2940.00 1254.96
Bitumen emulsion (SS-1)
Chennai
980.00 22163.15 2940.00 886.53
Bitumen emulsion (RS-1)
Chennai
980.00 22735.25 2940.00 909.41
Cement
2900.00
Steel
33000.00
Certified that the above leads are correct and nearest to the work site to best of my knowledge

ASST.ENGINEER
PIU SD
PIU SD

DY.EXECUTIVE ENGINEER
PIU DIVN.
PR

EXECUTIVE ENGINEER

SUPERINTENDING ENGINEER

220.00
70.00
35568.92
25989.68
26584.66
2900.00
33000.00

117.60
117.60

Data Sheet

RATE ANALYSIS
0
Model bridge estimate 6 vent 6.00 m span , 8 vent 6.00 m span
S. No.

Index
Code

RBREECD4

Description of item

Unit

Qty

Rate

Amount

Construction of Embankment with Material Obtained from Borrow


pits by Machinery
Construction of embankment with approved material obtained from
borrow pits with all lifts, transporting to site, spreading, grading to
required slope and compacting to meet requirement of Tables 300.1
and 300.2 with a lead upto 1000 m as per Technical Specification
Clause 301.5 MORD/ 305 MORTH including overhead charges &
Contractor profit, But excluding VAT
Unit = cum
Taking output = 100 cum

a)

Labour
Mazdoor (Unskilled)

b)

day

1.04

196.00

203.84

Hydraulic Excavator 0.9 cum bucket capacity


@ 60 cum per hr

hour

1.67

1,808.50

3020.20

Tipper 5.5cum with 10T capacity

hour

4.50

629.80

2834.10

Dozer D50 for spreading @ 200 cum per hour

hour

0.50

1,081.19

540.60

Tractor with Grader @ 25 cum per hour

hour

4.00

345.00

1380.00

Water tanker 6 KL capacity

hour

2.00

345.00

690.00

1.00

1704.60

1704.60

Machinery

Vibratory Roller 80-100 KN @100cum per hour

hour

Basic rate of formation of road with


borrow soils per Cum
d)

Add 18.00 % for Over head charges & Contractors profit

10373.34
1867.20
12240.54

Deduct VAT @4.00%

-414.93
11825.61

Rate per cum


2

RBRSBBS2

118.26

Gravel / Soil - Aggregate Base (Table 400.2) Grading C

Page 3 of 32

Data Sheet

S. No.

Index
Code

Description of item

Unit

Qty

Rate

Amount

Construction of granular sub-base by providing well graded material,


spreading in uniform layers with motor grader on prepared surface,
mixing by mix in place method with rotavator
at OMC, and
compacting with three wheel 80-100 kN static roller / Vibratory Roller
80-100 kN capacity to achieve the desired density, complete as per
Technical Specification Clause 402 MORD, including overhead
charges & Contractor profit, But excluding VAT

Taking out put = 300 cum


a)

b)

c)

Labour
Mazdoor (Skilled)

day

2.40

196.00

470.40

Mazdoor (Un-Skilled)

day

8.00

196.00

1568.00

Vibratory Roller 80-100 KN @10cum per hour

hour

6.00

1704.60

10227.60

Water tanker 6kl capacity

hour

5.00

345.00

1725.00

Tractor with grader @ 25 cum per hour

hour

12.00

345.00

4140.00

Tractor with rotavator @ 25 cum per hour

hour

12.00

345.00

4140.00

9.5 mm to 4.75 mm @ 66% (Gravel)

cum

237.60

50.50

11998.80

2.36 mm below @ 34% (sand)

cum

122.40

70.00

8568.00

Machinery

Material
Well graded granular sub-base material as per
table 400.2
Cost of materials

Basic rate of Granular sub base for 300


cum

42837.80

a)

Basic rate of Granular sub base cum

142.79

c)

Add 18.00 % for Over head charges &


Contractors profit
Deduct VAT @4.00%

25.70
142.79

Rate per cum

162.78

Add for conveyance of gravel

cum

0.79

66.00

52.27

Add for conveyance of Sand

cum

0.41

117.60

47.98

Rate per cum


3

RBRCCPV5

-5.71

263.03

Cement Concrete Pavement

Page 4 of 32

Data Sheet

S. No.

Index
Code

Description of item

Unit

Qty

Rate

Amount

Construction of un-reinforced, dowel jointed at expansion and construction joint only,


plain cement concrete pavement, thickness as per design, over a prepared sub base,
with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse
and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less
than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid
in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick
polythene film, wedges, steel plates including levelling the formwork as per drawing),
spreading the concrete with sholvels, rakes, compacted using needle, scareed and
plate vibrators and finished in continuous operation including provision of contraction
and expansion, construction joints, applying debonding strips, primer, sealant, dowel
bars, near approaches to bridge / culvert and construction joints, admixtures as
approved, curing of concrete slabs for 14- days, curing compound (where specified)
and water finishing to lines and grade as per drawing and Technical Specification
Clause 1501 MORD including overhead charges & Contractors profit but excluding
VAT.

Unit = cum
Taking output = 75cum (172.50 t)
(100x3.75 x 0.200)
a)

b)

Labour
Mason (1st class)
Mason (2nd class)
Mazdoor (unskilled)
Mazdoor(skilled)
Surveyor
Mazdoor (semi-skilled)
Black smith for cutting of dowel bars including
removal of burrs, fabrications & fixing of dowel
bars
Machinery

c)

Concrete mixer 0.28/0.40 cum capacity ( 6


mixers) with weight batcher and suitable
capacity calibrated water tank
Needle vibrator
Screed vibrator
Plate vibrator
Water tanker 6 Kl. Capacity
Air compressor ( 1hour initial + 1 hour final)
Material

(I)

day
day
day
day
day
day
day

5.00
5.00
150.00
6.00
2.00
6.00
1.00

258.00
237.00
196.00
196.00
237.00
196.00
237.00

1290.00
1185.00
29400.00
1176.00
474.00
1176.00
237.00

Hour

36.00

345.00

12420.00

Hour
Hour
Hour
Hour
Hour

9.00
9.00
9.00
5.00
2.00

0.00
40.00
40.00
345.00
370.00

0.00
360.00
360.00
1725.00
740.00

Cum
Cum

44.55
22.95

1125.00
770.00

50118.75
17671.50

Crushed stone coarse aggregates, grading will


be as per clause 1501.2.4.1 (Table 1500.1) of
specifications @ 0.90 Cum/cum of concrete
20mm
10mm

Page 5 of 32

Data Sheet

S. No.

Index
Code

Description of item

Unit

Qty

Rate

Amount

(ii)

Sand as per IS:383 and conforming to clause


1500.2.4.2. @ 0.45 cum of concrete

cum

33.75

220.00

7425.00

(iii)
(iv)
(v)

Cement @ 325 Kg/cum of concrete


Polythene sheet 125 micron
Mild steel dowel bar 25mm dia of grade S
240.500 mm long 20 Nos. at culvert/bridge
slab and at construction joiont including 5
percent wastage

t
sqm

24.375
412.5

2900.00
15.00

70687.50
6187.50

Kg

117.6

33.00

3880.80

0.005

35568.92

177.84

Bitumenous sealant 800 ml. Per joint for 23 joints

Litre

19.00

36.00

684.00

Jute rope 12mm dia including 5 per cent wastage

90.00

5.00

450.00

Debonding strips 3.75m. (length) x 10mm


(width) x 5 mm (thick) cut-out of rubber fillter
board of similar material including 5 per cent
wastage

90.00

9.00

810.00

Polythene sheathing, covering 2/3rd dowel


bars (20x23) and tight fit including 5 per cent
wastage

No

483.00

0.50

241.50

Plasticizer 0.5 per cent by weight of cement

Litre

122.00

58.00

7076.00

Curing compound (if used) @ 0.33 litre per


sqm
Joint filler board 20mm thick as per IS:1838
(4x3.75x0.200 = 3 sqm)

Litre
sqm

131.25
3.00

58.00
732.00

7612.50
2196.00

(4x20x0.500) + 5 per cent wastage = 42m @


2.80 Kg per m = 117.6 kg.
Bitumen primer @ 200ml. Per joint for 23 joints

(d)

Form work @ 3% on (a+b+c)

225761.89
6772.86

Cost for 75 cum = a+b+c+d

232534.75

Rate per Cum = (a+b+c+d+e)/75


(e)

3100.46

Over head charges & contracots profit @


18.00% on (a+b+c+d)
Deduct VAT @ 4%

558.08
3100.46

-124.02

Add for conveyance of metal

Cum

0.90

596.40

536.76

Add for conveyance of sand

Cum

0.45

117.60

52.92

Rate per cum

ASST.ENGINEER
PIU SD
PIU SD

DY.EXECUTIVE ENGINEER
PIU DIVN.
PR

4124.20

EXECUTIVE ENGINEER

Page 6 of 32

SUPERINTENDING ENGINEER

RATE ANALYSIS AS PER MORD

(CD WORKS)

RATE ANALYSIS FOR CD WORKS


Model bridge estimate 6 vent 6.00 m span , 8 vent 6.00 m span
S.
No.
13

Index
Code
RBRFNDN-1

Description of item

Unit

Qty

Rate

Amount

Excavation for Structures


Excavation of structures:
Earthwork in excavation for structures as per drawing and technical
specifications Clause 305.1 including setting out, construction of shoring
and bracing, removal of stumps and other deleterious material and
disposal upto a lead of 50 m, dressing of sides and bottom and backfilling
in trenches with excavated suitable material as per Technical Specification
305 MORD / 304 MORTH ,including overhead charges & Contractors profit
but excluding VAT.
Note : Classifications of Earth Work Specification are as per
302.2.1(a) of MORD and 301.2.1 of MORT&H

Ordinary soil
Mechanical Means
Upto 3 m depth
Unit = cum
Taking output = 240 cum
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic Excavator 1 cum bucket capacity
Add seignorage charges
5% For dewatering

day
day

0.00
8.32

hour
cum

6.00
240.00
12481.72

Overheads & Contractors Profit @18%


Cost for 240 cum = a+b+c+d
Deduct 4% VAT
Rate per cum = /240

237.00
196.00

0.00
1630.72

1808.50 10851.00
0.00
0.00
0.05
624.09
13105.81
2359.05
15464.86
-524.23
14940.62
62.25

Note : 1. Cost of dewatering upto 5% of a+b may be added, where


required, up to 10 per cent of labour cost. Assessment for dewatering shall
be made as per site conditions.
ii

NOTE:
3 m to 6 m depth
Mechanical Means

RATE ANALYSIS AS PER MORD

(CD WORKS)

S.
No.

Index
Code

Description of item
Unit = cum
Taking output = 210 cum
a) Labour
Mate
Mazdoor (Unskilled)
b)
Machinery
Hydraulic excavator 1.0 cum bucket capacity
Add seignorage charges
5% For dewatering

Unit

Qty

day
day

0.00
8.32

hour
cum

6.00
210.00
12481.72

Overheads & Contractors Profit @18%


Deduct 4% VAT
Cost for 210 cum = a+b+c+d
Rate per cum = (a+b+c+d)/210
Note : Cost of dewatering upto 5 per cent of (a+b) may be added, where
required. Assessment for dewatering shall be made as per site conditions.

Rate

237.00
196.00

Amount

0.00
1630.72

1808.50 10851.00
0.00
0.00
0.05
624.09
13105.81
2359.05
13105.81
-524.23
14940.62
71.15

2. Cost of shoring and shuttering, where needed, may be taken @ 10 per


cent on cost of excavation for open foundation.
iii

6m above Depth
Mechanical Means
Unit = cum
Taking output = 180 cum
a)

Labour

Mate

day

0.00

237.00

0.00

Mazdoor (Unskilled)

day

10.40

196.00

2038.40

Hydraulic excavator 1.0 cum bucket capacity

hour

6.00

Add seignorage charges

cum

180.00

0.00

0.00

12889.40

0.05

644.47

b)

Machinery

5% For dewatering

1808.50 10851.00

13533.87
Overheads & Contractors Profit @18%
Deduct 4% VAT
Cost for 210 cum = a+b+c+d
Rate per cum = (a+b+c+d)/210

2436.10
13533.87

-541.35
15428.61
85.71

Note : Cost of dewatering upto 5 per cent of (a+b) may be added, where
required. Assessment for dewatering shall be made as per site conditions.

RATE ANALYSIS AS PER MORD

(CD WORKS)

S.
No.

Index
Code

Description of item

Unit

Qty

Rate

Amount

2. Labour provided for excavation by mechanical means includes that


required for trimming of bottom and side slopes.
14

RBRFNDN-2

Filling in foundation trenches as per drawing and technical specification


Clause 305.3.9 MORD & 304 MORTH ,including overhead charges &
Contractors profit but excluding VAT.
Sand filling
Unit = cum
a) Labour
Mate
Mazdoor (Unskilled)
b) Material
Sand
Overheads & Contractors Profit @18%
Deduct 4% VAT
Add for conveyance of sand filling
Rate per cum = a+b+c+d

day
day

0.00
0.31

237.00
196.00

0.00
60.76

cum

1.00

70.00

cum

1.00

130.76
117.60

70.00
130.76
23.54
-5.23
117.60
266.67

cum

12.000

50.50

606.00

day
day

7.280

196.00

1426.88

hour
hour

2.500
0.050

40.00
345.00

cum

12.000

66.00

100.00
17.25
2150.13
387.02
-86.01
792.00
3243.14

23

Backfilling behind abutment, wing wall and return wall


complete as per drawings & technical specification
Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200
RBR-SBST-10
MORTH including overhead charges & Contractors
profit but excluding VAT.
Unit = cum
Taking output = 10 cum
Granular material
(a) Material
Granular material
(b) Labour
Mate
Mazdoor (Unskilled)
(c) Machinery
Plate compactor / power rammer
Water Tanker
d&e) Overheads & Contractors Profit @ 18%
Deduct 4% VAT
Add for conveyance of granular material
Cost for 10 cum of granular backfill = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/10

324.31

RATE ANALYSIS AS PER MORD

(CD WORKS)

S.
No.
15

Index
Code
RBRFNDN-4

Description of item

Unit

Qty

Rate

Amount

Providing concrete for plain concrete M 10 grade in open foundations


using 40 mm nominal size Graded hard stone aggregate, mechanically
mixed, placed in foundation and compacted by vibration including curing
for 14 days complete as per drawings and technical specifications Clause
802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including
overhead charges & Contractors profit but excluding VAT.

P.C.C grade M 10
Nominal mix 1:3:6
Unit = cum
(a) Material
Cement
Coarse sand
40 mm aggregate
Water
(b) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)
(c) Machinery
Mechanical concrete mixer 0.4/0.28 cum capacity
fitted with water measuring device and preferably
also with load cell.
Water tanker 6 kl capacity

t
cum
cum
kl

0.22
0.45
0.9
1.2

2900.00
220.00
695.00
0.00

638.00
99.00
625.50
0.00

day
day
day

0
0.10
1.39

237.00
258.00
196.00

0.00
25.80
272.44

hour

0.40

345.00

138.00

hour

0.13

345.00

44.85

4.00%

1843.59

73.74

(d) Formwork @ 4% on cost of material, labour


and machinery (a+b+c)

1917.33
Overheads & Contractors Profit @18%

345.12

Deduct 4% VAT

1917.33

-76.69

Add for conveyance of sand

cum

0.45

117.60

52.92

Add for conveyance of metal

cum

0.90

596.40

536.76

Rate per cum = a+b+c+d+e+f


17

RBRFNDN-7

2775.44

Supplying, fitting and placing HYSD bar reinforcement in foundation


complete as per drawings and technical specifications Clauses 1000 and
1202 MORD & 1100, 1600 MORTH for Bars below 36 mm dia including
over laps and wastage, where they are not welded ,including overhead
charges & Contractors profit but excluding VAT.
Unit = t
(a) Material
HYSD bars including 5 per cent for overlaps and
wastage
Binding wire

t
kg

1.05 33000.00 34650.00


6.00

52.00

312.00

10

RATE ANALYSIS AS PER MORD

(CD WORKS)

S.
No.

Index
Code

Description of item

Unit

Qty

Rate

Amount

(b) Labour for cutting, bending, shifting to site,


tying and placing in position
Mate

day

0.00

237.00

0.00

Blacksmith

day

2.00

237.00

474.00

Mazdoor (Unskilled)

day

6.40

196.00

1254.40
36690.40

Overheads & Contractors Profit @ 18%

6604.27

Deduct 4% VAT

36690.40

Rate per t = a+b+c+d


18

RBRFNDN-4

-1467.62
41827.05

Providing concrete for reinforced concrete M 20 grade (Design Mix) in


open foundations using 20 & 10 mm nominal size Graded hard stone
aggregate, mechanically mixed, placed in foundation and compacted by
vibration including curing for 14 days complete as per drawings and
technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500,
1700 & 2100 MORTH ,including overhead charges & Contractors profit but
excluding VAT.
R.C.C grade M 20 (Design Mix) using 20 mm
Graded Metal (MORTH)
CASE I : Using Concrete Mixer
Unit = cum
(a) Material
Cement
Coarse sand
20 mm aggregate
10 mm aggregate
(b) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA

t
cum
cum
cum

0.347
0.45
0.54
0.36

2900.00
220.00
1125.00
770.00

1006.30
99.00
607.50
277.20

day
day
day

0
0.1
1.39

237.00
258.00
196.00

0.00
25.80
272.44

hr / cum

0.4

345.00

138.00

hour

0.4

620.00

248.00

4.00%

2674.24

106.97

(d) Formwork @ 4% on (a+b+c)

2781.21
Overheads & Contractors Profit @ 18%

500.62

Deduct 4% VAT

2781.21

-111.25

Add for conveyance of sand

cum

0.45

117.60

52.92

Add for conveyance of metal

cum

0.90

596.40

536.76

Rate per cum = a+b+c+d+e+f

3760.26

11

RATE ANALYSIS AS PER MORD

(CD WORKS)

S.
No.
19

Index
Code
RBRSBST-5

Description of item

Unit

Qty

Rate

Amount

Plain cement concrete M 15 grade using 40,20 & 10mm metal


mechanically mixed in substructure complete as per drawings and
technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204
MORD and 1500, 1700 & 2200 MORTH ,including overhead charges &
Contractors profit but excluding VAT.
Note : Water for concrete : A provision for cost of water may be added at
1.2 kl / 1 cum (including curing purpose) keeping the site conditions
Coarse Aggregate : Single grade nominal size can also be used instead of
graded metal, keeping the site conditions in view
For height upto 5 m
Unit = cum
P.C.C grade M 15
Nominal mix (1:2.5:5) using CC Mixer (MORD)
Unit = cum
(a) Material
Cement

0.275

2900.00

797.50

Coarse sand

cum

0.480

220.00

105.60

40 mm aggregate

cum

0.480

695.00

333.60

20 mm aggregate

cum

0.240

1125.00

270.00

10 mm aggregate

cum

0.080

770.00

61.60

Mate

day

0.000

237.00

0.00

Mason (1st Class)

day

0.100

258.00

25.80

Mazdoor (Unskilled)

day

1.390

196.00

272.44

hour

0.400

345.00

138.00

10.00%

2004.54

200.45

(b) Labour

(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
(d) Formwork @ 10% on cost of material, labour
and machinery (a+b+c)
Overheads & Contractors Profit @ 18%
Deduct 4% VAT
Add for conveyance of sand
Add for conveyance of metal
Rate per cum = a+b+c+d+e+f

cum
cum

0.48
0.80

2204.99
117.60
596.40

2204.99
396.90
-88.20
56.45
477.12
3047.26

12

RATE ANALYSIS AS PER MORD

(CD WORKS)

S.
No.
20

Index
Code
RBRSBST-6

Description of item

Unit

Qty

Rate

Amount

Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in


substructure complete as per drawings and technical specification
Clauses 1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200 MORTH
for Bars below 36 mm dia including over laps and wastage, where they are
not welded ,including overhead charges & Contractors profit but excluding
VAT.
Unit = t
(a) Material
HYSD bars including 5 per cent overlaps and
wastage
Binding wire

1.050 33000.00 34650.00

kg

6.000

52.00

312.00

(b) Labour for cutting, bending, shifting to site,


tying, and placing in position
Mate

day

0.000

237.00

0.00

Blacksmith

day

2.000

237.00

474.00

Mazdoor (Unskilled)

day

6.840

196.00

1340.64
36776.64

Overheads & Contractors Profit @ 18%

6619.80

Deduct 4% VAT

36776.64

Rate per t = a+b+c+d


21

RBRSBST-5

-1471.07
41925.37

Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm
metal mechanically mixed in substructure complete as per drawings
and technical specification Clauses 802, 804, 805, 806, 807, 1202 and
1204 MORD and 1500, 1700 & 2200 MORTH ,including overhead charges
& Contractors profit but excluding VAT upto 5m height.
R.C.C. grade M 25 (Design Mix)
Unit = cum
Height upto 5m
Case I : Using concrete Mixer
(a) Material
Cement

0.403

2900.00

1168.70

Coarse sand

cum

0.450

220.00

99.00

20 mm aggregate

cum

0.540

1125.00

607.50

10 mm aggregate

cum

0.360

770.00

277.20

Mate

day

0.00

237.00

0.00

Mason (1st Class)

day

0.10

258.00

25.80

Mazdoor (Unskilled)

day

1.39

196.00

272.44

(b) Labour

13

RATE ANALYSIS AS PER MORD

(CD WORKS)

S.
No.

Index
Code

Description of item

Unit

Qty

Rate

Amount

(c) Machinery
Concrete mixer 0.4/0.28 cum capacity

hour

0.40

345.00

138.00

Generator 33 KVA

hour

0.40

620.00

248.00

Vibrator

hour
10.00%

2836.64

283.66

(d) Formwork @ 10% on (a+b+c)

3120.30
Overheads & Contractors Profit @18%

561.65

Deduct 4% VAT

3120.30

-124.81

Add for conveyance of sand

cum

0.45

117.60

52.92

Add for conveyance of metal

cum

0.90

596.40

536.76

Rate per cum = a+b+c+d+e+f


22

RBRSBST-5

4146.83

Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm
metal mechanically mixed in substructure complete as per drawings
and technical specification Clauses 802, 804, 805, 806, 807, 1202 and
1204 MORD and 1500, 1700 & 2200 MORTH ,including overhead charges
& Contractors profit but excluding VAT 5 to 10m height.
R.C.C. grade M 25 (Design Mix)
Height 5m to 10m
Case I : Using concrete Mixer
Per Cum Basic Cost of Labour, Material &
Machinery (a+b+c) of Item VI (i) Case I excluding
of Formwork

cum

2836.64

2836.64

11.80%

2836.64

334.72

1.80%

2836.64

51.06

d) formwork
Add on cost of material, labour and machinery
(a+b+c) for Formwork
Add on cost of material, Labour and machinery
excluding formwork to cater for extra lift

3222.42
Overheads & Contractors Profit @18%
Deduct 4% VAT
Rate perm (a+b+c+d+e+f)

23

RBRSPST-2

580.04
3222.42

-128.90
3673.56

Supplying, fitting, and placing HYSD bar reinforcement in superstructure


complete as per drawing and technical specifications Clauses 1002, 1010
and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over
laps and wastage, where they are not welded ,including overhead charges
& Contractors profit but excluding VAT.

14

RATE ANALYSIS AS PER MORD

(CD WORKS)

S.
No.

Index
Code

Description of item

Unit

HYSD bars including 5 per cent for laps and wastage

Qty

Rate

Amount

Unit = t
(a) Material
1.05 33000.00 34650.00

Binding wire

kg

8.00

52.00

416.00

(b) Labour for cutting, bending, tying and placing


in position
Mate

day

0.00

237.00

0.00

Blacksmith/ Rod Binder

day

3.00

237.00

711.00

Mazdoor (Unskilled)

day

8.44

196.00

1654.24
37431.24

Overheads & Contractors Profit @18%

6737.62

Deduct 4% VAT

37431.24

Rate per t = a+b+c+d


24

RBRSPST-1

-1497.25
42671.61

Providing and laying reinforced cement concrete M25 grade (Design Mix)
using 20 & 10mm metal mechanically mixed in superstructure as per
drawing and technical specifications Clauses 800, 1205.4 and 1205.5
MORD / Sections 1500, 1600 & 1700 MORTH ,including overhead charges
& Contractors profit but excluding VAT upto 5m height.
R.C.C M 25 Grade (Design Mix)
Unit =cum
(i) Height upto 5m
Case I : Using Concrete Mixer.
(a) Material
Cement
Coarse sand
20 mm aggregate
10 mm aggregate
(b) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA
d) For formwork and staging refer to sub-item I
(B) case I above
d)
Formwork and staging of (a+b+c)

t
cum
cum
cum

0.40
0.45
0.54
0.36

2900.00
220.00
1125.00
770.00

1160.00
99.00
607.50
277.20

day
day
day

0.00
0.10
1.39

237.00
258.00
196.00

0.00
25.80
272.44

hour/cu
m
hour

0.40

345.00

138.00

0.40

620.00

248.00

20.00%

2827.94

565.59

15

RATE ANALYSIS AS PER MORD

(CD WORKS)

S.
No.

Index
Code

Description of item

Unit

Qty

Rate

Amount
3393.53

Overheads & Contractors Profit @18%

610.84

Deduct 4% VAT

3393.53

-135.74

Add for conveyance of sand

cum

0.45

117.60

52.92

Add for conveyance of metal

cum

0.90

596.40

536.76

Rate per cum = a+b+c+d+e+f


25

RBRSPST-1

4458.30

Providing and laying reinforced cement concrete M25 grade (Design Mix)
using 20 & 10mm metal mechanically mixed in superstructure as per
drawing and technical specifications Clauses 800, 1205.4 and 1205.5
MORD / Sections 1500, 1600 & 1700 MORTH ,including overhead charges
& Contractors profit but excluding VAT 5 to 10m height.
R.C.C M 25 Grade (Design Mix)
Unit =cum
Height 5m to 10m
Case I : Using Concrete Mixer.
(a) Material
Cement

0.40

2900.00

1160.00

Coarse sand

cum

0.45

220.00

99.00

20 mm aggregate

cum

0.54

1125.00

607.50

10 mm aggregate

cum

0.36

770.00

277.20

Mate

day

0.00

237.00

0.00

Mason (1st Class)

day

0.10

258.00

25.80

Mazdoor (Unskilled)

day

1.39

196.00

272.44

hour/cu
m
hour

0.40

345.00

138.00

0.40

620.00

248.00

25.00%

2827.94

706.99

(b) Labour

c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA
d) For formwork and staging refer to sub-item I
(B) case I above
d)
Formwork and staging of (a+b+c)

3534.93
Overheads & Contractors Profit @18%

636.29

Deduct 4% VAT

3534.93

-141.40

Add for conveyance of sand

cum

0.45

117.60

52.92

Add for conveyance of metal

cum

0.90

596.40

536.76

16

RATE ANALYSIS AS PER MORD

(CD WORKS)

S.
No.

Index
Code

Description of item

Unit

Qty

Rate

Rate per cum = a+b+c+d+e+f


26

RBRSPST-5

Amount
4619.50

Providing and laying cement concrete wearing course M 30 (Design Mix)


grade using 20 & 10mm metal mechanically mixed excluding
reinforcement complete as per drawing and technical specifications
Clauses 800 and 1206.3 MORD and 2702 MORTH ,including overhead
charges & Contractors profit but excluding cost of steel and VAT.
Unit = cum
(a) Material
Cement
Sand
20 mm aggregate
10 mm aggregate
HYSD bar reinforcement including binding wire (Rate
as per item 13.2) except OH & CP
(b) Labour

t
cum
cum
cum
t

Mate

day

0.00

237.00

0.00

Mason (1st Class)

day

0.10

258.00

25.80

Mazdoor (Unskilled)

day

1.39

196.00

272.44

Mazdoor (Unskilled) for cleaning deck slab concrete


surface
c) Machinery

day

0.15

196.00

29.40

Concrete mixer 0.4/0.28 cum capacity

hour

0.40

345.00

138.00

Generator 33 KVA.

hour

0.40

620.00

248.00

3.00%

5436.98

0.45
0.90

5848.09
117.60
596.40

163.11
5848.09
1052.66
-233.92
52.92
536.76

(d) Formwork @ 3% of cost of concrete


Overheads & Contractors Profit @18%
Deduct 4% VAT
Add for conveyance of sand
Add for conveyance of metal

cum
cum

0.407 2900.00
0.45
220.00
0.54 1125.00
0.36
770.00
0.075 37431.24

Rate per cum = a+b+c+d+e+f

ASST.ENGINEER
PIU SD
PIU SD

DY.EXECUTIVE ENGINEER
PIU DIVN.
PR

EXECUTIVE ENGINEER

1180.30
99.00
607.50
277.20
2807.34

7256.50

SUPERINTENDING ENGINEER

17

SPECIFICATION REPORT
Model bridge estimate 6 vent 6.00 m span , 8 vent 6.00 m span

Estimate cost : Rs.

114.33

Lakhs

The above work has been administratively sanctioned vide G.O.Ms.No.330, dated 17.09.2010 by the
Govt.of Andhra Pradesh under PMGSY Phase IX grant.
PROVISIONS MADE IN THE ESTIMATE
The above work estimate is prepared with the following provisions with AP REVISED STANDARD DATAS as
per PMGSY guidelines.
1

Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 as per
Technical Specification 305 MORD / 304 MORTH.

Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size Graded
hard stone aggregate, mechanically mixed, as per drawings and technical specifications Clause 802, 803,
1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

Plain cement concrete M 15 grade using 40,20 & 10mm metal mechanically mixed in substructure complete
as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500,
1700 & 2200 MORTH.

Providing concrete for reinforced concrete M 20 grade (Design Mix) in open foundations using 20 & 10 mm
nominal size Graded hard stone aggregate as per drawings and technical specifications Clause 802, 803,
1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal
mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and
1205.5 MORD / Sections 1500, 1600 & 1700 MORTH.

Providing and laying cement concrete wearing course M 30 (Design Mix) grade using 20 & 10mm metal
mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses
800 and 1206.3 MORD and 2702 MORTH.

Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and
technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH.

Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification
Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH.

Construction of embankment with approved material obtained from borrow pits with all lifts, transporting
to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and
300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 MORD/ 305 MORTH

Construction of granular sub-base by providing well graded material, spreading in uniform layers with
motor grader on prepared surface, and compacting with three wheel 80-100 kN static roller / Vibratory
Roller 80-100 kN as per Technical Specification Clause 402 MORD

Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement
concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other
type as per Clause 1501.2.2 M30 (Grade), as per drawing and Technical Specification Clause 1501 MORD.

10

Preparation of DPR 1% on project cost

The estimate is prepared with the SSR for the year 2010-2011.

ASST.ENGINEER
PIU SD

PIU SD

DY.EXECUTIVE ENGINEER
PIU DIVN.

EXECUTIVE ENGINEER
PR

SUPERINTENDING ENGINEER

DETAILED AND ABSTRACT ESTIMATE


Name of the work :

Model bridge estimate 6 vent 6.00 m span , 8 vent 6.00 m span

Constuction of 6 V of 6m Span High level bridge


Sl.
No
1

Description of item

Nos

Qty in
cum

Rate

Per

Amount

62.25

1 cum

30582

2775.44 1Cum

476581

Earthwork in excavation for structures as per drawing and


technical specifications Clause 305.1 including setting out,
construction of shoring and bracing, removal of stumps
and other deleterious material and disposal upto a lead of
50 m, dressing of sides and bottom and backfilling in
trenches with excavated suitable material as per Technical
Specification 305 MORD / 304 MORTH ,including
overhead charges & Contractors profit but excluding VAT.

For Footings abutments

1 x

2.70

8.70

1.65

77.52

For piers

1 x

3.30

9.60

1.65

261.36

for wing walls


Cut of walls U/S

2 x
1 x

2
1

5.00
40.00

2.35
0.60

1.20
1.50

56.40
36.00

Cut of walls D/S

1 x

40.00

0.60

2.50

60.00
491.28
Cum

Providing concrete for plain concrete M 10 grade in open


foundations using 40 mm nominal size Graded hard stone
aggregate, mechanically mixed, placed in foundation and
compacted by vibration including curing for 14 days
complete as per drawings and technical specifications
Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 &
2100 MORTH ,including overhead charges & Contractors
profit but excluding VAT.

For Footings abutments

1 x

2.70

8.70

0.30

14.09

for wing walls

2 x

5.00

2.35

0.30

14.10

For piers

1 x

3.30

9.60

0.30

47.52

Cut of walls U/S

1 x

40.00

0.60

1.50

36.00

Cut of walls D/S

1 x

40.00

0.60

2.50

60.00
171.71
Cum

Page 20 of 32

Sl.
Description of item
Nos
L
No
3 Plain cement concrete M 15 grade using 40,20 & 10mm
metal mechanically mixed in substructure complete as per
drawings and technical specification Clauses 802, 804,
805, 806, 807, 1202 and 1204 MORD and 1500, 1700 &
2200 MORTH ,including overhead charges & Contractors
profit but excluding VAT.

Qty in
cum

Abutments 1st step


for piers 1st step
for wing walls
2nd step abumtments
piers
wing walls

1
1
2
1
1
2

x
x
x
x
x
x

2
5
2
2
5
2

2.50
3.00
5.00
2.30
2.70
5.00

8.70
9.60
2.35
8.30
9.20
1.95

0.45
0.45
0.45
0.45
0.45
0.45

19.58
64.80
21.15
17.18
55.89
17.55

3rd step abumtments


piers
wing walls
Above GL abutments

1
1
2
1

x
x
x
x

2
5
2
2

2.10
2.40
5.00
7.50

7.90
8.80
1.55

0.45
0.45
0.45
2.10

14.93
47.52
13.95
42.53

Above GL piers

8.40

2.4+1.2
2

2.10

158.76

for wing walls

5.00

1.4+0.7
2

3.00

63.00

1.8+0.9
2

536.83
Cum
4

Per

Amount

3047.26 1Cum

1635868

4.05
15.12
19.17 3760.26 1Cum

72084

Providing concrete for reinforced concrete M 20 grade


(Design Mix) in open foundations using 20 & 10 mm
nominal size Graded hard stone aggregate, mechanically
mixed, placed in foundation and compacted by vibration
including curing for 14 days complete as per drawings and
technical specifications Clause 802, 803, 1202 & 1203
MORD and 1500, 1700 & 2100 MORTH ,including
overhead charges & Contractors profit but excluding VAT.
Bed blocks over abutments
for piers

Rate

1 x
1 x

2
5

7.50
8.40

Providing and laying reinforced cement concrete M25


grade (Design Mix) using 20 & 10mm metal mechanically
mixed in superstructure as per drawing and technical
specifications Clauses 800, 1205.4 and 1205.5 MORD /
Sections 1500, 1600 & 1700 MORTH ,including overhead
charges & Contractors profit but excluding VAT upto 5m
height.

Page 21 of 32

0.90
1.20

0.30
0.30

Sl.
No

Description of item
For Deckslab 1st and last
Centre slabs

1 x
1 x

2
4

7.50
7.50

7.90
7.90

0.45
0.45

Qty in
Rate
Per
cum
53.33
106.65
159.98 4458.30 1Cum

1
1

x
x

713217

2
4

7.50
7.50

7.90
7.90

0.075
0.075

8.89
17.78
26.66

7256.50 1Cum

30.00

42671.61 MT

193477

Supplying, fitting, and placing HYSD bar reinforcement in


superstructure complete as per drawing and technical
specifications Clauses 1002, 1010 and 1202 MORD / 1600
MORTH, for Bars below 36 mm dia including over laps and
wastage, where they are not welded ,including overhead
charges & Contractors profit but excluding VAT.

1280148

Backfilling behind abutment, wing wall and return wall


complete as per drawings & technical specification Clause
1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH
including overhead charges & Contractors profit but
excluding VAT.
1 x

5.00

6.60

3.75+0.6
2

143.55
143.55

Amount

Providing and laying cement concrete wearing course M


30 (Design Mix) grade using 20 & 10mm metal
mechanically mixed excluding reinforcement complete as
per drawing and technical specifications Clauses 800 and
1206.3 MORD and 2702 MORTH ,including overhead
charges & Contractors profit but excluding cost of steel
and VAT.
on slab
Approaches

Nos

324.31

1Cum

46555

118.26

1Cum

42572

Construction of embankment with approved material obtained from


borrow pits with all lifts, transporting to site, spreading, grading to
required slope and compacting to meet requirement of Tables 300.1
and 300.2 with a lead upto 1000 m as per Technical Specification
Clause 301.5 MORD/ 305 MORTH including overhead charges &
Contractor profit, But excluding VAT
Forming approach for diversion

120.00

Page 22 of 32

6.00

0.500

360.00
360.00
Cum

Sl.
Description of item
Nos
L
B
No
10 Construction of granular sub-base by providing well graded
material, spreading in uniform layers with motor grader on prepared
surface, mixing by mix in place method with rotavator at OMC, and
compacting with three wheel 80-100 kN static roller / Vibratory
Roller 80-100 kN capacity to achieve the desired density, complete
as per Technical Specification Clause 402 MORD, including
overhead charges & Contractor profit, But excluding VAT
For approaches

5.00

6.60

0.150

Qty in
cum

Rate

Per

263.03

1Cum

2604

11.25
11.25 3047.26 1Cum
Cum

34282

15.00
15.00 4124.20 1Cum
Cum

61863

9.90
9.90
Cum

Amount

11 Plain cement concrete M 15 grade using 40,20 & 10mm metal


mechanically mixed in substructure complete as per drawings and
technical specification Clauses 802, 804, 805, 806, 807, 1202 and
1204 MORD and 1500, 1700 & 2200 MORTH ,including overhead
charges & Contractors profit but excluding VAT for approaches
levelling course
For approaches

5.00

7.50

0.150

12 Construction of un-reinforced, dowel jointed at expansion and


construction joint only, plain cement concrete pavement, thickness
as per design, over a prepared sub base, with 43 grade cement or
any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine
aggregates conforming to IS : 383, maximum in a concrete mixer of
not less than 0.2 cum capacity and appropeiate weigh batcher using
approved mix design, laid in approved fixed side formwork (steel
channel, laying and fixing of 125 mictron thick polythene film,
wedges, steel plates including levelling the formwork as per
drawing), spreading the concrete with sholvels, rakes, compacted
using needle, scareed and plate vibrators and finished in continuous
operation including provision of contraction and expansion,
construction joints, applying debonding strips, primer, sealant, dowel
bars, near approaches to bridge / culvert and construction joints,
admixtures as approved, curing of concrete slabs for 14- days,
curing compound (where specified) and water finishing to lines and
grade as per drawing and Technical Specification Clause 1501
MORD including overhead charges & Contractors profit but
excluding VAT.
1

5.00

7.50

0.200

13 For guide posts

50000
Total:

ASST.ENGINEER
PIU SD
PIU SD

DY.EXECUTIVE ENGINEER
PIU DIVN.
PR

EXECUTIVE ENGINEER

Page 23 of 32

SUPERINTENDING ENGINEER

4639833

Calculation of Seignorage Charges


Model bridge estimate 6 vent 6.00 m span , 8 vent 6.00 m span
S.No

Item

Quantity
(finished item)

Unit

Material

Qty
(collected)

Rate

Seignorage
Amount

Earth work excavation

491.28

Cum

Earth

491.28

22.00

10808

M10 for foundation

171.71

Cum

M15 for footings

536.83

Cum

Metal
Sand
Metal

154.54
77.27
429.47

50.00
40.00
50.00

7727
3091
21474

Sand

257.68

40.00

10307

Metal

17.25

50.00

863

Sand

8.63

40.00

345

Metal

143.98

50.00

7199

Sand

71.99

40.00

2880

M20 for abutments and piers

M25 for slab

159.98

Rough stone

Back fillwing with gravel

M30 for wearing coat

For diversion road

10

GSB (66% gravel & 34%


sand)

11

12

19.17

M15 for levelling course

For CC pavement

Cum

Cum

0.00

Cum

Metal

0.00

50.00

143.55

Cum

Gravel

157.91

22.00

3474

26.66

Cum

Metal

24.00

50.00

1200

Sand

12.00

40.00

480

360.00

Cum

Gravel

396.00

22.00

8712

9.90

Cum

Gravel

8.42

22.00

185

Sand

4.26

40.00

170

Metal

10.13

50.00

507

Sand

5.06

40.00

202

Metal

13.50

50.00

675

Sand

6.75

40.00

270

11.25

15.00

Cum

Cum

Total Seignorage amount

ASST.ENGINEER
PIU SD
PIU SD

DY.EXECUTIVE ENGINEER
PIU DIVN.

80569

EXECUTIVE ENGINEER
PR

SUPERINTENDING ENGINEER

DETAILED AND ABSTRACT ESTIMATE


Name of the work :

Model bridge estimate 6 vent 6.00 m span , 8 vent 6.00 m span

Constuction of 8 V of 6m Span High level bridge


Sl.
No
1

Description of item

Nos

Qty in
cum

Rate

Per

Amount

62.25

1 cum

38584

2775.44 1Cum

595947

Earthwork in excavation for structures as per drawing and


technical specifications Clause 305.1 including setting out,
construction of shoring and bracing, removal of stumps
and other deleterious material and disposal upto a lead of
50 m, dressing of sides and bottom and backfilling in
trenches with excavated suitable material as per Technical
Specification 305 MORD / 304 MORTH ,including
overhead charges & Contractors profit but excluding VAT.

For Footings abutments

1 x

2.70

8.70

1.65

77.52

For piers

1 x

3.30

9.60

1.65

365.90

for wing walls


Cut of walls U/S

2 x
1 x

2
1

5.00
50.00

2.35
0.60

1.20
1.50

56.40
45.00

Cut of walls D/S

1 x

50.00

0.60

2.50

75.00
619.82
Cum

Providing concrete for plain concrete M 10 grade in open


foundations using 40 mm nominal size Graded hard stone
aggregate, mechanically mixed, placed in foundation and
compacted by vibration including curing for 14 days
complete as per drawings and technical specifications
Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 &
2100 MORTH ,including overhead charges & Contractors
profit but excluding VAT.

For Footings abutments

1 x

2.70

8.70

0.30

14.09

for wing walls

2 x

5.00

2.35

0.30

14.10

For piers

1 x

3.30

9.60

0.30

66.53

Cut of walls U/S

1 x

50.00

0.60

1.50

45.00

Cut of walls D/S

1 x

50.00

0.60

2.50

75.00
214.72
Cum

Page 25 of 32

Sl.
Description of item
Nos
L
No
3 Plain cement concrete M 15 grade using 40,20 & 10mm
metal mechanically mixed in substructure complete as per
drawings and technical specification Clauses 802, 804,
805, 806, 807, 1202 and 1204 MORD and 1500, 1700 &
2200 MORTH ,including overhead charges & Contractors
profit but excluding VAT.

Qty in
cum

Abutments 1st step


for piers 1st step
for wing walls
2nd step abumtments
piers
wing walls

1
1
2
1
1
2

x
x
x
x
x
x

2
7
2
2
7
2

2.50
3.00
5.00
2.30
2.70
5.00

8.70
9.60
2.35
8.30
9.20
1.95

0.45
0.45
0.45
0.45
0.45
0.45

19.58
90.72
21.15
17.18
78.25
17.55

3rd step abumtments


piers
wing walls
Above GL abutments

1
1
2
1

x
x
x
x

2
7
2
2

2.10
2.40
5.00
7.50

7.90
8.80
1.55

0.45
0.45
0.45
2.10

14.93
66.53
13.95
42.53

Above GL piers

8.40

2.4+1.2
2

2.10

222.26

for wing walls

5.00

1.4+0.7
2

3.00

63.00

1.8+0.9
2

667.62
Cum
4

Per

Amount

3047.26 1Cum

2034414

4.05
21.17
25.22 3760.26 1Cum

94826

Providing concrete for reinforced concrete M 20 grade


(Design Mix) in open foundations using 20 & 10 mm
nominal size Graded hard stone aggregate, mechanically
mixed, placed in foundation and compacted by vibration
including curing for 14 days complete as per drawings and
technical specifications Clause 802, 803, 1202 & 1203
MORD and 1500, 1700 & 2100 MORTH ,including
overhead charges & Contractors profit but excluding VAT.
Bed blocks over abutments
for piers

Rate

1 x
1 x

2
7

7.50
8.40

Providing and laying reinforced cement concrete M25


grade (Design Mix) using 20 & 10mm metal mechanically
mixed in superstructure as per drawing and technical
specifications Clauses 800, 1205.4 and 1205.5 MORD /
Sections 1500, 1600 & 1700 MORTH ,including overhead
charges & Contractors profit but excluding VAT upto 5m
height.

Page 26 of 32

0.90
1.20

0.30
0.30

Sl.
No

Description of item
For Deckslab 1st and last
Centre slabs

1 x
1 x

2
6

7.50
7.50

7.90
7.90

0.45
0.45

Qty in
Rate
Per
cum
53.33
159.98
213.30 4458.30 1Cum

1
1

x
x

950956

2
6

7.50
7.50

7.90
7.90

0.075
0.075

8.89
26.66
35.55

7256.50 1Cum

42.00

42671.61 MT

257969

Supplying, fitting, and placing HYSD bar reinforcement in


superstructure complete as per drawing and technical
specifications Clauses 1002, 1010 and 1202 MORD / 1600
MORTH, for Bars below 36 mm dia including over laps and
wastage, where they are not welded ,including overhead
charges & Contractors profit but excluding VAT.

1792208

Backfilling behind abutment, wing wall and return wall


complete as per drawings & technical specification Clause
1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH
including overhead charges & Contractors profit but
excluding VAT.
1 x

5.00

6.60

3.75+0.6
2

143.55
143.55

Amount

Providing and laying cement concrete wearing course M


30 (Design Mix) grade using 20 & 10mm metal
mechanically mixed excluding reinforcement complete as
per drawing and technical specifications Clauses 800 and
1206.3 MORD and 2702 MORTH ,including overhead
charges & Contractors profit but excluding cost of steel
and VAT.
on slab
Approaches

Nos

324.31

1Cum

46555

118.26

1Cum

53215

Construction of embankment with approved material obtained from


borrow pits with all lifts, transporting to site, spreading, grading to
required slope and compacting to meet requirement of Tables 300.1
and 300.2 with a lead upto 1000 m as per Technical Specification
Clause 301.5 MORD/ 305 MORTH including overhead charges &
Contractor profit, But excluding VAT
Forming approach for diversion

150.00

Page 27 of 32

6.00

0.500

450.00
450.00
Cum

Sl.
Description of item
Nos
L
B
No
10 Construction of granular sub-base by providing well graded
material, spreading in uniform layers with motor grader on prepared
surface, mixing by mix in place method with rotavator at OMC, and
compacting with three wheel 80-100 kN static roller / Vibratory
Roller 80-100 kN capacity to achieve the desired density, complete
as per Technical Specification Clause 402 MORD, including
overhead charges & Contractor profit, But excluding VAT
For approaches

5.00

6.60

0.150

Qty in
cum

Rate

Per

263.03

1Cum

2604

11.25
11.25 3047.26 1Cum
Cum

34282

15.00
15.00 4124.20 1Cum
Cum

61863

9.90
9.90
Cum

Amount

11 Plain cement concrete M 15 grade using 40,20 & 10mm metal


mechanically mixed in substructure complete as per drawings and
technical specification Clauses 802, 804, 805, 806, 807, 1202 and
1204 MORD and 1500, 1700 & 2200 MORTH ,including overhead
charges & Contractors profit but excluding VAT for approaches
levelling course
For approaches

5.00

7.50

0.150

12 Construction of un-reinforced, dowel jointed at expansion and


construction joint only, plain cement concrete pavement, thickness
as per design, over a prepared sub base, with 43 grade cement or
any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine
aggregates conforming to IS : 383, maximum in a concrete mixer of
not less than 0.2 cum capacity and appropeiate weigh batcher using
approved mix design, laid in approved fixed side formwork (steel
channel, laying and fixing of 125 mictron thick polythene film,
wedges, steel plates including levelling the formwork as per
drawing), spreading the concrete with sholvels, rakes, compacted
using needle, scareed and plate vibrators and finished in continuous
operation including provision of contraction and expansion,
construction joints, applying debonding strips, primer, sealant, dowel
bars, near approaches to bridge / culvert and construction joints,
admixtures as approved, curing of concrete slabs for 14- days,
curing compound (where specified) and water finishing to lines and
grade as per drawing and Technical Specification Clause 1501
MORD including overhead charges & Contractors profit but
excluding VAT.
1

5.00

7.50

0.200

13 For guide posts

50000
Total:

ASST.ENGINEER
PIU SD
PIU SD

DY.EXECUTIVE ENGINEER
PIU DIVN.
PR

EXECUTIVE ENGINEER

Page 28 of 32

SUPERINTENDING ENGINEER

6013423

Calculation of Seignorage Charges


Model bridge estimate 6 vent 6.00 m span , 8 vent 6.00 m span
S.No

Item

Quantity
(finished item)

Unit

Material

Qty
(collected)

Rate

Seignorage
Amount

Earth work excavation

619.82

Cum

Earth

619.82

22.00

13636

M10 for foundation

214.72

Cum

Metal

193.25

50.00

9663

Sand

96.62

40.00

3865

Metal

534.10

50.00

26705

Sand

320.46

40.00

12818

Metal

22.70

50.00

1135

Sand

11.35

40.00

454

Metal

191.97

50.00

9599

Sand

95.99

40.00

3840

M15 for footings

M20 for abutments and piers

M25 for slab

Rough stone

Back fillwing with gravel

M30 for wearing coat

For diversion road

10

GSB (66% gravel & 34%


sand)

12

25.22

213.30

11

667.62

M15 for levelling course

For CC pavement

Cum

Cum

Cum

0.00

Cum

Metal

0.00

50.00

143.55

Cum

Gravel

157.91

22.00

3474

35.55

Cum

Metal

32.00

50.00

1600

Sand

16.00

40.00

640

450.00

Cum

Gravel

495.00

22.00

10890

9.90

Cum

Gravel

8.42

22.00

185

Sand

4.26

40.00

170

Metal

10.13

50.00

507

Sand

5.06

40.00

202

Metal

13.50

50.00

675

Sand

6.75

40.00

270

11.25

15.00

Cum

Cum

Total Seignorage amount

ASST.ENGINEER
PIU SD
PIU SD

DY.EXECUTIVE ENGINEER