Sie sind auf Seite 1von 7

Final Preliminary Design Review Report

i
Content

Contents
Page

Chapter 1 Introduction
1.1Project Background
1.1.1

1-1

Background of project development

1-1

1.2Objectives of the report

1-3

1.3Structure of the Report

1-3

Chapter 2 Train Operation Plan and Service System


2.1Overview of Train Operation

2-1

2.2Data and Parameters

2-1

2.2.1

Track Layout

2-3

2.3Train Operation Simulation

2-5

2.3.1

Train Operation Time and Operation Speed

2.3.2

Train Capacity

2-5
2-7

2.3.3

Balancing between Passenger Demand and Train

Capacity 2-8

JMS/TLT/RE5501/P1988/RE080 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


ii
Content

2.4System Operation Plan


2.4.1

2-10
Case

2-10

Train operation plan for the normal situation

2.4.2 Train Operation Plan for Degraded/Emergency

2-13

Chapter 3 Designed Alignments


3.1General
3-1

3.2Route Alignment
3.2.1

3-2

3.2.2

3-1

Horizontal Route Alignment

Vertical Alignment

3-3

3.3Proposed Route Alignment-Plan and Profile

3-4

3.3.1

General

3.3.2

Other Related Projects

3.3.3

Preliminary Designed Alignments

3-4
3-4
3-5

JMS/TLT/RE5501/P1988/RE080 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


iii
Content

Contents (Cont.)
Page
Chapter 4 Station Design

4.1Design Standard

4-1

4.1.1

Station Design: Overview

4.1.2

Design Standard

4-1
4-1

4.2Concept for Station Design and Functional Space

Arrangement 4-5
4.2.1

Main Concepts

4.2.2

Concept for Functional Areas Design

4-5

4-10

4.2.3

The analysis of platform width and area for

passenger flow 4-40


4.2.4

The Analysis for Emergency Evacuation

4.2.5

Signage

4-41
4-41

JMS/TLT/RE5501/P1988/RE080 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


iv
Content

4.2.6

Facilities for Disabled People

4-42

4.2.7

Landscape Architecture

4-44

4.3Material
4-45
Chapter 5 Depot and Stabling Yard

5.1Architectural Design Criteria and Standard

5-1

5.2Details of Depot, Train Operation and Park and Ride

Buildings 5-5

Chapter 6 Civil and Structural Works


6.1Soil Profile and Foundation Design Pink Line (Khae-

Min Buri) 6-1

6.1.1

Soil Profile

6.1.2

Foundation Design

6-1
6-5

6.2Monorail Train Running Structure Design


6.2.1

6-8

Viaduct Structure Design

6-8
JMS/TLT/RE5501/P1988/RE080 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


v
Content

6.2.2

Guideway beam

6-12

6.2.3

Switching

6-13

6.2.4

Return Facilities

6-15

6.2.5

Substructures

6-17

Contents (Cont.)
Page

6.3Station Structure

6-19

6.4Park & Ride Building

6-20

6.5Depot
6-21

Chapter 7 Mechanical and Electrical Works

7.1Overall of Mechanical and Electrical System

7-1

7.2Mechanical and Electrical System

7-2

7.2.1

Monorail Rolling Stock

7-2

JMS/TLT/RE5501/P1988/RE080 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


vi
Content

7.2.2

Signaling

7-8

7.2.3

Telecommunication System

7-14

7.2.4

7-21

7.2.5

SCADA
Substation Design and Power Distribution

7-23

7.3Electrical and Mechanical System for Station

7-32

7.3.1

Elevators and Escalators

7.3.2

Lighting

7.3.3

Air Conditioning and Ventilation System

7-32
7-36
7-37

Chapter 8 Existing Utility Diversion

8.1Likely Impact of the Pink Line Mass Transit Project

to existing Utility

8-1

8.2Procedure for Utility Diversion


8.2.1

8-2

8-2
General

JMS/TLT/RE5501/P1988/RE080 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


vii
Content

8.2.2

Co-ordination for utility diversion during

construction 8-4
8.2.3

Preparation of Shop Drawings for Utility

Diversion 8-4

8.3Utility Diversion Programming

8-4

8.4Highways and Utility Relocation

8-5

8.4.1

8-5

8.4.2

8-8

Existing condition
Improving the road.

8.4.3

Utilities affected by the project

8-15

JMS/TLT/RE5501/P1988/RE080 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Das könnte Ihnen auch gefallen