Beruflich Dokumente
Kultur Dokumente
LEVEL-1
POWER BLOCK
PB
LEVEL-2
GAS TURBINE BUILDING UNIT 1 PB-2
LEVEL-3
C4 , CA
LEVEL-4 (System) GT 3-1 Lube Oil Cooler
BQ
Weight
Sheet No.
CODE
CODE
CODE
CODE
P-21
Area Code
Ton
%
PPSS-GT1-MECH-12
13100
1.
1
2
3
4
5
6
7
PB
PB
PB
PB
PB
PB
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
C4
C4
C4
C4
C4
C4
9
10
11
12
13
14
15
16
17
18
19
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
C4
C4
C4
C4
C4
C4
C4
C4
C4
C4
C4
3.
22
23
24
25
26
27
28
29
30
31
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
PB-2
C4
C4
C4
C4
C4
C4
C4
C4
C4
C4
C4
6.
33
34
35
36
PB
PB
PB
PB
PB-2
PB-2
PB-2
PB-2
CA
CA
CA
CA
CA
CA
CA
CA
2.1.
2.2.
2.3.
2.4.
2.5.
2.6.
2.7.
2.8.
2.9.
2.10.
2.11.
Equipment on position
Install found. bolt & nut hanging at the base plate of Equip.
Check centerline & elevation of equipment
Alignment inspection of equipment
Install formwork
Grouting Foundation
Curing time
Remove formwork
Check alignment (centerline & elevation) after grouting
Tightening anchor bolt
Inspection equipment after grouting
3.1.
3.2.
3.3.
3.4.
3.5.
3.6.
3.7.
3.8.
3.9.
3.10.
3.11.
Equipment on position
Install found. bolt & nut hanging at the base plate of Equip.
Check centerline & elevation of equipment
Alignment inspection of equipment
Install formwork
Grouting Foundation
Curing time
Remove formwork
Check alignment (centerline & elevation) after grouting
Tightening anchor bolt
Inspection equipment after grouting
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
C4 X04
13100
CA X02
13100
CA X02
13100
CA X02
13100
CA X02
Elevation : 2mm
Locattion : 2mm
Elevation : 2mm
Locattion : 2mm
RESOURCE
Mechanical
Manpower
START
FINISH
START
FINISH
NUM.
DUR.
NUM.
DUR.
Insulation
painting
Manpower
Progress (%)
Manpower
Plan
(Mandays)
(Mandays)
(Mandays)
Plan
Plan
Plan
Act
Act
Act
1
-
Painting
6.1.
6.2.
6.3.
6.4.
Preparation
Cleaning surface
Painting Work
Painting Inspection
TOTAL
Drawing No.
ACTUAL
C4
C4
C4
C4
C4
C4
C4
C4
C4
C4
C4
32
PLANNING
C4
C4
C4
C4
C4
C4
C4
C4
C4
C4
C4
20
21
1.1.
1.2.
1.3.
1.4.
1.5.
1.6.
2.
Remarks
ACTUAL
Weight
Actual
%
Weight
Preparation
C4
C4
C4
C4
C4
C4
Equipment/ Tools
MNS
WBS Code
LEVEL-6
(Activity)
LEVEL-5
F-WBS
Activity No.
LEVEL-3
PC-WBS
PLANNING
96
-
32-38111
- 1/1 -
[07/28/2015]