Sie sind auf Seite 1von 2

VENTILATION AND DUCTING

Job Ref: DS 150


Sewage Treatment Plant at Jabel Ali
FRESH AIR SUPPLY - FANS & DUCT SIZES

SR.
NO

Location

Duct
Fan to Hori

Supply Fans

Qty
Nos.

Flow
m3/sec

Rating

FOUL AIR EXTRACTORS

Duct
Horizontal

Remarks

Duct
Vertical

Louvres

Size
m

Length m

Material

Size
m

Length
m

Material

Size
m

Length
m

Material

Size
m

Qty
Nos.

Material

Qty
Nos.

Type

Flow
m3/sec

Roof
Opening

0.7 x 06

30.0

S.S

0.7x0.6

13

ECGI

0.6 x 0.6

4.4

ECGI

0.7 x 0.7

ECGI

Roof

1.53

500 x 500

0.7 x 06

30.0

S.S

0.7x0.6

13

ECGI

0.6 x 0.6

4.4

ECGI

0.7 x 0.7

ECGI

Roof

1.53

500 x 500

1.2 x 1.0

20

S.S

1.2 x 1.0

34

ECGI

0.6 x 0.6

4.8

ECGI

0.6 x 0.8

ECGI

Roof

6.25

915 x 915

1.2 x 0.8

34

ECGI

0.6 x 0.6

4.8

ECGI

0.6 x 0.8

ECGI

1.2 x 0.5

32.0

ECGI

0.6 x 0.6

4.8

ECGI

0.6 x 0.8

ECGI

0.8 x 0.8

ECGI

0.8 x 0.6

24

ECGI

0.8 x 0.85

ECGI

0.8 x 0.6

ECGI

0.8 x 0.6

50

ECGI

0.8 x 0.85

ECGI

1.64

8 Nos. 1.5 x 1.2 m


Louvered windows
500 x 500 provided

Kw
Aerated grit channel pump house
1A gallery No.1

4
( 2D + 2S)

2.3

Aerated grit channel pump house


1B gallary No.2

4
( 2D + 2S)

2.3

PST - Sludge pump gallery - duct


type A

4
( 2D + 2S)

6.25

PST - Sludge pump gallery - duct


type B

Aerated grit & Pre-areation blower


building

4
( 2D + 2S)

6.25

8.04

8.04

1.2 x 1.0

20

S.S

Roof

Activated sludge Air blower building

Roof

2.32

10 Nos. 2.0 x 1.5 m


Louvered Windows
710 x 710 provided

Tertiary Blower Building

Roof

3.89

4 Nos. 1.5 x 1.2 m


Louvered Windows
710 x 710 provided

Effluent pumping station building

8
( 4D + 4S)

7.36

1.2 x 1.1

40

S.S

1.0 x 0.9

56

ECGI

0.7 x 0.8

24.0

ECGI

0.8 x 1.1

16

ECGI

Roof

7.36

915 x 915

Inlet Building

12

Roof

6.67

20 Nos. 2.0 x 1.4 m


Louvered Windows
915 x 915 provided

3.8

4 Nos. 1.2 x 1.2 m


Louvered Windows
710 x 710 provided

6.08

6 Nos. 1.2 x 1.2 m


Louvered Windows
915 x 915 provided

Primary Sludge thickening Building

GBT Building

11.6

ABBREVIATIONS :

Roof

Roof

S.S :

Stainless Steel

ECGI :

EPOXY Coated
Galvanised Iron

ds150/draft final design/design data/Mechanical detail/ventillation system/ventilation ducting(R1 13-12-05).xls

07/29/2015

277845878.xls

Job Ref: DS 150


Sewage Treatment Plant at Jabel Ali
FRESH AIR SUPPLY - FANS & DUCT SIZES

SR.
NO

Location

Duct
Fan to Hori

Supply Fans

FOUL AIR EXTRACTORS

Duct
Horizontal

Remarks

Duct
Vertical

Louvres

10 UV Treatment Building

Wall

1.70

2 Nos. 1.2 x 1.0 m


Louvered Windows
584 x 584 provided

11 Boiler Building

Roof

5.28

2 Nos. 1.8 x 1.0 m


Louvered Windows
635 x 635 provided

2.7

2 Nos. 1.8 x 1.0 m


Louvered Windows
635 x 635 provided

RDT & GBT Polymer make-up &


12 Dosing room

Roof

Roof

1.5

2 Nos. 1.0 x 1.0 m


Louvered Windows
510 x 510 provided

4.25

1.0 x 0.7

10.0

S.S

0.7 x 0.7

41.0

ECGI

0.6 x 0.5

6.0

ECGI

0.6 x 0.7

ECGI

Roof

1.3

510 x 510

1.51

0.6 x 0.5

10

S.S

0.4 x 0.5

14.0

ECGI

0.6 x 0.5

2.4

ECGI

0.6 x 0.7

2.0

ECGI

Roof

0.8

405 x 405

Roof

3.36

4 Nos. 1.8 x 1.0 m


Louvered Windows
635 x 635 provided

15

Roof

3.56

12 Nos. 2 x 1.5 m
Louvered Windows
635 x 635 provided

18 Sludge cake silo storage

7.62

1.2 x 1.2

12

S.S

1.0 x 0.9

24.0

EPGI

0.8 x 0.8

4.8

ECGI

0.8 x 1.1

ECGI

Wall

2.54

625 x 625

19 Dried Sludge (Pellet) Storage Room

Roof

2.4

1 Nos. 1.0 x 1.0 m


Louvered Window
635 x 635 provided

13 Diesel Storage

14 Sludge pump house gallery

2
( 1D + 2S)

3.83

15 Centrifuge feed pumps

2
( 1D + 2S)

1.63

16 Centrifuge Room

17 Belt Dryer Building

11.65

ds150/draft final design/design data/Mechanical detail/ventillation system/ventilation ducting(R1 13-12-05).xls

07/29/2015

277845878.xls