Beruflich Dokumente
Kultur Dokumente
(410503-V)
Calculation
Reference
Project :
M
U
=
=
=
=
=
=
Penang
1.829
ha
Earth embankment and perforated outlet
Sandy loam (Type C)
Less than 2 years
3
month ARI
Table 39.4
=
=
=
0.15
65
2
m
%
(iv) to = 107.n.L1/3/S0.5
45.6
minutes
b)
(i)
(ii)
(iii)
=
=
=
1.5
250.0
2.8
m/s
m
minutes
48.4
minutes
153
m2/ha
279.97
184
336.54
m3
=
=
=
=
=
168.27
15.00
0.60
18.70
35.00
m3
m
m
m
m
=
=
=
525.00
58.33
2.33
m2
m
m
c) Time of concentration
(i) tc = to + td
Table 14.2
Eq.14.1
b)
Settling zone
(i)
(ii)
(iii)
(iv)
Settling zone
Sedimentation pond width, W1
Sedimentation pond depth, D1
Required Sedimentation pond length
Try sedimentation pond length, L1
Table 39.5
m2
m3/ha
Table 39.5
Reference
Project :
=
=
=
=
168.27
2
13.8
33.8
m3
V2
131.47
m3
V2
171.60
m3
=
=
=
=
WB =
LB =
16.20
36.20
12.20
32.20
12.20
32.20
m
m
m
m
m
m
m
m
0.3
Trial 2, D2 =
0.4
m
As a conclusion,
D2 >0.3m (Min) and V2 >V2 required; OK.
c)
(i)
(ii)
(iii)
(iv)
2Aav(D1+D2)0.5
tCd(2g)
2
8.53E-03 m
0.5
22.0
mm
Eq.19.5
Reference
Project :
136.65
92.83
106.03
mm/hr
mm/hr
mm/hr
=
=
68.32
92.83
mm
mm
=
=
=
=
120
0.000
68.32
85
mm
=
=
Urban
0.90
0.485
m3/s
0.30
0.00
m
m
(iii) Q10
0.485
m3/s
0.000
m3/s
=
=
=
=
0.485
1.50
4.00
0.30
m3/s
0.986
m
m
m3/s
1.30
(iii)
(iv)
(v)
(vi)
Qspillway = CspBHp1.5
Eq 13.2
10
year
Table 13.A1
Eq 13.3
mm
mm/hr
Eq 14.7
Chart 14.3
Assume
Eq.20.2
Chart 20.2
Fig.13.3
Table 13.3
Eq.20.9