Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
Prepared By:
Date:
I.Q. Corporation
Format Approval
Content Approval
ENGINEERING:
ENGINEERING:
SIGNATURE
SIGNATURE
P. PIPER
Date:
P. PIPER
QUALITY ASSURANCE:
QUALITY ASSURANCE:
SIGNATURE
SIGNATURE
D. NAMED
Date:
D. NAMED
PRODUCTION:
PRODUCTION:
SIGNATURE
SIGNATURE
D. NAMED
Date:
D. NAMED
REGULATORY:
REGULATORY:
SIGNATURE
SIGNATURE
S. NAMED
PRINT
SAMPLE
Date:
S. NAMED
Date:
Date:
Date:
Date:
Page 1 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
TABLE OF CONTENTS
1.0
Purpose
2.0
Scope
3.0
Responsibilities
4.0
References
5.0
System/Equipment Description
6.0
Rationale
7.0
Procedure
8.0
7.1
Controller Qualification
7.2
Acceptance Criteria
Abbreviations
SAMPLE
Page 2 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
1.0
PURPOSE
The purpose of this Controller Qualification (CQ) Protocol is to verify that the CIP/SIP
Control System is installed in accordance with design specifications, manufacturer's
recommendations, and applicable vendor/engineering drawings.
2.0
SCOPE
This Controller Qualification Protocol will be performed on the CIP/SIP Control
System, located in Building 88.
3.0
4.0
RESPONSIBILITIES
3.1
3.2
3.3
3.4
REFERENCES
4.1
SAMPLE
Drawings
4.1.2
Manuals
4.1.3
Specifications
4.1.4
Procedures
Page 3 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
5.0
SYSTEM/EQUIPMENT DESCRIPTION
This protocol addresses the Big Pharma CIP/SIP Control System for Building 88. The
primary function of the CIP/SIP Control System is to perform the sequencing required
to clean the different process piping and equipment in the Big Pharma 88 building.
The correct sequencing is verified through the use of feedback limit switches on each
value and device. CIP/SIP process data is printed on Kaye Digistrip recorders located
in each process area. The process data is directly transmitted, as an analog signal,
from each instrument to each kaye channel.
5.1
PLC Subsystem
B.
C.
5.1.1
SAMPLE
The PLC Subsystem contains the primary processing power for the
entire system. The other subsystems communicate directly to the PLC
Subsystem but cannot operate without it. The PLC Subsystem is
directly responsible for the execution of all CIP/SIP logic The
components of the PLC Subsystems are as follows:
A.
B.
C.
Instrumentation:
The majority of the input sensors are
Thornton instruments.
They measure flow, conductivity,
temperature and levels. The Thornton 770 PCs are devices
which can process four different measurements simultaneously.
Each of the 770 PCs transmitters is connected to a two wire
local area network (LAN) called T-NET.
There are two
separate T-NETS within the plant. The instrument readings are
digitized and transmitted over these T-NETs to the control
coprocessor. The data is then written to the PLC as scaled,
floating point values. The few inputs that are not from the
Thornton network are wired directly to the PLCs analog input
modules.
These instrumentation devices are located
throughout the plant.
Page 4 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
D.
2.
3.
5.1.2
5.1.3
Suite 100
B.
Suite 200
C.
Suite 300
D.
Suite 400
SAMPLE
Page 5 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
6.0
RATIONALE
Where appropriate, testing will be conducted at the field devices and at the PLC to
insure proper system functioning. Testing should not be conducted at field devices
when equipment or personnel safety could be compromised.
7.0
PROCEDURE
7.1
SAMPLE
CONTROLLER QUALIFICATION
7.1.1
7.1.2
7.1.3
7.1.4
7.1.5
B.
C.
D.
E.
F.
G.
Page 6 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
SAMPLE
H.
Utilities - Electrical
I.
J.
K.
L.
M.
N.
Alarm Verification
O.
P.
Q.
Test Equipment
R.
Drawings
S.
T.
Manuals
U.
V.
W.
Page 7 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
7.2
ACCEPTANCE CRITERIA
The Acceptance Criteria are the specific set of standards or design
specifications that each piece of equipment or system must meet in order to
demonstrate a high level of confidence that the system/equipment is capable of
consistently operating within established limits or tolerances.
Acceptance Criteria for Controller Qualification (CQ) may include, but is not
limited to, the follow ing requirements:
Instrumentation:
Utilities:
Security:
Softw are:
SAMPLE
Verification that the application software is the specified revision and that
any subsequent changes made are supported by Change Control SOP 214.
Page 8 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
Verification that the application code is properly annotated and all input and
output software variables have a unique point descriptor assigned to the
point.
Functional:
Verification that all field device alarms and interlocks are properly identified,
function as specified, and where applicable the appropriate response is
observed.
Pow er Failure:
Verification that the CPU and operator interface modules do not experience
a failure due to the removal of power.
Verification that during the Power Failure test, all devices default to a failsafe mode.
Verification that when power is restored, the CPU restarts the program
safely, or returns to an initial condition from which the operator can restart
the operation, and the operator interface panel recovers from the power
failure and is fully functional.
Environment:
SAMPLE
Page 9 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
8.0
ABBREVIATIONS
A
AC
A/C
amp
atm
Ampere
Air conditioning
Alternating Current
Ampere, also A
Atmosphere
mg
mHz
MHz
mm
mmHg
BTU
C
cfm
kVA
cGMP
NIST
cfu
CQ
DPU
Controller Qualification
Distributed process units
OD
ohm/
e.g.,
F
ft./min.
OK
OQ
P&ID
GMP
gph
gpm
HEPA
PH
psf
psi
psig
hp
hr.
Hz
Horsepower
Hour
Hertz
RH
rpm
RTD
i.e.,
in
That is
Inch
s
SOP
IQ
Installation Qualification
k
kg
kV
kW
kWh
l
Kilo
Kilogram
Kilovolt
Kilowatt
Kilowatt-hour
Liter
sq. ft. or
SF
SS
g
V
W
w.c.
lb
m
mb
mfg.
Pound (avoirdupois)
Meter or milli
Millibar
Manufacturing
WIF
WFI
W.G.
w.g.
SAMPLE
NBS
N.V.
Milligram
Millihertz
Megahertz
Millimeter
Conventional millimeter of
mercury
Kilovolt ampere
National Bureau of
Standards
National Institute of
Standards & Technology
Not Visible - requires
disassembly
Outside diameter
The SI unit of electrical
resistance
Okay
Operational Qualification
Piping and Instrumentation
Diagram
Phase (3 PH)
Pounds per square foot
Pounds per square inch
Pounds per square inch,
gauge
Relative humidity
Revolutions per minute
Resistance temperature
detection
Second
Standard Operating
Procedures
Square feet or foot
Stainless steel
Micro
Microgram
Volt (240 V)
Watt
Water closet (Arch.) Or
water column (Mech.)
Weld Inspection Form
Water for Injection
Wire gage
Water gauge
Page 10 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
CONTROLLER QUALIFICATION PREREQUISITES
Before execution of Controller Qualification (CQ) Activities, the following prerequisites must be
addressed and found acceptable and approved by Big Pharma.
Prerequisites
Verified By / Date
______________________________________Big Pharma
SIGNATURE/DATE
SAMPLE
Page 11 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
PURCHASE ORDER INSPECTION
Verify that the specified component is supplied and installed in accordance with specifications and
options indicated by their respective purchase orders. If a purchase order is not available, refer to
applicable drawings such as engineering drawings.
Equipment Name:
Manufacturer:
Equipment ID No.:
Model No.:
Serial No.:
Verified By:
Location:
Purchase Order:
Equipment Status (CIRCLE ONE):
Verified By:
New
Transferred/Used
(Yes / No):
COMMENTS:
Date: ____________________
Date: ____________________
SAMPLE
Page 12 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
PROGRAMMABLE LOGIC CONTROLLER VERIFICATION
Controller Tag ID No.: PLC CIP
Controller Description: Allen Bradley PLC-5 Programmable Logic Controller
Verify the following information about the controller to ensure that it is installed in accordance with
design specification.
Specified
Actual
Manufacturer
Allen-Bradley
Model No.
PLC 5/40
Serial No.
Not Specified
Location
CP-01
NEMA Rating
Not Specified
1785-L40B 1
Rack 0, Group 0
Spare slot
Rack 0, Group 1
Spare slot
Rack 0, Group 2
Spare slot
Rack 0, Group 3
Spare slot
Rack 0, Group 4
Spare slot
Rack 0, Group 5
Spare slot
COMMENTS:
1
CP-01 is on Powerhouse.
Date: ____________________
Date: ____________________
SAMPLE
Page 13 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
PROGRAMMABLE LOGIC CONTROLLER VERIFICATION (CONTD)
Controller Tag ID No.: PLC CIP
Controller Description: Allen Bradley PLC-5 Programmable Logic Controller
Verify the following information about the controller to ensure that it is installed in accordance with
design specification.
Specified
Actual
Rack 0, Group 6
Spare slot
Rack 0, Group 7
Spare slot
Rack 1, Group 0
Spare slot
Rack 1, Group 1
Spare slot
Rack 1, Group 2
Spare slot
Rack 1, Group 3
Spare slot
COMMENTS:
1
Date: ____________________
Date: ____________________
SAMPLE
Page 14 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
PROGRAMMABLE LOGIC CONTROLLER VERIFICATION (CONTD)
Controller Tag ID No.: PLC CIP
Controller Description: Allen Bradley PLC-5 Programmable Logic Controller
Verify the following information about the controller to ensure that it is installed in accordance with
design specification.
Specified
Actual
1771-IBD
1771-IBD
1771-IBD
1771-IBD
1771-IBD
1771-IBD
Rack 2, Group 6
Spare slot
Rack 2, Group 7
Spare slot
COMMENTS:
1
This chassis also contains a remote I/O adapter, model 1771-ASB, in the leftmost slot.
Date: ____________________
Date: ____________________
SAMPLE
Page 15 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
PROGRAMMABLE LOGIC CONTROLLER VERIFICATION (CONTD)
Controller Tag ID No.: PLC CIP
Controller Description: Allen Bradley PLC-5 Programmable Logic Controller
Verify the following information about the controller to ensure that it is installed in accordance with
design specification.
Specified
Actual
1771-OBD
1771-OBD
Rack 3, Group 2
Spare slot
Rack 3, Group 3
Spare slot
Rack 3, Group 4
Spare slot
Rack 3, Group 5
Spare slot
Rack 3, Group 6
Spare slot
Rack 3, Group 7
Spare slot
COMMENTS:
1
Date: ____________________
Date: ____________________
SAMPLE
Page 16 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
PROGRAMMABLE LOGIC CONTROLLER VERIFICATION (CONTD)
Controller Tag ID No.: PLC CIP
Controller Description: Allen Bradley PLC-5 Programmable Logic Controller
Verify the following information about the controller to ensure that it is installed in accordance with
design specification.
Specified
Actual
1771-IBD
1771-IBD
1771-IBD
1771-IBD
1771-IBD
1771-IBD
1771-IBD
1771-IBD
COMMENTS:
1
This chassis also contains remote I/O adapter module in the left most slot. Model #1771-ASB
Date: ____________________
Date: ____________________
SAMPLE
Page 17 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
PROGRAMMABLE LOGIC CONTROLLER VERIFICATION (CONTD)
Controller Tag ID No.: PLC CIP
Controller Description: Allen Bradley PLC-5 Programmable Logic Controller
Verify the following information about the controller to ensure that it is installed in accordance with
design specification.
Specified
Actual
1771-IBD
1771-IBD
1771-IBD
1771-IBD
1771-OBD
1771-OBD
Rack 5, Group 6
Spare slot
1771-IFE
COMMENTS:
1
Date: ____________________
Date: ____________________
SAMPLE
Page 18 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
PROGRAMMABLE LOGIC CONTROLLER VERIFICATION (CONTD)
Controller Tag ID No.: PLC CIP
Controller Description: Allen Bradley PLC-5 Programmable Logic Controller
Verify the following information about the controller to ensure that it is installed in accordance with
design specification.
Specified
Actual
1771-IBD
1771-IBD
1771-IBD
1771-IBD
1771-IBD
1771-IBD
1771-IBD
1771-IBD
COMMENTS:
1
This chassis also contains a remote I/O adapter, model 1771-ASB, in the leftmost slot.
Date: ____________________
Date: ____________________
SAMPLE
Page 19 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
PROGRAMMABLE LOGIC CONTROLLER VERIFICATION (CONTD)
Controller Tag ID No.: PLC CIP
Controller Description: Allen Bradley PLC-5 Programmable Logic Controller
Verify the following information about the controller to ensure that it is installed in accordance with
design specification.
Specified
1771-IBD
1771-OBD
1771-OBD
Rack 7, Group 3
Spare Slot
Rack 7, Group 4
Spare Slot
Rack 7, Group 5
Spare Slot
Rack 7, Group 6
Spare Slot
1771-IFE
Actual
COMMENTS:
1
Date: ____________________
Date: ____________________
SAMPLE
Page 20 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
PROGRAMMABLE LOGIC CONTROLLER VERIFICATION (CONTD)
Controller Tag ID No.: PLC CIP
Controller Description: Allen Bradley PLC-5 Programmable Logic Controller
Verify the following information about the controller to ensure that it is installed in accordance with
design specification.
Specified
1771-IBD
1771-IBD
1771-OBD
1771-IBD
Spare Slot
Spare Slot
Spare Slot
Spare Slot
Actual
COMMENTS:
1
2
3
Date: ____________________
Date: ____________________
SAMPLE
Page 21 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
PROGRAMMABLE LOGIC CONTROLLER VERIFICATION (CONTD)
Controller Tag ID No.: PLC CIP
Controller Description: Allen Bradley PLC-5 Programmable Logic Controller
Verify the following information about the controller to ensure that it is installed in accordance with
design specification.
Specified
Actual
Spare Slot
Spare Slot
Spare Slot
Spare Slot
Spare Slot
Spare Slot
Spare Slot
Spare Slot
COMMENTS:
1
Date: ____________________
Date: ____________________
SAMPLE
Page 22 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY CONTROL SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Designated
Actual
System Type:
Operator Terminal
Manufacturer:
Allen-Bradley
ID No.:
Main OCS
Model No.:
Serial No.:
IMOGN95SK
Location:
CP-01 Powerhouse
NEMA Rating:
NEMA type 4
Yes
Firmware Version:
5.0
Reference Documents:
See below
COMMENTS:
1
Date: ____________________
Date: ____________________
SAMPLE
Page 23 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Operator Terminal
Manufacturer:
Nematron
CP-02
Model No.:
IWS-120
Serial No.:
Not Specified
Location:
CP-02
NEMA Rating:
NEMA 4X
Yes
Firmware Version:
2.00
Unit Rev:
Reference Documents:
COMMENTS:
1
Date: ____________________
Date: ____________________
SAMPLE
Page 24 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Operator Terminal
Manufacturer:
Nematron
CP-03
Model No.:
IWS-120
Serial No.:
Not Specified
Location:
CP-03
NEMA Rating:
NEMA 4X
Yes
Firmware Version:
2.00
Unit Rev:
Reference Documents:
COMMENTS:
1
Date: ____________________
Date: ____________________
SAMPLE
Page 25 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Operator Terminal
Manufacturer:
Nematron
CP-04
Model No.:
IWS-120
Serial No.:
Not Specified
Location:
NEMA Rating:
NEMA 4X
Yes
Firmware Version:
2.00
Unit Rev:
Reference Documents:
COMMENTS:
1
Date: ____________________
Date: ____________________
SAMPLE
Page 26 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Operator Terminal
Manufacturer:
Nematron
CP-05
Model No.:
IWS-120
Serial No.:
Not Specified
Location:
NEMA Rating:
NEMA 4X
Yes
Firmware Version:
2.00
Unit Rev:
Reference Documents:
COMMENTS:
1
Date: ____________________
Date: ____________________
SAMPLE
Page 27 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Operator Terminal
Manufacturer:
Nematron
CP-TT-07
Model No.:
IWS-120
Serial No.:
Not Specified
Location:
NEMA Rating:
NEMA 4X
Yes
Firmware Version:
2.00
Unit Rev:
Reference Documents:
COMMENTS:
1
Date: ____________________
Date: ____________________
SAMPLE
Page 28 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Operator Terminal
Manufacturer:
Nematron
CP-07
Model No.:
IWS-120
Serial No.:
Not Specified
Location:
NEMA Rating:
NEMA 4X
Yes
Firmware Version:
2.00
Unit Rev:
Reference Documents:
COMMENTS:
1
Date: ____________________
Date: ____________________
SAMPLE
Page 29 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
System Type:
Industrial Computer
Manufacturer:
Action Instruments
Not Specified
Model No.:
CMPC-5BOXPC
Serial No.:
A316J
Location:
CP-01 Powerhouse
NEMA Rating:
Not Specified
Yes
Actual
COMMENTS:
Date: ____________________
Date: ____________________
SAMPLE
Page 30 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Microprocessor Recorder
Manufacturer:
Kaye
CP-02
Model No.:
Digistrip 4S Plus
Serial No.:
Not Specified
Location:
NEMA Rating:
Not Specified
Not Specified
Firmware Version
Not Specified
Reference Documents:
COMMENTS:
1
This recorder is used to monitor both CIP/SIP parameters and process parameters.
Date: ____________________
Date: ____________________
SAMPLE
Page 31 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Microprocessor Recorder
Manufacturer:
Kaye
CP-05
Model No.:
Digistrip 4S Plus
Serial No.:
Not Specified
Location:
Suite 200
NEMA Rating:
Not Specified
Not Specified
Firmware Version
Not Specified
Reference Documents:
COMMENTS:
1
This recorder is used to monitor both CIP/SIP parameters and process parameters.
Date: ____________________
Date: ____________________
SAMPLE
Page 32 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Microprocessor Recorder
Manufacturer:
Kaye
Digistrip 4S Plus
Serial No.:
Not Specified
Location:
Suite 300
NEMA Rating:
Not Specified
Not Specified
Firmware Version
Not Specified
Reference Documents:
COMMENTS:
1
This recorder is used to monitor both CIP/SIP parameters and dispatch parameters.
Date: ____________________
Date: ____________________
SAMPLE
Page 33 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Microprocessor Recorder
Manufacturer:
Kaye
CP-40
Model No.:
Digistrip 4S Plus
Serial No.:
Not Specified
Location:
Suite 400
NEMA Rating:
Not Specified
Not Specified
Firmware Version
Not Specified
Reference Documents:
COMMENTS:
1
Date: ____________________
Date: ____________________
SAMPLE
Page 34 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Microprocessor Recorder
Manufacturer:
Kaye
CP-22
Model No.:
Digistrip 4S Plus
Serial No.:
Not Specified
Location:
Powerhouse
NEMA Rating:
Not Specified
Not Specified
Firmware Version
Not Specified
Reference Documents:
COMMENTS:
1
Date: ____________________
Date: ____________________
SAMPLE
Page 35 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
System Type:
Solenoid Bank
Manufacturer:
SMC
Model No.:
IN313-AB1
Serial No.:
Not Specified
Location:
CP-S-04
NEMA Rating:
Not Specified
Not Specified
Actual
Reference Documents:
COMMENTS:
1
This device is connected to the CIP PLC 5/40 via a remote I/O link. The device is directly addressed as
0:100/0-15.
Date: ____________________
Date: ____________________
SAMPLE
Page 36 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
System Type:
Solenoid Bank
Manufacturer:
SMC
Model No.:
IN313-AB1
Serial No.:
Not Specified
Location:
CP-S-08,
NEMA Rating:
Not Specified
Not Specified
Actual
Reference Documents:
COMMENTS:
1
This device is connected to the CIP PLC 5/40 via a remote I/O link. The device is directly addressed as
0:120/0-15.
Date: ____________________
Date: ____________________
SAMPLE
Page 37 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
System Type:
Solenoid Bank
Manufacturer:
SMC
Model No.:
IN313-AB1
Serial No.:
Not Specified
Location:
CP-S-08, Area
NEMA Rating:
Not Specified
Not Specified
Actual
Reference Documents:
COMMENTS:
1
This device is connected to the CIP PLC 5/40 via a remote I/O link. The device is directly addressed as
0:122/0-15.
Date: ____________________
Date: ____________________
SAMPLE
Page 38 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents..
Specified
System Type:
Solenoid Bank
Manufacturer:
SMC
Model No.:
IN313-AB1
Serial No.:
Not Specified
Location:
CP-S-09
NEMA Rating:
Not Specified
Not Specified
Actual
Reference Documents:
COMMENTS:
1
This device is connected to the CIP PLC 5/40 via a remote I/O link. The device is directly addressed as
0:124/0-15.
Date: ____________________
Date: ____________________
SAMPLE
Page 39 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
System Type:
Solenoid Bank
Manufacturer:
SMC
Model No.:
IN313-AB1
Serial No.:
Not Specified
Location:
CP-S-10, Powerhouse
NEMA Rating:
Not Specified
Not Specified
Actual
Reference Documents:
COMMENTS:
1
This device is connected to the CIP PLC 5/40 via a remote I/O link. The device is directly addressed as
0:126/0-15
Date: ____________________
Date: ____________________
SAMPLE
Page 40 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
System Type:
Solenoid Bank
Manufacturer:
SMC
Model No.:
IN313-AB1
Serial No.:
Not Specified
Location:
CP-S-01
NEMA Rating:
Not Specified
Not Specified
Actual
Reference Documents:
COMMENTS:
1
This device is connected to the CIP PLC 5/40 via a remote I/O link. The device is directly addressed as
0:140/0-15.
Date: ____________________
Date: ____________________
SAMPLE
Page 41 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
System Type:
Solenoid Bank
Manufacturer:
SMC
Model No.:
IN313-AB1
Serial No.:
Not Specified
Location:
CP-S-01
NEMA Rating:
Not Specified
Not Specified
Actual
Reference Documents:
COMMENTS:
1
This device is connected to the CIP PLC 5/40 via a remote I/O link. The device is directly addressed as
0:142/0-15.
Date: ____________________
Date: ____________________
SAMPLE
Page 42 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
System Type:
Solenoid Bank
Manufacturer:
SMC
Model No.:
IN313-AB1
Serial No.:
Not Specified
Location:
CP-S-02
NEMA Rating:
Not Specified
Not Specified
Actual
Reference Documents:
COMMENTS:
1
This device is connected to the CIP PLC 5/40 via a remote I/O link. The device is directly addressed as
0:144/0-15.
Date: ____________________
Date: ____________________
SAMPLE
Page 43 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
System Type:
Solenoid Bank
Manufacturer:
SMC
Model No.:
IN313-AB1
Serial No.:
Not Specified
Location:
CP-S-02
NEMA Rating:
Not Specified
Not Specified
Actual
Reference Documents:
COMMENTS:
1
This device is connected to the CIP PLC 5/40 via a remote I/O link. The device is directly addressed as
0:146/0-15.
Date: ____________________
Date: ____________________
SAMPLE
Page 44 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents..
Specified
System Type:
Solenoid Bank
Manufacturer:
SMC
Model No.:
IN313-AB1
Serial No.:
Not Specified
Location:
CP-S-03
NEMA Rating:
Not Specified
Not Specified
Actual
Reference Documents:
COMMENTS:
1
This device is connected to the CIP PLC 5/40 via a remote I/O link. The device is directly addressed as
0:150/0-15.
Date: ____________________
Date: ____________________
SAMPLE
Page 45 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
System Type:
Solenoid Bank
Manufacturer:
SMC
Model No.:
IN313-AB1
Serial No.:
Not Specified
Location:
CP-S-05
NEMA Rating:
Not Specified
Not Specified
Actual
Reference Documents:
COMMENTS:
1
This device is connected to the CIP PLC 5/40 via a remote I/O link. The device is directly addressed as
0:160/0-15.
Date: ____________________
Date: ____________________
SAMPLE
Page 46 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
System Type:
Solenoid Bank
Manufacturer:
SMC
Model No.:
IN313-AB1
Serial No.:
Not Specified
Location:
CP-S-05
NEMA Rating:
Not Specified
Not Specified
Actual
Reference Documents:
COMMENTS:
1
This device is connected to the CIP PLC 5/40 via a remote I/O link. The device is directly addressed as
0:162/0-15.
Date: ____________________
Date: ____________________
SAMPLE
Page 47 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
System Type:
Solenoid Bank
Manufacturer:
SMC
Model No.:
IN313-AB1
Serial No.:
Not Specified
Location:
CP-S-06
NEMA Rating:
Not Specified
Not Specified
Actual
Reference Documents:
COMMENTS:
1
This device is connected to the CIP PLC 5/40 via a remote I/O link. The device is directly addressed as
0:164/0-15.
Date: ____________________
Date: ____________________
SAMPLE
Page 48 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
System Type:
Solenoid Bank
Manufacturer:
SMC
Model No.:
IN313-AB1
Serial No.:
Not Specified
Location:
CP-S-07
NEMA Rating:
Not Specified
Not Specified
Actual
Reference Documents:
COMMENTS:
1
This device is connected to the CIP PLC 5/40 via a remote I/O link. The device is directly addressed as
0:166/0-15.
Date: ____________________
Date: ____________________
SAMPLE
Page 49 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Manufacturer:
Thornton
Gateway 1, T-NET-2
Model No.:
770 PC
Serial No.:
Location:
CP-TT-05
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
Date: ____________________
Date: ____________________
SAMPLE
Page 50 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Manufacturer:
Thornton
TT-035/036
Model No.:
770 PC
Serial No.:
Location:
CP-TT-05
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
It has four individual software controlled set-points which can be set as a high or low limit. Any set-point
can be programmed to operate one of two output relays.
5
Date: ____________________
Date: ____________________
SAMPLE
Page 51 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Manufacturer:
Thornton
TT-034/044
Model No.:
770 PC
Serial No.:
Location:
CP-TT-05
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
It has four individual software controlled set-points which can be set as a high or low limit. Any set-point
can be programmed to operate one of two output relays.
5
Date: ____________________
Date: ____________________
SAMPLE
Page 52 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Process Controller /
Conductivity / Flow Meter
Manufacturer:
Thornton
Model No.:
770 PC
Serial No.:
Location:
CP-TT-05
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
It has four individual software controlled set-points which can be set as a high or low limit. Any set-point
can be programmed to operate one of two output relays. It has temperature compensation with automatic
reference to 25 C conductivity.
5
Date: ____________________
Date: ____________________
SAMPLE
Page 53 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Process Controller /
Conductivity / Flow Meter
Manufacturer:
Thornton
Model No.:
770 PC
Serial No.:
Location:
CP-TT-05
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
It has four individual software controlled set-points which can be set as a high or low limit. Any set-point
can be programmed to operate one of two output relays. It has temperature compensation with automatic
reference to 25 C conductivity.
5
Date: ____________________
Date: ____________________
SAMPLE
Page 54 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Process Controller /
Conductivity Meter
Manufacturer:
Thornton
CIT-048 / TT-047
Model No.:
770 PC
Serial No.:
Location:
CP-TT-05
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
It has four individual software controlled set-points which can be set as a high or low limit. Any set-point
can be programmed to operate one of two output relays. It has temperature compensation with automatic
reference to 25 C conductivity.
5
Date: ____________________
Date: ____________________
SAMPLE
Page 55 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Manufacturer:
Thornton
TT-045/046
Model No.:
770 PC
Serial No.:
Location:
CP-TT-05
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
It has four individual software controlled set-points which can be set as a high or low limit. Any setpoint can be programmed to operate one of two output relays.
Date: ____________________
Date: ____________________
SAMPLE
Page 56 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Manufacturer:
Thornton
TT-625/626
Model No.:
770 PC
Serial No.:
Location:
CP-TT-01
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
It has four individual software controlled set-points which can be set as a high or low limit. Any setpoint can be programmed to operate one of two output relays.
Date: ____________________
Date: ____________________
SAMPLE
Page 57 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Process Controller /
Temperature Meter
Manufacturer:
Thornton
TT-623/624
Model No.:
770 PC
Serial No.:
Location:
CP-TT-01
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
It has four individual software controlled set-points which can be set as a high or low limit. Any setpoint can be programmed to operate one of two output relays.
SAMPLE
Date: ____________________
Page 58 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Process Controller /
Temperature Meter
Manufacturer:
Thornton
TT-683/695
Model No.:
770 PC
Serial No.:
Location:
CP-TT-01
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
It has four individual software controlled set-points which can be set as a high or low limit. Any setpoint can be programmed to operate one of two output relays.
Date: ____________________
Date: ____________________
SAMPLE
Page 59 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Process Controller /
Temperature Meter
Manufacturer:
Thornton
TT-699/700
Model No.:
770 PC
Serial No.:
Location:
CP-TT-01
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
It has four individual software controlled set-points which can be set as a high or low limit. Any setpoint can be programmed to operate one of two output relays.
Date: ____________________
Date: ____________________
SAMPLE
Page 60 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Process Controller /
Conductivity / Flow Meter
Manufacturer:
Thornton
Model No.:
770 PC
Serial No.:
Location:
CP-TT-08
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
It has four individual software controlled set-points which can be set as a high or low limit. Any setpoint can be programmed to operate one of two output relays. It has temperature compensation with
automatic reference to 25 C conductivity.
Date: ____________________
Date: ____________________
SAMPLE
Page 61 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Process Controller /
Conductivity / Flow Meter
Manufacturer:
Thornton
Model No.:
770 PC
Serial No.:
Location:
CP-TT-08,
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
It has four individual software controlled set-points which can be set as a high or low limit. Any setpoint can be programmed to operate one of two output relays. It has temperature compensation with
automatic reference to 25 C conductivity.
Date: ____________________
Date: ____________________
SAMPLE
Page 62 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Process Controller /
Temperature Meter
Manufacturer:
Thornton
TT-645/665
Model No.:
770 PC
Serial No.:
Location:
CP-TT-06
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
It has four individual software controlled set-points which can be set as a high or low limit. Any setpoint can be programmed to operate one of two output relays.
Date: ____________________
Date: ____________________
SAMPLE
Page 63 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Process Controller /
Conductivity Meter
Manufacturer:
Thornton
CIT-621 / TT-622
Model No.:
770 PC
Serial No.:
Location:
CP-TT-06
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
It has four individual software controlled set-points which can be set as a high or low limit. Any setpoint can be programmed to operate one of two output relays. It has temperature compensation with
automatic reference to 25 C conductivity.
Date: ____________________
Date: ____________________
SAMPLE
Page 64 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Process Controller /
Conductivity / Flow Meter
Manufacturer:
Thornton
Model No.:
770 PC
Serial No.:
Location:
CP-TT-06
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
It has four individual software controlled set-points which can be set as a high or low limit. Any setpoint can be programmed to operate one of two output relays. It has temperature compensation with
automatic reference to 25 C conductivity.
Date: ____________________
Date: ____________________
SAMPLE
Page 65 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Process Controller /
Conductivity / Flow Meter
Manufacturer:
Thornton
Model No.:
770 PC
Serial No.:
Location:
CP-TT-06
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
It has four individual software controlled set-points which can be set as a high or low limit. Any setpoint can be programmed to operate one of two output relays. It has temperature compensation with
automatic reference to 25 C conductivity.
Date: ____________________
Date: ____________________
SAMPLE
Page 66 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents..
Specified
Actual
System Type:
Process Controller /
Temperature Meter
Manufacturer:
Thornton
TT-661/662
Model No.:
770 PC
Serial No.:
Location:
CP-TT-06
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
It has four individual software controlled set-points which can be set as a high or low limit. Any setpoint can be programmed to operate one of two output relays.
Date: ____________________
Date: ____________________
SAMPLE
Page 67 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Manufacturer:
Thornton
Model No.:
770 PC
Serial No.:
Location:
CP-TT-06
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
Date: ____________________
Date: ____________________
SAMPLE
Page 68 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Manufacturer:
Thornton
Model No.:
770 PC
Serial No.:
Location:
CP-TT-02, Powerhouse
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
Date: ____________________
Date: ____________________
SAMPLE
Page 69 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Manufacturer:
Thornton
TT-101
Model No.:
770 PC
Serial No.:
Location:
CP-TT-02, Powerhouse
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
It has four individual software controlled set-points which can be set as a high or low limit. Any setpoint can be programmed to operate one of two output relays.
Date: ____________________
Date: ____________________
SAMPLE
Page 70 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Manufacturer:
Thornton
TT-103 / LT-104
Model No.:
770 PC
Serial No.:
Location:
CP-TT-02, Powerhouse
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
It has four individual software controlled set-points which can be set as a high or low limit. Any setpoint can be programmed to operate one of two output relays.
Date: ____________________
Date: ____________________
SAMPLE
Page 71 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Manufacturer:
Thornton
TT-115 / LT-116
Model No.:
770 PC
Serial No.:
Location:
CP-TT-02, Powerhouse
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
It has four individual software controlled set-points which can be set as a high or low limit. Any setpoint can be programmed to operate one of two output relays.
Date: ____________________
Date: ____________________
SAMPLE
Page 72 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Manufacturer:
Thornton
Model No.:
770 PC
Serial No.:
Location:
CP-TT-03, Powerhouse
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
It has four individual software controlled set-points which can be set as a high or low limit. Any setpoint can be programmed to operate one of two output relays. It has temperature compensation with
automatic reference to 25 C conductivity.
Date: ____________________
Date: ____________________
SAMPLE
Page 73 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Manufacturer:
Thornton
Model No.:
770 PC
Serial No.:
Location:
CP-TT-03, Powerhouse
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
It has four individual software controlled set-points which can be set as a high or low limit. Any setpoint can be programmed to operate one of two output relays. It has temperature compensation with
automatic reference to 25 C conductivity.
Date: ____________________
Date: ____________________
SAMPLE
Page 74 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Process Controller /
Conductivity / Flow Meter
Manufacturer:
Thornton
Model No.:
770 PC
Serial No.:
Location:
CP-TT-04, Area 2
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
It has four individual software controlled set-points which can be set as a high or low limit. Any setpoint can be programmed to operate one of two output relays. It has temperature compensation with
automatic reference to 25 C conductivity.
Date: ____________________
Date: ____________________
SAMPLE
Page 75 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Process Controller /
Conductivity Meter
Manufacturer:
Thornton
CIT-131 / TT-132
Model No.:
770 PC
Serial No.:
Location:
CP-TT-04, Area 2
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
It has four individual software controlled set-points which can be set as a high or low limit. Any setpoint can be programmed to operate one of two output relays. It has temperature compensation with
automatic reference to 25 C conductivity.
Date: ____________________
Date: ____________________
SAMPLE
Page 76 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Process Controller /
Temperature Meter
Manufacturer:
Thornton
TT-219/220
Model No.:
770 PC
Serial No.:
Location:
CP-TT-07
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
It has four individual software controlled set-points which can be set as a high or low limit. Any setpoint can be programmed to operate one of two output relays.
Date: ____________________
Date: ____________________
SAMPLE
Page 77 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Process Controller /
Temperature Meter
Manufacturer:
Thornton
TT-212/233
Model No.:
770 PC
Serial No.:
Location:
CP-TT-07
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
It has four individual software controlled set-points which can be set as a high or low limit. Any setpoint can be programmed to operate one of two output relays.
Date: ____________________
Date: ____________________
SAMPLE
Page 78 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Process Controller /
Conductivity / Flow Meter
Manufacturer:
Thornton
Model No.:
770 PC
Serial No.:
Location:
CP-TT-07
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
It has four individual software controlled set-points which can be set as a high or low limit. Any setpoint can be programmed to operate one of two output relays. It has temperature compensation with
automatic reference to 25 C conductivity.
Date: ____________________
Date: ____________________
SAMPLE
Page 79 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Process Controller /
Conductivity / Flow Meter
Manufacturer:
Thornton
Model No.:
770 PC
Serial No.:
Location:
CP-TT-07
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
It has four individual software controlled set-points which can be set as a high or low limit. Any setpoint can be programmed to operate one of two output relays. It has temperature compensation with
automatic reference to 25 C conductivity.
Date: ____________________
Date: ____________________
SAMPLE
Page 80 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Process Controller /
Temperature Meter
Manufacturer:
Thornton
TT-216
Model No.:
770 PC
Serial No.:
Location:
CP-TT-07
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
It has four individual software controlled set-points which can be set as a high or low limit. Any setpoint can be programmed to operate one of two output relays.
Date: ____________________
Date: ____________________
SAMPLE
Page 81 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Process Controller /
Temperature Meter
Manufacturer:
Thornton
TT-235
Model No.:
770 PC
Serial No.:
Location:
CP-TT-07
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
It has four individual software controlled set-points which can be set as a high or low limit. Any setpoint can be programmed to operate one of two output relays.
Date: ____________________
Date: ____________________
SAMPLE
Page 82 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Process Controller /
Temperature Meter
Manufacturer:
Thornton
TT-226
Model No.:
770 PC
Serial No.:
Location:
CP-TT-07
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
It has four individual software controlled set-points which can be set as a high or low limit. Any setpoint can be programmed to operate one of two output relays.
Date: ____________________
Date: ____________________
SAMPLE
Page 83 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Manufacturer:
Thornton
Model No.:
770 PC
Serial No.:
Location:
CP-TT-07
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
This has an RS-232 Interface and a amp fuse circuit protection located on the back plane of the
printed circuit board.
Date: ____________________
Date: ____________________
SAMPLE
Page 84 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
System Type:
Manufacturer:
Acopian
P1
Model No.:
A24H1200
Serial No.:
Not Specified
Location:
CP-01
NEMA Rating:
Not Specified
Not Specified
Actual
Reference Documents:
COMMENTS:
1
This device powers discrete I/O circuits and the SMC Solenoid bank valves.
Date: ____________________
Date: ____________________
SAMPLE
Page 85 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
System Type:
Manufacturer:
Acopian
P2
Model No.:
A30MT210
Serial No.:
Not Specified
Location:
CP-01
NEMA Rating:
Not Specified
Not Specified
Actual
Reference Documents:
COMMENTS:
1
Date: ____________________
Date: ____________________
SAMPLE
Page 86 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
System Type:
Manufacturer:
Acopian
P3
Model No.:
A24MT210
Serial No.:
Not Specified
Location:
CP-01
NEMA Rating:
Not Specified
Not Specified
Actual
Reference Documents:
COMMENTS:
1
Date: ____________________
Date: ____________________
SAMPLE
Page 87 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Power Supply
Manufacturer:
Allen Bradley
None
Model No.:
1771-P7
Serial No.:
Not Specified
Location:
CP-01, Chassis 1
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
Date: ____________________
Date: ____________________
SAMPLE
Page 88 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Power Supply
Manufacturer:
Allen Bradley
None
Model No.:
1771-P7
Serial No.:
Not Specified
Location:
CP-01, Chassis 2
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
Date: ____________________
Date: ____________________
SAMPLE
Page 89 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Power Supply
Manufacturer:
Allen Bradley
None
Model No.:
1771-P7
Serial No.:
Not Specified
Location:
CP-01A, Chassis 3
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
Date: ____________________
Date: ____________________
SAMPLE
Page 90 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Power Supply
Manufacturer:
Allen Bradley
None
Model No.:
1771-P7
Serial No.:
Not Specified
Location:
CP-01A, Chassis 4
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
Date: ____________________
Date: ____________________
SAMPLE
Page 91 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
Actual
System Type:
Power Supply
Manufacturer:
Allen Bradley
None
Model No.:
1771-P7
Serial No.:
Not Specified
Location:
CP-01A, Chassis 5
NEMA Rating:
Not Specified
Not Specified
Reference Documents:
COMMENTS:
1
Date: ____________________
Date: ____________________
SAMPLE
Page 92 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
System Type:
Manufacturer:
Acopian
P4
Model No.:
A24H1500
Serial No.:
Not Specified
Location:
CP-01A
NEMA Rating:
Not Specified
Not Specified
Actual
Reference Documents:
COMMENTS:
1
This device supplies the discrete I/O and the SMC Solenoid bank valves
Date: ____________________
Date: ____________________
SAMPLE
Page 93 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
System Type:
Manufacturer:
Acopian
P5
Model No.:
A30MT210
Serial No.:
Not Specified
Location:
CP-01A
NEMA Rating:
Not Specified
Not Specified
Actual
Reference Documents:
COMMENTS:
1
Date: ____________________
Date: ____________________
SAMPLE
Page 94 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ANCILLARY SYSTEM SPECIFICATION VERIFICATION
Verify the controller contact ancillary system(s), and components, such as, controls, monitors,
processors, I/O modules, recorders, etc., are installed in accordance with applicable
documents.
Specified
System Type:
Manufacturer:
Acopian
P6
Model No.:
A24MT210
Serial No.:
Not Specified
Location:
CP-01A
NEMA Rating:
Not Specified
Not Specified
Actual
Reference Documents:
COMMENTS:
1
Date: ____________________
Date: ____________________
SAMPLE
Page 95 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
HARDWARE CONFIGURATION VERIFICATION - JUMPERS
Document any jumper configurations for each major component. Verify all configurations in
accordance with the reference document(s). If specifications are available document source
information.
Hardware
Specified
Location
Equipment Name
Actual
See Below
Off
On
DH+ Address
SW2
2 3 4 5 6
7 8 9 10
2 3 4 5 6
7 8 9 10
Off
On
Communication Mode
Comments:
Note: Processor is at DH+ address 24 and its communications mode should be set to RS-232.
Reference Documents:
Date: ____________________
Date: ____________________
SAMPLE
Page 96 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
HARDWARE CONFIGURATION VERIFICATION - JUMPERS
Document any jumper configurations for each major component. Verify all configurations in
accordance with the reference document(s). If specifications are available document source
information.
Hardware
Specified
Actual
Location
Equipment Name
See Below
Last State Jumpers
1
Verify / Date
Comments:
Set for minimum output on rack fault.
Reference Documents:
Allen Bradley publication 1771-6.5.3.0
Date: ____________________
Date: ____________________
SAMPLE
Page 97 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
HARDWARE CONFIGURATION VERIFICATION - JUMPERS
Document any jumper configurations for each major component. Verify all configurations in
accordance with the reference document(s). If specifications are available document source
information.
Hardware
Specified
Actual
Location
Equipment Name
See Below
Last State Jumpers
1
Verify / Date
Comments:
Set for minimum output on rack fault.
Reference Documents:
Allen Bradley publication 1771-6.5.3.0
Date: ____________________
Date: ____________________
SAMPLE
Page 98 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
HARDWARE CONFIGURATION VERIFICATION - JUMPERS
Document any jumper configurations for each major component. Verify all configurations in
accordance with the reference document(s). If specifications are available document source
information.
Hardware
Specified
Actual
Location
Equipment Name
See Below
Last State Jumpers
1
Verify / Date
Comments:
Set for minimum output on rack fault.
Reference Documents:
Allen Bradley publication 1771-6.5.3.0
Date: ____________________
Date: ____________________
SAMPLE
Page 99 of 211
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
HARDWARE CONFIGURATION VERIFICATION - JUMPERS
Document any jumper configurations for each major component. Verify all configurations in
accordance with the reference document(s). If specifications are available document source
information.
Hardware
Specified
Actual
Location
Equipment Name
Channel 2
See Below
Verify / Date
1
3
29
31
11
Channel 6
13
Channel 3
27
15
Verify / Date
33
35
37
Channel 7
39
17
41
19
43
Channel 4
21
Channel 8
45
23
25
47
49
Comments:
Reference Documents:
Allen Bradley publication 1771-6.5.90
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
HARDWARE CONFIGURATION VERIFICATION - JUMPERS
Document any jumper configurations for each major component. Verify all configurations in
accordance with the reference document(s). If specifications are available document source
information.
Hardware
Specified
Location
Equipment Name
Actual
See Below
Open/Off
Closed/On
1
SW2
2 3 4 5 6
7 8 9 10
2 3 4 5 6
7 8 9 10
Open/Off
Closed/On
Comments:
Reference Documents:
Allen Bradley publication 1771-2.48
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
HARDWARE CONFIGURATION VERIFICATION - JUMPERS
Document any jumper configurations for each major component. Verify all configurations in
accordance with the reference document(s). If specifications are available document source
information.
Hardware
Specified
Location
Equipment Name
Actual
See Below
Open/Off
Closed/On
1
SW2
2 3 4 5 6
7 8 9 10
2 3 4 5 6
7 8 9 10
Open/Off
Closed/On
Comments:
Reference Documents:
Allen Bradley publication 1771-2.48
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
HARDWARE CONFIGURATION VERIFICATION - JUMPERS
Document any jumper configurations for each major component. Verify all configurations in
accordance with the reference document(s). If specifications are available document source
information.
Hardware
Specified
Actual
Location
Equipment Name
Channel 2
See Below
Verify / Date
1
3
29
31
11
Channel 6
13
Channel 3
27
15
Verify / Date
33
35
37
Channel 7
39
17
41
19
43
Channel 4
21
Channel 8
45
23
25
47
49
Comments:
Reference Documents:
Allen Bradley publication 1771-6.5.90
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
HARDWARE CONFIGURATION VERIFICATION - JUMPERS
Document any jumper configurations for each major component. Verify all configurations in
accordance with the reference document(s). If specifications are available document source
information.
Hardware
Specified
Location
Equipment Name
Actual
See Below
Open/Off
Closed/On
1
SW2
2 3 4 5 6
7 8 9 10
2 3 4 5 6
7 8 9 10
Open/Off
Closed/On
Comments:
Reference Documents:
Allen Bradley publication 1771-2.48
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
HARDWARE CONFIGURATION VERIFICATION - JUMPERS
Document any jumper configurations for each major component. Verify all configurations in
accordance with the reference document(s). If specifications are available document source
information.
Hardware
Specified
Actual
Location
Equipment Name
Channel 2
See Below
Verify / Date
1
3
29
31
11
Channel 6
13
Channel 3
27
15
Verify / Date
33
35
37
Channel 7
39
17
41
19
43
Channel 4
21
Channel 8
45
23
25
47
49
Comments:
Reference Documents:
Allen Bradley publication 1771-6.5.90
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
HARDWARE CONFIGURATION VERIFICATION - JUMPERS
Document any jumper configurations for each major component. Verify all configurations in
accordance with the reference document(s). If specifications are available document source
information.
Hardware
Specified
Location
Equipment Name
Actual
See Below
Open/Off
Closed/On
1
SW2
2 3 4 5 6
7 8 9 10
2 3 4 5 6
7 8 9 10
Open/Off
Closed/On
Comments:
Reference Documents:
Allen Bradley publication 1771-2.48
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
HARDWARE CONFIGURATION VERIFICATION - JUMPERS
Document any jumper configurations for each major component. Verify all configurations in
accordance with the reference document(s). If specifications are available document source
information.
Hardware
Specified
Equipment Name
Location
Area CP-5-010
Actual
See Below
Off
On
1
2 3 4 5 6
7 8 9 10
2 3 4 5 6
7 8 9 10
Comments:
Reference Documents:
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
HARDWARE CONFIGURATION VERIFICATION - JUMPERS
Document any jumper configurations for each major component. Verify all configurations in
accordance with the reference document(s). If specifications are available document source
information.
Hardware
Specified
Equipment Name
Location
Actual
See Below
Off
On
1
2 3 4 5 6
7 8 9 10
2 3 4 5 6
7 8 9 10
Comments:
Reference Documents:
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
HARDWARE CONFIGURATION VERIFICATION - JUMPERS
Document any jumper configurations for each major component. Verify all configurations in
accordance with the reference document(s). If specifications are available document source
information.
Hardware
Specified
Equipment Name
Location
Actual
See Below
Off
On
1
2 3 4 5 6
7 8 9 10
2 3 4 5 6
7 8 9 10
Comments:
Reference Documents:
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
HARDWARE CONFIGURATION VERIFICATION - JUMPERS
Document any jumper configurations for each major component. Verify all configurations in
accordance with the reference document(s). If specifications are available document source
information.
Hardware
Specified
Equipment Name
Location
Actual
See Below
Off
On
1
2 3 4 5 6
7 8 9 10
2 3 4 5 6
7 8 9 10
Comments:
Reference Documents:
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
HARDWARE CONFIGURATION VERIFICATION - JUMPERS
Document any jumper configurations for each major component. Verify all configurations in
accordance with the reference document(s). If specifications are available document source
information.
Hardware
Specified
Equipment Name
Location
Area CP-5-02
Actual
See Below
Off
On
1
2 3 4 5 6
7 8 9 10
2 3 4 5 6
7 8 9 10
Comments:
Reference Documents:
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
HARDWARE CONFIGURATION VERIFICATION - JUMPERS
Document any jumper configurations for each major component. Verify all configurations in
accordance with the reference document(s). If specifications are available document source
information.
Hardware
Specified
Equipment Name
Location
Area CP-5-01
Actual
See Below
Off
On
1
2 3 4 5 6
7 8 9 10
2 3 4 5 6
7 8 9 10
Comments:
Reference Documents:
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
HARDWARE CONFIGURATION VERIFICATION - JUMPERS
Document any jumper configurations for each major component. Verify all configurations in
accordance with the reference document(s). If specifications are available document source
information.
Hardware
Specified
Equipment Name
Location
Area CP-5-01
Actual
See Below
Off
On
1
2 3 4 5 6
7 8 9 10
2 3 4 5 6
7 8 9 10
Comments:
Reference Documents:
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
HARDWARE CONFIGURATION VERIFICATION - JUMPERS
Document any jumper configurations for each major component. Verify all configurations in
accordance with the reference document(s). If specifications are available document source
information.
Hardware
Specified
Equipment Name
Location
Area CP-5-05
Actual
See Below
Off
On
1
2 3 4 5 6
7 8 9 10
2 3 4 5 6
7 8 9 10
Comments:
Reference Documents:
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
HARDWARE CONFIGURATION VERIFICATION - JUMPERS
Document any jumper configurations for each major component. Verify all configurations in
accordance with the reference document(s). If specifications are available document source
information.
Hardware
Specified
Equipment Name
Location
Area CP-5-05
Actual
See Below
Off
On
1
2 3 4 5 6
7 8 9 10
2 3 4 5 6
7 8 9 10
Comments:
Reference Documents:
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
HARDWARE CONFIGURATION VERIFICATION - JUMPERS
Document any jumper configurations for each major component. Verify all configurations in
accordance with the reference document(s). If specifications are available document source
information.
Hardware
Specified
Equipment Name
Location
Area CP-5-06
Actual
See Below
Off
On
1
2 3 4 5 6
7 8 9 10
2 3 4 5 6
7 8 9 10
Comments:
Reference Documents:
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
HARDWARE CONFIGURATION VERIFICATION - JUMPERS
Document any jumper configurations for each major component. Verify all configurations in
accordance with the reference document(s). If specifications are available document source
information.
Hardware
Specified
Equipment Name
Location
Area CP-5-07
Actual
See Below
Off
On
1
2 3 4 5 6
7 8 9 10
2 3 4 5 6
7 8 9 10
Comments:
Reference Documents:
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
HARDWARE CONFIGURATION VERIFICATION - JUMPERS
Document any jumper configurations for each major component. Verify all configurations in
accordance with the reference document(s). If specifications are available document source
information.
Hardware
Specified
Equipment Name
Location
Area CP-5-03
Actual
See Below
Off
On
1
2 3 4 5 6
7 8 9 10
2 3 4 5 6
7 8 9 10
Comments:
Reference Documents:
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
HARDWARE CONFIGURATION VERIFICATION - JUMPERS
Document any jumper configurations for each major component. Verify all configurations in
accordance with the reference document(s). If specifications are available document source
information.
Hardware
Specified
Equipment Name
Location
Area CP-5-04
Actual
See Below
Off
On
1
2 3 4 5 6
7 8 9 10
2 3 4 5 6
7 8 9 10
Comments:
Reference Documents:
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
INPUT/OUTPUT LIST AND POINTS VERIFICATION
I/O Module Type/Model No.: Allen Bradley PLC 5
I/O Module Description: Analog and Discrete Modules
I/O Module Location: Racks 0 Verify the following list of Input/Output signals to/from the control system by simulating and
verifying I/O signals. Describe the test method below. Note: Points denoted as Spare will be
verified to be not connected to a field device and not included in the control logic.
Hardware
Point
Software
Address
Description
As
Specified
Yes / No
Verified
By / Date
I:020/00
I:020/00
FV-100 Valve Open Limit SW.
I:020/01
I:020/01
FV-100 Valve Closed Limit SW.
O:120/12
O:120/12
FV-100 Valve Command
I:020/02
I:020/02
FV-107 Valve Open Limit SW.
I:020/03
I:020/03
FV-107 Valve Closed Limit SW.
O:120/13
O:120/13
FV-107 Valve Command
I:020/12
I:020/12
FV-113 Valve Open Limit SW.
I:020/13
I:020/13
FV-113 Valve Closed Limit SW.
O:120/17
O:120/17
FV-113 Valve Command
I:021/02
I:021/02
FV-135 Valve Open Limit SW.
I:021/03
I:021/03
FV-135 Valve Closed Limit SW.
O:122/12
O:122/12
FV-135 Valve Command
I:021/04
I:021/04
FV-136 Valve Open Limit SW.
I:021/05
I:021/05
FV-136 Valve Closed Limit SW.
O:122/14
O:122/14
FV-136 Valve Command
TEST METHOD:
1
Inputs were examined using the PLC5 Programming Software online.
2
Outputs were verified using the PLC5 Programming Software online and Forcing the
respective output. The device operation was then verified in the field.
COMMENTS:
A
See attachment A CIP/SIP System I/O Checklist
B
The above points are a portion of a 20% recheck of Attachment A.
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
INPUT/OUTPUT LIST AND POINTS VERIFICATION
I/O Module Type/Model No.: Allen Bradley PLC 5
I/O Module Description: Analog and Discrete Modules
I/O Module Location: Racks 0 - 16
Verify the following list of Input/Output signals to/from the control system by simulating and
verifying I/O signals. Describe the test method below. Note: Points denoted as Spare will be
verified to be not connected to a field device and not included in the control logic.
Hardware
Point
Software
Address
Description
As
Specified
Yes / No
Verified
By / Date
I:021/10
I:021/10
FV-139 Valve Open Limit SW.
I:021/11
I:021/11
FV-139 Valve Closed Limit SW.
O:124/00
O:124/00
FV-139 Valve Command
I:021/12
I:021/12
FV-140 Valve Open Limit SW.
I:021/13
I:021/13
FV-140 Valve Closed Limit SW.
O:124/01
O:124/01
FV-140 Valve Command
I:021/14
I:021/14
FV-208 Valve Open Limit SW.
I:021/15
I:021/15
FV-208 Valve Closed Limit SW.
O:124/02
O:124/02
FV-208 Valve Command
I:021/16
I:021/16
FV-209 Valve Open Limit SW.
I:021/17
I:021/17
FV-209 Valve Closed Limit SW.
O:124/03
O:124/03
FV-209 Valve Command
I:022/00
I:022/00
FV-210 Valve Open Limit SW.
I:124/01
I:124/01
FV-210 Valve Closed Limit SW.
O:122/04
O:122/04
FV-210 Valve Command
TEST METHOD:
1
Inputs were examined using the PLC5 Programming Software online.
2
Outputs were verified using the PLC5 Programming Software online and Forcing the
respective output. The device operation was then verified in the field.
COMMENTS:
A
See attachment A CIP/SIP System I/O Checklist
B
The above points are a portion of a 20% recheck of Attachment A.
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
INPUT/OUTPUT LIST AND POINTS VERIFICATION
I/O Module Type/Model No.: Allen Bradley PLC 5
I/O Module Description: Analog and Discrete Modules
I/O Module Location: Racks 0 Verify the following list of Input/Output signals to/from the control system by simulating and
verifying I/O signals. Describe the test method below. Note: Points denoted as Spare will be
verified to be not connected to a field device and not included in the control logic.
Hardware
Point
Software
Address
Description
As
Specified
Yes / No
Verified
By / Date
I:022/02
I:022/02
FV-214 Valve Open Limit SW.
I:022/03
I:022/03
FV-214 Valve Closed Limit SW.
O:124/05
O:124/05
FV-214 Valve Command
I:022/04
I:022/04
FV-215 Valve Open Limit SW.
I:022/05
I:022/05
FV-215 Valve Closed Limit SW.
O:124/06
O:124/06
FV-215 Valve Command
I:022/06
I:022/06
FV-217 Valve Open Limit SW.
I:022/07
I:022/07
FV-217 Valve Closed Limit SW.
O:124/07
O:124/07
FV-217 Valve Command
I:022/10
I:022/10
FV-218 Valve Open Limit SW.
I:022/11
I:022/11
FV-218 Valve Closed Limit SW.
O:124/08
O:124/08
FV-218 Valve Command
I:022/12
I:022/12
FV-222 Valve Open Limit SW.
I:022/13
I:022/13
FV-222 Valve Closed Limit SW.
O:124/11
O:124/11
FV-222 Valve Command
TEST METHOD:
1
Inputs were examined using the PLC5 Programming Software online.
2
Outputs were verified using the PLC5 Programming Software online and Forcing the
respective output. The device operation was then verified in the field.
COMMENTS:
A
See attachment A CIP/SIP System I/O Checklist
B
The above points are a portion of a 20% recheck of Attachment A.
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
INPUT/OUTPUT LIST AND POINTS VERIFICATION
I/O Module Type/Model No.: Allen Bradley PLC 5
I/O Module Description: Analog and Discrete Modules
I/O Module Location: Racks 0 Verify the following list of Input/Output signals to/from the control system by simulating and
verifying I/O signals. Describe the test method below. Note: Points denoted as Spare will be
verified to be not connected to a field device and not included in the control logic.
Hardware
Point
Software
Address
Description
As
Specified
Yes / No
Verified
By / Date
I:023/04
I:023/04
FV-236 Valve Open Limit SW.
I:023/05
I:023/05
FV-236 Valve Closed Limit SW.
O:124/16
O:124/16
FV-236 Valve Command
I:023/06
I:023/06
FV-237 Valve Open Limit SW.
I:023/07
I:023/07
FV-237 Valve Closed Limit SW.
O:124/17
O:124/17
FV-237 Valve Command
I:023/10
I:023/10
FV-239 Valve Open Limit SW.
I:023/11
I:023/11
FV-239 Valve Closed Limit SW.
O:126/04
O:126/04
FV-239 Valve Command
I:023/12
I:023/12
FV-240 Valve Open Limit SW.
I:023/13
I:023/13
FV-240 Valve Closed Limit SW.
O:126/02
O:126/02
FV-240 Valve Command
I:023/14
I:023/14
FV-241 Valve Open Limit SW.
I:023/15
I:023/15
FV-241 Valve Closed Limit SW.
O:126/00
O:126/00
FV-241 Valve Command
TEST METHOD:
1
Inputs were examined using the PLC5 Programming Software online.
2
Outputs were verified using the PLC5 Programming Software online and Forcing the
respective output. The device operation was then verified in the field.
COMMENTS:
A
See attachment A CIP/SIP System I/O Checklist
B
The above points are a portion of a 20% recheck of Attachment A.
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
INPUT/OUTPUT LIST AND POINTS VERIFICATION
I/O Module Type/Model No.: Allen Bradley PLC 5
I/O Module Description: Analog and Discrete Modules
I/O Module Location: Racks 0 Verify the following list of Input/Output signals to/from the control system by simulating and
verifying I/O signals. Describe the test method below. Note: Points denoted as Spare will be
verified to be not connected to a field device and not included in the control logic.
Hardware
Point
Software
Address
Description
As
Specified
Yes / No
Verified
By / Date
I:043/14
I:043/14
FV-601 Valve Open Limit SW.
I:043/15
I:043/15
FV-601 Valve Closed Limit SW.
O:130/00
O:130/00
FV-601 Valve Command
I:043/16
I:043/16
FV-603 Valve Open Limit SW.
I:043/17
I:043/17
FV-603 Valve Closed Limit SW.
O:130/01
O:130/01
FV-603 Valve Command
I:044/00
I:044/00
FV-604 Valve Open Limit SW.
I:044/01
I:044/01
FV-604 Valve Closed Limit SW.
O:130/02
O:130/02
FV-604 Valve Command
I:044/02
I:044/02
FV-605 Valve Open Limit SW.
I:044/03
I:044/03
FV-605 Valve Closed Limit SW.
O:130/03
O:130/03
FV-605 Valve Command
I:044/04
I:044/04
FV-606 Valve Open Limit SW.
I:044/05
I:044/05
FV-606 Valve Closed Limit SW.
O:130/04
O:130/04
FV-606 Valve Command
TEST METHOD:
1
Inputs were examined using the PLC5 Programming Software online.
2
Outputs were verified using the PLC5 Programming Software online and Forcing the
respective output. The device operation was then verified in the field.
COMMENTS:
A
See attachment A CIP/SIP System I/O Checklist
B
The above points are a portion of a 20% recheck of Attachment A.
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
INPUT/OUTPUT LIST AND POINTS VERIFICATION
I/O Module Type/Model No.: Allen Bradley PLC 5
I/O Module Description: Analog and Discrete Modules
I/O Module Location: Racks 0 Verify the following list of Input/Output signals to/from the control system by simulating and
verifying I/O signals. Describe the test method below. Note: Points denoted as Spare will be
verified to be not connected to a field device and not included in the control logic.
Hardware
Point
Software
Address
Description
As
Specified
Yes / No
Verified
By / Date
I:044/06
I:044/06
FV-607 Valve Open Limit SW.
I:044/07
I:044/07
FV-607 Valve Closed Limit SW.
O:130/05
O:130/05
FV-607 Valve Command
I:044/10
I:044/10
FV-608 Valve Open Limit SW.
I:044/11
I:044/11
FV-608 Valve Closed Limit SW.
O:130/15
O:130/15
FV-608 Valve Command
I:044/12
I:044/12
FV-609 Valve Open Limit SW.
I:044/13
I:044/13
FV-609 Valve Closed Limit SW.
O:134/00
O:134/00
FV-609 Valve Command
I:044/14
I:044/14
FV-610 Valve Open Limit SW.
I:044/15
I:044/15
FV-610 Valve Closed Limit SW.
O:130/06
O:130/06
FV-610 Valve Command
I:044/16
I:044/16
FV-612 Valve Open Limit SW.
I:044/17
I:044/17
FV-612 Valve Closed Limit SW.
O:130/07
O:130/07
FV-612 Valve Command
TEST METHOD:
1
Inputs were examined using the PLC5 Programming Software online.
2
Outputs were verified using the PLC5 Programming Software online and Forcing the
respective output. The device operation was then verified in the field.
COMMENTS:
A
See attachment A CIP/SIP System I/O Checklist
B
The above points are a portion of a 20% recheck of Attachment A.
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
INPUT/OUTPUT LIST AND POINTS VERIFICATION
I/O Module Type/Model No.: Allen Bradley PLC 5
I/O Module Description: Analog and Discrete Modules
I/O Module Location: Racks 0 Verify the following list of Input/Output signals to/from the control system by simulating and
verifying I/O signals. Describe the test method below. Note: Points denoted as Spare will be
verified to be not connected to a field device and not included in the control logic.
Hardware
Point
Software
Address
Description
As
Specified
Yes / No
Verified
By / Date
I:045/00
I:045/00
FV-613 Valve Open Limit SW.
I:045/01
I:045/01
FV-613 Valve Closed Limit SW.
O:130/10
O:130/10
FV-613 Valve Command
I:045/02
I:045/02
FV-614 Valve Open Limit SW.
I:045/03
I:045/03
FV-614 Valve Closed Limit SW.
O:130/11
O:130/11
FV-614 Valve Command
I:045/04
I:045/04
FV-615 Valve Open Limit SW.
I:045/05
I:045/05
FV-615 Valve Closed Limit SW.
O:130/12
O:130/12
FV-615 Valve Command
I:045/06
I:045/06
FV-616 Valve Open Limit SW.
I:045/07
I:045/07
FV-616 Valve Closed Limit SW.
O:130/13
O:130/13
FV-616 Valve Command
I:045/10
I:045/10
FV-617 Valve Open Limit SW.
I:045/11
I:045/11
FV-617 Valve Closed Limit SW.
O:130/14
O:130/14
FV-617 Valve Command
TEST METHOD:
1
Inputs were examined using the PLC5 Programming Software online.
2
Outputs were verified using the PLC5 Programming Software online and Forcing the
respective output. The device operation was then verified in the field.
COMMENTS:
A
See attachment A CIP/SIP System I/O Checklist
B
The above points are a portion of a 20% recheck of Attachment A.
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
INPUT/OUTPUT LIST AND POINTS VERIFICATION
I/O Module Type/Model No.: Allen Bradley PLC 5
I/O Module Description: Analog and Discrete Modules
I/O Module Location: Racks 0 Verify the following list of Input/Output signals to/from the control system by simulating and
verifying I/O signals. Describe the test method below. Note: Points denoted as Spare will be
verified to be not connected to a field device and not included in the control logic.
Hardware
Point
Software
Address
Description
As
Specified
Yes / No
Verified
By / Date
I:046/00
I:046/00
FV-627 Valve Open Limit SW.
I:046/01
I:046/01
FV-627 Valve Closed Limit SW.
O:150/13
O:150/13
FV-627 Valve Command
I:046/02
I:046/02
FV-628 Valve Open Limit SW.
I:046/03
I:046/03
FV-628 Valve Closed Limit SW.
O:150/12
O:150/12
FV-628 Valve Command
I:046/04
I:046/04
FV-629 Valve Open Limit SW.
I:046/05
I:046/05
FV-629 Valve Closed Limit SW.
O:134/04
O:134/04
FV-629 Valve Command
I:046/06
I:046/06
FV-630 Valve Open Limit SW.
I:046/07
I:046/07
FV-630 Valve Closed Limit SW.
O:134/05
O:134/05
FV-630 Valve Command
I:046/10
I:046/10
FV-631 Valve Open Limit SW.
I:046/11
I:046/11
FV-631 Valve Closed Limit SW.
O:130/16
O:130/16
FV-631 Valve Command
TEST METHOD:
1
Inputs were examined using the PLC5 Programming Software online.
2
Outputs were verified using the PLC5 Programming Software online and Forcing the
respective output. The device operation was then verified in the field.
COMMENTS:
A
See attachment A CIP/SIP System I/O Checklist
B
The above points are a portion of a 20% recheck of Attachment A.
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
INPUT/OUTPUT LIST AND POINTS VERIFICATION
I/O Module Type/Model No.: Allen Bradley PLC 5
I/O Module Description: Analog and Discrete Modules
I/O Module Location: Racks 0 Verify the following list of Input/Output signals to/from the control system by simulating and
verifying I/O signals. Describe the test method below. Note: Points denoted as Spare will be
verified to be not connected to a field device and not included in the control logic.
Hardware
Point
Software
Address
O:015:00
O:015:01
O:015:02
O:015:03
O:016:00
O:016:01
N12:235
N12:236
N12:237
N12:238
N12:205
N12:206
O:016:02
N12:207
Description
As
Specified
Yes / No
Verified
By / Date
O:016:03
N12:208
I:017:00
N12:39
I:017:01
N12:40
I:017:02
N12:41
TEST METHOD:
1
Inputs were examined using the PLC5 Programming Software online.
2
Outputs were verified using the PLC5 Programming Software online and Forcing the
respective output. The device operation was then verified in the field.
COMMENTS:
A
See attachment A CIP/SIP System I/O Checklist
B
The above points are a portion of a 20% recheck of Attachment A.
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
INPUT/OUTPUT LIST AND POINTS VERIFICATION
I/O Module Type/Model No.: Allen Bradley PLC 5
I/O Module Description: Analog and Discrete Modules
I/O Module Location: Racks 0 Verify the following list of Input/Output signals to/from the control system by simulating and
verifying I/O signals. Describe the test method below. Note: Points denoted as Spare will be
verified to be not connected to a field device and not included in the control logic.
Hardware
Point
Software
Address
I:057:00
I:057:01
I:057:02
I:057:03
I:057:04
I:057:05
I:057:06
I:077:00
I:077:01
I:077:02
I:077:03
N12:89
N12:90
N12:91
N12:92
N12:93
N12:94
N12:95
N12:139
N12:140
N12:141
N12:142
Description
WIT-660
WIT-690
WIT-691
WIT-692
WIT-697
WIT-411
WIT-696
WIT-052
WIT-054
WIT-058
WIT-412
As
Specified
Yes / No
Verified
By / Date
Weight
Weight
Weight
Weight
Weight
Weigh
Weight
Weight
Weight
Weight
Weight
TEST METHOD:
1
Inputs were examined using the PLC5 Programming Software online.
2
Outputs were verified using the PLC5 Programming Software online and Forcing the
respective output. The device operation was then verified in the field.
COMMENTS:
A
See attachment A CIP/SIP System I/O Checklist
B
The above points are a portion of a 20% recheck of Attachment A.
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
MAJOR HARDWARE COMPONENT VERIFICATION
Verify that major hardware components and computer related devices, such as control
panel, panel mounted devices, process I/O hardware, PLC, MMI, PC, printers,
communication Interface devices, etc., are installed in accordance with design specification
or vendor documents. Wiring will also be verified using the 20%/40%/100% option as
indicated by validation effort.
Item
No.
Hardware
Description
Manufacturer
Model No.
Serial
No.
Location
Verified
by/Date
Main PLC
enclosure
Remote PLC
enclosure
Kaye enclosure
Kaye enclosure
Kaye enclosure
CIP room
1
1
2
2
Comments:
1 See PRO-563-CQ Ancillary System Specification Verification section for specific information
on major components.
2 See IQ Controls Corporation As -Built drawings in Attachment D.
SAMPLE
Date: ____________________
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
UTILITIES-ELECTRICAL
Confirm that the utilities necessary for the operation of the components of the control system have
been installed in accordance with design and/or manufacturing specifications.
Component Name:
PLC CIP
Specified1
Electrical System
Line Voltage
Phase
Single Phase
16 Amps
Line Power
Not Specified
Frequency
60 Hertz 1
CB-2
CP-01, TB1
Actual
COMMENTS:
1
REFERENCE DOCUMENT(S):
Allen Bradley I/O Chassis and Power Supplies Product Data Pub #1771-2.185
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
UTILITIES-ELECTRICAL
Confirm that the utilities necessary for the operation of the components of the control system have
been installed in accordance with design and/or manufacturing specifications.
Component Name:
PLC CIP
Specified1
Electrical System
Line Voltage
Phase
Single Phase
16 Amps
Line Power
Not Specified
Frequency
60 Hertz 1
CB-3
CP-01, TB1
Actual
COMMENTS:
1
REFERENCE DOCUMENT(S):
Allen Bradley I/O Chassis and Power Supplies Product Data Pub #1771-2.185
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
UTILITIES-ELECTRICAL
Confirm that the utilities necessary for the operation of the components of the control system have
been installed in accordance with design and/or manufacturing specifications.
Component Name:
Main OCS
Specified1
Electrical System
Line Voltage
Phase
Single Phase
Frequency
60 Hertz 1
CB-4
CP-01, TB1
Actual
COMMENTS:
1
REFERENCE DOCUMENT(S):
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
UTILITIES-ELECTRICAL
Confirm that the utilities necessary for the operation of the components of the control system have
been installed in accordance with design and/or manufacturing specifications.
Component Name:
P1
Specified1
Electrical System
Line Voltage
Phase
Single Phase
15 Amps
Line Power
1200 W
Frequency
60 Hertz 1
CB-6
CP-01, TB1
Actual
COMMENTS:
1
This supplies the Discrete I/O and the SMC solenoid bank valves.
REFERENCE DOCUMENT(S):
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
UTILITIES-ELECTRICAL
Confirm that the utilities necessary for the operation of the components of the control system have
been installed in accordance with design and/or manufacturing specifications.
Component Name:
P2
Specified1
Electrical System
Line Voltage
Phase
Single Phase
2 Amps
Line Power
210 W
Frequency
60 Hertz 1
CB-5
CP-01, TB1
Actual
COMMENTS:
1
2
REFERENCE DOCUMENT(S):
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
UTILITIES-ELECTRICAL
Confirm that the utilities necessary for the operation of the components of the control system have
been installed in accordance with design and/or manufacturing specifications.
Component Name:
P3
Specified1
Electrical System
Line Voltage
Phase
Single Phase
2 Amps
Line Power
210 W
Frequency
60 Hertz 1
CB-7
CP-01, TB1
Actual
COMMENTS:
1
2
REFERENCE DOCUMENT(S):
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
UTILITIES-ELECTRICAL
Confirm that the utilities necessary for the operation of the components of the control system have
been installed in accordance with design and/or manufacturing specifications.
Component Name:
Remote Rack
Specified1
Electrical System
Line Voltage
Phase
Single Phase
16 Amps
Line Power
Not Specified
Frequency
60 Hertz 1
CB-2
CP-01A, TB1
Actual
COMMENTS:
1
REFERENCE DOCUMENT(S):
Allen Bradley I/O Chassis and Power Supplies Product Data Pub #1771-2.185
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
UTILITIES-ELECTRICAL
Confirm that the utilities necessary for the operation of the components of the control system have
been installed in accordance with design and/or manufacturing specifications.
Component Name:
Remote Rack
Specified1
Electrical System
Line Voltage
Phase
Single Phase
16 Amps
Line Power
Not Specified
Frequency
60 Hertz 1
CB-3
CP-01A, TB1
Actual
COMMENTS:
1
REFERENCE DOCUMENT(S):
Allen Bradley I/O Chassis and Power Supplies Product Data Pub #1771-2.185
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
UTILITIES-ELECTRICAL
Confirm that the utilities necessary for the operation of the components of the control system have
been installed in accordance with design and/or manufacturing specifications.
Component Name:
PLC CIP
Specified1
Electrical System
Line Voltage
Phase
Single Phase
16 Amps
Line Power
Not Specified
Frequency
60 Hertz 1
CB-4
CP-01A, TB1
Actual
COMMENTS:
1
REFERENCE DOCUMENT(S):
Allen Bradley I/O Chassis and Power Supplies Product Data Pub #1771-2.185
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
UTILITIES-ELECTRICAL
Confirm that the utilities necessary for the operation of the components of the control system have
been installed in accordance with design and/or manufacturing specifications.
Component Name:
P4
Specified1
Electrical System
Line Voltage
Phase
Single Phase
15 Amps
Line Power
1500 W
Frequency
60 Hertz 1
CB-6
CP-01A, TB1
Actual
COMMENTS:
1
This supplies the Discrete I/O and the SMC solenoid bank valves.
REFERENCE DOCUMENT(S):
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
UTILITIES-ELECTRICAL
Confirm that the utilities necessary for the operation of the components of the control system have
been installed in accordance with design and/or manufacturing specifications.
Component Name:
P5
Specified1
Electrical System
Line Voltage
Phase
Single Phase
2 Amps
Line Power
210 W
Frequency
60 Hertz 1
CB-5
CP-01A, TB1
Actual
COMMENTS:
1
REFERENCE DOCUMENT(S):
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
UTILITIES-ELECTRICAL
Confirm that the utilities necessary for the operation of the components of the control system have
been installed in accordance with design and/or manufacturing specifications.
Component Name:
P6
Specified1
Electrical System
Line Voltage
Phase
Single Phase
2 Amps
Line Power
210 W
Frequency
60 Hertz 1
CB-7
CP-01A, TB1
Actual
COMMENTS:
1
REFERENCE DOCUMENT(S):
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
UTILITIES-ELECTRICAL
Confirm that the utilities necessary for the operation of the components of the control system have
been installed in accordance with design and/or manufacturing specifications.
Component Name:
CP-02
Specified1
Electrical System
Line Voltage
Phase
Single Phase
Line Power
Not Specified
Frequency
60 Hertz 1
CB-2
CP-02
Actual
COMMENTS:
1
Located in Area 1.
REFERENCE DOCUMENT(S):
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
UTILITIES-ELECTRICAL
Confirm that the utilities necessary for the operation of the components of the control system have
been installed in accordance with design and/or manufacturing specifications.
Component Name:
CP-05
Specified1
Electrical System
Line Voltage
Phase
Single Phase
Line Power
Not Specified
Frequency
60 Hertz 1
CB-2
CP-05
Actual
COMMENTS:
1
REFERENCE DOCUMENT(S):
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
UTILITIES-ELECTRICAL
Confirm that the utilities necessary for the operation of the components of the control system have
been installed in accordance with design and/or manufacturing specifications.
Component Name:
CP-22
Specified1
Electrical System
Line Voltage
Phase
Single Phase
Line Power
Not Specified
Frequency
60 Hertz 1
CB-2
CP-22
Actual
COMMENTS:
1
REFERENCE DOCUMENT(S):
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
UTILITIES-ELECTRICAL
Confirm that the utilities necessary for the operation of the components of the control system have
been installed in accordance with design and/or manufacturing specifications.
Component Name:
Electrical System
Line Voltage
Phase
Single Phase
Line Power
Not Specified
Frequency
60 Hertz 1
EDP2-2 #7
Actual
COMMENTS:
1
Located in Area 2.
REFERENCE DOCUMENT(S):
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
UTILITIES-ELECTRICAL
Confirm that the utilities necessary for the operation of the components of the control system have
been installed in accordance with design and/or manufacturing specifications.
Component Name:
Electrical System
Line Voltage
Phase
Single Phase
Line Power
Not Specified
Frequency
60 Hertz 1
ERP2-1B #15
Interstitial Northeast
Actual
COMMENTS:
1
Located in .
REFERENCE DOCUMENT(S):
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
UTILITIES-ELECTRICAL
Confirm that the utilities necessary for the operation of the components of the control system have
been installed in accordance with design and/or manufacturing specifications.
Component Name:
Electrical System
Line Voltage
Phase
Single Phase
Line Power
Not Specified
Frequency
60 Hertz 1
ERP2-1B #16
Interstitial Northeast
Actual
COMMENTS:
1
REFERENCE DOCUMENT(S):
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
UTILITIES-ELECTRICAL
Confirm that the utilities necessary for the operation of the components of the control system have
been installed in accordance with design and/or manufacturing specifications.
Component Name:
Electrical System
Line Voltage
Phase
Single Phase
Line Power
Not Specified
Frequency
60 Hertz 1
ERP2-1B #13
Interstitial Northeast
Actual
COMMENTS:
1
REFERENCE DOCUMENT(S):
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
UTILITIES-ELECTRICAL
Confirm that the utilities necessary for the operation of the components of the control system have
been installed in accordance with design and/or manufacturing specifications.
Component Name:
Remote OCS
Specified1
Electrical System
Line Voltage
Phase
Single Phase
Line Power
Not Specified
Frequency
60 Hertz 1
CB-3
CP-02
Actual
COMMENTS:
1
Located in Area 1.
REFERENCE DOCUMENT(S):
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
UTILITIES-ELECTRICAL
Confirm that the utilities necessary for the operation of the components of the control system have
been installed in accordance with design and/or manufacturing specifications.
Component Name:
CP-05
Specified1
Electrical System
Line Voltage
Phase
Single Phase
Line Power
Not Specified
Frequency
60 Hertz 1
CB-3
CP-05
Actual
COMMENTS:
1
REFERENCE DOCUMENT(S):
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
UTILITIES-ELECTRICAL
Confirm that the utilities necessary for the operation of the components of the control system have
been installed in accordance with design and/or manufacturing specifications.
Component Name:
CP-07
Specified1
Electrical System
Line Voltage
Phase
Single Phase
Line Power
Not Specified
Frequency
60 Hertz 1
Actual
REFERENCE DOCUMENT(S):
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
SUPPLY VOLTAGE AND CIRCUIT PROTECTION VERIFICATION
Verify that the supply voltage to the control system is installed in accordance with the
manufacturers specifications. Record the location of voltage measurement and the actual
value.
Page 1 of 2
COMPONENT SUPPLY VOLTAGE
Location of
Voltage
Measurement
Specified
Result
Panelview Main
OCS
CP-01
120 VAC
Nematron
Operator
Terminal
CP-02
Nematron
Operator
Terminal
CP-03
Nematron
Operator
Terminal
CP-04
Nematron
Operator
Terminal
CP-05
Device Name
Actual
Result
Performed By /
Date:
+/- 10%
120 VAC
+/- 10%
120 VAC
+/- 10%
120 VAC
+/- 10%
120 VAC
+/- 10%
COMMENTS:
SAMPLE
Date: ____________________
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
SUPPLY VOLTAGE AND CIRCUIT PROTECTION VERIFICATION
Verify that the supply voltage and circuit protection devices associated with the control
system are installed in accordance with the manufacturer specifications. Verify the
amperage and/or voltage of the protection device.
Page 2 of 2
COMPONENT SUPPLY VOLTAGE
Location of
Voltage
Measurement
Specified
Result
Nematron
Operator
Terminal
CP-TT-07
Suite 300
120 VAC
Nematron
Operator
Terminal
CP-07
Suite 400
120 VAC
Main PLC
enclosure CP-01
CP-01
Powerhouse
120 VAC
Remote PLC
enclosure
CP-01A
CP-01A
Suite 400
120 VAC
Device Name
Actual
Result
Performed By /
Date:
+/- 10%
+/- 10%
+/- 10%
+/- 10%
COMMENTS:
SAMPLE
Date: ____________________
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
SOFTWARE COMPONENT VERIFICATION
Verify the following information about the installed software and source code for the specified
equipment. Document and comment on any noticeable deviations.
Equipment Name/Description:
Equipment ID No.:
Item
Kaye Validator
Digistrip 4 Plus , CP-02
Specified
Title
Validator Programmer
Software
Version
Not Specified
Date:
Not Specified
Location
Not Specified
Filename
Not Specified
Development
Software Used
Not Specified
Disk Copy
Installed Copy
Does the Installed Version Identification Disk Version Identification = Hardcopy Version
Identification?
YES / NO
COMMENTS:
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
SOFTWARE APPLICATION CODE VERIFICATION
ID No.: Control Coprocessor CP-01
Verify the current software source code and the internal change control procedure by contacting the
appropriate person. Ensure the current software is installed and implemented win accordance with the
applicable specifications. Obtain a printout of a program listing and/or batch files for comparison as
required.
Department contacted for Information on Application Source Code:
Name
Engineering Department
Company
Big Pharma
IQ Controls Corporation
Version/Date
Storage Location
Authorization SOP
Number
Version/Date
Storage Location
COMMENTS:
Date: _____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
SOFTWARE APPLICATION CODE VERIFICATION
ID No.: Main OCS
Verify the current software source code and the internal change control procedure by contacting the
appropriate person. Ensure the current software is installed and implemented win accordance with the
applicable specifications. Obtain a printout of a program listing and/or batch files for comparison as
required.
Department contacted for Information on Application Source Code:
Name
Engineering Department
Company
Big Pharma
IQ Controls Corporation
Version/Date
Storage Location
Authorization SOP
Number
Version/Date
Storage Location
COMMENTS:
Date: _____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
SECURITY CODE TEST
Verify that the program security prevents unauthorized access to process screens and PID parameter
changes. Obtain the current password from Maintenance and record the current password in the
comments section.
Step
No.
Test Procedure
Specified Result
Actual Result
Approach Remote
Operator Station at
CP-02,
Enter an invalid
password, press
Enter
None
COMMENTS:
1
See IQ Controls Corporation CIP/SIP System, Editors Manual for instructions on how to change/add
passwords.
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
SECURITY CODE TEST
Verify that the program security prevents unauthorized access to process screens and PID parameter
changes. Obtain the current password from Maintenance and record the current password in the
comments section.
Step
No.
Test Procedure
Specified Result
Actual Result
Choose Select
Options, press Enter
10
Choose Select
Options, press Enter
11
Enter a valid
supervisory level
password, press
Enter
12
Test is complete,
press Cancel three
times.
COMMENTS:
1
See IQ Controls Corporation CIP/SIP System, Editors Manual for instructions on how to change/add
passwords.
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
SECURITY CODE TEST
Verify that the program security prevents unauthorized access to process screens and PID parameter
changes. Obtain the current password from Maintenance and record the current password in the
comments section.
Step
No.
Test Procedure
Specified Result
Actual Result
13
Approach Remote
Operator Station at
CP-03,
14
15
16
Enter an invalid
password, press
Enter
17
18
None
COMMENTS:
1
See IQ Controls Corporation CIP/SIP System, Editors Manual for instructions on how to change/add
passwords.
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
SECURITY CODE TEST
Verify that the program security prevents unauthorized access to process screens and PID parameter
changes. Obtain the current password from Maintenance and record the current password in the
comments section.
Step
No.
Test Procedure
Specified Result
Actual Result
19
20
Choose Select
Options, press Enter
21
22
Choose Select
Options, press Enter
23
Enter a valid
supervisory level
password, press
Enter
24
Test is complete,
press Cancel three
times.
COMMENTS:
1
See IQ Controls Corporation CIP/SIP System, Editors Manual for instructions on how to change/add
passwords.
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
SECURITY CODE TEST
Verify that the program security prevents unauthorized access to process screens and PID parameter
changes. Obtain the current password from Maintenance and record the current password in the
comments section.
Step
No.
Test Procedure
Specified Result
Actual Result
25
Approach Remote
Operator Station at
CP-04, Suite 100
26
27
28
Enter an invalid
password, press
Enter
29
30
None
COMMENTS:
1
See IQ Controls Corporation CIP/SIP System, Editors Manual for instructions on how to change/add
passwords.
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
SECURITY CODE TEST
Verify that the program security prevents unauthorized access to process screens and PID parameter
changes. Obtain the current password from Maintenance and record the current password in the
comments section.
Step
No.
Test Procedure
Specified Result
Actual Result
31
32
Choose Select
Options, press Enter
33
34
Choose Select
Options, press Enter
35
Enter a valid
supervisory level
password, press
Enter
36
Test is complete,
press Cancel three
times.
COMMENTS:
1
See IQ Controls Corporation CIP/SIP System, Editors Manual for instructions on how to change/add
passwords.
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
SECURITY CODE TEST
Verify that the program security prevents unauthorized access to process screens and PID parameter
changes. Obtain the current password from Maintenance and record the current password in the
comments section.
Step
No.
Test Procedure
Specified Result
Actual Result
37
Approach Remote
Operator Station at
CP-05, Suite 200
38
39
40
Enter an invalid
password, press
Enter
41
42
None
COMMENTS:
1
See IQ Controls Corporation CIP/SIP System, Editors Manual for instructions on how to change/add
passwords.
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
SECURITY CODE TEST
Verify that the program security prevents unauthorized access to process screens and PID parameter
changes. Obtain the current password from Maintenance and record the current password in the
comments section.
Step
No.
Test Procedure
Specified Result
Actual Result
43
44
Choose Select
Options, press Enter
45
46
Choose Select
Options, press Enter
47
Enter a valid
supervisory level
password, press
Enter
48
Test is complete,
press Cancel three
times.
COMMENTS:
1
See IQ Controls Corporation CIP/SIP System, Editors Manual for instructions on how to change/add
passwords.
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
SECURITY CODE TEST
Verify that the program security prevents unauthorized access to process screens and PID parameter
changes. Obtain the current password from Maintenance and record the current password in the
comments section.
Step
No.
Test Procedure
Specified Result
Actual Result
49
Approach Remote
Operator Station at
CP-TT-07, Suite 300
50
51
52
Enter an invalid
password, press
Enter
53
54
None
COMMENTS:
1
See IQ Controls Corporation CIP/SIP System, Editors Manual for instructions on how to change/add
passwords.
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
SECURITY CODE TEST
Verify that the program security prevents unauthorized access to process screens and PID parameter
changes. Obtain the current password from Maintenance and record the current password in the
comments section.
Step
No.
Test Procedure
Specified Result
Actual Result
55
56
Choose Select
Options, press Enter
57
58
Choose Select
Options, press Enter
59
Enter a valid
supervisory level
password, press
Enter
60
Test is complete,
press Cancel three
times.
COMMENTS:
1
See IQ Controls Corporation CIP/SIP System, Editors Manual for instructions on how to change/add
passwords.
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
SECURITY CODE TEST
Verify that the program security prevents unauthorized access to process screens and PID parameter
changes. Obtain the current password from Maintenance and record the current password in the
comments section.
Step
No.
Test Procedure
Specified Result
Actual Result
61
Approach Remote
Operator Station at
CP-07, Suite 400
62
63
64
Enter an invalid
password, press
Enter
65
66
None
COMMENTS:
1
See IQ Controls Corporation CIP/SIP System, Editors Manual for instructions on how to change/add
passwords.
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
SECURITY CODE TEST
Verify that the program security prevents unauthorized access to process screens and PID parameter
changes. Obtain the current password from Maintenance and record the current password in the
comments section.
Step
No.
Test Procedure
Specified Result
Actual Result
67
68
Choose Select
Options, press Enter
69
70
Choose Select
Options, press Enter
71
Enter a valid
supervisory level
password, press
Enter
72
Test is complete,
press Cancel three
times.
COMMENTS:
1
See IQ Controls Corporation CIP/SIP System, Editors Manual for instructions on how to change/add
passwords.
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
FUNCTIONAL TEST VERIFICATION
Verify system operation by following the steps and associated test procedures in order. Verify the
descriptions for each step and verify that the system operation is in accordance with the specified
result.
Step
No.
Test Procedure
Approach Remote
Operator Control
Station at CP-02,
Select
FTESTNCY.PIN,
press Enter
Press Enter
Specified Result
Actual Result
None
Reference Document and No.: Inc. CIP/SIP System Functional Design Document.
COMMENTS:
Note: For Area 2, Freeze dryer only.
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
FUNCTIONAL TEST VERIFICATION
Verify system operation by following the steps and associated test procedures in order. Verify the
descriptions for each step and verify that the system operation is in accordance with the specified
result.
Step
No.
Test Procedure
Specified Result
Actual Result
Press Enter
Press Enter
10
Press Enter
11
Press Enter
12
Press Menu
13
FT-
Reference Document and No.: Inc. CIP/SIP System Functional Design Document.
COMMENTS:
Note: For Area 2, Freeze dryer only.
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
FUNCTIONAL TEST VERIFICATION
Verify system operation by following the steps and associated test procedures in order. Verify the
descriptions for each step and verify that the system operation is in accordance with the specified
result.
Step
No.
Test Procedure
14
15
Press Cancel
Specified Result
Actual Result
Hold
16
Press Menu
17
18
Select Run
19
Press Cancel
Screen displays:
Step-005
Time xx:xx
Hold off
Mode-Run
The time displayed will be counting down.
20
Time displayed
reaches 00:00
Screen displays:
Step-006
Time xx:xx
Hold on
Mode-Run
Also: FV-056 is open, FT-042 > 30 gpm
Timer is counting down.
21
Press Menu
22
Reference Document and No.: Inc. CIP/SIP System Functional Design Document.
COMMENTS:
Note: For Area 2, Freeze dryer only.
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
FUNCTIONAL TEST VERIFICATION
Verify system operation by following the steps and associated test procedures in order. Verify the
descriptions for each step and verify that the system operation is in accordance with the specified
result.
Step
No.
Test Procedure
Specified Result
Actual Result
23
Select Hold on
24
Press Cancel
25
Press Menu
26
27
Select Run
28
Press Cancel
29
Timer = 00:00
30
Press Enter
Reference Document and No.: Inc. CIP/SIP System Functional Design Document.
COMMENTS:
Note: For Area 2, Freeze dryer only.
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
FUNCTIONAL TEST VERIFICATION
Verify system operation by following the steps and associated test procedures in order. Verify the
descriptions for each step and verify that the system operation is in accordance with the specified
result.
Step
No.
Test Procedure
31
Press F4 key on
front of panel
32
Press Cancel
33
Select Cancel
Note: Mode=Hold off
Specified Result
Actual Result
Time xx::xx
34
Press Menu
35
36
Select Run
37
Press Cancel
Note: Mode=Run
Screen displays:
Step-008
Mode-Run
38
Timer=00:00
39
Press Enter
40
Timer=00:00
Reference Document and No.: Inc. CIP/SIP System Functional Design Document.
COMMENTS:
Note: For Area 2, Freeze dryer only.
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
FUNCTIONAL TEST VERIFICATION
Verify system operation by following the steps and associated test procedures in order. Verify the
descriptions for each step and verify that the system operation is in accordance with the specified
result.
Step
No.
Test Procedure
Specified Result
Actual Result
41
Press Enter
42
Timer=00:00
43
In Room 1038,
remove TT-043 probe
from piping and put in
cool water
44
Press Enter
45
Press Enter
46
47
Press Enter
48
Press Enter
TT-043 < 70 c
Screen displays:
Step-013
Time xx::xx
Mode-Run
Timer is not timing.
Program does not advance.
Event error TT-043 too low displays
TT-043 > 70 c
Reference Document and No.: Inc. CIP/SIP System Functional Design Document.
COMMENTS:
Note: For Area 2, Freeze dryer only.
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
FUNCTIONAL TEST VERIFICATION
Verify system operation by following the steps and associated test procedures in order. Verify the
descriptions for each step and verify that the system operation is in accordance with the specified
result.
Step
No.
Test Procedure
Specified Result
Actual Result
49
50
Press Enter
51
Timer=00:00
52
Press Enter
53
Press Enter
54
55
Press Enter
56
Press Enter
57
Press Enter
58
Timer=00:00
Screen displays:
Step-017
Time xx::xx
Mode-Run
Timer is not timing.
Program does not advance.
Event error FT-042 is too low displays
FT-042 > 5.0 gpm
COMMENTS:
Note: For Area 2, Freeze dryer only.
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
FUNCTIONAL TEST VERIFICATION
Verify system operation by following the steps and associated test procedures in order. Verify the
descriptions for each step and verify that the system operation is in accordance with the specified
result.
Step
No.
Test Procedure
Specified Result
59
60
Press Enter
61
Press Enter
62
63
Press Enter
Actual Result
Screen displays:
Step-021
Time xx::xx
Mode-Run
Timer is not timing.
Program does not advance.
CIT-041 too high Event error displays
CT-041 begins to decrease. When CT-041
< 5.0 S, message Cond.test finished
appears
CIP System Idle screen appears
CIP/SIP System Functional Design Document.
COMMENTS:
Note: For Area 2, Freeze dryer only.
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ALARM VERIFICATION
Verify that all device alarms controlled by the application logic are identified correctly, function
properly, and respond in accordance with the manufacturers specifications.
Test Description
Verification will be completed by creating specific alarm conditions and verifying the correct alarm
output is energized. For each alarm, document the test procedure used to activate the alarm and
the logic response to the alarm (if applicable). Record verification of the alarm annunciation alarm
acknowledge, and alarm reset for each alarm condition.
Alarm
Test Procedure
Specified Result
CR-117
Not
verified
CR-118
Not
verified
CR-119
Not
verified
CR-120
Not
verified
CR-037
Not
verified
Actual Result
Verified
By / Date
COMMENTS:
1
MCC2-1 is on Powerhouse
SAMPLE
Date: ____________________
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ALARM VERIFICATION
Verify that all device alarms controlled by the application logic are identified correctly, function
properly, and respond in accordance with the manufacturers specifications.
Test Description
Verification will be completed by creating specific alarm conditions and verifying the correct alarm
output is energized. For each alarm, document the test procedure used to activate the alarm and
the logic response to the alarm (if applicable). Record verification of the alarm annunciation alarm
acknowledge, and alarm reset for each alarm condition.
Alarm
Test Procedure
Specified Result
CR-652
Not
verified
CR-533
Not
verified
FV-001
Failed to
proof
FV-002
Failed to
proof
FV-003
Failed to
proof
FV-004
Failed to
proof
Actual Result
Verified
By / Date
COMMENTS:
1
N.O. valve
SAMPLE
Date: ____________________
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ALARM VERIFICATION
Verify that all device alarms controlled by the application logic are identified correctly, function
properly, and respond in accordance with the manufacturers specifications.
Test Description
Verification will be completed by creating specific alarm conditions and verifying the correct alarm
output is energized. For each alarm, document the test procedure used to activate the alarm and
the logic response to the alarm (if applicable). Record verification of the alarm annunciation alarm
acknowledge, and alarm reset for each alarm condition.
Alarm
Test Procedure
Specified Result
FV-005
Failed to
proof
FV-006
Failed to
proof
FV-007
Failed to
proof
FV-008
Failed to
proof
FV-009
Failed to
proof
FV-010
Failed to
proof
Actual Result
Verified
By / Date
COMMENTS:
SAMPLE
Date: ____________________
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ALARM VERIFICATION
Verify that all device alarms controlled by the application logic are identified correctly, function
properly, and respond in accordance with the manufacturers specifications.
Test Description
Verification will be completed by creating specific alarm conditions and verifying the correct alarm
output is energized. For each alarm, document the test procedure used to activate the alarm and
the logic response to the alarm (if applicable). Record verification of the alarm annunciation alarm
acknowledge, and alarm reset for each alarm condition.
Alarm
Test Procedure
Specified Result
FV-011
Failed to
proof
FV-012
Failed to
proof
FV-013
Failed to
proof
FV-014
Failed to
proof
FV-015
Failed to
proof
FV-016
Failed to
proof
Actual Result
Verified
By / Date
COMMENTS:
SAMPLE
Date: ____________________
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ALARM VERIFICATION
Verify that all device alarms controlled by the application logic are identified correctly, function
properly, and respond in accordance with the manufacturers specifications.
Test Description
Verification will be completed by creating specific alarm conditions and verifying the correct alarm
output is energized. For each alarm, document the test procedure used to activate the alarm and
the logic response to the alarm (if applicable). Record verification of the alarm annunciation alarm
acknowledge, and alarm reset for each alarm condition.
Alarm
Test Procedure
Specified Result
FV-017
Failed to
proof
FV-018
Failed to
proof
FV-019
Failed to
proof
FV-020
Failed to
proof
FV-021
Failed to
proof
FV-022
Failed to
proof
Actual Result
Verified
By / Date
COMMENTS:
1
N.O. valve
SAMPLE
Date: ____________________
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ALARM VERIFICATION
Verify that all device alarms controlled by the application logic are identified correctly, function
properly, and respond in accordance with the manufacturers specifications.
Test Description
Verification will be completed by creating specific alarm conditions and verifying the correct alarm
output is energized. For each alarm, document the test procedure used to activate the alarm and
the logic response to the alarm (if applicable). Record verification of the alarm annunciation alarm
acknowledge, and alarm reset for each alarm condition.
Alarm
Test Procedure
Specified Result
FV-023
Failed to
proof
FV-024
Failed to
proof
FV-025
Failed to
proof
FV-029
Failed to
proof
FV-030
Failed to
proof
FV-031
Failed to
proof
Actual Result
Verified
By / Date
COMMENTS:
SAMPLE
Date: ____________________
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ALARM VERIFICATION
Verify that all device alarms controlled by the application logic are identified correctly, function
properly, and respond in accordance with the manufacturers specifications.
Test Description
Verification will be completed by creating specific alarm conditions and verifying the correct alarm
output is energized. For each alarm, document the test procedure used to activate the alarm and
the logic response to the alarm (if applicable). Record verification of the alarm annunciation alarm
acknowledge, and alarm reset for each alarm condition.
Alarm
Test Procedure
Specified Result
FV-032
Failed to
proof
FV-055
Failed to
proof
FV-056
Failed to
proof
FV-057
Failed to
proof
FV-100
Failed to
proof
FV-107
Failed to
proof
Actual Result
Verified
By / Date
COMMENTS:
SAMPLE
Date: ____________________
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ALARM VERIFICATION
Verify that all device alarms controlled by the application logic are identified correctly, function
properly, and respond in accordance with the manufacturers specifications.
Test Description
Verification will be completed by creating specific alarm conditions and verifying the correct alarm
output is energized. For each alarm, document the test procedure used to activate the alarm and
the logic response to the alarm (if applicable). Record verification of the alarm annunciation alarm
acknowledge, and alarm reset for each alarm condition.
Alarm
Test Procedure
Specified Result
FV-108
Failed to
proof
FV-109
Failed to
proof
FV-110
Failed to
proof
FV-112
Failed to
proof
FV-113
Failed to
proof
FV-134
Failed to
proof
Actual Result
Verified
By / Date
COMMENTS:
SAMPLE
Date: ____________________
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ALARM VERIFICATION
Verify that all device alarms controlled by the application logic are identified correctly, function
properly, and respond in accordance with the manufacturers specifications.
Test Description
Verification will be completed by creating specific alarm conditions and verifying the correct alarm
output is energized. For each alarm, document the test procedure used to activate the alarm and
the logic response to the alarm (if applicable). Record verification of the alarm annunciation alarm
acknowledge, and alarm reset for each alarm condition.
Alarm
Test Procedure
Specified Result
FV-135
Failed to
proof
FV-136
Failed to
proof
FV-137
Failed to
proof
FV-138
Failed to
proof
FV-139
Failed to
proof
FV-140
Failed to
proof
Actual Result
Verified
By / Date
COMMENTS:
SAMPLE
Date: ____________________
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ALARM VERIFICATION
Verify that all device alarms controlled by the application logic are identified correctly, function
properly, and respond in accordance with the manufacturers specifications.
Test Description
Verification will be completed by creating specific alarm conditions and verifying the correct alarm
output is energized. For each alarm, document the test procedure used to activate the alarm and
the logic response to the alarm (if applicable). Record verification of the alarm annunciation alarm
acknowledge, and alarm reset for each alarm condition.
Alarm
Test Procedure
Specified Result
FV-690
Failed to
proof
FV-691
Failed to
proof
Problem
reading
diskette
With no disk in
coprocessor, press
upload on panelview
supervisor screen
SV-028
Failed to
proof
SV-230
Failed to
proof
Actual Result
Verified
By / Date
COMMENTS:
1
SAMPLE
Date: ____________________
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ALARM VERIFICATION
Verify that all device alarms controlled by the application logic are identified correctly, function
properly, and respond in accordance with the manufacturers specifications.
Test Description
Verification will be completed by creating specific alarm conditions and verifying the correct alarm
output is energized. For each alarm, document the test procedure used to activate the alarm and
the logic response to the alarm (if applicable). Record verification of the alarm annunciation alarm
acknowledge, and alarm reset for each alarm condition.
Alarm
Test Procedure
Specified Result
Thornton
Gateway
1:128
failed
Disconnect TNET-01-01
from coprocessor
stopping communication
with Gateway 1:128
Thornton
Gateway
1:129
failed
Disconnect TNET-01-02
from coprocessor
stopping communication
with Gateway 1:129
Thornton
Network
#1 failed
Thornton
Gateway
2:128
failed
Disconnect TNET-02-01
from coprocessor
stopping communication
with Gateway 2:128
Thornton
Gateway
2:129
failed
Disconnect RS-232EX
from coprocessor
stopping communication
with Gateway 2:129
Thornton
Network
#2 failed
Actual Result
Verified
By / Date
COMMENTS:
1
SAMPLE
Date: ____________________
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ALARM VERIFICATION
Verify that all device alarms controlled by the application logic are identified correctly, function
properly, and respond in accordance with the manufacturers specifications.
Test Description
Verification will be completed by creating specific alarm conditions and verifying the correct alarm
output is energized. For each alarm, document the test procedure used to activate the alarm and
the logic response to the alarm (if applicable). Record verification of the alarm annunciation alarm
acknowledge, and alarm reset for each alarm condition.
Alarm
Test Procedure
Specified Result
Thornton
xmtter
1:21
failed
Thornton
xmtter
1:22
failed
Thornton
xmitter
1:23
failed
Thornton
xmitter
1:31
failed
Thornton
xmitter
1:32
failed
Thornton
xmitter
1:41
failed
Actual Result
Verified
By / Date
COMMENTS:
1
SAMPLE
Date: ____________________
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ALARM VERIFICATION
Verify that all device alarms controlled by the application logic are identified correctly, function
properly, and respond in accordance with the manufacturers specifications.
Test Description
Verification will be completed by creating specific alarm conditions and verifying the correct alarm
output is energized. For each alarm, document the test procedure used to activate the alarm and
the logic response to the alarm (if applicable). Record verification of the alarm annunciation alarm
acknowledge, and alarm reset for each alarm condition.
Alarm
Test Procedure
Specified Result
Thornton
xmtter
1:42
failed
Thornton
xmtter
1:71
failed
Thornton
xmitter
1:72
failed
Thornton
xmitter
1:73
failed
Thornton
xmitter
1:74
failed
Thornton
xmitter
1:75
failed
Actual Result
Verified
By / Date
COMMENTS:
1
SAMPLE
Date: ____________________
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ALARM VERIFICATION
Verify that all device alarms controlled by the application logic are identified correctly, function
properly, and respond in accordance with the manufacturers specifications.
Test Description
Verification will be completed by creating specific alarm conditions and verifying the correct alarm
output is energized. For each alarm, document the test procedure used to activate the alarm and
the logic response to the alarm (if applicable). Record verification of the alarm annunciation alarm
acknowledge, and alarm reset for each alarm condition.
Alarm
Test Procedure
Specified Result
A remote
OCS failed
to respond
Main seq
exceeded
max time
in step
Lyo seq
exceeded
max time
in step
General
PLC rack
failure
SMC
solenoid
bank rack
failure
Panelview
has rack
faulted
Actual Result
Verified
By / Date
COMMENTS:
1
SAMPLE
Date: ____________________
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
POWER FAILURE TEST
Verify that each specified operation of the operator display panel accuracy performs the specified
function in accordance with the manufacturer specifications.
Step No.
Test Method
Specified Results
Actual Results
COMMENTS:
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
POWER FAILURE TEST
Verify that each specified operation of the operator display panel accuracy performs the specified
function in accordance with the manufacturer specifications.
Step No.
Test Method
Specified Results
With program
FTESTLYO.PIN running at
CP-07 in Area 2, go to CP-01
on Powerhouse and remove
power from control
coprocessor only.
With program
FTESTLYO.PIN running at
CP-07 in Area 1, go to CP-01
on Powerhouse and open
circuit breaker CB-4
Actual Results
COMMENTS:
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ENVIRONMENTAL OPERATING PARAMETERS VERIFICATION
Verify that the environmental parameters (such as temperatures and relative humidity) within the
panels and/or cabinets where the controllers reside, are within the manufacturers specifications.
Temperature
Location
Controller
Internal to CP-01
Powerhouse
Allen-Bradley
PLC 5
Internal to CP-01
Powerhouse
Allen-Bradley
Panelview
CP-02 Area 1
Kaye printer/
recorder
CP-05 Area 2
Kaye printer/
recorder
Specified
0-60
degrees
Celsius
0-50
degrees
Celsius
0-50
degrees
Celsius
0-40
degrees
Celsius
Relative Humidity
Actual
Specified
Actual
Verified
By/Date
5-95% w/o
condensing
95% @ 0-30 C
75% @ 30-40 C
40% @ 40-50 C
95% noncondensing
90% RH or less
w/o
condensing
COMMENTS:
Reference documents: Allen-Bradley Publications 1784-1.10, dated May 1991; Allen-Bradley
Publication 2711.1.1, dated September 1992.
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
ENVIRONMENTAL OPERATING PARAMETERS VERIFICATION
Verify that the environmental parameters (such as temperatures and relative humidity) within the
panels and/or cabinets where the controllers reside, are within the manufacturers specifications.
Temperature
Location
Controller
Internal to CP-22
Powerhouse
Kaye Printer
Recorder
Internal to
CP-01A
Area 3
1771-ASB
Remote I/O
Adapter
Specified
0-60
degrees
Celsius
0-50
degrees
Celsius
Relative Humidity
Actual
Specified
Actual
Verified
By/Date
5-95% w/o
condensing
95% @ 0-30 C
75% @ 30-40 C
40% @ 40-50 C
COMMENTS:
Reference documents: Allen-Bradley Publications 1784-1.10, dated May 1991; Allen-Bradley
Publication 2711.1.1, dated September 1992.
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
TEST EQUIPMENT
List all testing equipment used during the Controller Qualification testing.
Model No.
Variables
Measured
Serial No.
Voltage, Amps,
Resistance
Volts/Amperes
Temperature/RH Meter
Temperature/RH
Calibration
Exp. Date
COMMENTS:
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
DRAWINGS
List the reference drawings for the system.
Drawing No.
Drawing Title
Main PLC
Main PLC Enclosure Layout
Sheet 1 of 23
Main PLC
Main PLC Panel Layout
Sheet 2 of 23
Main PLC
I/O Chassis Detail Rack 0 & 1
Sheet 3 of 23
Main PLC
I/O Chassis Detail Rack 2 & 3
Sheet 4 of 23
Main PLC
Terminal Block Layout - Rail 1
Sheet 5 of 23
Main PLC
Terminal Block Layout - Rail 3
Sheet 6 of 23
Main PLC
Terminal Block Layout - Rail 2 & 4
Sheet 7 of 23
Main PLC
Power Distribution (Main) 120 VAC
Sheet 8 of 23
Main PLC
Power Distribution (Main) 24 VDC
Sheet 9 of 23
Main PLC
Power Distribution (Main) 24 VDC
Sheet 10 of 23
Main PLC
Power Distribution (Main) 24 VDC
Sheet 11 of 23
Main PLC
Main Enclosure Rack 1, Group 4
Sheet 12 of 23
Storage Location: Validation Files
Revision
No.
Date
Original
1/27/06
6/10/06
6/10/06
Original
1/27/06
2/10/06
Original
1/31/06
Original
1/31/06
Original
1/31/06
Original
1/27/06
2/10/06
2/10/06
2/10/06
Verified
By / Date
Comments:
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
DRAWINGS
List the reference drawings for the system.
Drawing No.
Drawing Title
Main PLC
Main Enclosure Rack 1, Group 5
Sheet 13 of 23
Main PLC
Main Enclosure Rack 1, Group 6
Sheet 14 of 23
Main PLC
Main Enclosure Rack 1, Group 7
Sheet 15 of 23
Main PLC
Main Enclosure Rack 2, Group 0
Sheet 16 of 23
Main PLC
Main Enclosure Rack 2, Group 1
Sheet 17 of 23
Main PLC
Main Enclosure Rack 2, Group 2
Sheet 18 of 23
Main PLC
Main Enclosure Rack 2, Group 3
Sheet 19 of 23
Main PLC
Main Enclosure Rack 2, Group 4
Sheet 20 of 23
Main PLC
Main Enclosure Rack 2, Group 5
Sheet 21 of 23
Main PLC
Main Enclosure Rack 3, Group 0
Sheet 22 of 23
Main PLC
Main Enclosure Rack 3, Group 1
Sheet 23 of 23
Storage Location: Validation Files
Revision
No.
Date
2/10/06
2/10/06
Original
1/27/06
6/14/06
6/14/06
6/14/06
6/14/06
6/14/06
2/10/06
6/14/06
2/10/06
Verified
By / Date
Comments:
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
DRAWINGS
List the reference drawings for the system.
Drawing No.
Drawing Title
Remote PLC
Remote PLC Enclosure Layout
Sheet 1 of 44
Remote PLC
Remote Panel Layout
Sheet 2 of 44
Remote PLC
I/O Chassis Detail Rack 4 & 5
Sheet 3 of 44
Remote PLC
I/O Chassis Detail Rack 6 & 7
Sheet 4 of 44
Remote PLC
I/O Chassis Detail Rack 10 & 11
Sheet 5 of 44
Remote PLC
Terminal Block Layout Rail 1
Sheet 6 of 44
Remote PLC
Terminal Block Layout Rail 3
Sheet 7 of 44
Remote PLC
Terminal Block Layout Rail 2 & 4
Sheet 8 of 44
Remote PLC
Terminal Block Layout Rail 5
Sheet 9 of 44
Remote PLC
Power Distribution (remote) 120 VAC
Sheet 10 of 44
Remote PLC
Power Distribution (remote) 24 VDC
Sheet 11 of 44
Remote PLC
Power Distribution (remote) 24 VDC
Sheet 12 of 44
Storage Location: Validation Files
Revision
No.
Date
Original
1/27/06
Original
6/14/06
Original
1/27/06
Original
1/27/06
Original
1/27/06
Original
1/31/06
Original
1/31/06
Original
1/31/06
Original
1/31/06
Original
1/27/06
Original
1/27/06
Original
1/27/06
Verified
By / Date
Comments:
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
DRAWINGS
List the reference drawings for the system.
Drawing No.
Drawing Title
Remote-N. DWG
Architec.DWG
Revision
No.
Date
Original
6/18/06
12/14/06
TNET2A.DWG
2/10/06
TNET1A.DWG
2/10/06
TNET2.DWG
Original
6/6/06
Original
5/23/06
Equip
Original
1/10/06
ABRemote
Original
1/13/06
OCS-Remote
6/10/06
Original
1/31/06
Original
1/31/06
Original
1/31/06
TNET1.DWG
Verified
By / Date
Comments:
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
DRAWINGS
List the reference drawings for the system.
Drawing No.
Non Kaye Sheet
4 of 5
Non Kaye Sheet
5 of 5
Kaye Sheet 1
of 6
Kaye Sheet 2
of 6
Kaye Sheet 3
of 6
Kaye Sheet 4
of 6
Kaye Sheet 5
of 6
Kaye Sheet 6
of 6
Kaye Sheet 6A
of 6
Drawing Title
Kaye Panel CP-02 Scanner 1
Electrical Dwg
Kaye Panel CP-02 Scanner 2
Electrical Dwg
Kaye Enclosure Mfg
Revision
No.
Date
2/10/06
2/10/06
Original
1/31/06
Original
1/31/06
Original
1/31/06
2/10/06
2/10/06
2/10/06
2/10/06
Verified
By / Date
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
DRAWINGS
List the reference drawings for the system.
Drawing No.
CIP Kaye
Sheet 1 of 7
CIP Kaye
Sheet 2 of 7
CIP Kaye
Sheet 3 of 7
CIP Kaye
Sheet 4 of 7
CIP Kaye
Sheet 5 of 7
CIP Kaye
Sheet 6 of 7
CIP Kaye
Sheet 7 of 7
Drawing Title
Revision
No.
Date
Original
1/31/06
Original
1/31/06
Original
1/31/06
Original
1/31/06
Original
2/10/06
Original
2/10/06
Original
2/10/06
Verified
By / Date
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
DRAWINGS
List the reference drawings for the system.
Drawing No.
Drawing Title
Revision
No.
Loop Diagrams
Loop Diagram TT-034
Sheet 1 of 68
Loop Diagrams
Loop Diagram TT-035
Sheet 2 of 68
Loop Diagrams
Loop Diagram TT-036
Sheet 3 of 68
Loop diagrams
Loop Diagram TT-040/CIT-038
Sheet 4 of 68
Loop Diagrams
Loop Diagram FT-039
Sheet 5 of 68
Loop Diagrams
Loop Diagram FT-042
Sheet 6 of 68
Loop Diagrams
Loop Diagram TT-044
Sheet 7 of 68
Loop Diagrams
Loop Diagram TT-045
Sheet 8 of 68
Loop Diagrams
Loop Diagram TT-046
Sheet 9 of 68
Loop Diagrams
Loop Diagram TT-047/CIT-048
Sheet 10 of 68
Loop Diagrams
Loop Diagram TT-043/CIT-041
Sheet 11 of 68
Loop Diagrams
Loop Diagram TT-101
Sheet 12 of 68
Storage Location: Validation Files
Date
2/22/06
2/22/06
2/22/06
2/22/06
2/22/06
2/22/06
2/22/06
2/22/06
2/22/06
2/22/06
2/22/06
2/22/06
Verified
By / Date
Comments:
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
DRAWINGS
List the reference drawings for the system.
Drawing No.
Drawing Title
Revision
No.
Loop Diagrams
Loop Diagram TT-103
Sheet 13 of 68
Loop Diagrams
Loop Diagram TT-104
Sheet 14 of 68
Loop Diagrams
Loop Diagram TT-105/CIT-111
Sheet 15 of 68
Loop diagrams
Loop Diagram FT-106
Sheet 16 of 68
Loop Diagrams
Loop Diagram TT-115
Sheet 17 of 68
Loop Diagrams
Loop Diagram LT-116
Sheet 18 of 68
Loop Diagrams
Loop Diagram TT-124
Sheet 19 of 68
Loop Diagrams
Loop Diagram TT-125/CIT-123
Sheet 20 of 68
Loop Diagrams
Loop Diagram FT-129
Sheet 21 of 68
Loop Diagrams
Loop Diagram TT-130/CIT-128
Sheet 22 of 68
Loop Diagrams
Loop Diagram TT-132/CIT-131
Sheet 23 of 68
Loop Diagrams
Loop Diagram TT-133
Sheet 24 of 68
Storage Location: Validation Files
Date
2/22/06
2/22/06
2/22/06
2/22/06
2/22/06
2/22/06
2/22/06
2/22/06
2/22/06
2/22/06
2/22/06
2/22/06
Verified
By / Date
Comments:
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
SPARE PARTS LIST
Manufacturer
Model Number
Description
Allen Bradley
1771-ASB
Allen Bradley
1771-IBD
Allen Bradley
1771-OBD
Allen Bradley
1771-IFE
Allen Bradley
1771-OFE
Allen Bradley
1771-L40B
Allen Bradley
1771-P7
Allen Bradley
2711-KC1
SMC
IN313-AB1
Nematron
IWS-120
Thornton
772-211
Thornton
774-231
Thornton
1025-77
Littlefuse
225-250
Black Box
RJ-ME790A-M
Allen Bradley
1784-KT
Opto-22
AC24
Winncom
COMMENTS:
N.A.
SAMPLE
Date:
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
Reviewed By: _______________________________________
__________________
Date:
MANUALS
List the reference manuals for the system.
Vendor
Advance Industrial
Systems
Advance Industrial
Systems
Advance Industrial
Systems
Advance Industrial
Systems
Allen-Bradley
Manual Title
Revision No.
Original
Original
Original
Original
Allen-Bradley
Original
Allen-Bradley
Original
Allen-Bradley
Allen-Bradley
Allen-Bradley
Date
Verified
Original
1771-2.75
1771-2.76
1771-2.48
Storage Location:
COMMENTS:
SAMPLE
Date: ____________________
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
Reviewed By: __________________________________________
SAMPLE
Date: ____________________
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
MANUALS
List the reference manuals for the system.
Vendor
Allen Bradley
Manual Title
Kaye
Thornton
Thornton
Nematron
Allen Bradley
Revision No.
Date
Verified
2711-812
IWS-232
First Edition
Rev 1.0
Rev D
1771-2.185
Storage Location:
COMMENTS:
Date: ____________________
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
STANDARD OPERATING PROCEDURES LIST
SOP #
REVISION
EFFECTIVE
DATE
TITLE
COMMENTS:
SAMPLE
Date:
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
AMENDMENT(S) AND DEVIATION(S)
Any deviation that was determined during the execution of the CQ portion of this Protocol, must be
noted below.
Deviation No.:
AMENDMENT/DEVIATION:
Date: ____________________
SAMPLE
Building/Area: Building 88
Room: Powerhouse
CONTROLLER QUALIFICATION
Verified By / Date
SAMPLE