Sie sind auf Seite 1von 19

Boustead QUALITY PLAN

BIH JOB: 704


CLIENT :
Petrofac E&C Oman LLC.
WHRU TITLE:
3 unit's of Hot Oil WHRU

CLIENT PO NO. :

CO-BPXO-12-0376

CLIENT REQUISITION NO. :


WHRU TAG NO. :

KZ01-ME-REQ-53-0016

REVISION:

FAC1-H-804001/804002/804003

DATE:

The Quality Plan is compiled in accordance with BIH's BS EN ISO 9001 approved procedures, complying with BIH Procedure PEP 017.
Covers the 'in-house' activities
Covers process pressure part materials
Covers instruments and controls
Covers non-pressure part components
Covers refractory materials
Covers ancillaries
Lists the minimum inspection and test requirements envisaged for the requisition packages
of fabrication and equipment items.
The detailed fabrication Inspection and Test Plans will be supplied by the relevant Supplier with provision for BIH and
client mark-up.

ED 013 Rev.2

704 ETD-001/C

SHEET:

This Quality Plan is relative to the activities at BIH and relates to the engineering design and administration functions performed at/by BIH.

PART A
PART B
PART C
PART D
PART E
PART F
PART G

DOC NO:

of 15

8-May-15

ED 013 Rev.2

Boustead

DOC NO:
SHEET:

704 ETD-001/C
2

INSPECTION AND TEST PLANS (ITP)


ITPs for the following activities shall be issued under separate cover within fourteen (14) days of sub-order placement and shall form the
working document for quality verification by the inspectors.
REQUISITION
262
341

COMMODITY

DOCUMENT NO

Steel & Coil Fabrication


Damper

704-262-103
704-341-103

The Inspection and Test Plan (ITP) shall be issued by the Supplier for review and approval prior to commencement of the pre-inspection meeting and fabrication.
Reference shall be made to the minimum requirements to be included as detailed in part G of this plan, the Purchase Order Requisition noted above and the Customer's
specifications listed on ED 002
SPECIAL NOTES
1) All supplier and sub-supplier shall be ISO 9001 accrediated.
2) WHRU Package (including damper) shall compliance to ATEX 95 Product Directive 94/9/EC to Zone 2.Self certification is acceptable.
3) WHRU Electrical shall be ATEX certified.ATEX product certification require to Zone 2, Gas Group II B, and Temperature Class T3. Self certification not acceptable.
4) WHRU Instrumentation shall be ATEX certified.ATEX product certification require to Zone 1, Gas Group II B, and Temperature Class T3.Self certification not acceptable.
5) Inspection, testing and measuring equipment and instruments shall be ISO 17025 or UKAS or equivalent national accreditation laboratories.
6) Damper E & I installation shall be inspect by CompEx certified personnel (in-house).
7) Damper E & I detail installation, inspection shall be done by Ex competent inspection body (Baseefa Ltd, Cenelec etc..)
8) All lifting equipments & tackles (eyebolts, spreader beams, slings, chains, shackles etc.. require a proof load test certificate issued by 3rd party.

ED 013 Rev.2

of 15

Boustead

DOC NO:
SHEET:

704 ETD-001/C
3

KEY TO LEGENDS
AP
APPROVAL- Approval required of the applicable activity results or design
document.
H
HOLD POINT-Work shall not proceed without attendance
BIH/Petrofac.
Notification
is equired by BIH/Petrofac.
R
REVIEWReview
of Documentation
W
WITNESS-An operation or process that requires witness by the BIH/Petrofac. Notification is required.
I/W
INITIAL WITNESS-Witness Initial Operations followed by ongoing surveillance. Notification required for the first operation.
S
SURVEILLANCE- Periodic surveillance by BIH/Petrofac. Notification is not required.

HOLD POINTS

are specific stages to be attended by the inspector.


Work may not proceed without written authorisation by the Customer.

WITNESS POINTS are specific stages that, providing the notification has been given within the prescribed time, the non-attendance of the Customer's
inspector will be construed as agreement to proceed with the inspection or test. Records of the inspection will be offered to the inspector or Customer
as evidence of compliance.
Note : Fourteen (14) working days notification required for all customer inspection HOLD and/or WITNESS POINTS.

KEY TO RESPONSIBLE PERSONNEL


MD
Managing Director
ED
Engineering Director
PD
Projects Director
CD
Contract Director
SD
Sales Director
PEM
Project Engineering Manager
PRCD
Procurement Director
SDM
Structural Design Manager
PE
Project Engineer
DE
Design Engineer
SC
Spares Controller
DC
Document Controller
CM
Construction Manager
QM
Quality Manager
ED 013 Rev.2

of 15

ED 013 Rev.2

Boustead

QUALITY PLAN

PART A

DOC NO:

704 ETD-001/C Rev

SHEET:

Activity ref no
1

Activity Description

of 15

Controlling Document/Procedure

Acceptance Criteria

Verifying Document

Authorised Party Legend

Signatory

Contract Review of Customer Purchase Order

BS EN ISO 9001 - 5.2/7.2

Customer's P O

Signed Purchase Order

MD + SD

SD

to ensure:

Customer's Purchase Order


CO-BPXO-12-0376

Conditions

ED 024 SD 002 P O Memo


Handover Checklist

SD

PEM

PEM

PEM/PE

DE

QM

a) All contract requirements are adequately defined. SDP 003


b) Any requirements differing from those in tender
are resolved.

CO-BPXO-12-0376
KZ01-ME-REQ-53-0016

c) BIH have the capability to meet all the contract


requirements.
d) Applicable specifications and engineering
standards with editions are listed and complete.
2

Sales Handover

BS EN ISO 9001 - 7.2


SDP 003 PEP 004 PD 032-3

Review of Sales Handover documentation

BS EN ISO 9001 - 7.2


PEP 004 PEP 006

Customer's Purchase
Order Conditions.

ED 002

Design (Process)

BS EN ISO 9001 - 7.3


PDP 001 PDP 002 DES 001
DO 002
KZ01-ME-REQ-53-0016
KZ01-ME-DAT-53-0064
KZ01-ME-SPE-53-0003
KZ01-PR-BOD-53-0002
KZ01-PI-BOD-53-0001
KZ01-EV-BOD-53-0001
KZ01-PI-SPE-53-0006

Customer's Purchase
Order Conditions and
Data Sheets
ISO 13704 (API 530)
ISO 13705 (API 560)
ASME B31.3
ASME VIII Div.1
GIS 22-101

Tubewall & Hydrotest calcs


DE
ETD008/A
Refractory Thickness calculation
ETD005/B

Customers specs as
listed on ED 002

ED.013 Rev.2

a) Review project spec to establish design basis


b) Review latest revision of applicable codes
c) Produce design calculations
d) Review of computer calculations
e) Check design calcs
f) Amendments if required
g) Check amendments
h) Approval of calculations
i) Complete WHRU Data Sheets
j) Review of pink copy(Engineering Review)

SD 002 PDP 002


SD 002 PDP 002
PDP 002
PDP 002
PDP 002
PDP 002
PDP 002
PDP 002
PDP 002
DO 002

Obtain Third Party Design Approval


Lifting equipment (spreader beam & lifting
accessories)

BS EN ISO 9001 - 7.3

Calculation sheets
Calculation sheets
Calculation sheets
Calculation sheets
Calculation sheets
Calculation sheets
WHRU Data ETD002/A
Pink copy
PEP 019

Third party approval

Third party approval


documentation.

PEM

Boustead

QUALITY PLAN

PART A

704 ETD-001/C Rev

DOC NO:

SHEET

Activity ref no
6

Activity Description
Design (Structural)

of 15

Controlling Document/Procedure

Acceptance Criteria

Verifying Document

Authorised Party Legend

Signatory

BS EN ISO 9001-7.3
ENG 001 DO 002 Clause 2 DES 001
KZ01-ME-SPE-53-0003
KZ01-CV-BOD-53-0001
KZ01-CV-SPE-53-0003
GIS 22-101

Customer's Purchase
Order Conditions and
Data Sheets
AWS D1.1
Eurocode 1990,1991,
1993,1994,1998
ISO 13705 (API 560)

Foundation & Structural calcs


ETD003/D
Tube Suport cacls ETD007/A

SDM

PEM

Customers specs as
listed on ED 002
a)
b)
c)
d)
e)
f)

Review project spec to establish design basis


Review latest revision of applicable codes
Produce structural design calculations
Check mathematical correctness & content
Approval of structural design calculations
Review of structural design drawings

SD 002 ENG 001 ED 024


SD 002 ENG 001 ED 024
ENG 001 DES 001 ED 024
ENG 001
ENG 001
ENG 001

Calculation sheets/drawings
Calculation sheets/drawings
Calculation sheets/drawings
Calculation sheets/drawings

Compilaton of Master Document List

BS EN ISO 9001 - 4.2.3


PEP 012 Customer SDRML

Contract document
requirements
KZ01-ME-REQ-53-0016
Annexure 2
KZ01-QA-PLN-53-0113
KZ01-DM-SDR-00-0001

ED010 ED 011/A

PEM/PE

PE

Preparation of production programme

BS EN ISO 9001 - 7.1


PEP 011

Customer PO Delivery
Requirements

ETD-001/B

PEM

PEM

Supplier document control

BS EN ISO 9001 - 4.2.3


PEP 013
PEP 014 PEP 037 DC 002 DC
003

ED 011
KZ01-ME-REQ-53-0016
Annexure 2
KZ01-QA-PLN-53-0113
KZ01-DM-SDR-00-0001
KZ01-DM-SPE-00-0004
KZ01-DM-TEM-53-0002

Document History Report

PE

PE

10

Preparation of Material Requisitions and


Specifications for manufacturing and fabrication.

BS EN ISO 9001 - 7.2 / 7.4


SDP 004 PEP 020 QA 034

Customer's Purchase
Order Conditions
KZ01-QA-PRO-53-0005
KZ01-QA-PLN-53-0113
KZ01-QA-SPE-53-0002
KZ01-ME-REQ-53-0016

Approved copy of requisition


package.

PEM

PEM

BS EN ISO 9001 - 7.3


DO 002 QA 034 Customer SDDR

Customer's Purchase
Order Conditions

Approved drawing

PEM

PE

Procurement of components and services.

BS EN ISO 9001-7.4
PD 032

Purchase Order
Specifications
KZ01-QA-PRO-53-0005

PRCD

PRCD

a) Procurement strategy meeting

PD032-3 PEP 007 PEP 011


PD032-2 QA004
PD032-4
PD032-4

a) Compilation of requisition packages for subsuppliers using approved drawings, contract


documentation, specifications & standards
b) Approval of the requisition package
c) Issue to Procurement for enquiry/purchase
11

Production of Contract drawings.


a) Drawings prepared based on design and
contract specificatons
b) Check of drawing details
c) Circulation of pink copy (Engineering Review)
d) Issue of drawings for approval

12

b) Supplier selection
c) Preparation of bid tab and evaluation.
d) Placement of Purchase Order

ED.013 Rev.2

Approved Supplier

Approved Suppliers list


Bid tab
Authorised PO

Boustead

QUALITY PLAN

PART A

704 ETD-001/C Rev

DOC NO:

SHEET

Activity ref no
13
14

Activity Description
Spares Quotations (if applicable)

Acceptance Criteria

Verifying Document

Authorised Party Legend

Signatory

BS EN ISO 9001 - 7.4


PEP 021
SDP 005

Customer's Purchase
Order Conditions

Approved copy of requisition


package

SC

PE

QM

QM

Change Order Notice

PEM

PEM

PD 032-2.7

Process Control / Inspection & Testing

BS EN ISO 9001 - 5.4.2, 7.1, 7.5.2, 8.1, Client's Purchase Order


8.2.4, 8.3 PD032-5 QA034 PEP019 Conditions
QC001
KZ01-ME-REQ-53-0016
(Criticality Rating : 3)
KZ01-QA-PLN-53-0113
KZ01-QA-SPE-53-0002
KZ01-QA-PRO-53-0009
KZ01-PE-PRO-53-0005
KZ01-MT-SPE-53-0103
GIS 36-103

Expediting & Inspection Reports

a)
b)
c)
d)
e)
f)
g)

QA034
QC 001
PD032-5
PEP 019
QC 001
QC 001
QC 001

Approved procedures
Minutes of meeting
Procurement Status
Inspection & Expediting reports
PMI Reports
NCR Report
Release note

Review of Technical Documents


PIM for major fabrications
Material progress reports
Review of Inspection & Expediting reports
Alloy verification
Control of non-conforming product
Final inspections

of 15

Controlling Document/Procedure

DC011

PEP 033 QC 001


QA 035 PEP 029
PEP 019

15

Change Notification & Change Order control

BS EN ISO 9001 - 7.2.2 / 7.3.7


PEP 023 DO 002-4

16

Corrective Action

BS EN ISO 9001 - 8.5.2


QA 036 PEP 029

Compliance with
concesson or Purchase
Order conditions
KZ01-PE-PRO-53-0005

Closed out NCR

PEM/QM

QM

17

Concessions

BS EN ISO 9001 - 8.3 / 8.5.2


PEP 032

Compliance with
concesson or Purchase
Order conditions
KZ01-PE-PRO-53-0005

Approved concession report

PEM

PEM

18

Compilation of Data Dossiers

BS EN ISO 9001 - 4.2.4


QA 038

Customer's Purchase
Order Conditions
KZ01-DM-SDR-00-0001
KZ01-QA-PLN-53-0113
KZ01-QA-SPE-53-0002

ETD-105

QM

QM

19

Produce Erection Procedures

BS EN ISO 9001 - 6.3 / 7.1 / 7.5.1


PEP 026

Customer's Purchase
Order Conditions

Approved Procedures
ETD-070/A

PE

PEM

20

Commissioning, Start-up. Operating & Maintenance BS EN ISO 9001 Instructions


7.5.1 / 7.5.2 / 7.5.4 / 7.5.5
PEP 027

Customer's Purchase
Order Conditions

Approved documents
ETD-070/B

PE

PEM

21

Shipping. Handling & Storage Procedures

Customer's Purchase
Order Conditions

Approved Procedures

PE

PE

BS EN ISO 9001 - 7.5.5


PD032-6 PEP 026 B-11

GPO-MP-SPE-00001
KZ01-QA-PRO-53-0003
KZ01-QA-PRO-53-0009

ED.013 Rev.2

22

Certified As-built drawings, specifications & Data


Sheets

BS EN ISO 9001 - 4.2.4 / 7.3.7


PEP 030 DO002-6

Customer's Purchase
Order Conditions

Approved documents

PE

PE

23

Marking documentation & shipping instructions

BS EN ISO 9001 4.2.3 / 7.5.1 / 7.5.3 / 7.5.5 PD032-6

Customer's Purchase
Order Conditions
GPO-MP-SPE-00001
KZ01-QA-PRO-53-0003
KZ01-QA-PRO-53-0009

Authorised shipping instructions

PEM/PRCD

PEM/PRCD

Boustead
Activity ref no
24

Activity Description
COIL MATERIALS (PRESSURE PARTS)

QUALITY PLAN

PART B

Controlling Document/Procedure

Acceptance Criteria

BS EN ISO 9001 - 4.2.4 / 7.4.3 / 7.5.1 /

Req as (10) above

704 ETD-001/C Rev

DOC NO:
SHEET:

of 15

Verifying Document

Authorised Party Legend

Signatory

EN 10204 3.1

QM/PE

QM/PEM

Inspection, Acceptance &


Release Certs

QM

QM/PEM

Release Note ED 014

QM/PE/PEM

QM/PEM

EN 10204 2.1/2.2 Certificates

QM

QM

Inspection, Acceptance &


Release Certs

QM

QM/PEM

Release Note ED 014

QM/PE/PEM

QM/PEM

7.5.2 / 7.5.3 / 7.5.5 / 8.2.4


QC 001

Alloy Pipes
Alloy Manifold
Alloy Fittings
Manifold Fittings
Alloy Flanges
Weldoflanges
Extruded Manifolds
See also 704-262-103AA - Steel & Coil Fabrication

Requisition:
101
121
139
145
178
188
250
262

24.1

Material Certification

24.2

Visual and Dimensional

24.3

Delivery
Free issue to finning manufacture & fabricator

PD032-6

Finning Material for Tubes

BS EN ISO 9001 - 4.2.4 / 7.4.3 / 7.5.1 /

25

KZ01-QA-SPE-53-0002
Attachment 2

Req as (10) above

7.5.2 / 7.5.3 / 7.5.5 / 8.2.4


QC 001
Finning

ED.013 Rev.2

25.1

Material Certification

25.2

Visual Dimensional & Marking

25.3

Delivery
Free issue to coil fabricator

Requisition 240
KZ01-QA-SPE-53-0002
Attachment 2

PD032-6

Boustead
Activity ref no
26

Activity Description
INSTRUMENTATION / CONTROLS

QUALITY PLAN

PART C

Controlling Document/Procedure

Acceptance Criteria

Verifying Document

BS EN ISO 9001 - 4.2.4 / 7.4.3 / 7.5.1 /

Requsition as (10)
above

Manufacturers' Standards

KZ01-QA-SPE-53-0002
Attachment 2
KZ01-QA-PLN-53-0113
KZ01-EL-SPE-53-0001
KZ01-EL-SPE-53-0002
KZ01-IC-SPE-53-0003
Zone 1, Gas Group II B,
T3.

7.5.2 / 7.5.3 / 7.5.5 / 8.2.4


QC 001

ED.013 Rev.2

Instrumentations

Requisitions
434

See also 704-341-103 - Damper

341

26.1

Material Certification

26.2

Visual Dimensional
Manufacturer's Standard Test and Markings

26.3

Delivery
Site

PD032-6

704 ETD-001/C Rev

DOC NO:
SHEET:

of 15

Authorised Party Legend

Signatory

EN 10204 Certificates
Hazardous Area Certificates
ATEX Certification
Ingress Protection Certificates
Inspection & Test Reports

QM/PEM

QM/PEM

Inspection, Acceptance &


Release Certificates

QM/PEM

QM/PEM

Release Notes ED 014

QM/PEM

QM/PEM

Boustead
Activity ref no
27

WHRU COMPONENTS (NON-PRESSURE)

PART D

Controlling Document/Procedure

Acceptance Criteria

BS EN ISO 9001 - 4.2.4 / 7.4.3 / 7.5.1 /

Requisition as (10)

7.5.2 / 7.5.3 / 7.5.5 / 8.2.4


Requisitions

above

Bolts
Plate
Puller
Expansion Joints
Piping Insulation

191
278
294
344
540

See also 704-262-103AA - Steel & Coil Fabrication

262

27.1

Material Certification

27.2

Visual Dimensional & Markings

27.3

ED.013 Rev.2

Activity Description

QUALITY PLAN

Delivery to :
Site / Fabricator

QC 001

KZ01-QA-SPE-53-0002
Attachment 2
KZ01-QA-PLN-53-0113

Verifying Document

Release Certificate
ED 014

Authorised Party Legend

EN 10204 3.1 for


QM/PEM
Primary/Secondary Structural &
Steel & Load Bearing
Components
EN 10204 2.1/2.2 for Tertiary
Structural Steel & Non-functional
Components

Inspection, Acceptance &


Release Certs
PD032-6

704 ETD-001/C Rev

DOC NO:
SHEET:

of 15

Signatory

QM/PEM

QM/PEM

QM/PEM

QM/PEM

QM/PEM

Boustead
Activity ref no
28

Activity Description
REFRACTORY MATERIALS

QUALITY PLAN

PART E

Controlling Document/Procedure

Acceptance Criteria

BS EN ISO 9001 - 4.2.4 / 7.4.3 / 7.5.1 /

Requisition as (10)
above

7.5.2 / 7.5.3 / 7.5.5 / 8.2.4


QC 001

ED.013 Rev.2

Refractory Studs
Ceramic Fibre
Internal Coating

Requisitions
381
524
531

See also 704-262-103AA - Steel & Coil Fabrication

262

28.1

Material Certification

28.2

Delivery to :
Site / Fabricator

KZ01-QA-SPE-53-0002
Attachment 2
KZ01-QA-PLN-53-0113

PD032-6

704 ETD-001/C Rev

DOC NO:
SHEET:

Verifying Document

10

Authorised Party Legend

of 15

Signatory

EN10204 3.1 for Insulation


QM/PEM
material (Ceramic Fiber)
EN 10204 2.1/2.2 for other parts.

QM/PEM

Release Certificate ED 014

QM/PEM

QM/PEM

Boustead
Activity ref no
29

Activity Description
ANCILLARIES

QUALITY PLAN

PART F

Controlling Document/Procedure

Acceptance Criteria

Verifying Document

BS EN ISO 9001 - 4.6.4 4.8 4.9 4.10

Requsition as (10)
above

Manufacturers' Standards

KZ01-QA-SPE-53-0002
Attachment 2
KZ01-QA-PLN-53-0113

4.12 4.15 4.16


QC 001

Name Plate
Noise Study
CFD

ED.013 Rev.2

29.1

Material Certification (where applicable)

29.2

Visual Dimensional & Markings (where


applicable)

29.3

Delivery (where applicable) to


Site

704 ETD-001/C Rev

DOC NO:
SHEET:

11

of 15

Authorised Party Legend

Signatory

EN10204 2.1

QM/PEM

QM/PEM

Inspector's report

QM/PEM

QM/PEM

Release Certificate ED 014

QM/PEM

QM/PEM

Requisitions
620
641
648

PD032-6

Boustead

QUALITY PLAN PART G

704 ETD-001/C Rev


0
12
of 15

JOB NO
SHEET

Shop inspection and test requirements


Activity
Ref No

Activity Description

Authorised Parties Note 1


Sub
Vendor

BIH

Petrofac/
BP/ NIB
PIB

AP

AP

AP

NoBo

Convection Coil & Manifold


1 Produce inspection and test plans
Produce WPS/PQR (including repair if any) complete
2 with relevant lab test reports for the PQR tests carried
out including Weld/NDE plan.
3 Produce applicable inspection,test,NDE procedures
4

Pre inspection meeting (PIM)/Pre Production Meeting


(PPM) and QMS Audit if any- With Steelwork

Welder qualification test and NDE operator qualification


as applicable

S/R

S/R

Materials inspection,identification,traceability and


certification requirements (including weld consumables)

S/R

S/R

7 Welding controls-Fit up,tack, welding, weld repair


8 100% Visual and dimensional inspection-after welding

H
H

S/R
W

S/R
W

R
R

~
~

9 Coil fabrication

S/R

S/R

S/R

S/R

S/R

S/R

13 Positive material identification (PMI)

S/R

S/R

14 Hydrostatic test
15 Dryness & Cleanliness of Coil internal side
Surface treatment & Insulation

H
H

H
W

W
I/W

W
R

~
~

I/W

and Shipping- Including handling, preservation,


18 Packing
identificaton, loose items & spare etc..

I/W

19 Issue of Release Notes-IRN


20 Review of Data Book/Dossier (R01+R04+R05)

H
H

H
H

H
H

R
R

~
~

9.1 Build Review (30%, 60% and 90%) of convection coil assembly

10

RT/UT
10.1 100% RT of all butt welds on convection coil & manifold
10.2 100% UT on fillet welds greater than 12mm.

MPI/LPI
11

11.1 100% of all butt & branch welds, attachment welds and grinding
marks.
11.2 100% of area after removal of thermocouple attachments.
11.3 100% on groove weld preparation prior root pass welding.

Hardness- Max 225 HBW (HRB 97,6).


12

12.1 Base Metal (BM)


12.1.1 5% of heat (minimum 1 item), 1 test for every item in sample
12.2 Groove Welds (Weld Cap/Root/HAZ)
12.2.1 No PWHT or Furnace PWHT: 1 test per weld of 5% of the
welds

13.1 10% on weld & base metal

16

16.1 Blasting, surface profile check


16.2 Primer Coat Inspection
16.3 Intermediate Coat Inspection
16.4 Finish Coat Inspection
16.5 Coating Inspection & Test

Final inspection / Cleanliness


17

17.1 Verification of punchlist completion.


17.2 Verfication of name plate marking & tagging detail.
17.3 Verify all inspection & test completed per approved ITP.

ED.013 Rev.2

Boustead

QUALITY PLAN PART G

704 ETD-001/C Rev


0
13
of 15

JOB NO
SHEET

Shop inspection and test requirements


Activity
Ref No

Activity Description

Authorised Parties Note 1

Sub
Vendor
WHRU Casings and Structure (Ducts, Stacks, Platforms & Ladders)
1 Produce inspection and test plans
Produce WPS/PQR (including repair if any) complete
2 with relevant lab test reports for the PQR tests carried
out including Weld/NDE plan.
3 Produce applicable inspection,test,NDE procedures

BIH

Petrofac/
BP/ NIB
PIB

NoBo

AP

AP

AP

Pre inspection meeting (PIM)/Pre Production Meeting


(PPM) and QMS Audit if any- With Steelwork

Welder qualification test and NDE operator qualification


as applicable

S/R

S/R

Materials inspection,identification,traceability and


certification requirements (including weld consumables)

S/R

S/R

H
H

S/R
W

S/R
W

R
R

~
~

S/R

S/R

S/R

S/R

S/R

S/R

S/R

H
H
H
H
H

S/R
S/R
S/R
S/R
H

R
R
R
R
W

R
R
R
R
R

~
~
~
~
W

and Shipping- Including handling, preservation,


20 Packing
identificaton, loose items & spare etc..

I/W

21 Issue of Release Notes-IRN


22 Review of Data Book/Dossier (R01+R04+R05)

H
H

H
H

H
H

R
R

~
~

7 Welding controls-Fit up,tack, welding, weld repair


8 100% Visual and dimensional inspection-after welding
Fabrication and assembly
9 9.1 Build Review (30%, 60% and 90%) of WHRU
structural/duct/casing assembly

RT/UT [subject to geometry]


10.1 10% of full penetration butt welds in each frame or structure.
10

10.2 100% of full penetration butt welds in primary members


including splice joints.
10.3 100% of full penetration lifting lugs welds (including pad eyes)
10.4 One radiograph of each junction and one intermediate shot of
all longitudinal welds.Note 2

MPI/LPI

11

11.1 10% of full penetration butt welds in each frame or structure.


11.2 10% of all fillet welds in major/primary joints.
11.3 100% of full penetration butt welds in primary members
including splice joints.
11.4 100% of full penetration lifting lugs welds (including pad eyes)
11.5 100% of weld rat holes corner joints.

Match drilling/Trial assembly c/w match marks


12

Unit outside overall dimensions


Unit frame anchor bolt hole dimensions
Tie-in connections elevation;
Tie - in Flange rating, flange bolt hole orientation ( centre line
straddling), flange face finish etc
Bolt torqueing where applicable

Surface treatment-Internal & External


13

14
15
16
17
18

13.1 Blasting, surface profile check


13.2 Primer Coat Inspection
13.3 Intermediate Coat Inspection
13.4 Finish Coat Inspection
13.5 Coating Inspection & Test
13.6 Galvanizing of ladders & platforms

Visual and dimensional of anchors/studs layout


Hammer test of anchors/studs - 5% random
Installation of ceramic fibre blanket
Installation of insulation cladding plates
Spreader Beam - Load test
Final inspection / Cleanliness

19

19.1 Verification of punchlist completion.


19.2 Verfication of name plate marking & tagging detail.
19.3 Verify all inspection & test completed per approved ITP.

ED.013 Rev.2

ED.013 Rev.2

Boustead

QUALITY PLAN PART G

704 ETD-001/C Rev


0
14
of 15

JOB NO
SHEET

Shop inspection and test requirements


Activity
Ref No

Activity Description

Authorised Parties Note 1


Sub
Vendor

BIH

Petrofac/
BP/ NIB
PIB

AP

AP

AP

S/R

S/R

S/R

S/R

H
H

S/R
W

S/R
W

R
R

~
~

S/R

S/R

S/R

S/R

S/R

H
H
H
H

S/R
S/R
S/R
S/R

R
R
R
R

R
R
R
R

~
~
~
~

S/R

22 Packing and Shipping- Including handling, preservation,

I/W

23 Issue of Release Notes-IRN


24 Review of Data Book/Dossier (R01+R04+R05+R13)

H
H

H
H

H
H

R
R

~
~

NoBo

Dampers
1 Produce inspection and test plans
Produce WPS/PQR (including repair if any) complete
2 with relevant lab test reports for the PQR tests carried
out including Weld/NDE plan.
3 Produce applicable inspection,test,NDE procedures
Pre inspection meeting (PIM)/Pre Production Meeting
4
(PPM) and QMS Audit if any
Welder qualification test and NDE operator qualification
5
as applicable
Materials inspection,identification,traceability and
6 certification requirements (including weld consumables,
Electrical & Instrumentations)
7 Welding controls-Fit up,tack, welding, weld repair
8 100% Visual and dimensional inspection-after welding
9 Fabrication and assembly
9.1 Build Review (30%, 60% and 90%) of Damper assembly

RT/UT [subject to geometry]


10.1 10% of full penetration butt welds in each frame or structure.
10

10.2 100% of full penetration butt welds in primary members


including splice joints.
10.3 100% of full penetration lifting lugs welds (including pad eyes)

MPI/LPI

11

11.1 10% of full penetration butt welds in each frame or structure.


11.2 10% of all fillet welds in major/primary joints.
11.3 100% of full penetration butt welds in primary members
including splice joints.
11.4 100% of full penetration lifting lugs welds (including pad eyes)
11.5 100% of weld rat holes corner joints.

12 Inspection/certification of air reservoir

- incl hydrotest

Surface treatment-Internal & External


13

13.1 Blasting, surface profile check


13.2 Primer Coat Inspection
13.3 Intermediate Coat Inspection
13.4 Finish Coat Inspection
13.5 Coating Inspection & Test

Visual and dimensional of anchors/studs layout


Hammer test of anchors/studs - 5% random
Installation of ceramic fibre blanket
Installation of insulation cladding plates
Detailed inspections of installed equipment, systems
18 and installations- ATEX 95 Products Directive 94/9/EC
14
15
16
17

Pre-FAT

19

19.1 Wiring check-Insulation,loop, continuity, routing, earthing,


tagging, cleanliness
19.2 Electrical/instument functional/calibration testing
19.3 Intruments tubing & fittings check- type & competencies
19.4 Completion check of mechanical, electrical & instruments
installations
19.5 ATEX documentations verification

FAT
20.1 Wiring check-Insulation,loop, continuity, routing, earthing,
20

tagging, cleanliness
20.2 Electrical/instument functional/calibration testing
20.3 Intruments tubing & fittings check- type & competencies
20.4 Completion check of mechanical, electrical & instruments
installations
20.5 ATEX documentations verification

Final inspection / Cleanliness


21

21.1 Verification of punchlist completion.


21.2 Verfication of name plate marking & tagging detail.
21.3 Verify all inspection & test completed per approved ITP.
identificaton, loose items & spare etc..

ED.013 Rev.2

Boustead

QUALITY PLAN PART G

704 ETD-001/C Rev


0
15
of 15

JOB NO
SHEET

Shop inspection and test requirements


Activity
Ref No

Activity Description

Authorised Parties Note 1


Sub
Vendor

BIH

Petrofac/
BP/ NIB
NIB

NoBo

KEY TO LEGENDS
AP
APPROVAL- Approval required of the applicable activity results or design
H
HOLD POINT-Work shall not proceed without attendance
REVIEW- Review of Documentation by BIH/Petrofac.
R
WITNESS-An operation or process that requires witness by the BIH/Petrofac. Notification is required.
W
I/W
INITIAL WITNESS-Witness Initial Operations followed by ongoing surveillance. Notification required for the first operation.
S
SURVEILLANCE- Periodic surveillance by BIH/Petrofac. Notification is not required.
DPI
MPI
UT
RT
BIH
Petrofac
BP
NoBo
NIB
PIB

DYE PENETRANT INSPECTION


MAGNETIC PARTICLE INSPECTION
ULTRASONIC TESTING
RADIOGRAPHIC TESTING
BOUSTEAD INTERNATIONAL HEATER
Petrofac E&C Oman LLC.
BP OMAN
NOTIFIED BODY- European Community ATEX directive, ASME and or 3rd Party Inspection Body
NOMINATED INSPECTON BODY- Appointed by Company-BP OMAN
PURCHASER INSPECTON BODY- Appointed by Purchaser- Petrofac E&C Oman LLC

NOTE
1. All authorised parties are to sign and date the activities above on the respective locations of the supplier ITPs.
2. Applicable for Stack section only. Minimum Radiograph length shall be 250mm.
3. For random inspection "10%" the selection of joint shall represent each welding process, welders/Welding Operator
for every week production.

ED.013 Rev.2

ED.013 Rev.2

Das könnte Ihnen auch gefallen