Sie sind auf Seite 1von 1

PLN Tanjung Priok GFPPEP

LEVEL-1
POWER BLOCK
PB
LEVEL-2
GAS TURBINE BUILDING UNIT 1 PB-2
LEVEL-3
C4 , CA
LEVEL-4 (System) GT 3-1 Lube Oil Cooler

BQ
Weight
Sheet No.

CODE
CODE
CODE
CODE

P-21

Area Code

Ton
%
PPSS-GT1-MECH-12

13100

GT 3-1 Lube Oil Cooler

1.

1
2
3
4
5
6
7

PB
PB
PB
PB
PB
PB

PB-2
PB-2
PB-2
PB-2
PB-2
PB-2

C4
C4
C4
C4
C4
C4

9
10
11
12
13
14
15
16
17
18
19

PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB

PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2

C4
C4
C4
C4
C4
C4
C4
C4
C4
C4
C4

3.

22
23
24
25
26
27
28
29
30
31

PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB

PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2

C4
C4
C4
C4
C4
C4
C4
C4
C4
C4
C4

6.

33
34
35
36

PB
PB
PB
PB

PB-2
PB-2
PB-2
PB-2

CA
CA
CA
CA

CA
CA
CA
CA

Check & marking Centerline of foundation floor


Chipping at foundation floor & box out
Cleaning foundation
Setting packer plate
Curing time
Alignment inspection of packer plate

Theodolite, Y-level,Measurer tape, ElectricDrill, Hammer

2.1.
2.2.
2.3.
2.4.
2.5.
2.6.
2.7.
2.8.
2.9.
2.10.
2.11.

Equipment on position
Install found. bolt & nut hanging at the base plate of Equip.
Check centerline & elevation of equipment
Alignment inspection of equipment
Install formwork
Grouting Foundation
Curing time
Remove formwork
Check alignment (centerline & elevation) after grouting
Tightening anchor bolt
Inspection equipment after grouting

Chain Block, Wire Sling


Y-level, Water level,
Spanner, Measuring Tape

3.1.
3.2.
3.3.
3.4.
3.5.
3.6.
3.7.
3.8.
3.9.
3.10.
3.11.

Equipment on position
Install found. bolt & nut hanging at the base plate of Equip.
Check centerline & elevation of equipment
Alignment inspection of equipment
Install formwork
Grouting Foundation
Curing time
Remove formwork
Check alignment (centerline & elevation) after grouting
Tightening anchor bolt
Inspection equipment after grouting

13100

C4 X04

13100

C4 X04

13100

C4 X04

13100

C4 X04

13100

C4 X04

13100

C4 X04

13100

C4 X04

13100

C4 X04

13100

C4 X04

13100

C4 X04

13100

C4 X04

13100

C4 X04

Dial Gauge, Feeler Gauge,


Outside Micrometer,
Hammer, Screw Driver,
Elevation : 2mm
Spanner, Scissor
Locattion : 2mm
Micrometer

13100

C4 X04

13100

C4 X04

13100

C4 X04

13100

C4 X04

13100

C4 X04

Chain Block, Wire Sling


Y-level, Water level,
Spanner, Measuring Tape

13100

C4 X04

13100

C4 X04

13100

C4 X04

13100

C4 X04

13100

C4 X04

13100

C4 X04

13100

C4 X04

13100

C4 X04

13100

C4 X04

13100

C4 X04

13100

C4 X04

13100

CA X02

13100

CA X02

13100

CA X02

13100

CA X02

Elev. -3mm ~ 0mm


Location : 5mm

Elevation : 2mm
Locattion : 2mm

Elevation : 2mm
Locattion : 2mm

Dial Gauge, Feeler Gauge,


Outside Micrometer,
Hammer, Screw Driver,
Elevation : 2mm
Spanner, Scissor
Locattion : 2mm
Micrometer

RESOURCE
Mechanical
Manpower

START

FINISH

START

FINISH

NUM.

DUR.

NUM.

DUR.

Insulation

painting

Manpower

Progress (%)

Manpower
Plan

(Mandays)

(Mandays)

(Mandays)

Plan

Plan

Plan

Act

Act

Act

1
-

Painting
6.1.
6.2.
6.3.
6.4.

Preparation
Cleaning surface
Painting Work
Painting Inspection

TOTAL

Drawing No.

ACTUAL

Installation (GT 3-1 Lube Oil Cooler B)

C4
C4
C4
C4
C4
C4
C4
C4
C4
C4
C4

32

PLANNING

Installation (GT 3-1 Lube Oil Cooler A)

C4
C4
C4
C4
C4
C4
C4
C4
C4
C4
C4

20
21

1.1.
1.2.
1.3.
1.4.
1.5.
1.6.
2.

Remarks

ACTUAL

Weight

Actual
%

Weight

Preparation

C4
C4
C4
C4
C4
C4

Equipment/ Tools

MNS

WBS Code

LEVEL-6
(Activity)

LEVEL-5

F-WBS

Activity No.

LEVEL-3

PC-WBS

PLANNING

96
-

32-38111

- 1/1 -

[07/28/2015]

Das könnte Ihnen auch gefallen