CLIENT PO NO. :
CO-BPXO-12-0376
KZ01-ME-REQ-53-0016
REVISION:
FAC1-H-804001/804002/804003
DATE:
The Quality Plan is compiled in accordance with BIH's BS EN ISO 9001 approved procedures, complying with BIH Procedure PEP 017.
Covers the 'in-house' activities
Covers process pressure part materials
Covers instruments and controls
Covers non-pressure part components
Covers refractory materials
Covers ancillaries
Lists the minimum inspection and test requirements envisaged for the requisition packages
of fabrication and equipment items.
The detailed fabrication Inspection and Test Plans will be supplied by the relevant Supplier with provision for BIH and
client mark-up.
ED 013 Rev.2
704 ETD-001/C
SHEET:
This Quality Plan is relative to the activities at BIH and relates to the engineering design and administration functions performed at/by BIH.
PART A
PART B
PART C
PART D
PART E
PART F
PART G
DOC NO:
of 15
8-May-15
ED 013 Rev.2
Boustead
DOC NO:
SHEET:
704 ETD-001/C
2
COMMODITY
DOCUMENT NO
704-262-103
704-341-103
The Inspection and Test Plan (ITP) shall be issued by the Supplier for review and approval prior to commencement of the pre-inspection meeting and fabrication.
Reference shall be made to the minimum requirements to be included as detailed in part G of this plan, the Purchase Order Requisition noted above and the Customer's
specifications listed on ED 002
SPECIAL NOTES
1) All supplier and sub-supplier shall be ISO 9001 accrediated.
2) WHRU Package (including damper) shall compliance to ATEX 95 Product Directive 94/9/EC to Zone 2.Self certification is acceptable.
3) WHRU Electrical shall be ATEX certified.ATEX product certification require to Zone 2, Gas Group II B, and Temperature Class T3. Self certification not acceptable.
4) WHRU Instrumentation shall be ATEX certified.ATEX product certification require to Zone 1, Gas Group II B, and Temperature Class T3.Self certification not acceptable.
5) Inspection, testing and measuring equipment and instruments shall be ISO 17025 or UKAS or equivalent national accreditation laboratories.
6) Damper E & I installation shall be inspect by CompEx certified personnel (in-house).
7) Damper E & I detail installation, inspection shall be done by Ex competent inspection body (Baseefa Ltd, Cenelec etc..)
8) All lifting equipments & tackles (eyebolts, spreader beams, slings, chains, shackles etc.. require a proof load test certificate issued by 3rd party.
ED 013 Rev.2
of 15
Boustead
DOC NO:
SHEET:
704 ETD-001/C
3
KEY TO LEGENDS
AP
APPROVAL- Approval required of the applicable activity results or design
document.
H
HOLD POINT-Work shall not proceed without attendance
BIH/Petrofac.
Notification
is equired by BIH/Petrofac.
R
REVIEWReview
of Documentation
W
WITNESS-An operation or process that requires witness by the BIH/Petrofac. Notification is required.
I/W
INITIAL WITNESS-Witness Initial Operations followed by ongoing surveillance. Notification required for the first operation.
S
SURVEILLANCE- Periodic surveillance by BIH/Petrofac. Notification is not required.
HOLD POINTS
WITNESS POINTS are specific stages that, providing the notification has been given within the prescribed time, the non-attendance of the Customer's
inspector will be construed as agreement to proceed with the inspection or test. Records of the inspection will be offered to the inspector or Customer
as evidence of compliance.
Note : Fourteen (14) working days notification required for all customer inspection HOLD and/or WITNESS POINTS.
of 15
ED 013 Rev.2
Boustead
QUALITY PLAN
PART A
DOC NO:
SHEET:
Activity ref no
1
Activity Description
of 15
Controlling Document/Procedure
Acceptance Criteria
Verifying Document
Signatory
Customer's P O
MD + SD
SD
to ensure:
Conditions
SD
PEM
PEM
PEM/PE
DE
QM
CO-BPXO-12-0376
KZ01-ME-REQ-53-0016
Sales Handover
Customer's Purchase
Order Conditions.
ED 002
Design (Process)
Customer's Purchase
Order Conditions and
Data Sheets
ISO 13704 (API 530)
ISO 13705 (API 560)
ASME B31.3
ASME VIII Div.1
GIS 22-101
Customers specs as
listed on ED 002
ED.013 Rev.2
Calculation sheets
Calculation sheets
Calculation sheets
Calculation sheets
Calculation sheets
Calculation sheets
WHRU Data ETD002/A
Pink copy
PEP 019
PEM
Boustead
QUALITY PLAN
PART A
DOC NO:
SHEET
Activity ref no
6
Activity Description
Design (Structural)
of 15
Controlling Document/Procedure
Acceptance Criteria
Verifying Document
Signatory
BS EN ISO 9001-7.3
ENG 001 DO 002 Clause 2 DES 001
KZ01-ME-SPE-53-0003
KZ01-CV-BOD-53-0001
KZ01-CV-SPE-53-0003
GIS 22-101
Customer's Purchase
Order Conditions and
Data Sheets
AWS D1.1
Eurocode 1990,1991,
1993,1994,1998
ISO 13705 (API 560)
SDM
PEM
Customers specs as
listed on ED 002
a)
b)
c)
d)
e)
f)
Calculation sheets/drawings
Calculation sheets/drawings
Calculation sheets/drawings
Calculation sheets/drawings
Contract document
requirements
KZ01-ME-REQ-53-0016
Annexure 2
KZ01-QA-PLN-53-0113
KZ01-DM-SDR-00-0001
ED010 ED 011/A
PEM/PE
PE
Customer PO Delivery
Requirements
ETD-001/B
PEM
PEM
ED 011
KZ01-ME-REQ-53-0016
Annexure 2
KZ01-QA-PLN-53-0113
KZ01-DM-SDR-00-0001
KZ01-DM-SPE-00-0004
KZ01-DM-TEM-53-0002
PE
PE
10
Customer's Purchase
Order Conditions
KZ01-QA-PRO-53-0005
KZ01-QA-PLN-53-0113
KZ01-QA-SPE-53-0002
KZ01-ME-REQ-53-0016
PEM
PEM
Customer's Purchase
Order Conditions
Approved drawing
PEM
PE
BS EN ISO 9001-7.4
PD 032
Purchase Order
Specifications
KZ01-QA-PRO-53-0005
PRCD
PRCD
12
b) Supplier selection
c) Preparation of bid tab and evaluation.
d) Placement of Purchase Order
ED.013 Rev.2
Approved Supplier
Boustead
QUALITY PLAN
PART A
DOC NO:
SHEET
Activity ref no
13
14
Activity Description
Spares Quotations (if applicable)
Acceptance Criteria
Verifying Document
Signatory
Customer's Purchase
Order Conditions
SC
PE
QM
QM
PEM
PEM
PD 032-2.7
a)
b)
c)
d)
e)
f)
g)
QA034
QC 001
PD032-5
PEP 019
QC 001
QC 001
QC 001
Approved procedures
Minutes of meeting
Procurement Status
Inspection & Expediting reports
PMI Reports
NCR Report
Release note
of 15
Controlling Document/Procedure
DC011
15
16
Corrective Action
Compliance with
concesson or Purchase
Order conditions
KZ01-PE-PRO-53-0005
PEM/QM
QM
17
Concessions
Compliance with
concesson or Purchase
Order conditions
KZ01-PE-PRO-53-0005
PEM
PEM
18
Customer's Purchase
Order Conditions
KZ01-DM-SDR-00-0001
KZ01-QA-PLN-53-0113
KZ01-QA-SPE-53-0002
ETD-105
QM
QM
19
Customer's Purchase
Order Conditions
Approved Procedures
ETD-070/A
PE
PEM
20
Customer's Purchase
Order Conditions
Approved documents
ETD-070/B
PE
PEM
21
Customer's Purchase
Order Conditions
Approved Procedures
PE
PE
GPO-MP-SPE-00001
KZ01-QA-PRO-53-0003
KZ01-QA-PRO-53-0009
ED.013 Rev.2
22
Customer's Purchase
Order Conditions
Approved documents
PE
PE
23
Customer's Purchase
Order Conditions
GPO-MP-SPE-00001
KZ01-QA-PRO-53-0003
KZ01-QA-PRO-53-0009
PEM/PRCD
PEM/PRCD
Boustead
Activity ref no
24
Activity Description
COIL MATERIALS (PRESSURE PARTS)
QUALITY PLAN
PART B
Controlling Document/Procedure
Acceptance Criteria
DOC NO:
SHEET:
of 15
Verifying Document
Signatory
EN 10204 3.1
QM/PE
QM/PEM
QM
QM/PEM
QM/PE/PEM
QM/PEM
QM
QM
QM
QM/PEM
QM/PE/PEM
QM/PEM
Alloy Pipes
Alloy Manifold
Alloy Fittings
Manifold Fittings
Alloy Flanges
Weldoflanges
Extruded Manifolds
See also 704-262-103AA - Steel & Coil Fabrication
Requisition:
101
121
139
145
178
188
250
262
24.1
Material Certification
24.2
24.3
Delivery
Free issue to finning manufacture & fabricator
PD032-6
25
KZ01-QA-SPE-53-0002
Attachment 2
ED.013 Rev.2
25.1
Material Certification
25.2
25.3
Delivery
Free issue to coil fabricator
Requisition 240
KZ01-QA-SPE-53-0002
Attachment 2
PD032-6
Boustead
Activity ref no
26
Activity Description
INSTRUMENTATION / CONTROLS
QUALITY PLAN
PART C
Controlling Document/Procedure
Acceptance Criteria
Verifying Document
Requsition as (10)
above
Manufacturers' Standards
KZ01-QA-SPE-53-0002
Attachment 2
KZ01-QA-PLN-53-0113
KZ01-EL-SPE-53-0001
KZ01-EL-SPE-53-0002
KZ01-IC-SPE-53-0003
Zone 1, Gas Group II B,
T3.
ED.013 Rev.2
Instrumentations
Requisitions
434
341
26.1
Material Certification
26.2
Visual Dimensional
Manufacturer's Standard Test and Markings
26.3
Delivery
Site
PD032-6
DOC NO:
SHEET:
of 15
Signatory
EN 10204 Certificates
Hazardous Area Certificates
ATEX Certification
Ingress Protection Certificates
Inspection & Test Reports
QM/PEM
QM/PEM
QM/PEM
QM/PEM
QM/PEM
QM/PEM
Boustead
Activity ref no
27
PART D
Controlling Document/Procedure
Acceptance Criteria
Requisition as (10)
above
Bolts
Plate
Puller
Expansion Joints
Piping Insulation
191
278
294
344
540
262
27.1
Material Certification
27.2
27.3
ED.013 Rev.2
Activity Description
QUALITY PLAN
Delivery to :
Site / Fabricator
QC 001
KZ01-QA-SPE-53-0002
Attachment 2
KZ01-QA-PLN-53-0113
Verifying Document
Release Certificate
ED 014
DOC NO:
SHEET:
of 15
Signatory
QM/PEM
QM/PEM
QM/PEM
QM/PEM
QM/PEM
Boustead
Activity ref no
28
Activity Description
REFRACTORY MATERIALS
QUALITY PLAN
PART E
Controlling Document/Procedure
Acceptance Criteria
Requisition as (10)
above
ED.013 Rev.2
Refractory Studs
Ceramic Fibre
Internal Coating
Requisitions
381
524
531
262
28.1
Material Certification
28.2
Delivery to :
Site / Fabricator
KZ01-QA-SPE-53-0002
Attachment 2
KZ01-QA-PLN-53-0113
PD032-6
DOC NO:
SHEET:
Verifying Document
10
of 15
Signatory
QM/PEM
QM/PEM
QM/PEM
Boustead
Activity ref no
29
Activity Description
ANCILLARIES
QUALITY PLAN
PART F
Controlling Document/Procedure
Acceptance Criteria
Verifying Document
Requsition as (10)
above
Manufacturers' Standards
KZ01-QA-SPE-53-0002
Attachment 2
KZ01-QA-PLN-53-0113
Name Plate
Noise Study
CFD
ED.013 Rev.2
29.1
29.2
29.3
DOC NO:
SHEET:
11
of 15
Signatory
EN10204 2.1
QM/PEM
QM/PEM
Inspector's report
QM/PEM
QM/PEM
QM/PEM
QM/PEM
Requisitions
620
641
648
PD032-6
Boustead
JOB NO
SHEET
Activity Description
BIH
Petrofac/
BP/ NIB
PIB
AP
AP
AP
NoBo
S/R
S/R
S/R
S/R
H
H
S/R
W
S/R
W
R
R
~
~
9 Coil fabrication
S/R
S/R
S/R
S/R
S/R
S/R
S/R
S/R
14 Hydrostatic test
15 Dryness & Cleanliness of Coil internal side
Surface treatment & Insulation
H
H
H
W
W
I/W
W
R
~
~
I/W
I/W
H
H
H
H
H
H
R
R
~
~
9.1 Build Review (30%, 60% and 90%) of convection coil assembly
10
RT/UT
10.1 100% RT of all butt welds on convection coil & manifold
10.2 100% UT on fillet welds greater than 12mm.
MPI/LPI
11
11.1 100% of all butt & branch welds, attachment welds and grinding
marks.
11.2 100% of area after removal of thermocouple attachments.
11.3 100% on groove weld preparation prior root pass welding.
16
ED.013 Rev.2
Boustead
JOB NO
SHEET
Activity Description
Sub
Vendor
WHRU Casings and Structure (Ducts, Stacks, Platforms & Ladders)
1 Produce inspection and test plans
Produce WPS/PQR (including repair if any) complete
2 with relevant lab test reports for the PQR tests carried
out including Weld/NDE plan.
3 Produce applicable inspection,test,NDE procedures
BIH
Petrofac/
BP/ NIB
PIB
NoBo
AP
AP
AP
S/R
S/R
S/R
S/R
H
H
S/R
W
S/R
W
R
R
~
~
S/R
S/R
S/R
S/R
S/R
S/R
S/R
H
H
H
H
H
S/R
S/R
S/R
S/R
H
R
R
R
R
W
R
R
R
R
R
~
~
~
~
W
I/W
H
H
H
H
H
H
R
R
~
~
MPI/LPI
11
14
15
16
17
18
19
ED.013 Rev.2
ED.013 Rev.2
Boustead
JOB NO
SHEET
Activity Description
BIH
Petrofac/
BP/ NIB
PIB
AP
AP
AP
S/R
S/R
S/R
S/R
H
H
S/R
W
S/R
W
R
R
~
~
S/R
S/R
S/R
S/R
S/R
H
H
H
H
S/R
S/R
S/R
S/R
R
R
R
R
R
R
R
R
~
~
~
~
S/R
I/W
H
H
H
H
H
H
R
R
~
~
NoBo
Dampers
1 Produce inspection and test plans
Produce WPS/PQR (including repair if any) complete
2 with relevant lab test reports for the PQR tests carried
out including Weld/NDE plan.
3 Produce applicable inspection,test,NDE procedures
Pre inspection meeting (PIM)/Pre Production Meeting
4
(PPM) and QMS Audit if any
Welder qualification test and NDE operator qualification
5
as applicable
Materials inspection,identification,traceability and
6 certification requirements (including weld consumables,
Electrical & Instrumentations)
7 Welding controls-Fit up,tack, welding, weld repair
8 100% Visual and dimensional inspection-after welding
9 Fabrication and assembly
9.1 Build Review (30%, 60% and 90%) of Damper assembly
MPI/LPI
11
- incl hydrotest
Pre-FAT
19
FAT
20.1 Wiring check-Insulation,loop, continuity, routing, earthing,
20
tagging, cleanliness
20.2 Electrical/instument functional/calibration testing
20.3 Intruments tubing & fittings check- type & competencies
20.4 Completion check of mechanical, electrical & instruments
installations
20.5 ATEX documentations verification
ED.013 Rev.2
Boustead
JOB NO
SHEET
Activity Description
BIH
Petrofac/
BP/ NIB
NIB
NoBo
KEY TO LEGENDS
AP
APPROVAL- Approval required of the applicable activity results or design
H
HOLD POINT-Work shall not proceed without attendance
REVIEW- Review of Documentation by BIH/Petrofac.
R
WITNESS-An operation or process that requires witness by the BIH/Petrofac. Notification is required.
W
I/W
INITIAL WITNESS-Witness Initial Operations followed by ongoing surveillance. Notification required for the first operation.
S
SURVEILLANCE- Periodic surveillance by BIH/Petrofac. Notification is not required.
DPI
MPI
UT
RT
BIH
Petrofac
BP
NoBo
NIB
PIB
NOTE
1. All authorised parties are to sign and date the activities above on the respective locations of the supplier ITPs.
2. Applicable for Stack section only. Minimum Radiograph length shall be 250mm.
3. For random inspection "10%" the selection of joint shall represent each welding process, welders/Welding Operator
for every week production.
ED.013 Rev.2
ED.013 Rev.2